Sediment trapping fence
The sediment trapping fence with vertically erected columns and detachable beam members addresses the cost and space limitations of existing technologies, offering an economical and durable solution for capturing small gravel in restricted areas.
Patent Information
- Application Number
- JP2023055679
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
Existing sediment trapping technologies, such as those described in Patent Documents 1 and 2, are costly and unable to effectively capture small gravel due to large beam diameters, and are not suitable for installation in restricted spaces like residential areas or near highways.
A sediment trapping fence with vertically erected columns, detachable beam members, and diagonal supports that reduce the required foundation width, allowing for easy installation and maintenance, and can capture gravel of up to 0.15 m in diameter.
The fence provides an economical solution with reduced installation width, enabling installation in restricted areas while maintaining durability and capturing small gravel effectively, with replaceable beam members for easy maintenance.
Smart Images

Figure 2024143154000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a sediment trapping fence installed in a mountain stream. [Background technology]
[0002] There is a need for trapping fences to prevent soil and gravel flowing in relatively small mountain streams from flowing into residential areas, roads, and railways. For example, Patent Document 1 and Patent Document 2 shown below have been published as trapping fences for trapping soil and gravel.
[0003] Patent document 1 discloses a permeable protective fence installed in a zero-order valley or a primary valley, which has a plurality of pillar portions and a plurality of beam portions spaced a predetermined distance apart from each other along the extension direction of the pillar portions.
[0004] Patent Document 2 discloses a protective work in which a capture body formed of H-shaped steel column members and steel pipe beam members has a concrete block base. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2017-141568 A [Patent Document 2] JP 2022-39651 A Summary of the Invention [Problem to be solved by the invention]
[0006] On the other hand, when capturing sediment and gravel flowing in a relatively small mountain stream, the target volume of sediment to be captured is 1,000 m 3In order to reduce costs, a simpler and smaller structure is desirable than a normal steel permeable sabo dam. In addition, when trapping soil and gravel flowing in mountain streams in areas where residential areas are close to the valley outlet or near mountain roads and railways, trapping fences are often installed in places where land use and transportation routes for materials are limited, such as behind residential houses or along highways, so it is desirable for the structure to be small in width and have a structure that also takes economic efficiency into consideration. In addition, when trapping fences are of permeable structure, relatively small gravel, with the maximum diameter of the gravel flowing down the river, being around 0.15m, may also be captured, and a structure that can trap these gravel is required.
[0007] However, in the technology disclosed in Patent Document 1 and Patent Document 2, the diameter of the beam member for capturing gravel is large, which increases costs, and cannot accommodate the reduction in the diameter of the gravel to be captured as it flows down. Furthermore, the installation location of the capture fence in the technology disclosed in Patent Document 1 and Patent Document 2 is not assumed to be in a place where land is limited, such as behind a private house or along a highway. Therefore, the technology disclosed in Patent Document 1 and Patent Document 2 has the problem that the capture fence cannot be installed in a place where land is limited. If the width of the capture fence is narrowed to solve this problem, the stress generated in each component will increase, the size of each component will increase, and there is a problem that the cost will increase.
[0008] The present invention has been devised in consideration of the above-mentioned problems, and its object is to provide a soil and sand capture fence that requires a small installation width and also takes economical efficiency into consideration. [Means for solving the problem]
[0009] The sediment capture fence of the first invention is a sediment capture fence installed in a relatively small stream, and is characterized by comprising a number of posts erected vertically or perpendicular to the installation ground, a beam member supported on the upstream side of the multiple posts, and a diagonal member installed diagonally on the downstream side of the posts and extending downward.
[0010] The soil trapping fence according to the second invention is characterized in that, in the first invention, the beam member is detachably attached to the upstream side of the support pillar.
[0011] The soil capture fence of the third invention is characterized in that, in the second invention, the beam member is provided with an attachment plate whose downstream main plane abuts against the upstream attachment surface of the support.
[0012] The soil capture fence of the fourth invention is characterized in that, in the first to third inventions, the diagonal member is installed diagonally from the midpoint between the lower end and the top end of the support to the top end. Effect of the Invention
[0013] According to the first to fourth inventions, the soil trapping fence comprises a plurality of posts erected vertically or perpendicular to the installation ground, beam members, and diagonal members. As the posts are erected vertically or perpendicular to the installation ground, the foundation width required to install the soil trapping fence is small, making it possible to install a soil trapping fence with a small foundation width and with consideration for economy.
[0014] In particular, according to the second invention, the beam member that captures gravel and the like is attached freely attachable and detachable to the upstream side of the support pillar to protect the support pillar, so that the support pillar will not be damaged even in the event of a gravel collision, and even if the capture member such as a beam member is damaged, the capture member such as a beam member can be easily replaced, making it possible to install a soil and sand capture fence that is also excellent for maintaining and managing the facility.
