Concrete work management method and concrete work management system
The concrete work management system addresses the challenge of relying on personal experience by using relational expressions to integrate and update data from past projects, ensuring accurate quality control in future concrete work.
Patent Information
- Application Number
- JP2023057895
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
AI Technical Summary
Existing concrete work management systems rely heavily on personal experience for quality control, making it difficult to effectively utilize data from previous concrete works for future projects, leading to potential inaccuracies in quality prediction.
A concrete work management system and method that utilizes relational expressions to predict future concrete work data by integrating and updating data from previous projects, using X data as explanatory variables and Y data as objective variables, with an arithmetic unit to create and update these expressions.
Enables effective utilization of past concrete work data for accurate quality control in future projects, enhancing the predictability and reliability of concrete work quality.
Smart Images

Figure 2024145510000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a concrete work management method and a concrete work management system. [Background technology]
[0002] Various documents on concrete, which describe concrete mixes, unloading test results, strength test results, etc., in concrete construction work, are prepared and stored, for example, on paper. Therefore, various data on concrete in concrete construction work that has been completed is stored separately for each concrete construction work. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2007-77740 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, it is difficult to utilize various data on concrete from concrete work that has already been carried out for quality control of concrete in concrete work that is scheduled to be carried out, and quality control of the concrete has relied solely on the experience of the construction staff.
[0005] The present invention aims to effectively utilize various data relating to concrete in concrete work that has already been carried out for concrete work that is scheduled to be carried out. [Means for solving the problem]
[0006] Some embodiments of the present invention are a concrete work management method that performs the following steps: creating a relational equation in which X data related to one or more items X of completed concrete work is used as an explanatory variable, and Y data related to an item Y corresponding to the X data is used as an objective variable; creating an updated relational equation in which the relational equation is updated by adding additional X data related to the one or more items X of a new completed concrete work to a new explanatory variable, and adding additional Y data related to the item Y corresponding to the additional X data to a new objective variable; and predicting Y data related to the item Y corresponding to the X data related to the one or more items X of a concrete work to be performed using the updated relational equation.
[0007] Some embodiments of the present invention are a concrete work management system that includes an acquisition unit that acquires X data related to one or more items X of completed concrete work, and acquires additional X data related to the one or more items X of new completed concrete work, and a calculation unit that creates a relational equation in which the X data is an explanatory variable and Y data related to an item Y corresponding to the X data is an objective variable, and updates the relational equation by using the X data to which the additional X data has been added as a new explanatory variable and the Y data to which the additional Y data related to the item Y corresponding to the additional X data is added as a new objective variable, and the calculation unit predicts Y data related to the item Y corresponding to the X data related to the one or more items X of concrete work to be performed, using the updated relational equation.
[0008] Other features of the present invention will become apparent from the following specification and drawings. Effect of the Invention
[0009] According to some embodiments of the present invention, various data related to concrete in concrete work that has already been carried out can be effectively utilized for concrete work that is to be carried out. [Brief description of the drawings]
[0010] [Figure 1] FIG. 1 is an explanatory diagram of a concrete work management system 100 according to the present embodiment. [Diagram 2] FIG. 2 is a functional block diagram of the concrete work management server 10 of the present embodiment. [Diagram 3] FIG. 3 is a flow diagram of a concrete work management procedure according to this embodiment. [Figure 4] FIG. 4 is an explanatory diagram illustrating an example of concrete plant data. [Diagram 5] FIG. 5 is an explanatory diagram showing an example of concrete unloading test data. [Figure 6] FIG. 6 is an explanatory diagram showing an example of concrete strength test data. [Figure 7] FIG. 7 is a graph showing the relationship between the outside air temperature at the time of unloading and the strength ratio of concrete using cement A. [Figure 8] FIG. 8 is a graph showing the relationship between the outside air temperature at the time of unloading and the strength ratio of concrete using B cement. [Figure 9] FIG. 9 is a graph showing the relationship between the outside air temperature at the time of unloading and the strength ratio of concrete using C cement. [Figure 10] FIG. 10 is a graph showing the strength development properties of concrete using cement A. [Figure 11] FIG. 11 is a graph showing the strength development properties of concrete using B cement. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] At least the following points will become apparent from the following specification and drawings.
