Storage system

A dual-container system with a compressor and control valves manages boil-off gas in LNG storage systems, preventing atmospheric discharge and maintaining fuel consistency by transferring gas between containers based on pressure thresholds.

JP2024144962AInactive Publication Date: 2024-10-15ISUZU MOTORS LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2023057160
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Conventional storage systems for liquefied natural gas (LNG) in vehicles discharge boil-off gas into the atmosphere due to increased internal pressure, which is undesirable due to methane's greenhouse effect and flammability.

Method used

A dual-container system with a compressor that transfers boil-off gas from a first LNG container to a second compressed natural gas container, using control valves and check valves to manage gas flow and pressure, and a supply unit to operate the compressor based on pressure thresholds.

Benefits of technology

This system effectively suppresses the discharge of boil-off gas into the atmosphere by storing it in the second container, maintaining consistent fuel composition for the engine, and simplifying fuel injection control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024144962000001_ABST
    Figure 2024144962000001_ABST
Patent Text Reader

Abstract

To inhibit a boil-off gas from being discharged to the atmospheric air.SOLUTION: A storage system S mounted on a vehicle includes: a first container 1 for storing a liquefaction natural gas which is a fuel of an engine of the vehicle; a second container 2 for storing a compressed natural gas which is a fuel of the engine; a first duct line 41 which connects the first container 1 with the second container 2 and in which a boil-off gas generated by the liquefaction natural gas in the first container 1 being vaporized flows; and a compressor 3 which is provided at the first duct line 41, compresses the boil-off gas, and supplies the boil-off gas to the second container 2.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a storage system for storing natural gas. [Background technology]

[0002] Vehicles that run on natural gas are known. Patent Document 1 discloses a vehicle equipped with a container for storing liquefied natural gas. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-90906 A Summary of the Invention [Problem to be solved by the invention]

[0004] The liquefied natural gas in the container evaporates due to atmospheric heat, etc., generating boil-off gas. In conventional technology, when boil-off gas is generated and the internal pressure of the container increases, the boil-off gas is discharged into the atmosphere.

[0005] The present invention has been made in consideration of these points, and aims to suppress the emission of boil-off gas into the atmosphere. [Means for solving the problem]

[0006] One aspect of the present invention provides a storage system mounted on a vehicle, the storage system having a first container for storing liquefied natural gas as fuel for an engine of the vehicle, a second container for storing compressed natural gas as fuel for the engine, a first pipeline connecting the first container and the second container and through which boil-off gas formed by vaporizing the liquefied natural gas in the first container flows, and a compressor provided in the first pipeline for compressing the boil-off gas and supplying it to the second container.

[0007] The boil-off gas supplying device may further include a supply unit that operates the compressor to supply compressed boil-off gas to the second container when the pressure of the boil-off gas in the first container becomes equal to or higher than a first predetermined value while the engine is stopped.

[0008] The supply unit may stop the compressor when the pressure of the boil-off gas in the first container becomes less than a second predetermined value that is lower than the first predetermined value after operating the compressor.

[0009] The storage system may include a second pipeline connecting the engine and the second container, a control valve provided in the second pipeline, and a supply unit that supplies a mixture of the compressed natural gas and the boil-off gas in the second container to the engine by opening the control valve.

[0010] The first pipeline may include a first check valve provided between the compressor and the first container to allow the boil-off gas to pass from the first container to the compressor and to block the boil-off gas from the compressor to the first container.

