State estimation device, state estimation method, program, and storage medium

The state estimation device adjusts determination times based on the number of connected power storage devices to accurately assess precharging completion, addressing the challenge of inrush currents and ensuring efficient power transfer.

JP2024141638APending Publication Date: 2024-10-10HONDA MOTOR CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023053397
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing power storage devices face challenges in determining the completion of precharging accurately when the number of connected devices changes, leading to difficulties in preventing inrush currents.

Method used

A state estimation device that includes a calculation unit to acquire the number of connected power storage devices and adjust the determination time based on this number, allowing for quick estimation of precharging completion.

Benefits of technology

Enables rapid determination of precharging completion even with varying numbers of connected devices, preventing inrush currents and ensuring efficient power transfer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141638000001_ABST
    Figure 2024141638000001_ABST
Patent Text Reader

Abstract

To provide a state estimation device, a state estimation method, a program, and a storage medium that accurately estimate a state, when multiple storage devices are connected in parallel electrically to a load.SOLUTION: In a power device, which is a state estimation device, a determination time Td is set on the basis of the number of connections of one battery connected to a large-capacity capacitor arranged in a load or two or more batteries connected mutually in parallel to a large-capacity capacitor. Then, the power device determines whether pre-charging is completed within the set determination time Td.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a state estimation device, a state estimation method, a program, and a storage medium. [Background technology]

[0002] Patent Document 1 discloses a power supply device including a capacitor (electric storage device), a discharge resistor, and a switch. A series circuit of a discharge resistor and a switch is electrically connected in parallel to the capacitor. When the switch is turned on, the charge stored in the capacitor is discharged. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-54181 A Summary of the Invention [Problem to be solved by the invention]

[0004] A power storage device such as a battery is electrically connected to a load via a first switch. If the load has a power storage device and the power storage device has a small amount of stored power (amount of charge), turning on the first switch generates an inrush current. The inrush current flows suddenly from the power storage device to the load (the power storage device with a low amount of charge). To prevent the generation of the inrush current, a precharge circuit is provided in the power storage device. The precharge circuit is electrically connected in parallel with the first switch. The precharge circuit is a series circuit of a second switch and a resistor.

[0005] Prior to the supply of power from the power storage device to the load, pre-charging is performed. Pre-charging is a process for charging the power storage device in advance. Specifically, when the first switch is in the off state, the second switch is turned on. As a result, the charge stored in the power storage device is discharged to the power storage device via the second switch and the resistor. That is, a pre-charge current flows from the power storage device to the load. The power storage device stores the charge discharged by the power storage device.

[0006] When the amount of charge in the capacitor exceeds the threshold within a certain determination time after the second switch is turned on, the first switch is turned on to end the precharge. If the amount of charge in the capacitor does not exceed the threshold within the determination time, it is determined that the execution of the precharge is an error.

[0007] However, because the determination time is a fixed time, when a plurality of power storage devices are electrically connected in parallel to a load, if the number of power storage devices connected to the load (the number of connections) changes, the time required for precharging to be normally completed changes, making it difficult to quickly determine whether the execution of precharging is an error.

[0008] An object of the present invention is to solve the above-mentioned problems. [Means for solving the problem]

[0009] A first aspect of the present invention is a state estimation device that estimates a state of a storage battery that is connected in parallel to a load, the state estimation device comprising a first acquisition unit that acquires a connection number, which is the number of one storage device connected to the storage battery, or two or more storage devices connected in parallel to the storage battery, a second acquisition unit that acquires a storage state of the storage battery, and an estimation unit that estimates the state of the storage battery based on the storage state acquired by the second acquisition unit, and the estimation unit differs in the manner in which it estimates the state of the storage battery based on the number of connections acquired by the first acquisition unit.

[0010] A second aspect of the present invention is a state estimation method for estimating a state of a storage battery connected in parallel to a load, the state estimation method having a first step of acquiring a connection number, which is the number of one storage device connected to the storage battery, or two or more storage devices connected in parallel to the storage battery, a second step of varying a manner in which the state of the storage battery is estimated based on the acquired connection number, a third step of acquiring a storage state of the storage battery, and a fourth step of estimating the state of the storage battery based on the acquired storage state.

[0011] A third aspect of the present invention is a program for causing a computer to execute the above-mentioned state estimation method.

[0012] A fourth aspect of the present invention is a storage medium for storing the program. Effect of the Invention

[0013] According to the present invention, the number of connections of one power storage device connected to the power storage device or two or more power storage devices connected in parallel to the power storage device is obtained, and the manner of estimating the state of the power storage device is changed based on the obtained number of connections, and after the charge state of the power storage device is obtained, the state of the power storage device is estimated based on the obtained charge state. This makes it possible to quickly estimate the state of the power storage device even if the number of connections changes. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a circuit diagram of a power device according to the present embodiment. [Diagram 2] FIG. 2 is a circuit diagram of the battery of FIG. [Diagram 3] FIG. 3 is a timing chart showing changes over time in the voltage and current of the capacitor. [Figure 4] FIG. 4 is a flow chart showing the operation of the power device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] FIG. 1 is a circuit diagram of a power device 10 (state estimation device) according to this embodiment.

[0016] The power device 10 includes a plurality of batteries 12 (power storage devices), a plurality of mounting units 14, an ECU 16 (control unit), a main switch 18, an input unit 20, an output unit 22, and a load 24.

[0017] The multiple batteries 12 are attached to multiple attachment sections 14 such as slots. The batteries 12 are detachable from the attachment sections 14. The batteries 12 are mobile batteries that are detachable from the power device 10. The batteries 12 are also mobile batteries that can be charged and discharged. The batteries 12 are preferably, for example, a battery pack of detachable lithium-ion batteries. The batteries 12 may be fixed to the attachment sections 14.

