Passenger-flow information generation device, passenger-flow information generation method, and passenger-flow information generation program
The passenger flow information generation device enhances the accuracy of estimating connecting stations in no-latch transfers by analyzing entry/exit data, addressing the limitations of existing systems that rely on ticket gate data.
Patent Information
- Application Number
- JP2023059718
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-16
AI Technical Summary
Existing passenger flow information generation systems struggle to accurately estimate connecting stations used in no-latch transfers and mutual direct operations between different railway businesses, as they rely on ticket gate data which is not available for all transfer types.
A passenger flow information generation device and method that utilizes entry/exit data from ticket gates to identify passengers and estimate connecting stations by analyzing entry/exit patterns, considering factors like fare, time, and number of transfers, without relying on ticket gate data from other railway companies.
Improves the accuracy of predicting passenger flow between railway lines by estimating connecting stations used in no-latch transfers and mutual direct operations, allowing for better understanding of passenger trends and optimizing train schedules.
Smart Images

Figure 2024146979000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a passenger flow information generation device, a passenger flow information generation method, and a passenger flow information generation program that generate information regarding the flow of passengers from a first railway line to a second railway line that has mutual access via a specified railway station as a connecting station. [Background technology]
[0002] JP 2013-210753 A (Patent Document 1) describes a passenger flow information generation system that generates a movement log including transfers based on ID information from information such as ticket gate entry and exit information stored as electronic ticket history, creates comprehensive data that tabulates the usage status of each route based on the movement log, and uses the previously created tabulated data to estimate the extent to which each of multiple routes is used. This passenger flow information generation system can grasp passenger flows, including transfers between different railway businesses. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-210753 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the above-mentioned passenger flow information generation system is based on the assumption that transfers between different railway operators are made through ticket gates. In the case of so-called no-latch transfers or mutual through-running, where passengers transfer to lines of different railway operators without going through ticket gates, it is not possible to identify connecting stations. Therefore, there is still room for improvement in terms of the accuracy of understanding passenger flows. The present invention has been made in consideration of the above, and one of its objectives is to estimate connecting stations used in no-latch transfers and through-running.
[0005] The passenger flow information generating device, the passenger flow information generating method, and the passenger flow information generating program of the present invention employ the following means to achieve the above-mentioned object. [Means for solving the problem]
[0006] A passenger flow information generating device according to a first aspect of the present invention is a passenger flow information generating device that generates information on the flow of passengers from a first railway line to a second railway line that have mutual access with a specific railway station as a connecting station, and includes a ticket gate passage data acquiring unit, an entry / exit data generating unit, a data identifying unit, and a connecting station estimating unit. The ticket gate passage data acquiring unit records, when a passenger passes through a ticket gate installed at a railway station included in the first railway line, the ticket gate passage data together with passenger identification information that can identify the passenger. The entry / exit data generating unit extracts entry data and exit data having the same passenger identification information from the ticket gate passage data acquired by the ticket gate passage data acquiring unit. The entry data includes entry identification information that can identify entry, an entry station, and an entry time. The exit data includes exit identification information that can identify exit, an entry station, an entry time, an exit station, and an exit time. The entry / exit data generating unit then sorts the extracted entry data and exit data by entry time to generate entry / exit data related to passenger identification information. The data identifying unit determines whether or not there is first entry data that is presumed to indicate entry at a railway station included in the first railway line and exit at a railway station included in the second railway line, based on the entry / exit data generated by the entry / exit data generating unit, and, if the first entry data is present, identifies the first entry data and identifies first exit data that is presumed to be paired with the first entry data, which indicates entry at a railway station included in the second railway line and exit at a railway station included in the first railway line. The connecting station estimating unit estimates, based on the first exit data, the first connecting station used when entry was made at a railway station included in the first railway line and exited at a railway station included in the second railway line. Here, the "first railway" in the present invention refers to a railway company on the company's side that generates passenger flow information, and the second railway refers to a railway company on the other company's side that has mutual access with the first railway via a connecting station. The second railway may refer to one railway company, or may refer to a plurality of railway companies that share a common line via a plurality of connecting stations.In addition, in the present invention, a "connecting station" typically refers to a railway station included in a first railway line where passengers get off to transfer from the first railway line to the second railway line, but in cases where the first railway and the second railway have through-running services, it refers to a railway station included in the first railway line that is located on the border with the second railway line.
[0007] According to the first invention, based on the entry / exit data, it is determined whether or not there is first entry data that would have involved a no-latch transfer or a mutual through operation, and if the first entry data is present, the first exit data that would be paired with the first entry data is identified, and based on the first exit data, the first connecting station used when a no-latch transfer or a mutual through operation was performed is estimated. In other words, based on the basic idea that passengers travel along the same route on the way there and back, the first connecting station used when a no-latch transfer or a mutual through operation was performed is estimated. In this way, it is possible to estimate the connecting station used by a passenger when a no-latch transfer or a mutual through operation was performed from a line of the company's own station (first railway) to a line of the other company's station (second railway) using only the entry / exit data (entrance data and exit data) generated based on the ticket gate passage data obtained on the company's own station (first railway) side, without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations included in the line of the other company's station (second railway). This makes it possible to know the trends of passengers moving from the company's (first railway) line to the company's (second railway) line without going through a ticket gate. It also makes it possible to improve the accuracy of predictions of the number of passengers moving from the company's (first railway) line to the company's (second railway) line.
[0008] In the passenger flow information generation device of the second invention, the connecting station estimation unit estimates, based on the first exit data, the second connecting station used when entering at a railway station included in the second railway line and exiting at a railway station included in the first railway line, and estimates that the first connecting station is the second connecting station. According to the second invention, the first connecting station can be easily estimated.
[0009] The passenger flow information generation device of the third invention is a passenger flow information generation device of the first or second invention, wherein the data identification unit identifies, in the entry / exit data generated by the entry / exit data generation unit, entry data that does not have exit data corresponding to the entry data as first entry data, and identifies exit data in which a railway station included in a second railway line is recorded as the entry station of the exit data as the first exit data. According to the third invention, the first entrance data and the first exit data can be easily specified using the entry / exit data.
[0010] A passenger flow information generation device of a fourth invention is a passenger flow information generation device of any one of the first to third inventions, wherein the connecting station estimation unit estimates that the first connecting station is the second connecting station when the entry station of the first entry data and the exit station of the first exit data match. According to the fourth aspect of the present invention, it is possible to improve the accuracy of estimating the first connecting station used when performing no-latch transfer or mutual through operation.
[0011] A passenger flow information generation device of the fifth invention is a passenger flow information generation device of any one of the first to fourth inventions, wherein when the entry station in the first entry data and the exit station in the first exit data do not match, the connecting station estimation unit estimates a first connecting station based on the entry station in the first entry data and the entry station in the first exit data, and when the estimated first connecting station matches the second connecting station, the connecting station is estimated to be the second connecting station. According to the fifth aspect of the present invention, it is possible to improve the accuracy of estimating the first connecting station used when performing no-latch transfer or mutual through operation.
[0012] A passenger flow information generation device according to a sixth aspect of the present invention is a passenger flow information generation device according to any one of the first to fourth aspects of the present invention, wherein the connecting station estimation unit estimates a second connecting station by referring to a cheapest fare route table that associates a first railway station included in a first railway line, a second railway station included in a second railway line, and a connecting station that can be traveled for the cheapest fare among the routes between the first railway station and the second railway station.
[0013] According to the sixth aspect of the present invention, by using the entrance station and exit station of the first exit data and the cheapest fare route table, it is possible to easily estimate a connecting station (second connecting station) when traveling between the entrance station and the exit station via a route that can be traveled with the cheapest fare. Note that the estimation of the connecting station is based on the premise that a passenger should travel while considering which route will have the cheapest fare.
[0014] A passenger flow information generation device according to a seventh aspect of the present invention is a passenger flow information generation device according to the fifth aspect of the present invention, in which the connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a cheapest fare route table that associates a first railway station included in a first railway line, a second railway station included in a second railway line, and a connecting station that can be traveled for the cheapest fare among the routes between the first railway station and the second railway station.
