Route planning device
The route planning device optimizes route calculation for multiple agents by managing movement areas and constraint regions, addressing computational challenges and enabling real-time efficient planning in complex environments.
Patent Information
- Application Number
- JP2023066537
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-14
- Publication Date
- 2024-10-25
AI Technical Summary
Existing methods for calculating routes for multiple robots or vehicles in environments with many obstacles and agents require significant computational resources and time, making real-time planning impractical due to increasing optimization problems as the number of robots or obstacles grows.
A route planning device that manages agent locations, calculates movement areas, and defines constraint regions using a linear sum of basis functions to reduce computational load, allowing real-time planning without detailed maps, by managing agent and non-controlled object positions and optimizing routes to avoid collisions.
Enables efficient, real-time route planning for multiple agents by reducing computational complexity and ensuring collision avoidance, even in dynamic environments with many obstacles and agents.
Smart Images

Figure 2024152382000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a route planning device that generates a movement route plan in an area where a plurality of agents exist. [Background technology]
[0002] In order to solve the labor shortage in transporting goods in logistics warehouses and transporting goods between processes in factories, mobile robots (AGVs) are being developed. A utomated G uided V ehicle, AMR: A utonomous M obile R The introduction of mobile robots (such as obot) is progressing. To introduce such mobile robots, it is necessary to set up the paths the robots can move through within warehouses and factories (creating a graph consisting of nodes and branches / edges, for example). The more detailed this setting is, the greater the freedom the robots have in choosing paths, enabling more efficient transport. However, the setting up work requires a lot of man-hours. Furthermore, the work of setting up the paths is necessary every time the layout of a warehouse or factory changes, so the work of setting up detailed paths places a heavy burden (engineering costs) on the business operators who manage the warehouse or factory.
[0003] In addition, in warehouses and factories, items are sometimes temporarily placed on the aisles, making it difficult to obtain accurate map information. This issue can be common in other industrial fields as well. For example, when dealing with autonomous vehicles that travel around the city, it is difficult to obtain accurate map information because of environmental changes such as the installation of pylons and signs due to temporary road closures caused by road construction. In addition, when dealing with automated construction machinery (hydraulic excavators, wheel loaders, dump trucks, etc.) used at construction sites and mines, map information changes from moment to moment as excavation work is carried out.
[0004] Since it is rare for a robot to operate alone in a warehouse or factory, it is necessary to perform driving control so that the robot does not come into contact with other robots or workers working in the warehouse or factory.
[0005] In response to such problems, Patent Document 1 presents a method for calculating a route for multiple robots (vehicles in Patent Document 1) to move without designing detailed paths. Furthermore, Patent Document 2 presents a method for calculating a route for a robot (vehicle in Patent Document 2) to avoid contact with obstacles (corresponding to other robots or workers) that exist in the movement route.
[0006] More specifically, in Patent Document 1, control inputs (velocity, angular velocity) for each robot are calculated according to the idea of model predictive control so that each robot does not come into contact with obstacles (pillars or walls inside a building, other robots, etc.) and the current position of each robot is as small as possible from the target position of each robot. The calculated control inputs are then integrated to calculate a movement path (position, posture). Furthermore, in Patent Document 2, an elliptical area surrounding the robot is defined, and a movement path for the robot that does not come into contact with obstacles is calculated by solving an optimization problem with constraints imposed so that obstacles do not enter the range of this elliptical area. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Patent Publication No. 2021-77090 [Patent Document 2] JP 2022-134905 A Summary of the Invention [Problem to be solved by the invention]
[0008] According to Patent Document 1, it is possible to calculate a path for a robot to reach a target position without designing detailed passage information in a warehouse or factory in advance. In addition, since a movement plan that takes into account the dynamics of all robots is calculated in time series, it is possible to generate a more efficient movement plan than an exclusive control method that divides a target area in advance and controls so that multiple robots do not enter the divided area. Furthermore, it is believed that by combining the technology of Patent Document 1 with the technology of Patent Document 2, it is possible to generate a path plan that prevents the target robot from coming into contact with other robots and obstacles in the target area.
[0009] However, in Patent Document 1, an optimization problem is solved using the collective dynamics of all robots present in the target area. In Patent Document 2, constraint conditions are derived for the relationship between the elliptical area surrounding the robot and obstacles. It is known that in formulating such an optimization problem, the calculation load increases rapidly as the number of robots or the number of obstacles increases. Therefore, if the methods of Patent Document 1 and Patent Document 2 are applied to an area where a large number of robots exist, it is expected that an enormous amount of time will be required for optimization calculations, making it difficult to plan the movement of the robots.
[0010] The present invention has been made to solve the above-mentioned problems, and aims to provide an apparatus that calculates a route plan in real time for efficiently moving a large number of agents (a general term for robots, vehicles, etc.). [Means for solving the problem]
[0011] In order to solve the above problems, the path planning device of the present invention is a path planning device that generates a path for an agent, which is a controllable moving body, and includes an agent management unit that manages position information of the agent, an environment management unit that acquires position information of uncontrollable non-controlled objects, an operation management unit that calculates a target position of the agent based on the position information of the agent acquired by the agent management unit, a movement area management unit that determines a movement area in which the agent can move and manages the positions of non-controlled objects within the movement area, a constraint area management unit that calculates a constraint area within the movement area that is less than the total number of uncontrolled objects included in the movement area, a path calculation unit that calculates a path to the target position of the agent so that the agent within the movement area does not enter the constraint area, and a path distribution unit that distributes the route calculated by the path calculation unit to the agent. Effect of the Invention