[0012] A concrete work management method has been revealed that performs the following steps: creating a relational equation in which X data related to one or more items X of completed concrete work is used as an explanatory variable, and Y data related to item Y corresponding to the X data is used as an objective variable; creating an updated relational equation in which the relational equation is updated by adding X data to which additional X data related to the one or more items X of a new completed concrete work is added as a new explanatory variable, and adding Y data to which additional Y data related to the item Y corresponding to the additional X data is added as a new objective variable; and predicting Y data related to the item Y that corresponds to the X data related to the one or more items X of concrete work to be performed using the updated relational equation.
[0013] According to this concrete work management method, various data relating to concrete in concrete work that has already been carried out can be effectively utilized for concrete work that is scheduled to be carried out.
[0014] The X data is preferably concrete plant data before concrete is unloaded.
[0015] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0016] The Y data is preferably concrete unloading test data or concrete strength test data obtained when unloading concrete.
[0017] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0018] The X data is preferably concrete unloading test data at the time of unloading concrete, concrete age data, and / or concrete strength test data.
[0019] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0020] The Y data is preferably concrete strength test data.
[0021] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0022] The X data is preferably data on outside air temperature in the concrete unloading test data.
[0023] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0024] The Y data is desirably data on the ratio of developed strength to nominal strength of concrete in the concrete strength test data.
[0025] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0026] The X data is preferably the concrete age data.
[0027] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0028] It is preferable to create a first update relational equation using the X data as concrete age data and the Y data as concrete strength test data, create a second update relational equation using the X data as outside air temperature data in concrete unloading test data and the Y data as data on the ratio of developed strength to nominal strength of concrete in concrete strength test data, and correct the first update relational equation using the second update relational equation.
[0029] This allows various data regarding concrete from concrete work that has already been carried out to be effectively utilized for concrete work that is scheduled to be carried out.
[0030] It is desirable to re-update the update relational equation by using the extracted X data for the one or more items X extracted under a first condition as an explanatory variable and the extracted Y data for an item Y corresponding to the extracted X data as a target variable, and to predict the extracted Y data for the item Y corresponding to the extracted X data for the one or more items X of the concrete work to be carried out using the update relational equation.
[0031] This makes it possible to easily organize various concrete-related data from concrete work that has already been carried out by desired items and effectively utilize the data for concrete work that is scheduled to be carried out.
[0032] It is desirable to re-update the updated relational equation by using additional extracted X data for the one or more items X extracted under a second condition different from the first condition as a new explanatory variable, and additional extracted Y data for an item Y corresponding to the additional extracted X data as a new objective variable, and to predict additional extracted Y data for the item Y corresponding to the additional extracted X data for the one or more items X of the concrete work to be carried out using the updated relational equation.
[0033] This makes it possible to easily organize various concrete-related data from concrete work that has already been carried out by desired items and effectively utilize the data for concrete work that is scheduled to be carried out.
[0034] A concrete work management system has been disclosed that includes an acquisition unit that acquires X data related to one or more items X of concrete work that has already been performed, and acquires additional X data related to the one or more items X of new concrete work that has already been performed, and a calculation unit that creates a relational equation with the X data as an explanatory variable and Y data related to an item Y corresponding to the X data as an objective variable, and updates the relational equation with the X data to which the additional X data has been added as a new explanatory variable and the Y data to which the additional Y data related to the item Y corresponding to the additional X data has been added as a new objective variable, wherein the calculation unit uses the updated relational equation to predict Y data related to the item Y that corresponds to the X data related to the one or more items X of concrete work to be performed.
[0035] According to such a concrete work management system, various data relating to concrete in concrete work that has already been carried out can be effectively utilized for concrete work that is scheduled to be carried out.
[0036] Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. The same or equivalent components, members, etc. shown in each drawing are designated by the same reference numerals, and duplicated descriptions will be omitted as appropriate.
[0037] ===This embodiment=== <Summary> FIG. 1 is an explanatory diagram of a concrete work management system 100 according to the present embodiment.
