Simulation soft ground, construction method of simulation soft ground and measuring method of settlement amount of vehicle

The simulated soft ground system with elastically deformable shock absorbers and GNSS measurement addresses the issue of changing ground conditions, enabling repeated vehicle experiments and efficient field setup.

JP2024142575APending Publication Date: 2024-10-11KUMAGAI GUMI CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023054763
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing methods for creating simulated soft ground for vehicle experiments result in changing ground conditions with each repetition, making consistent experimentation impossible, and require significant time to set up.

Method used

A simulated soft ground system using a housing section with randomly installed shock absorbers that distort within elastic limits under vehicle pressure, allowing repeated experiments without altering ground conditions, and a method for measuring vehicle subsidence using a GNSS receiver.

Benefits of technology

Enables repeated experiments on stable ground conditions by using elastically deformable shock absorbers that return to original shape, and allows rapid setup of experimental fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024142575000001_ABST
    Figure 2024142575000001_ABST
Patent Text Reader

Abstract

To execute experiments repeatedly without changing a ground condition.SOLUTION: A simulation soft ground (10) can be constructed in an experiment field for a vehicle (31). At the simulation soft ground, a storage part (15) which is formed into a concave shape in a cross sectional view with an upper surface open, and a large number of shock absorbers (14) installed at random inside the storage part are provided. The large number of shock absorbers are distorted within an elastic limit by a ground contact pressure from the vehicle, and a travel part of the vehicle is made to be settled inside the storage part.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a simulated soft ground, a method for constructing a simulated soft ground, and a method for measuring the amount of settlement of a vehicle. [Background technology]

[0002] Generally, on soft ground consisting of soft clay or loose sand, a runway is secured by arranging multiple plates on the soft ground to allow construction machinery and the like to run on it. Lightweight and easy-to-handle resin plates have been proposed as runway plates (see, for example, Patent Document 1). In order to confirm the performance of such plates, it is necessary to artificially create soft ground and actually run vehicles on the plates arranged on the soft ground. Artificial soft ground is created by pouring water into the soil to increase the soil's moisture content, adjusting the proportion of sand and clay in the soil, and so on. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Utility Model Registration No. 3198217 Summary of the Invention [Problem to be solved by the invention]

[0004] However, with artificial soft ground, the gaps between soil particles change each time an experiment is repeated, making it impossible to conduct repeated experiments under the same ground conditions. In addition, it takes a lot of time to create an experimental field.

[0005] The present invention has been made in consideration of the above points, and aims to provide a simulated soft ground that allows repeated experiments to be carried out without changing the ground conditions, a method for constructing the simulated soft ground, and a method for measuring the amount of vehicle settlement. [Means for solving the problem]

[0006] One embodiment of the simulated soft ground of the present invention is a simulated soft ground that can be created in an experimental field for vehicles, and comprises a storage section that is formed in a concave cross-section with an open top, and a number of buffers that are randomly installed within the storage section, and the number of buffers are distorted within their elastic limits by the ground contact pressure from the vehicle, causing the running parts of the vehicle to sink into the storage section. Effect of the Invention

[0007] In one embodiment of the present invention, the simulated soft ground has a number of buffers randomly stored in the storage section, with appropriate gaps between the buffers. When a vehicle runs over the number of buffers in the storage section, the buffers are distorted or retracted, causing the vehicle's running section to sink into the storage section, reproducing the soft ground. At this time, the number of buffers is distorted within its elastic limit due to the ground pressure from the vehicle, and when the ground pressure from the vehicle is removed, the number of buffers returns to their original shape. Therefore, experiments can be repeatedly performed on the simulated soft ground without changing the ground conditions of the simulated soft ground. In addition, since it is sufficient to randomly store a number of buffers in the storage section, the experimental field can be constructed in a short time. [Brief description of the drawings]

