The information processing system addresses the challenge of quantifying undetermined greenhouse gas emissions by separating and updating carbon footprints, ensuring accurate and fair allocation and transparency in emissions data.

JP2024142208APending Publication Date: 2024-10-10DENSO CORP +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023054274
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing systems struggle to accurately determine and allocate greenhouse gas emissions, particularly Scope 3 emissions, which are difficult to quantify at the time of product manufacture, leading to challenges in calculating carbon footprints.

Method used

An information processing system that separates undetermined greenhouse gas emissions from determined emissions, using provisional values and tracking information to allocate emissions accurately to products, even when the number of products is unknown, and updates the carbon footprint once determined.

Benefits of technology

Enables accurate and fair allocation of greenhouse gas emissions to individual products, ensuring the use of primary data for carbon footprint calculations and providing transparency to end users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024142208000001_ABST
    Figure 2024142208000001_ABST
Patent Text Reader

Abstract

To provide an information processing method and the like that can appropriately deal with the unsettled greenhouse gas emissions.SOLUTION: A data processing server executes an information processing method, and processes emissions information related to the greenhouse gas emissions linking to an object, that is, the carbon footprint. The information processing method determines whether there is an unsettled carbon footprint linking to the object. When there is the unsettled carbon footprint, an undetermined CFP indicating the unsettled carbon footprint is generated as the emissions information of the object in addition to a settled CFP indicating the settled carbon footprint.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] TECHNICAL FIELD This disclosure relates to techniques for processing and storing emissions information relating to greenhouse gas emissions. [Background technology]

[0002] Patent Document 1 describes a derivation device that derives the total amount of greenhouse gas emissions related to a product. The derivation device in Patent Document 1 can derive not only Scope 1 emissions that are directly emitted by the business itself, but also Scope 2 emissions that are indirectly emitted, and Scope 3 emissions that are emitted by supply chain activities. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 7178064 Summary of the Invention [Problem to be solved by the invention]

[0004] In reality, it is difficult to determine all greenhouse gas emissions related to a product at the time of manufacturing the product, etc. In particular, as in Patent Document 1, it is difficult to determine the amount of emissions to be allocated to each product at an early stage, especially for Scope 3 greenhouse gas emissions. However, Patent Document 1 does not anticipate dealing with undetermined emissions that cannot be determined at the time of manufacturing.

[0005] The present disclosure aims to provide an information processing method, an information processing program, a data processing system, a data display device, an information storage method, an information storage program, and a data storage system that are capable of appropriately handling undetermined greenhouse gas emissions. [Means for solving the problem]

[0006] In order to achieve the above-mentioned object, one disclosed aspect is an information processing method for processing emission information related to greenhouse gas emissions linked to an object (IM), the information processing method including, in processing executed by at least one processor (11), the steps of determining whether or not there is an undetermined amount of emissions linked to the object (S107), and, if there is an undetermined amount of emissions, generating undetermined data indicating the undetermined amount of emissions as emission information of the object, in addition to the confirmed data indicating the confirmed amount of emissions (S111).

[0007] One aspect disclosed is an information processing program for processing emission information related to greenhouse gas emissions linked to an object (IM), the information processing program causing at least one processor (11) to execute processing including: determining whether there is an undetermined amount of emissions linked to the object (S107); and, if there is an undetermined amount of emissions, generating undetermined data indicating the undetermined amount of emissions as emission information of the object, in addition to the confirmed data indicating the confirmed amount of emissions (S111).

[0008] One aspect disclosed is a data processing system that processes emission information related to greenhouse gas emissions linked to an object (IM), the data processing system including an undetermined determination unit (S107) that determines whether or not there is an undetermined amount in the emissions linked to the object, and a data generation unit (S111) that, if there is an undetermined amount of emissions, generates undetermined data indicating the undetermined amount of emissions as emission information of the object, in addition to confirmed data indicating the confirmed amount of emissions.

[0009] One aspect disclosed is an information processing method for processing emission information related to greenhouse gas emissions linked to an object (IM), the information processing method including the steps of acquiring emission information of the object (S114), and, if the emission information includes, in addition to confirmed data indicating the confirmed emission amount, unconfirmed data indicating the unconfirmed emission amount, displaying both the confirmed data and the unconfirmed data on a display screen (DP) (S115), in processing executed by at least one processor (111).

[0010] One aspect disclosed is an information processing program for processing emission information related to greenhouse gas emissions linked to an object (IM), the information processing program causing at least one processor (111) to execute processing including: acquiring emission information of the object (IM) (S114); and, if the emission information includes confirmed data indicating the confirmed emission amount as well as unconfirmed data indicating the unconfirmed emission amount, displaying both the confirmed data and the unconfirmed data on a display screen (DP) (S115).

[0011] One aspect disclosed is a data display device that displays emission information related to greenhouse gas emissions linked to an object (IM), the data display device including: an information acquisition unit (S114) that acquires emission information of the object; and a display control unit (S115) that, when the emission information includes not only confirmed data indicating the confirmed emission amount but also unconfirmed data indicating the unconfirmed emission amount, displays both the confirmed data and the unconfirmed data on a display screen (DP).

[0012] In these aspects, when there is an unconfirmed amount of emissions linked to the target object, unconfirmed data indicating the unconfirmed amount of emissions can be generated or displayed. In this way, by separating the unconfirmed data from the confirmed data, it becomes possible to appropriately handle the unconfirmed amount of greenhouse gas emissions.

[0013] One aspect disclosed is an information storage method for storing emission information related to greenhouse gas emissions linked to an object (IM) in a database (20), the information storage method including, in a process executed by at least one processor (11), steps of: if there is an undetermined amount of emissions linked to the object, recording in the database (S6) tracking information for linking determined information generated after the undetermined amount is determined to the object; and calculating the emission amount to be allocated to the object using the determined information after the undetermined amount is determined (S8).

[0014] One aspect disclosed is an information storage program that stores in a database (20) emission information related to greenhouse gas emissions linked to an object (IM), and causes at least one processor (111) to execute processing including, when there is an undetermined portion of the emissions linked to the object, recording in the database (S6) tracking information for linking determined information generated after the undetermined portion is determined to the object, and calculating (S8) the emission amount to be allocated to the object using the determined information after the undetermined portion is determined.

[0015] One embodiment disclosed is a data storage system that stores in a database (20) emission information related to greenhouse gas emissions linked to an object (IM), and when there is an undetermined amount of emissions linked to the object, the data storage system includes an information recording unit (S6) that records in the database tracking information for linking determined information generated after the undetermined amount is determined to the object, and an emission calculation unit (S8) that calculates the emission amount to be allocated to the object using the determined information after the undetermined amount is determined.

