Demand prediction method for container ship, demand prediction program for container ship, and demand prediction system for container ship

The method and system enhance container ship demand forecasting by integrating maritime cargo movement, ordering, and construction models to accurately predict demand, addressing the lack of research in existing techniques.

JP2024141622APending Publication Date: 2024-10-10PORT & AIRPORT RES INST +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
JP2023053368
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing demand forecasting techniques primarily focus on bulk carrier ships and lack sufficient research on demand forecasting for container ships.

Method used

A method and system for container ship demand forecasting that includes input value acquisition, maritime cargo movement derivation, transportation efficiency calculation, and order amount derivation, utilizing models such as maritime cargo movement, ordering, construction, and scrapped ship models to predict container ship demand with high accuracy.

Benefits of technology

Enables precise prediction of container ship demand by accurately deriving maritime cargo movement, transportation efficiency, and order amounts, improving forecasting accuracy through correction and consideration of external factors and shipyard operational status.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141622000001_ABST
    Figure 2024141622000001_ABST
Patent Text Reader

Abstract

To predict future demand for a container ship with high accuracy.SOLUTION: A demand prediction method for a container ship includes: an input value acquisition step of acquiring a container port handling amount, cargo transport distance, ship speed, port congestion rate, and a hull volume of the container ship; an ocean load movement amount derivation step of deriving an ocean load movement amount based on the container port handling amount and the cargo transport distance by applying an ocean load movement model capable of deriving the ocean load movement amount; a transport efficiency derivation step of applying an order model capable of deriving an order quantity of the container ship to derive transport efficiency based on the ocean load movement amount, and the hull volume, the ship speed, and the port congestion rate of the container ship; and an order quantity derivation step of deriving the order quantity of the container ship based on the transport efficiency and the hull volume of the container ship by applying the order model.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a demand forecasting method for container ships, a demand forecasting program for container ships, and a demand forecasting system for container ships. [Background technology]

[0002] In recent years, the demand for cargo transport by ship has been expanding, making it necessary to forecast the demand for ships and develop management strategies based on that forecast.

[0003] Non-Patent Documents 1 and 2 disclose a simulation system that forecasts ship demand using the system dynamics method, which is effective for modeling and analyzing complex systems in which various factors interact with each other. Non-Patent Document 3 provides a model that uses system dynamics to predict container volumes at ports with high accuracy. [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] Yujiro Wada, "Study on SD model for ship demand forecasting and its utilization", Doctoral thesis, Graduate School of Engineering, Hiroshima University, March 2017 [Non-Patent Document 2] Yujiro Wada et.al. “A system dynamics model for shipbuilding demand forecasting”, J Mar Sci Technol, July (2017) [Non-Patent Document 3] Ying Wang et.al. “Application and Improvement of a System Dynamics Model to Forecast the Volume of Containers”, Journal of Applied Science and Engineering, Vol. 16, No. 2, pp. 187-196 (2013) Summary of the Invention [Problem to be solved by the invention]

[0005] Conventional shipbuilding demand forecasting techniques have focused on demand forecasting for bulk carrier ships, and there has been insufficient research into demand forecasting for container ships.

[0006] An object of the present invention is to provide a demand forecasting method, a demand forecasting program, and a demand forecasting system for container ships that enable demand forecasting for container ships. [Means for solving the problem]

[0007] The container ship demand forecasting operation method of claim 1 of the present invention is a container ship demand forecasting method characterized by comprising an input value acquisition step of acquiring container port handling volume, cargo transport distance, ship speed, port congestion rate, and container ship capacity; a marine cargo movement volume derivation step of applying a marine cargo movement model capable of deriving marine cargo movement volume to derive the marine cargo movement volume based on the container port handling volume and the cargo transport distance; a transport efficiency derivation step of applying an ordering model capable of deriving an order volume for a container ship to derive transport efficiency based on the marine cargo movement volume, the container ship capacity, the ship speed, and the port congestion rate; and an order volume derivation step of applying the ordering model to derive the order volume for the container ship based on the transport efficiency and the container ship capacity.

[0008] Here, the marine cargo movement model calculates a total flow volume from the container port handling volume based on (Equation 1), and calculates the marine cargo movement volume by multiplying the total flow volume by the cargo transport distance based on (Equation 2).

number

[0009] In addition, the transportation efficiency in the ordering model is calculated by selecting (Formula 3) or (Formula 4) according to the port congestion rate based on the marine cargo movement volume and the container ship capacity.

number

[0010] It is also preferable to derive the order volume of the container ship based on a relational expression between the transport efficiency obtained in advance and the ratio between the order volume of the container ship and the shipping capacity of the container ship.

[0011] It is also preferable to have an order quantity correction step of acquiring an external factor order quantity in the input value acquisition step, and correcting the order quantity for the container ship derived in the order quantity derivation step in accordance with the external factor order quantity.

[0012] It is also preferable to have a size-by-size order quantity derivation step in which the input value acquisition step acquires an order ratio by size of the container ship, and further derives a size-by-size order quantity based on the size-by-size order ratio and the order quantity of the container ship derived in the order quantity derivation step.

[0013] It is also preferable to have a completion quantity derivation step in which a construction model capable of deriving a completion quantity based on the order quantity by size is applied to derive the completion quantity by size based on the on-hand construction quantity by size acquired in the input value acquisition step, and further the completion quantity is derived by adding up the completion quantities by size.

[0014] It is also preferable that the construction model constructs the relationship between the on-hand construction volume and the completed volume, taking into account the completed volume depending on the operational status of the shipyard, changes due to time delays, and differences in the construction capacity of the container ships between countries.

[0015] It is also preferable to derive the size-specific completion volume based on a predetermined relationship between the on-hand construction volume and the completion volume by size.