[0018] It is sufficient that the power device 10 includes at least one battery 12. If the power device 10 includes a plurality (two or more) of batteries 12, it is sufficient that at least one of the plurality of batteries 12 is attachable to and detachable from the power device 10. In this case, it is more preferable that the battery 12 is attachable to and detachable from the power device 10 without using a separate work tool or the like. The battery 12 is configured so that it can be attached to and detached from the power device 10 without using a work tool or the like. In addition, "attaching to and detaching from the power device 10" includes a case where the battery 12 is attached to the power device 10 and a case where the battery 12 is detached from the power device 10.

[0019] When the battery 12 is attached to the attachment section 14, the battery 12 and the load 24 can exchange power via a power transmission path 26. More specifically, when the battery 12 is attached to the attachment section 14, the battery 12 and the load 24 are electrically connected. The power transmission path 26 has a positive electrode line 28 and a negative electrode line 30. The positive electrode terminal 32 of the battery 12 is electrically connected to the positive electrode of the load 24 via the positive electrode line 28. The negative electrode terminal 34 of the battery 12 is electrically connected to the negative electrode of the load 24 via the negative electrode line 30.

[0020] When a battery 12 is attached to two or more of the attachment sections 14, the two or more batteries 12 are electrically connected in parallel to the load 24. In each of the two or more batteries 12, the positive terminal 32 is electrically connected to the positive electrode of the load 24 via a positive electrode line 28. In each of the two or more batteries 12, the negative terminal 34 is electrically connected to the negative electrode of the load 24 via a negative electrode line 30.

[0021] The load 24 is an electric load that operates by power (DC power) supplied from the battery 12 via the power transmission path 26. For example, the load 24 is an inverter that converts the DC power supplied from the battery 12 into AC power. The load 24 may be a DC / DC converter that converts the voltage value of a DC voltage when DC power is supplied from the battery 12. The load 24 may be an electric load in which a DC / DC converter and an inverter are connected in order to the battery 12. The load 24 may include an electric load (internal load) arranged in the power device 10 and an electric load (external load) that exists outside the power device 10 and is electrically connected to the internal load. In this case, the inverter is the internal load. Also, a home appliance that exists outside the power device 10 and is electrically connected to the inverter is the external load. Alternatively, the load 24 may be an external load.

[0022] Therefore, the power device 10 functions as a power supply device that supplies (discharges) power from the battery 12 to the load 24. The power device 10 also functions as a charging device that inputs (charges) power from the load 24 to the battery 12.

[0023] A relatively large-capacity capacitor 36 (electrical storage device) is disposed in the load 24. The capacitor 36 is also referred to as a capacitor. The capacitor 36 is provided electrically in parallel with the load 24. Therefore, when one battery 12 is electrically connected to the load 24, the capacitor 36 and the battery 12 are electrically connected in parallel with the load 24. In addition, when a plurality of batteries 12 are electrically connected in parallel with the load 24, the plurality of batteries 12 are electrically connected in parallel with the capacitor 36 and the load 24.

[0024] The ECU 16 controls each part of the power device 10 including the multiple batteries 12 mounted on the multiple mounting parts 14. The ECU 16 has a calculation part 38 (first acquisition part, second acquisition part, third acquisition part, estimation part, computer), a memory 40 (storage medium), an activation command part 42, and a CAN communication part 44. The ECU 16, the multiple batteries 12, and the load 24 are connected via a communication line 46 such as a CAN communication line. The ECU 16 can transmit and receive signals or information between the multiple batteries 12 and the load 24 via the communication line 46. The ECU 16 and the multiple batteries 12 are also connected via a signal line 48. The ECU 16 can supply command signals to the multiple batteries 12 via the signal line 48.

[0025] The calculation unit 38 may be configured by a processor such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit). That is, the calculation unit 38 may be configured by a processing circuitry. The calculation unit 38 realizes the functions of a first acquisition unit, a second acquisition unit, a third acquisition unit, and an estimation unit by reading and executing a program stored in the memory 40. The functions of the calculation unit 38 will be described later.

[0026] At least a part of the first acquisition unit, the second acquisition unit, the third acquisition unit, and the estimation unit may be realized by an integrated circuit such as an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), etc. At least a part of the first acquisition unit, the second acquisition unit, the third acquisition unit, and the estimation unit may be configured by an electronic circuit including a discrete device.

[0027] The memory 40 may be composed of a volatile memory (not shown) and a non-volatile memory (not shown). The volatile memory may be, for example, a random access memory (RAM). The volatile memory is used as a working memory of the processor, and temporarily stores data and the like required for processing or calculation. The non-volatile memory may be, for example, a read only memory (ROM) or a flash memory. The non-volatile memory is used as a storage memory, and stores programs, tables, maps, and the like. At least a part of the memory 40 may be provided in the processor, integrated circuit, and the like as described above.

[0028] The activation command unit 42 supplies a command signal (activation signal) for switching the state of the battery 12 to the battery 12 via the signal line 48. In particular, the command signal includes a signal for putting the battery 12 into a usable state (active state) and a signal for putting the battery 12 into an unusable state (inactive state). The activation command unit 42 supplies a signal of a predetermined voltage level (high level signal) to the battery 12 as a command signal for putting the battery 12 into an active state. The activation command unit 42 also supplies a low level signal to the battery 12 as a command signal for putting the battery 12 into an inactive state. The activation command unit 42 may realize a command signal of a low level signal by stopping the supply of the command signal. In this way, the command signal is a signal for instructing the battery 12 to put the battery 12 into an inactive state or an active state.

[0029] The inactive state is a state in which the battery main body 50 (power storage unit) of the battery 12 cannot be electrically connected to the outside of the battery 12. Therefore, in the inactive state, it is not possible to output (discharge) power from the battery main body 50 to the outside of the battery 12, or to input (charge) power from the outside of the battery 12 to the battery main body 50.