[0038] The concrete work management system 100 is a system for managing the quality of concrete in concrete work. The concrete work management system 100 includes a plant manager terminal 1, a construction manager terminal 2, a concrete work management server 10, and a construction manager terminal 30.
[0039] As shown in Fig. 1, the plant staff terminal 1 is a terminal for inputting concrete plant data before concrete is unloaded in a concrete plant and transmitting the data to the concrete work management server 10. In the concrete work management system 100 of this embodiment, the plant staff terminal 1 is a personal computer. However, the plant staff terminal 1 may also be a smartphone or a tablet-type mobile terminal. The plant staff terminal 1 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse), etc., which are not shown.
[0040] As shown in Fig. 1, the construction worker terminal 2 is a terminal for inputting concrete unloading test data at the time of unloading concrete at a completed concrete pouring site and concrete strength test data, and transmitting the data to the concrete work management server 10. In the concrete work management system 100 of this embodiment, the construction worker terminal 2 is a personal computer. However, the construction worker terminal 2 may also be a smartphone or a tablet-type mobile terminal. The construction worker terminal 2 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse), etc., which are not shown.
[0041] The concrete work management server 10 is a device for acquiring various data related to concrete in concrete work that has already been performed and performing calculation processing to predict various data related to concrete in concrete work that is to be performed. Specifically, the concrete work management server 10 performs processing to create a relational equation based on various data related to concrete in concrete work that has already been performed (S003 in FIG. 3, which will be described later). The concrete work management server 10 also performs processing to create an updated relational equation in which the relational equation is updated based on various data related to concrete in new concrete work that has already been performed (S006 in FIG. 3, which will be described later). Furthermore, the concrete work management server 10 performs processing to predict various data related to concrete in concrete work that is to be performed using the updated relational equation (S008 in FIG. 3, which will be described later).
[0042] In the concrete work management system 100 of this embodiment, the concrete work management server 10 is able to execute the various processes described above through cooperation between various hardware and software (not shown) of the concrete work management server 10. The concrete work management server 10 is, for example, a computer such as a server, and is composed of an arithmetic unit (CPU, etc.), memory, a storage device, a communication device, etc. The storage device stores programs and various data relating to the various processes described above executed by the concrete work management server 10.
[0043] The arithmetic device reads out the programs stored in the storage device into memory and executes them, thereby executing the various processes described above in the concrete work management server 10. The concrete work management server 10 may include multiple computers. The various processes described above in the concrete work management server 10 may be executed by the multiple computers working together via a network.
[0044] In the concrete work management system 100 shown in Fig. 1, the concrete work management server 10 is connected to a terminal used in one completed concrete work via a communication network. In the concrete work management system 100 shown in Fig. 1, the "terminal used in one completed concrete work" here is a plant staff terminal 1 in a concrete plant and a construction staff terminal 2 at a concrete pouring site. Also, the "communication network" is, for example, the Internet, a wireless communication network, a telephone line network, a LAN, a VAN, etc. However, the concrete work management server 10 is connected to terminals used in many completed concrete works via the communication network, and can acquire various data related to concrete in many completed concrete works.
[0045] The concrete work management server 10 may perform supervised learning. Here, "supervised learning" is machine learning that enables an artificial intelligence to recognize patterns, etc. from data given in advance and to make predictions for newly input data. In order for an artificial intelligence using a trained model obtained by supervised learning to make highly accurate predictions, it needs teacher data with a suitable amount of information. In other words, the more teacher data used in the supervised learning of the artificial intelligence, the higher the reliability of the predictions of the artificial intelligence. The concrete work management server 10 can obtain various data related to concrete from many concrete works that have been carried out and perform supervised learning.
[0046] The concrete work management system 100 does not have to have at least one of the plant staff terminal 1 and the construction staff terminal 2. In this case, the concrete work management server 10 has an input device (e.g., a keyboard or a mouse), and various data related to concrete in concrete work that has been carried out may be directly input via the input device.