[0016] It is also preferable to correct the shipping capacity of the container ship based on the completed volume.

[0017] It is also preferable to correct the on-hand construction volume based on the completed construction volume.

[0018] It is also preferable to have a scrapped ship volume derivation step that uses a scrapped ship model that can derive the scrapped ship volume based on the transport efficiency, and applies the transport efficiency derived in the transport efficiency derivation step to the relationship between the transport efficiency, the scrapped ship volume, and the container ship tonnage ratio to derive the scrapped ship volume.

[0019] The container ship demand forecasting operation program of claim 13 of the present invention is a program for forecasting demand for container ships, which is characterized in that it incorporates the above-mentioned marine cargo movement model and order model into a computer, executes an input value acquisition step, a marine cargo movement volume deriving step, a transport efficiency deriving step, and an order volume deriving step, and outputs the derivation results.

[0020] Here, it is preferable to cause the computer to obtain an external factor order amount and execute an order amount correction step.

[0021] It is also preferable to have the computer acquire the size-specific order ratios of container ships, execute a size-specific order quantity derivation step, and output the derivation results.

[0022] It is also preferable to have the computer execute a construction model acquisition step and a completion volume derivation step, and output the derivation results.

[0023] It is also preferable to have the computer execute the scrapped ship model acquisition step and the scrapped ship volume derivation step, and output the derivation results.

[0024] A system for predicting container ship demand according to claim 18 of the present invention, comprising a condition input means, a result output means for outputting a derived result, and a computer, executes the above-mentioned container ship demand forecasting method in accordance with conditions including input values ​​input by the condition input means, and outputs the derived result from the result output means.

[0025] Here, it is preferable that the computer is connected to the condition input means and the result output means using an information and communication network, and executes the above-mentioned container ship demand forecasting method according to conditions including input values ​​input by the condition input means.

[0026] It is also preferable that the output contents of the derivation result of the result output means be selectable in accordance with an input to the condition input means. Effect of the Invention

[0027] The container ship demand forecasting operation method according to claim 1 of the present invention comprises an input value acquisition step of acquiring container port handling volume, cargo transport distance, ship speed, port congestion rate, and container ship capacity, a marine cargo movement volume derivation step of applying a marine cargo movement model capable of deriving marine cargo movement volume to derive the marine cargo movement volume based on the container port handling volume and the cargo transport distance, a transport efficiency derivation step of applying an ordering model capable of deriving an order volume for a container ship to derive transport efficiency based on the marine cargo movement volume, the container ship capacity, the ship speed, and the port congestion rate, and an order volume derivation step of applying the ordering model to derive the order volume for the container ship based on the transport efficiency and the container ship capacity, thereby making it possible to predict future demand for container ships with high accuracy.

[0028] Here, the marine cargo movement model calculates a total flow volume from the container port handling volume based on (Equation 1), and calculates the marine cargo movement volume by multiplying the total flow volume by the cargo transport distance based on (Equation 2).

number

[0029] The transportation efficiency in the ordering model is calculated by selecting (Formula 3) or (Formula 4) according to the port congestion rate based on the marine cargo movement volume and the container ship capacity.

number

[0030] Furthermore, by deriving the order volume of the container ship based on the relational equation between the previously determined transport efficiency and the ratio between the order volume of the container ship and the tonnage of the container ship, the order volume of the container ship can be derived with high accuracy using the transport efficiency of the container ship, thereby improving the accuracy of demand forecasts for container ships.

[0031] In addition, by having an order quantity correction step of acquiring an external factor order quantity in the input value acquisition step and correcting the order quantity for the container ship derived in the order quantity derivation step in accordance with the external factor order quantity, the order quantity for the container ship can be derived with higher accuracy, and the accuracy of demand forecast for container ships can be improved.

[0032] Furthermore, by acquiring the order ratio by size of the container ship in the input value acquisition step, and further deriving size-specific order quantities based on the size-specific order ratios and the order quantities of the container ships derived in the order quantity derivation step, the order quantities for each container ship size can be derived with high accuracy, and the accuracy of demand forecasts for container ships can be improved using the order quantities for each container ship size.

[0033] In addition, by applying a construction model that can derive the completion volume based on the order volume by size, deriving the completion volume by size based on the on-hand construction volume by size acquired in the input value acquisition step, and further having a completion volume derivation step that adds up the completion volumes by size to derive the completion volume, the completion volume for each container ship size can be derived with high accuracy, and the accuracy of demand forecasts for container ships can be improved using the completion volumes of container ships.

[0034] In addition, the construction model constructs the relationship between the on-hand construction volume and the completed volume, taking into account the completed volume depending on the operating status of the shipyard, changes due to time delays, and differences in the construction capacity of the container ships between countries, so that the completed volume of container ships for each ship size can be derived with greater accuracy, and the completed volume of container ships can be used to improve the accuracy of demand forecasts for container ships.

[0035] In addition, by deriving the completion volume by size based on the relationship between the on-hand construction volume and the completion volume by predetermined size, the completion volume for each container ship size can be derived with greater accuracy, and the completion volume of container ships can be used to improve the accuracy of demand forecasts for container ships.

[0036] In addition, by correcting the container ship's shipping capacity based on the completed volume, the container ship's shipping capacity can be corrected with high accuracy, and the corrected container ship's shipping capacity can be used to improve the accuracy of container ship demand forecasts.

[0037] In addition, by revising the on-hand work volume based on the completed volume, the on-hand work volume of the container ship can be revised with high accuracy, and the accuracy of demand forecasts for container ships can be improved using the revised on-hand work volume of the container ship.

[0038] In addition, by using a scrapped ship model capable of deriving the amount of scrapped ships based on the transportation efficiency, and by applying the transportation efficiency derived in the transportation efficiency derivation step to the relationship between the ratio of the transportation efficiency, the amount of scrapped ships and the container ship tonnage to derive the amount of scrapped ships, the amount of scrapped container ships can be derived with high accuracy, and the accuracy of demand forecasts for container ships can be improved using the amount of scrapped container ships.