[0016] In these embodiments, when there is an unconfirmed amount of emissions associated with the object, the tracking information is recorded in the database. Therefore, after the unconfirmed amount is determined, the emissions based on the determined information can be correctly assigned to the object. Therefore, it is possible to appropriately handle the unconfirmed amount of greenhouse gas emissions.

[0017] In addition, the reference numbers in parentheses in the above and claims merely show an example of the correspondence with the specific configurations in the embodiments described below, and do not limit the technical scope in any way. In addition, claims that are not explicitly stated in the claims can be combined together as long as there is no particular problem with the combination. [Brief description of the drawings]

[0018] [Figure 1] 1 is a block diagram showing an overall view of an information processing system according to a first embodiment of the present disclosure. [Diagram 2]FIG. 13 is a diagram for explaining a method of allocating greenhouse gas emissions to products in association with a type change. [Diagram 3] 13A and 13B are diagrams showing details of emission amount information stored in a database and details of display of the emission amount information. [Figure 4] FIG. 2 is a diagram showing details of an overall flow showing a flow of product manufacturing. [Diagram 5] 13 is a flowchart showing details of a first accumulation process. [Figure 6] FIG. 13 is a diagram showing an example of line names defined in the first accumulation process. [Figure 7] 13 is a flowchart showing details of a second accumulation process. [Figure 8] 13 is a flowchart showing details of a third accumulation process. [Figure 9] 13 is a flowchart showing details of a fourth accumulation process. [Figure 10] 11 is a sequence diagram showing details of a carbon footprint disclosure process performed by the data processing server and the user terminal. FIG. [Figure 11] 13 is a flowchart showing details of a second accumulation process according to a second embodiment. [Figure 12] 13 is a flowchart showing details of a third accumulation process according to the second embodiment. [Figure 13] 13 is a flowchart showing details of a fourth accumulation process according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, multiple embodiments of the present disclosure will be described based on the drawings. In addition, by assigning the same reference numerals to corresponding components in each embodiment, duplicated descriptions may be omitted. When only a part of the configuration is described in each embodiment, the configuration of the other embodiment described above can be applied to the other parts of the configuration. In addition to the combination of configurations explicitly stated in the description of each embodiment, configurations of multiple embodiments can be partially combined even if not explicitly stated, as long as there is no particular problem with the combination. And, combinations of configurations described in multiple embodiments and modified examples that are not explicitly stated are also considered to be disclosed by the following description.

[0020] First embodiment The information processing system 100 according to the first embodiment of the present disclosure shown in FIG. 1 enables the calculation and verification of carbon footprints in the entire supply chain SC. The supply chain SC is a connection between traders for delivering industrial products, agricultural products, marine products, etc. to end users EU. The supply chain SC is constructed by a large number of traders. As an example, the supply chain SC that supplies industrial products to end users EU includes a large number of suppliers SP that procure raw materials, manufacture parts, assemble parts, etc., transporters TP, and finished product manufacturers MF, etc. as traders. The traders may further include secondary users and recyclers of the final products. The final products supplied by the supply chain SC may be various items such as automobiles, batteries, semiconductors, fresh food, marine products, food, flowers, medicines, and chemicals.

[0021] The information processing system 100 treats materials, parts, assemblies, final products, etc., supplied by the supply chain SC as objects IM. The information processing system 100 processes emission information related to greenhouse gas emissions (hereinafter, GHS emissions) linked to the objects IM. Specifically, the information processing system 100 continuously collects and accumulates emission information linked to the objects IM, and provides the accumulated emission information to each trader, the end user EU, supervisory authorities, etc.

[0022] In detail, the information processing system 100 acquires primary data indicating the amount of GHS emissions emitted in each process of manufacturing, distribution, and sales of the object IM as emission information, and accumulates it in the database 20. The information processing system 100 may further acquire GHS emissions associated with use and maintenance management in the end user EU, GHS emissions in processes such as mining and recycling of raw materials, and GHS emissions in processes related to disposal such as incineration and landfilling. Based on the accumulated emission information, the information processing system 100 adds up the GHS emissions by each trader and visualizes them as a carbon footprint for each product of the object IM. The information processing system 100 realizes the traceability of the carbon footprint and enables the assurance of the accuracy of the carbon footprint (the validity of the numerical value).

[0023] As an example, within the European Union, all batteries sold for automobiles, industrial use, portable use, etc. are required to display their carbon footprints (EU Battery Regulation). The information processing system 100 is suitable for application to a supply chain SC that supplies products such as batteries that are required to display their carbon footprints.

[0024] [Carbon footprint] The greenhouse gases whose emissions are recorded as carbon footprints may be carbon dioxide only, or may include methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride, etc. In this case, emissions of greenhouse gases other than carbon dioxide are converted into carbon dioxide emissions and included in the presented carbon footprint value.

[0025] The GHS emissions (supply chain emissions) calculated as the carbon footprint are the total value of the GHS emissions classified as Scope 1 to 3. Scope 1 GHS emissions (hereafter referred to as Scope 1 emissions) are GHS emissions that are directly emitted from emission sources owned or managed by business operators such as suppliers SP. For example, emissions from fuel used at a business operator's factory during manufacturing fall under Scope 1 emissions.

[0026] Scope 2 GHS emissions (hereinafter referred to as "scope 2 emissions") are GHS emissions that are indirectly emitted as a result of a business's use of purchased energy, such as electricity, heat, and steam. For example, emissions associated with the generation of electricity from purchased electricity fall under scope 2 emissions. GHS emissions subject to carbon neutrality generally fall under scope 1 and scope 2 emissions.

[0027] Scope 3 GHS emissions (hereinafter referred to as "Scope 3 emissions") are GHS emissions excluding Scope 1 and Scope 2 emissions. Scope 3 emissions are further classified into 15 categories depending on the activities. Scope 3 emissions are the total value of the GHS emissions derived for each category. For example, emissions associated with the procurement of raw materials, employee business trips, and outsourcing of waste disposal fall under Scope 3 emissions. Scope 3 emissions are generally subject to net zero.

[0028] [Configuration of information processing system 100] The information processing system 100 is composed of a large number of data processing terminals 50, a data processing server 10, a time stamp server 30, an application distribution server 40, etc. A user terminal 110 may be further included as a configuration of the information processing system 100. Each element constituting the information processing system 100 is connected to a network as a single node and can communicate with each other.