[0008] [Figure 1] FIG. 2 is a schematic cross-sectional view of the simulated soft ground of the present embodiment. [Diagram 2] 3 is a schematic cross-sectional view of a simulated soft ground when the construction machine of the present embodiment is traveling. FIG. [Diagram 3] FIG. 2 is an explanatory diagram of a method for constructing a simulated soft ground according to the present embodiment. [Figure 4] FIG. 2 is a schematic top view of the roadway protection mat of the present embodiment. [Diagram 5] 4 is an explanatory diagram of a method for measuring the amount of subsidence of a construction machine according to the present embodiment. FIG. [Figure 6] FIG. 13 is a schematic cross-sectional view of a modified example of a simulated soft ground. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] The simulated soft ground of this embodiment will be described below. Fig. 1 is a schematic cross-sectional view of the simulated soft ground of this embodiment. Fig. 2 is a schematic cross-sectional view of the simulated soft ground when the construction machine of this embodiment is traveling.

[0010] In recent years, natural disasters such as earthquakes and typhoons can cause the ground to become soft, and it is necessary to respond to such disasters using construction machinery on such soft ground. A simulated soft ground is prepared to simulate a disaster, and various experiments are performed using construction machinery. However, in soft ground artificially created by pouring water, the gaps between soil particles change as experiments are repeated, making it impossible to perform experiments under the same ground conditions. Therefore, in this embodiment, a large number of elastically deformable buffer bodies are randomly placed to reproduce soft ground, and the fact that the buffer bodies return to their original state after being crushed makes it possible to perform repeated experiments without changing the ground conditions.

[0011] As shown in FIG. 1, an excavation hole 11 is prepared in an experimental field for a construction machine (a backhoe in this embodiment) 31, and a simulated soft ground 10 is created by installing multiple buffer mats 13 and multiple buffer bodies 14 in the excavation hole 11. A curing sheet 12 is laid on the inner surface of the excavation hole 11, and multiple buffer mats 13 are installed on the curing sheet 12 to form a storage section 15. The storage section 15 is formed in a concave shape in cross section with an open top, and multiple buffer bodies 14 are installed randomly in the storage section 15. Since the multiple buffer bodies 14 are arranged in a disorderly manner, appropriate gaps are provided between the multiple buffer bodies 14 to form an evacuation space when the buffer bodies 14 are pushed into the construction machine 31.

[0012] The multiple buffer mats 13 are made of plate-shaped urethane sponge, and the depth of the storage section 15 is adjusted by the multiple buffer mats 13. The number of buffer bodies 14 installed is reduced by the amount of buffer mats 13 installed, thereby reducing the labor required for installation. The multiple buffer bodies 14 are made of cubic urethane sponge, and the multiple buffer bodies 14 in the storage section 15 reproduce soft ground. Buffer mats 13 are also laid at the entrance section 16 to the storage section 15 and the evacuation section 17 from the storage section 15, and the buffer mats 13 reproduce ground that sinks slightly in the entrance section 16 and the evacuation section 17.

[0013] As shown in Fig. 2, when the construction machine 31 runs over the multiple buffer bodies 14, the multiple buffer bodies 14 are distorted within their elastic limits by the ground pressure from the construction machine 31, and the multiple buffer bodies 14 retreat into the gaps, causing the tracks 32 of the construction machine 31 to sink into the accommodation section 15. At this time, the amount of sinking of the construction machine 31 is adjusted by the multiple buffer bodies 14 so that the amount of sinking of the construction machine 31 becomes the minimum ground clearance. In this way, when the construction machine 31 runs over the ground, the bottom of the construction machine 31 runs over the ground, causing the tracks 32 to float off the ground and making it difficult to run, resulting in a so-called turtle-shaped ground condition, is reproduced by the multiple buffer bodies 14 as soft ground.

