Hidden position estimation processing apparatus and method

The processing device and method address the issue of hole detection blind spots by using time-series image analysis and relative positional calculations to accurately align the boom tip with the hole, enhancing precision in tunnel operations.

JP2024143559APending Publication Date: 2024-10-11SHIMIZU CORP +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023056300
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing techniques for moving the tip of a boom to a hole in a tunnel wall based on image analysis fail when the hole is not detected due to blind spots caused by the boom or other objects, leading to inaccurate positioning.

Method used

A processing device and method that utilize a camera on the boom to acquire time-series images, detect holes and feature points, calculate relative positional relationships, and estimate the hole's position using earlier images, enabling precise boom tip alignment even when the hole is not directly visible.

Benefits of technology

Enables accurate positioning of the boom tip at the hole location by estimating the hole's position based on relative positional relationships, ensuring high precision in operations like rock bolt driving and mortar injection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143559000001_ABST
    Figure 2024143559000001_ABST
Patent Text Reader

Abstract

To allow a boom to be correctly moved even when a hole is not detected in an image in a technique which moves a front end of the boom toward the position of the hole in a tunnel wall surface on the basis of a result of image analysis.SOLUTION: A processing apparatus 10 includes: an acquisition unit 11 which acquires time-series images captured by a camera attached to a boom; an image analysis unit 12 which detects a hole H formed in a side wall of a tunnel from the images and extracts feature points P1 to P4 and so on of the side wall of the tunnel; and a calculation unit 13 which calculates relative positional relations in the images between the feature points P1 to P4 and so on and the hole H on the basis of an image preceding an image being a processing object in the order of time series and estimates the position of the hole H in the image being the processing object on the basis of the positions of the feature points P1 to P4 and so on in the image being the processing object and the relative positional relations in the images between the feature points P1 to P4 and so on and the hole H, which are calculated from the preceding image.SELECTED DRAWING: Figure 15
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a processing apparatus and a processing method. [Background technology]

[0002] Techniques related to the present invention are disclosed in Patent Documents 1 to 4.

[0003] Patent Document 1 discloses a rock bolt driving vehicle that includes a dolly and a number of booms mounted on the dolly. The rock bolt driving vehicle includes a drilling boom and a driving boom. In a work using the rock bolt driving vehicle, a hole is drilled with the drilling boom, and then the driving boom is moved to the position of the hole and a rock bolt is driven into the hole.

[0004] Patent Documents 2 and 3 disclose boom control methods for moving the tip of a boom to a target position.

[0005] Patent Document 4 discloses a technology for driving a boom based on the results of image analysis. In this technology, a load is detected in an image, and based on the position of the load in the image, the boom is moved in a direction such that the tip of the boom is directly above the load in the direction of gravity. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent Publication No. 2021-195819 [Patent Document 2] JP 2017-78684 A [Patent Document 3] JP 2017-77617 A [Patent Document 4] JP 2011-207571 A Summary of the Invention [Problem to be solved by the invention]

[0007] The inventors have studied a technology for moving the tip of a boom to the position of a hole in a tunnel wall based on the results of image analysis, and have found the following problem. In this technology, a hole that is to be the target position for moving the tip of the boom is detected in an image, and then the tip of the boom is moved toward the position of the hole. In this process, it is essential to detect the hole in the image, but there may be cases where the hole is temporarily not included in the image due to a blind spot of a part of the vehicle or other objects. If the position of the hole in the image is unknown, the tip of the boom cannot be moved toward the position of the hole. None of Patent Documents 1 to 4 discloses this problem or a means for solving it.

[0008] One example of the objectives of the present invention is to provide a processing device and processing method that solves the problem of enabling a boom to be moved correctly even when a hole is not detected in an image in a technology for moving the tip of a boom toward the position of a hole in a tunnel wall based on the results of image analysis, in consideration of the above-mentioned problems. [Means for solving the problem]

[0009] According to one aspect of the present invention, an acquisition unit that acquires time-series images captured by a camera attached to the boom; an image analysis unit that detects holes formed in a side wall of a tunnel from the image and extracts feature points of the side wall of the tunnel; a calculation unit that calculates a relative positional relationship between the feature point and the hole in the image based on the image that is chronologically earlier than the image to be processed, and estimates a position of the hole in the image to be processed based on the position of the feature point in the image to be processed and the relative positional relationship between the feature point and the hole in the image; A processing apparatus is provided having:

[0010] According to one aspect of the present invention, The computer an acquisition step of acquiring time-series images taken by a camera attached to the boom; an image analysis step of detecting holes formed in a side wall of a tunnel from the image and extracting feature points of the side wall of the tunnel; a calculation step of calculating a relative positional relationship between the feature point and the hole in the image based on the image that is chronologically earlier than the image to be processed, and estimating a position of the hole in the image to be processed based on the position of the feature point in the image to be processed and the relative positional relationship between the feature point and the hole in the image; A processing method for performing the above is provided. Effect of the Invention

[0011] According to one aspect of the present invention, in a technology for moving the tip of a boom toward the position of a hole in a tunnel wall based on the results of image analysis, a processing device and processing method are provided that solve the problem of enabling the boom to be moved correctly even when the hole is not detected in the image. [Brief description of the drawings]

[0012] The above objects, as well as other objects, features and advantages, will become more apparent from the following preferred embodiments and the accompanying drawings.