[0029] The data processing terminal 50 is an information processing device operated by traders such as supplier SP, transporter TP, and finished product manufacturer MF involved in the manufacturing process of the final product supplied by the supply chain SC. The data processing terminal 50 is installed at the business base of the traders. Each business base receives products such as materials, parts, and assembled products shipped from the business base of the trader in the previous process. The delivered products are processed at the business base of the process and shipped as new products to the business base of the trader in the next process.

[0030] Products exchanged between traders are accompanied by identification information for identifying each individual product. For the identification information, unique ID information (hereinafter, unique ID) issued by the data processing server 10, or a hash value generated with a predetermined number of bits, etc. are used. The identification information is recorded in, for example, a two-dimensional code CD such as a QR code (registered trademark), or an RF tag, etc., and is distributed together with the product. The identification information may be updated for each trader, or the same information may be continuously used between multiple traders.

[0031] The data processing terminal 50 is mainly composed of a control circuit 50a. The control circuit 50a includes a processor 51, a RAM 52, a storage unit 53, an input / output interface 54, and a bus connecting these, and functions as a computer that performs arithmetic processing. The processor 51 is hardware for arithmetic processing that is combined with the RAM 52. The processor 51 executes application programs (transaction record accumulation program, emission amount information accumulation program, etc.) stored in the storage unit 53. The input / output interface 54 is electrically connected to input devices such as a keyboard and a mouse, a display, a scanner or camera that reads the identification information, and a printer that outputs the identification information to a paper medium or an RF tag, etc.

[0032] The data processing terminal 50 reads the identification information through processing based on the transaction record accumulation program, and obtains information such as what was purchased from which transactor (such as the supplier SP of the previous process) and when it was delivered, as a transaction record related to the product. In addition, the data processing terminal 50 obtains emission information indicating the GHG emissions related to the manufacture of distribution products shipped from its own process through processing based on the emission information accumulation program. The data processing terminal 50 transmits the transaction record and emission information to the data processing server 10.

[0033] The data processing server 10, the time stamp server 30, and the application distribution server 40 are server devices operated by an administrator of the supply chain SC or a platform provider PF selected by the administrator. The administrator is, for example, a finished product manufacturer MF, or a supervisory agency having supervisory authority over final products supplied by the supply chain SC. The platform provider PF is a business entity that provides large-scale information processing resources on the Internet, or an alliance (e.g., Catena-X, etc.) aimed at data sharing throughout the supply chain SC. The data processing server 10, the time stamp server 30, and the application distribution server 40 may be on-premise server devices that are physically managed by the administrator or the platform provider PF, or may be virtual configurations provided on the cloud. Furthermore, the data processing server 10, the time stamp server 30, and the application distribution server 40 may be configured to be managed by different administrators or platform providers PFs.

[0034] The data processing server 10 is an information processing device mainly including a control circuit 10a. The control circuit 10a includes a processor 11, a RAM 12, a storage unit 13, an input / output interface 14, and a bus connecting these components, and functions as a high-performance computer that performs arithmetic processing at high speed. The processor 11 is hardware for arithmetic processing that is coupled to the RAM 12. The processor 11 accesses the RAM 12 to execute various processes related to data management and provision. The storage unit 13 stores an information management program that realizes functions related to data management and an information provision program that realizes functions related to data provision. The information management program is a program (information processing program) that causes the data processing server 10 to execute the information storage method of the present disclosure. The information provision program is a program (information processing program) that causes the data processing server 10 to execute the information processing method of the present disclosure.

[0035] The data processing server 10 acquires the transaction record and emission amount information transmitted by the data processing terminal 50 by receiving it. The data processing server 10 stores the acquired transaction record and emission amount information in the database 20 as traceability information of the target object IM (hereinafter, referred to as traceability information). In the traceability information, a large number of accumulated emission amount information are associated with each other based on the transaction record (see FIG. 3). The database 20 may be constructed in an on-premise file server managed by the platform provider PF, or may be constructed in a virtual file server provided on the cloud.

[0036] The database 20 uses blockchain technology to store the data to be stored (traceability information) including transaction records and emission information in a substantially tamper-proof state. As one example, the database 20 stores the data to be stored as transactions in blocks of a private blockchain. The database 20 hashes information stored in one block and stores it in the next block, making it difficult to tamper with the data to be stored stored in each block. As another example, the database 20 may store a hash value generated from the data to be stored in a block of a consortium or public blockchain, making it substantially impossible to tamper with the data to be stored.

[0037] The data processing server 10 receives and acquires a carbon footprint inquiry request sent by the user terminal 110 (see FIG. 10). The data processing server 10 extracts the transaction record of the object IM specified in the inquiry request from the traceability information accumulated in the database 20. The data processing server 10 further extracts emission amount information related to the object IM from the database 20 based on the transaction record. The data processing server 10 calculates the carbon footprint of the object IM using the extracted emission amount information, and transmits it to the requesting user terminal 110 as data to be provided (see FIG. 10).

[0038] The time stamp server 30 is a server device mainly including a computer. The time stamp server 30 creates input information using news articles distributed by a news distribution server or the like. The time stamp server 30 generates a hash value of a predetermined number of bits (e.g., 256 bits) as time stamp data by inputting the created input information into a hash function. The time stamp data is provided to the data processing server 10 and stored in the database 20 together with the traceability information as verification data for verifying whether the acquisition time or storage time of the traceability information has been tampered with.

[0039] The application distribution server 40 is a server device mainly including a computer. The application distribution server 40 distributes a carbon footprint inquiry application (hereinafter, CFP inquiry application) to the user terminal 110 through a network. The CFP inquiry application is an application for inquiring about the carbon footprint of a distributed product or an end product. The CFP inquiry application is downloaded from the application distribution server 40 to the storage unit 113 of the user terminal 110, and is automatically installed in the user terminal 110 after the download is completed. The application distribution server 40 may be a server device managed by, for example, a vendor of the operating system of the user terminal 110.

[0040] The user terminal 110 is a smartphone, tablet terminal, dedicated reading terminal, etc. owned by the end user EU. The user terminal 110 is composed of a camera, a terminal communication device, etc. in addition to a control circuit 110a and a display 120. The control circuit 110a includes a processor 111, a RAM 112, a storage unit 113, an input / output interface 114, and a bus connecting these, etc., and functions as a computer that performs arithmetic processing.

[0041] The above-mentioned CFP inquiry application is installed in the user terminal 110. The user terminal 110 functions as an information display device that displays a carbon footprint on the display screen DP of the display 120 by executing the CFP inquiry application by the processor 111. The user terminal 110 cooperates with the data processing server 10 and performs the CFP disclosure process (see FIG. 10) described later.