[0015] According to the seventh invention, by using the entrance station and exit station of the first exit data and the cheapest fare route table, it is possible to easily estimate connecting stations (first connecting station and second connecting station) when traveling between the entrance station and the exit station by the route that can be traveled with the cheapest fare. Note that the estimation of the connecting stations is based on the premise that a passenger should travel while considering which route to take to get the cheapest fare.
[0016] A passenger flow information generation device according to an eighth aspect of the present invention is a passenger flow information generation device according to any one of the first to fourth aspects of the present invention, wherein the connecting station estimation unit estimates a second connecting station by referring to a shortest time route table that associates a first railway station included in a first railway line, a second railway station included in a second railway line, and a connecting station that can be reached in the shortest time on a route between the first railway station and the second railway station.
[0017] According to the eighth aspect of the present invention, by using the entrance station and exit station of the first exit data and the shortest time route table, it is possible to easily estimate a connecting station (second connecting station) when traveling between the entrance station and the exit station via a route that can be traveled in the shortest time. Note that the estimation of the connecting station is based on the premise that a passenger should travel while considering which route will allow the passenger to travel in the shortest time.
[0018] A passenger flow information generation device according to a 9th aspect of the present invention is a passenger flow information generation device according to the 5th aspect of the present invention, wherein the connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a shortest time route table that associates a first railway station included in a first railway line, a second railway station included in a second railway line, and a connecting station that can be reached in the shortest time among the routes between the first railway station and the second railway station.
[0019] According to the ninth aspect of the present invention, by using the entrance station and exit station of the first exit data and the shortest time route table, it is possible to easily estimate connecting stations (first connecting station and second connecting station) when traveling between the entrance station and the exit station via a route that can be traveled in the shortest time. Note that the estimation of the connecting stations is based on the premise that a passenger should travel while considering which route will allow the passenger to travel in the shortest time.
[0020] A passenger flow information generation device according to a tenth aspect of the present invention is a passenger flow information generation device according to any one of the first to fourth aspects of the present invention, wherein the connecting station estimation unit estimates the second connecting station by referring to a route with the fewest transfers table that associates a first railway station included in a first railway line, a second railway station included in a second railway line, and a connecting station that is accessible with the fewest transfers among the routes between the first railway station and the second railway station.
[0021] According to the tenth aspect of the present invention, by using the entrance station and exit station of the first exit data and the route table with the fewest transfers, it is possible to easily estimate a connecting station (second connecting station) when traveling between the entrance station and the exit station via a route with the fewest transfers. Note that the estimation of the connecting station is based on the premise that a passenger should travel while considering which route will allow him or her to travel with the fewest transfers.
[0022] A passenger flow information generation device according to an eleventh aspect of the present invention is a passenger flow information generation device according to the fifth aspect of the present invention, wherein the connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a route with the fewest transfers that associates a first railway station included in a first railway line, a second railway station included in a second railway line, and a connecting station with the fewest transfers among the routes between the first railway station and the second railway station.
[0023] According to the eleventh invention, by using the entrance station and exit station of the first exit data and the route table with the fewest transfers, it is possible to easily estimate connecting stations (first connecting station and second connecting station) when traveling between the entrance station and the exit station via a route with the fewest transfers. Note that the estimation of the connecting stations is based on the premise that a passenger should travel while considering which route will allow him / her to travel with the fewest transfers.
[0024] A passenger flow information generation device according to a twelfth aspect of the present invention is the passenger flow information generation device according to any one of the first to eleventh aspects of the present invention, further comprising a movement path estimation unit. The movement path estimation unit acquires the first junction station estimated by the junction station estimation unit and acquires train schedule information, and estimates a movement path indicating which train of the first railway the passenger used to move from the entrance station to the first junction station in the first entrance data, based on the acquired first junction station and train schedule information. Here, the "train schedule information" in the present invention typically corresponds to a train operation plan. According to the twelfth invention, when a passenger makes a no-latch transfer or a through-run from a line of the company's own station (first railway) to a line of another company's station (second railway), it is possible to estimate which route the passenger took to get to the line of the other company's station (second railway).
[0025] A passenger flow information generation device according to a 13th aspect of the present invention is a passenger flow information generation device according to the 12th aspect of the present invention, wherein the movement route estimation unit extracts, as a movement route, at least one movement route of a train of a first railway that has a departure time later than the entry time of the first entry data and has a first connecting station as a stop. According to the thirteenth invention, when a passenger makes a no-latch transfer or a mutual through service from a line of the company's own station (first railway) to a line of another company's station (second railway), it is possible to easily estimate which route the passenger took to get to the line of the other company's station (second railway).
[0026] A passenger flow information generation device according to a fourteenth aspect of the present invention is a passenger flow information generation device according to the thirteenth aspect of the present invention, wherein the travel route estimation unit estimates a plurality of travel routes and assigns a utilization rate to each of the plurality of travel routes so that the utilization rate is higher the fewer the number of transfers on each of the estimated plurality of travel routes, and / or the utilization rate is higher the smaller the difference between the entry time and the departure time on each of the estimated plurality of travel routes, and / or the utilization rate is higher the smaller the difference between the arrival time at a first connecting station on each of the estimated plurality of travel routes and the arrival time at the first connecting station of the travel route that arrives at the second connecting station earliest among the estimated plurality of travel routes.
[0027] According to the fourteenth invention, it is possible to estimate what kind of travel route is used and at what ratio when no-latch transfer or through operation is performed. This can be useful for revising train timetables. In addition, it is possible to know the congestion rate for each travel route. The allocation of the ratio of use to each of a plurality of travel routes is based on the premise that passengers travel with the thoughts of "I would be happy if I could arrive early" and "I would be happy if I had to transfer less."
[0028] A passenger flow information generation device according to a fifteenth aspect of the present invention is a passenger flow information generation device according to the twelfth or thirteenth aspect of the present invention, wherein the movement route estimation unit estimates a plurality of movement routes and allocates an equal usage rate to each of the estimated plurality of movement routes. According to the fifteenth aspect of the present invention, it is possible to easily estimate what kind of travel route is used and at what rate when no-latch transfers or mutual direct operation are performed. This can be useful for revising train timetables. In addition, it is possible to estimate the congestion rate for each travel route.
[0029] A passenger flow information generating method according to a sixteenth aspect of the present invention is a passenger flow information generating method for generating information on the flow of passengers from a first railway line to a second railway line that has mutual access with a specific railway station as a connecting station, and includes a ticket gate passage data acquiring step, an entrance / exit data generating step, a data identifying step, and a connecting station estimating step. In the ticket gate passage data acquiring step, ticket gate passage data recorded together with passenger identification information that identifies the passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line is acquired. In the entrance / exit data generating step, entrance data and exit data having the same passenger identification information are extracted from the acquired ticket gate passage data. The entrance data includes entrance identification information that can identify entrance, an entrance station, and an entrance time. The exit data includes exit identification information that can identify exit, an entrance station, an entrance time, an exit station, and an exit time. In the entrance / exit data generating step, the extracted entrance data and exit data are sorted by the entrance time to generate entrance / exit data related to the passenger identification information. In the data identification step, the presence or absence of first entry data that is presumed to indicate entry at a railway station included in the first railway line and exit at a railway station included in the second railway line is determined based on the generated entry / exit data, and if the first entry data is present, the first entry data is identified and the first exit data that is presumed to be paired with the first entry data and that indicates entry at a railway station included in the second railway line and exit at a railway station included in the first railway line is identified. In the connecting station estimation step, the first connecting station used when entry at a railway station included in the first railway line and exit at a railway station included in the second railway line is estimated based on the first exit data. Here, the "first railway" in the present invention refers to a railway company on the side of the company's own station that generates passenger flow information, and the second railway refers to a railway company on the side of another company's station that has mutual access with the first railway through a connecting station. The second railway may refer to one railway company or multiple railway companies that have mutual access through multiple connecting stations.In addition, in the present invention, a "connecting station" typically refers to a railway station included in a first railway line where passengers get off to transfer from the first railway line to the second railway line, but in cases where the first railway and the second railway have through-running services, it refers to a railway station included in the first railway line that is located on the border with the second railway line.