[0015] In particular, according to the third aspect of the present invention, the beam member is provided with a mounting plate whose downstream main plane abuts against the upstream mounting surface of the support. The beam member is supported by abutting and joining the mounting surface and the mounting plate. This means that no connecting members such as bolts are exposed on the upstream side of the beam member, making it possible to install a soil trapping fence with superior durability.
[0016] In particular, according to the fourth aspect of the invention, the fence is installed diagonally from the midpoint between the bottom and top of the support to the top of the support, which makes it possible to install an economical soil trapping fence that requires a small foundation width and is subjected to a small stress. [Brief description of the drawings]
[0017] [Figure 1] FIG. 1 is a diagram showing an example of a soil trapping fence in the first embodiment. [Diagram 2] Fig. 2(a) is a diagram showing an example of a side surface of the soil trapping fence in the first embodiment. Fig. 2(b) is a diagram showing an example of a side surface of the soil trapping fence using anchor materials in the first embodiment. [Diagram 3] FIG. 3 is a diagram showing a part of the support column in the first embodiment. [Figure 4] Fig. 4(a) is a diagram showing one end of a beam member in the first embodiment, and Fig. 4(b) is a top view of one end of a beam member in the first embodiment. [Diagram 5] Fig. 5(a) is a diagram showing a side surface of a beam member in the first embodiment, and Fig. 5(b) is a diagram showing a side surface of a beam member in the first embodiment when a bolt is attached to the beam member in advance. [Figure 6] Fig. 6(a) is a diagram showing one end of a beam member when the joint shape is a hollow-out type in the first embodiment, and Fig. 6(b) is a diagram showing a side of a beam member when the joint shape is a hollow-out type in the first embodiment. [Figure 7] Fig. 7(a) is a diagram showing an example of a joint portion between a post and a beam member in the first embodiment, and Fig. 7(b) is a diagram showing a plan view of the joint portion between a post and a beam member in the first embodiment. [Figure 8] Fig. 8(a) is a diagram showing an example of a joint between a support and a beam member in the first embodiment when the shape of the joint is a hollow-out type. Fig. 8(b) is a diagram showing a plan view of a joint between a support and a beam member in the first embodiment when the shape of the joint is a hollow-out type. [Figure 9] FIG. 9 is a diagram showing a process of installing the soil trapping fence in the first embodiment. [Figure 10] Fig. 10(a) is a diagram showing a step of joining the posts and the beam members in the step of installing the soil trapping fence in the first embodiment, and Fig. 10(b) is a diagram showing the state after the posts and the beam members have been joined in the step of installing the soil trapping fence in the first embodiment. [Figure 11] Fig. 11(a) is a diagram showing a step of joining a support to a beam member when the joint shape is a cutout type in the installation step of the soil capture fence in the first embodiment, and Fig. 11(b) is a diagram showing the state after joining a support to a beam member when the joint shape is a cutout type in the installation step of the soil capture fence in the first embodiment. [Figure 12] Figure 12(a) is a graph showing the relationship between the foundation width of the sediment trapping fence and the position of the diagonal members when the debris flow depth is 2.0 m. Figure 12(b) is a graph showing the relationship between the maximum bending moment of the sediment trapping fence and the position of the diagonal members when the debris flow depth is 2.0 m. [Figure 13] Figure 13 is a graph showing the relationship between the foundation width of the sediment capture fence and the position of the diagonal members when the debris flow depth is 0.6 m. [Figure 14] Figure 14(a) is a diagram showing an example of a sediment trapping fence where concrete blocks are used for the non-overflow section or for riverbank erosion prevention. Figure 14(b) is a diagram showing an example of a sediment trapping fence where concrete blocks are used for part of the foundation and the non-overflow section or for riverbank erosion prevention. Figure 14(c) is a diagram showing an example of a sediment trapping fence where concrete blocks are used for the foundation and non-overflow section or for riverbank erosion prevention. [Figure 15] FIG. 15 shows an example of a sediment capture fence in which steel frames are used for the foundation and non-overflow areas or for riverbank erosion prevention. [Figure 16] Fig. 16(a) is a diagram showing an example of a joint portion between a pillar and a beam member in the second embodiment, and Fig. 16(b) is a diagram showing a plan view of the joint portion between a pillar and a beam member in the second embodiment. [Figure 17] Fig. 17(a) is a diagram showing a step of joining the posts and the beam members in the installation step of the soil trapping fence in the second embodiment, and Fig. 17(b) is a diagram showing the state after the posts and the beam members have been joined in the installation step of the soil trapping fence in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] An example of a soil trapping fence 1 according to a first embodiment of the present invention will be described with reference to the drawings.