[0042] [Issues with using primary data] From the perspective of fairness, it is desirable for the carbon footprint explained so far to be calculated using the actual GHS emissions emitted by each trader (primary data). However, calculating carbon footprints using primary data is difficult, and in general, pre-registered figures (secondary data), such as average values ​​for each industry, are often used to calculate carbon footprints. Furthermore, when calculating carbon footprints that include Scope 2 emissions and Scope 3 emissions, using primary data becomes even more difficult.

[0043] To explain the reason in detail, for example, GHS emissions outside a trader's business base (factories, etc.) do not occur regularly, but occur irregularly and with large fluctuations. Examples of such GHS emissions include GHS emissions associated with facility construction, GHS emissions associated with line renovation, GHS emissions associated with line air conditioning (blower operation, etc.), and GHS emissions associated with energy consumption in the factory's administration building. It would be extremely unfair to allocate such GHS emissions to the products that happened to be in production at the time they were generated, and in order to maintain fairness, it is desirable to allocate GHS emissions that occur irregularly evenly to all related products.

[0044] However, as shown in Figure 2, for example, GHS emissions associated with a mold change can only be allocated to individual products (parts, etc.) after the number of units manufactured has been determined. Specifically, for GHS emissions associated with a specific mold change A, the number of products to be allocated (hereinafter, CFP distribution number, m units) is unknown at the time of mold change A and is only determined when the next mold change B is made. Therefore, GHS emissions associated with mold change A cannot be allocated to individual products until the next mold change B. Similarly, the CFP distribution number (n units) of GHS emissions associated with mold change B is only determined when the next mold change C is made. Therefore, GHS emissions associated with mold change B cannot be allocated to individual products until the next mold change C. As described above, when primary data is used, GHS emissions cannot be allocated until the CFP distribution number is determined, so it is inevitable that there will be periods during which the carbon footprint cannot be calculated.

[0045] [Carbon footprint accumulation processing] To address these issues, in the information processing system 100 according to the present disclosure, a carbon footprint for which the CFP distribution number cannot be determined is treated as an undetermined carbon footprint (hereinafter, undetermined CFP) (see the left side of FIG. 3). That is, in the emission information accumulated in the database 20, the undetermined CFP is separated from the determined carbon footprint (hereinafter, determined CFP). At the stage where the CFP distribution number has not been determined, an approximate value is displayed as the undetermined CFP. For such an approximate value, a tentative value prepared in advance, such as the above-mentioned secondary data, and a value with a certain degree of certainty may be used.

[0046] Then, when the number of CFP distributions is finalized, the finalized GHS emissions (total CFP) are newly registered as emission information in the traceability information of database 20 (blockchain) in a state that can be linked to the undetermined CFP (see the right side of Figure 3). As a result, even if there is an undetermined CFP, the finalized information linked to this undetermined CFP can be used to calculate the additional finalized CFP, and this can be added to the initial finalized CFP, making it possible to calculate and display the finalized CFP accurately and fairly.

[0047] In the following, in relation to such data processing, details of the overall flow showing the flow of product manufacturing at the supplier SP and the finished product manufacturer MF, etc., and details of the information processing flow linked to each step of the overall flow will be explained based on Figures 4 to 9 and with reference to Figures 1 to 3.

[0048] <Overall flow> As shown in Figure 4, when a supplier SP or a finished product manufacturer MF constructs a factory or installs a line (S1), a first accumulation process related to the measurement and / or calculation of GHS emissions associated with the construction of this factory or installation of the line is carried out (S2). Furthermore, when processing machines or molding dies, etc. are installed in the newly constructed factory or line (S3), a second accumulation process related to the measurement and / or calculation of GHS emissions associated with this process is carried out (S4). Then, when a process such as manufacturing or processing of a product is carried out (S5), a third accumulation process related to the measurement and / or calculation of GHS emissions associated with this process is carried out (S6).

[0049] After the start of parts production, etc., replacement or repair of the processing machine or molding die occurs at a specific timing (S7). At this time, a fourth accumulation process related to measurement and / or calculation of GHS emissions associated with the replacement or repair is carried out (S8). When maintenance of the line is completed, the process of manufacturing or processing the product is carried out again (S5), and steps S5 to S8 are repeated. The first to fourth accumulation processes are carried out by the data processing server 10 in cooperation with the data processing terminal 50.

[0050] <Information processing flow: First storage process S2> As shown in FIG. 5, in the first accumulation process (S2) associated with the construction of a factory or the installation of a line, first, the name N of the factory and the line is defined (S21). The data processing server 10 defines a unique name N that does not overlap with other factories and lines based on a request from the data processing terminal 50. The name N is identification information for identifying the manufacturing line of each product. As an example, the data processing server 10 defines names A01 to A03 for lines 1 to 3 of factory A (see the upper part of FIG. 6). Similarly, the data processing server 10 defines names B01 to B03 for lines 1 to 3 of factory B (see the lower part of FIG. 6). As another example, the data processing server 10 defines names 0001 to 0003 for lines 1 to 3 of factory A (see the upper part of FIG. 6). Similarly, the data processing server 10 defines names 0004 to 0006 for lines 1 to 3 of factory B (see the lower part of FIG. 6).

[0051] After the definition of the name N, the data processing server 10 calculates the GHS emission amount F N The data processing server 10 calculates the name N and the GHS emission amount F N The data is registered in the database 20 (blockchain) as traceability information (emissions information) (S23). N The process of calculating may be performed by the data processing terminal 50.

[0052] <Information processing flow: Second accumulation process S4> As shown in FIG. 7, in the second accumulation process (S4) associated with the installation of a processing machine or a molding die, variables i and j are set to 1 and 0, respectively (S41). Variable i is a variable (sequential number) that counts the number of times a processing machine or a molding die is installed. Variable i is counted up when replacement or repair occurs on the line. Variable i can be used as information for distinguishing between before and after replacement or repair that occurs on the line. Variable j is a variable (sequential number) that counts the number of products manufactured. Variable j is counted up as products are manufactured.

[0053] The data processing server 10 calculates the GHS emissions M N,i Furthermore, the data processing server 10 calculates the date and time TM of the first operation after the processing machine or the molding die is changed. N,i Then, the variable j is counted up (S44). The GHS emission amount M N,i The process of calculating and the process of counting up the variable j may be performed by the data processing terminal 50.

[0054] <Information processing flow: Third storage process S6> In the third accumulation process (S6) shown in Fig. 8, on the premise that there will be an undetermined amount (undetermined CFP) in the GHS emission amount linked to the product (target object IM), tracing information for linking the determined information generated after the undetermined CFP is determined to the product is recorded in the database 20. The third accumulation process corresponds to a "tracking information recording step", and the functional unit of the processor 11 that executes the third accumulation process corresponds to an "information recording unit". Line information related to the production line that manufactured the product is used as the tracing information.

