Transport method of heavy object

The method of constructing a temporary scaffold with a trolley rail for transporting heavy objects addresses inefficiencies in conventional methods by enabling efficient and versatile transport within buildings, reducing planning time and costs.

JP2024143206AActive Publication Date: 2024-10-11SANKYU INC

Patent Information

Application Number
JP2023055751
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11
Estimated Expiration
2043-03-30

AI Technical Summary

Technical Problem

Conventional methods for transporting heavy objects, such as crane running beams, within buildings face inefficiencies in work efficiency, planning and consideration time, and versatility due to the need for constructing temporary floors and repeated lifting, which are time-consuming and costly.

Method used

A method involving the construction of a temporary scaffold up to the height of a high wall, allowing access for a mobile crane, with a trolley rail installed on the scaffold for transporting heavy objects between areas that the crane can reach, eliminating the need for forming a working floor and reducing the need for preliminary surveys.

Benefits of technology

This method enhances work efficiency, reduces planning and consideration time, and increases planning versatility by allowing for standardized planning and quicker execution of heavy object transport without the need for temporary floors or repeated lifting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143206000001_ABST
    Figure 2024143206000001_ABST
Patent Text Reader

Abstract

To provide a transport method of a heavy object which has more excellent work efficiency, shortened planning and examination time, and versatility of a plan than before.SOLUTION: In a transport method of a heavy object which is removed from a high wall part or installed to the high wall part which is in a region A where a mobile crane 12 cannot enter, a temporary scaffold 17 is constructed up to a height position of the high wall part and is installed from the region A to a region B where the mobile crane 12 cannot enter. On the temporary scaffold 17, a rail 20 for a truck is installed for a transport truck 21 on which the heavy object can be placed, and the transport truck 21 is reciprocally moved between the region A and the region B along the rail 20 for the truck.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for transporting heavy objects, for example, used in removal and installation work of heavy objects such as equipment and devices in an existing building. [Background technology]

[0002] For example, when removing or installing heavy objects such as equipment and machinery inside an existing building (hereinafter referred to as removal and installation), overhead cranes and mobile cranes (mobile lifting machines) are used to transport them. However, overhead cranes have restrictions on the approach and lifting load when traveling and traversing, and therefore may not be usable. In addition, there are cases where a mobile crane (for example, crawler crane) is prevented from entering a building by existing equipment and piping inside the building. There are two ways to deal with this: 1) remove the roof of the building and use the mobile crane from outside, and 2) set up a platform to flatten the floor inside the building, create a temporary flat work floor with iron plates, etc., and then pull the heavy object out sideways.

[0003] However, using method 1) above places a heavy burden on the outdoor environment, costs, and construction time, while method 2) above, while commonly used, places a heavy burden on costs and construction time depending on the load-bearing capacity, height difference, and length of the work floor. As one example, the above-mentioned overhead crane cannot be used in the removal and installation work of the crane travel beam (also called crane travel girder: hereinafter, also referred to as CRG) of the overhead crane installed inside the building (for example, see Patent Document 1). For this reason, the use of a mobile crane is considered, but in this case, because the existing equipment and floor height difference inside the building make it impossible for the mobile crane to approach the removal and installation position, the sideways pulling of the CRG is considered. The removal work of the CRG of the overhead crane installed inside the building will be described below with reference to Figs. 7 and 8.