[0019] The sediment trapping fence 1 will be described with reference to Figs. 1 to 6. Fig. 1 is a diagram showing an example of the sediment trapping fence 1 in the first embodiment. In Fig. 1, a mountain stream flows in a direction x from upstream to downstream. Fig. 2(a) is a diagram showing an example of a side of the sediment trapping fence 1 in the first embodiment. Fig. 2(b) is a diagram showing an example of a side of the sediment trapping fence 1 using anchor materials 7 in the first embodiment. Fig. 3 is a diagram showing a part of a support 2 in the first embodiment. Fig. 4(a) is a diagram showing a beam member 3 in the first embodiment. Fig. 4(b) is an overhead view of the beam member 3 in the first embodiment. Fig. 5(a) is a diagram showing a side of the beam member 3 in the first embodiment. Fig. 5(b) is a diagram showing a side of the beam member 3 in the first embodiment when a bolt 32 is attached to the beam member 3 in advance. Fig. 6(a) is a diagram showing the beam member 3 in the first embodiment when the shape of the joint 34 is a hollow-out type. FIG. 6(b) is a diagram showing a side surface of the beam member 3 when the joint portion 34 in the first embodiment has a hollow-out shape.
[0020] The sediment trapping fence 1 is a fence installed in a mountain stream to trap sediment and stones and gravel, as shown in FIG. 1. The sediment trapping fence 1 includes, for example, a plurality of posts 2 erected in the vertical direction z, a beam member 3 supported on the upstream side of the plurality of posts 2, and a diagonal member 4 obliquely installed on the downstream side of the posts 2 and extending downward. The sediment trapping fence 1 may be erected not only vertically but also vertically on the installation ground. The installation ground here refers to the riverbed or concrete foundation on which the sediment trapping fence 1 is installed. The sediment trapping fence 1 may include wire mesh, grating, punched metal, etc. (not shown) between the plurality of posts 2 instead of the beam member 3, or may include both the beam member 3 and wire mesh, grating, punched metal, etc. (not shown) between the plurality of posts 2. The mountain stream may also be, for example, a valley outlet. The mountain stream may also be, for example, a first-order valley or a zero-order valley. A first-order valley is a valley whose depth is deeper than its opening width, for example, a small mountain stream. A zero-order valley is, for example, a valley that does not have surface water at all times. A mountain stream may be in an area where residential areas are close to the valley outlet, or near roads and railways along mountains.
[0021] As shown in FIG. 2(a), the support pillar 2 is a column erected in the vertical direction z. The support pillar 2 is, for example, embedded in a foundation concrete (cast in place) 5, but is not limited thereto. As shown in FIG. 2(b), the lower end 2b of the support pillar 2 may be fixed to the foundation concrete (cast in place) 5 by, for example, an anchor material 7. The support pillar 2 is, for example, an H-shaped steel composed of a web 24 and a pair of flanges 25a, 25b at both ends of the web 24. The support pillar 2 is provided with an upstream flange 25a and a downstream flange 25b at both ends of the web 24 with respect to the flow direction x of the stream. The support pillar 2 is preferably an H-shaped steel, but is not limited thereto, and may be a circular steel pipe, a square steel pipe, a CT steel, a channel steel, or the like. A plurality of support pillars 2 may be arranged in parallel such that the interval b between the support pillars 2 is 0.5 m to 3.0 m or less. The support 2 may be provided so that the fence height h from the fulcrum 2e, which is the contact point between the support 2 and the foundation concrete (cast in place) 5, to the top end 2c, is 1.0 m to 5.0 m. In addition, for example, when the support 2 is a square steel pipe, the plate on the upstream side with respect to the flow direction x of the stream may be the flange 25a. In addition, as shown in FIG. 3, the support 2 may be provided with bolt holes 21 in the flange 25a on the upstream side of the stream. In addition, the upstream surface of the flange 25a of the support 2 is the mounting surface 2a. The mounting surface 2a is not limited to the upstream surface of the flange 25a, but may be any upstream side surface of the support 2. In addition, the mounting surface 2a is preferably a flat surface, but is not limited thereto, and may be curved, for example. In addition, when the support 2 is fixed to the foundation concrete (cast in place) 5 by the anchor material 7, the lower end 2b of the support 2 is the fulcrum 2e.