[0030] The active state is a state in which the battery main body 50 can be electrically connected to the outside of the battery 12. Therefore, in the active state, it is possible to output electric power from the battery main body 50 to the outside of the battery 12, or to input electric power from the outside of the battery 12 to the battery main body 50.

[0031] The CAN communication unit 44 transmits and receives signals or information between the multiple batteries 12 and the load 24 via the communication line 46. For example, the CAN communication unit 44 acquires various pieces of information related to the batteries 12 from the multiple batteries 12 mounted in the multiple mounting units 14. The CAN communication unit 44 acquires various pieces of information related to the load 24 and the capacitor 36 from the load 24.

[0032] The main switch 18 is a start switch for the electric power device 10. For example, when the electric power device 10 is applied to an electric vehicle, the main switch 18 is a main switch for the electric vehicle.

[0033] The input unit 20 receives an operation input from a user, and outputs the content of the received operation input to the calculation unit 38. The input unit 20 is, for example, a touch panel or an operation button.

[0034] The output unit 22 notifies various types of information to the outside based on instructions from the calculation unit 38. The notification unit is, for example, a display or an indicator.

[0035] As shown in FIG. 2, the battery 12 has a battery main body 50, a BMU 52 (first acquisition unit, second acquisition unit, third acquisition unit, estimation unit, computer), a CAN communication unit 54, a switch 56 (interrupter), and a precharge circuit unit 58 (storage circuit unit).

[0036] The battery body 50 is composed of a plurality of cells connected in series. The battery body 50 is a secondary battery. The switch is a switching element such as a contactor or a semiconductor switch. The positive electrode of the battery body 50 is connected to the positive electrode line 28 of the power transmission path 26 via the switch 56 and the positive electrode terminal 32. The negative electrode of the battery body 50 is connected to the negative electrode line 30 of the power transmission path 26 via the negative electrode terminal 34.

[0037] The precharge circuit unit 58 is electrically connected in parallel to the switch 56. The precharge circuit unit 58 has a switch 60 and a resistor 62. The precharge circuit unit 58 is a series circuit of the switch 60 and the resistor 62. The series circuit of the switch 60 and the resistor 62 is electrically connected in parallel to the switch 56. The conductive states of the two switches 56, 60 are controlled by the BMU 52. The precharge circuit unit 58 operates when a precharge (electricity storage process) described later is executed. Therefore, when precharge is not executed, the switch 60 of the precharge circuit unit 58 is off.

[0038] The BMU 52 is a computer such as a processor, etc. The BMU 52 realizes various functions described below by reading and executing programs stored in a memory 64 (storage medium).

[0039] The BMU 52 monitors the charging / discharging status of the battery 12, the amount of stored electricity in the battery main body 50, the temperature, etc. The BMU 52 also monitors the potential difference between the positive terminal 32 and the negative terminal 34 of the battery 12 (the voltage of the battery 12). As described above, one battery 12 or two or more batteries 12 are electrically connected in parallel to the capacitor 36, so the voltage of the battery 12 may be considered as the voltage V (amount of stored electricity, state of stored electricity) of the capacitor 36. In addition, the BMU 52 monitors whether the battery 12 is connected to the capacitor 36 by detecting whether the battery 12 is attached to the attachment part 14.

[0040] The CAN communication unit 54 transmits and receives signals or information to and from the CAN communication unit 44 (see FIG. 1) of the ECU 16. This allows the BMU 52 to share the monitoring results with the ECU 16 by communicating with the ECU 16 via the CAN communication unit 54. The BMU 52 also controls the charging and discharging between the battery main body 50 and the outside of the battery 12 by controlling two switches 56, 60, etc. based on a command signal from the ECU 16 or the above-mentioned monitoring results.

[0041] The BMU 52 performs control to change the state of the battery 12 to an inactive state or an active state based on a command signal supplied from the activation command unit 42. Specifically, the BMU 52 turns on the switch 56 upon receiving a command signal of a high level signal. In the active state, power can be output from the battery main body 50 to the outside of the battery 12 (load 24). Also, the BMU 52 turns off the switch 56 upon receiving a command signal of a low level. In the inactive state, power cannot be output from the battery main body 50 to the outside of the battery 12 (load 24).

[0042] When the battery 12 is mounted on the mounting portion 14, signals or information can be transmitted and received between the battery 12 and the ECU 16, and the battery 12 and the capacitor 36 are electrically connected. Therefore, when communication is possible between the battery 12 and the ECU 16, the calculation unit 38 can determine that the battery 12 is connected to the capacitor 36. Furthermore, when communication is not possible between the battery 12 and the ECU 16, the calculation unit 38 can determine that the battery 12 is not connected to the capacitor 36.

[0043] Furthermore, like the calculation unit 38, the BMU 52 can realize the functions of a first acquisition unit, a second acquisition unit, a third acquisition unit, and an estimation unit by reading and executing a program stored in the memory 64.

[0044] As described above, in this embodiment, either the BMU 52 of the battery 12 or the calculation unit 38 of the ECU 16 may function as the first acquisition unit, the second acquisition unit, the third acquisition unit, and the estimation unit.

[0045] When the load 24 (see FIG. 1) has a capacitor 36 and the amount of stored electricity (charge amount) of the capacitor 36 is small, turning on the switch 56 (see FIG. 2) at time t (see FIG. 3) of t=0 generates a large current (inrush current). The inrush current flows abruptly from the battery 12 toward the load 24 (the capacitor 36 with a low charge amount). That is, the inrush current increases abruptly as time passes from t=0. The inrush current increases further beyond the threshold value Ifth, and then decreases to a predetermined current value Is. The threshold value Ifth is a judgment threshold for judging whether an overcurrent has occurred. When a current exceeding the threshold value Ifth flows through the power transmission path 26, it is judged that an overcurrent has occurred.