[0055] Specifically, in the third accumulation process associated with the implementation of product manufacturing or processing, etc., the manufacturing or processing time T N,j is recorded (S61). N,j is information indicating the date and time when a product was manufactured or processed on a line with the name N. N,j The time T N,j The line name N corresponds to the above-mentioned "tracking information" and "line information." In addition, the time T N,j corresponds to the "processing date and time" linked to the L1 and L3 lines (see Figure 3).

[0056] The data processing server 10 judges whether or not the processing machine or the molding die needs to be replaced or repaired (S63). If there is a need for replacement or repair (S63: YES), the process of the replacement or repair is carried out (S7). On the other hand, if there is no need for replacement or repair (S63: NO), the data processing server 10 records a provisional estimated value that estimates the undetermined GHS emission amount and is used as a substitute for the undetermined CFP in the traceability information of the database 20, linking it to the product (S64). Then, the variable j is counted up (S44), and the processes of S61 to S64 are repeated. The process of recording the estimated value in S64 may be omitted, or may be carried out at a timing different from the third accumulation process. In addition, a process of setting the estimated value may be carried out in the CFP disclosure process (see FIG. 10, S111) described later.

[0057] <Information processing flow: Fourth storage process S8> In the fourth accumulation process (S8) shown in Fig. 9, an undetermined CFP is determined in association with replacement or repair of a processing machine or a molding die. The fourth accumulation process corresponds to a "calculation step" of the emissions to be allocated to the object, and the functional part of the processor 11 that executes the fourth accumulation process corresponds to an "emissions calculation part." In the fourth accumulation process, after the undetermined CFP is determined, the GHS emissions to be allocated to each product (object IM), i.e., the carbon footprint, is calculated using the CFP distribution number, which is one of the determination information.

[0058] Specifically, in the fourth accumulation process (S8) associated with the replacement or repair of the processing machine or the molding die, the data processing server 10 or the data processing terminal 50 counts up the variable i (S81). Through this process, the variable i becomes a sequential number that is counted up when an undetermined CFP is determined.

[0059] The data processing server 10 calculates the GHS emissions M N,i Furthermore, the data processing server 10 calculates TM N,i The time TM is recorded (S83). N,iis time information indicating the date and time when the variable i was changed. Therefore, the time TM N,i-1 From time TM N,i The period corresponds to the period from type change A to type change B, or the period from type change B to type change C, etc. (see Figure 2).

[0060] The data processing server 10 determines the time TM N,i-1 From time TM N,i GHS emissions C required for manufacturing or processing during the period up to N,i-1 Calculate the GHS emission amount C (S84). N,i is the total GHS emission amount used in processing during the period associated with the variable i. The data processing server 10 adds the GHS emission amount M N,i , time TM N,i ,GHS emissionsC N,i-1 Record (S85).

[0061] The data processing server 10 selects the time T associated with the product from among the products processed on the line with the name N. N,j Using the information of time TM N,i-1 From time TM N,i Then, the data processing server 10 obtains information on the products having a processing time between and (S86). Then, based on the obtained product information, the data processing server 10 obtains the number of products to be manufactured, n N,i-1 Calculate the number of production units n (S87). N,i-1 corresponds to the above-mentioned CFP distribution number. The data processing server 10 calculates the carbon footprint per product based on the following formula 1 (S88). C = ( M N,i-1 + C N,i-1 ) / n N,i-1 (Equation 1)

[0062] The data processing server 10 assigns the calculated carbon footprint to the emission information associated with the acquired product (S89). The data processing server 10 records the assigned carbon footprint (hereinafter, assigned CFP) as final information in the traceability information of each product. Then, the variable j is counted up (S44), and the production of the product is started (S5).

[0063] Here, the GHS emission amount M calculated in the fourth accumulation process N,i ,C N,i-1 The sum of these values ​​corresponds to the "total CFP" of the L1 and L3 lines shown in FIG. 3. N,i-1 ,TM N,i These correspond to the "start date and time" and "end date and time" of the L1 and L3 lines shown in FIG.

[0064] [Carbon footprint disclosure processing] The data processing server 10 and the user terminal 110 disclose the carbon footprint (emission amount information) of the target IM to the end user EU, etc., through the CFP disclosure process. Details of the CFP disclosure process will be described below based on FIG. 10 with reference to FIG. 1 to FIG. 3.

[0065] For the CFP disclosure process, an information processing terminal owned by a trader, such as the data processing terminal 50, may be used instead of the user terminal 110. In this way, various information processing terminals, such as smartphones, tablet terminals, and personal computers, are not limited to the user terminal 110 and can be used to display the carbon footprint.

[0066] The user terminal 110 starts a CFP inquiry application by operation of an end user EU or the like (S101). The user terminal 110 reads out identification information from a two-dimensional code Cd (or an RF tag) attached to an object IM such as a product or a final product (S102). The identification information may be manually input using an input device such as a keyboard, or may be acquired through a network. The user terminal 110 transmits the read out identification information to the data processing server 10 together with a CFP disclosure request for the object IM (S103, S104).

[0067] When the data processing server 10 receives the disclosure request (S104), it identifies the object IM that is the subject of the request (S105). The data processing server 10 searches for emission information linked to the object IM from the traceability information stored in the database 20, and obtains confirmed data (confirmed CFP, see FIG. 3) that indicates the confirmed emission amount of the object IM (S106). The confirmed CFP is a value (in kg) that indicates the confirmed GHS emission amount allocated to the object IM.

[0068] The data processing server 10 judges whether or not there is an undetermined amount (undetermined CFP, see FIG. 3) in the carbon footprint linked to the object IM (S107). S107 corresponds to a "judgment step" that judges whether or not there is an undetermined emission amount, and the functional unit of the processor 11 that executes S107 corresponds to an "undetermined judgment unit." If there is no undetermined CFP (S107: NO), the data processing server 10 transmits the determined CFP acquired in S106 to the user terminal 110 that is the source of the disclosure request as data to be provided (emission amount information of the object IM) (S112, S113).

[0069] On the other hand, if there is an undetermined CFP (S107: YES), the data processing server 10 searches for the confirmed information corresponding to the undetermined CFP (S108). The confirmed information includes the above-mentioned CFP distribution number (manufacturing number in FIG. 3) and the GHS emission amount M N,i ,C N,i-1 (see FIG. 9) or may be the assigned CFP calculated in the fourth accumulation process (see FIG. 9). The data processing server 10 uses line information such as the line name and processing time recorded in the third accumulation process (see FIG. 8) as tracing information, and identifies the determined information corresponding to the undetermined CFP from among a large number of pieces of traceability information.