[0013] [Figure 1] FIG. 2 is a top view showing an example of a boom configuration. [Diagram 2] FIG. 2 is a side view showing an example of a configuration of a boom. [Diagram 3] FIG. 1 is a diagram for explaining a problem. [Figure 4] FIG. 2 is a diagram for explaining a camera installed on a boom. [Diagram 5] FIG. 2 illustrates an example of a hardware configuration of a processing device. [Figure 6] FIG. 2 is a diagram illustrating an example of a functional block diagram of a processing device. [Figure 7] FIG. 13 is a diagram showing an example of an image to be processed. [Figure 8] 11 is a flowchart showing an example of a processing flow of the processing device. [Figure 9] 13 is a flowchart showing another example of the processing flow of the processing device. [Figure 10] FIG. 11 is a diagram showing an example of feature points of a background extracted from an image. [Figure 11] 13 is a flowchart showing another example of the processing flow of the processing device. [Figure 12] 13 is a flowchart showing another example of the processing flow of the processing device. [Figure 13] 11 is a diagram for explaining a process for predicting a position where the tip of the boom will come into contact. FIG. [Figure 14] FIG. 11 is another diagram for explaining the process of predicting the position at which the tip of the boom will come into contact. [Figure 15] FIG. 11 is another diagram for explaining the process of predicting the position at which the tip of the boom will come into contact. [Figure 16] 13 is a flowchart showing another example of the processing flow of the processing device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, embodiments of the present invention will be described with reference to the drawings. In all the drawings, the same components are denoted by the same reference numerals, and the description thereof will be omitted as appropriate.

[0015] <First embodiment> "overview" The processing device of this embodiment detects a hole from an image captured so that the tip of the boom is visible, then calculates the relative positional relationship between the tip of the boom and the hole in the image, and drives the boom based on the calculation result to move the tip of the boom toward the hole. The processing device of this embodiment realizes highly accurate positioning of the tip of the boom to the position of the hole in the tunnel wall by controlling the boom based on the result of such image analysis. This will be described in detail below.

[0016] "Boom configuration" The configuration of the boom controlled by the processing device will be described. In this embodiment, the configuration of the boom is not particularly limited, and any known configuration can be adopted. However, the processing device is particularly suitable for use in applications in which the boom is driven (the boom's attitude is changed) to position the tip of the boom at the position of a hole in a tunnel wall with high precision. In other words, the boom may be configured for such applications. Examples of such applications include, but are not limited to, the work of driving rock bolts into the side wall of a tunnel, more specifically, the work of driving rock bolts into holes drilled in advance, the work of injecting mortar into holes drilled in advance, and the work of inserting explosives or the like into holes drilled in advance (charging).

[0017] Here, an example of the configuration of the boom will be described with reference to Figs. 1 to 4. Note that the configuration of the boom exemplified here is merely an example, and is not limited to this configuration. Fig. 1 is a top view of a vehicle with a boom mounted on a dolly, and Fig. 2 is a side view of the vehicle. In this example, three booms are mounted on one dolly. Specifically, two drilling booms DBL and DBR and one bolt driving boom BB are provided. At the tip of each boom, a machine for each work is located. At the tip of the drilling booms DBL and DBR, a machine for performing drilling work is located. At the tip of the bolt driving boom BB, a machine for performing bolt driving work is located. These machines are the tip of the boom. In this specification, the "tip of the boom" refers to the machine for each work located at the tip of the boom, or the tip of that machine. In this specification, the machine for each work located at the tip of the boom is treated as a part of the boom. Note that the configuration of the boom in this example is the same as the configuration of the boom disclosed in Patent Document 1, so a description thereof will be omitted here.

[0018] When the drilling boom and the bolt driving boom are provided separately as in this example, as shown in Figure 3, it is necessary to drive the drilling boom DBR to drill hole H at a predetermined position, and then drive the bolt driving boom BB (to change the posture of the boom) to position the tip of the boom at the position of hole H with high precision.

[0019] In this embodiment, the camera is installed in a position and orientation that allows it to simultaneously capture both the tip of the boom and a hole located near the tip of the boom. The hole is the object of work using the boom, and in the case of the above-mentioned work of driving rock bolts into the side wall of a tunnel or the loading work, the drilled hole is the object of work. The camera may capture moving images (multiple frame images in a time series) or may capture multiple still images in a time series at predetermined intervals.

[0020] The camera is attached to any position on the boom. The conceptual diagram in Figure 4 shows a camera C attached to the bolt driving boom BB. The camera C is attached in a direction that allows it to simultaneously photograph the tip of the bolt driving boom BB and the tunnel side wall located nearby. When configured in this way, the camera C can simultaneously photograph the tip of the bolt driving boom BB and the hole drilled in the tunnel side wall located nearby.

[0021] It is preferable to mount the camera closer to the tip of the boom, but if it is placed too close to the tip of the boom, the camera will become dirty. Taking these factors into consideration, the camera can be installed at an appropriate position on the boom. In order to prevent the camera from getting dirty, a cleaning function may be installed that sprays air, liquid, cleaning solution, etc. on the camera lens to remove dirt.

[0022] "Hardware Configuration" Next, an example of the hardware configuration of the processing device will be described. Each functional part of the processing device is realized by any combination of hardware and software, centering on a CPU (Central Processing Unit) of any computer, memory, programs loaded into the memory, a storage unit such as a hard disk for storing the programs (programs stored beforehand at the stage of shipping the device, as well as programs downloaded from a recording medium such as a CD (Compact Disc) or a server on the Internet, can be stored), and a network connection interface. Those skilled in the art will understand that there are various variations in the method of realizing the above and the device.