[0039] The container ship demand forecasting operation program of claim 13 of the present invention is a program for forecasting demand for container ships, which incorporates the above-mentioned marine cargo movement model and ordering model into a computer, executes an input value acquisition step, a marine cargo movement volume deriving step, a transport efficiency deriving step, and an order volume deriving step, and outputs the derivation results, thereby making it possible to predict future demand for container ships with high accuracy.

[0040] Here, by having the computer acquire the external factor order quantity and execute the order quantity correction step, the order quantity for the container ship can be derived with higher accuracy, and the accuracy of the demand forecast for the container ship can be improved.

[0041] Furthermore, by having the computer obtain the order ratios by size of container ships, execute a size-by-size order quantity derivation step, and output the derivation results, the order quantities for each container ship size can be derived with high accuracy, and the order quantities for each container ship size can be used to improve the accuracy of demand forecasts for container ships.

[0042] In addition, by having the computer execute a construction model acquisition step and a completion volume derivation step and output the derivation results, the completion volume of each container ship size can be derived with high accuracy, and the completion volume of container ships can be used to improve the accuracy of demand forecasts for container ships.

[0043] Furthermore, by having the computer execute a scrapped ship model acquisition step and a scrapped ship volume derivation step and outputting the derivation results, the scrapped container ship volume can be derived with high accuracy, and the accuracy of container ship demand forecasts can be improved using the scrapped container ship volume.

[0044] A system for predicting container ship demand according to claim 18 of the present invention comprises a condition input means, a result output means for outputting derived results, and a computer, and executes the above-mentioned container ship demand forecasting method in accordance with conditions including input values ​​input by the condition input means, and outputs the derived results from the result output means, thereby making it possible to input necessary information and present to a user container ship demand predicted with high accuracy using the input information.

[0045] Here, the computer is connected to the condition input means and the result output means via an information and communication network, and executes the above-mentioned container ship demand forecasting method according to conditions including input values ​​input by the condition input means, thereby inputting necessary information from a remote location via the information and communication network, and presenting to a user the demand for container ships predicted with high accuracy using the input information.

[0046] Furthermore, the output contents of the derivation results of the result output means can be selected according to the input to the condition input means, so that the output contents can be selected according to the information required by the user. [Brief description of the drawings]

[0047] [Figure 1] 1 is a diagram showing a configuration of a demand forecasting system for container ships in an embodiment of the present invention. FIG. [Diagram 2] FIG. 2 is a diagram showing a configuration of a server according to an embodiment of the present invention. [Diagram 3] 1 is a diagram showing a configuration of a demand forecasting system for container ships in an embodiment of the present invention. FIG. [Figure 4] 1 is a flowchart showing a demand forecasting method for container ships in an embodiment of the present invention. [Diagram 5] FIG. 11 is a diagram showing the relationship between transportation efficiency and order quantity applied to the ordering model in the embodiment of the present invention. [Figure 6] A figure showing the relationship between the on-hand construction volume and the completed construction volume applied to the construction model in an embodiment of the present invention. [Figure 7] FIG. 13 is a diagram showing the relationship between transportation efficiency and the amount of scrapped ships applied to the scrapped ship model in the embodiment of the present invention. [Figure 8] FIG. 1 is a diagram showing the relationship between charter fees and scrapping correction amounts in an embodiment of the present invention. [Figure 9] FIG. 11 is a diagram showing a simulation result according to an embodiment of the present invention. [Figure 10] FIG. 11 is a diagram showing a simulation result according to an embodiment of the present invention. [Figure 11] FIG. 4 is a diagram showing simulation conditions in the embodiment of the present invention. [Figure 12] FIG. 11 is a diagram showing a simulation result according to an embodiment of the present invention. [Figure 13] FIG. 4 is a diagram showing simulation conditions in the embodiment of the present invention. [Figure 14] FIG. 11 is a diagram showing a simulation result according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0048] A container ship demand forecasting system 100 according to an embodiment of the present invention includes a server 102, a database 104, and user terminals 106 (106a, 106b), as shown in Fig. 1. The server 102, the database 104, and the user terminals 106 (106a, 106b) are connected to each other so as to enable information exchange via an information and communication network 108. The information and communication network 108 may be wired or wireless, and is, for example, a public line such as the Internet.

[0049] In the container ship demand forecasting system 100, upon receiving condition input from a condition input means of a user terminal 106 (106a, 106b), a container ship demand forecasting process is executed in a server 102 based on various information stored in a database 104. The processing results obtained in the server 102 are transmitted to the user terminal 106 (106a, 106b), and the processing results are output by a result output means.

[0050] The server 102 provides a service of predicting demand for container ships. The server 102 is installed in, for example, a service organization that predicts demand for container ships. The server 102 is realized by a computer 200.

[0051] As shown in FIG. 2, the computer 200 includes a processing unit 30, a storage unit 32, an input unit 34, an output unit 36, and a communication providing unit 38. The processing unit 30 includes a means for performing arithmetic processing, such as a CPU. The processing unit 30 performs demand forecast processing for container ships by executing a demand forecast program for container ships stored in the storage unit 32. The storage unit 32 includes storage means, such as a semiconductor memory and a hard disk. The storage unit 32 is connected to the processing unit 30 so as to be accessible, and stores the demand forecast program for container ships and various information required for the demand forecast processing for container ships. The demand forecast program for container ships may also include various models, such as a marine cargo movement model and an order model, required for the demand forecast of container ships. In addition, a program including various models, such as a marine cargo movement model and an order model, may be prepared as a separate program, stored in advance in the storage unit 32 of the computer 200, and incorporated, and may be read out as necessary and used to derive the order volume, completion volume, etc. of container ships. In this case, even if it is a separate program, it is interpreted as being included in the demand forecast program for container ships. The input means 34 includes a means for inputting information to the computer 200. The input means 34 includes, for example, a keyboard or the like for receiving input from a user. The output means 36 includes a means for outputting information from the computer 200. The output means 36 includes, for example, a means for outputting a processing result in the computer 200, such as a user interface screen (UI). The output means 36 includes, for example, a display for presenting an image to the user. The communication providing means 38 is configured to include an interface for exchanging information with the database 104 and the user terminals 106 (106a, 106b) and other information and communication devices via the information and communication network 108. Communication by the communication providing means 38 may be wired or wireless.