[0047] As shown in Fig. 1, the construction worker terminal 30 is a terminal for displaying various data related to concrete in the concrete work to be carried out, predicted by the concrete work management server 10, at the planned concrete pouring site. In the concrete work management system 100 of this embodiment, the construction worker terminal 30 is a personal computer. However, the construction worker terminal 30 may also be a smartphone or a tablet-type mobile terminal. The construction worker terminal 30 is equipped with hardware such as a CPU, memory, storage device, communication module, display device (e.g., liquid crystal display), input device (e.g., keyboard and mouse) etc., which are not shown.
[0048] The construction worker terminal 30 is connected to the concrete work management server 10 via a communication network. Note that the concrete work management system 100 does not need to have the construction worker terminal 30. In this case, the concrete work management server 10 may have a display device (e.g., a liquid crystal display), and various data related to the concrete in the concrete work to be carried out may be directly displayed via the display device.
[0049] As shown in Fig. 1, the concrete work management server 10 acquires concrete plant data before concrete is unloaded via the plant manager terminal 1. The concrete plant data is concrete delivery data at the stage when the concrete was generated in the concrete plant (specifically, at the time of delivery). The concrete plant data is data related to the concrete collection date, plant name, nominal strength, concrete mix, etc., as described below.
[0050] 1, the concrete work management server 10 acquires concrete unloading test data at the time of unloading concrete via the construction worker terminal 2. The concrete unloading test data is data on the concrete unloading test at the stage when the concrete is unloaded at the concrete pouring site (i.e., at the time of unloading). The concrete unloading test data is data on the outside air temperature, concrete temperature, air volume, etc. at the time of unloading the concrete, as will be described later.
[0051] Furthermore, the concrete work management server 10 acquires concrete strength test data via the construction worker terminal 2 as shown in Fig. 1. The concrete strength test data is data on strength tests of concrete at a concrete pouring site. The concrete strength test data is data on the 7-day strength, 28-day strength, etc. of concrete, as described below.
[0052] The concrete work management server 10 may acquire only a part of the concrete plant data, the concrete unloading test data, and the concrete strength test data, for example, it may acquire only the concrete plant data.
[0053] Furthermore, the concrete work management server 10 may acquire data related to concrete other than the above-mentioned concrete plant data, concrete unloading test data, and concrete strength test data. The concrete work management server 10 may acquire, for example, concrete age data (concrete age data) at a concrete pouring site. The concrete age data may be a part of the concrete strength test data.
[0054] Conventionally, various documents on concrete containing various data on concrete in concrete work are prepared and stored, for example, on paper. Therefore, various data on concrete in concrete work that has been completed is stored separately for each concrete work, and it is difficult to utilize various data on concrete in concrete work that has been completed for quality control of concrete in concrete work to be performed.
[0055] If various data on concrete from concrete works that have already been carried out are not utilized, the quality control of concrete in concrete works will depend solely on the experience of the construction workers, which may result in low accuracy in predicting the quality of concrete in concrete works to be carried out.
[0056] Therefore, in this embodiment, the concrete work management server 10 can effectively utilize various data related to concrete in concrete work that has already been performed for concrete work that is to be performed. Specifically, the concrete work management server 10 creates a predetermined relational expression (an updated relational expression described later) by performing calculation processing using the various data related to concrete in the concrete work that has already been performed, and stores the data of the predetermined relational expression in a recording unit (a recording unit 15 described later). Then, the concrete work management server 10 can read out the predetermined relational expression from the recording unit and predict various data related to concrete in concrete work that is to be performed based on the predetermined relational expression. A construction worker can accurately perform quality control of concrete in concrete work that is to be performed by checking the predicted various data via a construction worker terminal 30 described later.
[0057] <Function> FIG. 2 is a functional block diagram of the concrete work management server 10 of the present embodiment.
[0058] The concrete work management server 10 has an acquisition unit 11, a calculation unit 12, a recording unit 15, and a display unit 16.
[0059] The acquisition unit 11 is a part (function) of the concrete work management server 10 that acquires various data related to concrete in completed concrete work. As described above, the various data related to concrete in completed concrete work is concrete plant data before concrete is unloaded at the concrete plant and concrete pouring site data at the concrete pouring site. The concrete plant data is, for example, concrete delivery data, and the concrete pouring site data is, for example, concrete unloading test data, concrete age data, and concrete strength test data.