[0014] In this case, it is preferable that one side of the multiple buffer bodies 14 is half the width of the crawler belt or less. Since the multiple buffer bodies 14 are installed randomly, there are appropriate gaps between the multiple buffer bodies 14. If one side of the buffer body 14 is half the width of the crawler belt or less, taking into account the gaps between the multiple buffer bodies 14, the crawler belt 32 will ride up on three or more buffer bodies 14 in the vehicle width direction. Since there are gaps between three or more buffer bodies 14 lined up in the vehicle width direction, the buffer bodies 14 are distorted by the ground pressure from the crawler belt 32, and the buffer bodies 14 retreat into the gaps, allowing the crawler belt 32 to sink appropriately.

[0015] If one side of the multiple buffer bodies 14 is too small, there is a risk that the multiple buffer bodies 14 will be entangled in the crawler belt 32. For this reason, one side of the multiple buffer bodies 14 is formed to a size that will not cause the multiple buffer bodies 14 to be entangled in the crawler belt 32. For example, it is preferable that one side of the multiple buffer bodies 14 is 1 / 10 or more of the crawler belt width. In this embodiment, since the crawler belt width is 30 cm, the multiple buffer bodies 14 are formed in a cube shape with a side of 10 cm and less than half the crawler belt width and more than 1 / 10 of the crawler belt width. By forming the multiple buffer bodies 14 in a cube shape with a side of 10 cm, a sinking of 30 cm, which is the minimum ground clearance of the construction machine 31, is reproduced, and the buffer bodies 14 are prevented from being entangled in the crawler belt 32.

[0016] Furthermore, the multiple buffer bodies 14 are formed of a material that distorts within its elastic limit when subjected to ground pressure from the tracks 32 of the construction machine 31. Since the ground pressure of the tracks 32 of a typical construction machine 31 is 30 kPa, a material that distorts within its elastic limit when subjected to 30 kPa is selected as the material for the buffer bodies 14. As described above, in this embodiment, the multiple buffer bodies 14 are formed of urethane sponge. When the ground pressure from the construction machine 31 is removed, the multiple buffer bodies 14 return to their original shape, so that experiments using the construction machine 31 on the simulated soft ground 10 can be repeatedly performed without changing the ground conditions of the simulated soft ground 10.

[0017] The material of the buffer 14 is selected by carrying out uniaxial compression tests on several kinds of urethane sponge. The distortion of each urethane sponge is measured when a compressive force of 30 kPa, which is the ground pressure of the crawler 32, is applied to the sponge, and the thickness of the sponge required to sink 30 cm, which is the minimum ground clearance of the construction machine 31, is measured. Then, urethane sponges manufactured by Achilles, part numbers LH (25% compression hardness 9.24±1.59 kPa) and LF (25% compression hardness 4.46±1.59 kPa), which do not undergo plastic deformation even when a compressive force of 30 kPa is applied and require a small sponge thickness to sink 30 cm, are selected as the material of the buffer 14.

[0018] The approach section 16 and the retreat section 17 also employ a cushioning mat 13 made of the same urethane sponge as the cushioning body 14. The approach section 16 and the retreat section 17 are formed so as to be distorted by the ground pressure of 30 kPa of the tracks 32, and the strength of the ground (the amount of settlement of the construction machine 31) is changed in stages from the ground on the experimental field to the simulated soft ground 10. The N value of the soft ground reproduced in the simulated soft ground 10 is less than 4, and the N value of the ground reproduced in the approach section 16 and the retreat section 17 is 4 or more and less than 10. The N value is a test result (numerical value) that determines the strength of the ground, etc., obtained by a standard penetration test.

[0019] Next, a method for constructing a simulated soft ground will be described with reference to Fig. 3. Fig. 3 is an explanatory diagram of a method for constructing a simulated soft ground according to this embodiment.

[0020] As shown in FIG. 3(A), the ground of the experimental field is excavated to excavate the excavation hole 11. In this case, the excavation hole 11a that becomes the storage section 15 (see FIG. 1) is formed deeper than the minimum ground clearance of the construction machine 31 (see FIG. 1) and deep enough to reproduce the turtle-shaped state of the construction machine 31 (for example, 0.6 [m]). The length of the excavation hole 11a is formed according to the planned travel length (for example, 2.5 [m]), and the width of the excavation hole 11a is formed larger than the vehicle width of the construction machine 31 and the travel path protection mat 40 of the test specimen (see FIG. 4) by about 1 [m] or more on both sides (for example, 4.1 [m]). By forming the width of the excavation hole 11a wider, it becomes easier to release a large number of buffer bodies 14 to the left and right when the construction machine 31 travels.