[0023] Fig. 5 is a block diagram illustrating a hardware configuration of a processing device. As shown in Fig. 5, the processing device has a processor 1A, a memory 2A, an input / output interface 3A, a peripheral circuit 4A, and a bus 5A. The peripheral circuit 4A includes various modules. The processing device does not have to have the peripheral circuit 4A. The processing device may be composed of multiple devices that are physically and / or logically separated. In this case, each of the multiple devices can have the above hardware configuration.

[0024] The bus 5A is a data transmission path for the processor 1A, memory 2A, peripheral circuit 4A, and input / output interface 3A to transmit and receive data to each other. The processor 1A is an arithmetic processing device such as a CPU or a GPU (Graphics Processing Unit). The memory 2A is a memory such as a RAM (Random Access Memory) or a ROM (Read Only Memory). The input / output interface 3A includes an interface for acquiring information from an input device, an external device, an external server, an external sensor, a camera, etc., and an interface for outputting information to an output device, an external device, an external server, etc. Examples of the input device include a keyboard, a mouse, a microphone, a physical button, a touch panel, etc. Examples of the output device include a display, a speaker, a printer, a mailer, etc. The processor 1A can issue commands to each module and perform calculations based on the results of those calculations.

[0025] "Function Configuration" Next, the functional configuration of the processing device of this embodiment will be described in detail. Fig. 6 shows an example of a functional block diagram of the processing device 100. As shown in the figure, the processing device 100 has an image analysis device 10 that analyzes an image captured so that the tip of the boom is visible, and a boom control device 20 that drives the boom based on the analysis results of the image analysis device 10. Each device will be described in detail below.

[0026] -Image analysis device 10- As shown in FIG. 6, the image analysis device 10 includes an acquisition unit 11, an image analysis unit 12, and a calculation unit 13.

[0027] The acquisition unit 11 acquires an image captured so as to capture the tip of the boom. The acquisition unit 11 acquires an image generated by a camera capturing an image so as to capture the tip of the boom by real-time processing. The camera and the image analysis device 10 are connected to each other so as to be able to communicate with each other by wire and / or wirelessly.

[0028] The image analysis unit 12 detects holes from the image acquired by the acquisition unit 11. Then, the image analysis unit 12 outputs hole position information based on the detection result.

[0029] The "hole" is the target of the work using the boom, and for example, in the case of the work of driving rock bolts into the side wall of the tunnel or the loading work, the drilled hole is the target of the work. The image analysis unit 12 detects the hole from the image based on the feature amount of the hole's appearance. The image analysis unit 12 can employ any technology that detects the target from the image based on the feature amount of the target's appearance.

[0030] "Hole position information" is information indicating the position of a detected hole in an image. The hole position information is indicated, for example, by coordinates in an image coordinate system set in the image.

[0031] 7 shows an example of an image P acquired by the acquisition unit 11. In the image P of the illustrated example, the tip E of the boom and a hole H are simultaneously captured. The image analysis unit 12 detects the hole H from such an image P and outputs hole position information indicating the position of the detected hole H in the image.

[0032] The calculation unit 13 calculates the relative positional relationship between the tip of the boom and the hole in the image. Then, the calculation unit 13 outputs information indicating the calculated relative positional relationship. The output information is input to the boom control device 20.

[0033] "Relative positional relationship" includes the direction connecting two points and the distance between the two points. For example, the relative positional relationship includes the direction from the tip of the boom toward the hole and the distance between the two points.

[0034] The calculation unit 13 identifies the position of the hole in the image based on the hole position information output by the image analysis unit 12.

[0035] On the other hand, the position of the boom tip in the image may be given in advance as a fixed value. If there is no change in the position and orientation of the camera, the state of the boom tip, etc., the position of the boom tip in the image does not change. In this case, the position of the boom tip in the image may be registered in advance as a fixed value in the image analyzing device 10. There are various means for realizing this registration. For example, the user may specify the position of the boom tip in the image while checking the image, and the specified position in the image may be registered. Alternatively, the image analyzing device 10 may detect the boom tip from within the image by image analysis based on the feature quantity of the boom's appearance.

[0036] In addition, when the position and orientation of the camera, the state of the boom tip, etc. can be changed by user operation or automatic control of a computer, the above-mentioned image analysis unit 12 may detect the boom tip from within the image based on the feature quantity of the boom's appearance by image analysis. Then, the image analysis unit 12 may output information indicating the position of the detected boom tip within the image. In this example, the calculation unit 13 can identify the position of the boom tip within the image based on the information.

[0037] -Boom control device 20- As shown in FIG. 6, the boom control device 20 has a boom control unit 21.

[0038] The boom control unit 21 includes a means for detecting the position and direction of the tip of the boom. The detection can be realized by any means. An example is, but is not limited to, the use of a sensor that detects the state of various joints and the like that the boom is equipped with. The position of the tip of the boom detected by the means may include an error. That is, a deviation may occur between the position of the tip of the boom detected by the means and the actual position of the tip of the boom. However, in this embodiment, the boom control unit 21 performs high-precision alignment of the tip of the boom by moving the tip of the boom in a direction approaching the hole based on the "relative positional relationship between the tip of the boom and the hole in the image" calculated by the calculation unit 13 described above. Therefore, as described above, there is no problem even if a deviation occurs between the position of the tip of the boom detected by a sensor or the like and the actual position of the tip of the boom. Hereinafter, a high-precision alignment process of the tip of the boom based on the "relative positional relationship between the tip of the boom and the hole in the image" will be described in detail.