[0004] First, before removing the CRG 81 installed in the building 80, the electric chain block 83 is installed on the beam 82 from above the overhead crane walkway (installation of the electric chain block). For the removal work, a temporary scaffold is set up from the floor to the installation height of the CRG 81 (assembly of the scaffold). Openings and steps in the floor below the CRG 81 are covered, and a platform for pulling horizontally and a steel plate are installed to form a work floor 84 (installation of safety equipment). Using temporary scaffolding, the bottom of the CRG81 is protected with metal sheets and spatter sheets (fire protection installation). The existing rails of the overhead crane are cut with gas for each CRG81 span (cutting the existing CRG). A through hole for slinging is drilled in the cut CRG81, and it is set up so that it can be hoisted at four points by the electric chain block 83 (CRG slinging). The back girder hardware is cut using gas (back girder cutting). The bolts of the connecting plate at the bottom of the CRG81 are removed (CRG connecting plate removal). The cut CRG 81 is lifted by an electric chain block 83 to a position where it clears the scaffolding handrails and moved sideways (CRG lifting), then lowered to a work floor 84 and placed on a cart 85 (CRG lowering). The cart 85 carrying the CRG 81 is pulled sideways by human power to a position where it can be hoisted by a crawler crane 86 (CRG removal), and the CRG 81 is loaded onto a lifting truck 87 by the crawler crane 86 and removed to a temporary storage area (completed). The above-mentioned work from slinging the CRG to completion is repeated for each cut CRG 81, thereby completing the removal of the CRG 81 from within the building 80. The installation work of the CRG 88 in the building 80 is performed in the reverse order to the above-described procedure, as shown in Fig. 9. In Figs. 8 and 9, reference numeral 89 denotes an operator. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2010-150039 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, the conventional transportation methods mentioned above had problems to be solved in terms of work efficiency, reduction of planning and review time, and versatility of the plan. 1) Work efficiency To pull the CRG horizontally, it is necessary to lay a rack and steel plates on the floor inside the building, which takes time and increases costs. The CRG to be removed must travel a longer distance, and must be lowered a longer distance to the work platform. For example, this requires frequent replacement of the electric chain hoist, which lengthens the work time. 2) Reducing planning and review time · In order to form a work floor, the condition of the floor surface must be surveyed in advance, and preparation work takes time. - Because floor conditions and other factors vary depending on the work location, it is not possible to format explanatory materials for clients requesting work, for example. 3) Versatility of the plan - Because floor conditions and other factors vary depending on the work location, it is difficult to use other work plans that have been prepared in advance, and it takes time to consider the work content and create the plan.

[0007] The present invention has been made in consideration of the above circumstances, and aims to provide a method for transporting heavy objects which is superior in terms of work efficiency, shortens planning and review time, and allows for greater versatility in planning than conventional methods. [Means for solving the problem]

[0008] A method for transporting a heavy object according to the present invention that meets the above-mentioned objective is a method for transporting a heavy object that has been removed from a high wall portion in an area A where a mobile crane cannot enter, or that is to be installed on the high wall portion, comprising the steps of: A temporary scaffold is constructed up to the height of the high wall portion, and is installed from the area A to the area B where the mobile crane can enter, and a carriage rail for a transport carriage on which the heavy object can be placed is installed on the temporary scaffold, The transport cart is reciprocated between the area A and the area B along the cart rail.

[0009] In the method for transporting heavy objects according to the present invention, the area A is located inside a building, and the temporary scaffolding can be installed inside the building. Here, the heavy object may be a crane travel beam of an overhead crane installed inside the building. Effect of the Invention

[0010] The method of transporting heavy objects according to the present invention involves constructing a temporary scaffolding up to the height of a high wall and setting it up from area A, which a mobile crane cannot enter, to area B, which it can enter, and installing cart rails for a transport cart on which heavy objects can be placed, on this temporary scaffolding. The transport cart is then moved back and forth between areas A and B along the cart rails. Therefore, for example, there is no need to form a work floor, repeatedly lift and lower heavy objects, or conduct prior surveys for forming a work floor, as was done in the conventional method. Therefore, it is possible to provide a method for transporting heavy objects which is superior in work efficiency, shortens planning and review time, and allows for greater versatility in planning than ever before. [Brief description of the drawings]