[0022] The diagonal member 4 is a member that is obliquely installed on the flange 25b on the downstream side of the support 2 as shown in FIG. 2(a) and extends downward in the vertical direction z of the flow direction x of the stream. The diagonal member 4 may be the same size as the support 2, but is not limited to this, and any size may be used. The diagonal member 4 is preferably an H-shaped steel, but is not limited to this, and may be a circular steel pipe, a square steel pipe, a CT steel, a channel steel, etc. The diagonal member 4 is preferably installed obliquely from a midpoint 2d between the fulcrum 2e and the top end 2c of the support 2 to the top end 2c of the support 2, but is not limited to this. The diagonal member 4 may be embedded in the foundation concrete (cast in place) 5 and fixed thereto. The diagonal member 4 may be fixed to the foundation concrete (cast in place) 5 by an anchor material 7 or the like as shown in FIG. 2(b). The diagonal member 4 may be joined to the downstream side of the support 2 by a bolt 41 and a nut 42 that screws the bolt 41 into place. The diagonal member 4 may be welded to the support 2 in advance. The position where the diagonal member 4 is installed diagonally on the support 2 is set as the installation position 4b. The installation position 4b is the intersection point between the center line of the support 2 and the center line of the diagonal member 4. The intersection point of the diagonal line inclined 45° upstream from the vertical direction z passing through the lower end 2b of the support 2 and the surface of the foundation concrete (cast in place) 5 is set as point 5a. The intersection point of the diagonal line inclined 45° downstream from the vertical direction z passing through the lower end 4a of the diagonal member 4 and the surface of the foundation concrete (cast in place) 5 is set as point 5b. The width from point 5a to point 5b is set as the foundation width d, which is the minimum width required for the structure of the soil capture fence 1. In addition, as shown in FIG. 2(b), when the support 2 and the diagonal member 4 are fixed to the foundation concrete (cast in place) 5 by the anchor material 7, the width from the lower end 4a of the diagonal member 4 to the lower end 2b of the support 2 may be set as the foundation width d required for the structure. The foundation width (the width of the concrete foundation) required for stability so that the soil trapping fence 1 remains stable even when soil and gravel are trapped may be taken as the foundation width W, and the foundation width W required for stability cannot be made smaller than the foundation width d required for structure. If the foundation width d required for structure is smaller than the foundation width W required for stability, it is advantageous in terms of stability to make it larger on the upstream side, as shown in Figure 2(a).
[0023] The beam member 3 is a beam for capturing soil, sand, and gravel, as shown in FIG. 4(a). The beam member 3 may be made of, for example, a circular steel pipe, a square steel pipe, a computed tomography steel pipe, a channel steel, or an L-shaped steel. The beam member 3 may be made of, for example, a steel pipe having a diameter of 100 mm or more and a steel pipe thickness of 8 mm or more. A plurality of beam members 3 may be arranged in parallel on the upstream side of the support column 2 shown in FIG. 1 with a minimum interval a of 0.1 m. The beam member 3 is configured to absorb the dent energy E of a steel pipe against gravel, as shown in the following formula 1: d For the dent rate (dent deformation δ d / A steel pipe with an outer diameter D) of 40% or less may be used.
number
[0024] As shown in FIG. 4(b), the beam member 3 is provided with a mounting plate 31 having a bolt hole 35 drilled therein via a joint 34 on the downstream side. The downstream main plane of the mounting plate 31 is defined as a contact surface 31a. The beam member 3 may be attached in advance so that a connecting member such as a bolt 32 is exposed between the downstream side surface 3a and the upstream main plane 31b of the mounting plate 31, as shown in FIG. 5(b), for example. The joint 34 is a joint portion between the beam member 3 and the mounting plate 31, and is welded, for example, to the downstream side surface 3a of the beam member 3 and the upstream main plane 31b of the mounting plate 31. The joint 34 may be welded to the downstream side surface 3a of the beam member 3 and to the upstream main plane 31b of the mounting plate 31 along a direction y perpendicular to the vertical direction z and the direction x, thereby joining the beam member 3 and the mounting plate 31. The joint 34 may be provided in a plurality of positions in the vertical direction z that are different from each other. In addition, the upstream end surface 34a of the joint 34 may be formed so as to follow the direction y of the downstream side surface 3a of the beam member 3. In addition, when the beam member 3 is shaped as a circular steel pipe, the upstream end surface 34a of the joint 34 may be formed so as to be curved so as to follow the direction y of the downstream side surface 3a of the beam member 3. In such a case, the curvature of the upstream end surface 34a of the joint 34 in the cross section in the xz plane may be the same as the curvature of the downstream side surface 3a of the beam member 3 in the cross section in the xz plane. In addition, although not shown, the mounting plate 31 may be provided in a plurality of parts. In addition, the mounting plate 31 and the joint 34 may be formed integrally, for example, like an angle iron, without being welded.