[0021] The excavation holes 11b, 11c which become the entrance section 16 and the retreat section 17 are formed to a depth half that of the excavation hole 11a (for example, 0.3 [m]). The length of the excavation holes 11b, 11c is formed to match the track length of the construction machine 31 (for example, 2.1 [m]), and the width of the excavation holes 11b, 11c is formed to match the vehicle width of the construction machine 31 (for example, about 2.0 [m]). In this way, the excavation holes 11b, 11a, 11c are lined up in the ground of the experimental field along the extension direction of the travel path, and the excavation hole 11a is formed deeper than the excavation holes 11b, 11c in a cross-sectional view, and the excavation hole 11a is formed wider than the excavation holes 11b, 11c in a plan view.

[0022] Next, as shown in FIG. 3(B), the excavation holes 11a-11c are covered from the inside with a curing sheet 12. A buffer mat 13 is installed in the excavation hole 11a to form a storage section 15, a buffer mat 13 is installed in the excavation hole 11b to form an entrance section 16, and a buffer mat 13 is installed in the excavation hole 11c to form an evacuation section 17. By laying the curing sheet 12 in the excavation holes 11a-11c, the buffer mat 13 is prevented from coming into contact with the soil and becoming dirty. The amount of buffer 14 used is reduced by the amount of the buffer mat 13 installed in the excavation hole 11a. In the entrance section 16 and the evacuation section 17, the buffer mat 13 reproduces ground with a smaller amount of settlement than the soft ground.

[0023] Next, as shown in FIG. 3(C), a large number of buffer bodies 14 are randomly placed in the storage section 15. The storage section 15 stores a large number of buffer bodies 14 up to the same height as the ground surface of the experimental field. Gaps are provided between the buffer bodies 14, and the buffer bodies 14 and the gaps reproduce soft ground. As described above, the ground conditions are set such that when the construction machine 31 (see FIG. 1) rides on the buffer bodies 14, the tracks 32 of the construction machine 31 sink into the buffer bodies 14. At this time, the buffer bodies 14 are elastically deformed, so the ground conditions do not change even if the construction machine 31 travels repeatedly.

[0024] Next, a method for measuring the amount of settlement of a construction machine on a simulated soft ground will be described with reference to Fig. 4 and Fig. 5. In this embodiment, the direction for measuring the amount of settlement of a construction machine when a runway protection mat is laid on the simulated soft ground will be described, but the method for measuring the amount of settlement of a construction machine when a floor plate is laid on the simulated soft ground or when nothing is laid on the simulated soft ground is the same. Fig. 4 is a schematic top view of the runway protection mat of this embodiment. Fig. 5 is an explanatory diagram of the method for measuring the amount of settlement of a construction machine of this embodiment.

[0025] As shown in Fig. 4, the runway protection mat 40 includes a mat 41 laid on a soft ground and a plurality of core materials 43 provided in the mat 41. The mat 41 is formed by bonding a surface cloth 42 and a lining cloth (not shown) made of synthetic fiber woven fabric such as polyester and having a rectangular shape when viewed from above. Three sides of the surface cloth 42 and the lining cloth, excluding one side parallel to the extension direction of the runway, are bonded, and the surface cloth 42 and the lining cloth are bonded at a plurality of straight line portions 44 parallel to the width direction of the runway. The bonding of the surface cloth 42 and the lining cloth forms a plurality of tubular bag portions 45 arranged in parallel in the mat 41. One end of the plurality of tubular bag portions 45 is not bonded and is open to allow the insertion and removal of the plurality of core materials 43.