[0030] According to the sixteenth aspect of the present invention, the presence or absence of first entry data that would have involved a no-latch transfer or a mutual direct operation is determined based on the entry / exit data, and if the first entry data is present, the first entry data is identified, and the first exit data that would be paired with the first entry data is identified, and based on the first exit data, the first connecting station used when the no-latch transfer or the mutual direct operation was performed is estimated. In other words, based on the basic idea that passengers travel along the same route on the way there and back, the no-latch transfer or the mutual direct operation is estimated. In order to estimate the first connecting station used when a passenger passes through an automatic ticket gate installed at a railway station included in the line of another company (second railway), it is possible to estimate the connecting station used by the passenger when making a no-latch transfer or a mutual direct operation from the line of the company (first railway) to the line of the other company (second railway) using only the entry / exit data (entrance data and exit data) generated based on the ticket gate passage data acquired by the company (first railway) without obtaining the record of the ticket gate passage data of the passenger who passed through the automatic ticket gate installed at a railway station included in the line of the other company (second railway) from an external source such as an issuer of an IC card held by each passenger. This makes it possible to know the trend of passengers who move from the line of the company (first railway) to the line of the other company (second railway) without passing through a ticket gate. In addition, it is possible to improve the prediction accuracy of the number of passengers who move from the line of the company (first railway) to the line of the other company (second railway).
[0031] A passenger flow information generating method according to a 17th aspect of the present invention is a passenger flow information generating method according to the 16th aspect of the present invention, in which the connecting station estimation step estimates, based on the first exit data, a second connecting station used when entering at a railway station included in the second railway line and exiting at a railway station included in the first railway line, and estimates that the first connecting station is the second connecting station. According to the seventeenth aspect of the present invention, the first connecting station can be easily estimated.
[0032] A passenger flow information generating method according to the 18th invention is a passenger flow information generating method according to the 16th or 17th invention, further comprising a travel route estimation step of acquiring an estimated first connecting station and train timetable information, and estimating a travel route indicating which train of the first railway a passenger used to travel from the entrance station to the first connecting station in the first entrance data based on the acquired first connecting station and train timetable information. According to the 18th invention, when a passenger makes a no-latch transfer or a through run from a line of the company's own station (first railway) to a line of another company's station (second railway), it is possible to estimate which route the passenger took to get to the line of the other company's station (second railway).
[0033] A passenger flow information generation program according to a nineteenth aspect of the present invention is a passenger flow information generation program for generating information on the flow of passengers from a first railway line to a second railway line that share a common railway line at a specific railway station, and causes a computer to execute each step of the passenger flow information generation method according to any one of the sixteenth to eighteenth aspects of the present invention. The program may be recorded on a computer-readable recording medium, such as a hard disk, a ROM, an SSD, a flash memory (such as a USB memory or an SD card), a floppy disk, a CD, or a DVD, or may be distributed from one computer to another computer via a transmission medium, such as a communication network such as the Internet or a LAN, or may be transmitted in any other manner.
[0034] According to the 19th invention, the same effect as that of the passenger flow information generating method according to any one of the 16th to 18th inventions described above can be achieved, for example, the effect of estimating the connecting station used by the passenger when transferring from the line of the company's station (first railway) to the line of the other company's station (second railway) in a no-latch transfer or mutual direct operation can be achieved only by using the entry / exit data (entrance data and exit data) generated based on the ticket gate passage data acquired by the company's station (first railway) side, without obtaining the record of the ticket gate passage data of the passenger who passed through the automatic ticket gate installed at the railway station included in the line of the other company's station (second railway) from an external source such as an issuer of an IC card held by each passenger. This makes it possible to know the trend of passengers who flow from the line of the company's station (first railway) to the line of the other company's station (second railway) without passing through the ticket gate. In addition, the prediction accuracy of the number of passengers who flow from the line of the company's station (first railway) to the line of the other company's station (second railway) can be improved. Effect of the Invention
[0035] According to the passenger flow information generation device, passenger flow information generation method, and passenger flow information generation program of the present invention, it is possible to estimate connecting stations used for no-latch transfers and through-running. [Brief description of the drawings]
[0036] [Figure 1] 1 is a block diagram showing the configuration of a passenger flow information generation device 1 and its peripherals according to an embodiment of the present invention. [Diagram 2] FIG. 1 is an explanatory diagram showing an example of a route map including connecting stations of multiple railway companies through which passengers travel. [Diagram 3] This is an explanatory diagram showing an example of entry / exit data 120 when the entry station of the first entry data 122 and the exit station of the first exit data 124 match, and the first exit data 124 appears after the first entry data 122 appears. [Figure 4]This is an explanatory diagram showing an example of entry / exit data 120 when the entry station of the first entry data 122 matches the exit station of the first exit data 124, and the first entry data 122 appears after the first exit data 124 appears. [Diagram 5] FIG. 2 is an explanatory diagram showing an example of a lowest fare route table 32. [Figure 6] 13 is a flowchart showing an example of a connecting station estimation processing routine. [Figure 7] 13 is an explanatory diagram showing an example of the entry / exit data 220 in the case where the entry station in the first entry data 222 does not match the exit station in the first exit data 224. FIG. [Figure 8] 13 is a flowchart showing an example of a travel route estimation process routine. [Figure 9] FIG. 10 is an explanatory diagram illustrating a schematic view of a state in which a plurality of travel routes are estimated; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0037] Next, the best mode for carrying out the present invention will be described with reference to examples. In the present embodiment, more detailed explanations than necessary may be omitted. For example, detailed explanations of already well-known matters or duplicate explanations of substantially the same configurations may be omitted. This is to avoid the following explanation becoming unnecessarily redundant and to facilitate understanding by those skilled in the art. In addition, the applicant provides the accompanying drawings and the following explanation so that those skilled in the art can fully understand the present invention, and does not intend to limit the subject matter described in the claims by them. EXAMPLES
[0038] A passenger flow information generation device 1 according to an embodiment of the present invention is connected to a display device 2 and a data server 4 as shown in Fig. 1, and is realized, for example, in a server managed by a railway operator or an information terminal used by an employee of the railway operator involved in timetable revision work. Here, the server or information terminal is a computer equipped with a CPU, memory, and an input / output interface. A passenger flow information generation program according to the present invention is installed in such a computer and stored in its memory. The CPU reads the program in the memory and processes information according to the steps instructed by the program, so that the computer executes the passenger flow information generation method according to the present invention and functions as a passenger flow information generation device.
[0039] The passenger flow information generating device 1 is installed on the side of the company's own station (hereinafter, sometimes referred to as "first railway" or "station A") as shown in Fig. 2. The passenger flow information generating device 1 is configured as a device that generates information on the flow of passengers from the company's own station's line to the line of another company's station (hereinafter, sometimes referred to as "second railway" or "station B", "station C", or "station D") that is mutually connected with the company's own station, with predetermined railway stations (A1 station, A7 station, A13 station) included in the company's own station's line as connecting stations, and estimates connecting stations (A1 station, A7 station, A13 station) used by passengers flowing from the company's own station's line to the other company's station's line without externally acquiring information such as passengers' IC cards used when boarding. Here, as shown in FIG. 2, station A is a railway company having a plurality of lines including a plurality of railway stations (stations A1 to A10, stations A11 to A13), and the line of station B is connected to station A7, the line of station C is connected to station A1, and the line of station D is connected to station A13. That is, station A uses stations A1, A7, and A13 as connecting stations with the lines of station B, station C, and station D. As shown in FIG. 2, the line of station B is also connected to station C at station B9. In this embodiment, stations A1, A7, and A13 are so-called no-latch connecting stations where a passenger can transfer from the line of station A to the lines of station B, station C, and station D without passing through a ticket gate, or are railway stations located at the boundary between station A and the lines of station B, station C, and station D which are mutually operated through station A. The automatic ticket gate 5 is an example of an embodiment corresponding to the "ticket gate" in the present invention.