[0046] In order to prevent such an inrush current from occurring, the battery 12 is provided with a precharge circuit section 58. In the power device 10, precharge is executed before power is exchanged between the battery 12 and the load 24 via the switch 56. Precharge is a process for charging the capacitor 36 in advance. Specifically, as shown in FIG. 3, when the switch 56 (see FIG. 2) is in the off state, the switch 60 of the precharge circuit section 58 is turned on at t=0. This causes a current (precharge current) to flow from the battery main body 50 to the capacitor 36 (see FIG. 1) via the precharge circuit section 58.

[0047] As a result of the pre-charge current flowing from t=0, the battery main body 50 discharges electric charge, and the discharged electric charge is stored in the capacitor 36. As a result, the voltage V of the capacitor 36 gradually increases over time. That is, the voltage V of the capacitor 36 gradually increases over time according to a time constant determined by the resistance value of the resistor 62 and the capacitance of the capacitor 36. When the voltage V of the capacitor 36 reaches a predetermined voltage value Vs (for example, a fully charged voltage), charging of the capacitor 36 is completed.

[0048] After the pre-charging is completed, the switch 56 is turned on to short the pre-charging circuit section 58, and power is exchanged between the battery main body 50 and the load 24. Since the capacitor 36 is charged by the pre-charging, the generation of an inrush current is suppressed even if the switch 56 is turned on. The switch 60 of the pre-charging circuit section 58 may be turned off after the switch 56 is turned on. Alternatively, the switch 60 of the pre-charging circuit section 58 may be turned off after the pre-charging is completed and before the switch 56 is turned on.

[0049] As described above, the calculation unit 38 and the BMUs 52 of the multiple batteries 12 can transmit and receive signals or information. Furthermore, the calculation unit 38 and the BMUs 52 of the multiple batteries 12 can share the monitoring results of the batteries 12. Therefore, the calculation unit 38 or the BMU 52 can determine whether precharging has been completed normally (whether charging has been completed) based on the monitoring results of the (multiple) batteries 12 and information on the load 24 including the capacitor 36.

[0050] Specifically, the calculation unit 38 or the BMU 52 determines whether the pre-charge has been completed normally by determining whether the voltage V exceeds a determination voltage Ved (storage threshold) within a predetermined determination time Td (estimated period) from t=0. The determination voltage Ved is an arbitrary voltage value equal to or less than the voltage value Vs. The determination voltage Ved is a voltage value that can suppress the occurrence of an inrush current and can determine that the pre-charge has been completed.

[0051] If the voltage V exceeds the judgment voltage Ved within the judgment time Td, the calculation unit 38 or the BMU 52 judges that the pre-charging has been completed normally. After judging that the pre-charging has been completed normally, the calculation unit 38 instructs the activation command unit 42 to supply a command signal to the battery 12 to switch the battery 12 to an active state. In response to the command signal, the battery 12 can turn on the switch 56 and switch to the active state.

[0052] Furthermore, if the voltage V does not reach the determination voltage Ved within the determination time Td, the calculation unit 38 or the BMU 52 determines that the execution of the pre-charge is not completed (is an error). After determining that the execution of the pre-charge is an error, the calculation unit 38 or the BMU 52 notifies the outside via the output unit 22 that the execution of the pre-charge is an error. Furthermore, the calculation unit 38 instructs the activation command unit 42 to supply a command signal to the battery 12 to put it into a deactivated state. As a result, the battery 12 receives the command signal and maintains the deactivated state.

[0053] Furthermore, the calculation unit 38 or the BMU 52 determines the determination time Td according to the number N of batteries 12 connected to the load 24 and the capacitor 36 (number of connections). The determination time Td is set to a time inversely proportional to the number N of connections of the battery 12. Specifically, the determination time Td is a value obtained by dividing a determination time initial value Td0 (initial value of the estimated period), which is the determination time when the number of connections N is 1, by the number of connections N (Td=Td0 / N). Alternatively, the determination time Td may be a value obtained by dividing the determination time initial value Td0 by the square root of the number of connections N (Td=Td0 / (N 1 / 2 )).

[0054] Each battery 12 has a resistor 62. As the number of connections N changes, the resistance value when looking at the power transmission path 26 from the capacitor 36 changes, and the rise time of the voltage V changes. Therefore, as shown in FIG 3, the greater the number of connections N, the shorter the determination time Td becomes.

[0055] The calculation unit 38 or the BMU 52 identifies the number N of connected batteries 12 based on the monitoring results (presence or absence of connection to the capacitor 36) of the multiple batteries 12. Alternatively, the calculation unit 38 or the BMU 52 may identify the number N of connected batteries 12 by identifying the batteries 12 that can communicate with the ECU 16.

[0056] FIG. 3 illustrates the time change (dashed line) of the voltage V of the capacitor 36 when N=1 and the time change (solid line) when N=4. When N=1, the judgment time Td is Td0 set at time t2. When N=4, the judgment time Td is Td4 set at time t1. FIG. 3 illustrates the time change of the voltage V when Td4=Td0 / 4. In the example of FIG. 3, when N=1, the voltage V exceeds the judgment voltage Ved within the judgment time initial value Td0, so that the calculation unit 38 or the BMU 52 can determine that the pre-charge has been completed normally. When N=4, the voltage V exceeds the judgment voltage Ved within the judgment time Td4, so that the calculation unit 38 or the BMU 52 can determine that the pre-charge has been completed normally.

[0057] The capacitance of the capacitor 36 changes due to deterioration. When the capacitance of the capacitor 36 changes, the voltage value Vs changes. When the capacitance of the capacitor 36 changes, the time it takes for the voltage V to reach the voltage value Vs changes. Therefore, the calculation unit 38 or the BMU 52 may adjust the determination voltage Ved based on the capacitance of the capacitor 36. Also, the calculation unit 38 or the BMU 52 may adjust the determination time Td based on the number of connections N and the capacitance of the capacitor 36.