[0039] First, the boom control unit 21 identifies the attitude of the camera based on the attitude of the boom at that time.

[0040] The "boom posture" is indicated by the boom length L, boom hoisting angle θ, boom swivel angle φ, etc. A sensor (such as an angle / length sensor that detects data for calculating the position and direction of the boom tip) installed in advance measures the above values. Then, the boom control unit 21 acquires the measurement values ​​measured by the sensor through real-time processing. The sensor and the boom control device 20 are connected to each other so as to be able to communicate with each other by wire and / or wirelessly. As disclosed in Patent Documents 2 and 3, the coordinates of the boom tip in the world coordinate system can be calculated using the sensor values.

[0041] The "camera attitude" indicates the direction and inclination of the camera in the world coordinate system. In this embodiment, the camera is attached to a boom. Therefore, the direction and inclination of the camera are uniquely identified based on the attitude of the boom.

[0042] Next, the boom control unit 21 converts the "direction from the tip of the boom toward the hole in the image" calculated by the calculation unit 13 into a direction in the world coordinate system (direction in real space) based on the specified camera attitude. If the direction and inclination of the camera in the world coordinate system are clear, a specified direction in the image captured in that state can be converted into a direction in the world coordinate system by a specified calculation. For example, a direction in the world coordinate system in which a reference direction (e.g., horizontal direction, x-axis direction in FIG. 7) in an image captured by a camera having a reference attitude (camera direction: reference direction in the world coordinate system, camera inclination: 0) is projected onto the world coordinate system is registered in advance. Then, the above-mentioned conversion may be realized by correcting this direction in the world coordinate system based on the difference (difference in direction, difference in inclination) between the reference attitude and the specified camera attitude, and the difference between the reference direction in the image and the direction from the tip of the boom toward the hole in the image. Note that this conversion method is merely an example and is not limited thereto.

[0043] Then, the boom control unit 21 moves the tip of the boom in a direction in the world coordinate system (direction in real space) obtained by the above conversion. The control for moving the tip of the boom in a predetermined direction in the world coordinate system can be realized by employing any well-known technology. For example, the technologies disclosed in Patent Documents 1 to 4 may be used.

[0044] The boom control unit 21 can control the position of the boom tip, and can also control the direction (orientation) of the boom tip. For example, in the operation of driving a rock bolt into a hole drilled in advance, the operation of injecting mortar into a hole drilled in advance, the operation of inserting an explosive into a hole drilled in advance, and the like, it is necessary to insert a member for injecting a rock bolt, mortar, or explosive along the extension direction of the hole drilled in advance. To achieve this, it is necessary to control the direction of the boom tip. Note that, when the member for injecting mortar is a member with a variable shape such as a tube, the control for strictly adjusting the direction of the boom tip may not be necessary.

[0045] Here, an example of control for adjusting the direction of the tip of the boom will be described. For example, when the processing device 100 drives the drilling booms DBR and DBL to drill holes in advance, it calculates the extension direction of the drilled hole, i.e., the direction in which the drilling member was inserted, from the attitude of the boom at that time, and registers it in the storage device. The attitude of the boom is specified based on measurements taken by a sensor (such as an angle / length sensor that detects data for calculating the position and direction of the tip of the boom) attached to the boom, for example. The extension direction of the drilled hole is managed as data (for example, vector information) in a world coordinate system, for example. Then, the boom control unit 21 controls the attitude of the boom so that the extension direction of the hole drilled in advance, specified based on the data, and the direction of the tip of the boom at the current time are approximately parallel (a predetermined state).

[0046] Such control to adjust the direction of the boom tip can be performed at any timing. For example, the boom control unit 21 can perform control to adjust the direction of the boom tip at any timing while the boom attitude is being automatically controlled (for example, during "a first mode in which the boom is driven based on the position information of a hole registered when a hole is formed" and "a second mode" described in the following embodiment). Note that while the boom attitude is being automatically controlled, the boom control unit 21 may continue to monitor whether the direction of the boom tip at the current time is in a predetermined state. Then, when the boom control unit 21 detects that the direction of the boom tip at the current time has deviated from the predetermined state (for example, the amount of deviation between the direction of the boom tip at the current time and the predetermined state has become equal to or greater than a threshold), the boom control unit 21 may perform control to adjust the direction of the boom tip in response to the detection.

[0047] Next, an example of the flow of processing by the processing device 100 will be described with reference to the flowchart of FIG.

[0048] When the image analyzing device 10 acquires an image in which the tip of the boom is captured (S10), it detects a hole in the image (S11). Next, the image analyzing device 10 calculates the relative positional relationship between the tip of the boom and the hole detected in S11 in the image (S12).

[0049] Thereafter, the boom control device 20 drives the boom based on the calculation result of S12 (S13). For example, the boom control device 20 identifies the camera attitude based on the attitude of the boom at that time, and then converts the direction in the image calculated in S12 into a direction in the world coordinate system (direction in real space) based on the identified camera attitude. Then, the boom control device 20 moves the tip of the boom to the direction in the world coordinate system (direction in real space) obtained by the conversion.

[0050] Next, another example of the processing flow of the processing device 100 will be described with reference to the flowchart of FIG.

[0051] When the image analyzing device 10 acquires an image in which the tip of the boom is captured (S20), it detects a hole in the image (S21). Next, the image analyzing device 10 calculates the relative positional relationship in the image between the tip of the boom and the hole detected in S21 (S22).