[0026] A plurality of eyelets 46 are attached at equal intervals to one side of the front cloth 42 and the back cloth. A string 47 is passed through the plurality of eyelets 46, and one end of the plurality of tubular bag portions 45 is closed by tightening the string 47. A plurality of core materials 43 are inserted into the plurality of tubular bag portions 45, so that the plurality of core materials 43 are arranged parallel to the width direction of the travel path. The plurality of core materials 43 are formed of circular pipes made of resin such as polyvinyl chloride. The plurality of core materials 43 support the construction machine 31, and the plurality of core materials 43 and the mat 41 distribute the load of the construction machine 31 over a wide area on the simulated soft ground 10, thereby preventing the construction machine 31 from sinking.

[0027] As shown in Fig. 5(A), when measuring the amount of settlement of the construction machine 31, a simulated soft ground 10 is created in the experimental field. A runway protection mat 40 is laid on the simulated soft ground 10, and a runway for the construction machine 31 is formed on the simulated soft ground 10. A plurality of core materials 43 are parallel to the width direction of the runway, and a plurality of core materials 43 are arranged in the extension direction of the runway. A GNSS (Global Navigation Satellite System) receiver 33 is attached to the cockpit of the construction machine 31 as a height sensor, and the GNSS receiver 33 receives signals from the satellite system to measure the height displacement of the construction machine 31.

[0028] As shown in Fig. 5(B), when the construction machine 31 runs onto the runway protection mat 40, the tracks 32 of the construction machine 31 are received by the multiple core materials 43. The load of the construction machine 31 is dispersed over a wide area on the simulated soft ground 10 by the multiple core materials 43 and the mat 41, suppressing sinking of the construction machine 31. At this time, the amount of sinking of the construction machine 31 on the simulated soft ground 10 is measured by the GNSS receiver 33. The performance of the runway protection mat 40 is confirmed by comparing the amount of sinking of the construction machine 31 when the runway protection mat 40 is laid on the simulated soft ground 10 and when the runway protection mat 40 is not laid on the simulated soft ground 10.

[0029] As described above, according to the simulated soft ground 10 of this embodiment, a large number of buffer bodies 14 are randomly stored in the storage section 15, and appropriate gaps are provided between the buffer bodies 14. When the construction machine 31 rides over the large number of buffer bodies 14 in the storage section 15, the buffer bodies 14 are distorted or the buffer bodies 14 are evacuated, causing the tracks 32 of the construction machine 31 to sink into the storage section 15, thereby reproducing soft ground. At this time, the large number of buffer bodies 14 are distorted within their elastic limits due to the ground pressure from the construction machine 31, so that when the ground pressure from the construction machine 31 is removed, the large number of buffer bodies 14 return to their original shape. Therefore, experiments can be repeatedly performed on the simulated soft ground 10 without changing the ground conditions of the simulated soft ground 10.

[0030] In addition, since it is sufficient to randomly store a large number of buffers 14 in the storage section 15, the simulated soft ground 10 can be created in the experimental field in a short time. The amount of settlement of the construction machine 31 on the simulated soft ground 10 can be repeatedly measured without changing the ground conditions of the simulated soft ground 10.

[0031] In this embodiment, the entrance section 16 and the evacuation section 17 are formed by the buffer mat 13, but the entrance section 16 and the evacuation section 17 may be formed by a slope and a number of buffers. For example, as shown in the modified example of FIG. 6, an excavation hole 21a that becomes the storage section 25, an excavation hole 21b that becomes the entrance section 26, and an excavation hole 21c that becomes the evacuation section 27 are excavated in the experimental field. The bottom surface of the excavation hole 21a is a horizontal plane, and the bottom surfaces of the excavation holes 21b and 21c are slopes that become deeper toward the excavation hole 21a (storage section 25). A protective sheet 22 is laid in the excavation holes 21a-21c, and the surfaces of the excavation holes 21a-21c are covered with the protective sheet 22.