[0040] In addition, in the passenger flow information generation device 1, a ticket gate passage data acquisition unit 10, an entrance / exit data generation unit 12, a data identification unit 14, a connecting station estimation unit 16, a movement path estimation unit 18, an output unit 20, and a memory unit 30 are constructed as functional blocks by cooperation of one or both of hardware resources (CPU, ROM, RAM, various interfaces, etc.) and software (application programs (passenger flow information generation programs) such as an installed operating system), as shown in Fig. 1. In other words, it can be said that each of these units (ticket gate passage data acquisition unit 10, entrance / exit data generation unit 12, data identification unit 14, connecting station estimation unit 16, movement path estimation unit 18, output unit 20, and memory unit 30) is a function realized by each component (CPU, ROM, RAM, various interfaces, etc.) operating alone or in cooperation with each other in response to an instruction from a CPU that executes an application program expanded from ROM onto RAM. In addition, each functional unit included in the passenger flow information generation device 1 may be configured such that multiple functional units are integrated into one functional unit, or one functional unit may be divided into multiple functional units for each function. As shown in FIG. 1, the ticket gate passage data acquisition unit 10 is connected to the data server 4 and the storage unit 30 in which the ticket gate passage data is stored, and acquires the ticket gate passage data acquired at the automatic ticket gates 5 installed at stations A1 to A13 at an appropriate timing. The ticket gate passage data includes the entrance data of each passenger and the corresponding exit data collected from the automatic ticket gates 5 during the operation of trains at station A. The ticket gate passage data is stored on the data server 4 in a state in which the entrance data and the exit data are linked to each other via passenger ID information. In the entrance data and the exit data, a passenger ID, which is information that can identify a passenger and is assigned to each ticket, is recorded at the stage when the entrance data and the exit data are acquired by the automatic ticket gates 5. The entrance data is data that is linked to a passenger ID, such as a type for identifying the entrance, the entrance station of the company's own station (A1 to A13 stations), and the time of entry to the entrance station of the company's own station (A1 to A13 stations). The exit data is data that is linked to a passenger ID, such as a type for identifying the exit, the entrance station of the company's own station (A1 to A13 stations), the time of entry at the entrance station of the company's own station (A1 to A13 stations), the time of entry to the entrance station of other companies' stations (B1 to B1 stations, C1 to C12 stations, D1 to D2 stations), and the time of entry to the entrance station of other companies' stations (B1 to B1 stations, C1 to C12 stations, D1 to D2 stations). The entrance data and the exit data are acquired by the automatic ticket gate 5 at different locations and different times. The ticket gate passage data acquired by the ticket gate passage data acquisition unit 10 may be set to be stored in the storage unit 30. The passenger ID corresponds to the "passenger identification information" in this invention, the type for identifying entry corresponds to the "entry identification information" in this invention, and the type for identifying exit corresponds to the "exit identification information capable of identifying exit" in this invention, which is an example of an implementation configuration.
[0041] As shown in FIG. 1, the entrance / exit data generating unit 12 is connected to the ticket gate passage data acquiring unit 10 and the storage unit 30, and extracts the entrance and exit data of the same passenger, i.e., the entrance and exit data with the same passenger ID, from the entrance and exit data of passengers acquired by the ticket gate passage data acquiring unit 10 in a predetermined time unit, and generates the entrance / exit data 120 by sorting the extracted entrance and exit data by the entrance time (see FIG. 3 and FIG. 4). Since the entrance / exit data 120 is sorted by the entrance time as shown in FIG. 3 and FIG. 4, the entrance data and the exit data corresponding to the entrance data can be made to appear consecutively. In other words, by using the entrance / exit data 120, it is possible to specify one trip data by using the railway from the entrance to the exit of the same passenger. Note that when the entrance data and the exit data corresponding to the entrance data do not appear consecutively, that is, the first entrance data 122, which is the entrance data without the corresponding exit data, may appear. In this case, the first exit data 124, which is the exit data having the entrance station of a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the line of the other company station and the exit station of a railway station (A1-A13 stations) included in the line of the company station, also appears, so that the first entrance data 122 and the first exit data 124 can be estimated as a set of data, that is, each trip data by the same passenger's round trip by railway. FIG. 3 shows a state in which the first entrance data 122 appears first and the first exit data 124 appears later, and FIG. 4 shows a state in which the first entrance data 124 appears first and the first entrance data 122 appears later, which is the opposite of FIG. 3. The entrance / exit data 120 generated in the entrance / exit data generating unit 12 may be set to be stored in the storage unit 30.Here, in this embodiment, the first entrance data 122, which is entrance data that does not have corresponding exit data, and the first exit data 124, which is entrance data that has as its entrance stations railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the line of the other station and as its exit stations railway stations (A1 to A13 stations) included in the line of the company's own station, are configured not to appear consecutively. However, for example, when the entrance / exit data generation unit 12 is configured to extract only one day's worth of entrance data and exit data from the ticket gate passage data acquisition unit 10, it goes without saying that there may be cases where the first entrance data 122, which is entrance data that does not have corresponding exit data, and the first exit data 124, which is entrance data that has as its entrance stations railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the line of the other station and as its exit stations railway stations (A1 to A13 stations) included in the line of the company's own station, appear consecutively.
[0042] As shown in FIG. 1, the data identification unit 14 is connected to the entrance / exit data generation unit 12 and the storage unit 30, and uses the entrance / exit data 120 generated by the entrance / exit data generation unit 12 to determine the presence or absence of first entrance data 122 that is presumed to have entered at a railway station (A1 to A13 stations) included in the line of the company's station and exited at a railway station (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the line of the other company's station, and, if the first entrance data 122 is present, identifies the first exit data 124 that is presumed to be paired with the first entrance data 122 (see FIG. 3 and FIG. 4). Here, the determination of the presence or absence of the first entrance data 122 can be specifically performed by determining the presence or absence of entrance data that does not have corresponding exit data (see FIG. 3 and FIG. 4). In FIG. 3 and FIG. 4, the first entrance data 122, which is entrance data that does not have paired exit data, exists, so it is determined that the first entrance data 122 exists. In addition, the first appearance data 124 can be specified by specifying the appearance data that enters at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the line of the other station and exits at a railway station (A1-A13 stations) included in the line of the company station. In the figures and 43, the appearance data that enters at B1 station included in the line of the B station and exits at A3 station included in the line of the A station is specified as the first appearance data 124.
[0043] As shown in FIG. 1, the connecting station estimation unit 16 is connected to the data identification unit 14, the storage unit 30, and the output unit 20, and estimates the connecting station used by the passenger when the passenger enters at a railway station (A1-A13 stations) included in the line of the company's station and exits at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the line of the other company's station based on the first entrance data 122 and the first exit data 124 identified in the data identification unit 14, and outputs the estimated connecting station to the fare calculation unit 18 and the output unit 20. In this embodiment, the estimation of the connecting station is performed by referring to the lowest fare route table 32 stored in the storage unit 30. In this embodiment, the estimation of the connecting station is based on the basic idea that, for example, when a person travels from A3 station to B1 station during a certain business day, the passenger will "go and then return home," so that the passenger will also travel from B1 station to A3 station. Details regarding the estimation of the connecting station will be described later.