[0060] The calculation unit 12 is a part (function) of the concrete work management server 10 that creates a predetermined relational equation (an updated relational equation described later) by performing calculation processing using various acquired data related to concrete in concrete work that has already been carried out. The calculation unit 12 also stores prediction data related to concrete in concrete work that is scheduled to be carried out based on the predetermined relational equation.
[0061] The calculation unit 12 includes a relational equation creating unit 13 and a relational equation updating unit 14 .
[0062] The relational equation creating unit 13 is a part (function) of the calculation unit 12 that creates a relational equation. The relational equation has X data related to one or more items X of the completed concrete work as explanatory variables, and Y data related to item Y corresponding to the X data as objective variables. The relational equation creating unit 13 creates the relational equation and stores it in the recording unit 15.
[0063] The relational equation update unit 14 is a part (function) of the calculation unit 12 that creates an updated relational equation in which the relational equation is updated. The updated relational equation has X data to which additional X data related to the one or more items X of the newly completed concrete work is added as a new explanatory variable, and Y data to which additional Y data related to the item Y corresponding to the additional X data is added as a new objective variable. The relational equation update unit 14 further predicts Y data related to the item Y corresponding to the X data related to the one or more items X of the concrete work to be performed, using the updated relational equation, and stores the predicted Y data in the recording unit 15.
[0064] For convenience, the relational equation creating unit 13 and the relational equation updating unit 14 are described as being divided into two parts (functions), but one part (function) of the calculation unit 12 may have the functions of the relational equation creating unit 13 and the relational equation updating unit 14. Specific examples of the X data and Y data and the additional X data and additional X data will be described later.
[0065] The recording unit 15 is a part (function) of the concrete work management server 10 that records data of the relational equations created by the relational equation creation unit 13, data of the updated relational equations created by the relational equation update unit 14, etc. Although not shown, the recording unit 15 may also record various data related to concrete in completed concrete work acquired by the acquisition unit 11.
[0066] The display unit 16 is a part (function) of the concrete work management server 10 for outputting data of the relational equations created by the relational equation creation unit 13 and data of the updated relational equations created by the relational equation update unit 14 to an external display device (for example, the construction worker terminal 30). The display unit 16 also outputs Y data on item Y corresponding to X data on one or more items X of the concrete work to be carried out, predicted by the relational equation update unit 14, to an external display device. The display unit 16 reads out the updated relational equations and the predicted Y data from the recording unit 15, and transmits a command to output them to an external display device. Although not shown, the display unit 16 may display various data on concrete in the completed concrete work, acquired by the acquisition unit 11, on an external display device.
[0067] <Concrete construction management procedure flow> FIG. 3 is a flow diagram of a concrete work management procedure according to this embodiment.
[0068] First, the concrete work management server 10 acquires concrete plant data of a concrete plant where concrete used in a completed concrete work is produced (S001). In the concrete work management procedure of this embodiment, concrete plant data before concrete is unloaded at the concrete plant is input to the plant staff terminal 1 by a plant staff member. Then, the concrete plant data is transmitted to the concrete work management server 10, so that the concrete work management server 10 can acquire the concrete plant data.
[0069] FIG. 4 is an explanatory diagram illustrating an example of concrete plant data.
[0070] As described above, the concrete plant data is concrete delivery data at the stage when the concrete was generated in the concrete plant (specifically, at the time of delivery). For example, as shown in Fig. 4, the concrete plant data is configured in a table format of data related to the concrete collection date, plant name, cement company, type, nominal strength, etc., and is stored in the recording unit 15 in a file format such as CSV format or JSON format.
[0071] Next, the concrete work management server 10 acquires concrete pouring site data for the concrete pouring site of the completed concrete work (S002). In the concrete work management procedure of this embodiment, the construction worker inputs concrete pouring site data for the concrete pouring site of the completed concrete work to the construction worker terminal 2. Then, the concrete pouring site data is transmitted to the concrete work management server 10, so that the concrete work management server 10 can acquire the concrete pouring site data.