[0025] The joint 34 may be a hollow-out type in which an upstream end surface 34a of the joint 34 is formed along the direction z of the downstream side surface 3a of the beam member 3, as shown in Fig. 6(a) and Fig. 6(b). The joint 34 may be welded to the downstream side surface 3a along the vertical direction z of the beam member 3 and also welded to the upstream main plane 31b of the mounting plate 31 to join the beam member 3 and the mounting plate 31. Furthermore, a plurality of joints 34 may be provided at different positions in the direction y. Furthermore, the joint 34 is not limited to this, and may have any shape. Furthermore, the beam member 3 and the mounting plate 31 may be joined to the beam member 3 by any method.
[0026] Next, the joint structure between the support 2 and the beam member 3 will be described with reference to Figs. 7 and 8. Fig. 7(a) is a diagram showing an example of a joint between the support 2 and the beam member 3 in the first embodiment. Fig. 7(b) is a diagram showing a plan view of the joint between the support 2 and the beam member 3 in the first embodiment, and is a diagram showing the plan view of Fig. 7(a). Fig. 8(a) is a diagram showing an example of a joint between the support 2 and the beam member 3 in the first embodiment when the shape of the joint 34 is a hollow-out type. Fig. 8(b) is a diagram showing a plan view of the joint between the support 2 and the beam member 3 in the first embodiment when the shape of the joint 34 is a hollow-out type, and is a diagram showing the plan view of Fig. 8(a). As shown in Fig. 7(a), the soil trapping fence 1 is joined between the support 2 and the beam member 3 via an attachment plate 31 provided on the downstream side of the beam member 3. As shown in FIG. 7(b), the soil trapping fence 1 supports the beam member 3 on the upstream side of the support 2 by abutting the upstream mounting surface 2a of the support 2 with the abutment surface 31a of the beam member 3, and joining the flange 25a and the mounting plate 31 with a bolt 32 and a nut 22 that screws the bolt 32. Even if the shape of the joint 34 is a hollow-out type, the beam member 3 is supported on the upstream side of the support 2 by abutting and joining the upstream mounting surface 2a of the support 2 with the abutment surface 31a of the beam member 3 in the same manner as shown in FIG. 8(a) and FIG. 8(b). The support 2 and the beam member 3 may be joined, for example, by a U-bolt (not shown) that is attached to the support 2 and fits the beam member 3. The support 2 and the beam member 3 may be joined, for example, by a retainer (not shown) that is attached to the support 2 and has a hole through which the beam member 3 can pass. The support 2 and the beam member 3 may be joined by any method. Moreover, the beam member 3 may be attached to the upstream side of the support pillar 2 in a detachable manner.
[0027] Next, the process of installing the soil trapping fence 1 in the first embodiment will be described with reference to Figs.
[0028] FIG. 9 is a diagram showing the installation process of the sediment trapping fence 1 in the first embodiment. FIG. 10(a) is a diagram showing the process of joining the support 2 and the beam member 3 in the installation process of the sediment trapping fence 1 in the embodiment. FIG. 10(b) is a diagram showing the state after the support 2 and the beam member 3 are joined in the installation process of the sediment trapping fence 1 in the embodiment. FIG. 11(a) is a diagram showing the process of joining the support 2 and the beam member 3 in the case where the shape of the joint 34 is a hollow-out type in the installation process of the sediment trapping fence 1 in the embodiment. FIG. 11(b) is a diagram showing the state after the support 2 and the beam member 3 in the case where the shape of the joint 34 is a hollow-out type in the installation process of the sediment trapping fence 1 in the embodiment. First, in S1, a plurality of support columns 2 are erected in the vertical direction z. The support columns 2 may be provided in, for example, foundation concrete (cast in place) 5. In such a case, as shown in Fig. 2(b), the lower end 2b of the support 2 may be fixed to the foundation concrete (cast in place) 5 using an anchor material 7, but this is not limited thereto, and the support 2 may be provided so that the part from the fulcrum 2e of the support 2 to the lower end 2b of the support 2 is embedded in the foundation concrete (cast in place) 5. In addition, the multiple support columns 2 may be arranged side by side at equal intervals, but this is not limited thereto, and they may be arranged side by side at any intervals.
[0029] Next, in S2, the diagonal member 4 is joined to the support pillar 2 on the downstream side. In this case, the diagonal member 4 may be provided so as to be diagonally installed between the midpoint 2d between the fulcrum 2e and the top end 2c of the support pillar 2 and the top end 2c of the support pillar 2. The diagonal member 4 and the support pillar 2 may also be embedded and fixed in foundation concrete (cast in place) 5. The diagonal member 4 may also be joined to the flange 25b on the downstream side of the support pillar 2. The diagonal member 4 is provided so as to extend downward in the vertical direction z of the flow direction x of the stream. This provides a resistance force f against a force acting in the flow direction x of the stream, improving the strength of the sediment capture fence 1.