[0070] The data processing server 10 judges whether the determination information is recorded in the traceability information (S109). If there is the determination information to determine the undetermined CFP (S109: YES), the data processing server 10 generates a determined CFP (updated determined data) by adding the emission amount (allocated CFP) based on the determination information to the initial determined CFP acquired in S106 (S110). That is, the data processing server 10 recalculates the carbon footprint in S110. In this process, the data processing server 10 may use the recorded calculated allocated CFP, or may recalculate the allocated CFP based on the above formula 1. The data processing server 10 transmits the updated determined CFP value, which is the updated determined data generated in S110, to the user terminal 110 that made the disclosure request as data to be provided (S112, S113).

[0071] When there is an undetermined CFP and there is no confirmation information to confirm the undetermined CFP (S109: NO), the data processing server 10 generates undetermined data indicating the undetermined GHS emission amount (S111). S111 corresponds to a "generation step" of the undetermined data, and the functional unit of the processor 11 that executes S107 corresponds to a "data generation unit". The undetermined data may be an estimated value recorded as an undetermined CFP in the third accumulation process (see FIG. 8), or may be a notification flag indicating the existence of an undetermined CFP. The data processing server 10 transmits the confirmed CFP acquired in S106 and the estimated value or the notification flag acquired in S111 to the user terminal 110 that is the source of the disclosure request as data to be provided (S112, S113).

[0072] The data processing server 10 can calculate the carbon footprint (current process CFP) of only the manufacturing process (current process) of the object IM, as well as the accumulated value of the carbon footprint up to the current process (accumulated CFP) (see FIG. 3). When there is an undetermined CFP, the data processing server 10 provides the undetermined and confirmed portions of the current process CFP and the accumulated CFP to the user terminal 110 as data to be provided. When there is confirmed information for only a portion of the multiple undetermined CFPs, the data processing server 10 performs both a process of generating updated confirmed data using this confirmed information and a process of generating unconfirmed data for the undetermined CFPs.

[0073] The user terminal 110 acquires the data to be provided (emission amount information of the object IM) by reception from the data processing server 10 (S113, S114). S114 corresponds to an "acquisition step" of the emission information, and the functional unit of the processor 111 that executes S107 corresponds to an "information acquisition unit." The user terminal 110 displays a value based on the data to be provided as the carbon footprint of the object IM on the display screen DP of the display 120 (S115). S115 corresponds to a "display step" of the confirmed data and the unconfirmed data, and the functional unit of the processor 111 that executes S107 corresponds to a "display control unit."

[0074] The user terminal 110 judges whether or not information indicating the presence of an undetermined CFP (unconfirmed data) is included in the data to be provided. If there is no unconfirmed data, the user terminal 110 displays the confirmed CFP of the data to be provided on the display 120 (see the lower right diagram of FIG. 3). On the other hand, if an estimated value as the unconfirmed data is included in the data to be provided, the user terminal 110 displays the estimated value as an undetermined CFP together with the confirmed CFP on the display 120 (see the lower left diagram of FIG. 3). Furthermore, if a notification flag as the unconfirmed data is included in the data to be provided, the user terminal 110 displays a message saying "There is an unconfirmed carbon footprint" on the display 120 in addition to the confirmed CFP.

[0075] [Summary of the first embodiment] In the first embodiment described so far, if there is an unconfirmed portion in the carbon footprint linked to the object IM, unconfirmed data indicating the unconfirmed carbon footprint is generated. In this way, by separating the unconfirmed data from the confirmed data, it becomes possible to appropriately handle the unconfirmed GHS emissions. As a result, it is possible to realize the use of primary data of the carbon footprint, which is an actual value, as emission information.

[0076] In addition, in the first embodiment, if there is finalized information that finalizes the unconfirmed GHS emissions, the carbon footprint (allocated CFP) based on the finalized information is added to the finalized data indicating the initial finalized CFP, and updated finalized data is generated. As a result of the above, even if the carbon footprint cannot be immediately determined at the time of production, etc., an accurate carbon footprint can be calculated at the stage when the production quantity, etc. is determined. As a result of the above, it becomes possible to fairly allocate GHS emissions that occur irregularly to each product.

[0077] In the first embodiment, a provisional estimated value prepared in advance is used as the undetermined data, so that it is possible to present an approximate value of the carbon footprint of the object IM even before the undetermined GHS emission amount is determined.

[0078] Furthermore, in the first embodiment, if there is an unconfirmed portion in the carbon footprint linked to the object IM, the unconfirmed data indicating the unconfirmed carbon footprint is displayed on the display 120 as an unconfirmed CFP. In this way, by separating the unconfirmed data from the confirmed data, it becomes possible to appropriately handle the unconfirmed GHS emissions. As a result, an end user EU or the like who inquires about the carbon footprint can correctly understand the carbon footprint of the object IM.

[0079] In addition, in the first embodiment, a provisional estimated value prepared in advance is displayed as undetermined data (undetermined CFP). Therefore, even if an end user EU or the like makes an inquiry before the undetermined GHS emission amount is determined, the end user can grasp the approximate value of the carbon footprint of the target object IM.

[0080] In the first embodiment, if there is an unconfirmed portion of the carbon footprint linked to the object IM, the tracking information is recorded in the database 20. Therefore, after the unconfirmed portion is confirmed, the emission amount based on the confirmed information can be correctly assigned to the object IM. As a result, it becomes possible to appropriately handle the unconfirmed GHS emission amount. And the accuracy and fairness of the carbon footprint can be ensured.

[0081] Furthermore, in the first embodiment, line information related to the production line that produced the object IM is recorded as tracing information in the database 20. By using such line information as tracing information, it becomes possible to reliably allocate the determined carbon footprint to the object IM produced by the supplier SP at the stage when the production quantity is determined due to a type change or the like.

[0082] Additionally, in the first embodiment, line information including a name N, which is unique identification information for identifying a production line, and time information indicating the date and time when the product was produced on the production line, is recorded in the database 20. By using such line information as tracking information, when the carbon footprint that was undetermined due to a type change or the like is determined, the determined carbon footprint can be appropriately assigned to each product.

[0083] In the first embodiment, when the carbon footprint associated with the object IM has an undetermined amount, a provisional estimate of the emission amount of the undetermined amount is recorded in the database 20. Therefore, even before the amount of GHS emission of the undetermined amount is determined, it becomes possible to present an approximate value of the carbon footprint of the object IM.