[0032] The excavation hole 21a is formed deeper than the excavation holes 21b and 21c. A buffer mat 23 is installed on the bottom surface of the excavation hole 21a, and the upper surface of the buffer mat 23 of the excavation hole 21a is connected to the bottom surface (slope) of the excavation holes 21b and 21c. A large number of buffer bodies 24 are randomly installed in the excavation holes 21a-21c to form the simulated soft ground 20. In this way, the entrance section 26 and the retreat section 27 are formed by the slopes of the excavation holes 21b and 21c and the large number of buffer bodies 24, and the amount of the buffer bodies 24 piled up varies depending on the slope. This reproduces a ground in which the amount of sinking gradually increases toward the storage section 25.

[0033] In the present embodiment, the multiple shock absorbers are formed in a cubic shape, but the shape of the multiple shock absorbers is not particularly limited. For example, the multiple shock absorbers may be formed in a spherical shape. In this case, it is preferable that the diameter of the multiple shock absorbers is equal to or smaller than half the width of the crawler belt, and that the diameter of the multiple shock absorbers is large enough not to be caught in the crawler belt.

[0034] In addition, in this embodiment, the multiple shock absorbers are formed of urethane sponge, but the material of the multiple shock absorbers is not particularly limited as long as the multiple shock absorbers can be distorted within their elastic limits by the ground pressure from the construction machine and the traveling part of the construction machine can be sunk into the storage part. For example, the multiple shock absorbers may be formed of highly elastic rubber balls.

[0035] In addition, in this embodiment, multiple buffer bodies are formed to be the same size and made of the same material, but by mixing multiple types of buffer bodies of different sizes and materials into multiple buffer bodies, the porosity of the simulated soft ground and the distortion amount of the buffer bodies can be changed to adjust the amount of settlement of the construction machine.

[0036] In addition, in the present embodiment, a construction machine is exemplified as a vehicle, but a vehicle other than a construction machine may be used. The size, material, etc. of the multiple buffer bodies may be appropriately changed depending on the type and size of the vehicle.

[0037] In addition, in this embodiment, a large number of buffers sink the tracks of the construction machine into the storage section so that the amount of sinking of the construction machine becomes the minimum ground clearance of the construction machine, but the amount of sinking of the construction machine can be changed as appropriate depending on the content of the experiment.

[0038] Further, in this embodiment, a GNSS receiver is exemplified as the height sensor, but the height sensor may be any sensor capable of measuring the amount of subsidence of the construction machine.

[0039] Furthermore, in this embodiment, the simulated soft ground is used to measure the amount of subsidence of the construction machine, but the simulated soft ground may also be used to carry out other tests, such as a turning test of the construction machine.

[0040] As described above, the first embodiment is a simulated soft ground (10, 20) that can be constructed in an experimental field for a vehicle (construction machine 31), and includes a storage section (15, 25) formed in a concave shape in cross section with an open top, and a number of buffer bodies (14, 24) randomly installed in the storage section, and the number of buffer bodies are distorted within their elastic limits by the ground pressure from the vehicle, causing the running part (track 32) of the vehicle to sink into the storage section. According to this configuration, a number of buffer bodies are randomly stored in the storage section, and appropriate gaps are provided between the buffer bodies. When the vehicle runs over the number of buffer bodies in the storage section, the running part of the vehicle sinks into the storage section due to the distortion of the buffer bodies and the retreat of the buffer bodies, thereby reproducing soft ground. At this time, the number of buffer bodies are distorted within their elastic limits by the ground pressure from the vehicle, and when the ground pressure from the vehicle is removed, the number of buffer bodies return to their original shape. Therefore, experiments can be repeatedly performed on the simulated soft ground without changing the ground conditions of the simulated soft ground. Furthermore, since it is sufficient to randomly store a large number of buffers in the storage section, the experimental field can be created in a short period of time.

[0041] In the second aspect, the amount of sinking of the vehicle in the first aspect is the minimum ground clearance of the vehicle. With this configuration, when the vehicle runs on soft ground, it is possible to reproduce the turtle-shaped state in which the running part floats off the ground and it becomes difficult to run.

