Power supply control device and power supply control method
The power supply control device addresses the issue of power fluctuations by using a controller to disconnect faulty systems, store abnormality information, and set the inter-system switch to a half-on state for stable restarts, ensuring uninterrupted vehicle operation.
Patent Information
- Application Number
- JP2023053875
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-10
AI Technical Summary
After a ground fault occurs in the second system of an on-vehicle power supply device during evacuation drive, reconnecting the inter-system switch without resolving the fault can cause a sudden decrease in power from the first power source, hindering vehicle operation.
A power supply control device with a controller that detects abnormalities in both systems, performs fail-safe control by disconnecting the faulty system, stores abnormality information, and sets the inter-system switch to a half-on state at startup to limit current flow, allowing for a confirmation process to ensure the second system is stable before full operation.
Ensures vehicle operation is not hindered by power fluctuations when restarting after a ground fault, by limiting current flow and confirming system stability before full reconnection, thus preventing sudden power drops.
Smart Images

Figure 2024141963000001_ABST
Abstract
Description
[Technical field]
[0001] The disclosed embodiments relate to a power supply control device and a power supply control method. [Background technology]
[0002] 2. Description of the Related Art There is an on-board power supply device that includes a first system that supplies power from a first power source to a load, a second system that supplies power from a second power source to the load, and an inter-system switch that connects the first system and the second system.
[0003] The on-board power supply device maintains the inter-system switch in a connected state during normal operation when no ground fault occurs in the first and second systems. If a ground fault subsequently occurs in the second system while the vehicle is in autonomous driving, the on-board power supply device cuts off the inter-system switch and causes the vehicle to evacuate using power supplied from the first power source via the first system (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent Publication No. 2022-80730 Summary of the Invention [Problem to be solved by the invention]
[0005] However, when the on-board power supply device is started next time after the evacuation driving is completed and the IG (ignition switch) is turned off, if the inter-system switch is connected as in normal operation, it may cause a hindrance to the driving of the vehicle.For example, if the ground fault of the second system has not been eliminated when the on-board power supply device is started next time, when the inter-system switch is connected, a current flows from the first power source to the ground fault point of the second system, causing a sudden decrease in the power of the first power source and causing a hindrance to the driving of the vehicle.
[0006] One aspect of the embodiment has been made in consideration of the above, and aims to provide a power supply control device and a power supply control method that do not interfere with the vehicle's driving when the device is next started up after a ground fault occurs in the second system and evacuation driving is completed. [Means for solving the problem]
[0007] A power supply control device according to an embodiment includes a controller. The controller controls a connection device provided on an inter-system line connecting a first system that supplies power from a first power source to a first load and a second system that supplies power from a second power source to a second load. When the controller detects an abnormality in the first system or the second system, the controller shuts off the connection device, performs fail-safe control to supply power through a normal system of the first system and the second system, and stores abnormality information indicating an abnormal system of the first system and the second system in a non-volatile memory. At the next startup, if the abnormality information indicating an abnormality in the second system is stored in the non-volatile memory, the controller executes a second system confirmation process to check for an abnormality in the second system by setting the connection device to a half-on state that limits a current flowing through the connection device. Effect of the Invention
[0008] A power supply control device according to one aspect of an embodiment provides an advantage in that the next time the power supply control device is started after a ground fault occurs in the second system and evacuation travel is completed, the vehicle travel is not hindered. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is an explanatory diagram of the configuration and operation of a power supply control device according to an embodiment. [Diagram 2] FIG. 2 is an explanatory diagram of the configuration and operation of the power supply control device according to the embodiment. [Diagram 3] FIG. 3 is an explanatory diagram of the configuration and operation of the power supply control device according to the embodiment. [Figure 4] FIG. 4 is an explanatory diagram of the configuration and operation of the power supply control device according to the embodiment. [Diagram 5] FIG. 5 is a flowchart illustrating an example of processing executed by the controller according to the embodiment. [Figure 6] FIG. 6 is a flowchart illustrating an example of processing executed by the controller according to the embodiment. [Figure 7] FIG. 7 is a flowchart illustrating an example of processing executed by the controller according to the embodiment. [Figure 8] FIG. 8 is a flowchart illustrating an example of processing executed by the controller according to the embodiment. [Figure 9] FIG. 9 is a flowchart illustrating an example of processing executed by the controller according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of a power supply control device and a power supply control method will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the following embodiment. In the following, a case where a vehicle equipped with a power supply control device according to the embodiment is an electric vehicle or a hybrid vehicle will be described.
[0011] The vehicle in which the power supply control device according to the embodiment is installed may be an engine vehicle that runs on an internal combustion engine. The power supply control device according to the embodiment is a device that is installed in a vehicle with an automatic driving function and supplies power to a load.
[0012] [1. Power supply control device configuration] The configuration and operation of a power supply control device 1 according to an embodiment will be described with reference to Fig. 1 to Fig. 4. Fig. 1 to Fig. 4 are explanatory diagrams of the configuration and operation of a power supply control device 1 according to an embodiment. As shown in Fig. 1, the power supply control device 1 according to an embodiment is connected to a first power source 10, a first load 101, a general load 102, a second load 103, and an external device 100.
