Power supply management system

The power management system addresses inefficiencies in power supply and demand by using strategically controlled power storage devices to balance power across facilities, reducing reliance on the grid and optimizing power usage.

JP2024141706AActive Publication Date: 2024-10-10OSAKA GAS CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2023053498
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

Existing power management systems for facilities with solar cell devices and power storage devices struggle to efficiently manage power supply and demand, leading to inefficiencies and increased reliance on the power grid during peak demand periods.

Method used

A power management system that includes power storage devices installed in multiple facilities, connected through a power management device capable of information communication, which adjusts discharge instructions based on a strain index value to balance power supply and demand across facilities, utilizing first and second power storage devices with different discharge capabilities.

Benefits of technology

The system effectively reduces power supply and demand imbalances by strategically discharging power storage devices, minimizing grid reliance and optimizing power usage across multiple facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024141706000001_ABST
    Figure 2024141706000001_ABST
Patent Text Reader

Abstract

To provide a power supply management system capable of adjusting power demand and supply of the whole of a plurality of facilities by using power storage devices.SOLUTION: A power supply management system includes a power supply management device 3 that does not transmit a discharge instruction to a first power storage device 13A and a second power storage device 13B when a tightness index value indicating highness of the degree of tightness of power demand and supply is smaller than a predetermined first reference level, transmits the discharge instruction to the second power storage device 13B and does not transmit the discharge instruction to the first power storage device 13A when the tightness index value is equal to or larger than the first reference level and smaller than a second reference level higher than the first reference level, and transmits the discharge instruction to the first power storage device 13A and the second power storage device 13B when the tightness index value is equal to or larger than the second reference level.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power management system including a power storage device installed in each of a plurality of facilities, and a power management device capable of communicating information with the plurality of power storage devices. [Background technology]

[0002] There is a system in which a power generation device such as a solar cell device and a power storage device are provided in a facility such as a residence or a business. When a power storage device is provided in the facility, the power storage device can be charged or not charged when the power generation device such as the solar cell device is generating power. For example, Patent Document 1 (JP Patent Publication 2015-159726 A) describes an operation mode in which, when the power generation power of the solar cell device is greater than the power consumption of the power consumption device, the surplus power is charged in the power storage device, and then, when the power consumption of the power consumption device of the facility becomes greater than the power generation power of the solar cell device, that is, when a power shortage occurs, the power storage device is discharged. That is, in this operation mode, priority is given to consuming the power generated by the solar cell device in the facility. In addition, there is an operation mode in which, when the power generation power of the solar cell device is greater than the power consumption of the power consumption device, the surplus power is not charged in the power storage device but is reversely flowed to the power grid. That is, in this operation mode, priority is given to reversely flowing the power generated by the solar cell device to the power grid. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-159726 A Summary of the Invention [Problem to be solved by the invention]

[0004] FIG. 3 is a diagram showing the transition of the power at the receiving point of the facility. The dashed line indicates the value of [power consumption of power consuming device - power generated by power generating device], which corresponds to the surplus or shortage power mentioned above. The power generating device here is a solar cell device. In the example shown in FIG. 3, the power generated by the power generating device is large during the day, so [power consumption of power consuming device - power generated by power generating device] is a negative value. In other words, surplus power is occurring. In contrast, during the period from the evening to the next morning, when the power generated by the power generating device becomes zero, [power consumption of power consuming device - power generated by power generating device] is a positive value. In other words, a power shortage is occurring.

[0005] In the example shown in Fig. 3, surplus power generated after 8:00 is charged in the power storage device, increasing the remaining amount of stored power in the power storage device. Then, at around 11:00, the remaining amount of stored power in the power storage device reaches an upper limit value and further charging is no longer possible, so thereafter the surplus power flows back from the facility to the power grid.

[0006] At around 17:00, the power generated by the power generation device decreases while the power consumption of the power consumption device increases, and [power consumption of power consumption device - power generated by power generation device] becomes a positive value (i.e., a power shortage occurs). At that time, the power storage device still has a remaining charge, so the power shortage is covered by the power discharged from the power storage device. However, at around 19:00, the remaining charge in the power storage device reaches its lower limit and it is no longer possible to discharge any more, so the power shortage thereafter is covered by the power received by the facility from the power grid.

[0007] In this way, in the example shown in FIG. 3, the power storage device is charged and discharged at a timing that is favorable for the facility in which it is installed.