[0011] The first pipeline may include a second check valve provided between the compressor and the second container to allow the boil-off gas to pass from the compressor to the second container and to block the boil-off gas and the compressed natural gas from the second container to the compressor. Effect of the Invention

[0012] According to the present invention, it is possible to suppress emission of boil-off gas into the atmosphere. [Brief description of the drawings]

[0013] [Figure 1] FIG. 2 is a diagram for explaining the configuration of a storage system. [Diagram 2] FIG. 2 is a diagram for explaining the configuration of a supply control device. [Diagram 3]FIG. 4 is a diagram for explaining a change in pressure over time while the vehicle is stopped. [Figure 4] 4 is a flowchart illustrating an example of a process for storing boil-off gas. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] [Configuration of storage system S] FIG. 1 is a diagram for explaining the configuration of the storage system S. FIG. 2 is a diagram for explaining the configuration of the supply control device 9. The storage system S is mounted on a vehicle. The storage system S is a system for storing natural gas, which is fuel for an engine 5 of the vehicle. The storage system S includes a first container 1, a second container 2, a compressor 3, a first pipeline 41, a second pipeline 42, a third pipeline 43, a fourth pipeline 44, a fifth pipeline 45, a first valve 71, a second valve 72, a third valve 73, a regulator 74, a regulator 75, a safety valve 76, a first check valve 77, a second check valve 78, a filling port 81, a heat exchanger 82, a vent stack 83, a filling port 84, and a supply control device 9. Hereinafter, the configuration of the storage system S will be explained with reference to FIG. 1 and FIG. 2.

[0015] The first container 1 stores liquefied natural gas (LNG) obtained by liquefying natural gas. The liquefied natural gas is stored in the first container 1 at a temperature at which the natural gas can maintain a liquid state (for example, at or below -162 degrees Celsius at which natural gas liquefies). The first container 1 has, for example, a cylindrical shape, but is not limited to this. A heat insulating material is provided on the inside of the first container 1. The capacity of the first container 1 is, for example, 300 liters, but is not limited to this. A filling port 81 for filling the first container 1 with the liquefied natural gas is connected to the first container 1.

[0016] The first container 1 and the engine 5 of the vehicle are connected by a third pipeline 43. A heat exchanger 82 for vaporizing the liquefied natural gas is provided between the first container 1 and the engine 5. The heat exchanger 82 is provided with a pipe through which a coolant for the engine 5 circulates. The heat exchanger 82 vaporizes the liquefied natural gas by utilizing heat from the cooling water of the engine 5. A regulator 75 is provided between the heat exchanger 82 and the engine 5 for adjusting the pressure of the natural gas that has passed through the heat exchanger 82 to a pressure that can be injected by the engine 5. The pressure that can be injected is, for example, 5 atmospheres. The third valve 73 is provided between the regulator 75 and the engine 5 and is a valve that switches between passing or blocking the natural gas flowing through the third pipeline 43 toward the engine 5.

[0017] Incidentally, although a thermal insulation material is provided inside the first container, atmospheric heat still flows into the first container even with the thermal insulation material. When atmospheric heat flows into the first container 1, the temperature of the liquefied natural gas rises, causing the liquefied natural gas to vaporize and generate boil-off gas, the main component of which is methane. When the boil-off gas is generated, the internal pressure of the first container 1 rises. Before the internal pressure of the first container 1 rises and exceeds the pressure that the first container 1 can withstand, it is necessary to discharge the boil-off gas from the first container 1 and reduce the internal pressure of the first container 1.

[0018] The first vessel 1 is connected to a fourth pipe 44 for discharging the boil-off gas to the atmosphere, a safety valve 76, and a vent stack 83. The safety valve 76 automatically opens to discharge the boil-off gas when the pressure in the first vessel 1 becomes equal to or higher than a threshold value, and automatically closes when the pressure in the first vessel 1 drops below the threshold value. The boil-off gas discharged from the safety valve 76 is discharged from the vent stack 83 to the atmosphere.

[0019] However, methane, the main component of boil-off gas, has a high greenhouse effect and is flammable, so it is undesirable to discharge it into the atmosphere. Therefore, in the storage system S according to the embodiment, the boil-off gas generated in the first container 1 is compressed by the compressor 3 and stored in the second container 2, thereby suppressing discharge into the atmosphere.