[0030] Next, in S3, as shown in Fig. 10(a) and Fig. 10(b), the beam member 3 is provided on the upstream side of the support pillar 2. In this case, the beam member 3 is supported by the support pillar 2 by abutting and joining the abutment surface 31a against the upstream mounting surface 2a of the support pillar 2. Also, any number of beam members 3 may be supported by the support pillar 2. Similarly, in the case where the shape of the joint 34 is a hollow-out type, the beam member 3 is supported by the support pillar 2 by abutting and joining the abutment surface 31a against the upstream mounting surface 2a of the support pillar 2, as shown in Fig. 11(a) and Fig. 11(b).
[0031] The above-mentioned steps complete the installation of the sediment trapping fence 1 in the first embodiment. The method of installation of the sediment trapping fence 1 is not limited to the above-mentioned method, and any method may be used. The sediment trapping fence 1 may be pre-assembled and installed in the mountain stream.
[0032] Next, calculation results when the soil trapping fence 1 in the first embodiment is used will be described with reference to the drawings.
[0033] FIG. 12(a) is a graph showing the relationship between the foundation width W required for stability of the sediment capture fence 1 and the position of the diagonal member 4 when the height h of the support pillar 2 is 2.0 m and a large-scale debris flow (debris flow depth is 2.0 m) is assumed. In the graph of FIG. 12(a), the horizontal axis indicates the distance from the top end 2c of the support pillar 2 to the installation position 4b of the diagonal member 4, and the vertical axis indicates the foundation width W required for stability. As shown in the graph of FIG. 12(a), when the distance from the top end 2c of the diagonal member 4 to the installation position 4b is about 1.0 m, that is, the distance from the top end 2c of the support pillar 2 to the midpoint 2d, the foundation width W required for stability decreases significantly as the distance increases, but when the distance from the top end 2c of the diagonal member 4 to the installation position 4b is greater than 1.0 m, that is, greater than the distance from the top end 2c of the support pillar 2 to the midpoint 2d, the reduction in the foundation width W required for stability decreases as the distance increases.
[0034] Figure 12(b) is a graph showing the relationship between the maximum bending moment of the sediment trapping fence 1 and the position of the diagonal members when the height h of the support pillar 2 is 2.0 m and a large-scale debris flow (debris flow depth is 2.0 m) is assumed. In the graph of Figure 12(b), the horizontal axis shows the distance from the top 2c of the support pillar 2 to the installation position 4b of the diagonal member 4, and the vertical axis shows the maximum bending moment (kN m). Furthermore, as the graph of Figure 12(b) shows, when the distance from the top 2c of the diagonal member 4 to the installation position 4b is greater than 1.0 m, in other words, when it is greater than the distance from the top 2c of the support pillar 2 to the midpoint 2d, the maximum bending moment (kN m) increases as the distance increases, and the stress generated in each member of the sediment trapping fence 1 increases.
[0035] FIG. 13 is a graph showing the relationship between the foundation width W required for stability of the sediment capture fence 1 and the position of the diagonal member 4 when the height h of the support pillar 2 is 2.0 m and a typical debris flow (debris flow depth is 0.6 m) is assumed. In the graph of FIG. 13, the horizontal axis indicates the distance from the top end 2c of the support pillar 2 to the installation position 4b of the diagonal member 4, and the vertical axis indicates the foundation width W required for stability. As shown in the graph of FIG. 13, when the distance from the top end 2c of the diagonal member 4 to the installation position 4b is about 1.0 m, that is, the distance from the top end 2c of the support pillar 2 to the midpoint 2d, the foundation width W required for stability decreases as the distance increases, but when the distance from the top end 2c of the diagonal member 4 to the installation position 4b is greater than 1.0 m, that is, greater than the distance from the top end 2c of the support pillar 2 to the midpoint 2d, the amount of reduction in the foundation width W required for stability, which decreases even when the distance increases, decreases significantly, and the foundation width W remains almost the same. This is because this is the limit value of the foundation width W required for stability, and therefore the foundation width W required for stability cannot be reduced even if the foundation width d required for structure is reduced.
