Delay time calculation device, calculation method, and computer program

By segmenting the inflow road into sections and using average travel times of signal waiting sections, the method accurately calculates delay times per vehicle, addressing inaccuracies in conventional methods that include non-traffic-light stop events.

JP2024152856AActive Publication Date: 2024-10-25SUMITOMO ELECTRIC INDUSTRIES LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2024134091
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2020-10-19
Filing Date
2024-08-09
Publication Date
2024-10-25
Estimated Expiration
2041-07-06

AI Technical Summary

Technical Problem

Conventional calculation devices inaccurately estimate delay time per vehicle due to waiting at traffic lights, as they rely on link travel time that includes stop events other than traffic light waiting, leading to inflated delay times.

Method used

A method and device that calculates delay time per vehicle by dividing the inflow road into sections, determining the total number of signal waiting sections based on section speeds, and using average travel time of these sections to accurately estimate delay time, independent of non-traffic-light stop events.

Benefits of technology

This approach enhances the accuracy of delay time calculation by precisely identifying signal waiting sections, thereby improving the estimation of delay times per vehicle, even in complex traffic scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024152856000001_ABST
    Figure 2024152856000001_ABST
Patent Text Reader

Abstract

To improve the accuracy of calculating the delay time per vehicle due to waiting at a traffic light.SOLUTION: A device according to an aspect of the present disclosure includes: an acquisition unit for acquiring probe information of a probe vehicle passing on an incoming route to an intersection; and an information processing unit that uses the probe information as source data to perform a calculation process of a delay time per vehicle due to waiting for a signal on the incoming route. The calculation process includes: a first process for calculating, based on the probe information, a plurality of section speeds, which are average speeds of vehicles for each section of the incoming route divided into a plurality of sections; a second process for calculating, based on the plurality of section speeds, the total number of sections, which is the total number of sections included in the signal waiting sections on the incoming route; a third process for calculating the average travel time of the signal waiting sections based on the total number of sections; and a fourth process for calculating the delay time based on the total number of sections and the average travel time of the signal waiting sections.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a delay time calculation device, a calculation method, and a computer program. This application claims priority to Japanese Application No. 2020-175372, filed on October 19, 2020, and incorporates by reference all of the contents of said Japanese application. [Background technology]

[0002] Patent document 1 describes a traffic index calculation device that includes a first calculation unit that calculates normalized data that expresses the traffic variables of the entering road at a target intersection as a ratio to the saturation traffic flow rate, and a second calculation unit that uses the calculated normalized data to calculate a traffic index defined by an equation in which the traffic variables of the entering road are included in the numerator and the saturation traffic flow rate is included in the denominator.

[0003] In the calculation device of Patent Document 1, the delay time per vehicle due to waiting at a traffic light on an approaching road is calculated from the average travel time of the probe vehicles, and the above normalized data is calculated based on the calculated delay time. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] International Publication No. 2020 / 071040 Summary of the Invention

[0005] An apparatus according to one embodiment of the present disclosure includes an acquisition unit that acquires probe information of a probe vehicle traveling on an entrance road to an intersection, and an information processing unit that uses the probe information as original data to execute a calculation process of a delay time per vehicle due to waiting at a traffic light on the entrance road, the calculation process including a first process of calculating a plurality of section speeds, which are the average speed of vehicles for each of a plurality of sections that are divided into the entrance road, based on the probe information, a second process of calculating a total number of sections, which is the total number of sections included in the traffic light waiting sections on the entrance road, based on the plurality of section speeds, a third process of calculating an average travel time for the traffic light waiting sections based on the total number of sections, and a fourth process of calculating the delay time based on the total number of sections and the average travel time for the traffic light waiting sections.

[0006] A method according to one embodiment of the present disclosure includes the steps of acquiring probe information of a probe vehicle traveling on an entrance road to an intersection, and executing a calculation process of a delay time per vehicle due to waiting at a traffic light on the entrance road using the probe information as original data, the calculation process including a first process of calculating a plurality of section speeds, which are the average speed of vehicles for each of a plurality of sections formed by dividing the entrance road, based on the probe information, a second process of calculating a total number of sections, which is the total number of sections included in the traffic light waiting sections on the entrance road, based on the plurality of section speeds, a third process of calculating an average travel time for the traffic light waiting sections based on the total number of sections, and a fourth process of calculating the delay time based on the total number of sections and the average travel time for the traffic light waiting sections.