[0020] The second container 2 stores compressed natural gas, which is fuel for the engine 5. The second container 2 is a pressure-resistant container. For example, both ends of the second container 2 are hemispherical, and the portion of the second container 2 other than both ends is cylindrical, but this is not limited thereto. The capacity of the second container 2 is, for example, 180 liters. A plurality of second containers 2 may be provided.

[0021] The second container 2 and the engine 5 are connected by a second pipeline 42. A regulator 74 is provided between the second container 2 and the engine 5. The regulator 74 adjusts the pressure of the natural gas that has passed through it to a pressure that can be injected by the engine 5. The pressure that can be injected is, for example, 5 atmospheres. A second valve 72 is provided between the regulator 74 and the engine 5. The second valve 72 is a valve that switches between passing or blocking the natural gas flowing through the second pipeline 42 toward the engine 5.

[0022] A filling port 84 for filling the second container 2 with compressed natural gas is connected to the second container 2. Specifically, the second container 2 and the filling port 84 are connected by a fifth pipeline 45. The fifth pipeline 45 is connected to the second pipeline 42. Specifically, the fifth pipeline 45 is connected to the second pipeline 42 between the first valve 71 and the regulator 74. Note that the fifth pipeline 45 may be directly connected to the second container 2.

[0023] The first container 1 and the second container 2 are connected by a first pipeline 41. The first pipeline 41 branches off from a fourth pipeline 44 and merges with a fifth pipeline 45. The first pipeline 41 is not limited to this, and may merge with a second pipeline 42 between the first valve 71 and the regulator 74. Boil-off gas obtained by vaporizing the liquefied natural gas in the first container 1 flows through the first pipeline 41. A compressor 3 is provided in the first pipeline 41.

[0024] The compressor 3 compresses the boil-off gas and supplies it to the second container 2. Specifically, the compressor 3 sucks in the boil-off gas flowing through the first pipe 41 and the fourth pipe 44 and supplies it to the second container 2. More specifically, the compressor 3 compresses the boil-off gas sucked out from the first container 1 by sucking in the boil-off gas flowing through the first pipe 41 and the fourth pipe 44, and supplies it to the second container 2. The compressor 3 can compress the boil-off gas up to 20 MPa (megapascals). The compressor 3 may compress the boil-off gas to 20 MPa or more, or less than 20 MPa. The compressor 3 is, for example, a centrifugal compressor, but is not limited thereto.

[0025] A first valve 71 is provided between the second container 2 and the regulator 74. The first valve 71 is a control valve that switches between passing and blocking the natural gas flowing from the second container 2 to the engine 5. Specifically, the first valve 71 passes the compressed natural gas filled from the filling port 84 and the boil-off gas supplied from the compressor 3, and blocks the mixed gas of the compressed natural gas and the boil-off gas flowing from the second container 2 to the second pipeline 42. The first valve 71 is opened under the control of the supply unit 922 to pass the mixed gas from the second container 2 to the second pipeline 42. The first valve 71 is provided as a safety device that prevents gas leakage when the container is removed or in an emergency such as a gas leak due to a piping breakage.

[0026] A first check valve 77 is provided in the first pipe 41 between the first container 1 and the compressor 3. The first check valve 77 passes boil-off gas flowing from the first container 1 to the compressor 3 and blocks boil-off gas flowing from the compressor 3 to the first container 1. The first check valve 77 is, for example, a disk-type check valve, but is not limited to this and may be a poppet-type check valve, a swing-type check valve, or another type of check valve.

[0027] A second check valve 78 is provided between the compressor 3 and the second vessel 2. The second check valve 78 passes the boil-off gas flowing from the compressor 3 to the second vessel 2 and blocks the boil-off gas and compressed natural gas flowing from the second vessel 2 to the compressor 3. The second check valve 78 may be a check valve of the same type as the first check valve 77, or a check valve of a different type.

[0028] The supply control device 9 controls the opening and closing of the first valve 71, the second valve 72, and the third valve 73, and the operation of the compressor 3. The supply control device 9 has a storage unit 91 and a control unit 92. The storage unit 91 is a storage medium including a ROM (Read Only Memory), a RAM (Random Access Memory), a hard disk, etc. The storage unit 91 stores a program executed by the control unit 92.