[0072] Fig. 5 is an explanatory diagram showing an example of concrete unloading test data, and Fig. 6 is an explanatory diagram showing an example of concrete strength test data.
[0073] The concrete pouring site data is, for example, concrete unloading test data at the time of unloading concrete, concrete age data, and concrete strength test data. The concrete unloading test data is, for example, as shown in Fig. 5, data on the test date of the concrete unloading test, the name of the work, the type, the outside air temperature, the concrete temperature, the air volume, etc., configured in a table format, and is stored in the recording unit 15 in a file format such as CSV format or JSON format. The concrete strength test data is, for example, as shown in Fig. 6, data on the collection date, the name of the work, the type, the 7-day strength, the 28-day strength, etc., of the concrete specimen used in the concrete strength test, configured in a table format, and is stored in the recording unit 15 in a file format such as CSV format or JSON format.
[0074] Next, the concrete work management server 10 creates a relational equation by performing calculation processing using the acquired various data related to concrete in the completed concrete work (S003). In the concrete work management procedure of this embodiment, the relational equation creation unit 13 of the calculation unit 12 creates the relational equation in which X data related to one or more items X of the completed concrete work is used as an explanatory variable, and Y data related to an item Y corresponding to the X data is used as an objective variable.
[0075] For example, among various data related to concrete in the acquired concrete work that has already been carried out, the data on the nominal strength of the concrete plant data is taken as X data (explanatory variable), and the data on the 28-day strength of the concrete strength test data is taken as Y data (objective variable). In this case, the relational equation creation unit 13 of the calculation unit 12 creates a relational equation that expresses the relationship between the nominal strength and the 28-day strength. Here, the X data that is taken as the explanatory variable is not limited to one item, and may be multiple items. For example, the plant name and nominal strength data of the concrete plant data may be taken as X data (explanatory variable).
[0076] Next, the concrete work management server 10 acquires concrete plant data for the concrete plant where the concrete to be used in the newly completed concrete work is produced (S004). The concrete work management server 10 also acquires concrete pouring site data for the concrete pouring site of the newly completed concrete work (S005). The concrete work management server 10 then adds the acquired various data related to the concrete in the newly completed concrete work to the various data acquired in S001 and S002, and performs calculation processing to create an updated relational equation in which the relational equation has been updated (S006).
[0077] In the concrete work management procedure of this embodiment, various data related to concrete in newly completed concrete work is added and calculation processing is performed, making it possible to accurately predict various data related to concrete in concrete work that is scheduled to be carried out.
[0078] In the concrete work management procedure of this embodiment, the update relational equation may be updated again by further adding various data related to concrete in newly completed concrete work and performing calculation processing. When the updating of the update relational equation is completed (S007: YES), prediction of various data related to concrete in concrete work to be performed is performed (S008).
[0079] Specifically, the concrete work management server 10 uses the update relational equation to predict Y data for item Y corresponding to X data for one or more items X of the concrete work to be carried out, and stores the predicted Y data in the recording unit 15. When the update relational equation is an equation expressing the relationship between nominal strength and 28-day strength, the concrete work management server 10 can read out the update relational equation stored in the recording unit 15, and output a predicted value of the 28-day strength corresponding to a predetermined nominal strength of the concrete work to be carried out.
[0080] In the concrete work management procedure of this embodiment, the update relational equation can be updated again by using extracted X data extracted under a first condition (e.g., nominal strength of 40 or more) as an explanatory variable and extracted Y data corresponding to the extracted X data as an objective variable. Furthermore, in the concrete work management procedure of this embodiment, the update relational equation can be updated again by using extracted X data extracted under a second condition different from the first condition (e.g., when a different type of concrete is used) as an explanatory variable and extracted Y data corresponding to the extracted X data as an objective variable.
[0081] This makes it possible to predict Y data for item Y corresponding to X data for one or more items X of concrete work to be carried out using an item-specific (for example, nominal strength or type-specific) update relational equation. Note that the concrete work management procedure of this embodiment can utilize various data stored in file formats such as CSV and JSON, making it easy to organize data by desired items.