[0084] In the first embodiment, the data processing server 10 corresponds to a "data processing system" and a "data storage system", and the user terminal 110 corresponds to a "data display device".

[0085] Second Embodiment The second embodiment of the present disclosure shown in Figs. 11 to 13 is a modified example of the first embodiment. In the second embodiment, the contents of the second to fourth accumulation processes among the carbon footprint accumulation processes are different from those of the first embodiment. Details of the second to fourth accumulation processes of the second embodiment will be described below based on Figs. 11 to 13 and with reference to Figs. 1 and 3. Note that, in the second embodiment as well, the second to fourth accumulation processes are performed by the data processing server 10 in cooperation with the data processing terminal 50.

[0086] <Information processing flow: Second accumulation process S4> In the second accumulation process (S4) of the second embodiment shown in FIG. 11, variables i and m are set to 1 and 0, respectively (S241), as in the first embodiment. Variable m is a value indicating the number of products manufactured after the current processing machine or molding die is installed, and is counted up as products are manufactured. Then, the amount of GHS emissions M N,i (S242) and the count-up of the variable m (S243) are performed by the data processing server 10 or the data processing terminal 50 in that order.

[0087] <Information processing flow: Third storage process S6> In the third accumulation process (S6) of the second embodiment shown in FIG. N,jIn this third accumulation process, the data processing server 10 records the variables i and m in addition to the unique name N for identifying the production line in the traceability information of the database 20 by linking them to the product being manufactured (S261). The variable i is a value (sequential number) that is counted up when the production line is changed, such as when the processing machine or the molding die is replaced or repaired. The variable i is used as a value indicating the mold number. As described above, the variable m is number information indicating the number of products manufactured after the variable i is switched. The line name N and the variable i correspond to the "tracing information" and "line information" in the second embodiment. In the CFP disclosure process (see FIG. 10), these line information are used to search for products to which the final information is linked (S108).

[0088] The data processing server 10 or the data processing terminal 50 determines whether or not the processing machine or the molding die needs to be replaced or repaired (S262). If replacement or repair is required (S262: YES), the replacement or repair process is carried out (S7). On the other hand, if replacement or repair is not required (S262: NO), the data processing server 10 records a provisional estimate of the undetermined GHS emission amount, which is used as a substitute for the undetermined CFP, in the traceability information of the database 20 (S263).

[0089] <Information processing flow: Fourth storage process S8> In the fourth accumulation process (S8) of the second embodiment shown in FIG. 13, as in the first embodiment, the variable i is counted up (S281), and the amount of GHS emissions M N,i is calculated (S282). Furthermore, the amount of GHS emissions C required for manufacturing or processing from the previous (i-1th) mold change to the current (ith) mold change is calculated. N,i-1 Then, the variables i, m, and the GHS emission amount M N,i ,C N,i-1 is recorded in the traceability information (emission amount information) of the database 20 (S284).

[0090] The data processing server 10 acquires information on the product having the information on the model number i-1 from among the products processed on the line named N (S285). Then, the data processing server 10 calculates the carbon footprint per product based on the following formula 2 (S286). C = ( M N,i-1 + C N,i-1 ) / m (Equation 2)

[0091] The data processing server 10 assigns the calculated carbon footprint to the emission information of the product having the information of the model number i-1 (S287). Then, the variable m is reset and counted up in turn (S288, S243).

[0092] [Summary of the second embodiment] The second embodiment described so far also has the same effect as the first embodiment, and even if there is unconfirmed data, it becomes possible to appropriately handle the unconfirmed GHS emission amount.

[0093] Additionally, in the second embodiment, the line information includes a name N, which is unique identification information for identifying the production line, and a variable i, which is incremented when the production line is changed. By using such line information as tracking information, it becomes possible to appropriately assign the finalized carbon footprint to each product when the undetermined carbon footprint is finalized due to a change in the production line, etc.

[0094] (Other embodiments) Although several embodiments of the present disclosure have been described above, the present disclosure should not be construed as being limited to the above-described embodiments, and can be applied to various embodiments and combinations within the scope not departing from the gist of the present disclosure.

[0095] In the above embodiment, confirmed data and unconfirmed data are generated for each of the current process CFP and the accumulated CFP, and are displayed as confirmed CFP and undetermined CFP. On the other hand, in the modified example 1 of the above embodiment, confirmed data and unconfirmed data are generated for only one of the current process CFP and the accumulated CFP, and the confirmed CFP and undetermined CFP are displayed. Also, in the modified example 2 of the above embodiment, confirmed data and unconfirmed data are generated for only the current process CFP, and both the confirmed CFP and the undetermined CFP are displayed. On the other hand, for the accumulated CFP, only confirmed data is generated, and only the confirmed CFP is displayed.

[0096] In the third modification of the above embodiment, the initial confirmed CFP data that was confirmed at the time of manufacture and the additional confirmed CFP data that was confirmed at a later date are generated. As a result, the initial confirmed CFP and the additional confirmed CFP are displayed separately.

[0097] In the fourth modification of the above embodiment, if an estimated value substituting an undetermined CFP is not registered in the database 20, the generated undetermined data and the displayed undetermined CFP are set to zero.

[0098] A portion of the GHS emissions (carbon footprint) accumulated in the information processing system 100 may not be primary data. In such an information processing system 100, the proportion of primary data in the carbon footprint of the target object IM may be provided to the user terminal 110 as emission information and displayed on the display 120. Furthermore, the proportion of traders who have acquired international standards related to carbon footprints (e.g., ISO14065, etc.), or the proportion of GHS emissions of such traders, etc. may be provided to the user terminal 110 as emission information and displayed on the display 120.

[0099] In the above embodiment, the confirmed data (including updated confirmed data) is a value indicating the confirmed carbon footprint, and the unconfirmed data is a value indicating the unconfirmed carbon footprint, or a notification flag indicating that there is an unconfirmed carbon footprint. Such data formats of the confirmed data and the unconfirmed data may be changed as appropriate. For example, the unit of carbon footprint is not limited to the above-mentioned "kg" and may be changed as appropriate depending on the type of object IM and the region or country in which the information processing system 100 is used.

[0100] In the above embodiment, each function provided by the data processing server 10 and each terminal 50, 110 can be provided by software and hardware that executes the software, software alone, hardware alone, or a combination of these. When such a function is provided by an electronic circuit as hardware, each function can also be provided by a digital circuit including a large number of logic circuits, or an analog circuit.

[0101] Each processor in the above embodiment may include at least one arithmetic core such as a central processing unit (CPU) and a graphics processing unit (GPU). The processor may further include a field-programmable gate array (FPGA), a neural network processing unit (NPU), and an IP core having other dedicated functions. The processor may also be individually mounted on a printed circuit board. Alternatively, the processor may be implemented in an application specific integrated circuit (ASIC), a system on chip (SoC), an FPGA, or the like.