[0029] The control unit 92 is a computation resource including a processor such as a CPU (Central Processing Unit). The control unit 92 executes a program stored in the storage unit 91 to realize the functions of an acquisition unit 921 and a supply unit 922.

[0030] The acquiring unit 921 acquires the first pressure of the boil-off gas in the first container 1. For example, the acquiring unit 921 acquires the first pressure from a pressure sensor provided in the first container 1. Since the pressure of the boil-off gas in the first container 1 and the pressure of the boil-off gas flowing through the first pipeline 41 are substantially equal to each other, the acquiring unit 921 may acquire the pressure of the boil-off gas flowing through the first pipeline 41 as the first pressure from a pressure sensor provided in the first pipeline 41.

[0031] The supply unit 922 supplies the boil-off gas compressed by the compressor 3 to the second container 2. Specifically, when a first pressure of the boil-off gas in the first container 1 becomes equal to or higher than a first predetermined value while the engine 5 of the vehicle is stopped, the supply unit 922 operates the compressor 3 to supply the compressed boil-off gas to the second container 2. In this way, the supply unit 922 can store the boil-off gas generated in the first container 1 in the second container 2 without discharging it to the atmosphere.

[0032] Even if boil-off gas is generated during the operation of the engine 5, it is consumed as fuel by the engine 5, so the first pressure in the first container 1 is unlikely to rise, but while the engine 5 is stopped, the boil-off gas is not consumed as fuel, so the first pressure in the first container 1 is likely to rise. Therefore, when the first pressure of the boil-off gas in the first container 1 becomes equal to or greater than a first predetermined value while the engine 5 of the vehicle is stopped, the supply unit 922 operates the compressor 3 to supply the compressed boil-off gas to the second container 2. As a result, even when the engine 5 is stopped and the boil-off gas is not consumed as fuel, the supply unit 922 can store the boil-off gas generated in the first container 1 in the second container 2 without discharging it to the atmosphere.

[0033] The supply unit 922 operates the compressor 3 and then stops the compressor 3 when the first pressure falls below a predetermined value. Specifically, when the first pressure falls below a second predetermined value that is lower than the first predetermined value, the supply unit 922 stops the compressor 3 and stops the supply of boil-off gas to the second container 2.

[0034] FIG. 3 is a diagram for explaining the change in pressure over time while the vehicle is stopped. In FIG. 3, the horizontal axis indicates time, and the vertical axis indicates pressure. The engine 5 of the vehicle was stopped at time T0. After the engine 5 was stopped, the liquefied natural gas in the first container 1 was vaporized to generate boil-off gas. Then, the first pressure P1 of the boil-off gas in the first container 1 increased as time passed, and reached or exceeded the first predetermined value K1 at time T1.

[0035] At time T1 when the first pressure P1 becomes equal to or higher than the first predetermined value K1, the supply unit 922 operates the compressor 3 to start supplying the compressed boil-off gas to the second container 2. When the boil-off gas is supplied, the second pressure P2 of the boil-off gas in the second container 2 increases. On the other hand, the first pressure P1 decreases because the boil-off gas in the first container 1 decreases.

[0036] The first pressure P1 becomes equal to or lower than a second predetermined value K2, which is lower than the first predetermined value K1, at time T2. The supply unit 922 stops the operation of the compressor 3 at time T2 when the first pressure P1 becomes equal to or lower than the second predetermined value K2. When the compressor 3 stops, the boil-off gas is no longer supplied, so the second pressure P2 does not change and remains at a constant value. On the other hand, the first pressure P1 increases again because boil-off gas is generated.