[0008] In addition, instead of operating a power storage device for each of the multiple facilities, it is also possible to operate the power storage device for the multiple facilities as a whole. For example, it is possible to discharge the power storage device of each facility so that the purchased power of the multiple facilities as a whole is reduced.

[0009] The present invention has been made in view of the above-mentioned problems, and has an object to provide a power management system that can adjust the overall power supply and demand across a plurality of facilities by using a power storage device. [Means for solving the problem]

[0010] A characteristic configuration of a power supply management system according to the present invention for achieving the above object is a power supply management system including a power storage device installed in each of a plurality of facilities, and a power supply management device capable of communicating information between the plurality of power storage devices, Each of the facilities is provided with the power storage device, the power generation device, and the power consumption device, which are connected to a power grid, and the power storage device discharges when receiving a discharge instruction transmitted from the power management device; the plurality of power storage devices include a first power storage device configured to be able to discharge power exceeding the power consumption of the power consumption device when discharging in response to the discharge instruction from the power management device, and a second power storage device configured to be able to discharge within a range not exceeding the power consumption of the power consumption device when discharging in response to the discharge instruction from the power management device, The power management device includes: When a tightness index value indicating the level of tightness of power supply and demand is less than a predetermined first reference level, the discharge instruction is not transmitted to the first power storage device and the second power storage device; when the pressure index value is equal to or greater than the first reference level and is less than a second reference level higher than the first reference level, transmitting the discharge instruction to the second power storage device and not transmitting the discharge instruction to the first power storage device; When the pressure index value is equal to or greater than the second reference level, the discharge instruction is transmitted to the first power storage device and the second power storage device. Here, the power generation device may include at least one of a solar cell device and a gas consuming power generation device that generates power by consuming gas.

[0011] According to the above characteristic configuration, when the pressure index value indicating the level of pressure on the power supply and demand is less than a predetermined first reference level, the power management device does not transmit a discharge instruction to the first power storage device and the second power storage device. In other words, when the pressure on the power supply and demand is low, the power management device does not instruct either the first power storage device or the second power storage device to discharge. As a result, the first power storage device and the second power storage device do not discharge.

[0012] Furthermore, when the pressure index value is equal to or greater than the first reference level and less than the second reference level, the power management device transmits a discharge instruction to the second storage device and does not transmit a discharge instruction to the first storage device. In other words, when the degree of pressure on the power supply and demand begins to increase, the power management device instructs the second storage device to discharge but does not instruct the first storage device to discharge. In this way, at a stage where the degree of pressure on the power supply and demand begins to increase, the remaining amount of stored power in the second storage device is used to suppress an increase in the degree of pressure or to reduce the degree of pressure. At this stage, the remaining amount of stored power in the first storage device is preserved without being used in order to suppress an increase in the degree of pressure on the power supply and demand or to reduce the degree of pressure.

[0013] Furthermore, when the pressure index value is equal to or greater than the second reference level, the power management device transmits a discharge instruction to the first storage device and the second storage device. That is, when the pressure level of the power supply and demand becomes very high, the power management device instructs the first storage device and the second storage device to discharge. In this way, at a stage where the pressure level of the power supply and demand becomes very high, the increase in the pressure level is suppressed or the pressure level is reduced by using the remaining storage capacity of the first storage device and the second storage device. In particular, there is no limit to the discharge power of the first storage device, and it is possible to discharge power that exceeds the power consumption of the power consumption device installed in the facility itself. Therefore, when viewed as a whole of a plurality of facilities, discharging the first storage device can greatly contribute to suppressing the increase in the pressure level of the power supply and demand or reducing the pressure level. Therefore, it is possible to provide a power supply management system that can adjust the overall power supply and demand across multiple facilities using power storage devices.

[0014] Another characteristic configuration of the power supply management system according to the present invention is such that each of the plurality of facilities is provided with a power meter that measures a power receiving point of the facility, and information about the power receiving point measured by the power meter is transmitted to the power supply management device; The pressure index value is the sum of the power receiving points of the multiple facilities.

[0015] According to the above characteristic configuration, if the total of the power receiving point power of a plurality of facilities becomes large, it can be regarded that the degree of tightness of the power supply and demand among the plurality of facilities is high.

[0016] Another characteristic configuration of the power supply management system of the present invention is that the pressure index value is a total power shortage derived by subtracting the power generation of the power generation devices of the multiple facilities from the power consumption of the power consumption devices of the multiple facilities.