[0013] The power supply control device 1 includes a first system 110 and a second system 120. The first system 110 is a power supply system that supplies power from a first power source 10 to a first load 101 and a general load 102. The second system 120 is a power supply system that supplies power from a second power source 20 (described later) to a second load 103.
[0014] The first load 101 includes a load for autonomous driving. The first load 101 includes, for example, a steering motor, an electric brake device, an in-vehicle camera, etc. that operate during autonomous driving. The general load 102 includes a display, an air conditioner, an audio device, a video device, various lights, etc.
[0015] The second load 103 has some of the functions for automatic driving that the first load 101 has. The second load 103 includes, for example, a steering motor, an electric brake device, and a radar, which are minimum devices required for FOP (Fail Operation, evacuation drive control). The first load 101, the general load 102, and the second load 103 operate with power supplied from the power supply control device 1.
[0016] The external device 100 is a device that controls automatic driving of a vehicle by operating a first load 101 and a second load 103. When a power supply abnormality such as a ground fault occurs in the first system 110 during automatic driving of the vehicle, the external device 100 can implement FOP by the second load 103. Furthermore, when a power supply abnormality such as a ground fault occurs in the second system 120, the external device 100 can implement FOP by the first load 101.
[0017] The first power source 10 includes a DC / DC converter (hereinafter, referred to as "DC / DC 11") and a lead battery (hereinafter, referred to as "PbB 12"). The battery of the first power source 10 may be any secondary battery other than PbB 12.
[0018] The DC / DC 11 is connected to a generator and a high-voltage battery having a higher voltage than the PbB 12. The DC / DC 11 steps down the voltage of the generator and the high-voltage battery and outputs it to the first system 110. The generator is an alternator that converts the kinetic energy of a traveling vehicle into electricity to generate power. The high-voltage battery is a battery for driving the vehicle that is installed in an electric vehicle or a hybrid vehicle.
[0019] When the first power source 10 is installed in an engine vehicle, an alternator (generator) is provided instead of the DC / DC 11. The DC / DC 11 charges the PbB 12, supplies power to the first load 101 and the general load 102, supplies power to the second load 103, and charges the second power source 20 described later.
[0020] The power supply control device 1 includes a second power supply 20, an inter-system switch 41, a battery switch 42, a controller 3, a first voltage sensor 51, and a second voltage sensor 52. The second power supply 20 is a backup power supply in case the first power supply 10 is unable to supply power. The second power supply 20 includes a lithium ion battery (hereinafter referred to as "LiB21"). The battery of the second power supply 20 may be any secondary battery other than the LiB21.
[0021] The inter-system switch 41 is provided on an inter-system line 130 that connects the first system 110 and the second system 120. The inter-system switch 41 is an example of a connection device that can connect and disconnect the first system 110 and the second system 120.
[0022] In this embodiment, electrically connecting the first system 110 and the second system 120 by the inter-system switch 41 is referred to as making the inter-system switch 41 conductive or turning on the inter-system switch 41.
[0023] In the present embodiment, the cutting of the electrical connection between the first system 110 and the second system 120 by the inter-system switch 41 is referred to as interrupting the inter-system switch 41 or turning off the inter-system switch 41.
[0024] The inter-system switch 41 may be a DC / DC converter. In this case, the DC / DC converter is controlled by the controller 3. The DC / DC converter electrically connects the first system 110 and the second system 120 by starting operation, and disconnects the electrical connection between the first system 110 and the second system 120 by stopping operation.
[0025] The battery switch 42 is a switch that connects the second power source 20 to the second system 120. In this embodiment, electrically connecting the second power source 20 and the second system 120 by the battery switch 42 is referred to as making the battery switch 42 conductive or turning on the battery switch 42.
[0026] In addition, in this embodiment, cutting the electrical connection between the second power source 20 and the second system 120 by the battery switch 42 is referred to as interrupting the battery switch 42 or turning off the battery switch 42.
[0027] The first voltage sensor 51 is provided in the first system 110. The first voltage sensor 51 detects the voltage of the first system 110 and outputs the detection result to the controller 3. The second voltage sensor 52 is provided in the second system 120. The second voltage sensor 52 detects the voltage of the second system 120 and outputs the detection result to the controller 3.
[0028] The controller 3 includes a microcomputer having a central processing unit (CPU), a read only memory (ROM), a random access memory (RAM), etc., and various other circuits. The controller 3 may be configured with hardware such as an application specific integrated circuit (ASIC) or a field programmable gate array (FPGA).
[0029] Furthermore, the controller 3 includes a non-volatile memory 31. The non-volatile memory 31 stores abnormality information 32 (described later) of the first system 110 or the second system 120. The non-volatile memory 31 may be provided separately from the controller 3.
[0030] The controller 3 controls the operation of the power supply control device 1 by the CPU executing a program stored in the ROM using the RAM as a working area. The controller 3 controls the system switch 41 and the battery switch .