[0012] According to the above-described configuration of the present invention, it is possible to provide a device that calculates a route plan for efficiently moving a large number of agents in real time, without constructing a detailed map in advance. Further features related to the present invention will become apparent from the description of the present specification and the accompanying drawings. Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a functional block diagram showing a configuration of a route planning device according to the present invention. [Diagram 2] FIG. 1 is a diagram for explaining a situation in which the present invention is applied to a logistics warehouse. [Diagram 3] FIG. 13 is a diagram for explaining an example of map information used when the present invention is applied to a logistics warehouse. [Figure 4A] FIG. 2 is a diagram for explaining the configuration of an agent to be controlled. [Figure 4B] FIG. 2 is a diagram for explaining the configuration of an agent to be controlled. [Figure 5A] 5A to 5C are diagrams for explaining an example of an output from a movement area management unit in the present invention. [Figure 5B] 5A to 5C are diagrams for explaining an example of an output from a movement area management unit in the present invention. [Figure 6A] 5A and 5B are diagrams for explaining an example of an output from a constraint region management unit in the present invention. [Figure 6B] 5A and 5B are diagrams for explaining an example of an output from a constraint region management unit in the present invention. [Figure 6C] 5A and 5B are diagrams for explaining an example of an output from a constraint region management unit in the present invention. [Figure 6D] 5A and 5B are diagrams for explaining an example of an output from a constraint region management unit in the present invention. [Figure 6E] 5A and 5B are diagrams for explaining an example of an output from a constraint region management unit in the present invention. [Figure 7A] 4 is a diagram for explaining the processing of the constraint region management unit in the present invention in relation to the shortest route; FIG. [Figure 7B] 4 is a diagram for explaining the processing of the constraint region management unit in the present invention in relation to the shortest route; FIG. [Figure 7C] 4 is a diagram for explaining the processing of the constraint region management unit in the present invention in relation to the shortest route; FIG. [Figure 7D] 4 is a diagram for explaining the processing of the constraint region management unit in the present invention in relation to the shortest route; FIG. [Figure 8A] 5A and 5B are diagrams for explaining the processing of the constraint region management unit in the present invention in relation to fixed obstacles. [Figure 8B] 5A and 5B are diagrams for explaining the processing of the constraint region management unit in the present invention in relation to fixed obstacles. [Figure 9A] 4 is a diagram for explaining the processing of a constraint region management unit in the present invention in relation to a moving body; [Figure 9B] 4 is a diagram for explaining the processing of a constraint region management unit in the present invention in relation to a moving body; [Figure 9C] 4 is a diagram for explaining the processing of a constraint region management unit in the present invention in relation to a moving body; [Figure 10] 11 is a flowchart for explaining a processing procedure of a constraint region management unit in the present invention. [Figure 11A] 5A to 5C are diagrams for explaining the process of a path calculation unit in the present invention. [Figure 11B] 5A to 5C are diagrams for explaining the process of a path calculation unit in the present invention. [Figure 11C] 5A to 5C are diagrams for explaining the process of a path calculation unit in the present invention. [Figure 11D] 5A to 5C are diagrams for explaining the process of a path calculation unit in the present invention. [Figure 11E] 5A to 5C are diagrams for explaining the process of a path calculation unit in the present invention. [Figure 12A] FIG. 13 is a diagram for explaining a situation in which route calculation is performed for a plurality of agents. [Figure 12B] FIG. 13 is a diagram for explaining a situation in which route calculation is performed for a plurality of agents. [Figure 13] 4 is a flowchart illustrating a processing procedure of the path planning device. [Figure 14] FIG. 1 is a diagram for explaining the overall state of a parking lot when the present invention is applied to the parking lot. [Figure 15A] 11A and 11B are diagrams for explaining the operation of an agent when the present invention is applied to a parking lot. [Figure 15B] 11A and 11B are diagrams for explaining the operation of an agent when the present invention is applied to a parking lot. [Figure 15C] 11A and 11B are diagrams for explaining the operation of an agent when the present invention is applied to a parking lot. [Figure 15D] 11A and 11B are diagrams for explaining the operation of an agent when the present invention is applied to a parking lot. [Figure 15E] 11A and 11B are diagrams for explaining the operation of an agent when the present invention is applied to a parking lot. [Figure 16A] FIG. 2 is a diagram for explaining the state of a construction machine when the present invention is applied to a construction site. [Figure 16B] FIG. 1 is a diagram for explaining a situation in which the present invention is applied to a construction site. [Figure 17] FIG. 1 is a diagram for explaining the overall situation of a construction site when the present invention is applied to the site. [Figure 18A] 13 is an example of an output from a movement area management unit when the present invention is applied to a construction site. [Figure 18B] 13 is an example of an output from a movement area management unit when the present invention is applied to a construction site. [Figure 19]13 is an example of the output of the constraint area management unit when the present invention is applied to a construction site. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] A path planning device is a device that calculates the movement plans (time series of coordinates, posture, speed, etc.) of all agents (controllable mobile objects such as robots and vehicles) within a management area (e.g., a warehouse or parking lot) and generates routes for the agents to move according to this path plan.
[0015] Hereinafter, an embodiment of a route planning device of the present invention will be described with reference to the drawings.
[0016] 1 is a simplified example of a functional block diagram of a route planning device according to the present invention. In this specification, a situation in which the route planning device according to the present invention is applied will be described first, and each functional unit of the route planning device will be described in relation to the situation.
[0017] 2 shows an overall view of a logistics warehouse to which the path planning device according to the present embodiment is applied. In this figure, a situation is assumed in which multiple agents (A100a to A100c), workers (A101a to A101c), and a non-automated forklift A102 exist. The agents are autonomous robots that can be controlled by the path planning device according to the present embodiment.
[0018] There is no problem even if the numbers of agents A100, workers A101, and forklifts A102 are changed. Also, if the forklift is an automatic type, it may be treated as the agent A100.
[0019] The shelves A103 hatched in gray in FIG. 2 are fixed, but the pallet placement area A104 surrounded by a dashed line is not always the same because the forklift operator finds an empty space and places the pallet there. For this reason, in order to obtain accurate map information in the warehouse, the map information needs to be updated every time the pallet position changes. Furthermore, since there are cardboard boxes A105 temporarily placed by workers (A101a to A101c) in the warehouse, a large calculation cost is required to update the map information in real time and accurately, including these. For this reason, in this embodiment, a simple map as shown in FIG. 3, which records only the warehouse shape and shelf positions A103a to A103c, is used as a static map. The positions of the shelves recorded in this simple map are treated as obstacles. The path planning device of the present invention creates a travel path so that the agent A100 does not come into contact with obstacles recorded on this simple map.
[0020] The logistics warehouse in FIG. 2 is equipped with a plurality of monitoring sensors A106, which monitor the positions of agents (A100a to A100c) in the warehouse, the positions of workers (A101a to A101c), the position of a forklift A102, the position of pallets in a pallet storage area A104, and temporarily placed cardboard boxes A105. The monitoring sensors A106 can communicate with a management server A108 via a wireless communication device A107 installed in the warehouse. The management server A108 may be located in the warehouse or outside the warehouse. The path planning device of this embodiment is executed by the management server A108 equipped with a CPU and memory for calculation. The path plan calculated by the management server A108 is distributed to the agents (A100a to A100c) via the wireless communication device A107.
[0021] As shown in FIG. 4A, the agent A100 is assumed to be a differential two-wheel type mobile robot A100. The mobile robot is equipped with an encoder that detects the number of rotations of the wheels A1001, and an inertial sensor (IMU) that acquires the rotation speed and acceleration of the body. I nertia M assurance U nit), LiDAR ( Li ght D etection A n.d. R The system is equipped with sensors such as anging.