[0017] According to the above characteristic configuration, if the total power shortage derived by subtracting the power generated by the power generation devices of the multiple facilities from the power consumption devices of the multiple facilities becomes large, it can be considered that the degree of tightness in the supply and demand of power among the multiple facilities is high.

[0018] Another characteristic configuration of the power supply management system according to the present invention is that the pressure index value is a trading price of electricity.

[0019] When the degree of tightness of the power supply and demand in the power system is high, the trading price of electricity may become high, and when the degree of tightness of the power supply and demand in the power system is low, the trading price of electricity may become low. Therefore, in this characteristic configuration, if the trading price of electricity increases, it can be considered that the degree of tightness of electricity supply and demand in the power grid is high.

[0020] Another characteristic configuration of the power supply management system according to the present invention is that the pressure index value is a power usage rate in the power grid.

[0021] A high degree of tightness in the supply and demand of electricity in a power system means that the electricity usage rate in the power system is high. Therefore, in this characteristic configuration, if the power usage rate in the power system is high, it can be regarded as indicating that the degree of tightness of power supply and demand in the power system is high. [Brief description of the drawings]

[0022] [Figure 1] FIG. 1 is a diagram illustrating a configuration of a power management system. [Diagram 2] FIG. 13 is a diagram showing the transition of the total power received at multiple facilities. [Diagram 3] FIG. 13 is a diagram showing changes in power at receiving points of a plurality of facilities. [Figure 4] FIG. 13 is a diagram illustrating the configuration of another power management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0023] The configuration of a power management system according to an embodiment of the present invention will be described below with reference to the drawings. Fig. 1 is a diagram showing the configuration of a power supply management system. As shown in the figure, the power supply management system includes power storage devices 13 (first power storage device 13A, second power storage device 13B) installed in each of a plurality of facilities 10, and a power supply management device 3 capable of communicating information with the plurality of facilities 10 via an information communication line 2. Although three facilities 10A to 10C are depicted in Fig. 1, the number of facilities 10 can be changed as appropriate. For example, the plurality of facilities 10 are installed adjacent to each other in terms of location, and the plurality of facilities 10 form one city block. Alternatively, the plurality of facilities 10 may be installed apart in terms of location, and the plurality of facilities 10 may virtually form one city block.

[0024] Each of the facilities 10 is provided with a power storage device 13 connected to the power grid 1, a solar cell device 14 as a power generation device, and a power consumption device 15. The power storage device 13, the solar cell device 14, and the power consumption device 15 are connected to a power line 12. The facility 10 is also provided with a power meter 11 that measures the power receiving point of the facility 10. In this embodiment, the received power supplied from the facility 10 to the power grid 1 is treated as positive power receiving point power, and the reverse flow power supplied from the facility 10 to the power grid 1 is treated as negative power receiving point power. The power meter 11 may include a meter that measures the received power supplied from the facility 10 to the power grid 1, and a meter that measures the reverse flow power supplied from the facility 10 to the power grid 1, separately.

[0025] In this embodiment, a solar cell device 14 is installed in the facility 10 as a power generation device, but the power generation device may include at least one of a solar cell device and a gas-consuming power generation device that consumes gas to generate electricity. The gas-consuming power generation device is, for example, a fuel cell device that consumes hydrocarbon gas or hydrogen gas supplied at the facility 10 to generate electricity, or a device that includes a gas engine that uses hydrocarbon gas or hydrogen gas supplied at the facility 10 as fuel and a generator driven by the gas engine. When the supplied gas is hydrocarbon gas, a reformer that reforms the hydrocarbon gas to generate gas containing hydrogen is provided in addition to the fuel cell device.

[0026] A first power measuring unit CT1 and a second power measuring unit CT2 are provided on the power line 12. Measurement results of the first power measuring unit CT1 and the second power measuring unit CT2 are transmitted to the power storage device 13.

[0027] The first power measurement unit CT1 measures the power obtained by subtracting the generated power of the solar cell device 14 from the sum of the power consumed by the power consumption device 15 and the charging power of the power storage device 13, or the power obtained by subtracting the discharged power of the power storage device 13 and the generated power of the solar cell device 14 from the power consumed by the power consumption device 15. In other words, when the sum of the power consumed by the power consumption device 15 and the charging power of the power storage device 13 is greater than the generated power of the solar cell device 14, or when the power consumed by the power consumption device 15 is greater than the sum of the discharged power of the power storage device 13 and the generated power of the solar cell device 14, the power measured by the first power measurement unit CT1 is a positive value. In this case, the power at the power receiving point measured by the power meter 11 is also a positive value.