[0042] In the third aspect, in the first or second aspect, the running part is a crawler belt, the multiple buffer bodies are cubic or spherical, and one side or diameter of the multiple buffer bodies is half or less of the crawler belt width. With this configuration, since there are gaps between the multiple buffer bodies, the crawler belt of the vehicle rides on three or more buffer bodies in the vehicle width direction. The buffer bodies are distorted by the ground pressure from the crawler belt, or the buffer bodies retreat into the gaps, so that the crawler belt of the vehicle can be appropriately sunk.

[0043] In a fourth aspect, in the third aspect, one side or a diameter of the multiple shock absorbers is large enough not to be caught in the crawler belt. With this configuration, the shock absorbers are prevented from being caught in the crawler belt and being damaged.

[0044] A fifth aspect is any one of the first to fourth aspects, in which the storage section is formed by a plate-shaped shock-absorbing mat (13, 23). With this configuration, the number of shock-absorbing bodies to be stored in the storage section can be reduced, thereby reducing the labor required for installation.

[0045] In the sixth aspect, in any one of the first to fifth aspects, the entrance (16) to the storage section is formed by a plate-shaped shock absorbing mat. With this configuration, the shock absorbing mat reproduces ground that sinks to some extent, and the strength of the ground can be changed stepwise from the ground on the experimental field to the simulated soft ground.

[0046] The seventh aspect is any one of the first to fifth aspects, in which the entrance (26) to the storage unit is formed by a slope that is inclined so as to become deeper toward the storage unit, and a large number of buffer bodies are randomly placed on the slope. With this configuration, the amount of buffer bodies piled up varies depending on the slope, recreating a ground in which the amount of sinking gradually increases toward the storage unit.

[0047] In an eighth aspect, in any one of the first to seventh aspects, the multiple buffer bodies are of multiple types having different sizes and / or materials. With this configuration, the amount of settlement of the construction machine can be adjusted by changing the porosity of the simulated soft ground or the amount of distortion of the buffer bodies.

[0048] A ninth aspect is any one of the first to seventh aspects, in which the buffer body is formed of urethane sponge. With this configuration, the soft ground can be easily reproduced by the urethane sponge.

[0049] The tenth aspect is a method for constructing a simulated soft ground in an experimental field for vehicles, comprising the steps of excavating the ground to form an excavation hole, covering the excavation hole from the inside with a curing sheet (12, 22), forming a storage section in the excavation hole with a buffer mat, and randomly installing a number of buffers in the storage section, so that the number of buffers is distorted within its elastic limit by ground pressure from the vehicle, causing the vehicle's running section to sink into the storage section. According to this configuration, the soft ground is reproduced by the vehicle's running section sinking into the storage section due to the distortion of the buffers or the retraction of the buffers, and when the ground pressure from the vehicle is removed, the number of buffers return to their original shape. Therefore, experiments can be repeatedly performed on the simulated soft ground without changing the ground conditions of the simulated soft ground. In addition, since it is sufficient to randomly store a number of buffers in the storage section, the simulated soft ground can be constructed in the experimental field in a short time.

[0050] The eleventh aspect is a method for measuring the amount of settlement of a vehicle on a simulated soft ground, in which a storage section formed in a concave shape in cross section with an open top and a number of buffer bodies randomly installed in the storage section are provided in the simulated soft ground, and the simulated soft ground is formed so that the many buffer bodies are distorted within their elastic limits by the ground pressure from the vehicle, causing the running part of the vehicle to sink into the storage section, and the amount of settlement of the vehicle on the simulated soft ground is measured by a height sensor (GNSS receiver 33) provided on the vehicle. According to this configuration, the soft ground is reproduced by the running part of the vehicle sinking into the storage section due to the distortion of the buffer bodies or the retraction of the buffer bodies, and when the ground pressure from the vehicle is removed, the many buffer bodies return to their original shape. Therefore, the amount of settlement of the vehicle can be repeatedly measured on the simulated soft ground without changing the ground conditions of the simulated soft ground.