[0011] [Figure 1] 1 is a flowchart showing a method for removing an overhead crane to which a method for transporting a heavy object according to one embodiment of the present invention is applied from inside a building of a CRG. [Diagram 2] FIG. 11 is an explanatory diagram showing the removal of the overhead crane's CRG from the building. [Diagram 3] This is an explanatory diagram showing the inside of the building from above. [Figure 4] FIG. 11 is an explanatory diagram showing the removal work of CRG from a high wall portion within the building. [Diagram 5] 13(A) and 13(B) are a side view and a plan view, respectively, of a transport cart used to transport the CRG. [Figure 6] 1A is a front view of the transport cart, FIG. 1B is a side view of the chill tank portion provided on the transport cart, and FIG. 1C is a plan view of the four corners of the transport cart. [Figure 7] 13 is a flowchart showing a method for removing an overhead crane to which a conventional method for transporting a heavy object is applied from inside a CRG building. [Figure 8] FIG. 11 is an explanatory diagram showing the removal of the overhead crane's CRG from the building. [Figure 9] FIG. 2 is an explanatory diagram showing the installation status of the overhead crane inside the CRG building. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Next, with reference to the attached drawings, an embodiment of the present invention will be described for better understanding of the present invention. As shown in Figs. 1 to 4, a method for transporting heavy objects according to one embodiment of the present invention is a method used to remove / carry out from within a building 10, or to carry / install (carry in / install) into within the building 10, a crane travelling beam (also referred to as a crane travelling girder; hereinafter, also referred to as CRG: an example of a heavy object) 11 constituting the rails of an overhead crane installed within the building 10. The details are explained below.

[0013] The CRG 11 is for running the main body (not shown) of the ceiling crane in the longitudinal direction of the building 10, and is installed (mounted) in a pair in parallel on opposing high-altitude walls inside the building 10. Here, the high-altitude means, for example, a height of about 10 m from the floor, but is not particularly limited and can be changed depending on the size of the building, etc. To remove this CRG 11 from the high wall, a crawler crane (also called a rough terrain crane: an example of a mobile crane) 12 can be used, but as mentioned above, there is existing equipment, piping, etc. inside the building 10, and it is impossible for the crawler crane 12, which has entered the building 10 from the entrance / exit 13, to move (infiltrate) to below the high wall (the CRG removal location) (an example of area A). Therefore, CRG11 is removed and transported according to the flow shown in Figure 1.

[0014] (Electric chain block installation) Before removing the CRG 11 installed in the building 10, a worker 14 sets up an electric chain block 16 on a beam 15 from above the overhead crane walkway, as shown in FIG.

[0015] (Scaffolding assembly) In preparation for the removal of CRG11, temporary scaffolding 17 is set up within building 10. 2 to 4, the temporary scaffolding 17 is constructed along the inner wall surface of the building 10 on which the CRG 11 is installed, up to near its height (the height (installation height) of the high wall portion), and is also installed from below the high wall portion up to near an entrance (an example of area B) in the building 10 through which the crawler crane 12 can enter. In other words, the height (top surface position) of the temporary scaffolding 17 from the floor surface is approximately the same from the installation position of the CRG 11 to near the entrance in the building 10. Here, the type of temporary scaffolding 17 is not particularly limited, but it is preferable to use a next-generation scaffolding, a pre-rail construction wedge scaffolding (Albatross (registered trademark)), in terms of strength and temporary design (planning). Specifically, because the above-mentioned scaffolding is strong, it is possible to omit some scaffolding as shown in Fig. 2, for example, so that the number of scaffoldings to be installed can be reduced, the time required for scaffolding installation can be shortened, and temporary design can be simplified.

[0016] (Installation of rails for transport carts) After the temporary scaffolding 17 is set up, as shown in Fig. 4, multi-beam jacks (large underpinning jacks) 19 are installed on the upper ends of the multiple pillars 18 that make up the temporary scaffolding 17, and a pair of cart rails 20 are attached and fixed onto the multi-beam jacks 19 with their longitudinal directions aligned with the wall of the building 10. For the cart rails 20, for example, H-shaped steel or channel steel (C-shaped steel) can be used. (Mounted on a transport platform) By placing the transport cart 21 on this mating cart rail 20, the transport cart 21 can be moved back and forth along the cart rail 20 between the vicinity of the removal position of the CRG 11 and the vicinity of the entrance / exit of the building 10.