[0052] The computer 200 executes a demand forecasting program for container ships to perform demand forecasting processing for container ships, which will be described later. As a result, the computer 200 functions as an input value acquisition unit 10, a marine cargo movement volume derivation unit 12, a transport efficiency derivation unit 14, an order volume derivation unit 16, an order volume correction unit 18, a size-specific order volume derivation unit 20, a size-specific completion volume derivation unit 22, a completion volume derivation unit 24, and a scrapped ship volume derivation unit 26.

[0053] The database 104 is a database that stores information necessary for container ship demand forecasting in the container ship demand forecasting system 100. Information necessary for container ship demand forecasting includes container port handling volume, cargo transport distance, ship speed, order ratio by ship size, port congestion rate, order volume due to external factors, charter fee, on-hand construction volume by ship size, ship capacity, etc. The database 104 is accessed by the server 102 via the information and communication network 108, and transmits the stored information to the server 102 as necessary.

[0054] The user terminal 106 (106a, 106b) is a terminal for inputting and transmitting information for performing demand forecast processing for container ships to the server 102. The user terminal 106 (106a, 106b) may be a general computer. A user who wishes to perform demand forecasting for container ships inputs conditions for performing demand forecast processing for container ships using a condition input means provided in the user terminal 106 (106a, 106b). When the user terminal 106 (106a, 106b) accepts the input of the conditions, it transmits the conditions to the server 102 via the information and communication network 108. When the server 102 receives the conditions, it performs demand forecast processing for container ships according to the conditions, and transmits the processing results to the user terminal 106 (106a, 106b) via the information and communication network 108. When the user terminal 106 (106a, 106b) receives the processing results, it presents the processing results to the user using a result output means. The output contents of the derived result by the result output means may be selectable according to the input to the condition input means.

[0055] In this embodiment, an example is shown in which the user terminal 106a is installed in company A, which performs demand forecasting for container ships, and the user terminal 106b is installed in company B, which performs demand forecasting for container ships.

[0056] 3, the container ship demand forecasting system 100 may be configured such that the server 102 also functions as the database 104 and the user terminal 106 (106a, 106b). In this configuration, conditions and information are directly input to the computer 200 by the input means 34, and the processing results are directly output by the output means 36. In this case, the database 104 can also be connected via an information and communication network 108.

[0057] Hereinafter, the method for predicting demand for container ships in the container ship demand prediction system 100 will be described with reference to the flowchart of Fig. 4. The container ship demand prediction system 100 of this embodiment uses a marine cargo movement model, an ordering model, a construction model, and a scrapped ship model that have been constructed in advance, and predicts future demand for container ships by combining these models. Specifically, conditions such as container port handling volume, cargo transport distance, ship speed, order ratio by ship size, port congestion rate, external factor order volume, charter fee, on-hand construction volume by ship size, and ship capacity are applied to the marine cargo movement model, ordering model, construction model, and scrapped ship model as input values ​​to predict future demand such as order volume, scrapped ship volume, completed ship volume, ship capacity, and on-hand construction volume for container ships.

[0058] In steps S10 to S16, the server 102 acquires a marine cargo movement model, an ordering model, a construction model, and a scrapped ship model that have been previously constructed. The marine cargo movement model is a model for deriving the marine cargo movement volume from the container port handling volume, the cargo transport distance, and the like. The ordering model is a model for calculating the transport efficiency from the marine cargo movement volume, the ship volume, the ship speed, and the port congestion rate, and deriving the order volume of the container ship from the transport efficiency. The ordering model is also applied to a process for correcting the derived order volume of the container ship based on the external factor order volume. The ordering model is also applied to a process for further deriving the size-specific order volume based on the size-specific order ratio for the derived order volume of the container ship. The construction model is a model for deriving the completed volume of the container ship from the on-hand construction volume and the order volume derived by the ordering model. The construction model is also applied to a process for deriving the size-specific completed volume of the container ship based on the on-hand construction volume by size and the size-specific order volume derived by the ordering model. The scrapped ship model is a model that calculates transport efficiency from the marine cargo movement volume, ship volume, ship speed, and port congestion rate, and derives the amount of scrapped container ships from the transport efficiency. The scrapped ship model is also applied to a process of correcting the derived amount of scrapped ships based on the charter rate of the container ship. The marine cargo movement model, the ordering model, the construction model, and the scrapped ship model will be described in detail in steps S20 to S34.

[0059] In addition, the maritime cargo movement model, the ordering model, the construction model, and the scrapped ship model can also be constructed as a series of steps using the server 102.

[0060] The acquired or constructed marine cargo movement model, ordering model, construction model, and scrapped ship model are stored in the storage unit 32 of the computer 200 constituting the server 102. When performing demand forecasting processing for container ships, the server 102 reads out these models from the storage unit 32 and applies them, thereby functioning as the marine cargo movement volume derivation unit 12, the transport efficiency derivation unit 14, the order volume derivation unit 16, the order volume correction unit 18, the size-specific order volume derivation unit 20, the size-specific completion volume derivation unit 22, the completion volume derivation unit 24, and the scrapped ship volume derivation unit 26.