[0028] When the sum of the power consumed by the power consumption device 15 and the charging power of the power storage device 13 is smaller than the power generated by the solar cell device 14, or when the power consumed by the power consumption device 15 is smaller than the sum of the discharging power of the power storage device 13 and the power generated by the solar cell device 14, the power measured by the first power measurement unit CT1 becomes a negative value. In this case, the power receiving point power measured by the power meter 11 also becomes a negative value.

[0029] The second power measurement unit CT2 measures the power obtained by subtracting the discharge power of the power storage device 13 from the power consumption of the power consumption device 15, or the sum of the power consumption of the power consumption device 15 and the charging power of the power storage device 13. When the power consumption of the power consumption device 15 is greater than the discharge power of the power storage device 13, the power measured by the second power measurement unit CT2 is a positive value. On the other hand, when the power consumption of the power consumption device 15 is less than the discharge power of the power storage device 13, the power measured by the second power measurement unit CT2 is a negative value.

[0030] The plurality of power storage devices 13 are configured to discharge when receiving a discharge instruction transmitted from the power management device 3. For example, the power storage devices 13 are configured to consider the discharge instruction to be valid from the time when the power storage devices 13 receive a discharge instruction until the power storage devices 13 receive a discharge stop instruction from the power management device 3. The power storage devices 13 include a first power storage device 13A that is set to be able to discharge power exceeding the power consumption of the power consumption device 15 when receiving a discharge instruction from the power management device 3 to discharge, and a second power storage device 13B that is set to be able to discharge within a range not exceeding the power consumption of the power consumption device 15 when receiving a discharge instruction from the power management device 3 to discharge. That is, the first power storage device 13A is set as a device that can perform reverse power flow, and the second power storage device 13B is set as a device that cannot perform reverse power flow.

[0031] In the example shown in FIG. 1, the power storage device 13 provided in the facility 10A is a first power storage device 13A capable of reverse power flow, and the power storage device 13 provided in the facility 10C is a second power storage device 13B not capable of reverse power flow.

[0032] When the second power storage device 13B discharges with a discharge power within a range that does not exceed the power consumption of the power consumption device 15, for example, the discharge power is adjusted within a range in which the power supplied from the power system 1 to the facility 10 measured by the first power measurement unit CT1 does not become a negative value, that is, within a range in which no reverse flow power occurs from the facility 10 to the power system 1. If the power supplied from the power system 1 to the facility 10 measured by the first power measurement unit CT1 does not become a negative value, it is ensured that the discharge power of the second power storage device 13B does not exceed the power consumption of the power consumption device 15.

[0033] Supplementally, when the second storage device 13B receives a discharge instruction from the power management device 3 to perform discharge, if the second storage device 13B is not discharging and the power measured by the first power measurement unit CT1 is a positive value (i.e., if power is being supplied from the power system 1 to the facility 10), the second storage device 13B discharges within a range in which the power measured by the first power measurement unit CT1 does not become a negative value. In contrast, even if the second storage device 13B receives a discharge instruction from the power management device 3, the second storage device 13B does not discharge if the second storage device 13B is not discharging and the power measured by the first power measurement unit CT1 is a negative value (i.e., if power is being supplied from the facility 10 to the power system 1).

[0034] When first power storage device 13A capable of reverse power flow discharges, there is no limit to the discharge power.

[0035] In this way, the discharge power of the second power storage device 13B, which is unable to reversely flow its discharge power to the power grid 1, is limited to the power consumption of the power consumption device 15 installed in its own facility 10. Therefore, when viewed as a whole of the multiple facilities 10, the total power at the power receiving point of the multiple facilities 10 can be reduced by discharging the second power storage device 13B, but there is a limit to the extent of this reduction. In contrast, there is no limit to the discharge power of the first power storage device 13A, which is able to reversely flow power. Therefore, the ability of the first power storage device 13A to reduce the total power at the power receiving point of the multiple facilities 10 by discharging is greater than that of the second power storage device 13B.

[0036] Furthermore, when the power storage device 13 has not received a discharge instruction, it can perform charging within a range in which the sum of the power consumption and the charging power of the power consumption device 15 does not exceed the power generation of the solar cell device 14, that is, within a range of surplus power obtained by subtracting the power consumption of the power consumption device 15 from the power generation of the solar cell device 14. For example, the power storage device 13 can perform charging when it has not received a discharge instruction and the power measured by the first power measurement unit CT1 is a negative value (i.e., when the power generation of the solar cell device 14 is greater than the power consumption of the power consumption device 15).