[0022] 4B shows a simplified functional block diagram for explaining the control operation of the agent A100. The agent A100 includes a communication unit Ag01 that enables wireless communication using Bluetooth (registered trademark) or Wi-Fi (registered trademark), and is capable of communicating with a management server A108 via a wireless communication device A107.
[0023] The agent A100 is equipped with a self-position calculation unit Ag03 that calculates its own position (x, y coordinates on a two-dimensional plane) and orientation by combining the above-mentioned multiple sensors Ag02. S imultaneous L ocalization A n.d. M This can be achieved by a technique known as image-recognition mapping, and therefore detailed description thereof will be omitted.
[0024] The agent A100 includes a tracking control unit Ag04 for controlling the actuators (motors for the left and right wheels) of the agent based on the route plan received from the management server A108 and its own position calculated by a self-position calculation unit Ag03.
[0025] The control command calculated by the tracking control unit Ag04 actually controls the actuator via the actuator control unit Ag05. The actuator control unit Ag05 is a PLC ( P programmable L ogic C controller).
[0026] The position information calculated by the self-position calculation unit Ag03 can also be provided to the management server A108 via the communication unit Ag01 and the wireless communication device A107. With this configuration, even if the agent A100 moves behind the worker A101 and enters the blind spot of the monitoring sensor A106, the position information of the agent A100 can be provided to the management server A108.
[0027] Returning to Fig. 1 again, a detailed description will be given of each functional block of the route planning device for the logistics warehouse in Fig. 2. As shown in Fig. 1, the route planning device includes a business management unit S001, an agent management unit S002, an environment management unit S003, a movement area management unit S004, a constraint area management unit S005, a route calculation unit S006, and a route distribution unit S007.
[0028] The operation management unit S001 calculates the target position of the agent based on the position information of the agent A100 acquired by the agent management unit S002, and manages tasks for the agent A100 in the warehouse. In the present invention, a task means, for example, a series of actions in which an agent in a logistics warehouse collects an item and carries it to a specified shelf. Since the loading and unloading of items is performed by a worker A101 in the warehouse, in the present invention, only a part of the actions of the task, that is, the agent moves from an arbitrary point A to an arbitrary point B, is managed. Therefore, it is sufficient that the operation management unit S001 has at least a function of calculating the target position Tg for each agent A100. Note that the target position Tg is given to each agent, such as the target position Tga for the agent A100a and the target position Tgb for the agent A100b.
[0029] The agent management unit S002 manages the position information of the agent A100 in the warehouse and also manages the execution status of the task. The current position of the agent A100 is managed based on the self-position calculated by the self-position calculation unit Ag03 of each agent, or the position observed by the environmental sensor A106. The execution status of the task corresponds to a determination of whether the agent A100 has reached the target position Tg after the target position Tg is given to the agent. When the agent A100 reaches the target position Tg, the task is determined to be completed, and the next task is assigned by the operation management unit S001. On the other hand, when the agent A100 has not reached the target position Tg, it is determined that the task is ongoing, and the next task is not provided to the corresponding agent.
[0030] The environment management unit S003 acquires position information of uncontrollable non-controllable objects. That is, the environment management unit S003 calculates the positions of the agent A100, the worker A101, the forklift A102, the pallet position A104, and the temporarily placed cardboard box A105 in the warehouse based on the sensor data detected by the environment sensor A106 arranged in the warehouse. It is also possible to calculate the moving speed of the moving object (a collective term for the agent, the worker, and the forklift) from the time change in the position of each object. It is also possible to determine whether the object is a moving object or a non-moving object (a collective term for the pallet and the cardboard box) from the point cloud or image information acquired by the environment sensor A106.
[0031] The movement area management unit S004 determines the movement area MA in which the agent A100 can move, and manages the positions of non-controlled objects within the movement area. That is, the movement area management unit S004 defines the movement area MA in which the agent can move so as to surround the agent target position Tg calculated by the operation management unit S001 and the agent position calculated by the agent management unit S002, and manages the positions of non-controlled objects within the movement area MA. As an example, FIG. 5A shows a movement area MA defined by a rectangular area surrounding the initial position and target position Tg of each agent. The movement plan of each agent is calculated within the corresponding movement area. The reason for dividing the movement area in this way is to speed up the calculation of the movement plan, and details will be described later.
[0032] In Fig. 5A, the movement area MA is defined as a rectangle, but the method for determining the movement area MA is not limited to this shape. Also, as shown in Fig. 5B, the movement areas of each agent may be defined to overlap, or the same movement area may be assigned. Furthermore, if there are sufficient computational resources, the movement area MA may be the entire warehouse.
[0033] The constraint area management unit S005 calculates a constraint area within the movement area MA that is equal to or smaller than the total number of non-controlled objects contained in the movement area MA. Specifically, the constraint area management unit S005 defines and calculates a constraint area LA that is an area that the agent must not enter, according to the position information of the non-controlled objects (a general term for moving objects and non-moving objects other than the agent A100) within the movement area MA calculated by the movement area management unit S004.
[0034] Figure 6B can be given as an example of a constraint region when the movement region MAa of the agent A100a is given as in Figure 6A. In Figure 6B, the region including the cardboard box A105a and the worker A101a in the upper left of the figure is given as constraint region LA1, and the region including the cardboard box A105b and the worker A101b in the lower right of the figure is given as constraint region LA2. Such regions can be defined by inequality conditions such as Equation 1.
[0035]
number
[0036] The upper equation of Equation 1 indicates the area of the constraint area LA1, and the lower equation indicates the area of the constraint area LA2.
[0037] Note that the constraint region is not limited to this expression. For example, a circular constraint region can be defined as shown in Fig. 6C. If the region is circular, the constraint region LAi can be expressed by an inequality condition such as Expression 2. The subscript i indicates the number of the constraint region.
[0038]
number
[0039] Although the equation 2 defines the constraint region by an inequality that expresses the inside of a circle, an equation for an ellipse may be used instead of a circle. Furthermore, it is widely known that even a constraint region having a complex shape as shown in FIG. 6D can be approximately expressed by a linear sum of basis functions fi(x, y) and coefficients gi as shown in the equation 3. In this embodiment, the constraint region calculated by the constraint region management unit S005 is characterized in that it is calculated using a linear sum of basis functions that is equal to or less than the total number of non-controlled objects included in the moving region.
[0040]
number
[0041] Moreover, expressing it as such a linear sum has the advantage that the coefficient gi can be calculated efficiently. For example, such region division can be realized by using a clustering technique such as a Support Vector Machine (SVM). Note that the expression of Equation 3 is a more general expression that includes Equation 1 and Equation 2.