[0044] As shown in FIG. 1, the travel route estimation unit 18 is connected to the connecting station estimation unit 16, the memory unit 30, and the output unit 20, and acquires estimated connecting stations from the connecting station estimation unit 16 and acquires train schedule information 34 described later from the memory unit 30. Based on the acquired connecting stations and train schedule information 34, the travel route estimation unit 18 estimates the travel route of passengers who enter at a railway station (A1-A13 stations) included in the company's line and exit at a railway station (B1-B9 stations, C1-C12 stations, D1-D2 stations) included in the other company's line, specifically, the travel route of passengers from entering at a railway station (A1-A13 stations) included in the company's line to a connecting station, and outputs the estimated travel route to the output unit 20. Here, in this embodiment, the estimation of the travel route is based on the basic idea that, for example, when a person travels from station A3 to station B1 during a certain business day, the passenger will select a train (travel route) with fewer transfers, or a train (travel route) that arrives at station B1 early, and these two ideas are aggregated into a one-dimensional value as a utility degree, and the estimation is performed based on this value (hereinafter referred to as a "disutility value"). Note that, when there are multiple estimated travel routes, the utilization rate of each of the multiple travel routes is calculated and output. Details regarding the estimation of the travel route will be described later.
[0045] 1, the output unit 20 outputs the connecting stations and travel routes estimated by the connecting station estimation unit 16 and the travel route estimation unit 18 to the display device 2. This allows the manager of the company's station (station A) to easily recognize the connecting stations used by passengers who entered at train stations (stations A1 to A13) on a line included in the company's station (station A) and exited at train stations (stations B1 to B9, C1 to C12, and D1 to D2) on a line of another company's station, and the travel routes to those connecting stations.
[0046] The storage unit 30 stores a cheapest fare route table 32 and train schedule information 34, as shown in Fig. 1. The cheapest fare route table 32 is a table showing the relationship between railway stations (A1 to A13 stations) on lines included in the company's bureau, railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) on lines of other companies' bureaus, and connecting stations, as shown in Fig. 5. Here, the connecting stations listed in the cheapest fare route table 32 are connecting stations used (passed through) when traveling between railway stations (A1 to A13 stations) on lines included in the company's bureau and railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) on lines of other companies' bureaus, using a route that allows travel over the relevant section at the cheapest fare. For example, in the route map shown in FIG. 2, when a passenger who entered at B1 station of station B heads for A1 station of station A, there are two possible routes: one that heads for station A1 via A7 station as a connecting station, and another that travels through station C via C12 station of station C and then heads for station A1 from C1 station. It is presumed that the passenger will travel by considering which route will be cheaper, and it can be presumed that the connecting station is A7. The train schedule information 34 is information showing the train operation plan. In general rail passenger transportation, the daytime is the "operation time" during which passenger transportation is performed, and the time period from late night to early morning is the "track maintenance time" during which passenger transportation is suspended and track maintenance work is performed, and the operation time and track maintenance time are repeated in a daily cycle. The train schedule information 34 is composed of operation data (not shown) of each train that operates during one operation time. In addition, the train schedule information 34 is created for each direction, and the train schedule information 34 for each direction is further created for each day. The train schedule information 34 includes multiple types of data according to direction and day. Examples of types according to direction include an upbound schedule and a downbound schedule. Examples of types according to day include a weekday schedule that applies to operating hours on weekdays and a holiday schedule that applies to operating hours on holidays. Examples of further examples include a seasonal schedule that applies only on weekends during a limited period, such as autumn, and operates special trains to transport tourists, and an event schedule that applies only on days when an event that is expected to attract a large number of people, such as a soccer game or horse race, is held, and operates special trains to transport event guests.
[0047] The display device 2 is, for example, a PC (Personal Computer) installed as an administrator terminal, and displays information on passenger flows managed by the passenger flow information generating device 1. The data server 4 stores ticket gate passage data. As shown in FIG. 1, the ticket gate passage data is generated based on railway station entry data and exit data collected from automatic ticket gates 5 installed at each railway station (A1 to A13 stations) included in the company's first railway line. One or more automatic ticket gates 5 are installed at a railway station, and when a passenger passes through, they write information to an IC card or the like held by the passenger, or read the information to process a fare claim.
[0048] Next, the operation of the passenger flow information generating device 1 according to this embodiment configured as described above, particularly the operation when estimating connecting stations and moving routes, will be described. FIG. 6 is a flowchart showing an example of a connecting station processing routine executed by the passenger flow information generating device 1, and FIG. 7 is a flowchart showing an example of a moving route estimation processing routine executed by the passenger flow information generating device 1. The connecting station processing routine is executed, for example, when a command to estimate a connecting station is input by an administrator of the company's own station (station A), and the moving route estimation processing routine is executed, for example, when a command to estimate a moving route is input by an administrator of the company's own station (station A). Below, first, the connecting station processing routine will be described, and then the moving route estimation processing routine will be described.
[0049] <Connection Station Estimation Processing> When the connecting station estimation process routine is executed, first, the ticket gate passage data acquisition unit 10 executes a process of acquiring ticket gate passage data from the data server 4 (step S100). Next, the entrance / exit data generation unit 12 executes a process of extracting entrance data and exit data having the same passenger ID from the ticket gate passage data acquired by the ticket gate passage data acquisition unit 10 (step S102), and executes a process of generating entrance / exit data 120 by sorting the extracted entrance data and exit data by entrance time (step S104). When the entry / exit data 120 is generated, the data identification unit 14 executes a process of determining whether or not there is first entry data 122 that is presumed to have entered at a railway station (A1 to A13 stations) included in the line of the company's station and exited at a railway station (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the line of the other company's station from among the entry / exit data 120 (step S106), and executes a process of identifying the first entry data 122 if the first entry data 122 is present (step S108). On the other hand, if the first entry data 122 is not present, the process is terminated without doing anything. In this embodiment, as shown in FIG. 3, since the first entry data 122, which is entry data that does not have a paired exit data, exists, it is determined that the first entry data 122 exists, and the first entry data 122 is identified.
[0050] After identifying the first entry data 122, the data identification unit 14 executes a process of identifying the first exit data 124 that is presumed to be paired with the first entry data 122 (step S110). In this embodiment, as shown in Fig. 3, among the exit data, the exit data in which the train enters at station B1 included in the line of station B and exits at station A3 included in the line of station A is identified as the first exit data 124.
[0051] Next, the connecting station estimation unit 16 executes a process of estimating the first connecting station used in the trip that entered at the entry station (B1 station in FIG. 3) and exited at the exit station (A3 station in FIG. 3) based on the entry station (B1 station in FIG. 3) of the first exit data 124 and the exit station (A3 station in FIG. 3) of the first exit data 124 (step S112). In this embodiment, the estimation of the first connecting station is performed by referring to the lowest fare route table 32 in FIG. 5. Specifically, in FIG. 3, the entry station of the first exit data 124 is B1 station and the exit station of the first exit data 124 is A3 station, so A7 station is estimated as the first connecting station.
[0052] When the first connecting station is estimated, the connecting station estimation unit 16 executes a process of determining whether the entrance station in the first entrance data 122 and the exit station in the first exit data 124 match (step S114), and if the entrance station in the first entrance data 122 and the exit station in the first exit data 124 match, the estimated first connecting station is output (step S116), and this process ends. That is, if the entrance station in the first entrance data 122 and the exit station in the first exit data 124 match, the estimated first connecting station is estimated to be the connecting station used by the passenger in the trip in the first entrance data 122 (a trip that entered at a railway station (A1 to A13 stations) included in the company's line and exited at a railway station (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) included in the other company's line). In Figure 3, the entrance station (A3 station) in the first entrance data 122 matches the exit station (A3 station) in the first exit data 124, so the first connecting station, A7 station, is output as the connecting station used by the passenger in the trip in the first entrance data 122.
