Earth leakage circuit breaker

The earth leakage breaker addresses high current consumption in test operations by converting DC pulses to AC pulses, reducing power requirements and ensuring stable detection and tripping operations.

JP2024152364APending Publication Date: 2024-10-25MITSUBISHI ELECTRIC CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023066511
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-14
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Conventional earth leakage breakers require high current consumption for test operations due to the use of DC pulses with minimal AC components, necessitating increased circuit current and power supply capacity, which is inefficient.

Method used

The earth leakage breaker incorporates a zero-phase current transformer with a secondary and tertiary winding, a test circuit that generates DC pulses converted to AC pulses, and a power supply circuit that steps down AC voltage to DC for stable earth leakage detection and tripping operations, using a DC/AC conversion circuit to reduce current consumption.

Benefits of technology

This design suppresses current consumption in the test circuit, enabling stable earth leakage detection, tripping, and test operations while maintaining efficient power usage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024152364000001_ABST
    Figure 2024152364000001_ABST
Patent Text Reader

Abstract

To obtain an earth leakage circuit breaker with which it is possible to suppress current consumption of a test circuit and perform a stable earth leakage detection operation, a tripping operation, and a test operation.SOLUTION: An earth leakage circuit breaker 1 comprises: a zero-phase transformer 6 having a secondary winding 6a and a tertiary winding 6b; a zero-phase leakage detection circuit 7 for detecting leakage on the basis of an output current of the secondary winding 6a of the zero-phase transformer 6; a tripping device 8 for open-circuiting a switch unit 5 inserted into a main circuit 4 by the detection signal of the leakage detection circuit 7; a test circuit 20 for flowing a test current It to the tertiary winding 6b of the zero-phase transformer 6; and a power supply circuit 9 for supplying a DC voltage derived by stepping down an AC voltage of the main circuit 4 to the leakage detection circuit 7, the tripping device 8 and the test circuit 20. The test circuit 20 includes a DC pulse generation circuit 15 for generating a DC pulse, and a H-type bridge circuit 14 for converting the DC pulse into an AC pulse and flowing the AC pulse to the tertiary winding 6b as the test current It.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an earth leakage circuit breaker for detecting a leakage current flowing in an AC electric circuit such as a power distribution system and interrupting the AC electric circuit to prevent an earth leakage accident. [Background technology]

[0002] A conventional earth leakage circuit breaker includes a main circuit connected to an AC circuit, a switching unit having a switching mechanism for opening and closing this main circuit, a zero-phase current transformer that detects leakage current flowing through the main circuit, a tripping device that trips the switching mechanism of the switching unit to interrupt the main circuit when the zero-phase current transformer detects the leakage current, and a test circuit for passing a test current through the zero-phase current transformer to check the operation of the earth leakage tripping function, etc. The test circuit is composed of a test winding of the zero-phase current transformer, a test switch, a test resistor, etc. (For example, see Patent Document 1).

[0003] In conventional earth leakage circuit breakers, the operating power for the earth leakage detection circuit and the tripping device is obtained from the two-phase AC circuit of the main circuit. The test circuit also obtains its operating power from the AC voltage of the main circuit, and creates a test current from this operating power through a test switch and test resistor to flow to the test winding of the zero-phase current transformer. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Japanese Patent Application Publication No. 5-182579 Summary of the Invention [Problem to be solved by the invention]

[0005] In Patent Document 1, the test current is a DC pulse with the reference voltage of the internal control power supply at zero level, and is mainly DC component with very little AC component. Therefore, the output from the zero-phase current transformer by this test current is very small compared to the output from a zero-phase current transformer by a normal sine wave AC current. Therefore, a very large current is required as the test current for the test operation, and in order to increase the power capacity of the power supply circuit, it is necessary to increase the circuit current, which results in a problem of large current consumption by the test circuit.

[0006] The present disclosure has been made in consideration of the above, and aims to provide a ground fault circuit interrupter that can reduce the current consumption of a test circuit and perform stable ground fault detection, tripping, and test operations. [Means for solving the problem]

[0007] In order to solve the above problems and achieve the object, the earth leakage circuit breaker of the present disclosure includes a zero-phase current transformer that is inserted into an AC circuit and has a secondary winding and a test winding, a leakage current detection circuit that detects leakage current based on the output current of the secondary winding of the zero-phase current transformer, a tripping device that opens a switching unit inserted into the AC circuit in response to a detection signal from the leakage current detection circuit, a test circuit that passes a test current through the test winding of the zero-phase current transformer, and a power supply circuit that supplies a DC voltage obtained by stepping down the AC voltage of the AC circuit to the leakage current detection circuit, the tripping device, and the test circuit. The test circuit is characterized by including a DC pulse generation circuit that generates a DC pulse, and a DC / AC conversion circuit that converts the DC pulse into an AC pulse and passes the AC pulse as a test current through the test winding. Effect of the Invention