[0037] The supply unit 922 operates the compressor 3 when the first pressure P1 again becomes equal to or higher than the first predetermined value K1 (time T3), and stops the compressor 3 when the first pressure P1 becomes equal to or lower than the second predetermined value K2 (time T4). The supply unit 922 repeats the above process while the vehicle is stopped. In this way, the supply unit 922 stores the boil-off gas generated in the first container 1 in the second container 2, thereby suppressing the emission of the boil-off gas into the atmosphere.

[0038] The supply unit 922 operates the compressor 3 to supply the boil-off gas to the second container 2 while the second pressure P2 is equal to or lower than the pressure allowable value of the second container 2, and does not operate the compressor 3 when the second pressure P2 is higher than the pressure allowable value of the second container 2 even if the first pressure P1 is equal to or higher than the first predetermined value K1. This makes it possible for the supply unit 922 to suppress supplying boil-off gas in excess of the allowable amount of the second container 2 to the second container 2. When the second pressure P2 is higher than the pressure allowable value of the second container 2 and the first pressure P1 becomes equal to or higher than the first predetermined value K1, the boil-off gas in the first container 1 is discharged to the atmosphere from the vent stack 83 without being stored in the second container 2.

[0039] Incidentally, since boil-off gas is composed almost entirely of methane, and compressed natural gas contains butane, ethane, and propane in addition to methane, the combustion calories of only the boil-off gas differ from the combustion calories of compressed natural gas. Therefore, in order to appropriately combust only the boil-off gas in the engine 5, it is necessary to make the injection amount of the boil-off gas different from the injection amount of the compressed natural gas, which makes the control complicated.

[0040] Therefore, the supply unit 922 supplies the boil-off gas to the second container 2, thereby mixing the compressed natural gas and the boil-off gas in the second container 2. Since the second container 2 stores a larger amount of compressed natural gas than the boil-off gas generated in the first container 1, the component ratio of the gas in the second container 2 is unlikely to change even if the boil-off gas generated in the first container 1 is supplied to the second container 2. Therefore, the combustion calories of the mixed gas in the second container 2 is kept approximately constant. Then, the supply unit 922 supplies the mixed gas mixed in the second container 2 to the engine 5. Specifically, the supply unit 922 opens the first valve 71 and the second valve 72 to supply the mixed gas in the second container 2 to the engine 5. The supply unit 922 can suppress the difference in the fuel injection amount by supplying the mixed gas to the engine 5, so that the fuel injection control can be simplified.

[0041] [Process of storing boil-off gas executed by the supply control device 9] 4 is a flow chart showing an example of a process for storing boil-off gas. The process for storing boil-off gas is repeatedly executed while the engine 5 of the vehicle on which the storage system S is mounted is stopped.

[0042] The acquisition unit 921 acquires a first pressure P1 of the boil-off gas in the first container 1 (step S1). Specifically, the acquisition unit 921 acquires the first pressure P1 of the boil-off gas from a pressure sensor provided between the first container 1 and the safety valve 76.

[0043] The supply unit 922 determines whether the acquired first pressure P1 is equal to or greater than the first predetermined value K1 (step S2). If the first pressure P1 is less than the first predetermined value K1 (No in step S2), the supply unit 922 returns to step S1 and waits until the first pressure P1 becomes equal to or greater than the first predetermined value K1.

[0044] When the first pressure P1 is equal to or greater than the first predetermined value K1 (Yes in step S2), the supply unit 922 operates the compressor 3 (step S3). Specifically, the supply unit 922 operates the compressor 3 to supply the compressed boil-off gas to the second container 2.

[0045] The acquisition unit 921 acquires the first pressure P1 after the compressor 3 operates (step S4). The supply unit 922 determines whether the first pressure P1 acquired after the compressor 3 operates is equal to or less than the second predetermined value K2 (step S5). If the first pressure P1 is greater than the second predetermined value K2 (No in step S5), the supply unit 922 continues to operate the compressor 3 until the first pressure P1 becomes equal to or less than the second predetermined value K2.