[0082] In the concrete work management procedure of this embodiment, as described above, various data related to concrete in concrete work that has already been carried out can be effectively used for concrete work to be carried out, and the quality of concrete in the concrete work to be carried out can be accurately controlled.
[0083] In the concrete construction management procedure, the X data (explanatory variables) can be concrete plant data before concrete is unloaded, and the Y data (objective variables) can be concrete unloading test data or concrete strength test data at the time of concrete unloading.
[0084] In the concrete construction management procedure, the X data (explanatory variables) can be concrete unloading test data at the time of unloading concrete, concrete age data, and / or concrete strength test data. The Y data (objective variables) can also be concrete strength test data.
[0085] In the following, specific examples of the above-mentioned X data and Y data and the relational expressions will be described with reference to FIGS.
[0086] Fig. 7 is a graph showing the relationship between the outside temperature and the strength ratio when concrete using cement A was unloaded. Fig. 8 is a graph showing the relationship between the outside temperature and the strength ratio when concrete using cement B was unloaded. Fig. 9 is a graph showing the relationship between the outside temperature and the strength ratio when concrete using cement C was unloaded. Here, "strength ratio" refers to the ratio of the developed strength (strength at 28 days) to the nominal strength of the concrete.
[0087] In the specific example shown in Figures 7 to 9, the X data (explanatory variable) is the outside air temperature data in the concrete unloading test data, and the Y data (objective variable) is the ratio data of the developed strength (strength at 28 days) to the nominal strength of concrete in the concrete strength test data. In Figures 7 to 9, the Y data values corresponding to the X data are plotted with circles, and the regression equation found as the update relational equation is shown by a solid line graph.
[0088] 7 to 9 show the strength ratio of concrete (here, the ratio of developed strength to nominal strength of concrete) for each cement type at the concrete pouring site of a certain concrete work that has already been carried out. As shown in Figs. 7 to 9, it can be seen that the higher the outside air temperature at the time of unloading the concrete, the smaller the developed strength to the nominal strength of concrete tends to be. In other words, by using the update relational expressions shown in Figs. 7 to 9, it is possible to predict the strength ratio for a given outside air temperature at the time of unloading the concrete.
[0089] In concrete strength tests, concrete specimens are taken at the site and cured underwater the next day or the day after in a water tank kept at 20°C (i.e. standard curing). In other words, the concrete specimens are in an environment of approximately 20°C, but this figure shows that the 28-day strength is affected by the air temperature at the beginning of curing. In particular, as shown in Figure 8, concrete using B cement is more affected by the outside air temperature than other types of concrete.
[0090] Another specific example of the above-mentioned X data and Y data and the relational expression will be described below with reference to FIGS.
[0091] Fig. 10 is a graph showing the strength development properties of concrete using cement A. Fig. 11 is a graph showing the strength development properties of concrete using cement B.
[0092] In the specific example shown in Fig. 10 and Fig. 11, the X data (explanatory variable) is concrete age data, and the Y data (objective variable) is concrete strength test data. In Fig. 7 to Fig. 9, the Y data values corresponding to the X data are plotted with circles, and the regression equation obtained as the update relational equation is shown by a solid line graph.
[0093] In Figures 10 and 11, strength development can be confirmed using test results (graphs shown by dashed lines) from a third-party testing organization. Figures 10 and 11 show concrete strength development at a concrete pouring site for a concrete project that has already been carried out. Figure 10 shows the strength development of concrete using cement A, and Figure 11 shows the strength development of concrete using cement B.
[0094] The X-axis in Figs. 10A and 11A indicates the age of the material, and the X-axis in Figs. 10B, 10C, 11B, and 11C indicates the effective age. Here, the effective age is the age taking into consideration the outside air temperature at the time of unloading. Also, as shown in Figs. 7 to 9, the higher the concrete temperature at the time of unloading, the smaller the strength development. Therefore, it is assumed that the potential strength of concrete changes depending on the concrete temperature at the time of unloading, and in Figs. 10C and 11C, a coefficient due to the concrete temperature is taken into consideration. As shown in Figs. 10 and 11, by taking into consideration the outside air temperature and concrete temperature, the contribution rate (=R 2 ) was confirmed to be large.