[0036] From the above calculation results, when the installation position 4b of the diagonal member 4 is the top 2c of the pillar 2, the stress on the sediment trapping fence 1 is small, but the foundation width W required for stability is large. Furthermore, when the distance from the top 2c of the diagonal member 4 to the installation position 4b is greater than the distance from the top 2c of the pillar 2 to the midpoint 2d, the foundation width W required for stability is small, but the stress on the sediment trapping fence 1 is large. For this reason, when the installation position 4b of the diagonal member 4 is between the midpoint 2d and the top 2c, the foundation width W required for stability is small and the stress on the sediment trapping fence 1 is also small, so that the sediment trapping fence 1 can be installed with sufficient strength even in places where land is limited, such as behind residential areas or along highways.
[0037] Next, when installing the sediment trap fence 1, cast-in-place concrete is generally used for the foundation, non-overflow section, or riverbank erosion prevention, but as shown in Figs. 14 and 15, a secondary product such as concrete blocks 6 or a steel frame 8 including a cage frame can be used. Fig. 14(a) shows an example of the sediment trap fence 1 when concrete blocks 6 are used for the non-overflow section or riverbank erosion prevention. Fig. 14(b) shows an example of the sediment trap fence 1 when concrete blocks 6 are used for part of the foundation and the non-overflow section or riverbank erosion prevention. Fig. 14(c) shows an example of the sediment trap fence 1 when concrete blocks 6 are used for the foundation, non-overflow section, or riverbank erosion prevention. Fig. 15 shows an example of the sediment trap fence 1 when steel frames 8 are used for the foundation, non-overflow section, or riverbank erosion prevention. The foundation and non-overflow section used for the sediment trap fence 1 are provided in a concrete foundation (cast-in-place) 5, for example, as shown in Fig. 14(a). Also, as shown in Fig. 14(b), the sediment trapping fence 1 may be installed in a concrete foundation (cast in place) installed on a concrete block 5. Furthermore, as shown in Fig. 14(c), the sediment trapping fence 1 may be installed in a concrete block 6 without using a concrete foundation (cast in place) 5. In such a case, the sediment trapping fence 1 may be fixed to the concrete block 6 by, for example, anchor materials 7. Also, as shown in Fig. 15, the sediment trapping fence 1 may be installed by being embedded in a steel frame 8. Furthermore, the sediment trapping fence 1 may be installed in a stream by any method as a foundation and non-overflow part, or to prevent riverbank erosion.
[0038] The above describes the sediment trapping fence 1 according to the first embodiment of the present invention. The sediment trapping fence 1 according to the first embodiment of the present invention has a plurality of posts 2 erected in the vertical direction z, beam members 3, and diagonal members 4, which reduce the foundation width W required to install the sediment trapping fence 1. This makes it possible to install the sediment trapping fence 1 with a small laying width and with consideration given to economy. In addition, the sediment trapping fence 1 according to the first embodiment of the present invention has small members such as the beam members 3, which can be disassembled and transported. This makes it possible to transport materials and construct the trapping fence in a narrow area, even in places where land and transport roads for materials are limited, such as behind private homes or along highways.
[0039] Furthermore, in the soil trapping fence 1 according to the first embodiment of the present invention, an abutment surface 31a where the beam member 3 abuts against the upstream mounting surface 2a of the support 2 is provided on the downstream side of the beam member 3. As a result, the beam member 3 is supported by abutting and joining the mounting surface 2a and the abutment surface 31a, and joining members such as bolts and plates are not exposed on the upstream side of the beam member 3, making it possible to install a soil trapping fence 1 with superior durability.
[0040] Furthermore, in the soil trapping fence 1 according to the first embodiment of the present invention, the posts 2 and diagonal members 4 may be fixed by anchor materials 7. This makes it possible to install the soil trapping fence 1 on, for example, concrete blocks 6 even when there is no foundation such as foundation concrete (cast in place) 5, and thus allows for installation at lower cost.
[0041] Moreover, in the soil trapping fence 1 according to the first embodiment of the present invention, the beam member 3 is provided on the upstream side of the support pillar 2. This makes it possible to prevent gravel from hitting the support pillar 2 directly.
[0042] Furthermore, in the soil trapping fence 1 according to the first embodiment of the present invention, a plurality of beam members 3 with a minimum spacing a of 0.1 m are provided on the upstream side of the support pillars 2. This makes it possible to trap gravel even if the minimum diameter of the gravel is around 0.15 m.
[0043] Furthermore, in the soil capture fence 1 according to the first embodiment of the present invention, the posts 2 and the beam members 3 are joined by bolts 32 and nuts 22 that screw the bolts 32 into place. This makes it possible to easily replace the beam members 3 even if they are damaged.
[0044] Furthermore, in the soil capture fence 1 according to the first embodiment of the present invention, the upstream end face 34a of the joint 34 is formed to fit along the downstream side face 3a of the beam member 3. This makes it possible to abut and join the upstream end face 34a of the joint 34 and the downstream side face 3a of the beam member 3, thereby increasing the strength of the joint between the joint 34 and the beam member 3.