[0046] If the first pressure P1 is equal to or lower than the second predetermined value K2 (Yes in step S5), the supply unit 922 stops the compressor 3 (step S6). Specifically, the supply unit 922 stops the compressor 3 to stop the supply of the boil-off gas to the second container 2. Then, the supply unit 922 waits until the first pressure P1 acquired after stopping the compressor 3 becomes equal to or higher than the first predetermined value K1, and operates the compressor 3 again when the first pressure P1 becomes equal to or higher than the first predetermined value K1.

[0047] [Effects of Storage System S] The storage system S compresses the boil-off gas generated by vaporization of the liquefied natural gas stored in the first container 1 and stores it in the second container 2, thereby suppressing the discharge of the boil-off gas into the atmosphere. In addition, since the second container 2 stores a larger amount of compressed natural gas than the boil-off gas generated in the first container 1, the component ratio of the gas in the second container 2 is unlikely to change even if the boil-off gas is supplied to the second container 2. Therefore, even if a mixture of the boil-off gas and the compressed natural gas is supplied from the second container 2, the combustion calories in the cylinder of the engine 5 are kept approximately constant. In other words, the supply unit 922 can suppress correction of the fuel injection amount by supplying the mixture gas to the engine 5, thereby simplifying the fuel injection control.

[0048] Although the present invention has been described above using the embodiments, the technical scope of the present invention is not limited to the scope described in the above embodiments, and various modifications and changes are possible within the scope of the gist of the present invention. For example, all or part of the device can be configured by distributing or integrating functionally or physically in any unit. In addition, new embodiments resulting from any combination of multiple embodiments are also included in the embodiments of the present invention. The effect of the new embodiment resulting from the combination combines the effect of the original embodiment. [Explanation of symbols]

[0049] S Storage System 1 1st container 2 Second container 3. Compressor 41 1st pipeline 42 2nd pipeline 43 3rd pipeline 44 4th pipeline 45 5th pipeline 5 Engine 71 First valve 72 Second Valve 73 Third valve 74 Regulator 75 Regulator 77 First check valve 78 Second check valve 81 Filling port 82 Heat exchanger 83 Bent Stack 84 Filling port 9 Supply control device 91 Storage section 92 Control section 921 Acquisition Department 922 Supply section

Claims

1. 1. A storage system on board a vehicle, comprising: A first container for storing liquefied natural gas as fuel for the engine of the vehicle; a second container for storing compressed natural gas as fuel for the engine; a first pipeline connecting the first vessel and the second vessel and through which a boil-off gas formed by vaporizing the liquefied natural gas in the first vessel flows; a compressor provided in the first pipeline for compressing the boil-off gas and supplying the compressed boil-off gas to the second vessel; A storage system having:

2. a supply unit that operates the compressor to supply the compressed boil-off gas to the second container when the pressure of the boil-off gas in the first container becomes equal to or higher than a first predetermined value while the engine is stopped; The storage system of claim 1 .

3. The supply unit stops the compressor when the pressure of the boil-off gas in the first container becomes less than a second predetermined value that is lower than the first predetermined value after the compressor is operated. The storage system of claim 2 .

4. a second pipeline connecting the engine and the second vessel; a control valve provided in the second line; a supply unit that supplies the mixed gas of the compressed natural gas and the boil-off gas in the second container to the engine by opening the control valve. The storage system of claim 1 .

5. a first check valve provided in the first pipeline between the compressor and the first container to allow the boil-off gas to pass from the first container to the compressor and to block the boil-off gas from the compressor to the first container; A storage system according to any one of claims 1 to 4.

6. a second check valve provided in the first pipeline between the compressor and the second container to allow the boil-off gas to pass from the compressor to the second container and to block the boil-off gas and the compressed natural gas from the second container to the compressor; A storage system according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Fuel storing device

    JP1998266917A

  • Liquefied gas fuel supply device of internal combustion engine

    JP2004285837A

  • Dimethyl ether compression ignition engine

    JP2004353562A

  • Fuel supply method and system

    JP2007247729A

  • Fuel storage device for LNG vehicle

    JP2010144878A