[0017] As shown in Figures 5(A), (B) and 6(A) to (C), the transport vehicle 21 has a loading platform 22 on which the CRG 11 is placed. The loading platform 22 is connected by vertical frame members 23 and horizontal frame members 24 so as to have a substantially rectangular shape in a plan view. Note that the vertical frame members 23 and the horizontal frame members 24 can be, for example, H-shaped steel. The two horizontal frame members 24 arranged in parallel are connected by two reinforcing horizontal members 25 arranged in parallel to the vertical frame members 23. This improves the rigidity of the loading platform 22. Furthermore, a hook member 26 for towing is provided at the longitudinal intermediate position of each horizontal frame member 24. This allows towing by a chill hole (towing means) 27. A displacement prevention angle (displacement prevention member) 28 is attached and fixed on the loading platform 22 to prevent the CRG 11 placed thereon from displacing from its position.

[0018] A square plate-shaped mounting plate 29 is provided at each of the four corners of the loading platform 22 of the transport cart 21, i.e., at the corners where the vertical frame members 23 and the horizontal frame members 24 are connected. Each mounting plate 29 is attached to the vertical frame members 23 and the horizontal frame members 24 and fixed to be integrated with them. A Tiltank 30 (endless roller) that runs on the carriage rail 20 is attached to each mounting plate 29. Note that a device having wheels, crawlers, or the like can also be used in place of the Tiltank. A stopper member 31 is attached and fixed to each mounting plate 29 so as to be located outside the TILTANK 30. This stopper member 31 extends further downward than the TILTANK 30 and restricts the movement of the transport cart 21 in the rail width direction so that the TILTANK 30 does not come off the cart rail 20.

[0019] (Safety equipment installation) The openings and steps in the floor below CRG11 will be covered and used as a work floor.

[0020] (Fire protection installation) Using temporary scaffolding, the bottom of CRG11 is protected with sheet metal and spatter sheets.

[0021] (Existing CRG disconnected) As shown on the right side of Fig. 4, a gas cutter 32 cuts the CRG 11 for each span of the pillars by gas. Note that reference numeral 33 on the right side of Fig. 4 denotes a fire watchman who monitors the cutting work.

[0022] (CRG slinging) Through holes for slinging are drilled at both longitudinal ends of the cut CRG 11, and slinging is performed using a wire with an electric chain block 16. Then, the wire is wound up until it is taut.

[0023] (Back girder cutting) The back guard hardware is cut using gas.

[0024] (Remove CRG connecting plate) Remove the bolts from the connecting plate at the bottom of the CRG11.

[0025] (CRG lower rack) As shown on the left side of Figure 4, the chain of the electric chain block 16 is pulled in the direction of the arrow by an electric chain block not shown, and the cut CRG 11 is lifted up and then lowered onto and secured on the loading platform 22 of a transport cart 21 placed near the CRG removal position.

[0026] (CRG movement) As shown in the upper part of Figure 3, a chill hole 27 attached and fixed to the right end of the building 10 is connected to a towing hook member 26 provided on the transport cart 21 with a wire rope, and the transport cart 21 is moved to a position where the CRG 11 can be lifted by the crawler crane 12, i.e., near the entrance / exit of the building 10.

[0027] (CRG removal) The CRG 11 is lifted from the platform 22 of the transport vehicle 21 by the crawler crane 12 and loaded onto a truck 34.

[0028] (completion) CRG11 is transported to the temporary storage site by truck 34.

[0029] The above-mentioned work from slinging the CRG to completion is repeated for each cut CRG 11, thereby completing the removal of the CRG 11 from within the building 10. Moreover, the installation work of the CRG 11 in the building 10 is performed in the reverse order to the above-mentioned procedure. Simply put, the installation work of the CRG 11 involves lowering the CRG 11, which has been carried into the building 10 by a truck 34, onto the loading platform 22 of a transport cart 21 arranged near an entrance / exit of the building 10 by a crawler crane 12 and fixing it there. Next, as shown in the lower part of Fig. 3, the transport cart 21 is moved to the vicinity of the installation position of the CRG 11 by a chill hole 27 attached and fixed to the left end inside the building 10, and the CRG 11 is lowered from the transport cart 21 by using an electric chain block 16 and installed on a high wall portion (desired location). The above-mentioned work is repeated for each CRG 11, whereby the installation work of the CRG 11 in the building 10 is completed.