[0052] Thereafter, the boom control device 20 judges whether the calculation result of S22 indicates that "the positions in the image of the tip of the boom and the hole detected in S21 match" (S23). The condition for judging the match may be that the positions (coordinates) in the image of the tip of the boom and the hole detected in S21 match completely, or the distance therebetween may be within a threshold value.

[0053] If the calculation result in S22 indicates that "the position of the boom tip and the hole detected in S21 match in the image" (Yes in S23), the boom control device 20 stops controlling the driving of the boom. As a result, the attitude of the boom stops in that state, and the boom tip stops at that position.

[0054] On the other hand, if the calculation result in S22 does not indicate that "the positions of the tip of the boom and the hole detected in S21 in the image match" (No in S23), the boom control device 20 drives the boom based on the calculation result in S22 (S24). Specifically, the boom control device 20 identifies the camera attitude based on the boom attitude at that time, and then converts the direction in the image calculated in S22 into a direction in the world coordinate system (direction in real space) based on the identified camera attitude. Then, the boom control device 20 moves the tip of the boom to the direction in the world coordinate system (direction in real space) obtained by the conversion.

[0055] Thereafter, the process returns to S20 and the same process is repeated, that is, a new image is acquired, the new image is analyzed, and the boom is controlled based on the analysis result.

[0056] In driving the boom in S24, the movement in the direction in the calculated world coordinate system (direction in real space) may be a predetermined movement amount, or the movement amount may be controlled by other methods. The predetermined movement amount may be a predefined fixed value, or may be calculated based on the "distance in the image between the tip of the boom and the hole" indicated by the relative positional relationship calculated in S22.

[0057] "Action and effect" According to the processing device 100 of this embodiment, the position of the boom tip can be adjusted based on the relative positional relationship between the boom tip and the hole in the image. In this way, since the processing device 100 of this embodiment performs control based on the relative positional relationship between the boom tip and the hole in the image, there is no need to obtain absolute highly accurate position information of the boom tip and the hole.

[0058] Furthermore, the processing device 100 of this embodiment can adjust the position of the boom tip so that the positions of the boom tip and the hole on the image match. As a result, alignment for positioning the boom tip to the hole position can be performed with high accuracy.

[0059] <Second embodiment> The method described in the first embodiment, i.e., aligning the tip of the boom based on the result of image analysis, cannot be performed unless the hole is captured in the image. However, a situation may occur in which the hole is temporarily hidden by a part of the device itself (such as a part of the boom) or another object. In such a case, the image analysis device 10 of this embodiment estimates the position of the hole with high accuracy and drives the boom based on the estimation result. This will be described in detail below.

[0060] First, as a prerequisite of this embodiment, the relative positional relationship between the hole and the background shown in the image does not change. When this prerequisite is satisfied, the technology of this embodiment can be adopted. For example, in the work of driving a rock bolt into the side wall of a tunnel, more specifically, in the work of driving a rock bolt into a hole drilled in advance, the work of injecting mortar into a hole drilled in advance, or the work of inserting explosives into a hole drilled in advance, the "side wall of the tunnel" becomes the "background" shown in the image. Since the "hole" is formed in the "side wall of the tunnel," the condition that "the relative positional relationship between the hole and the background does not change" is satisfied.

[0061] The image analysis unit 12 extracts feature points of the background from the image. The feature points can be extracted by employing any technique. For example, the ORB (Oriented FAST and Rotated BRIEF) technique may be used.

[0062] The calculation unit 13 calculates the relative positional relationship in the image between the feature points extracted by the image analysis unit 12 and the holes detected by the image analysis unit 12. As shown in Fig. 10, feature points are extracted at multiple locations in the image. The calculation unit 13 calculates the relative positional relationship (direction, distance, etc.) between such multiple feature points and the holes.

[0063] Then, the calculation unit 13 estimates the position of the hole in the image based on "the position of the feature point in the image" and "the relative positional relationship between the feature point and the hole in the image". An example of the estimation process will be described below. First, the calculation unit 13 performs a matching process between the feature point extracted in the image to be processed among the multiple time-series images and the feature point extracted in the image that is chronologically earlier than the image to be processed, thereby identifying the correspondence relationship between the feature points between the two images. The matching process between the feature points is realized by using any known method. After that, the calculation unit 13 estimates the position of the hole in the image to be processed based on "the position of the feature point in the image to be processed among the multiple time-series images" and "the relative positional relationship between the feature point calculated based on the image that is chronologically earlier than the image to be processed and the hole in the image".

[0064] For example, assume that the "current image" shown in FIG. 13 is the image to be processed. As shown in FIG. 13, in the current image, the hole is hidden by the boom. The "previous image" shown in FIG. 14 is an image that precedes the image to be processed in chronological order. As shown in FIG. 14, in the previous image, the hole H is not hidden. The calculation unit 13 performs a matching process of feature points between such two images. As a result, assume that the correspondence relationship shown in FIG. 13 and FIG. 14 is calculated. In the figures, the same reference numerals are associated with feature points that correspond to each other. For example, the feature point associated with P1 in FIG. 13 and the feature point associated with P1 in FIG. 14 correspond to each other. Then, the calculation unit 13 estimates the position of the hole H in the current image in FIG. 13 based on the relative positional relationship between the feature points (feature points P1 to P4, etc.) identified from the previous image shown in FIG. 14 and the hole H, and the positions of the feature points (feature points P1 to P4, etc.) detected in the current image in FIG. 13. As shown in FIG. 15, the calculation unit 13 estimates a position that satisfies the relative positional relationship between the feature points (feature points P1 to P4, etc.) identified from the previous image and the hole H between the positions of the feature points (feature points P1 to P4, etc.) detected in the current image as the position of the hole H in the current image. After the feature points between the two images are associated, the calculation unit 13 calculates the relative relationship between the current image and the past image based on the calculated correspondence of the feature points. A projection matrix (homography matrix) that uses translation, rotation, inclination, and scale can be used to calculate the relative relationship. For example, a projection matrix is ​​calculated so that the corresponding feature points overlap each other as shown in FIG. 15. Then, the projection matrix can be used to project the hole H detected in the past image into the current image.