[0058] The power device 10 according to this embodiment is configured as described above. Next, the operation (state estimation method) of the power device 10 will be described with reference to the flowchart in Fig. 4. Here, precharging will be mainly described. In this operation description, a case will be described in which the calculation unit 38 functions as a first acquisition unit, a second acquisition unit, a third acquisition unit, and an estimation unit.

[0059] In step S1, a judgment time initial value Td0 (see FIG. 3), which is a default value of the judgment time Td, is set. In detail, the user operates the input unit 20 (see FIG. 1) to input the judgment time initial value Td0. The calculation unit 38 stores the input judgment time initial value Td0 in the memory 40.

[0060] In step S2 (first step), the calculation unit 38 determines the number N of connections of the battery 12 to the load 24 and the capacitor 36. The calculation unit 38 specifies the number N of connections of the battery 12 based on a monitoring result of the battery 12 shared among the multiple batteries 12. Alternatively, the calculation unit 38 specifies the number N of connections of the battery 12 by specifying the battery 12 that can communicate with the ECU 16.

[0061] In step S3 (second step), the calculation unit 38 uses the judgment time initial value Td0 and the number N of connections to determine the judgment time Td.

[0062] In step S4, the calculation unit 38 executes a numbering process to assign identification information to the multiple batteries 12 attached to the multiple attachment units 14. The calculation unit 38 executes the numbering process disclosed in, for example, JP 2022-166882 A by communicating with the multiple batteries 12 from the CAN communication unit 44 via the communication line 46. The BMU 52 of the battery 12 stores the assigned identification information in the memory 64.

[0063] In step S5 (third step), the calculation unit 38 instructs the batteries 12 attached to the attachment units 14 to execute pre-charging. Specifically, the calculation unit 38 instructs the batteries 12 to turn on the switch 60 of the pre-charging circuit unit 58 via the CAN communication unit 44 and the communication line 46. In each of the batteries 12, the BMU 52 turns on the switch 60 upon receiving the instruction from the calculation unit 38 (t=0 in FIG. 3). Turning on the switch 60 starts pre-charging, and a pre-charging current flows from the battery main body 50 to the capacitor 36 via the pre-charging circuit unit 58. The flow of the pre-charging current causes the battery main body 50 to discharge electric charge, and the discharged electric charge is stored in the capacitor 36. As a result, the voltage V of the capacitor 36 gradually increases over time.

[0064] In the multiple batteries 12, the BMU 52 monitors the states of the batteries 12. Furthermore, the calculation unit 38 is capable of communicating with the multiple batteries 12 via a communication line 46. Therefore, the calculation unit 38 is capable of sharing the monitoring results of the multiple batteries 12.

[0065] In step S6, the calculation unit 38 determines, based on the monitoring results of the multiple batteries 12 (the time elapsed since the switch was turned on), whether or not the time elapsed from t=0 has exceeded a determination time Td.

[0066] If t≦Td (if it is within the determination time Td, step S6: NO), the calculation unit 38 proceeds to step S7. In step S7 (third step), the calculation unit 38 determines whether the voltage V of the capacitor 36 has exceeded the determination voltage Ved based on the monitoring results of the multiple batteries 12 (the voltages of the batteries 12).

[0067] If the voltage V does not exceed the determination voltage Ved (V≦Ved, step S7: NO), the calculation unit 38 determines that the voltage V has not reached the determination voltage Ved and therefore precharging is not complete. The calculation unit 38 then returns to step S6 and executes the processes of steps S6 and S7 again. Therefore, if the time elapsed since t=0 (time t) is within the determination time Td (step S6: NO), the calculation unit 38 repeatedly executes the processes of steps S6 and S7 until the voltage V exceeds the determination voltage Ved (step S7: YES).

[0068] If V>Ved (step S7: YES), the calculation unit 38 proceeds to step S8 (fourth step). In step S8, the calculation unit 38 determines that the precharge has been completed normally because the voltage V has exceeded the determination voltage Ved within the determination time Td.

[0069] In step S9, the calculation unit 38 instructs the activation command unit 42 to switch the state of the battery 12 to the active state. Based on the instruction from the calculation unit 38, the activation command unit 42 supplies a high-level command signal to the battery 12 via the signal line 48. Based on the supplied command signal, the BMU 52 of the battery 12 turns on the switch 56. This switches the state of the battery 12 to the active state, and power begins to be exchanged between the battery main body 50 and the load 24. After the switch 56 is turned on, the BMU 52 turns off the switch 60 of the pre-charge circuit unit 58.

[0070] In step S6, if the time elapsed since t=0 exceeds the judgment time Td (step S6: YES), the calculation unit 38 proceeds to step S10. In step S10 (fourth step), the calculation unit 38 determines that the precharge is not completed normally because the voltage V does not exceed the judgment voltage Ved within the judgment time Td. That is, the calculation unit 38 determines that the execution of the precharge is an error. Next, the calculation unit 38 notifies the outside of the power device 10 via the output unit 22 that the execution of the precharge is an error. The user can take measures such as replacing the battery 12 by checking the contents of the notification from the output unit 22.

[0071] In addition, in FIG. 4, when BMU 52 functions as the first acquisition unit, the second acquisition unit, the third acquisition unit, and the estimation unit, the wording "calculation unit 38" in the explanation of steps S1 to S3, S5 to S8, and S10 can be replaced with "BMU 52" to explain the operation of BMU 52.

[0072] This embodiment has the following advantages.

[0073] 3 and 4, the calculation unit 38 or the BMU 52 acquires the number of connections N of one battery 12 (power storage device) connected to the capacitor 36 (electricity storage device) or two or more batteries 12 connected in parallel to the capacitor 36. The calculation unit 38 or the BMU 52 varies the determination time Td (mode) for determining (estimating) whether precharging of the capacitor 36 is complete (state of the capacitor 36) based on the acquired number of connections N. After acquiring the voltage V (charged state) of the capacitor 36, the calculation unit 38 or the BMU 52 determines whether precharging is complete based on the acquired voltage V. This makes it possible to quickly determine the completion of precharging even if the number of connections N changes.