[0042] Since the agent's route is planned so as not to enter the constraint area LA calculated by the constraint area management unit S005, if the constraint area LA becomes too wide, there is a possibility that the agent will not be able to move along a route. Therefore, it is desirable to set the constraint area LA so as to surround the obstacle and to make the area small. For example, both the area defined by the solid line in FIG. 6E (the area above the solid line AL1 in the moving area MAa and the area below the solid line AL2 in the moving area MAa) and the area defined by the dotted line (the area above the dotted line DL1 in the moving area MAa and the area below the dotted line DL2 in the moving area MAa) can separate the obstacle, but since the area defined by the solid line has a narrower constraint area LA, it is desirable to adopt the area defined by the solid line. That is, when there are multiple candidates for the constraint area, it is preferable to calculate the one with the smallest area as the constraint area.
[0043] In each calculation cycle, when updating the constraint region, the constraint condition dividing the area by a straight line as in Equation 1 may be changed to a method of dividing the area by a circle as in Equation 2. This will be described with reference to the situation in FIG. 7A, in which a new cardboard box A105c is added to the situation in FIG. 6A. As shown in FIG. 7B, in a situation in which the cardboard box A105c is placed in a position that is not included in either of the constraint regions LA1 and LA2 using any of the methods in FIG. 6B to 6D, a constraint region LA3 is provided to surround only the cardboard box A105c. An example of a condition for determining the constraint region LA for each individual non-controlled object in this way can be expressed as shown in FIG. 7C, in which the shortest route candidate QRC connecting the current position of the agent A100 to the target position Tg and the constraint region LA' do not have an overlapping region. In other words, the constraint region management unit S005 calculates, within the movement region MA, an area that does not include the shortest route from the movement target position of the agent to the current position as a constraint region that is less than the total number of non-controlled objects included in the movement region MA. The shortest route candidate QRC may be defined as an area including the shortest distance in a two-dimensional space, as shown in FIG. 7D.
[0044] Furthermore, as shown in Figure 8A, if there is an immovable obstacle BR such as a pillar or a wall within the movement area MA, the shortest route is not the shortest distance in the current space, but rather, as shown in Figure 8B, the route QR that avoids the obstacle BR, calculated using a search-based method such as RRT (Rapidly Exploring Random Tree), may be treated as the shortest route.
[0045] As shown in Figure 8B, it is possible to calculate the robot's movement path using only RRT. However, since it is not possible to fully take into account the robot's dynamics (including the limits of acceleration / deceleration and angular velocity), it is important to note that the agent may not actually be able to move along this path.
[0046] Furthermore, the condition for allowing the definition of such an individual constraint area LA must satisfy the requirement that the total number of the set constraint areas is smaller than the total number of non-control objects in the moving area MA. The reason for setting such a condition will be explained in the explanation of the path calculation unit S006 described later.
[0047] The process of defining the constraint area LA is executed when the moving area MA is defined. If only non-moving objects among the non-controlled objects exist within the constraint area LA calculated at this time, the constraint area LA is maintained unless the moving area MA is updated. On the other hand, if a moving object that is a non-controlled object exists within the constraint area LA, the constraint area LA is updated when the moving object deviates from the previously set constraint area or is predicted to deviate from it.
[0048] In other words, when the non-controlled objects present within the calculated constraint area LA include a moving object, and the moving object has deviated from the constraint area LA or is expected to deviate within a predetermined time period, it is preferable that the constraint area management unit S005 recalculates the constraint area LA to include the position of the moving object after movement.
[0049] For example, assume a situation in which constraint areas LA1a and LA2a are set as shown in FIG. 9A. Since workers A101a and A101b move within the warehouse according to their own work situations, they move outside the constraint areas LA1a and LA2a given in FIG. 9A. When deviation from the constraint area is confirmed, new constraint areas LA1b and LA2b are defined, respectively, as shown in FIG. 9B. Similarly, when worker A101 moves from the constraint areas LA1b and LA2b, the constraint areas are updated again. Here, when worker A101b moves to a situation as shown in FIG. 9C, constraint area LA2c is defined as an area that surrounds only the two cardboard boxes that were present within constraint area LA2b.
[0050] The above process may be performed before the worker A101 actually deviates from the constraint area. For example, the movement speed va1 of the worker A101 may be calculated using changes in the position information of the worker A101 managed by the environment management unit S003, and the constraint area may be updated when it is determined that a position a distance va1×t1 away from the constraint area after a predetermined time t1 has deviated from the constraint area. By adopting such a method, the possibility of the agent A100 coming into contact with the worker A101 can be further reduced.
[0051] The processing procedure of the constraint area management unit S005 will be described in detail with reference to the flowchart of FIG. 10. In Fc101, it is confirmed whether the movement area MA has been updated by the movement area management unit S004, or whether there is a change in the environmental situation obtained from the environment management unit S003, such as a new worker entering the already given movement area MA or a temporary cardboard box A105 being added. If any update is confirmed (YES), the process transitions to Fc102. If no update is confirmed (No), the process waits until an update is confirmed. In Fc102, the constraint area management unit S005 calculates the constraint area LA using the given environmental information (position information of the non-controlled object) and the movement area MA. When the calculation of the constraint area LA is completed, the process transitions to Fc103.
[0052] In Fc103, for the multiple constraint regions LAi calculated in Fc102, it is determined whether or not a moving object among the non-controlled objects is included in each constraint region. If a moving object is not included (NO), the process transitions to Fc104. On the other hand, if a moving object is included (YES), the process transitions to Fc105. When the process transitions to Fc104, the corresponding constraint region LAi does not include a moving object, so unless there is a change in the environment, there is no need to change the constraint region LAi. Therefore, the constraint region LAi is maintained.
[0053] When the state transitions to Fc105, since the corresponding constraint area LAi contains a moving object, it is necessary to review the constraint area LAi according to the movement status of the moving object. When the moving object has not deviated from the constraint area LAi calculated in advance (NO), the state transitions to Fc104. On the other hand, when the moving object deviates from the constraint area LAi calculated in advance (YES), the state transitions to Fc106. As described above, the deviation of the moving object may be determined not only when the moving object has actually deviated from the constraint area, but also when it is predicted that the moving object will deviate from the constraint area.
[0054] When the process transitions to Fc106, it is determined whether the moving object that has deviated from the previously given constraint area LAi is on a shortest route candidate that connects the current position of the agent A100 and the target position Tg. If the moving object is not on the shortest route candidate (NO), the process transitions to Fc107. On the other hand, if the moving object is on the shortest route candidate (YES), the process transitions to Fc108.