[0031] The controller 3 also acquires information indicating the remaining charge of the second power source 20 from the second power source 20 via the status monitoring line 22. The information indicating the remaining charge of the second power source 20 is, for example, the SOC (State Of Charge) of the LiB 21.
[0032] The LiB 21 is in a state where the remaining charge is maximum when the SOC is 100%. The LiB 21 is in a state where the remaining charge is zero when the SOC is 0%. The controller 3 acquires, for example, the SOC of the LiB 21 as information indicating the remaining charge of the second power source 20. The controller 3 monitors the remaining charge of the second power source 20 based on the SOC of the LiB 21.
[0033] Furthermore, the controller 3 is electrically connected to the first system 110 and the second system 120 so that even if an abnormality occurs in the first system 110 or the second system 120, the controller 3 can operate using power supplied from the normal system.
[0034] A diode 61 having an anode connected to the first system 110 and a cathode connected to the controller 3 is provided in the power supply line connecting the controller 3 and the second system 120. A diode 62 having an anode connected to the second system 120 and a cathode connected to the controller 3 is provided in the power supply line connecting the controller 3 and the second system 120.
[0035] Furthermore, the controller 3 detects an abnormality in the first system 110 or the second system 120 based on the detection results input from the first voltage sensor 51 and the second voltage sensor 52. An abnormality in the first system 110 includes a ground fault in the first system 110 and a disconnection in the first system 110. An abnormality in the second system 120 includes a ground fault in the second system 120. When the controller 3 detects an abnormality in the first system 110 or the second system 120, it notifies the external device 100 of that fact.
[0036] Specifically, when the controller 3 detects an abnormality in the first system 110 or the second system 120, it outputs an automatic driving prohibition signal indicating that automatic driving is not possible to the external device 100. Furthermore, when the controller 3 does not detect an abnormality in the first system 110 or the second system 120, it outputs an automatic driving permission signal indicating that automatic driving is possible to the external device 100.
[0037] [2. Normal operation of the power supply control device] 1, the controller 3 controls the inter-system switch 41 and the battery switch 42. Specifically, the controller 3 turns off the battery switch 42 and turns on the inter-system switch 41 to supply power from the first power source 10 to the first load 101, the general load 102, and the second load 103. The controller 3 outputs an automatic operation permission signal to the external device 100, during normal times when no abnormality occurs in the first system 110 and the second system 120.
[0038] [3. Operation of the power supply control device when a power supply abnormality occurs] Next, the operation of the power supply control device 1 when a power supply abnormality occurs will be described with reference to Figures 2 to 4. The controller 3 detects the occurrence of a power supply abnormality by comparing a parameter related to an abnormality in the first system 110 or the second system 120 with a threshold value.
[0039] Here, a case will be described in which the parameter related to the abnormality in the first system 110 is the voltage of the first system 110, and the parameter related to the abnormality in the second system 120 is the voltage of the second system 120. Hereinafter, the voltage of the first system 110 detected by the first voltage sensor 51 will be referred to as a first system voltage V1. Also, the voltage of the second system 120 detected by the second voltage sensor 52 will be referred to as a second system voltage V2.
[0040] The parameter related to the abnormality in the first system 110 may be a current flowing through the first system 110 or a current flowing through the second system 120. In this case, the power supply control device 1 includes a current sensor that detects the current flowing through the first system 110 and a current sensor that detects the current flowing through the second system 120. Then, the controller 3 detects the occurrence of a ground fault when the current flowing through the first system 110 or the current flowing through the second system 120 exceeds an overcurrent threshold.
[0041] 2, in the power supply control device 1, for example, when a ground fault 200 occurs in the first system 110 or when a ground fault 201 occurs in the second system 120, an overcurrent flows toward the ground fault point. As a result, the first system voltage V1 and the second system voltage V2 become equal to or lower than the ground fault threshold value.
[0042] For example, when the second system voltage V2 becomes equal to or lower than the ground fault threshold, the controller 3 provisionally determines that the ground fault 200 or the ground fault 201 has occurred in the first system 110 or the second system 120. After that, the controller 3 outputs an automatic driving prohibition signal to the external device 100.
[0043] Then, when the controller 3 provisionally determines that the ground fault 200 or 201 has occurred, it turns off the inter-system switch 41 and turns on the battery switch 42. This disconnects the first system 110 and the second system 120, so that power is supplied from the first power source 10 to the first system 110 and power is supplied from the second power source 20 to the second system 120. Hereinafter, the shutoff of the inter-system switch 41 based on the result of the provisional determination is also referred to as pre-shutoff.
[0044] The controller 3 can also provisionally determine that a ground fault has occurred in the first system 110 or the second system 120 when at least one of the first system voltage V1 and the second system voltage V2 becomes equal to or lower than a ground fault threshold value.