[0037] A Home Energy Management System (HEMS) 16 provided in the facility 10 communicates with devices provided in the facility 10 via communication lines, and can receive information from and transmit information to each device. The HEMS 16 can also transmit information received from each device to the power management device 3, and can receive information from the power management device 3 and the information providing server 6. The communication method between the HEMS 16 and the power meter 11, and between the HEMS 16 and the power storage device 13 is, for example, ECHONETLite (registered trademark), but can be set appropriately.

[0038] The HEMS 16 transmits information on the charging power and discharging power of the power storage device 13, information on the power receiving point power measured by the power meter 11, information on the power measured by the first power measurement unit CT1, information on the power measured by the second power measurement unit CT2, and the like to the power source management device 3. The HEMS 16 receives information on a discharge instruction and the stop of discharge from the power source management device 3. In each of the multiple facilities 10, the HEMS 16 may transmit information on a power shortage derived by subtracting the power generated by the solar cell device 14 from the power consumption of the power consumption device 15 to the power source management device 3. Note that when the power generated by the solar cell device 14 is greater than the power consumption of the power consumption device 15, the power shortage becomes a negative value (i.e., the surplus power becomes a positive value).

[0039] The power management device 3 includes a storage unit 4 that stores information to be handled, and a processing unit 5 that performs arithmetic processing of information. The storage unit 4 stores information indicating whether the power storage device 13 provided in each of the facilities 10 is the first power storage device 13A capable of reverse power flow or the second power storage device 13B not capable of reverse power flow. In the above example, the HEMS 16 of the facility 10 transmits information on the power shortage (or surplus power) derived by subtracting the power generated by the solar cell device 14 from the power consumption of the power consumption device 15 to the power management device 3, but the power management device 3 may derive the power shortage (or surplus power). For example, since the information as described above is transmitted from the facility 10 to the power management device 3, the processing unit 5 of the power management device 3 can derive the power consumption of the power consumption device 15 based on the power measured by the second power measurement unit CT2 and the charging power or discharging power of the power storage device 13. That is, the power management device 3 can recognize the power consumption of the power consumption device 15 and the charging power or discharging power of the power storage device 13. As a result, the processing unit 5 of the power management device 3 can derive the power generated by the solar cell device 14 based on the power measured by the first power measurement unit CT1, the power consumption of the power consumption device 15, and the charging power or discharging power of the power storage device 13. Then, the processing unit 5 of the power management device 3 can derive the sum of the value of [power consumption of the power consumption device 15-power generation of the solar cell device 14] in multiple facilities 10, that is, the trend of the total power shortage (or total surplus power), etc.

[0040] Here, the sum of the values ​​of [power consumption of power consuming devices 15 - power generation of solar cell devices 14] in the multiple facilities 10 is the total power shortage derived by subtracting the power generation of the solar cell devices 14 in the multiple facilities 10 from the power consumption of the power consuming devices 15 in the multiple facilities 10, and can be regarded as a pressure index value indicating the level of pressure on power supply and demand for the multiple facilities 10. In other words, the larger the total power shortage, the higher the pressure on power supply and demand.

[0041] When a pressure index value indicating the level of pressure on the power supply and demand (i.e., a total power shortage derived by subtracting the power generated by the solar cell devices 14 of the multiple facilities 10 from the power consumption of the power consumption devices 15 of the multiple facilities 10) is less than a predetermined first reference level, the processing unit 5 of the power management device 3 of this embodiment does not transmit a discharge instruction to the first power storage device 13A capable of reverse power flow and the second power storage device 13B not capable of reverse power flow. In other words, when the sum of the values ​​of [power consumption of the power consumption devices 15-power generation of the solar cell devices 14] in the multiple facilities 10 is a positive value, that is, the total power shortage is a positive value, but the total power shortage as the pressure index value is not so large, the processing unit 5 does not instruct either the first power storage device 13A or the second power storage device 13B to discharge. As a result, the first power storage device 13A and the second power storage device 13B do not discharge.