[0055] When the state transitions to Fc107, the constraint area LAi is modified so as to include the moving object position after the movement. When the state transitions to Fc108, the constraint area LAi that had previously surrounded the moving object is divided and given as a new constraint area LAj (j≠i) so as to surround the moving object position after the movement. In other words, when the non-control object existing in the calculated constraint area includes a moving object, and the moving object deviates from the constraint area and exists on the shortest route, the constraint area management unit S005 divides the constraint area so as to include the moving object position after the movement. Furthermore, when the area surrounded by the constraint area LAi becomes unintentionally wider due to the moving object deviating, it is desirable to also modify the constraint area LAi. It is desirable to execute the above processing at each calculation cycle of the path planning device. The above is the function performed by the constraint area management unit S005.
[0056] Referring again to Fig. 1, the path calculation unit S006 calculates a path to the target position Tg of the agent A100 in the movement area MA so that the agent A100 does not enter the constraint area LA. In other words, the path calculation unit S006 calculates a path for each agent A100 to move towards the target position Tg based on the constraint area LA calculated by the constraint area management unit S005.
[0057] When the agent A100 is a differential two-wheel type robot as shown in FIG. 4A, the equation of motion can be given by the following equation 4.
[0058]
number
[0059] Here, x and y are the x and y coordinates of the robot, θ is the orientation (direction) of the robot, v is the robot's moving speed, and ω is the robot's angular velocity. Here, the coordinates of the target position Tg are (xg, yg), and the vector that combines these is defined as r = [xg, yg]T (T means the transposition of the vector). In addition, the combined x and y coordinates when Equation 4 is discretized with the calculation period Δt are defined as vector p in Equation 5a in Equation 5.
[0060]
number
[0061] In this case, the problem of moving the agent A100 to the target position can be expressed as model predictive control represented by Equation 6a in Equation 6. Note that vector e(k) is a deviation vector from the current position p(k) to the target position r, defined by Equation 6b in Equation 6.
[0062]
number
[0063] Moreover, vector u is a vector of control inputs, and u(k)=[v(k),ω(k)]T. Furthermore, S, Q, and R are weighting matrices, and Np is a prediction horizon. In model predictive control, the control input u(k) is calculated so as to minimize the evaluation function J in Equation 6a. Since this formulation is a common control problem and there is no special ingenuity in this formulation itself, the details of the method of calculating the control input u(k) will be omitted.
[0064] If the control input u(k) can be calculated, the position and orientation at each time can be calculated by integrating Equation 4, and the combination of these can be used as a route. Note that if the target position Tg also contains attitude information, that is, the vector that combines the target coordinates (xg, yg) and the target attitude θg can be set as r=[xg, yg, θg]T, and changed to vector p (Equation 5b in Equation 5) that summarizes the agent's position and attitude.
[0065] Model predictive control has the advantage that it can explicitly handle constraint conditions. For example, in the case of the differential two-wheel robot shown in Fig. 4A, the upper and lower limits of the robot's moving speed v and turning angular velocity ω depend on the rotational speeds ωl and ωr of the left and right wheels of the travel motor. By incorporating the operating characteristics of such actuators as constraint conditions, it becomes possible to generate a path that the robot can actually follow. In addition, since the evaluation function J in Equation 6a includes the control input u, when calculating the control input u that minimizes the evaluation function J, it is possible to reduce the control input u itself, that is, to suppress energy consumption.
[0066] Now, in Equation 6, if S and Q are diagonal matrices and the values of the diagonal elements are designed to be equal, the first and second terms of Equation 6a can be considered as values weighted on the straight-line distance connecting the agent A100 and the target position Tg. Therefore, the route calculated by calculating the control input u(k) that minimizes Equation 6 and integrating this control input becomes the shortest route in two-dimensional space (FIG. 11A). In this way, calculating the control input so as to minimize Equation 6 has the advantage that an efficient movement route can be calculated without using detailed map information. Furthermore, when calculating the route multiple times, it is possible to calculate a more accurate route for each calculation by calculating so that the calculated value becomes smaller for each calculation.
[0067] In other words, the constraint region management unit S005 calculates the constraint region using a linear sum of basis functions that is equal to or less than the total number of non-controlled objects included in the movement region. Then, the path calculation unit S006 calculates the agent's path using the evaluation function J (Formula 6(a)) whose evaluation value decreases as the deviation between the agent's current position and the target position decreases, and the constraint condition (see Formula 3) determined by the constraint region management unit S005 as constraint conditions, so that the evaluation function becomes smaller than the previous calculation value for each calculation.
[0068] However, if there is an obstacle BR between the agent A 100a and its target position Tga as shown in FIG. 11B, using a route calculated to minimize Equation 6 will result in the agent colliding with the obstacle.
[0069] In order to avoid such a situation, a method of setting a constraint condition of the optimal control problem that the area surrounding the agent A100a and the area surrounding the obstacle BR do not intersect, as shown in Fig. 11C, can be considered. Specifically, if the area surrounding the agent A100a and the area surrounding the obstacle BR are given as circles with radii ra and ro, respectively, a path that avoids the obstacle BR as shown in Fig. 11D can be generated by setting Equation 7 as a constraint condition. That is, if there is an obstacle in the shortest path from the movement target position Tg of the agent to the current position in the movement area, the constraint area management unit S005 calculates the area that avoids the obstacle as a constraint area so that it is equal to or smaller than the total number of non-controlled objects included in the movement area.
[0070]
number
[0071] In the above description, each region is defined as a circle, but the region may be defined as a shape other than a circle. In other words, the same effect can be obtained even if each region is defined as an ellipse or a square.
[0072] The above process requires only one constraint condition since there is one agent and one obstacle. However, if there are no obstacles in the movement area MA, no constraint conditions are required to prevent one agent from coming into contact with each obstacle (Figure 11E shows an example of four obstacles). Furthermore, if there are na agents, na × no constraint conditions are required to prevent all agents from coming into contact with the no obstacles, and the number of constraint conditions must be increased further to control the agents so that they do not collide with each other. As mentioned above, it is known that when solving an optimization problem, the computational load increases rapidly as the number of constraint conditions to be considered increases.
[0073] To address the above problem, in this embodiment, the movement area management unit S004 limits the number of agents A100 present in each movement area MA, and further, the constraint area management unit S005 gives a constraint area LA, which is an area that the agent must not enter. This makes it possible to calculate a travel route that prevents the agent A100 from coming into contact with obstacles (including the worker A101 and the cardboard box A105) without having to consider individual constraint conditions.
[0074] To make the above explanation more concrete, when planning a path in the situation shown in Fig. 6A, if no special measures are taken, it will be necessary to consider six equations as constraint conditions, as shown in Equation 8, since there are two workers and four cardboard boxes.