[0065] The calculation unit 13 may perform a process of estimating the position of a hole in the image to be processed only when a hole is not detected in the image to be processed. That is, the calculation unit 13 may not perform a process of estimating the position of a hole in the image to be processed when a hole is detected in the image to be processed, and may perform a process of estimating the position of a hole in the image to be processed when a hole is not detected in the image to be processed.

[0066] In addition, the calculation unit 13 may perform a process of estimating the position of a hole in the image to be processed regardless of whether a hole is detected in the image to be processed. That is, the calculation unit 13 may perform a process of estimating the position of a hole in each image for all images.

[0067] After estimating the position of the hole in the image as described above, the calculation unit 13 calculates the relative positional relationship between the tip of the boom and the hole in the image based on the estimated position of the hole in the image. That is, the calculation unit 13 calculates the estimated position of the hole in the image and the relative positional relationship between the tip of the boom in the image. Then, the calculation unit 13 outputs the result of the calculation as the relative positional relationship between the tip of the boom and the hole in the image. The boom control device 20 drives the boom based on the estimated position of the hole in the image and the relative positional relationship between the tip of the boom in the image. The calculation of the relative positional relationship and the driving of the boom are the same as those in the first and second embodiments.

[0068] When a hole is detected in the image to be processed, the calculation unit 13 can calculate the relative positional relationship between the tip of the boom and the hole in the image to be processed based on the position of the detected hole in the image to be processed and output the result. The boom control device 20 drives the boom based on the result.

[0069] If no hole is detected in the image to be processed, the calculation unit 13 can calculate the relative positional relationship between the tip of the boom and the hole in the image to be processed based on the estimated position of the hole in the image to be processed. The boom control device 20 drives the boom based on the result.

[0070] Next, another example of the processing flow of the processing device 100 will be described with reference to the flowchart of FIG.

[0071] When the image analyzing device 10 acquires an image in which the tip of the boom is captured (S40), it executes a process of detecting holes from the image (S41) and a process of estimating the positions of the holes (S42). Hereinafter, the image acquired in S40 is referred to as the "image to be processed." In the figure, S41 and S42 are performed in parallel, but one of them may be performed before the other step.

[0072] In S42, the image analysis device 10 extracts feature points of the background of the image to be processed. Then, the image analysis device 10 estimates the position of the hole in the image to be processed based on the "relative positional relationship between the background feature points and holes in the image" calculated based on an image that precedes the image to be processed in chronological order, and the "position of the background feature points extracted from the image to be processed." Note that this process can be executed only when the "relative positional relationship between the background feature points and holes in the image" has been calculated based on an image that precedes the image to be processed in chronological order. The calculation of the relative positional relationship between the background feature points and holes in the image may be performed for all images obtained. There is no particular restriction on the processing timing.

[0073] Then, if a hole is detected in S41 (Yes in S43), the image analyzing device 10 calculates the relative positional relationship between the tip of the boom and the hole in the image to be processed based on the position of the detected hole in the image to be processed (S44).

[0074] On the other hand, if no hole is detected in S41 (No in S43), the image analyzing device 10 calculates the relative positional relationship between the tip of the boom and the hole in the image to be processed based on the position of the hole in the image to be processed estimated in S42 (S45).

[0075] Thereafter, the boom control device 20 judges whether the calculation result of S44 or S45 indicates that "the positions of the boom tip and the hole in the image to be processed match" (S46). The condition for judging the match may be that the positions (coordinates) of the boom tip and the hole in the image match completely, or the distance between them may be within a threshold value.

[0076] If the calculation result in S44 or S45 indicates that "the positions of the boom tip and the hole in the image to be processed match" (Yes in S46), the boom control device 20 stops controlling the driving of the boom. As a result, the attitude of the boom stops in that state, and the boom tip stops at that position.

[0077] On the other hand, if the calculation result in S44 or S45 does not indicate that "the positions of the boom tip and the hole in the image match" (No in S46), the boom control device 20 drives the boom based on the calculation result in S44 or S45 (S47). Specifically, the boom control device 20 identifies the camera attitude based on the boom attitude at that time, and then converts the direction in the image to be processed calculated in S44 or S45 into a direction in the world coordinate system (direction in real space) based on the identified camera attitude. Then, the boom control device 20 moves the boom tip to the direction in the world coordinate system (direction in real space) obtained by the conversion.

[0078] Thereafter, the process returns to S40 and the same process is repeated, that is, a new image is acquired, the new image is analyzed, and the boom is controlled based on the analysis results.