[0042] In addition, when the pressure index value is equal to or higher than the first reference level and is lower than a second reference level higher than the first reference level, the processing unit 5 of the power management device 3 transmits a discharge instruction to the second storage device 13B that is not capable of reverse power flow, and does not transmit a discharge instruction to the first storage device 13A that is capable of reverse power flow. In other words, when the sum of the values ​​of [power consumption of the power consumption device 15-power generation of the solar cell device 14] in the multiple facilities 10 is a positive value, that is, when the total power shortage as the pressure index value begins to increase, the processing unit 5 instructs the second storage device 13B to discharge. In this case, the second storage device 13B adjusts the discharge power within a range in which the power measured by the first power measurement unit CT1 does not become a negative value, as described above. In this way, at a stage where the pressure level of the power supply and demand begins to increase, the remaining amount of stored power in the second storage device 13B is used to suppress the increase in the pressure level or to reduce the pressure level. At this stage, the remaining amount of stored power in the first power storage device 13A capable of reverse power flow is not used but is preserved in order to suppress an increase in the degree of tightness of the power supply and demand or to reduce the degree of tightness.

[0043] Furthermore, when the pressure index value is equal to or higher than the second reference level, the processing unit 5 of the power management device 3 transmits a discharge instruction to the first storage device 13A capable of reverse power flow and the second storage device 13B not capable of reverse power flow. That is, when the sum of the values ​​of [power consumption of the power consumption device 15-power generation of the solar cell device 14] in the multiple facilities 10 is a positive value, that is, when the total power shortage as the pressure index value becomes very large, the processing unit 5 instructs the first storage device 13A and the second storage device 13B to discharge. For example, the power management device 3 may instruct the first storage device 13A capable of reverse power flow to a target value of discharge power, or may instruct the target value of reverse power flow from the facility 10 to the power grid 1. Then, the second storage device 13B not capable of reverse power flow adjusts the discharge power within a range in which the power measured by the first power measurement unit CT1 does not become a negative value as described above. Also, the first storage device 13A capable of reverse power flow discharges so that the discharge power becomes a target value, or so that the reverse power flow power measured by the first power measurement unit CT1 becomes a target value. In this way, at a stage where the degree of tightness of the power supply and demand becomes very high, the increase in the degree of tightness is suppressed or the degree of tightness is reduced by using the remaining power storage amounts of the first storage device 13A capable of reverse power flow and the second storage device 13B not capable of reverse power flow. In particular, there is no limit to the discharge power of the first storage device 13A, and it is also possible to discharge power that exceeds the power consumption of the power consumption device 15 installed in the facility 10 itself. Therefore, when viewed as a whole of the multiple facilities 10, the discharge of the first storage device 13A can greatly contribute to reducing the total power at the receiving point of the multiple facilities 10.

[0044] FIG. 2 is a diagram showing the transition of the total power at the receiving point of a plurality of facilities 10. The solid line indicates the transition of the total power at the receiving point. The dashed line indicates the transition of the total value of [power consumption of the power consumption device 15-power generation of the solar cell device 14] of the plurality of facilities 10, which does not include the charging power and discharging power of the power storage device 13. In other words, the solid line in FIG. 2 indicates the total value of [power consumption of the power consumption device 15-power generation of the solar cell device 14-discharging power of the power storage device 13] of the plurality of facilities 10, or the total value of [power consumption of the power consumption device 15-power generation of the solar cell device 14+charging power of the power storage device 13] of the plurality of facilities 10.

[0045] Incidentally, since the remaining amount of stored electricity in each power storage device 13 reaches the upper limit before the start of the "today" shown in Fig. 2, surplus electricity generated after 10:00 on the "today" is not charged. In contrast, surplus electricity generated after 8:00 on the "next day" shown in Fig. 2 is charged in each power storage device.

[0046] 2, the pressure index value, which is the total value of [power consumption of power consumption devices 15 - power generation of solar cell devices 14] of the multiple facilities 10, is less than the first reference level during the period from about 12:00 to about 17:00. Therefore, the processing unit 5 of the power management device 3 does not transmit a discharge instruction to the first power storage device 13A and the second power storage device 13B during that period.

[0047] Between 17:00 and 18:00, the pressure index value, which is the total value of [power consumption of the power consumption device 15-power generation of the solar cell device 14] of the multiple facilities 10, is equal to or greater than the first reference level and less than the second reference level. Therefore, the processing unit 5 of the power management device 3 transmits a discharge instruction to the second storage device 13B that cannot perform reverse power flow, and does not transmit a discharge instruction to the first storage device 13A that can perform reverse power flow. As a result, as shown by the solid line in FIG. 2, the total of the power at the power receiving point is reduced by the amount discharged by the second storage device 13B. The second storage device 13B is set so that it can discharge within a range that does not exceed the power consumption of the power consumption device 15. Therefore, the second storage device 13B of this embodiment discharges within a range in which the power measured by the first power measurement unit CT1 does not become a negative value, as described above.