[0045] This provisional determination may be made by a hardware circuit having a comparator. In this case, the comparator compares the second system voltage V2 with the ground fault threshold. When the detected voltage becomes equal to or lower than the ground fault threshold, the comparator outputs a failure detection signal indicating a provisional determination, thereby turning off the inter-system switch 41 and turning on the battery switch 42. After provisionally determining that a ground fault has occurred in the first system 110 or the second system 120, the controller 3 makes a final determination of the ground fault.
[0046] If, after the pre-shutdown, the first system voltage V1 is equal to or lower than the ground fault threshold for a predetermined period or more, and the second system voltage V2 is restored to equal to or higher than the normal threshold which is higher than the ground fault threshold for a predetermined period or more, the controller 3 determines that the second system 120 is normal and that the ground fault 200 has occurred in the first system 110. The predetermined period here is, for example, 100 ms. Note that the predetermined period is not limited to 100 ms. The normal threshold is a value higher than the ground fault threshold.
[0047] When the controller 3 determines that the ground fault 200 has occurred in the first system 110, it performs fail-safe control to supply power from the second power source 20 to the second load 103 as shown in Fig. 3, and notifies the external device 100 of the result. As a result, the external device 100 can operate the second load 103 using power supplied from the second power source 20, and evacuate the vehicle to a safe place and stop the vehicle. The fail-safe control may also include shutting off the inter-system switch 41 and turning on the battery switch 42 based on a provisional determination, and notifying the external device 100 of the result of the actual determination.
[0048] In addition, after the pre-shutdown, if the first system voltage V1 returns to being above the normal threshold for a predetermined period of time or more and the second system voltage V2 is below the ground fault threshold for a predetermined period of time or more, the controller 3 makes a final determination that the first system 110 is normal and that a ground fault 201 has occurred in the second system 120.
[0049] When the controller 3 determines that a ground fault 201 has occurred in the second system 120, it performs fail-safe control by turning off the battery switch 42 and supplying power from the first power source 10 to the first load 101 and the general load 102, as shown in Fig. 4. Then, the controller 3 notifies the external device 100 of this fact. As a result, the external device 100 can operate the first load 101 using the power supplied from the first power source 10, and can evacuate the vehicle to a safe place and stop it.
[0050] In this way, when the controller 3 detects an abnormality in the first system 110 or the second system 120, it turns off the inter-system switch 41. Then, the controller 3 performs FOP to supply power through the normal system of the first system 110 or the second system 120.
[0051] Furthermore, if both the first system voltage V1 and the second system voltage V2 continue to be at or above the normal threshold for a predetermined period or more after the pre-shutdown, the controller 3 determines that the voltage drop is a temporary voltage drop and that no ground faults 200, 201 have occurred. In other words, the controller 3 determines that both the first system 110 and the second system 120 are normal.
[0052] In this case, the controller 3 turns off the battery switch 42 from the pre-shutdown state shown in Fig. 2, turns on the inter-system switch 41, and restores the state to the normal operation state shown in Fig. 1. This allows the controller 3 to suppress a decrease in the amount of stored electricity in the second power source 20.
[0053] However, if the power supply control device 1 connects the inter-system switch 41 in the same manner as in normal operation at the next startup after the evacuation travel is completed and the IG (ignition switch) is turned off, there is a risk that this will cause problems with the travel of the vehicle.
[0054] For example, if the ground fault 201 in the second system 120 has not been resolved at the next startup, when the power supply control device 1 closes the inter-system switch 41, the power of the first power supply 10 will suddenly decrease, causing problems with the running of the vehicle.
[0055] Therefore, when the controller 3 detects an abnormality in the first system 110 or the second system 120 and performs fail-safe control, the controller 3 stores abnormality information 32 indicating which of the first system 110 and the second system 120 is abnormal in the non-volatile memory 31.
[0056] Then, at the next startup, if the non-volatile memory 31 stores abnormality information 32 indicating an abnormality in the second system 120, the controller 3 executes a second-system confirmation process to half-on the inter-system switch 41 and confirm the abnormality in the second system 120. Note that half-on means an on state (half-on state) in which the current flowing through the switching element (here, the inter-system switch 41) is limited while the amplification operation in the active region is being performed.
[0057] For example, when the inter-system switch 41 is an n-channel FET (Field Effect Transistor), the controller 3 slowly turns on the FET by linearly increasing the voltage applied to the gate of the FET from 0 V. Note that the controller 3 may half-turn on the inter-system switch 41 by applying to the gate of the FET a voltage equal to or less than half the voltage applied to the gate of the FET when turning on the FET.
[0058] Furthermore, the controller 3 may be configured to turn the inter-system switch 41 half-on by any method as long as it is possible to pass a current equal to or less than half the current flowing through the inter-system switch 41 when the inter-system switch 41 is on. For example, the controller 3 applies a pulse train of a constant frequency to the inter-system switch 41 to repeat on and off in a short cycle. As a result, the inter-system switch 41 is in a half-on state on average, and the average current flowing through the inter-system switch 41 becomes minute.
[0059] In this way, if the abnormality information 32 of the second system 120 is stored in the non-volatile memory 31 at the time of startup, the controller 3 turns the inter-system switch 41 half-on to check for an abnormality in the second system 120.