[0053] On the other hand, when the entrance / exit data generated in step S104 is like the entrance / exit data 220 shown in Fig. 7, and the entrance station of the first entrance data 222 does not match the exit station of the first exit data 224, the connecting station estimation unit 16 executes a process of estimating the second connecting station that the passenger would have used in the movement in the first entrance data 222 based on the entrance station of the first entrance data 222 and the entrance station of the first exit data 224 (step S118). The estimation of the second connecting station is based on the basic idea that the passenger will move along the same route on the way there and back, and estimates the second connecting station by estimating that the entrance station of the first exit data 224 is the exit station of the first entrance data 222. Specifically, for example, as shown in FIG. 7, when the entrance station in the first entrance data 222 is A3 station and the entrance station in the first exit data 224 is B1 station, by referring to the lowest fare route table 32 in FIG. 5, A7 station, which is a connecting station corresponding to the entrance station A3 station and the exit station B1 station, is estimated as the second connecting station. Then, after estimating the second connecting station, the connecting station estimation unit 16 executes a process of determining whether or not the estimated second connecting station coincides with the first connecting station estimated in step S110 (step S120), and if they coincide, outputs the first connecting station (step S116) and ends this process. On the other hand, if the first connecting station and the second connecting station do not coincide in step S120, the process ends without doing anything.
[0054] <Route Estimation Processing> Next, the movement route estimation process will be described using the movement route estimation process routine shown in FIG. 8. When the movement route determination process routine is executed, first, the connecting station estimation process shown in FIG. 7 described above is executed (step S200), and a process is executed to determine whether or not a connecting station (first connecting station) has been estimated by the connecting station estimation process (step S202). If a connecting station (first connecting station) has not been estimated, the process is terminated without doing anything. On the other hand, if a connecting station (first connecting station) has been estimated, the movement route estimation unit 18 executes a process to acquire the estimated first connecting station and train diagram information 34 from the storage unit 30 (step S204), and executes a process to estimate the movement route (step S206). Here, in this embodiment, the movement route estimation is performed by extracting a predetermined number of movement routes of trains that depart later than the entrance time at the entrance station in the first entrance data 122 and have the first connecting station as a stop station, using the train diagram information 34 (see FIG. 9).
[0055] Next, the movement path estimation unit 18 executes a process of determining whether or not the number of estimated movement paths is one (step S208), and if the number of estimated movement paths is one, outputs the tilt path (step S210) and ends this process. On the other hand, if there are multiple estimated movement paths, the movement path estimation unit 18 calculates the utilization ratio Pu of each of the multiple movement paths. i (step S212), and the calculated utilization ratio is output (step S214), and the process ends. iIn this embodiment, the calculation is performed using the following formula.
[0056]
number
[0057] Here, disutil i is a disutility value, and the greater the disutility value, the lower the proportion of passengers using a travel route. α, β, and γ are coefficients that can be set arbitrarily. For example, if it is considered that it is not worthwhile to arrive 30 minutes earlier than the scheduled time of transfer, α=30 is set, if it is considered that a train departing earlier is preferred for the same arrival time and the same number of transfers, the value of β is set to a large value, and if it is desired to allocate a larger usage quota to a route that arrives earlier, the value of γ is set to a large value. Note that i is a value for identifying a travel route, and N is the total number of estimated travel routes. The calculation of the disutility value is based on the basic idea that, for example, when a person travels from station A to station B during a certain business day, the passenger should select a train (travel route) with fewer transfers and a train (travel route) that arrives at station B earlier.
[0058] For example, as shown in Figure 9, when five movement routes (i = 1 to 5, N = 5) are estimated, the disutility value (disutil i ) and utilization rate Pu i The results are as shown in the table below. Note that α=30, β=1, and γ=1.
[0059] [Table 1]
[0060] Therefore, in the example of Figure 9, the utilization rate Pu1 = 0.582 for travel route i = 1, the utilization rate Pu2 = 0.134 for travel route i = 2, the utilization rate Pu3 = 0.159 for travel route i = 3, the utilization rate Pu4 = 0.065 for travel route i = 4, and the utilization rate Pu5 = 0.060 for travel route i = 5 are output. According to the passenger flow information generating device 1 according to the present embodiment described above, the presence or absence of the first entrance data 122 that would have involved a no-latch transfer or a mutual direct operation is determined based on the entrance / exit data, and if the first entrance data 122 is present, the first entrance data 122 is identified and the first exit data 124 that would be paired with the first entrance data 122 is identified. Then, the first connecting station is estimated based on the entrance station and exit station of the identified first exit data 124, and if the entrance station of the first entrance data 122 and the exit station of the first exit data 124 match, the first connecting station is output as the connecting station used in the no-latch transfer or mutual direct operation. On the other hand, if the entrance station in the first entrance data 122 does not match the exit station in the first exit data 124, the second connecting station is estimated based on the entrance station in the first entrance data 122 and the entrance station in the first exit data 124, and only when the first connecting station and the second connecting station match, the first connecting station is output as the connecting station used for no-latch transfers or through-running. That is, based on the basic idea that passengers move along the same route on the way there and back, in order to estimate the connecting stations used when making no-latch transfers or mutual direct operations, it is possible to estimate the connecting stations used by passengers when making no-latch transfers or mutual direct operations from the line of the company's own station (first railway) to the line of the other company's station (second railway) using only the entry / exit data (entry data and exit data) generated based on the ticket gate passage data acquired by the company's own station (first railway) side, without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations included in the line of the other company's station (second railway) from an external source such as an issuer of an IC card held by each passenger. This makes it possible to know the trends of passengers who move from the line of the company's own station (first railway) to the line of the other company's station (second railway). In addition, it is possible to improve the prediction accuracy of the number of passengers who move from the line of the company's own station (first railway) to the line of the other company's station (second railway).
[0061] Furthermore, according to the passenger flow information generation device 1 of this embodiment, since the cheapest fare route table is used to estimate the first and second connecting stations, it is possible to easily estimate the connecting stations (first connecting station, second connecting station) when traveling via the route that can be traveled between the entrance station and the exit station at the cheapest fare. Furthermore, according to the passenger flow information generating device 1 of this embodiment, when a connecting station is estimated, the connecting station and train timetable information are used to estimate the movement route of the passenger who made a no-latch transfer or a mutual direct operation, so that when a passenger makes a no-latch transfer or a mutual direct operation from a line of the company's station (first railway) to a line of another company's station (second railway), it is possible to estimate which movement route was used to move to the line of the other company's station (second railway). Note that the estimation of the movement route is performed by using the train timetable information 34 to extract a predetermined number of movement routes of trains that depart later than the entry time at the entry station in the first entry data 122 and have the first connecting station as a stop station, so that it is possible to easily estimate which movement route was used to move to the line of the other company's station (second railway).
[0062] In addition, according to the passenger flow information generation device 1 of this embodiment, when there are multiple estimated travel routes, the disutility value is calculated, and the utilization ratio Pu of each of the multiple travel routes is calculated based on the calculated disutility value. i In order to calculate this, we will consider what kind of travel route is used and what the utilization rate is for no-latch transfers and mutual direct operations. i This will be useful for revising train timetables. It will also be possible to know the congestion rate for each travel route.
[0063] In this embodiment, the first and second connecting stations are estimated by referring to the lowest fare route table, but this is not limiting. The first and second connecting stations may be estimated using a shortest time route table showing the relationship between the railway stations (A1 to A13 stations) of the line included in the company's office, the railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) of the line of the other company's office, and the connecting stations used (passed) when traveling between the railway stations (A1 to A13 stations) of the line included in the company's office and the railway stations (B1 to B9 stations, C1 to C12 stations, D1 to D2 stations) of the line of the other company's office by the shortest possible route, or The first and second connecting stations may be estimated using a route table with the fewest transfers that shows the relationship between railway stations on lines included in the company's own station (stations A1 to A13), railway stations on lines included in other companies' stations (stations B1 to B9, C1 to C12, D1 to D2), and connecting stations used (passed through) when traveling between railway stations on lines included in the company's own station (stations A1 to A13) and railway stations on lines included in other companies' stations (stations B1 to B9, C1 to C12, D1 to D2) via a possible route with the fewest number of transfers.