[0074] 3, in this embodiment, when one battery 12 or two or more batteries 12 are connected to the capacitor 36 in a state in which the voltage V of the capacitor 36 (amount of stored electricity in the electricity storage device) is lower than the determination voltage Ved (electricity storage threshold), the determination time Td is made to differ based on the number of connections N. This makes it unnecessary to set the determination time Td individually for each battery 12.

[0075] 3, in this embodiment, whether or not pre-charging is completed is determined in consideration of the elapsed time (elapsed time from t=0) from when one battery 12 or two or more batteries 12 are connected to the capacitor 36 and the determination time Td. This makes it possible to quickly determine whether or not pre-charging is completed.

[0076] As shown in FIG. 3, in this embodiment, it is possible to quickly determine whether the voltage V of the capacitor 36 has exceeded the determination voltage Ved within the determination time Td.

[0077] 4, in this embodiment, when the voltage V does not exceed the determination voltage Ved within the determination time Td, a signal indicating that the voltage V does not exceed the determination voltage Ved within the determination time Td is output to the outside. This makes it possible to notify the user that it is not possible to determine whether or not the precharge is completed within the determination time Td.

[0078] As shown in FIG. 3, in this embodiment, the determination time Td is set to a length that is inversely proportional to the number of connections N, so that the determination time Td can be set shorter as the number of connections N increases.

[0079] In this embodiment, the judgment time Td is set to a value obtained by dividing the judgment time initial value Td0 by the number of connections N, or a value obtained by dividing the judgment time initial value Td0 by the square root of the number of connections N, so that the judgment time Td can be set easily and simply.

[0080] In this embodiment, the determination time Td is adjusted based on the number of connections N and the capacitance of the capacitor 36, so that an appropriate determination time Td can be set according to the deterioration of the capacitor 36.

[0081] In this embodiment, since the determination voltage Ved is adjusted based on the capacitance of the capacitor 36, it is possible to set an appropriate determination voltage Ved according to the deterioration of the capacitor 36.

[0082] 1, in this embodiment, one battery 12 or each of two or more batteries 12 is detachable from the power device 10, and can be connected to the capacitor 36 by being attached to the power device 10. The calculation unit 38 or the BMU 52 obtains the number of connections N based on whether one battery 12 is attached to the power device 10, or whether two or more batteries 12 are attached to the power device 10. This makes it possible to reliably obtain the number of connections N.

[0083] In this embodiment, the calculation unit 38 can communicate with one battery 12 or two or more batteries 12 when each of the one battery 12 or two or more batteries 12 is attached to the power device 10. The calculation unit 38 or the BMU 52 obtains the number of batteries 12 with which it can communicate, thereby obtaining the number of connections N. This makes it possible to reliably obtain the number of connections N.

[0084] As shown in FIG. 4, in this embodiment, the number of connections N is obtained prior to precharging, so that it is possible to determine whether or not the precharging is completed during the precharging.

[0085] As shown in Figures 1 and 4, in this embodiment, once pre-charging is completed, the battery main body 50 and the capacitor 36 are connected, so that power can be quickly transferred between the battery main body 50 and the capacitor 36 after pre-charging is completed.

[0086] In this embodiment, the determination voltage Ved may be stored as a map or a table in the memory 40, 64. The determination time Td may be stored as a map or a table in the memory 40, 64. This allows the calculation unit 38 or the BMU 52 to set the determination voltage Ved and the determination time Td by referring to the map or the table.

[0087] In this embodiment, the calculation unit 38 or the BMU 52 may obtain information on the determination voltage Ved from the load 24 via the communication line 46. The calculation unit 38 or the BMU 52 may also obtain information on the capacitance of the capacitor 36 from the load 24 via the communication line 46.

[0088] In this embodiment, the power device 10 is applicable to various electric vehicles such as an electric unicycle, an electric two-wheeler, an electric three-wheeler, and an electric four-wheeler.

[0089] In this embodiment, the voltage of the battery 12 is acquired as the voltage V of the capacitor 36. In this embodiment, the voltage across the capacitor 36 or the voltage between the positive electrode line 28 and the negative electrode line 30 of the power transmission path 26 may be acquired as the voltage V of the capacitor 36.

[0090] In addition to the above disclosure, the following notes are also disclosed.

[0091] (Appendix 1) A state estimation device (10) that estimates a state of a storage battery (36) that is provided in parallel with a load (24), the state estimation device includes a first acquisition unit (38, 52) that acquires one storage device (12) connected to the storage battery, or a number of connections (N) that is the number of two or more storage devices connected in parallel to the storage battery, a second acquisition unit (38, 52) that acquires a storage state of the storage battery, and an estimation unit (38, 52) that estimates the state of the storage battery based on the storage state acquired by the second acquisition unit, and the estimation unit differs in the manner in which it estimates the state of the storage battery based on the number of connections acquired by the first acquisition unit.

[0092] According to this configuration, the number of connections of one power storage device connected to the power storage device or two or more power storage devices connected in parallel to the power storage device is obtained, the manner in which the state of the power storage device is estimated is changed based on the obtained number of connections, and after the charge state of the power storage device is obtained, the state of the power storage device is estimated based on the obtained charge state. This makes it possible to quickly estimate the state of the power storage device even if the number of connections changes.

[0093] (Appendix 2) In the state estimation device described in Appendix 1, when the storage amount (V) of the storage device in the power storage state is lower than a power storage threshold (Ved) and one of the power storage devices or two or more of the power storage devices are connected to the storage device, the estimation unit may vary an estimation period (Td) of the state of the storage device based on the number of connections acquired by the first acquisition unit.