[0007] A computer program according to one embodiment of the present disclosure is a computer program for causing a computer to function as an acquisition unit that acquires probe information of a probe vehicle traveling on an entrance road to an intersection, and an information processing unit that executes a calculation process of a delay time per vehicle due to waiting at a traffic light on the entrance road using the probe information as original data, the calculation process including a first process of calculating a plurality of section speeds, which are the average speed of vehicles for each of a plurality of sections formed by dividing the entrance road, based on the probe information, a second process of calculating a total number of sections, which is the total number of sections included in the traffic light waiting sections on the entrance road, based on the plurality of section speeds, a third process of calculating an average travel time for the traffic light waiting sections based on the total number of sections, and a fourth process of calculating the delay time based on the total number of sections and the average travel time for the traffic light waiting sections. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is an overall configuration diagram of a traffic signal control system. [Diagram 2] FIG. 2 is a block diagram of an information processing device, an on-board device of a probe vehicle, and a central device included in the traffic signal control system. [Diagram 3] FIG. 3 is a flowchart showing an outline of remote control according to a comparative example. [Figure 4] FIG. 4 is a flowchart showing an outline of the remote control according to this embodiment. [Diagram 5] FIG. 5 is an explanatory diagram showing an example of a method for calculating normalized data when the target intersection for remote control is a single intersection. [Figure 6] FIG. 6 is an explanatory diagram showing the traffic situation at an intersection when it is not saturated, and the relational expression required to derive the traffic volume Vin normalized by Sf. [Figure 7] FIG. 7 is an explanatory diagram showing an example of a traffic situation at an intersection when the traffic is oversaturated. [Figure 8] FIG. 8 is an explanatory diagram showing an example of a stop event that affects the accuracy of the delay time per vehicle due to waiting at a traffic light. [Figure 9]FIG. 9 is an explanatory diagram showing an example of the definition of variables used for calculating the average travel time in a traffic light waiting section. [Figure 10] FIG. 10 is a flowchart showing an example of a process for calculating a delay time per vehicle due to waiting at a traffic light. [Figure 11] FIG. 11 is a flowchart showing an example of a process for calculating the total number of sections within a signal waiting section. [Figure 12] FIG. 12 is an explanatory diagram showing an example of an actual calculation of the total number of sections. [Figure 13] FIG. 13 is an explanatory diagram showing an example of a method for calculating a delay time when a link between intersections has multiple lanes. [Figure 14] FIG. 14 is an explanatory diagram showing an example of a method for calculating a delay time when a link between intersections has multiple lanes. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] <Problems to be Solved by This Disclosure> In the conventional calculation device, the average travel time of the probe vehicle is calculated based on the link travel time from the upstream intersection to the target intersection. Therefore, if the probe vehicle has a stop event other than waiting at a traffic light, the delay time may be larger than the actual delay time. In view of the above-mentioned problems, the present disclosure has an object to improve the accuracy of calculating the delay time per vehicle due to waiting at a traffic light.

[0010] <Advantages of this disclosure> According to the present disclosure, it is possible to improve the accuracy of calculating the delay time per vehicle due to waiting at traffic lights.

[0011] <Overview of the embodiment of the present invention> Hereinafter, an outline of an embodiment of the present invention will be described. (1) The calculation device of this embodiment includes an acquisition unit that acquires probe information of a probe vehicle traveling on an entrance road to an intersection, and an information processing unit that executes a calculation process of a delay time per vehicle due to waiting at a traffic light on the entrance road using the probe information as original data. The calculation process includes a first process of calculating a plurality of section speeds, which are the average speed of vehicles for each of a plurality of sections formed by dividing the entrance road, based on the probe information, a second process of calculating a total number of sections, which is the total number of sections included in the traffic light waiting sections on the entrance road, based on the plurality of section speeds, a third process of calculating an average travel time for the traffic light waiting sections based on the total number of sections, and a fourth process of calculating the delay time based on the total number of sections and the average travel time for the traffic light waiting sections.

[0012] According to the calculation device of this embodiment, the average travel time for the traffic light waiting section is calculated based on the total number of sections, which is the total number of sections included in the traffic light waiting section on the entering road, and the above-mentioned delay time is calculated based on the total number of sections and the average travel time for the traffic light waiting section. Therefore, it is possible to accurately calculate the delay time per vehicle due to waiting at a traffic light on the entering road, regardless of the presence or absence of stopping events other than waiting at a traffic light.

[0013] (2) In the calculation device of this embodiment, the second process may include a search process for searching for a section that satisfies a speed condition in which the section speed is equal to or less than a speed threshold, starting from the downstream side of the entrance road, and counting the section that satisfies the speed condition as a section included in the signal waiting section. The reason is that the section that satisfies the above speed condition is estimated to be a section where the probe vehicle has slowed down or stopped due to waiting at a traffic light.

[0014] (3) In the calculation device of this embodiment, the second process may include a process of continuing the search process when the sum of the section lengths of one or more sections that do not satisfy the speed condition is less than a distance threshold. The reason for this is that if the length of the section that does not satisfy the speed conditions is short, this is likely the result of the probe vehicle repeatedly stopping and moving within the red light waiting section, and it cannot necessarily be said that the section being searched has reached the upstream side of the red light waiting section.

[0015] (4) In the calculation device of this embodiment, the second process may include a process in which, when the sum of the section lengths of one or more sections in which the section speed exceeds the speed threshold is equal to or greater than a distance threshold, the count value up to the most upstream section that satisfies the speed condition is set as the total number of sections. The reason for this is that if the length of the section that does not satisfy the speed condition is long, it is assumed that the section being searched has reached the upstream side of the section where the vehicle is waiting for a traffic light, and the most upstream section that satisfies the speed condition in the search so far can be estimated to be the end of the section where the vehicle is waiting for a traffic light.