[0064] In this embodiment and the above-mentioned variant, both the first connecting station and the second connecting station are estimated by referring to the cheapest fare route table, the shortest time route table, and the route table with the fewest number of transfers. However, the estimation of the connecting station by referring to the cheapest fare route table, the shortest time route table, and the route table with the fewest number of transfers may be limited to only one of the first connecting station and the second connecting station. In the present embodiment and the above-described modified example, when multiple travel routes are estimated, the utilization ratio of each of the multiple travel routes is calculated and allocated based on the assumption that the passengers are traveling with the thoughts of "it would be nice to arrive early" and "it would be nice to have few transfers", but this is not limited to the above. For example, when multiple travel routes are estimated, the utilization ratio of each of the multiple travel routes may be equally allocated.
[0065] In the present embodiment and the above-mentioned modified example, the present invention has been described as a passenger flow information generating device 1 that generates information on passenger flow from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, or as a passenger flow information generating method that generates information on passenger flow from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, but it may also be applied to, for example, a program that functions as the passenger flow information generating device 1 or a program for executing the passenger flow information generating method. This program may be recorded on a computer-readable recording medium (for example, a hard disk, a ROM, an SSD, a flash memory (such as a USB memory or an SD card), a floppy disk, a CD, a DVD, etc.), or may be distributed from one computer to another computer via a transmission medium (a communication network such as the Internet or a LAN), or may be transmitted and received in any other form. By executing this program on one computer or by having multiple computers share the execution of each step, each step of the smoking prevention measures processing routine described above is executed, thereby obtaining the same effects as the passenger flow information generation device 1 and passenger flow information generation method of this embodiment. The present embodiment shows an example of a mode for carrying out the present invention, and therefore the present invention is not limited to the configuration of the present embodiment.
[0066] <Additional Notes> In consideration of the above-mentioned gist of the invention, the passenger flow information generation device 1, the passenger flow information generation method, and the passenger flow information generation program according to the present invention can be configured in the following aspects. (Aspect 1) "A passenger flow information generating device that generates information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, a ticket gate passage data acquisition unit that acquires ticket gate passage data recorded together with passenger identification information that can identify a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entry / exit data generation unit that extracts, from the ticket gate passage data acquired by the ticket gate passage data acquisition unit, entry data including entry identification information capable of identifying entry, an entry station, and an entry time, and exit data including exit identification information capable of identifying exit, an entry station, an entry time, an exit station, and an exit time, which have the same passenger identification information, and sorts the extracted entry data and exit data by the entry time to generate entry / exit data relating to the passenger identification information; a data identification unit that determines whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the entry / exit data generated by the entry / exit data generation unit, and if the first entry data is present, identifies the first entry data and identifies the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimation unit that estimates a first connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway based on the first exit data; A passenger flow information generating device equipped with the above. (Aspect 2) "The connecting station estimation unit estimates a second connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway based on the first exit data, and estimates that the first connecting station is the second connecting station. The passenger flow information generation device according to the first aspect. (Aspect 3) "The data identification unit, in the entrance / exit data generated by the entrance / exit data generation unit, identifies the entrance data that does not have the exit data corresponding to the entrance data as the first entrance data, and identifies the exit data in which a railway station included in the line of the second railway is recorded as the entrance station of the exit data as the first exit data. The passenger flow information generation device according to aspect 1 or 2." (Aspect 4) "The connecting station estimation unit estimates that the first connecting station is the second connecting station when the entry station of the first entry data and the exit station of the first exit data match. The passenger flow information generation device according to any one of Aspects 1 to 3. (Aspect 5) "When the entrance station of the first entrance data does not match the exit station of the first exit data, the connecting station estimation unit estimates the first connecting station based on the entrance station of the first entrance data and the entrance station of the first exit data, and when the estimated first connecting station matches the second connecting station, estimates that the first connecting station is the second connecting station. The passenger flow information generation device according to any one of 1 to 4 above." (Aspect 6) "The connecting station estimation unit estimates the second connecting station by referring to a cheapest fare route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be traveled at the cheapest fare among the routes between the first railway station and the second railway station. The passenger flow information generation device according to any one of Aspects 1 to 4. (Aspect 7) "The connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a cheapest fare route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be traveled at the cheapest fare among the routes between the first railway station and the second railway station. The passenger flow information generation device according to aspect 5. (Aspect 8) "The connecting station estimation unit estimates the second connecting station by referring to a shortest time route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be reached in the shortest time among routes between the first railway station and the second railway station." The passenger flow information generation device according to any one of Aspects 1 to 4. (Aspect 9) "The connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a shortest time route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be reached in the shortest time among routes between the first railway station and the second railway station." The passenger flow information generation device according to aspect 5. (Aspect 10) "The connecting station estimation unit estimates the second connecting station by referring to a route table with the fewest transfers that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that is accessible with the fewest transfers among routes between the first railway station and the second railway station, The passenger flow information generation device according to any one of Aspects 1 to 4. (Aspect 11) "The connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a route table with the fewest transfers that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that is accessible with the fewest transfers among routes between the first railway station and the second railway station, The passenger flow information generation device according to aspect 5. (Aspect 12) "The method further includes a travel route estimation unit that acquires the first connecting station estimated by the connecting station estimation unit and acquires train schedule information, and estimates a travel route indicating which train of the first railway the passenger used to travel from the entrance station to the first connecting station in the first entrance data based on the acquired first connecting station and the train schedule information." The passenger flow information generation device according to any one of Aspects 1 to 11. (Aspect 13) "The travel route estimation unit extracts, as the travel route, at least one of the travel routes of a train of the first railway that has a departure time later than the entrance time of the first entrance data and has the first connecting station as a stop station. The passenger flow information generation device according to aspect 12. (Aspect 14) The travel route estimation unit estimates a plurality of the travel routes, and allocates the utilization ratio to each of the plurality of travel routes so that the utilization ratio increases as the number of transfers in each of the estimated plurality of travel routes decreases, and / or the utilization ratio increases as the difference between the entry time and the departure time in each of the estimated plurality of travel routes decreases, and / or the utilization ratio increases as the difference between the arrival time at the first connecting station in each of the estimated plurality of travel routes and the arrival time at the first connecting station of the travel route that arrives at the first connecting station earliest among the estimated plurality of travel routes decreases. The passenger flow information generation device according to aspect 13. (Aspect 15) "The travel route estimation unit estimates a plurality of the travel routes and allocates a utilization ratio equally to each of the estimated plurality of travel routes. The passenger flow information generation device according to aspect 12 or 13." (Aspect 16) "A passenger flow information generating method for generating information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, a ticket gate passage data acquisition step of acquiring ticket gate passage data recorded together with passenger identification information that identifies a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entry / exit data generation process for extracting, from the acquired ticket gate passage data, entry data including entry identification information capable of identifying entry, an entry station, and an entry time, and exit data including exit identification information capable of identifying exit, an entry station, an entry time, an exit station, and an exit time, which have the same passenger identification information, and for which the extracted entry data and exit data are sorted by the entry time to generate entry / exit data relating to the passenger identification information; a data identification process for determining whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the generated entry / exit data, and if the first entry data is present, identifying the first entry data and identifying the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimation step of estimating a first connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway, based on the first exit data; A passenger flow information generating method comprising: (Aspect 17) "The connecting station estimation step estimates a second connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway, based on the first exit data, and estimates that the first connecting station is the second connecting station. The passenger flow information generating method according to claim 16. (Aspect 18) "The method further includes a travel route estimation step of acquiring the estimated first connecting station and train timetable information, and estimating a travel route indicating which train of the first railway the passenger used to travel from the entrance station to the first connecting station in the first entrance data based on the acquired first connecting station and train timetable information." The passenger flow information generating method according to aspect 16 or 17. (Aspect 19) "A passenger flow information generating program that generates information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a specific railway station as a connecting station, A passenger flow information generation program for causing a computer to execute each step of the passenger flow information generation method according to any one of Aspects 16 to 18. [Industrial Applicability]
[0067] The passenger flow information generation device of the present invention has the effect of being able to estimate connecting stations used by passengers when making no-latch transfers or mutual through-running from one of its own stations (first railway) to another company's (second railway) line, using only entry / exit data (entry data and exit data) generated based on ticket gate passage data acquired by its own station (first railway), without obtaining records of ticket gate passage data of passengers who passed through automatic ticket gates installed at railway stations included in the lines of another company's (second railway) line from an external source, such as an issuer of an IC card held by each passenger.Therefore, the device can be widely applied to devices that manage routes where multiple railway companies have mutual access. [Explanation of symbols]
[0068] 1 Passenger flow information generation device (Passenger flow information generation device) 2 Display device 4 Data Server 5 Automatic ticket gates (ticket gates) 10 Ticket gate passing data acquisition unit (ticket gate passing data acquisition unit) 12 Entry / Exit Data Generation Unit (Entry / Exit Data Generation Unit) 14 Data Identification Part (Data Identification Part) 16. Junction Station Estimation Section (Junction Station Estimation Section) 18 Movement route estimation unit (movement route estimation unit) 20 Output section 30 Storage section 32 Lowest fare route table (lowest fare route table) 34 Train Schedule Information (Train Schedule Information) 120 Entry and exit data (Entry and exit data) 122 1st Entrance Data (1st Entrance Data) 124 1st appearance data (1st appearance data) 220 Entry and exit data (Entry and exit data) 222 1st Entrance Data (1st Entrance Data) 224 1st appearance data (1st appearance data)
Claims
1. A passenger flow information generating device that generates information regarding the flow of passengers from a first railway line to a second railway line that are mutually connected with a predetermined railway station as a connecting station, a ticket gate passage data acquisition unit that acquires ticket gate passage data recorded together with passenger identification information that can identify a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entry / exit data generation unit that extracts, from the ticket gate passage data acquired by the ticket gate passage data acquisition unit, entry data including entry identification information capable of identifying entry, an entry station, and an entry time, and exit data including exit identification information capable of identifying exit, an entry station, an entry time, an exit station, and an exit time, each having the same passenger identification information, and sorts the extracted entry data and exit data by the entry time to generate entry / exit data relating to the passenger identification information; a data identification unit that determines whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the entry / exit data generated by the entry / exit data generation unit, and if the first entry data is present, identifies the first entry data and identifies the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimation unit that estimates a first connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway based on the first exit data; A passenger flow information generating device comprising:
2. The connecting station estimation unit estimates a second connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway, based on the first exit data, and estimates that the first connecting station is the second connecting station. The passenger flow information generating device according to claim 1 .