[0094] According to this configuration, when one power storage device or two or more power storage devices are connected to the power storage device while the amount of stored power in the power storage device is lower than the power storage threshold, the estimation period for the state of the power storage device is made different based on the number of connections, which makes it unnecessary to set an estimation period for each power storage device individually.

[0095] (Appendix 3) The state estimation device described in Appendix 2 may further include a third acquisition unit (38, 52) that acquires an elapsed time since one of the storage devices, or two or more of the storage devices, began to be connected to the storage battery, and the estimation unit may estimate the state of the storage battery by taking into account the elapsed time and the estimation period.

[0096] According to this configuration, the state of the battery is estimated in consideration of the elapsed time from when one power storage device or two or more power storage devices are connected to the battery and the estimation period, thereby making it possible to quickly estimate the state of the battery.

[0097] (Appendix 4) In the state estimation device according to Supplementary Note 3, the estimation unit may estimate whether the stored power amount has exceeded the stored power threshold within the estimation period.

[0098] According to this configuration, it is possible to quickly estimate whether the amount of stored power has exceeded the power storage threshold within the estimation period.

[0099] (Appendix 5) In the state estimation device described in Supplementary Note 4, the state estimation device may further include an output unit (22) that, when the estimation unit estimates that the stored amount will not exceed the storage threshold within the estimation period, outputs to an outside of the state estimation device that the stored amount will not exceed the storage threshold within the estimation period.

[0100] According to this configuration, when the amount of stored power does not exceed the power storage threshold within the estimation period, the information that the amount of stored power will not exceed the power storage threshold within the estimation period is output to the outside, thereby making it possible to notify the user that the state of the power storage unit cannot be estimated within the estimation period.

[0101] (Appendix 6) In the state estimation device according to any one of Supplementary Notes 2 to 5, the estimation period may be set to a length that is inversely proportional to the number of connections.

[0102] According to this configuration, the estimation period is set to a length that is inversely proportional to the number of connections, so that the estimation period can be set to a shorter value as the number of connections increases.

[0103] (Appendix 7) In the state estimation device described in Supplementary Note 6, the estimation period may be a value obtained by dividing an estimation period initial value (Td0), which is an estimation period when the number of connections is 1, by the number of connections, or a value obtained by dividing the estimation period initial value by the square root of the number of connections.

[0104] According to this configuration, the estimated period is set to a value obtained by dividing the initial estimated period value by the number of connections, or a value obtained by dividing the initial estimated period value by the square root of the number of connections, so that the estimated period can be set easily and simply.

[0105] (Appendix 8) In the state estimation device according to any one of Supplementary notes 2 to 7, the estimation unit may adjust the estimation period based on the number of connections and a capacity of the power storage device.

[0106] According to this configuration, the estimation period is adjusted based on the number of connections and the capacity of the battery, so that an appropriate estimation period can be set according to the deterioration of the battery.

[0107] (Appendix 9) In the state estimation device according to any one of Supplementary notes 2 to 8, the estimation unit may adjust the power storage threshold value based on a capacity of the power storage device.

[0108] According to this configuration, since the power storage threshold is adjusted based on the capacity of the power storage device, it is possible to set an appropriate power storage threshold according to the deterioration of the power storage device.

[0109] (Appendix 10) In the state estimation device described in any one of Appendices 1 to 9, one of the power storage devices or each of the two or more power storage devices is detachable from a power device (10) and can be connected to the power storage device by being attached to the power device, and the first acquisition unit may acquire the number of connections based on whether or not one of the power storage devices is attached to the power device, or whether or not two or more of the power storage devices are attached to the power device.

[0110] According to this configuration, the number of connections can be reliably obtained based on whether or not one power storage device is attached to the power device, or based on whether or not two or more power storage devices are attached to the power device.

[0111] (Appendix 11) In the state estimation device described in Appendix 10, the power device includes a control unit (16) that controls one of the power storage devices or each of the two or more power storage devices, and the control unit is capable of communicating with the one of the power storage devices or each of the two or more power storage devices when the one of the power storage devices or each of the two or more power storage devices is attached to the power device, and the first acquisition unit may acquire the number of connections by grasping the number of power storage devices that can communicate with the control unit.

[0112] According to this configuration, by knowing the number of power storage devices that can communicate with the control unit, the number of connections can be reliably obtained.

[0113] (Appendix 12) In the state estimation device described in Appendix 10 or 11, each of the one or more power storage devices has a power storage unit (50), an interruption unit (56) that disconnects the power storage unit from the power storage device or connects the power storage unit to the power storage device, and a power storage circuit unit (58) connected in parallel to the interruption unit, wherein the power storage circuit unit executes a power storage process to discharge the power storage unit and store power in the power storage device when the interruption unit disconnects the power storage unit from the power storage device, and the first acquisition unit may acquire the number of connections prior to the power storage process.

[0114] According to this configuration, since the number of connections is obtained prior to the power storage process, it is possible to estimate the state of the power storage device during the power storage process.

[0115] (Appendix 13) In the state estimation device described in Appendix 12, the estimation unit may estimate whether the state of the storage device is in a storage complete state that can be determined to be close to full charge, and when the estimation unit estimates that the state of the storage device is in the storage complete state, the disconnection unit may connect the storage device and the storage device.

[0116] According to this configuration, when the storage battery is in a fully charged state, the storage unit and the storage battery are connected, so that the transfer of power between the storage unit and the storage battery can be started promptly after the storage process is completed.

[0117] (Appendix 14) A state estimation method for estimating a state of a storage battery provided in parallel with a load (24), the state estimation method including a first step (S2) of acquiring a connection number which is the number of one storage device connected to the storage battery, or two or more storage devices connected in parallel to the storage battery, a second step (S3) of varying a manner in which the state of the storage battery is estimated based on the acquired connection number, a third step (S5, S7) of acquiring a storage state of the storage battery, and a fourth step (S8, S10) of estimating the state of the storage battery based on the acquired storage state.