[0060] In addition, when a DCDCDC / DC converter is provided as a connection device in place of the system switch 41, the controller 3 can realize half-on of the connection device by limiting the output to a voltage (e.g., 1 V) lower than the output voltage range of normal control (e.g., 10 V to 20 V).
[0061] As a result, even if the abnormality in the second system 120 has not been resolved, the power reduction of the first power source 10 can be suppressed. That is, the controller 3 turns the inter-system switch 41 half-on, so that a current flows from the first power source 10 to the second system 120. At this time, even if the ground fault 201 in the second system 120 has not been resolved, the inter-system switch 41 is in the half-on state, so that the current flowing from the first power source 10 to the second system 120 is suppressed. Therefore, according to the power supply control device 1, when a ground fault occurs in the second system 120 and evacuation travel is completed, the vehicle travel is not hindered when the vehicle is started next time. Hereinafter, the process executed by the controller 3 of the power supply control device 1 will be specifically described.
[0062] [4. Processing performed by the controller] Next, the processing executed by the controller 3 will be described with reference to Fig. 5 to Fig. 9. Fig. 5 to Fig. 9 are flowcharts showing an example of the processing executed by the controller 3 according to the embodiment. In the power supply control device 1, while the IG of the vehicle is not turned on, that is, while the IG is off, the system switch 41 and the battery switch 42 are in an interrupted state.
[0063] [4-1. Main processing] When the IG of the vehicle is turned on, the controller 3 starts the main processing shown in Fig. 5. Specifically, as shown in Fig. 5, when the IG is turned on, the controller 3 first executes a startup process (step S101). A specific example of the startup process will be described later with reference to Fig. 6.
[0064] Next, the controller 3 determines whether or not an abnormality has been detected in the first system 110 or the second system 120 (step S102). When the controller 3 determines that an abnormality has not been detected in the first system 110 or the second system 120 (step S102, No), the controller 3 shifts the process to step S110.
[0065] Furthermore, when the controller 3 provisionally determines that an abnormality has been detected in the first system 110 or the second system 120 (step S102, Yes), it turns off the system switch 41 and turns on the battery switch 42 (step S103). This causes the power supply control device 1 to enter a pre-shutdown state as shown in FIG.
[0066] Next, the controller 3 judges whether or not there is an abnormality in the first system 110 (step S104). If the controller 3 judges that there is an abnormality in the first system 110 (step S104, Yes), it stores abnormality information 32 indicating the abnormality in the first system 110 in the non-volatile memory 31 (step S105) and moves the process to step S110. As a result, the power supply control device 1 enters the state shown in FIG. 3 and can supply power from the second power supply 20 to the second load 103 via the second system 120.
[0067] Furthermore, when the controller 3 determines that the first system 110 is not abnormal (step S104, No), it determines whether or not the second system 120 is abnormal (step S106). When the controller 3 determines that the second system 120 is abnormal (step S106, Yes), it turns off the battery switch 42 (step S107). Then, the controller 3 stores abnormality information 32 indicating an abnormality in the second system 120 in the non-volatile memory 31 (step S108), and moves the process to step S110. As a result, the power supply control device 1 is in the state shown in FIG. 4, and the power of the first power source 10 can be supplied to the first load 101 via the first system 110.
[0068] Furthermore, if the controller 3 determines that the second system 120 is not abnormal (step S106, No), that is, that neither the first system 110 nor the second system 120 is abnormal, the controller 3 turns on the inter-system switch 41 and turns off the battery switch 42 (step S109). This causes the power supply control device 1 to return to the normal state shown in FIG.
[0069] After that, the controller 3 moves the process to step S110. In step S110, the controller 3 determines whether or not the IG has been turned off. If the controller 3 determines that the IG has not been turned off (step S110, No), the controller 3 moves the process to step S102. If the controller 3 determines that the IG has been turned off (step S110, Yes), the controller 3 ends the main process.
[0070] [4-2. Startup processing] Next, the startup process (step S101 shown in FIG. 5) will be described with reference to FIG. 6. As shown in FIG. 6, when the startup process starts, the controller 3 first determines whether or not the nonvolatile memory 31 contains abnormality information 32 of the second system 120 (step S201).
[0071] If the abnormality information 32 of the second system 120 is stored in the nonvolatile memory 31, the controller 3 determines that the abnormality information 32 of the second system 120 is present (step S201, Yes), and turns the inter-system switch 41 half-on (step S202).
[0072] Next, the controller 3 executes a second system confirmation process for confirming an abnormality in the second system 120 (step S203), and ends the startup process. A specific example of the second system confirmation process will be described later with reference to FIG.
[0073] Furthermore, if the abnormality information 32 of the second system 120 is not stored in the nonvolatile memory 31, the controller 3 determines that there is no abnormality information 32 of the second system 120. Then, if the controller 3 determines that there is no abnormality information 32 of the second system 120 (step S201, No), the controller 3 determines whether or not there is abnormality information 32 of the first system 110 in the nonvolatile memory 31 (step S204).