[0061] In step S18, a process of acquiring input values ​​of processing conditions required for the processes in steps S20 to S34 is performed. The process in this step causes the server 102 to function as the input value acquisition unit 10. The server 102 is connected to the database 104 or the user terminal 106 via the information communication network 108, and acquires information required for demand forecast processing for container ships. The information required for demand forecast processing for container ships includes container port handling volume, cargo transport distance, ship speed, order ratio by ship size, port congestion rate, external factor order volume, charter fee, on-hand construction volume by ship size, ship capacity, etc. The information required for demand forecast processing for container ships may be stored in the database 104 in advance, or may be input by the user through the condition input means of the user terminal 106.

[0062] In steps S20 to S34, the demand forecast process for container ships is performed by applying the marine cargo movement model, the order model, the construction model, and the scrapped ship model. The demand forecast process for container ships is repeatedly performed at time intervals of the internal time t of the simulation.

[0063] In step S20, a process of deriving the marine cargo movement volume is performed. Through the process in this step, the server 102 functions as the marine cargo movement volume deriving unit 12. The server 102 calculates the marine cargo movement volume of container cargo based on the container port handling volume and the cargo transport distance.

[0064] First, the server 102 calculates the container port handling volume CPHV using (Equation 1). t Based on the total flow volume TFV t Furthermore, the total flow volume TFV is calculated using (Equation 2). t and cargo transport distance TD t Based on the ocean freight volume OCV t Hereinafter, the subscript t of each quantity indicates the internal time t of the simulation.

number

[0065] In step S22, a process of deriving the transport efficiency is performed. Through the process in this step, the server 102 functions as the transport efficiency derivation unit 14. The server 102 derives the transport efficiency of the container ship by applying the ship speed, port congestion rate, and shipping capacity acquired in step S18 and the marine cargo movement volume derived in step S20 to the ordering model. The transport efficiency is an index that indicates the tightness of the market conditions for container ships.

[0066] The server 102 calculates the ocean cargo movement volume OCV using (Equation 3) or (Equation 4). t , container ship capacity V t , ship speed S t and port congestion rate ConR t Based on the transport efficiency TE t In this case, the port congestion rate ConR t Depending on the value of , select either (Equation 3) or (Equation 4). t If is greater than 100, apply (Equation 3) and calculate the port congestion rate ConR t If is less than 100, apply (Formula 4). t is the non-dimensionalized result of dividing the offshore vessel volume at the internal time t of the simulation by the total vessel volume in the world. t It is preferable to apply a value corrected based on the completed volume of container ships derived by processing using a construction model described below.

number

[0067] In step S24, a process of deriving an order volume for a container ship is performed. Through the process in this step, the server 102 functions as the order volume derivation unit 16. The server 102 derives the order volume for a container ship by applying the transport efficiency derived in step S22 to the ordering model. The order volume for a container ship can be derived from the relationship between the transport efficiency and the order volume for a container ship. In other words, the relationship between the transport efficiency and the order volume for a container ship is applied to the ordering model.

[0068] Figure 5 is a diagram showing the relationship between transport efficiency and container ship order volume from 2007 to 2017. However, Figure 5 excludes data for 2008, 2012, 2014, and 2015, when external factors were significant. As shown in Figure 5, the relationship between transport efficiency and container ship order volume (shown as order volume / ship capacity in Figure 5) is expressed by a predetermined relational formula for each range of transport efficiency.

[0069] In step S26, a process of correcting the order volume of the container ship is performed. Through the process in this step, the server 102 functions as the order volume correcting unit 18. The server 102 corrects the order volume O of the container ship derived in step S24 according to the external factor order volume acquired in step S18. t Specifically, the external factor order amount O out The order quantity O of the container ship derived in step S24 t Add to this the order volume of container ships O t However, the container ship order volume O according to the external factor order volume is corrected. t The correction process is not limited to this, and may be any process that makes a correction taking into account the order volume of container ships based on external factors that were not taken into account in the relationship between transportation efficiency and order volume of container ships.

[0070] In step S28, a process of deriving the size-specific order quantity of the container ship is performed. Through the process in this step, the server 102 functions as the size-specific order quantity deriving unit 20. The server 102 derives the size-specific order quantity O of the container ship corrected in step S26. t The order quantity for each container ship size is derived by multiplying the order quantity by the order ratio by ship size acquired in step S18. Ship sizes are classified into, for example, less than 3000 TEU, between 300 TEU and 12000 TEU, and 12000 TEU or more. Then, the order ratio is acquired for each ship size, and the order quantity O of the container ship corrected by the order ratio is calculated. tThe order volume by size for each ship size can be derived by multiplying by . The order ratio by ship size may be set based on statistical data of the order ratio of container ships in the past, or may be set by the user as appropriate.

[0071] In step S30, a process is performed to derive the size-specific completion volume of the container ship. Through the process in this step, the server 102 functions as the size-specific completion volume derivation unit 22. The server 102 derives the size-specific completion volume of the container ship by applying the on-hand construction volume by ship size acquired in step S18 to the construction model. The construction model is a model that establishes the relationship between the on-hand construction volume and the completion volume, taking into account the completion volume depending on the operation status of the shipyard, changes due to time delays, and differences in container ship construction capacity between countries.