[0118] According to this method, the number of connections of one power storage device connected to the power storage device or two or more power storage devices connected in parallel to the power storage device is obtained, the manner in which the state of the power storage device is estimated is changed based on the obtained number of connections, and after the charge state of the power storage device is obtained, the state of the power storage device is estimated based on the obtained charge state. This makes it possible to quickly estimate the state of the power storage device even if the number of connections changes.

[0119] (Appendix 15) A program for causing a computer (38, 52) to execute the state estimation method described in Supplementary Note 14.

[0120] (Appendix 16) A storage medium (40, 64) that stores the program described in Supplementary Note 15.

[0121] The present invention is not limited to the above disclosure, and various configurations can be adopted without departing from the gist of the present invention. [Explanation of symbols]

[0122] 10...Power device (state estimation device) 12...Battery (energy storage device) 24…Load 36...Capacitor (electric storage device) 38...Calculation unit (first acquisition unit, second acquisition unit, third acquisition unit, estimation unit, computer) 40, 64...Memory (storage medium) 52...BMU (first acquisition unit, second acquisition unit, third acquisition unit, estimation unit, computer)

Claims

1. A state estimation device that estimates a state of a capacitor provided in parallel with a load, a first acquisition unit that acquires a connection number that is the number of one power storage device connected to the power storage device or the number of two or more power storage devices connected in parallel to the power storage device; A second acquisition unit that acquires a charge state of the battery; an estimation unit that estimates a state of the battery based on the storage state acquired by the second acquisition unit; Equipped with The estimation unit changes a manner in which the state of the battery is estimated based on the number of connections acquired by the first acquisition unit.

2. 2. The state estimation device according to claim 1, The state estimation device, when one of the storage devices or two or more of the storage devices are connected to the storage device in a state where the amount of stored energy of the storage device in the stored energy state is lower than a storage threshold, differs the estimation period of the state of the storage device based on the number of connections acquired by the first acquisition unit.

3. 3. The state estimation device according to claim 2, A third acquisition unit that acquires an elapsed time from when one of the power storage devices or two or more of the power storage devices are connected to the power storage device, The estimation unit estimates a state of the battery in consideration of the elapsed time and the estimation period.

4. 4. The state estimation device according to claim 3, The estimation unit estimates whether the stored power amount has exceeded the stored power threshold within the estimation period.

5. 5. The state estimation device according to claim 4, a state estimation device further comprising an output unit that, when the estimation unit estimates that the stored power amount will not exceed the storage threshold within the estimation period, outputs to an outside of the state estimation device that the stored power amount will not exceed the storage threshold within the estimation period.

6. The state estimation device according to any one of claims 2 to 5, A state estimation device, wherein the estimation period is set to a length inversely proportional to the number of connections.

7. 7. The state estimation device according to claim 6, a state estimation device, wherein the estimation period is a value obtained by dividing an initial value of the estimation period, which is an estimation period when the number of connections is 1, by the number of connections, or a value obtained by dividing the initial value of the estimation period by the square root of the number of connections.

8. The state estimation device according to any one of claims 2 to 7, The estimation unit adjusts the estimation period based on the number of connections and the capacity of the battery.

9. The state estimation device according to any one of claims 2 to 8, The estimation unit adjusts the power storage threshold based on a capacity of the power storage device.

10. The state estimation device according to any one of claims 1 to 9, one of the power storage devices or each of the two or more power storage devices is detachable from the power device and can be connected to the power storage device by being attached to the power device; The first acquisition unit acquires the number of connections based on whether one of the power storage devices is attached to the power device, or whether two or more of the power storage devices are attached to the power device.

11. 11. The state estimation device according to claim 10, The power device includes a control unit that controls one of the power storage devices or each of two or more of the power storage devices; the control unit is capable of communicating with one of the power storage devices or two or more of the power storage devices when each of the one of the power storage devices or two or more of the power storage devices is attached to the power device; The first acquisition unit acquires the number of connections by grasping the number of power storage devices that can communicate with the control unit.

12. 12. The state estimation device according to claim 10, One of the power storage devices or each of the two or more power storage devices is A power storage unit; an interrupting unit that disconnects the power storage unit and the power storage device or connects the power storage unit and the power storage device; a storage circuit unit connected in parallel to the interruption unit; having the power storage circuit unit executes a power storage process for discharging the power storage unit and storing electricity in the power storage device when the interrupter disconnects the power storage unit from the power storage device, The first acquisition unit acquires the number of connections prior to the power storage process.

13. 13. The state estimation device according to claim 12, The estimation unit estimates whether the state of the battery is a charge completion state that can be determined to be close to full charge, When the estimation unit estimates that the state of the battery is the charge completion state, the connection / disconnection unit connects the battery unit and the battery.

14. A state estimation method for estimating a state of a capacitor provided in parallel with a load, comprising: A first step of acquiring a number of connections, which is the number of one power storage device connected to the power storage device or the number of two or more power storage devices connected in parallel to the power storage device; a second step of changing a manner of estimating a state of the battery based on the acquired number of connections; A third step of acquiring a charge state of the capacitor; A fourth step of estimating a state of the battery based on the acquired charge state; The state estimation method comprises:

15. A program for causing a computer to execute the state estimation method according to claim 14.

16. A storage medium for storing the program according to claim 15.

Citation Information

Patent Citations

  • Charge control method for battery charger

    JP1994311662A

  • Power storage device and abnormality detection method

    JP2017085747A

  • Power supply device and control method therefor, and vehicle

    JP2020054181A

  • Battery-capacitor connecting device and battery-capacitor connecting method

    JP2022116487A

  • Precharge resistor abnormality determination method and battery system using the same

    JP2023510298A