3. The data identification unit identifies, in the entrance / exit data generated by the entrance / exit data generation unit, the entrance data that does not have the exit data corresponding to the entrance data as first entrance data, and identifies the exit data in which a railway station included in the line of the second railway is recorded as the entrance station of the exit data as the first exit data. The passenger flow information generating device according to claim 1 or 2.
4. The connecting station estimation unit estimates that the first connecting station is the second connecting station when the entrance station of the first entrance data and the exit station of the first exit data match. The passenger flow information generating device according to claim 1 or 2.
5. When the entrance station of the first entrance data does not match the exit station of the first exit data, the connecting station estimation unit estimates the first connecting station based on the entrance station of the first entrance data and the entrance station of the first exit data, and when the estimated first connecting station matches the second connecting station, estimates that the first connecting station is the second connecting station. The passenger flow information generating device according to claim 1 or 2.
6. The connecting station estimation unit estimates the second connecting station by referring to a cheapest fare route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be reached at the cheapest fare among routes between the first railway station and the second railway station. The passenger flow information generating device according to claim 1 or 2.
7. The connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a cheapest fare route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be reached at the cheapest fare among routes between the first railway station and the second railway station. The passenger flow information generating device according to claim 5.
8. The connecting station estimation unit estimates the second connecting station by referring to a shortest time route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be reached in the shortest time among routes between the first railway station and the second railway station. The passenger flow information generating device according to claim 1 or 2.
9. The connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a shortest time route table that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that can be reached in the shortest time among routes between the first railway station and the second railway station. The passenger flow information generating device according to claim 5.
10. the connecting station estimation unit estimates the second connecting station by referring to a route table with the fewest transfers that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that is accessible with the fewest transfers among routes between the first railway station and the second railway station; The passenger flow information generating device according to claim 1 or 2.
11. the connecting station estimation unit estimates the first connecting station and / or the second connecting station by referring to a route table with the fewest transfers that associates a first railway station included in the first railway line, a second railway station included in the second railway line, and the connecting station that is accessible with the fewest transfers among routes between the first railway station and the second railway station; The passenger flow information generating device according to claim 5.
12. The system further includes a travel route estimation unit that acquires the first connecting station estimated by the connecting station estimation unit and acquires train schedule information, and estimates a travel route indicating which train of the first railway the passenger used to travel from the entrance station to the first connecting station in the first entrance data, based on the acquired first connecting station and the train schedule information. The passenger flow information generating device according to claim 1 .
13. The travel route estimation unit extracts, as the travel route, at least one of the travel routes of a train of the first railway that has a departure time later than the entrance time of the first entrance data and has the first connecting station as a stop station. The passenger flow information generating device according to claim 12.
14. The travel route estimation unit estimates a plurality of the travel routes, and allocates the utilization ratio to each of the plurality of travel routes so that the utilization ratio increases as the number of transfers in each of the estimated plurality of travel routes decreases, and / or the utilization ratio increases as the difference between the entry time and the departure time in each of the estimated plurality of travel routes decreases, and / or the utilization ratio increases as the difference between the arrival time at the first connecting station in each of the estimated plurality of travel routes and the arrival time at the first connecting station of the travel route that arrives at the first connecting station earliest among the estimated plurality of travel routes decreases. The passenger flow information generating device according to claim 13.
15. The travel route estimation unit estimates a plurality of the travel routes and allocates a utilization ratio equally to each of the estimated plurality of travel routes. The passenger flow information generating device according to claim 12 or 13.
16. A passenger flow information generating method for generating information on the flow of passengers from a first railway line to a second railway line that are mutually connected with a predetermined railway station as a connecting station, comprising: a ticket gate passage data acquisition step of acquiring ticket gate passage data recorded together with passenger identification information that identifies a passenger when the passenger passes through a ticket gate installed at a railway station included in the first railway line; an entrance / exit data generation process for extracting, from the acquired ticket gate passage data, entrance data including entrance identification information capable of identifying an entrance, an entrance station, and an entrance time, and exit data including exit identification information capable of identifying an exit, an entrance station, an entrance time, an exit station, and an exit time, which have the same passenger identification information, and for which the entrance data and the exit data thus extracted are sorted by the entrance time to generate entrance / exit data relating to the passenger identification information; a data identification process for determining whether or not there is first entry data presumably indicating entry at a railway station included in the first railway line and exit at a railway station included in the second railway line based on the generated entry / exit data, and if the first entry data is present, identifying the first entry data and identifying the exit data presumably paired with the first entry data, the first exit data indicating entry at a railway station included in the second railway line and exit at a railway station included in the first railway line; a connecting station estimation step of estimating a first connecting station used when entering at a railway station included in the line of the first railway and exiting at a railway station included in the line of the second railway, based on the first exit data; A passenger flow information generating method comprising:
17. The connecting station estimation step estimates a second connecting station used when entering at a railway station included in the line of the second railway and exiting at a railway station included in the line of the first railway, based on the first exit data, and estimates that the first connecting station is the second connecting station. The passenger flow information generating method according to claim 16.
18. The method further includes a travel route estimating step of acquiring the estimated first connecting station and train timetable information, and estimating a travel route indicating which train of the first railway the passenger used to travel from the entrance station to the first connecting station in the first entrance data based on the acquired first connecting station and the train timetable information. The passenger flow information generating method according to claim 16 or 17.
19. A passenger flow information generation program for generating information on passenger flow from a first railway line to a second railway line that is mutually connected with a predetermined railway station as a connecting station, A passenger flow information generating program that causes a computer to execute each step of the passenger flow information generating method according to claim 16 or 17.
Citation Information
Patent Citations
Passenger flow information generation system and passenger flow information generation method
JP2013210753A