[0074] If the abnormality information 32 of the first system 110 is stored in the non-volatile memory 31, the controller 3 determines that the abnormality information 32 of the first system 110 is present. Then, when the controller 3 determines that the abnormality information 32 of the first system 110 is present (step S204, Yes), the controller 3 executes a first system confirmation process for confirming an abnormality in the first system 110 based on the first system voltage V1 (step S205), and ends the startup process. A specific example of the first system confirmation process will be described later with reference to FIG. 8. This allows the power supply control device 1 to easily confirm whether the abnormality in the first system 110 has been resolved.
[0075] Furthermore, if the abnormality information 32 of the first system 110 is not stored in the non-volatile memory 31, the controller 3 determines that there is no abnormality information 32 of the first system 110. If the controller 3 determines that there is no abnormality information 32 of the first system (step S204, No), it sets the inter-system switch 41 to a conductive state, sets the battery switch 42 to a cut-off state (step S206), and ends the startup process. This causes the power supply control device 1 to enter the normal state shown in FIG. 1.
[0076] [4-3. Second system confirmation process] Next, the second system confirmation process (step S203 shown in FIG. 6) will be described with reference to FIG. 7. As shown in FIG. 7, when the second system confirmation process is started, the controller 3 determines whether or not the abnormality in the second system 120 has been resolved (step S301).
[0077] By half-on of the inter-system switch 41, a minute current is supplied from the first power source 10 to the second system 120. If the second system voltage V2 increases due to this minute current, the controller 3 determines that the abnormality of the second system 120 has been resolved. When the controller 3 determines that the abnormality of the second system 120 has been resolved (step S301, Yes), it erases the abnormality information 32 of the second system 120 stored in the non-volatile memory 31 (step S302), turns on the inter-system switch 41 (step S303), turns off the battery switch 42 (step S304), and transitions to normal control (see FIG. 1). Then, the controller 3 ends the second system confirmation process. As a result, the power supply control device 1 can transition to normal control without any problems when restarting after FOP.
[0078] Furthermore, if the second system voltage V2 does not increase even when the inter-system switch 41 is half-on, the controller 3 determines that the abnormality in the second system 120 has not been resolved. If the controller 3 determines that the abnormality in the second system 120 has not been resolved (step S301, No), the controller 3 prohibits the external device 100 from performing automatic operation (step S305).
[0079] Specifically, the controller 3 prohibits the external device 100 from performing automatic driving by outputting an automatic driving prohibition signal to the external device 100, which indicates that automatic driving is not possible. If the abnormality of the second system 120 has not been resolved, the controller 3 does not erase the abnormality information 32 of the second system 120 stored in the non-volatile memory 31. This allows the second system confirmation process to be performed even at the next startup.
[0080] Thereafter, the controller 3 turns off the inter-system switch 41 (step S306), turns off the battery switch 42 (step S304), and ends the second system confirmation process.
[0081] As a result, when the power supply control device 1 is restarted after FOP, the abnormality in the second system 120 has not been resolved, so automatic driving which cannot ensure redundancy in the power supply is prohibited, but normal driving using the first power source 10 is possible.
[0082] [4-4. First system confirmation process] Next, the first system confirmation process (step S205 shown in FIG. 6) will be described with reference to FIG. 8. As shown in FIG. 8, when starting the first system confirmation process, the controller 3 determines whether the first system voltage V1 is equal to or higher than a first threshold indicating a normal value (step S401).
[0083] When the controller 3 determines that the first system voltage V1 is equal to or higher than the first threshold value (Yes at step S401), the controller 3 determines that the abnormality in the first system 110 has been resolved, that is, that the abnormality in the first system has been resolved (step S402).
[0084] Then, the controller 3 erases the abnormality information 32 of the first system 110 stored in the non-volatile memory 31 (step S403), turns on the inter-system switch 41 (step S404), turns off the battery switch 42 (step S405), transitions to normal control (see FIG. 1), and ends the first system confirmation process. This allows the power supply control device 1 to transition to normal control without any problems when restarting after FOP.
[0085] Furthermore, when the controller 3 determines that the first system voltage V1 is not equal to or higher than the first threshold (step S401, No), the controller 3 determines that the first system abnormality has not been resolved (step S406). In other words, when the controller 3 determines that the first system voltage V1 is less than the first threshold, the controller 3 determines that the abnormality of the first system 110 has not been resolved.
[0086] Then, the controller 3 executes an abnormality determination process to determine whether the abnormality in the first system 110 is a disconnection or a ground fault 201 (step S407), and ends the first-system confirmation process. A specific example of the abnormality determination process will be described later with reference to FIG. 9. This allows the power supply control device 1 to perform control according to the type of abnormality in the first system 110, that is, whether the abnormality is a disconnection or a ground fault 200 in the first system 110. Note that if the abnormality in the first system 110 has not been resolved, the controller 3 does not erase the abnormality information 32 of the first system 110 stored in the non-volatile memory 31. This allows the first-system confirmation process to be performed again at the next startup.