[0075]
number
[0076] In addition, [st] in Equation 8 is an abbreviation of [subject to], and means that the optimization problem is solved under the conditions after [st]. On the other hand, if the constraint domain is divided by straight lines as shown in Figure 6B, the optimization problem can be given by Equation 9.
[0077]
number
[0078] Since the constraint condition of Equation 9 is two equations, it can be solved faster than the original optimization problem (Equation 8). Furthermore, while the constraint condition of Equation 8 is nonlinear, the constraint condition of Equation 9 is linear, which further reduces the calculation load.
[0079] Moreover, if the constraint region is divided into circles as shown in FIG. 6C, the optimization problem can be expressed by the following equation (10).
[0080]
number
[0081] Like Equation 9, Equation 10 has two constraint conditions, and therefore can be solved faster than the original optimization problem (Equation 8). However, since the constraint conditions are nonlinear, it takes more calculation time than the division shown in FIG. 6b. If a division shown in FIG. 6D is used, the constraint conditions become even more complicated, and further calculations are required. Therefore, it is desirable for the constraint region management unit S005 to define the constraint region LA using as simple a formula as possible.
[0082] More specifically, it is preferable that the equation of the constraint condition is linear rather than nonlinear, and further it is preferable that the sum of the basis functions defining the constraint condition is smaller than a preset allowable value.
[0083] In summary, when the constraint region management unit S005 calculates the constraint region using a linear sum of basis functions that is equal to or smaller than the total number of non-controlled objects included in the movement region, (1) Linear and the sum of the basis functions is less than a preset tolerance (2) Linear and the sum of the basis functions is greater than a preset tolerance. (3) The model is nonlinear and the sum of the basis functions is less than a preset tolerance. (4) The model is nonlinear and the sum of the basis functions is greater than a preset tolerance. It is preferable to calculate the constraint region in the following order of priority:
[0084] So far, we have explained the processing contents of the path calculation unit S006 in a situation where there is only one agent A100 in the movement area MA. However, the path calculation unit S006 can perform similar calculations even when there are two or more agents in the same movement area, as shown in Figure 5B.
[0085] For example, even if there are two agents A100 in the movement area MA as shown in FIG. 12A, if the constraint area LA1 is given by the constraint area management unit S005 so as to surround the obstacles as shown in FIG. 12B, then path planning can be performed by solving the optimization problem of Equation 11 for the first agent A100a and the optimization problem of Equation 12 for the second agent A100b.
[0086]
number
[0087]
number
[0088] The formula common to both formulas 11 and 12 is a constraint condition for preventing contact between agent A 100a and agent A 100b. Even if the number of agents is three or more, a similar formulation can be used to perform path planning.
[0089] Returning to Fig. 1 again, the route distribution unit S007 communicates with the wireless communication device A107 to distribute the route calculated by the route calculation unit S006 to each agent. Note that for agents to which a route has already been assigned, route distribution is not necessary unless there is a route change. When the agent A100 receives the route from the wireless communication device A107, it executes tracking control according to the route.
[0090] The process procedure executed by the path planning device A108 explained so far will be explained using the flowchart in Fig. 13. First, in Fc201, information within the area is acquired. This process is performed by the agent management unit S002 and the environment management unit S003, and corresponds to the work of updating the position of the agent A100 or the agent A100 provided by the monitoring sensor A106, the position of the worker A101, the position of the pallet in the pallet storage area A104, the position of the temporarily placed cardboard box A105, and the like. The agent management unit S002 and the environment management unit S003 may be executed in any order, or may be executed in parallel. When Fc201 ends, a transition is made to Fc202.
[0091] In Fc202, it is confirmed whether there is an agent A100 to which no task is assigned. If there is an agent to which no task is assigned (YES), the process transitions to Fc203. If there is no agent to which no task is assigned (NO), that is, if tasks are assigned to all agents, the process transitions to Fc204.
[0092] In Fc203, a task is assigned to the agent A100. The target position Tg of the agent is determined by the task assignment. When the processing of Fc203 is completed, the process transitions to Fc204. As described above, Fc202 and Fc203 are processes performed by the business control unit S001.
[0093] In Fc204, a movement area MA is calculated to surround the current position and the target position Tg of the agent A100. If the current positions and target positions Tg of multiple agents A100 are similar, a movement area MA including multiple agents may be defined as shown in FIG. 5B. This process is performed by the movement area management unit S004. When the calculation of the movement area is completed, the process transitions to Fc205.
[0094] In Fc205, the area information acquired in Fc201 is used to calculate a constraint area LA in each moving area MA. This process is performed by the constraint area management unit S005. Details of the process of Fc205 are shown in the flowchart of Fig. 10. When the calculation of the constraint area is completed, the process proceeds to Fc206.
[0095] In Fc206, the target position Tg and the constraint area LA calculated in Fc203 to Fc205 are used to calculate the movement path of the agent. This process is performed by the path calculation unit S006. When the calculation of the path is completed, the process proceeds to Fc207.
[0096] In Fc207, a process is performed to distribute the route calculated in Fc206 to the agent. This function is performed by the route distribution unit S007. When the route distribution is completed, the process transitions to Fc208.
[0097] In Fc208, it is confirmed whether the task of each agent A100 is completed, that is, whether all agents A100 have reached the target position Tg. If the task is completed (YES), the process ends and restarts after a predetermined time has elapsed (return to Fc201). On the other hand, if the task is not completed (NO), the process transitions to Fc209.
[0098] In Fc209, the area information is checked again to check whether the location of the worker A101 or the like has changed during task execution. This process is the same as that in Fc201.
[0099] As described above, according to this embodiment, even if there are multiple agents or non-controlled objects within the working area, by appropriately setting a constraint area and reducing the constraints for route calculation, it is possible to calculate a route plan in real time for efficiently moving a large number of agents.
[0100] The above describes the case where the present invention is applied to a logistics warehouse, but below we will explain a specific example where the present invention is applied to route planning in a parking lot. Figure 14 shows an example of a parking lot to which the present invention is applied.
[0101] The target parking lot is a parking lot in a facility sandwiched between two roads, and has entrances and exits from each road to the parking lot. In addition, the vehicles that use the parking lot in this embodiment are autonomous vehicles, CAVs ( C connected A utonomous V In this embodiment, the CAV corresponds to the agent A100.
[0102] In the above-mentioned embodiment, a worker A101 working in a logistics warehouse was assumed as a non-controlled moving object, but in this embodiment, a pedestrian A101 moving from a parking lot to a facility corresponds to this. Also, a vehicle A105 temporarily stopped outside a parking area corresponds to a temporarily placed cardboard box A105. Also, as in the above-mentioned embodiment, a surveillance camera A106 is arranged so that the entire parking lot can be observed.