[0095] Therefore, in the example shown in Figures 10A and 11A, the first update relational equation is created with X data being concrete age data and Y data being concrete strength test data. Meanwhile, in the example shown in Figures 7 to 9 described above, the second update relational equation is created with X data being outside air temperature data in concrete unloading test data and Y data being data on the ratio of developed strength to nominal strength of concrete in concrete strength test data. Then, in Figures 10C and 11C, the first update relational equation is corrected using the second update relational equation to create an update relational equation.
[0096] ===Other=== The above-described embodiment is for the purpose of facilitating understanding of the present invention, and is not intended to limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and it goes without saying that the present invention includes equivalents thereof. [Explanation of symbols]
[0097] 1 Terminal for plant personnel 2. Terminal for construction staff 10 Concrete construction management server 11 Acquisition Department 12 Arithmetic section 13 Relational equation creation section 14 Relational expression update section 15 Recording section 16 Display section 30 Construction worker terminal 100 Concrete construction management system
Claims
1. Creating a relational equation in which X data relating to one or more items X of the completed concrete work is used as an explanatory variable and Y data relating to an item Y corresponding to the X data is used as a response variable; Creating an updated relational equation in which the relational equation is updated, using X data to which additional X data related to the one or more items X of the newly completed concrete work has been added as a new explanatory variable, and Y data to which additional Y data related to the item Y corresponding to the additional X data has been added as a new objective variable; Using the update relational expression, predicting Y data for the item Y corresponding to X data for the one or more items X of the concrete work to be performed; A method for managing concrete construction.
2. The X data is concrete plant data before concrete unloading. The method for managing concrete work according to claim 1.
3. The Y data is concrete unloading test data or concrete strength test data at the time of unloading concrete. The method for managing concrete work according to claim 2.
4. The X data is concrete unloading test data at the time of unloading concrete, concrete age data, or / and concrete strength test data, The method for managing concrete work according to claim 1 or 2.
5. The Y data is concrete strength test data. The method for managing concrete work according to claim 4.
6. The X data is data on outside air temperature in the concrete unloading test data. The method for managing concrete work according to claim 5.
7. The Y data is data of the ratio of the developed strength to the nominal strength of the concrete in the concrete strength test data. The method for managing concrete work according to claim 6.
8. The X data is the concrete age data. The method for managing concrete work according to claim 5.
9. A first update relational equation is created using the X data as concrete age data and the Y data as concrete strength test data; A second update relational equation is created by using the X data as data on outside air temperature in concrete unloading test data and the Y data as data on the ratio of developed strength to nominal strength of concrete in concrete strength test data; correcting the first update relational equation using the second update relational equation; The method for managing concrete work according to claim 1.
10. re-updating the update relational equation by using extracted X data related to the one or more items X extracted under a first condition as explanatory variables and extracted Y data related to an item Y corresponding to the extracted X data as a response variable; Using the update relational expression, predicting extracted Y data for the item Y corresponding to extracted X data for the one or more items X of the concrete work to be performed; The method for managing concrete work according to claim 1, further comprising the steps of:
11. re-updating the update relational equation by using additionally extracted X data for the one or more items X extracted under a second condition different from the first condition as a new explanatory variable, and additionally extracted Y data for an item Y corresponding to the additionally extracted X data as a new objective variable; Using the update relational expression, predicting additional extracted Y data for the item Y corresponding to additional extracted X data for the one or more items X of the concrete work to be performed; The method for managing concrete work according to claim 10, further comprising the steps of:
12. An acquisition unit that acquires X data related to one or more items X of a concrete work that has been carried out, and acquires additional X data related to the one or more items X of a new concrete work that has been carried out; a calculation unit that creates a relational equation with the X data as an explanatory variable and Y data related to the item Y corresponding to the X data as an objective variable, and updates the relational equation with the X data to which the additional X data has been added as a new explanatory variable and the Y data to which the additional Y data related to the item Y corresponding to the additional X data has been added as a new objective variable; having The calculation unit predicts Y data for the item Y corresponding to X data for the one or more items X of the concrete work to be performed by using the update relational equation. Concrete construction management system.