[0008] The earth leakage circuit breaker of the present disclosure has the advantage that it is possible to suppress the current consumption of the test circuit and perform stable earth leakage detection operation, tripping operation, and test operation. [Brief description of the drawings]

[0009] [Figure 1] A circuit diagram showing an earth leakage breaker according to an embodiment. [Diagram 2] 1 is a time chart showing waveforms of various parts during a test operation of an earth leakage circuit breaker according to an embodiment of the present invention; [Diagram 3] 1 is a time chart showing waveforms of various parts during a test operation of an earth leakage circuit breaker according to an embodiment of the present invention; [Figure 4] FIG. 2 is a diagram for explaining a path through which a positive test current flows in the earth leakage circuit breaker according to the embodiment; [Diagram 5] FIG. 2 is a diagram for explaining a path through which a negative test current flows in the earth leakage circuit breaker according to the embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, an earth leakage circuit breaker according to an embodiment will be described with reference to the drawings.

[0011] Embodiment Fig. 1 is a circuit diagram showing an earth leakage circuit breaker according to an embodiment. As shown in Fig. 1, the earth leakage circuit breaker 1 includes a main circuit 4, a switching unit 5, a zero-phase current transformer 6, an earth leakage detection circuit 7, a tripping device 8, a power supply circuit 9, a three-phase full-wave rectifier circuit 10, a differentiation circuit 16, and a test circuit 20 (described later) including a test current drive circuit 13. The test circuit 20 includes a tertiary winding 6b as a test winding, the test current drive circuit 13, the differentiation circuit 16, and a test switch 17. In Fig. 1, GRD indicates ground.

[0012] The main circuit 4 is composed of R-phase, S-phase, and T-phase electric circuits that connect the power supply side connection terminal 2 and the load side connection terminal 3. The switching unit 5 has switching contacts that open and close the three-phase main circuit of the R-phase, S-phase, and T-phase, and a switching mechanism that drives the switching contacts to open and close. The zero-phase current transformer 6 is inserted into the main circuit 4 so that the three-phase conductors of the main circuit 4 are passed through it. The zero-phase current transformer 6 detects the zero-phase current flowing through the main circuit 4 and outputs the detected zero-phase current signal from the secondary winding 6a. The tertiary winding 6b provided on the zero-phase current transformer 6 is used during testing. The leakage current detection circuit 7 detects the occurrence of a leakage current or a ground fault based on the zero-phase current signal input from the secondary winding 6a. The tripping device 8 has a tripping coil, and is triggered by a detection signal from the leakage current detection circuit 7 to trip and drive the switching mechanism of the switching unit 5 to cut off the main circuit 4. The three-phase full-wave rectifier circuit 10 converts the AC power of the main circuit 4 into DC power and supplies it to the power supply circuit 9. The power supply circuit 9 steps down the DC voltage VD output from the three-phase full-wave rectifier circuit 10 to a DC control voltage VS and supplies it to the leakage detection circuit 7 and the tripping device 8 as operating power.

[0013] The earth leakage breaker 1 is connected, via a power supply side connection terminal 2 and a load side connection terminal 3, to a three-phase AC circuit (not shown) in which an earth leakage should be detected.

[0014] The three-phase full-wave rectifier circuit 10 is composed of six well-known rectifier diodes, and rectifies the three-phase AC voltage of the main circuit 4 to supply a DC voltage VD to the power supply circuit 9. The AC side of the three-phase full-wave rectifier circuit 10 is connected to each of the R-phase, S-phase, and T-phase electric circuits of the main circuit 4 via impedance elements 11. In addition, a voltage suppression element 12 is connected to both ends of the DC side of the three-phase full-wave rectifier circuit 10.

[0015] The voltage suppression element 12 is connected in parallel to each of the two rectifier diodes that constitute the positive arm and negative arm of each phase of the three-phase full-wave rectifier circuit 10, and suppresses the reverse voltage to the rectifier diodes that is generated by overvoltage such as a surge or impulse, thereby protecting the entire internal circuit of the earth leakage circuit breaker 1, including the three-phase full-wave rectifier circuit 10.

[0016] The power supply circuit 9 is supplied with a DC voltage VD that has been full-wave rectified by a three-phase full-wave rectifier circuit 10. The power supply circuit 9 steps down the DC voltage VD to a DC control voltage VS (for example, DC 40 V) and supplies it to the leakage detection circuit .