[0051] Although the present embodiment and modifications have been described, other embodiments may be obtained by combining the above-described embodiments and modifications in whole or in part.

[0052] In addition, the technology of the present invention is not limited to the above-mentioned embodiment, and may be variously changed, substituted, or modified within the scope of the gist of the technical idea. Furthermore, if the technical idea can be realized in a different way due to the progress of technology or a different technology derived therefrom, it may be implemented using that method. Therefore, the claims cover all embodiments that may be included within the scope of the technical idea. [Explanation of symbols]

[0053] 10, 20: Simulated soft ground 12, 22: Protective sheet 13, 23: Cushioning mat 14, 24: Buffer 15, 25: Storage section 16, 26: Entrance section 31: Construction machinery (vehicles) 32: Track (running part) 33: GNSS receiver (height sensor)

Claims

1. A simulated soft ground that can be constructed in a vehicle test field, A storage section formed in a concave shape in cross section with an open upper surface; A number of buffer bodies are randomly installed in the storage section, A simulated soft ground, characterized in that the numerous buffer bodies are distorted within their elastic limits by the ground contact pressure from the vehicle, causing the running part of the vehicle to sink into the storage part.

2. 2. The simulated soft ground according to claim 1, wherein the amount of sinking of the vehicle is equal to the minimum ground clearance of the vehicle.

3. The traveling part is a crawler track, The multiple buffer bodies are cubic or spherical, 3. The simulated soft ground according to claim 1 or 2, characterized in that one side or diameter of the multiple buffer bodies is equal to or less than half the width of the track belt.

4. 4. The simulated soft ground according to claim 3, wherein one side or diameter of the multiple buffer bodies is large enough not to be caught in the crawler belt.

5. 3. The simulated soft ground according to claim 1 or 2, characterized in that the storage section is formed by a plate-shaped shock-absorbing mat.

6. 3. The simulated soft ground according to claim 1 or 2, characterized in that an entrance to the storage section is formed by a plate-shaped shock absorbing mat.

7. A simulated soft ground as described in claim 1 or claim 2, characterized in that the access to the storage section is formed by a slope that slopes so as to become deeper toward the storage section, and the numerous buffer bodies are randomly installed on the slope.

8. 3. The simulated soft ground according to claim 1 or 2, characterized in that the multiple buffer bodies are of multiple types with different sizes and / or materials.

9. 3. The simulated soft ground according to claim 1 or 2, characterized in that the buffer body is formed of urethane sponge.

10. A method for constructing a simulated soft ground in a vehicle test field, comprising: Excavating the ground to form a borehole; Covering the excavated hole from the inside with a curing sheet; forming a receiving portion in the drilled hole with a shock-absorbing mat; and randomly placing a number of buffer bodies in the receiving section. A method for creating a simulated soft ground, characterized in that the numerous buffer bodies are distorted within their elastic limits by the ground contact pressure from the vehicle, causing the running part of the vehicle to sink into the storage part.

11. A method for measuring a sinking amount of a vehicle on a simulated soft ground, comprising: The simulated soft ground is provided with a storage section formed in a concave shape in cross section with an open upper surface, and a number of buffer bodies randomly installed in the storage section, the simulated soft ground is formed so that the multiple buffer bodies are distorted within their elastic limits by ground contact pressure from the vehicle, causing the running part of the vehicle to sink into the accommodation part; A method for measuring an amount of settlement of a vehicle, comprising the steps of measuring an amount of settlement of the vehicle on the simulated soft ground by a height sensor provided on the vehicle.

Citation Information

Patent Citations

  • Imitation ground unit and imitation ground structural body

    JP2001020201A

  • Load test device

    JP2002350308A

  • Method for constructing temporary road for railway construction work

    JP2010111995A

  • Construction method for temporary road used in railroad construction and others

    JP2016069881A

  • Vehicle control device

    JP2023005658A