[0030] By using the above-described method for transporting heavy objects according to the present invention, the work efficiency, the time required for planning and reviewing, and the versatility of the plan are superior to conventional methods. 1) Work efficiency - Because temporary scaffolding (work scaffolding) can be used, there is no need to lay platforms and steel plates on the floor inside the building. In addition, there is no impact from obstacles such as floor slopes, existing equipment, and piping, so the time required for these tasks can be reduced. Since there is no need to manually pull the removed CRG sideways and the distance the CRG needs to be lowered is shorter, the amount of work required to re-install the electric chain hoist is reduced, improving workability and shortening work time. 2) Reducing planning and review time - Removal and installation can be planned using standard temporary scaffolding, shortening the time required for advance surveys and preparation work. - Because removal and installation can be planned using standardized temporary scaffolding, explanatory materials for clients requesting work can be formatted, increasing the reliability of the work. 3) Versatility of the plan - Because removal and installation can be planned using standardized temporary scaffolding, other work plans created in advance can be used, making it easier to consider work details (e.g., CAD) and create plan drawings.

[0031] Although the present invention has been described above with reference to the embodiments, the present invention is not limited to the configurations described in the above embodiments, and includes other embodiments and modifications that are conceivable within the scope of the claims. For example, the heavy object transport method of the present invention may be configured by combining some or all of the above-mentioned embodiments and modifications, which is also within the scope of the present invention. In the above embodiment, the method for transporting a CRG in the removal and installation work of the CRG for an overhead crane inside a building has been described, but the object is not limited to inside a building but may be outdoors as long as it is a high wall part in area A where a mobile crane cannot enter, and the object is not limited to a CRG but may be equipment, facilities, structures, etc. Specifically, the method for transporting heavy objects of the present invention can be applied to structures, etc. installed on high wall parts on the slopes of mountains or cliffs. In the above embodiment, a crawler crane is used as the mobile crane, but this is not particularly limited, and other mobile cranes, such as a truck crane or a crawler crane, may also be used. [Explanation of symbols]

[0032] 10: Building, 11: Beam for crane travel (heavy load), 12: Rough terrain crane (mobile crane), 13: Entrance / exit, 14: Worker, 15: Beam, 16: Electric chain block, 17: Temporary scaffolding, 18: Pillar, 19: Multi-beam jack, 20: Cart rail, 21: Transport cart, 22: Loading platform, 23: Vertical frame material, 24: Horizontal frame material, 25: Reinforcing horizontal material, 26: Hook material, 27: Chill hole, 28: Anti-slip angle, 29: Mounting plate, 30: Chill tank, 31: Anti-dislodgement material, 32: Gas blower, 33: Fire watchman, 34: Truck

Claims

1. A method for transporting a heavy object that has been removed from a high wall in an area A where a mobile crane cannot enter or that is to be installed on the high wall, comprising: A temporary scaffold is constructed up to the height of the high wall portion, and is installed from the area A to an area B where the mobile crane can enter, and a carriage rail for a transport carriage on which the heavy object can be placed is installed on the temporary scaffold, A method for transporting heavy objects, comprising reciprocating the transport cart between the area A and the area B along the cart rail.

2. 2. A method for transporting a heavy object according to claim 1, wherein the area A is located inside a building, and the temporary scaffolding is installed inside the building.

3. 3. A method for transporting a heavy load according to claim 2, wherein the heavy load is a crane running beam for an overhead crane installed in the building.

Citation Information

Patent Citations

  • Demolishing method of temporary shed for constructing structure

    JP1995233648A

  • Device of transferring and fitting exterior wall board of building and method thereof

    JP1998238123A

  • Carrying method of concrete panel and device therefor

    JP1999280262A

  • Building erection method using overhead traveling crane

    JP2000213170A

  • Crane girder replacing method and crane girder replacing device

    JP2010150039A

Cited By

  • Processing method of useful plants

    CN121013654A