[0079] In driving the boom in S47, the boom may be moved in the direction in the calculated world coordinate system (direction in real space) by a predetermined amount, or the amount of movement may be controlled by other methods. The predetermined amount of movement may be a predefined fixed value, or may be calculated based on the "distance in the image between the tip of the boom and the hole" indicated by the relative positional relationship calculated in S44 or S45.

[0080] Next, another example of the processing flow of the processing device 100 will be described with reference to the flowchart of FIG.

[0081] When the image analyzing device 10 acquires an image in which the tip of the boom is captured (S50), it executes a process of detecting holes from the image (S51). Hereinafter, the image acquired in S50 is referred to as the "image to be processed."

[0082] Then, if a hole is detected in S51 (Yes in S52), the image analyzing device 10 calculates the relative positional relationship between the tip of the boom and the hole in the image to be processed based on the position of the detected hole in the image to be processed (S53).

[0083] On the other hand, if no hole is detected in S51 (No in S52), the image analyzing device 10 performs a process of estimating the position of the hole (S54).

[0084] In S54, the image analysis device 10 extracts feature points of the background of the image to be processed. Then, the image analysis device 10 estimates the position of the hole in the image to be processed based on the "relative positional relationship between the background feature points and holes in the image" calculated based on an image that precedes the image to be processed in chronological order, and the "position of the background feature points extracted from the image to be processed." Note that this process can be executed only when the "relative positional relationship between the background feature points and holes in the image" has been calculated based on an image that precedes the image to be processed in chronological order. The calculation of the relative positional relationship between the background feature points and holes in the image may be performed for all images obtained. There is no particular restriction on the processing timing.

[0085] Next, the image analyzing device 10 calculates the relative positional relationship between the tip of the boom and the hole in the image to be processed, based on the position of the hole in the image to be processed estimated in S54 (S55).

[0086] Thereafter, the boom control device 20 judges whether the calculation result of S53 or S55 indicates that "the positions of the boom tip and the hole in the image to be processed match" (S56). The condition for judging the match may be that the positions (coordinates) of the boom tip and the hole in the image match completely, or the distance between them may be within a threshold value.

[0087] If the calculation result of S53 or S55 indicates that "the positions of the boom tip and the hole in the image to be processed match" (Yes in S56), the boom control device 20 stops controlling the driving of the boom. As a result, the attitude of the boom stops in that state, and the boom tip stops at that position.

[0088] On the other hand, if the calculation result in S53 or S55 does not indicate that "the positions of the boom tip and the hole in the image match" (No in S56), the boom control device 20 drives the boom based on the calculation result in S53 or S55 (S57). Specifically, the boom control device 20 identifies the camera attitude based on the boom attitude at that time, and then converts the direction in the image to be processed calculated in S53 or S55 into a direction in the world coordinate system (direction in real space) based on the identified camera attitude. Then, the boom control device 20 moves the boom tip to the direction in the world coordinate system (direction in real space) obtained by the conversion.

[0089] Thereafter, the process returns to S50 and the same process is repeated, that is, a new image is acquired, the new image is analyzed, and the boom is controlled based on the analysis results.

[0090] In driving the boom in S57, the boom may be moved in the direction in the calculated world coordinate system (direction in real space) by a predetermined amount, or the amount of movement may be controlled by other methods. The predetermined amount of movement may be a fixed value defined in advance, or may be calculated based on the "distance in the image between the tip of the boom and the hole" indicated by the relative positional relationship calculated in S53 or S55.

[0091] Next, another example of the processing flow of the processing device 100 will be described with reference to the flowchart of FIG.

[0092] When the image analyzing device 10 acquires an image (hereinafter, "current image") captured so as to capture the tip of the boom (S101), it executes a process of detecting holes from the current image (S102). In addition, the image analyzing device 10 executes a process of extracting feature points from the current image (S103).

[0093] Next, the image analysis device 10 matches the feature points extracted from the current image with the feature points extracted from the past image (S104). Next, the image analysis device 10 calculates the relative relationship between the current image and the past image based on the correspondence of the feature points calculated in S104 (S105). The calculation of the relative relationship can use a projection matrix (homography matrix) that expresses the relationship using translation, rotation, tilt, and scale. For example, a projection matrix is ​​calculated so that corresponding feature points overlap each other as shown in FIG. 15.

[0094] Next, the image analyzing device 10 projects the hole position in the past image onto the current image based on the relative relationship between the current image and the past image calculated in S105 (S106). Next, the image analyzing device 10 calculates the relative positional relationship (direction) between the hole on the current image and the tip of the boom (S107).

[0095] Thereafter, the boom control device 20 specifies the camera attitude based on the attitude of the boom at that time, and then converts the direction calculated in S107 into a direction in the world coordinate system (direction in real space) based on the specified attitude of the camera (S108).Then, the boom control device 20 moves the tip of the boom to the direction in the world coordinate system (direction in real space) obtained by the conversion.

[0096] The processes in S104 to S106 may be performed only if no hole is detected in the current image in S102.

[0097] The other configurations of the processing apparatus 100 of this embodiment are similar to those of the first and second embodiments.

[0098] According to the processing device 100 of this embodiment, the same action and effect as the first and second embodiments are realized. Furthermore, according to the processing device 100 of this embodiment, when a situation occurs in which the hole is temporarily hidden by a part of the device itself (such as a part of the boom) or another object and cannot be captured in the image, the position of the hole can be estimated with high accuracy and the boom can be driven based on the estimation result. In other words, a technology that is resistant to the problem of the hole not being captured in the image is realized.