[0087] [4-5. Abnormality Judgment Processing] Next, the abnormality determination process (step S407 shown in FIG. 8) will be described with reference to FIG. 9. As shown in FIG. 9, when the abnormality determination process is started, the controller 3 turns on the battery switch 42 (step S501) and turns on the inter-system switch 41 half-on (step S502). This causes a minute current to be supplied from the second power source 20 to the first system 110. Next, the controller 3 determines whether the first system voltage V1 is equal to or higher than a predetermined voltage (step S503). The predetermined voltage is, for example, a voltage higher than 0V and equal to or lower than the voltage of the ground fault threshold.
[0088] When the controller 3 determines that the first system voltage V1 is equal to or higher than the predetermined voltage (Yes at step S503), it determines that there is a break in the first system 110 (step S504). When the controller 3 determines that there is a break in the first system 110, it turns on the inter-system switch 41 (step S505) and the battery switch 42 (step S506) to supply power from the second power source 20 to the first load 101, and ends the abnormality determination process.
[0089] As a result, the power supply control device 1 can reliably detect a disconnection in the first system 110 while suppressing the amount of discharge of the second power supply 20 by half-on of the inter-system switch 41. Furthermore, the power supply control device 1 can enable the vehicle to move within a small area using the first load 101, the general load 102, and the second load 103 with the limited power of the second power supply 20.
[0090] Furthermore, when the controller 3 determines that the first system voltage V1 is not equal to or higher than the predetermined voltage (step S503, No), it determines that a ground fault has occurred in the first system 110 (step S507). In other words, when the controller 3 determines that the first system voltage V1 is less than the predetermined voltage, it determines that a ground fault 200 has occurred in the first system 110.
[0091] If the controller 3 determines that there is a ground fault in the first system 110, it turns the system switch 41 to an off state (step S508), turns the battery switch 42 on (step S506), supplies power from the second power source 20 to the second load 103, and terminates the abnormality determination process.
[0092] As a result, the power supply control device 1 can reliably detect the ground fault 201 in the first system 110 while suppressing the discharge amount of the second power supply 20 by half-on of the inter-system switch 41. Furthermore, the power supply control device 1 can use the second load 103 with the limited power of the second power supply 20 to enable the vehicle to move within a small range.
[0093] [5. Notes] As an appendix, the features of the present invention are as follows: (1) A power supply control device having a controller for controlling a connection device provided in an inter-system line connecting a first system that supplies power from a first power source to a first load and a second system that supplies power from a second power source to a second load, The controller: When an abnormality is detected in the first system or the second system, the connection device is shut off; performing fail-safe control to supply power through a normal system out of the first system and the second system; storing abnormality information indicating an abnormal system among the first system and the second system in a non-volatile memory; At the next startup, if the abnormality information indicating an abnormality in the second system is stored in the nonvolatile memory, the connection device is put into a half-on state that limits the current flowing through the connection device, and a second system confirmation process is executed to confirm an abnormality in the second system. Power control device. (2) The controller: When it is determined that the abnormality in the second system has been eliminated by the second system confirmation process, the connection device is energized and a transition is made to normal control. A power supply control device according to claim 1. (3) The controller: When it is determined that the abnormality in the second system has not been resolved by the second system confirmation process, the connection device is cut off, and automatic driving control of the vehicle by an external device is prohibited. A power supply control device according to (1) or (2). (4) The controller: At the next startup, if the abnormality information indicating an abnormality in the first system is stored in the nonvolatile memory, a first system confirmation process is executed to confirm an abnormality in the first system based on a voltage of the first system. A power supply control device according to any one of (1) to (3). (5) The controller is If the voltage of the first system is equal to or higher than a first threshold value indicating a normal value in the first system confirmation process, it is determined that the abnormality of the first system has been resolved, and the connection device is turned on to transition to normal control. A power supply control device as described in (4). (6) The controller is If the voltage of the first system is less than a first threshold value indicating a normal value in the first system confirmation process, it is determined that the abnormality of the first system has not been resolved, and an abnormality determination process is executed to determine whether the abnormality of the first system is a disconnection or a ground fault. A power supply control device according to (4) or (5). (7) The controller: In the abnormality determination process, the connection device is turned on halfway to supply power from the second power source to the first system, and if the voltage of the first system is equal to or higher than a predetermined voltage, it is determined that the first system is disconnected. A power supply control device as described in (6). (8) The controller: When it is determined that the first system is disconnected by the abnormality determination process, the connection device is turned on to supply power from the second power source to the first load. A power supply control device as described in (7). (9) The controller: In the abnormality determination process, the connection device is turned on halfway to supply power from the second power source to the first system, and if the voltage of the first system is less than a predetermined voltage, it is determined that a ground fault has occurred in the first system. A power supply control device according to any one of (6) to (8). (10) The controller: When the abnormality determination process determines that a ground fault has occurred in the first system, the connection device is shut off and power from the second power source is supplied to the second load. A power supply control device as described in (9). (11) a controller of a power supply control device that controls a connection device provided on an inter-system line that connects a first system that supplies power from a first power source to a first load and a second system that supplies power from a second power source to a second load, When an abnormality is detected in the first system or the second system, the connection device is shut off; performing fail-safe control to supply power through a normal system out of the first system and the second system; storing abnormality information indicating an abnormal system among the first system and the second system in a non-volatile memory; At the next startup, if the abnormality information indicating an abnormality in the second system is stored in the nonvolatile memory, the connection device is put into a half-on state that limits the current flowing through the connection device, and a second system confirmation process is executed to confirm an abnormality in the second system. Power control method.