[0072] Figure 6 shows the relationship between the on-hand construction volume and the completed construction volume for container ships with ship sizes of less than 3000 TEU, between 3000 TEU and 12000 TEU, and over 12000 TEU, obtained from past statistics. For ships with sizes of less than 3000 TEU, the completed construction volume y = 2.9 x 10 -2 x On-hand construction volume x. If the ship size is between 3000 TEU and 12000 TEU, the on-hand construction volume is 2000 x 10 3 If it is less than TEU, the completed volume y = 3.3 x 10 -2 × Work in hand x, where the work in hand is 2000 x 10 3 If the capacity is more than TEU, the completed capacity y = 2.4 × 10 -2 × On-hand construction volume x. If the ship size is 12,000 TEU or more, the on-hand construction volume is 2,000 x 10 3 If it is less than TEU, the completed volume y = 2.6 x 10 -2 × Work in hand x, where the work in hand is 2000 x 10 3 If the capacity is more than TEU, the completed capacity y = 3.0 x 10 -2 x the amount of work in hand x. Based on this formula, the amount of work completed corresponding to the amount of work in hand can be calculated. Note that the size of container ships is not limited to these classifications.

[0073] At this time, the amount of completed container ships by size increases or decreases with a time lag relative to the amount of on-hand work by size of container ships, so it is preferable to reflect the amount of on-hand work by size of container ships in the amount of completed container ships by size according to the time lag. For example, it is preferable to set the time lag to 9 months.

[0074] In step S32, a process is performed to derive the completed volume of the container ship. Through the process in this step, the server 102 functions as the completed volume deriving unit 24. The server 102 calculates the total completed volume of the container ship based on the completed volumes by ship size derived in step S30. For example, the server 102 derives the total completed volume of the container ship by adding up the completed volumes for each ship size of less than 3,000 TEU, between 300 TEU and 12,000 TEU, and 12,000 TEU or more.

[0075] In step S34, a process is performed to derive the amount of scrapped container ships. Through the process in this step, the server 102 functions as the scrapped ship amount deriving unit 26. The server 102 derives the amount of scrapped container ships by applying the transport efficiency derived in step S22 to the scrapped ship model. In the scrapped ship model, the relationship between the transport efficiency and the amount of scrapped container ships is applied, similar to the ordering model.

[0076] Figure 7 is a diagram showing the relationship between transport efficiency and the amount of scrapped container ships from 2007 to 2017. However, in Figure 7, data from 2012 to 2014 and 2016, when external factors were significant, are excluded. From the relationship shown in Figure 7, the relationship between transport efficiency and the amount of scrapped container ships (shown as order volume / ship capacity in Figure 7) can be expressed by a linear regression equation. That is, in the example of Figure 7, the transport efficiency TE t When the distance is less than 11,000 miles, the amount of scrapped ships is Sc_TE t Sc t =(-1.0×10 -6 TE t +1.0×10 -2 ) x tonnage V t The transport efficiency is calculated as TE tWhen the distance is more than 11,000 miles, Sc_TE t =(-2.9×10 -7 TE t +3.3×10 -3 ) x tonnage V t It is calculated as follows.

[0077] In addition, the container ship capacity V t is the amount of container ships scrapped with a time lag Sc_TE t Therefore, the container ship capacity V t The amount of scrapped container ships is Sc_TE t It is preferable to reflect this in the

[0078] In addition, it is preferable to correct the amount of scrapped ships according to the charter rate of container ships. In other words, when the market is not tight and the charter rate is low, additional container ships are scrapped. Therefore, the scrapping correction amount Sc_Tc according to the charter rate FR is t The amount of scrapped ships is Sc_TE t In addition, the amount of scrapped ships is Sc t = Amount of scrapped ships Sc_TE t +Decommissioned ship correction amount Sc_Tc t Figure 8 shows the scrapping correction amount Sc_Tc for the accumulated difference in charter fees (difference from index=48) from the point when the charter fees fell below index=48. t (difference in the amount of abandoned ships) t The corrected amount of scrapped ships, Sc t can be calculated.

[0079] In step S36, the shipping capacity of the container ship is corrected. The container ship is completed with a time delay after being added to the on-hand construction volume, and is added to the shipping capacity upon completion. Therefore, it is preferable to correct the shipping capacity acquired in step S18 based on the total completed capacity of the container ship.

[0080] In step S38, the on-hand work volume of the container ship is corrected. The on-hand work volume of the container ship decreases according to the completed volume of the container ship. Therefore, it is preferable to correct the on-hand work volume of the container ship according to the completed volume of the container ship. For example, the on-hand work volume of the container ship for each size is corrected according to the completed volume of the container ship for each size. The on-hand work volume of the container ship may be corrected based on the size-specific order volume of the container ship derived in step S28. In this case, the on-hand work volume of the container ship increases or decreases with a time delay relative to the size-specific order volume of the container ship, so it is preferable to reflect the size-specific order volume of the container ship in the on-hand work volume of the container ship according to the time delay.

[0081] In step S40, it is determined whether the demand forecasting process has been completed for the entire period for which the demand forecast for the container ship is performed. If the demand forecasting process has been completed for the entire period for which the demand forecast for the container ship is performed, the demand forecasting process is terminated. If not, the internal time t of the simulation is advanced by a predetermined step time, and the process is returned to step S20, and the demand forecasting process for the next internal time t is repeated.

[0082] Through the above processing, the order volume, on-hand construction volume, completed construction volume, ship tonnage, and scrapped ship volume of container ships are derived with respect to the demand forecast for container ships in the container ship demand forecast system 100. The server 102 stores information on these volumes in the memory unit 32, and also transmits and stores the information in the database 104 via the information and communication network 108. The server 102 also transmits the information to the user terminal 106 via the information and communication network 108. The user terminal 106 uses a result output means to present to the user information on the order volume, on-hand construction volume, completed construction volume, ship tonnage, scrapped ship volume, marine cargo movement volume, transport efficiency, and the like, with respect to the demand forecast for container ships.

[0083] [Example] An embodiment in which a simulation was performed to predict demand for container ships using the container ship demand prediction system 100 will be described below.