[0045] Furthermore, in the sediment capture fence 1 according to the first embodiment of the present invention, the beam members 3 are provided so that connecting members such as bolts 32 are exposed between the downstream side surface 3a and the upstream main flat surface 31b of the mounting plate 31. This prevents connecting members such as bolts and plates from being exposed on the upstream side of the beam members 3, making it possible to install a sediment capture fence 1 with superior durability.
[0046] Next, an example of a soil trapping fence 1 in a second embodiment of the present invention will be described with reference to Fig. 16. The soil trapping fence 1 in the second embodiment differs from the soil trapping fence 1 in the first embodiment in that the structure in which the beam members 3 are supported by the posts 2 is different. Also, descriptions similar to those in the first embodiment will be omitted.
[0047] Fig. 16(a) is a diagram showing an example of a joint portion between a pillar 2 and a beam member 3 in the second embodiment. Fig. 16(b) is a diagram showing a plan view of the joint portion between a pillar 2 and a beam member 3 in the second embodiment, showing the plan view of Fig. 16(a). When the pillar 2 is an H-shaped steel, a positioning member 23 is provided so as to penetrate an upstream flange 25a and a downstream flange 25b at both ends of the pillar 2. The positioning member 23 is joined to the upstream flange 25a and the downstream flange 25b at both ends of the pillar 2, for example, by screwing nuts 26, 27.
[0048] A guide material 33 is provided on the downstream side of the beam member 3. The guide material 33 is provided on the downstream side of the beam member 3 and is formed so as to be locked by the position stopper material 23. The guide material 33 may be, for example, an L-shape as shown in FIG. 16(b) in which a flange 25a is fitted and locked to the guide material 33, but is not limited thereto and any shape may be used. The guide material 33 may be joined to the beam member 3, for example, by being welded to the side surface 3a on the downstream side of the beam member 3.
[0049] As shown in FIG. 16(a), the beam member 3 is supported on the upstream side of the support pillar 2 by engaging the guide member 33 of the beam member 3 with the position retaining member 23 of the support pillar 2, so that the guide member 33 fits into the flange 25a.
[0050] Next, the installation process of the soil trapping fence 1 in the second embodiment will be described with reference to Fig. 17. Fig. 17(a) is a diagram showing the step of joining the support 2 and the beam member 3 in the installation process of the soil trapping fence 1 in the second embodiment. Fig. 17(b) is a diagram showing the state after the support 2 and the beam member 3 have been joined in the installation process of the soil trapping fence in the second embodiment. In S3, as shown in Figs. 17(a) and 17(b), the guide material 33 provided on the downstream side of the beam member 3 is engaged with the position retaining material 23 attached to the support 2 by fitting the guide material 33 into the flange 25a from the top end 2c of the support 2, and the beam member 3 is supported on the upstream side of the support 2.
[0051] The above has described the sediment trapping fence 1 according to the second embodiment of the present invention. In the sediment trapping fence 1 according to the second embodiment of the present invention, the beam members 3 can be attached and detached more easily. This improves the efficiency of assembly work and allows the sediment trapping fence 1 to be installed at lower cost.
[0052] Although the embodiment of the present invention has been described, this embodiment is presented as an example and is not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0053] 1. Sediment trapping fence 2 pillars 2a Mounting surface 2b Bottom edge 2c Top 2d midpoint 2e fulcrum 3 Beam members 3a side 4 Diagonals 4a Bottom edge 4b Installation position 5 Foundation concrete (cast in place) 5a point 5b points 6. Concrete Block 7 Anchor material 8 Steel frame 21 Bolt holes 22 Nut 23 Positioning material 24 Web 25 Flange 25a Upstream flange 25b Downstream flange 26 Nut 27 Nut 31 Mounting plate 31a Contact surface 31b Main plane 32 Volts 33 Guide material 34 Joint 34a End face 35 Bolt holes 41 Volts 42 Nut
Claims
1. A sediment capture fence installed in a mountain stream, The system is provided with a plurality of pillars erected vertically or vertically to the installation ground, a beam member supported on the upstream side of the plurality of pillars, and a diagonal member obliquely installed on the downstream side of the pillars and extending downward. A soil capture fence characterized by the above.
2. The beam member is detachably attached to the upstream side of the support. The soil trapping fence according to claim 1 .
3. The beam member is provided with a mounting plate whose downstream main plane abuts against the upstream mounting surface of the support. The soil trapping fence according to claim 2 .
4. The diagonal member is installed diagonally between the midpoint between the bottom end and the top end of the support and the top end. A soil trapping fence as claimed in any one of claims 1 to 3.