[0102] The form of the storage medium (non-transitory tangible storage medium) employed as each storage unit in the above-described embodiments and storing each program may be changed as appropriate. For example, the storage medium is not limited to a configuration provided on a circuit board, and may be provided in the form of a memory card or the like, inserted into a slot, and electrically connected to a computer bus. Furthermore, the storage medium may be an optical disk, a hard disk drive, or the like used as a source from which a program is copied or distributed to a computer.

[0103] The control unit and the method described herein may be implemented by a special-purpose computer having a processor programmed to execute one or more functions embodied in a computer program. Alternatively, the device and the method described herein may be implemented by a special-purpose hardware logic circuit. Alternatively, the device and the method described herein may be implemented by one or more special-purpose computers configured by a combination of a processor that executes a computer program and one or more hardware logic circuits. The computer program may also be stored in a computer-readable non-transitory tangible recording medium as instructions to be executed by the computer. [Explanation of symbols]

[0104] 10 data processing server (data processing system, data accumulation system), 11 processor (unconfirmed determination unit, data generation unit, information recording unit, emission amount calculation unit), 20 database, 50 data processing terminal, 100 information processing system, 110 user terminal (data display device), 111 processor (information acquisition unit, display control unit), DP display screen, IM object, S6 third accumulation process (recording step), S8 fourth accumulation process

Claims

1. An information processing method for processing emission information related to greenhouse gas emissions associated with an object (IM), comprising: It is determined whether there is an undetermined amount in the emission amount associated with the object (S107). When there is an unconfirmed emission amount, in addition to the confirmed data indicating the confirmed emission amount, unconfirmed data indicating the unconfirmed emission amount is generated as the emission amount information of the object (S111). The information processing method includes the steps of:

2. When there is confirmation information for confirming the unconfirmed emission amount, the emission amount based on the confirmation information is added to the confirmed data to generate updated confirmation data (S110). The information processing method according to claim 1 , further comprising the step of:

3. 3. The information processing method according to claim 1, wherein in the generating step of the unconfirmed data, a provisional estimated value prepared in advance is used as the unconfirmed data.

4. An information processing program for processing emission information related to greenhouse gas emissions associated with an object (IM), It is determined whether there is an undetermined amount in the emission amount associated with the object (S107). When there is an unconfirmed emission amount, in addition to the confirmed data indicating the confirmed emission amount, unconfirmed data indicating the unconfirmed emission amount is generated as the emission amount information of the object (S111). An information processing program that causes at least one processor (11) to execute a process including the steps of:

5. A data processing system for processing emission information relating to greenhouse gas emissions associated with an object (IM), comprising: an undetermined amount determination unit (S107) that determines whether or not there is an undetermined amount in the emission amount associated with the object; a data generating unit (S111) that generates, in a case where there is an unconfirmed emission amount, unconfirmed data indicating the unconfirmed emission amount as the emission amount information of the object in addition to the confirmed data indicating the confirmed emission amount; A data processing system comprising:

6. An information processing method for processing emission information related to greenhouse gas emissions associated with an object (IM), comprising: Acquire the emission information of the object (S114); When the emission amount information includes unconfirmed data indicating the unconfirmed emission amount in addition to the confirmed data indicating the confirmed emission amount, the confirmed data and the unconfirmed data are both displayed on a display screen (DP) (S115). The information processing method includes the steps of:

7. 7. The information processing method according to claim 6, wherein in the displaying step of the undetermined data, a provisional estimated value prepared in advance is displayed as the undetermined data.

8. An information processing program for processing emission information related to greenhouse gas emissions associated with an object (IM), Acquire the emission information of the object (S114); When the emission amount information includes unconfirmed data indicating the unconfirmed emission amount in addition to the confirmed data indicating the confirmed emission amount, the confirmed data and the unconfirmed data are both displayed on a display screen (DP) (S115). An information processing program that causes at least one processor (111) to execute a process including the steps of:

9. A data display device that displays emission information related to greenhouse gas emissions associated with an object (IM), An information acquisition unit (S114) that acquires the emission amount information of the object; a display control unit (S115) that displays both the determined amount data and the undetermined amount data on a display screen (DP) when the emission amount information includes, in addition to determined amount data indicating the determined amount of the emission amount, undetermined amount data indicating the undetermined amount of the emission amount; A data display device comprising:

10. An information accumulation method for accumulating emission information related to greenhouse gas emissions associated with an object (IM) in a database (20), comprising: If there is an unconfirmed amount in the emission amount linked to the object, tracking information for linking the determined information generated after the unconfirmed amount is determined to the object is recorded in the database (S6); After the undetermined amount is determined, the emission amount to be allocated to the object is calculated using the determined information (S8). The information storage method includes the steps of:

11. 11. The information storage method according to claim 10, wherein in said step of recording the tracing information, line information relating to a production line in which the object was manufactured is recorded in said database as the tracing information.

12. The information storage method according to claim 11, wherein the recording step records the line information in the database, the line information including unique identification information for identifying the production line and time information indicating the date and time when the object was produced on the production line.

13. 12. The information storage method according to claim 11, wherein said recording step records in said database said line information including unique identification information for identifying said production line and a serial number that is incremented whenever said production line is changed.

14. The information storage method according to any one of claims 10 to 13, wherein, when there is an undetermined amount of the emission amount linked to the object, a provisional estimate of the undetermined amount of the emission amount is recorded in the database (S64, S263).

15. An information storage program for storing emission information related to greenhouse gas emissions associated with an object (IM) in a database (20), If there is an unconfirmed amount in the emission amount linked to the object, tracking information for linking the determined information generated after the unconfirmed amount is determined to the object is recorded in the database (S6); After the undetermined amount is determined, the emission amount to be allocated to the object is calculated using the determined information (S8). An information storage program that causes at least one processor (111) to execute a process including the steps of:

16. A data accumulation system that accumulates emission information related to greenhouse gas emissions associated with an object (IM) in a database (20), an information recording unit (S6) that records, in the database, tracking information for linking determined information generated after the undetermined amount is determined to the object when the emission amount linked to the object is undetermined; an emission amount calculation unit (S8) that calculates the emission amount to be allocated to the object using the determination information after the undetermined amount is determined; A data storage system comprising:

Citation Information

Patent Citations

  • Total energy amount management device and method

    JP2012084070A

  • Carbon traceability management system

    WO2010095687A1

  • Deriving device, derivation method, and program

    JP7178064B1