[0017] The leakage current detection circuit 7 detects the occurrence of leakage current based on the zero-phase current signal input from the secondary winding 6a of the zero-phase current transformer 6. The leakage current detection circuit 7 determines the peak voltage value of the zero-phase current signal or the voltage width of the zero-phase signal, and determines that a leakage current has occurred when they exceed a threshold value. When the leakage current detection circuit 7 detects the occurrence of a leakage current, it supplies the DC control voltage VS stepped down by the power supply circuit 9 to the trip device 8 to drive the trip device 8. The trip device 8 trips and drives the switching mechanism of the switching unit 5 to break the main circuit 4.

[0018] Next, a test circuit 20 for performing a test operation of the earth leakage tripping function will be described. This test operation is performed by passing a test current It through the tertiary winding 6b provided on the zero-phase current transformer 6 to generate a pseudo earth leakage current and perform an earth leakage tripping. For example, if the sensitivity current of the earth leakage circuit breaker 1 is 500 mA and the tertiary winding 6b has 100 turns, the test current It needs to be about twice as large as the sensitivity current, so 500(mA) x 2 / 100(turns) = 10mA Therefore, the current value must be set to about 10 mA.

[0019] The test circuit 20 includes a tertiary winding 6b provided in the zero-phase current transformer 6, a test current drive circuit 13 that supplies a test current It to the tertiary winding 6b, a differentiation circuit 16, and a test switch 17. The test switch 17 is manually turned on to pass the test current It from the test current drive circuit 13 through the tertiary winding 6b. The differentiation circuit 16 has a function of suppressing the effective value of the test current It to a low value.

[0020] The test current drive circuit 13 includes an H-bridge circuit 14 as a DC-AC conversion circuit, and a DC pulse generation circuit 15. The H-bridge circuit 14 includes four transistors 14a to 14d, a transistor 14e, and resistors r1 to r5. The transistors 14a and 14d and the transistors 14b and 14c are turned on and off exclusively by the transistors 14e and the resistors r1 to r5. The H-bridge circuit 14 generates an AC test current It from a DC control voltage VS stepped down by the power supply circuit 9 by the switching operation of the transistors 14a to 14d. The DC pulse generation circuit 15 outputs a DC pulse voltage Vp for switching the transistors 14a to 14d. In other words, the H-bridge circuit 14 has a function of converting a DC pulse from the DC pulse generation circuit 15 into an AC pulse and passing the converted AC pulse as a strike current to the tertiary winding 6b.

[0021] Further, a differentiation circuit 16 is provided in the path connecting the tertiary winding 6b of the zero-phase-sequence current transformer 6 and the H-bridge circuit 14. The differentiation circuit 16 is configured as a series circuit of a resistor 16a and a capacitor 16b.

[0022] The test operation is performed by turning on the test switch 17. The test current It flows from the test current driver 13 to the tertiary winding 6b of the zero-phase-sequence current transformer 6 only when the test switch 17 is on.

[0023] In the earth leakage circuit breaker 1 configured as described above, when an electric leakage occurs in the AC circuit in which an electric leakage should be detected and a leakage current flows in the main circuit 4, a zero-phase-sequence current signal is output from the secondary winding 6a of the zero-phase-sequence current transformer 6 and input to the earth leakage detection circuit 7. The earth leakage detection circuit 7 detects the occurrence of an electric leakage based on the input current signal, and supplies the DC control voltage VS stepped down by the power supply circuit 9 to the trip device 8 to drive the trip device 8. As a result, the trip device 8 trips the switching contacts of the switching unit 5 to interrupt the main circuit 4.

[0024] Next, the operation of the earth leakage test of the earth leakage circuit breaker 1 will be described. FIG. 2 is a time chart showing the waveforms of each part in the test operation of the earth leakage circuit breaker 1 in the embodiment. FIG. 3 is a time chart showing the waveforms of each part in the test operation of the earth leakage circuit breaker 1 in the embodiment. FIG. 2 is a time chart when the earth leakage circuit breaker 1 is not provided with a differential circuit 16. FIG. 3 is a time chart when the earth leakage circuit breaker 1 is provided with a differential circuit 16. FIG. 4 is a diagram for explaining the path through which the positive test current It flows in the earth leakage circuit breaker in the embodiment. FIG. 5 is a diagram for explaining the path through which the negative test current It flows in the earth leakage circuit breaker in the embodiment.

[0025] 2 and 3, VS corresponds to the DC control voltage VS which is the output of the power supply circuit 9, Vp corresponds to the DC pulse voltage Vp which is the output of the DC pulse generating circuit 15, It corresponds to the test current It flowing through the tertiary winding 6b of the zero-phase current transformer 6, and Ie indicates the current consumption of the test current driving circuit 13 in effective value.