[0103] A CAV that enters a parking lot (managed area) communicates with a management server A108 via a wireless communication device A107 in the area, and moves to a parking space according to a route plan provided by the server. The CAV's task is to move to an empty space bi (i=1, 2, 3) in the parking lot. Note that, although only the explanation of guiding a vehicle to an empty space bi will be given here, it is also possible to guide a vehicle exiting the parking lot to the roadway.
[0104] The management server A108 manages vacant spaces bi in the parking lot, and guides each vehicle that enters to the vacant space bi. Note that, although the management server A108 is placed within the facility in Fig. 14, it may be placed anywhere in the parking lot as long as it can communicate with the wireless communication device A107.
[0105] As a specific example of guidance to an empty space in a parking lot, the operation of the route planning device A108 will be described using FIGS. 15A to 15E, taking as an example a situation in which CAV1: A100a and CAV2: A100a enter the parking lot.
[0106] When CAV1 and CAV2 enter the management area, they start communication with the management server A108. The business management unit S001 implemented in the management server A108 determines the target position Tg according to the current position of each CAV, the vacant space bi, and the positional relationship. If the target positions of CAV1 and CAV2 are set to the vacant spaces b1 and b2, the movement area management unit S004 sets the movement areas MA1 and MA2 as shown in FIG. 15B. The environment management unit S003 calculates the positions of the pedestrian A101, the temporarily stopped vehicle A105, and the parked vehicle A105 from information acquired by the surveillance camera in the parking lot, and the constraint area management unit S005 calculates the constraint areas LA1a, LA1b, and LA2 as shown in FIG. 15C based on this information.
[0107] Once the calculation of the constraint area is completed, the route calculation unit S006 calculates the movement route of the CAV so as not to come into contact with the constraint area. However, as shown in FIG. 15D, since the constraint area LA1a exists on the movement route of the CAV1, it is not possible to generate a route to the target position b1. However, since the obstacles in the constraint area LA1a are pedestrians and vehicles that are stopped temporarily, they are predicted to move over time. As a result, it becomes possible to generate a route for the CAV1 to move to b1, as shown in FIG. 15E.
[0108] Although the above-mentioned two embodiments deal with path planning for an agent moving on a plane, the present invention can be applied to things other than agents moving on a plane.
[0109] A specific embodiment in which the present invention is applied to route planning at a construction site will be described. Figures 16A and 16B show an example of a construction site to which the present invention is applied. Figure 16A shows the initial posture of a hydraulic excavator, which corresponds to the agent A100 in this embodiment, from above, and Figure 16B shows the final posture of the hydraulic excavator from the side. The path planning device of the present invention provides a three-dimensional trajectory that moves the working equipment position of the hydraulic excavator from the initial posture to a target position set in the sky above the dump truck DT.
[0110] As shown in the overall schematic diagram of the construction site in Fig. 17, similarly to the above-described embodiment, a monitoring camera A106 is installed at the construction site, and the situation within the site can be constantly monitored by a management server A108 via a wireless communication device A107. If there is only one hydraulic excavator to be controlled, the controller that controls the operation of the hydraulic excavator may be substituted for the server.
[0111] In addition to the hydraulic excavator A100 and the dump truck DT, there may be a situation where multiple workers A101 are present at the construction site to perform detailed excavation work that is difficult for the hydraulic excavator to handle, or to monitor the progress of the construction site.
[0112] The path planning device A108 of this embodiment implemented as a server determines, via an agent management unit S002, that the hydraulic excavator A100 has reached the initial posture after completion of the excavation operation, as shown in the posture of FIG. 16A, and sets a target position Tg on the bed of the dump truck DT via an operation management unit S001 based on the position of the dump truck DT calculated by an environment management unit S003.
[0113] In this embodiment, since it is assumed that the hydraulic excavator A100 operates only the front working equipment, the movement area management unit S004 determines the range in which the front working equipment of the hydraulic excavator A100 can operate, as shown in Figures 18A and 18B. Since the hydraulic excavator A100 can perform not only lifting and lowering operations but also turning operations, the movement area MA is also a three-dimensional area, as shown by the hatched portions in Figures 18A and 18B.
[0114] Similarly, in this embodiment, the constraint area LA calculated by the constraint area management unit S005 is, for example, a rectangular parallelepiped area surrounding the dump truck and the worker, as shown in Fig. 19. It goes without saying that the shape of the constraint area is not limited to a rectangular parallelepiped.
[0115] In the path calculation unit S006, a constraint condition is given so that the front work unit of the hydraulic excavator does not enter the constraint region in FIG. 19, and the model predictive control is solved, thereby making it possible to calculate the movement path of the front work unit.
[0116] Although the embodiments of the present invention have been described in detail above using a logistics warehouse, a parking lot, and a construction site as examples, it goes without saying that the application of the present invention is not limited to these cases. For example, the present invention can also be used to generate a route for a transport vehicle in a port, or a route for a robot moving in a theme park.
[0117] According to the embodiment of the present invention described above, the following advantageous effects are obtained. (1) A path planning device according to the present invention is a path planning device that generates a path for an agent, which is a controllable moving body, and includes an agent management unit that manages position information of the agent, an environment management unit that acquires position information of uncontrollable non-controlled objects, an operation management unit that calculates a target position of the agent based on the position information of the agent acquired by the agent management unit, a movement area management unit that determines a movement area in which the agent can move and manages the positions of non-controlled objects within the movement area, a constraint area management unit that calculates a constraint area within the movement area that is less than the total number of uncontrolled objects included in the movement area, a path calculation unit that calculates a path to the target position of the agent so that the agent within the movement area does not enter the constraint area, and a path distribution unit that distributes the path calculated by the path calculation unit to the agent.
[0118] The above configuration makes it possible to provide a method for reducing the number of constraint conditions that impose a computational load by introducing a constraint region, and for calculating a route plan in real time that allows a large number of agents to move efficiently.
[0119] (2) The constraint region management unit calculates the constraint region using a linear sum of basis functions that is equal to or less than the total number of non-controlled objects included in the movement region, thereby realizing high-speed calculation with simplified constraint conditions.
[0120] (3) The constraint area management unit calculates the constraint area using a linear sum of basis functions that is equal to or less than the total number of non-controlled objects contained in the movement area, and the path calculation unit calculates the agent's path so that the evaluation function is smaller than the previous calculation value for each calculation, using as constraints the evaluation function whose evaluation value decreases as the deviation between the agent's current position and the target position decreases and the constraint conditions determined by the constraint area management unit. This makes it possible to calculate an accurate path each time the calculation is performed.