[0084] In the simulation, first, for the simulation period from 2007 to 2017, the port handling volume of container ships, cargo transport distance, ship speed, order ratio by ship size, port congestion rate, order volume due to external factors, and actual values ​​of charter fees were input, and processing was performed to predict the order volume, scrapped ship volume, completed ship volume, ship volume, and on-hand construction volume of container ships at monthly intervals. A model to be used in the container ship demand forecasting system 100 was developed by this prediction processing.

[0085] Figure 9 shows the changes over time in the order volume, completion volume, shipping capacity, and scrapped volume of container ships derived from simulations at the time of model development. In Figure 9, the dashed line shows the actual values, the thick solid line shows the simulation results (with correction for charter fees), and the thin solid line shows the simulation results (without correction for charter volumes). As shown in Figure 9, the model was constructed so that the simulation results for the order volume, completion volume, shipping capacity, and scrapped volume of container ships match the actual values.

[0086] Next, in order to confirm the validity of the developed model, a simulation was conducted at monthly intervals for the period from 2018 to 2021, which is outside the model development period mentioned above, using actual values ​​for container ship port handling volume, cargo transport distance, ship speed, order ratio by ship size, port congestion rate, external factor order volume, and charter fees as inputs, and simulating container ship order volume, scrapped ship volume, completed ship volume, ship tonnage, and on-hand construction volume.

[0087] FIG. 10 shows the change over time in the order volume, completion volume, shipping capacity, and scrapped volume of container ships derived from the simulation. In FIG. 10, the dotted line shows the actual values, the solid line shows the simulation results (with correction based on port congestion rate), and the dashed line shows the simulation results (without correction based on port congestion rate). As shown in FIG. 10, the results of a simulation of the order volume, completion volume, shipping capacity, and scrapped volume of container ships outside the model development period of 2018 to 2021 by applying a model constructed using actual values ​​within the model development period of 2007 to 2017 were almost consistent with the actual values. This confirmed that the constructed model was valid.

[0088] Next, a future simulation was performed using the container ship demand forecasting system 100 to examine future trends in demand for container shipbuilding. The simulation period was from 2022 to 2040. Figure 11 shows the simulation conditions. In Case 1 (Case 1), the container port handling volume increases at an annual growth rate of 1.99%, the cargo transport distance decreases by 1.245 miles per month, the ship speed is index = 75, the port congestion rate converges in 2023 with 2016 as 100, the order ratio by ship size is 14.4% for less than 3000 TEU, 12.3% for 3000 TEU to 12000 TEU, and 73.3% for 12000 TEU or more, and the charter rate recovers to exceed index = 48 in 2025 with 1993 as 100. In Case 2, the container port handling volume increases at an annual growth rate of 3.28%, and other conditions are the same as in Case 1. In addition, it is assumed that 20,833 TEU of ships are scrapped every month due to the EEXI regulations.

[0089] Figure 12 shows the results of a future prediction of the order volume of container ships under the simulation conditions shown in Figure 11. In Figure 12, the solid line shows the simulation results for Case 1 (Case 1), and the dashed line shows the simulation results for Case 2 (Case 2). As shown in Figure 12, the prediction results show that the order volume of container ships will be sluggish from 2023 to 2032 in Case 1 (Case 1), and that the order volume of container ships will be sluggish from 2023 to 2028 in Case 2 (Case 2).

[0090] In addition, a future simulation was performed using the container ship demand forecasting system 100 to examine future trends in demand for container shipbuilding. The simulation period was from 2022 to 2040. FIG. 13 shows the simulation conditions. In Case 1 (Case 1) to Case 3 (Case 3), the container port handling volume increased at an annual growth rate of 3.28%, the cargo transport distance decreased by 1.245 miles per month, the ship speed was index = 75, the port congestion rate was set to 100 in 2016 and converged in 2023, the order ratio by ship size was 14.4% for less than 3000 TEU, 12.3% for 3000 TEU to 12000 TEU, and 73.3% for 12000 TEU or more, and the charter rate was set to 100 in 1993 and recovered to exceed index = 48 in 2025. In addition to the mandatory scrapping due to EEXI regulations, there are cases in which additional ships will be scrapped due to environmental regulations in international shipping. In Case 1, there are no additional scrappings, in Case 2, an additional 20,833 TEU will be scrapped each month, and in Case 3, an additional 40,263 TEU will be scrapped each month.

[0091] Figure 14 shows the results of a future prediction of container ship order volumes under the simulation conditions shown in Figure 13. In Figure 14, the solid line shows the simulation results for Case 1 (Case 1), the dashed line shows Case 2 (Case 2), and the dashed and dotted line shows Case 3 (Case 3). As shown in Case 3 (Case 3), the prediction result was that by proceeding with additional scrapping, order volumes are expected to recover from 2025, but that order volumes will stagnate from 2032 onwards. In contrast, in Case 2 (Case 2), the prediction result was that by maintaining an appropriate amount of additional scrapping, order volumes will recover from 2026 and any subsequent decline in order volumes can be curbed. [Industrial Applicability]

[0092] The present invention can be used to forecast demand for container ships. However, the scope of application of the present invention is not limited to demand forecast for container ships, and can also be applied to demand forecast for other types of ships. [Explanation of symbols]

[0093] 10 input value acquisition unit, 12 maritime cargo movement volume derivation unit, 14 transport efficiency derivation unit, 16 order volume derivation unit, 18 order volume correction unit, 20 size-by-size order volume derivation unit, 22 size-by-size completion volume derivation unit, 24 completion volume derivation unit, 26 scrapped ship volume derivation unit, 30 processing unit, 32 memory unit, 34 input means, 36 output means, 38 communication providing means, 100 demand forecasting system, 102 server, 104 database, 106 (106a, 106b) user terminal, 108 information and communication network, 200 computer.