[0048] Incidentally, after transmitting the discharge instruction to the second power storage device 13B, if the pressure index value becomes less than the first reference level, the processing unit 5 of the power management device 3 transmits a discharge stop instruction to the second power storage device 13B.

[0049] Between 18:00 and 23:00, the pressure index value, which is the total value of [power consumption of the power consumption devices 15-power generation of the solar cell devices 14] of the multiple facilities 10, is equal to or higher than the second reference level. Therefore, the processing unit 5 of the power management device 3 transmits a discharge instruction to the first storage device 13A capable of reverse power flow and the second storage device 13B not capable of reverse power flow. Therefore, the second storage device 13B discharges so that the power measured by the second power measurement unit CT2 does not become a negative value, and the first storage device 13A discharges at a predetermined discharge power. For example, the first storage device 13A may discharge at a predetermined constant discharge power, or may discharge at a discharge power such that the power measured by the first power measurement unit CT1 becomes a predetermined constant reverse power flow power.

[0050] Incidentally, after transmitting the discharge instruction to the first power storage device 13A, if the pressure index value becomes less than the second reference level, the processing unit 5 of the power management device 3 transmits a discharge stop instruction to the first power storage device 13A.

[0051] <Another embodiment> In the above embodiment, a specific example of the configuration of the power supply management system has been described, but the configuration can be changed as appropriate. For example, in the above embodiment, an example in which the solar cell device 14 is provided in the facility 10 as a power generation device has been described, but the power generation device may include at least one of the solar cell device and the gas consumption type power generation device that consumes gas to generate power. For example, as shown in FIG. 4, the facility 10 may be provided with both the solar cell device 14 and the fuel cell device 16 (gas consumption type power generation device) as power generation devices. In the example shown in FIG. 4, the fuel cell device 16 is connected to the power line 12 between the connection point of the power storage device 13 to the power line 12 and the connection point of the power consumption device 15 to the power line 12. In addition, a third power measurement unit CT3 is provided to measure the power obtained by subtracting the power generation power of the fuel cell device 16 from the power consumption power of the power consumption device 15, and the measurement result is transmitted to the fuel cell device 16. The fuel cell device 16 can perform operations such as setting the generated power to a predetermined constant value (e.g., rated output) or adjusting the generated power so that the power measured by the third power measurement unit CT3 becomes a constant value greater than or equal to zero (i.e., so that the generated power of the solar cell device 14 is greater than or equal to the power consumption of the power consumption device 15). Here, the fuel cell device 16 can derive the power consumption of the power consumption device 15 based on the power generated by itself and the power measured by the third power measurement unit CT3. Then, the fuel cell device 16 may transmit the derived power consumption of the power consumption device 15 to the electricity storage device 13. Alternatively, although not shown, a configuration in which only a gas consuming power generation device is provided as the power generation device, for example a configuration in which the solar cell device 14 is not provided in the power supply management system shown in FIG. 4, may be adopted. It should be noted that it is possible to appropriately change the connection points of each power generation device to the power line 12. It is also possible to appropriately set how each power generation device operates.

[0052] In the above embodiment, the pressure index value is described as a total power shortage derived by subtracting the power generated by the solar cell devices 14 of multiple facilities 10 from the power consumption of the power consumption devices 15 of multiple facilities 10, but the content of the pressure index value can be changed as appropriate.

[0053] For example, the pressure index value may be the sum of the power receiving point power of a plurality of facilities 10. In this case, the processing unit 5 of the power management device 3 can handle the sum of the power receiving point power measured by the power meter 11 of each facility 10 as the pressure index value.

[0054] Alternatively, the tightness index value may be the trading price of electricity. For example, when the degree of tightness of the power supply and demand, particularly the degree of tightness of the power supply and demand in the power system 1, is high, the trading price of electricity may be high, and when the degree of tightness of the power supply and demand in the power system 1 is low, the trading price of electricity may be low. Therefore, the processing unit 5 of the power management device 3 may obtain information on the trading price of electricity from the information providing server 6, and use the trading price as the tightness index value.

[0055] Alternatively, the pressure index value may be the power usage rate in the power system 1. A high power usage rate in the power system 1 means that the degree of pressure on power supply and demand in the power system 1 is high. For example, the processing unit 5 of the power management device 3 may obtain information about the power usage rate in the power system 1 from the information providing server 6, and use the power usage rate as the pressure index value.