[0121] (4) The constraint area management unit calculates an area within the movement area that does not include the shortest route from the movement target position of the agent to the current position as a constraint area that is equal to or smaller than the total number of non-control objects included in the movement area. This prevents the shortest route from the movement target position to the current position from being calculated as the constraint area, which can prevent the agent from being unable to pass through the shortest route.
[0122] (5) The constraint area management unit calculates the constraint area so that the area is equal to or smaller than the total number of uncontrolled objects contained in the movement area, and if there are multiple candidates for the constraint area, calculates the one with the smallest area as the constraint area. This makes it possible to maximize the area of the movement area in which the agent can move, and to ensure a large number of options for routes that can be adopted.
[0123] (6) When the uncontrolled objects existing in the calculated constraint area include a moving object, and the moving object deviates from the constraint area or is expected to deviate within a preset time, the constraint area management unit recalculates the constraint area to include the position of the moving object after the movement. This makes it possible to correct the route of the agent in real time.
[0124] (7) The constraint area management unit divides the constraint area so as to include the position of the moving object after it moves when the non-controlled objects existing in the calculated constraint area include a moving object that deviates from the constraint area and is on the shortest route. This makes it possible to eliminate in real time the risk that the agent will not be able to take the shortest route, as in (4).
[0125] (8) When an obstacle is present in the shortest path from the target position of the agent to the current position within the movement area, the constraint area management unit calculates an area for avoiding the obstacle as a constraint area that is equal to or smaller than the total number of non-control objects included in the movement area. This makes it possible to prevent the generation of a path that causes the agent to collide with an obstacle.
[0126] (9) The constraint region management unit, when calculating the constraint region within the movement region using a linear sum of basis functions that is equal to or less than the total number of non-controlled objects included in the movement region, [1] Linear and the sum of the basis functions is less than a preset tolerance [2] Linear and the sum of the basis functions is greater than a preset tolerance [3] Nonlinear and the sum of the basis functions is less than a preset tolerance. [4] Nonlinear and the sum of basis functions is greater than a preset tolerance. The constraint region is calculated in the following order of priority: In the present invention, by following such a priority, it becomes possible to quickly optimize the route.
[0127] The present invention is not limited to the above-described embodiments, and various modifications are possible. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to an embodiment having all of the configurations described. It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment. It is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to delete a part of the configuration of each embodiment, or to add or replace another configuration. [Explanation of symbols]
[0128] A100 Agent, A101 Worker (non-controlled object), A105 Cardboard (non-controlled object), LA Constraint area, MA Movement area, S001 Work management unit, S002 Agent management unit, S003 Environment management unit, S004 Movement area management unit, S005 Constraint area management unit, S006 Path calculation unit, S007 Path distribution unit, Tg Target position
Claims
1. A path planning device that generates a path for an agent that is a controllable mobile object, comprising: an agent management unit for managing location information of the agent; an environment management unit that acquires position information of uncontrollable non-controllable objects; a task management unit that calculates a target position of the agent based on the position information of the agent acquired by the agent management unit; a movement area management unit that determines a movement area in which the agent can move and manages the positions of the non-controlled objects within the movement area; a constraint region management unit that calculates, within the movement region, a constraint region that is equal to or smaller than the total number of the non-controlled objects included in the movement region; a path calculation unit that calculates a path to the movement target position of the agent so that the agent in the movement area does not enter the constraint area; and a route distribution unit that distributes the route calculated by the route calculation unit to the agent; A path planning device comprising:
2. The route planning device according to claim 1 , the constraint region management unit calculates the constraint region using a linear sum of basis functions within the movement region that is equal to or less than the total number of the non-controlled objects included in the movement region; A path planning device comprising:
3. The route planning device according to claim 1 , the constraint region management unit calculates the constraint region using a linear sum of basis functions within the movement region that is equal to or smaller than a total number of the non-controlled objects included in the movement region; said path calculation unit calculates the path of said agent using as constraints an evaluation function whose evaluation value decreases as the deviation between the current position and the target position of said agent decreases and the constraint conditions determined by said constraint domain management unit, so that said evaluation function becomes smaller than the previous calculated value for each calculation; A path planning device comprising:
4. The route planning device according to claim 1 , the constraint area management unit calculates, within the movement area, an area that does not include the shortest path from the movement target position of the agent to the current position, as the constraint area, so that the area is equal to or smaller than the total number of non-controlled objects included in the movement area; A path planning device comprising:
5. The route planning device according to claim 1 , the constraint region management unit calculates a constraint region within the movement region so that the constraint region is equal to or smaller than the total number of the non-controlled objects included in the movement region, and when there are multiple candidates for the constraint region, calculates the one with the smallest area as the constraint region; A path planning device comprising:
6. The route planning device according to claim 1 , the constraint area management unit, when the non-controlled objects existing within the calculated constraint area include a moving object, and the moving object has deviated from the constraint area or is expected to deviate within a preset time, recalculates the constraint area so as to include a position of the moving object after the movement; A path planning device comprising:
7. The route planning device according to claim 1 , the constraint region management unit divides the constraint region so as to include a position of the moving object after the moving object deviates from the constraint region and is on the shortest route when the non-controlled object existing within the calculated constraint region includes a moving object; A path planning device comprising:
8. The route planning device according to claim 1 , the constraint area management unit, when an obstacle is present in the movement area on the shortest path from the movement target position of the agent to the current position, calculates an area for avoiding the obstacle as the constraint area so that the area is equal to or smaller than the total number of non-controllable objects included in the movement area; A path planning device comprising:
9. The route planning device according to claim 1 , When calculating the constraint region using a linear sum of basis functions that is equal to or less than the total number of the non-controlled objects included in the movement region, the constraint region management unit: (1) Linear and the sum of the basis functions is less than a preset tolerance (2) Linear, and the sum of the basis functions is greater than a preset tolerance. (3) Nonlinear and the sum of the basis functions is less than a preset tolerance. (4) The model is nonlinear and the sum of the basis functions is greater than the preset tolerance. The constraint region is calculated in the order of priority. A path planning device comprising:
Citation Information
Patent Citations
Moving route generation method, autonomous moving object, and autonomous moving object control system
JP2008152599A
Map subdivision for robot navigation.
JP2022040169A
Vehicle travel control method and travel control device
WO2020152490A1
Multiple vehicle movement control method, movement controller, movement control system, program, and recording medium
JP2021077090A
Vehicle route generation method, vehicle route generation device, vehicle and program
JP2022134905A