Claims

1. 1. A method for forecasting demand for container ships, comprising: An input value acquisition step for acquiring the container port handling volume, the cargo transport distance, the ship speed, the port congestion rate, and the container ship capacity; a maritime cargo movement amount deriving step of deriving the maritime cargo movement amount based on the container port handling amount and the cargo transport distance by applying a maritime cargo movement model capable of deriving the maritime cargo movement amount; a transport efficiency deriving step of deriving transport efficiency based on the marine cargo movement volume, the container ship capacity, the ship speed, and the port congestion rate by applying an ordering model capable of deriving an order volume of a container ship; and an order quantity derivation step of applying the ordering model to derive an order quantity for the container ship based on the transportation efficiency and the shipping capacity of the container ship.

2. The method for forecasting demand for container ships according to claim 1, The maritime cargo movement model is Calculate the total flow volume from the container port handling volume based on (Equation 1); The total flow volume is multiplied by the cargo transport distance based on (Equation 2) to obtain the marine cargo movement volume. [0010] A method for forecasting demand for container ships, comprising:

3. The method for forecasting demand for container ships according to claim 1, The transportation efficiency in the ordering model is calculated by selecting (Formula 3) or (Formula 4) according to the port congestion rate based on the marine cargo movement volume and the container ship capacity. [0025] A method for forecasting demand for container ships, comprising:

4. The method for forecasting demand for container ships according to claim 1, A method for predicting demand for container ships, comprising deriving the order volume of the container ship based on a relational equation between the transport efficiency obtained in advance and the ratio of the order volume of the container ship to the shipping capacity of the container ship.

5. The method for forecasting demand for container ships according to claim 1, In the input value acquisition step, an external factor order amount is acquired, A demand forecasting method for container ships, comprising an order quantity correction step of correcting the order quantity for the container ship derived in the order quantity derivation step in accordance with the external factor order quantity.

6. The method for forecasting demand for container ships according to claim 1, In the input value acquisition step, an order ratio by size of the container ship is acquired, A demand forecasting method for container ships, comprising a size-by-size order quantity derivation step of further deriving size-by-size order quantities based on the size-by-size order ratios and the order quantities of the container ships derived in the order quantity derivation step.

7. The method for forecasting demand for container ships according to claim 6, A demand forecasting method for container ships, characterized by having a completion volume derivation step of applying a construction model capable of deriving a completion volume based on the order volume by size, deriving the completion volume by size based on the on-hand construction volume by size acquired in the input value acquisition step, and further comprising a completion volume derivation step of adding up the completion volumes by size to derive the completion volume.

8. The method for forecasting demand for container ships according to claim 7, A method for forecasting demand for container ships, characterized in that the construction model constructs a relationship between the on-hand construction volume and the completed volume, taking into account the completed volume depending on the operational status of the shipyard, changes due to time delays, and differences in the construction capacity of the container ships between countries.

9. The method for forecasting demand for container ships according to claim 7, A demand forecasting method for container ships, characterized in that the completion volume by size is derived based on a predetermined relationship between the on-hand construction volume and the completion volume by size.

10. The method for forecasting demand for container ships according to claim 7, A method for forecasting demand for container ships, comprising the steps of: revising the shipping capacity of the container ship based on the completed volume.

11. The method for forecasting demand for container ships according to claim 8, A method for forecasting demand for container ships, comprising the steps of: revising the on-hand construction volume based on the completed construction volume.

12. The method for forecasting demand for container ships according to claim 1, A demand forecasting method for container ships, comprising a scrapping volume derivation step of deriving the scrapping volume by applying the transport efficiency derived in the transport efficiency derivation step to the relationship between the transport efficiency, the scrapping volume and the container ship tonnage ratio using a scrapping ship model capable of deriving the scrapping volume based on the transport efficiency.

13. A program for forecasting demand for container ships, comprising: On the computer, A demand forecasting program for container ships, characterized in that it incorporates the maritime cargo movement model and order model described in any one of claims 1 to 12, executes an input value acquisition step, a maritime cargo movement volume deriving step, a transport efficiency deriving step, and an order volume deriving step, and outputs the derivation results.

14. A container ship demand forecasting program according to claim 13 which quotes claim 5, A demand forecasting program for container ships, characterized in that the program causes the computer to obtain an external factor order amount and execute an order amount correction step.

15. A container ship demand forecasting program according to claim 13 which quotes claim 6, A demand forecasting program for container ships, characterized in that the program causes the computer to obtain order ratios by size of container ships, execute a size-by-size order quantity derivation step, and output the derivation results.

16. A container ship demand forecasting program according to claim 15 which quotes claim 7, A container ship demand forecasting program that causes the computer to execute a construction model acquisition step and a completion volume derivation step, and output the derivation results.

17. A container ship demand forecasting program according to claim 13 which recites claim 10, A container ship demand forecasting program that causes the computer to execute a scrapped ship model acquisition step and a scrapped ship volume deriving step, and outputs the derivation results.

18. A system for forecasting demand for container ships, comprising: The method includes: a condition input means; a result output means for outputting a derived result; and a computer; A container ship demand forecasting system characterized by executing the container ship demand forecasting method described in any one of claims 1 to 12 according to conditions including input values ​​input by the condition input means, and outputting the derived results from the result output means.

19. The container ship demand forecasting system according to claim 18, The computer is connected to the condition input means and the result output means via an information and communication network, and executes the container ship demand forecasting method described in any one of claims 1 to 12 in accordance with conditions including input values ​​input by the condition input means. A container ship demand forecasting system characterized in that

20. The container ship demand forecasting system according to claim 18, A demand forecasting system for container ships, characterized in that the output contents of the derived results of the result output means can be selected depending on the input to the condition input means.

Citation Information

Cited By

  • Container tracking data processing method based on machine learning

    CN119151411A