[0056] In the above embodiment, the values ​​of the first reference level and the second reference level can be set appropriately.

[0057] In the above embodiment, an example was described in which the second storage device 13B refers to information on the measurement results of the first power measurement unit CT1 in order to discharge at a discharge power within a range that does not exceed the power consumption of the power consumption device 15. However, the discharge power may be adjusted by referring to other information as long as it is possible to achieve that the discharge power does not exceed the power consumption of the power consumption device 15.

[0058] In the above-described embodiment and other embodiments, the HEMS 16 may obtain information on the generated power from the solar cell device 14 and transmit it to the power source management device 3. Also, the HEMS 16 may obtain information on the generated power from the fuel cell device 16 and transmit it to the power source management device 3. Then, the processing unit 5 of the power source management device 3 may derive a total power deficit by subtracting the generated power of the power generation devices (solar cell device 14, fuel cell device 16) of the multiple facilities 10 from the power consumption of the power consumption devices 15 of the multiple facilities 10.

[0059] Furthermore, the configurations disclosed in the above embodiments (including other embodiments, the same applies below) can be applied in combination with configurations disclosed in other embodiments, provided that no contradiction arises. Furthermore, the embodiments disclosed in this specification are merely examples, and the embodiments of the present invention are not limited thereto, and can be appropriately modified within the scope that does not deviate from the purpose of the present invention. [Industrial Applicability]

[0060] INDUSTRIAL APPLICABILITY The present invention can be used in a power supply management system that can adjust the overall power supply and demand across a plurality of facilities by using power storage devices. [Explanation of symbols]

[0061] 1: Power system 2: Information and communication lines 3: Power management device 4: Storage section 5: Processing section 6: Information server 10 (10A, 10B, 10C): Facilities 11: Power meter 12: Power lines 13: Power storage device 13A: 1st power storage device 13B:Second power storage device 14: Solar cell equipment (power generation equipment) 15:Power consumption equipment 16: Fuel cell device (power generation device) CT1: 1st power measurement section CT2: Second power measurement unit CT3: Third power measurement unit

Claims

1. A power supply management system including a power storage device installed in each of a plurality of facilities and a power supply management device capable of communicating information between the plurality of power storage devices, Each of the facilities is provided with the power storage device, the power generation device, and the power consumption device, which are connected to a power grid, and the power storage device discharges when receiving a discharge instruction transmitted from the power management device; the plurality of power storage devices include a first power storage device configured to be able to discharge power exceeding the power consumption of the power consumption device when discharging in response to the discharge instruction from the power management device, and a second power storage device configured to be able to discharge within a range not exceeding the power consumption of the power consumption device when discharging in response to the discharge instruction from the power management device, The power management device includes: When a tightness index value indicating the level of tightness of power supply and demand is less than a predetermined first reference level, the discharge instruction is not transmitted to the first power storage device and the second power storage device; When the pressure index value is equal to or greater than the first reference level and is less than a second reference level higher than the first reference level, the discharge instruction is transmitted to the second power storage device, and the discharge instruction is not transmitted to the first power storage device; When the pressure index value is equal to or greater than the second reference level, the power management system transmits the discharge instruction to the first power storage device and the second power storage device.

2. a power meter for measuring a power receiving point of the facility is provided in each of the plurality of facilities, and information on the power receiving point measured by the power meter is transmitted to the power management device; The power supply management system according to claim 1 , wherein the pressure index value is a sum of the power receiving points of the plurality of facilities.

3. The power supply management system according to claim 1 , wherein the pressure index value is a total power shortage derived by subtracting the generated power of the power generation devices of the plurality of facilities from the power consumption of the power consumption devices of the plurality of facilities.

4. The power management system according to claim 1 , wherein the pressure index value is a trading price of electricity.

5. The power management system according to claim 1 , wherein the pressure index value is a power usage rate in the power grid.

6. 6. The power supply management system according to claim 1, wherein the power generation device includes at least one of a solar cell device and a gas consumption type power generation device that consumes gas to generate power.

Citation Information

Patent Citations

  • Monitoring and scheduling system and scheduling method for optical storage direct flexible energy

    CN115224796A

  • Storage type hot water supply system

    JP2013148287A

  • Local power demand control system

    JP2014168315A

  • Power supply system

    JP2016001967A

  • Power management device, power management method, and power management program

    JP2018170884A