[0094] Further advantages and modifications may readily occur to those skilled in the art. Thus, the invention in its broader aspects is not limited to the specific details and representative embodiments shown and described above. Accordingly, various modifications may be made without departing from the spirit or scope of the general inventive concept as defined by the appended claims and equivalents thereof. [Explanation of symbols]
[0095] 1 Power supply control device 3. Controller 10 1st power supply 11 DC / DC 12 PbB 20 2nd power supply 21 LiB 22 Condition monitoring line 31 Non-volatile memory 32 Abnormal information 41 Intersystem switch 42 Battery switch 51 First voltage sensor 52 Second voltage sensor 100 External device 101 1st load 102 General load 103 2nd load 110 1st system 120 2nd system 130 Intersystem Line 200 Earth fault 201 Earth fault V1 1st system voltage V2 Second system voltage
Claims
1. A power supply control device having a controller for controlling a connection device provided in an inter-system line connecting a first system that supplies power from a first power supply to a first load and a second system that supplies power from a second power supply to a second load, The controller: When an abnormality is detected in the first system or the second system, the connection device is shut off; performing fail-safe control to supply power through a normal system out of the first system and the second system; storing abnormality information indicating an abnormal system among the first system and the second system in a non-volatile memory; At the next startup, if the abnormality information indicating an abnormality in the second system is stored in the nonvolatile memory, the connection device is put into a half-on state that limits the current flowing through the connection device, and a second system confirmation process is executed to confirm an abnormality in the second system. Power control device.
2. The controller: When it is determined that the abnormality in the second system has been eliminated by the second system confirmation process, the connection device is energized and a transition is made to normal control. The power supply control device according to claim 1 .
3. The controller: When it is determined that the abnormality in the second system has not been eliminated by the second system confirmation process, the connection device is cut off, and automatic driving control of the vehicle by an external device is prohibited. The power supply control device according to claim 1 .
4. The controller: At the next startup, if the abnormality information indicating an abnormality in the first system is stored in the nonvolatile memory, a first system confirmation process is executed to confirm an abnormality in the first system based on a voltage of the first system. The power supply control device according to claim 1 .
5. The controller is If the voltage of the first system is equal to or higher than a first threshold value indicating a normal value in the first system confirmation process, it is determined that the abnormality of the first system has been resolved, and the connection device is made conductive to transition to normal control. The power supply control device according to claim 4.
6. The controller is If the voltage of the first system is less than a first threshold value indicating a normal value in the first system confirmation process, it is determined that the abnormality of the first system has not been resolved, and an abnormality determination process is executed to determine whether the abnormality of the first system is a disconnection or a ground fault. The power supply control device according to claim 4.
7. The controller: In the abnormality determination process, the connection device is turned on halfway to supply power from the second power source to the first system, and if the voltage of the first system is equal to or higher than a predetermined voltage, it is determined that the first system is disconnected. The power supply control device according to claim 6.
8. The controller: When it is determined that the first system is disconnected by the abnormality determination process, the connection device is turned on to supply power from the second power source to the first load. The power supply control device according to claim 7.
9. The controller: In the abnormality determination process, the connection device is turned on halfway to supply power from the second power source to the first system, and if the voltage of the first system is less than a predetermined voltage, it is determined that a ground fault has occurred in the first system. The power supply control device according to claim 6.
10. The controller: When the abnormality determination process determines that a ground fault has occurred in the first system, the connection device is shut off and power from the second power source is supplied to the second load. The power supply control device according to claim 9.
11. a controller of a power supply control device that controls a connection device provided on an inter-system line connecting a first system that supplies power from a first power supply to a first load and a second system that supplies power from a second power supply to a second load, When an abnormality is detected in the first system or the second system, the connection device is shut off; performing fail-safe control to supply power through a normal system out of the first system and the second system; storing abnormality information indicating an abnormal system among the first system and the second system in a non-volatile memory; At the next startup, if the abnormality information indicating an abnormality in the second system is stored in the nonvolatile memory, the connection device is put into a half-on state that limits the current flowing through the connection device, and a second system confirmation process is executed to confirm an abnormality in the second system. Power control method.
Citation Information
Patent Citations
Vehicle
JP2008072796A
Electric motorcycle
JP2011193715A
Power supply and control method
JP2022126340A
Power supply device and automatic operation system
JP2022170108A
Power control device
JP2022174606A