[0026] 2 and 3, the DC pulse generating circuit 15 outputs a DC pulse voltage Vp in which high and low are repeated at a preset cycle. During the period in which the DC pulse generating circuit 15 outputs the high DC pulse voltage Vp, the transistors 14a, 14d, and 14e are turned on and the transistors 14b and 14c are turned off, causing a positive test current It to flow. As shown in FIG. 4, the positive test current It flows in the order of the power supply circuit 9, test switch 17, transistor 14d, tertiary winding 6b, differentiation circuit 16, and transistor 14a.

[0027] On the other hand, during the period when the low DC pulse voltage Vp is output from the DC pulse generating circuit 15, the transistors 14a, 14d, and 14e are turned off and the transistors 14b and 14c are turned on, causing a negative test current It to flow. As shown in Fig. 5, the negative test current It flows in the order of the power supply circuit 9, test switch 17, transistor 14c, differentiation circuit 16, tertiary winding 6b, and transistor 14b.

[0028] In this manner, the test circuit 20 of the embodiment can pass the test current It, which is an AC current having both positive and negative polarities.

[0029] Next, the function of the differentiation circuit 16 will be described. As shown in Fig. 3, by providing the differentiation circuit 16, when the positive and negative test currents It rise, a peak current obtained by dividing the voltage of the DC control voltage VS by the resistance value of the resistor 16a of the differentiation circuit 16 flows, and then the test current It gradually drops as the current is charged to the capacitor 16b. As a result, the effective value of the test current (current consumption) It flowing through the test current drive circuit 13 can be kept low compared to the case shown in Fig. 2 without the differentiation circuit 16. Fig. 3 shows that the effective value Ie of the current consumption is reduced by ΔIe from the effective value Ie1 of the current consumption without the differentiation circuit 16 to the effective value Ie2 of the current consumption with the differentiation circuit 16.

[0030] In addition, when the magnitude of the test current It is set to the aforementioned 10 mA, for example, if the DC control voltage VS is DC 40 V, the resistance value of resistor 16a of the differentiation circuit 16 is set to about 2.7 kΩ and the capacitance of capacitor 16b is set to about 2.2 μF, the peak current will be 14.8 mA, which is an acceptable current value for the test current It.

[0031] Furthermore, as for the leakage current test operation, if the test current It exceeds the detection threshold Ic and detection width Δt that the leakage current detection circuit 7 can detect, the leakage current test operation is established, so there is no problem with the test current It decreasing gradually.

[0032] As described above, according to the earth leakage circuit breaker 1 of the embodiment, the test current It is AC current, so that the current consumption of the test circuit can be suppressed. Furthermore, the suppression of the current consumption allows stable earth leakage detection operation, tripping operation, and test operation. Furthermore, the current consumption of the test circuit 20 can be further suppressed by passing the test current It through the tertiary winding 6b via the differentiation circuit 16.

[0033] The configurations shown in the above embodiments are examples of the contents of the present disclosure, and may be combined with other known technologies, and parts of the configurations may be omitted or modified without departing from the gist of the present disclosure. [Explanation of symbols]

[0034] 1 earth leakage circuit breaker, 2 power supply side connection terminal, 3 load side connection terminal, 4 main circuit, 5 switching unit, 6 zero-phase current transformer, 6a secondary winding, 6b tertiary winding, 7 earth leakage detection circuit, 8 tripping device, 9 power supply circuit, 10 three-phase full-wave rectifier circuit, 11 impedance element, 12 voltage suppression element, 13 test current drive circuit, 14 H-bridge circuit, 14a to 14e transistors, 15 DC pulse generating circuit, 16 differentiation circuit, 16a, r1 to r5 resistors, 16b capacitor, 17 test switch, 20 test circuit.

Claims

1. a zero-phase current transformer inserted in an AC current circuit and having a secondary winding and a test winding; a leakage current detection circuit that detects leakage current based on an output current of a secondary winding of the zero-phase current transformer; a tripping device that opens a switching unit inserted in the AC circuit in response to a detection signal from the earth leakage detection circuit; a test circuit for passing a test current through the test winding of the zero-phase current transformer; a power supply circuit that supplies a DC voltage obtained by stepping down the AC voltage of the AC current line to the leakage current detection circuit, the tripping device, and the test circuit; The test circuit includes: A DC pulse generating circuit for generating a DC pulse; a DC / AC conversion circuit that converts the DC pulse into an AC pulse and passes the AC pulse through the test winding as the test current. A ground fault circuit interrupter characterized by the above.

2. A differentiation circuit is provided which differentiates the test current and supplies the differentiated current to the test winding.

2. The earth leakage circuit breaker according to claim 1.

3. The DC / AC conversion circuit is an H-bridge circuit.

3. The earth leakage circuit breaker according to claim 1 or 2.