[0099] Although the embodiments of the present invention have been described above with reference to the drawings, these are merely examples of the present invention, and various configurations other than those described above may be adopted. The configurations of the above-described embodiments may be combined with each other, or some of the configurations may be replaced with other configurations. Furthermore, the configurations of the above-described embodiments may be modified in various ways without departing from the spirit of the invention. Furthermore, the configurations and processes disclosed in the above-described embodiments and modified examples may be combined with each other.

[0100] In addition, in the flowcharts used in the above description, multiple steps (processes) are described in order, but the order of execution of the steps performed in each embodiment is not limited to the order described. In each embodiment, the order of the steps shown in the figures can be changed to the extent that does not cause problems in terms of content. In addition, the above-mentioned embodiments can be combined to the extent that the content is not contradictory.

[0101] A part or all of the above-described embodiments can be described as, but is not limited to, the following supplementary notes. 1. An acquisition unit that acquires time-series images taken by a camera attached to a boom; an image analysis unit that detects holes formed in a wall surface of a tunnel from the image and extracts feature points of the wall surface of the tunnel; a calculation unit that calculates a relative positional relationship between the feature point and the hole in the image based on the image that is chronologically earlier than the image to be processed, and estimates a position of the hole in the image to be processed based on the position of the feature point in the image to be processed and the relative positional relationship between the feature point and the hole in the image; A processing device having 2. The camera is mounted so that the tip of the boom is captured in the image; The calculation unit is When the hole is detected from the image to be processed, a relative positional relationship between the tip of the boom and the hole in the image to be processed is calculated based on a position of the detected hole in the image to be processed; A processing device as described in claim 1, which calculates the relative positional relationship between the tip of the boom and the hole in the image to be processed based on the estimated position of the hole in the image to be processed when the hole is not detected in the image to be processed. 3. A processing device as described in 1 or 2, further comprising a boom control unit that drives the boom based on the relative positional relationship between the tip of the boom and the hole within the image to be processed. 4. The calculation unit: if the hole is detected in the image to be processed, a process of estimating the position of the hole in the image to be processed is not performed; 4. The processing device according to any one of 1 to 3, further comprising a process for estimating a position of the hole within the image to be processed if the hole is not detected within the image to be processed. 5. A treatment device according to any one of 1 to 4, wherein the hole is a hole drilled for driving rock bolts or for loading explosives. 6. The computer: an acquisition step of acquiring time-series images taken by a camera attached to the boom; an image analysis step of detecting holes formed in a wall surface of a tunnel from the image and extracting feature points of the wall surface of the tunnel; a calculation step of calculating a relative positional relationship between the feature point and the hole in the image based on the image that is chronologically earlier than the image to be processed, and estimating a position of the hole in the image to be processed based on the position of the feature point in the image to be processed and the relative positional relationship between the feature point and the hole in the image; The processing method to be performed. [Explanation of symbols]

[0102] 10. Image analysis device 11 Acquisition Department 12 Image Analysis Section 13 Calculation section 20 Boom control device 21 Boom control unit 100 Processing equipment 1A Processor 2A Memory 3A input / output I / F 4A Peripheral circuit 5A Bus BB Bolt Driving Boom DBL Drilling Boom DBR Drilling Boom

Claims

1. an acquisition unit that acquires time-series images captured by a camera attached to the boom; an image analysis unit that detects holes formed in a wall surface of a tunnel from the image and extracts feature points of the wall surface of the tunnel; a calculation unit that calculates a relative positional relationship between the feature point and the hole in the image based on the image that is chronologically earlier than the image to be processed, and estimates a position of the hole in the image to be processed based on the position of the feature point in the image to be processed and the relative positional relationship between the feature point and the hole in the image; A processing device having

2. The camera is mounted so that the tip of the boom is captured in the image, The calculation unit is When the hole is detected from the image to be processed, a relative positional relationship between the tip of the boom and the hole in the image to be processed is calculated based on a position of the detected hole in the image to be processed; A processing device as described in claim 1, wherein when the hole is not detected in the image to be processed, the relative positional relationship between the tip of the boom and the hole in the image to be processed is calculated based on the estimated position of the hole in the image to be processed.

3. The processing device according to claim 1 or 2, further comprising a boom control unit that drives the boom based on a relative positional relationship between the tip of the boom and the hole in the image to be processed.

4. The calculation unit is if the hole is detected in the image to be processed, a process of estimating the position of the hole in the image to be processed is not performed; The processing device according to claim 1 or 2, further comprising a process for estimating a position of the hole in the image to be processed if the hole is not detected in the image to be processed.

5. 3. The treatment device according to claim 1, wherein the holes are holes drilled for driving rock bolts or for loading explosives.

6. The computer an acquisition step of acquiring time-series images taken by a camera attached to the boom; an image analysis step of detecting holes formed in a wall surface of a tunnel from the image and extracting feature points of the wall surface of the tunnel; a calculation step of calculating a relative positional relationship between the feature point and the hole in the image based on the image that is chronologically earlier than the image to be processed, and estimating a position of the hole in the image to be processed based on the position of the feature point in the image to be processed and the relative positional relationship between the feature point and the hole in the image; The processing method to be performed.

Citation Information

Patent Citations

  • Crane control device and crane

    JP2011207571A

  • Machinery operation control device, machinery operation controlling method, and program

    JP2017077617A

  • Hammering test control device, hammering test control method, and program

    JP2017078684A

  • Rock bolt placing vehicle and method of placing rock bolt

    JP2021195819A