[0016] (5) In the calculation device of this embodiment, the length of each of the multiple sections may be a value smaller than the installation interval (for example, 200 m) of vehicle detectors for measuring vehicle speed. In this way, the granularity of the measurement of the average vehicle speed is finer than when the average vehicle speed is measured by a vehicle detector, so the signal waiting section determined according to the total number of sections can be calculated more precisely, and the accuracy of the calculation of the delay time can be improved.

[0017] (6) In the calculation device of this embodiment, the third process may be a process of calculating an average travel time in the traffic light waiting section by the following formula (16). In this case, the average travel time in the traffic light waiting section can be accurately calculated by the following formula (16).

[0018]

number

[0019] (7) In the calculation device of this embodiment, the fourth process may be a process of calculating the delay time by the following formula (17). In this case, the delay time per vehicle due to waiting at a traffic light can be accurately calculated by the following formula (17).

[0020]

number

[0021] (8) In the calculation device of this embodiment, when the entering road is an entering road for which the right of way of multiple lanes is defined at the same phase, the information processing unit may execute the second process for each of the multiple lanes, and may execute the third process and the fourth process based on the maximum total number of sections among the total numbers of sections calculated by the second process. In this case, the delay time of the lane with the greatest degree of backlog among multiple lanes processed by the same aspect is calculated. This makes it possible to accurately calculate the traffic indicators of the intersection based on the actual traffic conditions, and improves the calculation accuracy of the signal control parameters.

[0022] (9) The calculation method of this embodiment is a calculation method executed by the calculation device of (1) to (8) above. Therefore, the calculation method of this embodiment has the same effects as the calculation devices of (1) to (8) above.

[0023] (10) The computer program of this embodiment is a computer program for causing a computer to function as the calculation device of (1) to (8) above. Therefore, the computer program of this embodiment has the same effects as the calculation device of (1) to (8) above.

[0024] <Details of the embodiment of the present invention> Hereinafter, the details of the embodiments of the present invention will be described with reference to the drawings. Note that at least some of the embodiments described below may be combined in any desired manner.

[0025] [Definition of terms] Before describing the details of this embodiment, the terms used in this specification will be defined. "Vehicle": refers to all vehicles that travel on roads. Therefore, in addition to automobiles, light vehicles, and trolleybuses, motorcycles also fall under the category of vehicles. In this embodiment, the term "vehicle" simply refers to both a probe vehicle having an on-board device capable of transmitting probe information, and a normal vehicle not having such an on-board device.

[0026] "Probe information" refers to various information related to a vehicle sensed by a probe vehicle traveling on a road. Probe information is also called probe data or floating car data. Probe information may include various vehicle data such as the identification information of the probe vehicle, vehicle position, vehicle speed, vehicle direction, and the time of occurrence of these. Probe information may also use information such as position and acceleration acquired by a smartphone or tablet in the vehicle.

[0027] "Probe vehicle": A vehicle that senses probe information and transmits it to the outside. Vehicles that travel on roads include both probe vehicles and other vehicles. However, even if a vehicle does not have an on-board device capable of transmitting probe information, it is included in the category of probe vehicle if it has a smartphone, tablet PC, or the like as mentioned above that can transmit probe information such as the vehicle's position information to the outside.

[0028] "Signal control parameters": The cycle length, split and offset, which are the time elements of a signal display, are collectively called signal control parameters or signal control constants. "Cycle length": The time from the start of a traffic signal's green (or red) to the start of the next green (or red). In Japan, the law requires that a green traffic light be called "green."

[0029] "Aspect": A traffic signal aspect indicates the relationship between the display status of each light in a traffic signal. An aspect indicates the right of way given to vehicles and pedestrians at an intersection for each approach road and the time period during which that right of way is given. "Split": The ratio of the time allocated to each phase to the cycle length. Generally expressed as a percentage or a ratio. Strictly speaking, it is the effective green time divided by the cycle length. "Offset": In coordinated or local control, this refers to the deviation of a certain point in a signal display, for example the start of a green signal on a main road, from a reference point common to the group of signals in question, or the deviation of the start point of the same display between adjacent intersections. The former is called absolute offset, and the latter is called relative offset, and is expressed as a time (seconds) or a percentage of the period.

[0030] "Green time": The time period during which vehicles have the right of way at an intersection. The end of the green time can be set at the earliest when the green light goes out, and at the latest when the yellow light goes out. In the case of an intersection with arrow lights, it can also be set at the end of the right turn arrow. "Red period": A period during which vehicles do not have the right of way at an intersection. The start of the red period may be set at the earliest when the green light goes out, and at the latest when the yellow light goes out. In the case of an intersection with arrow lights, it may also be set at the end of the right turn arrow.

[0031] As described above, in this embodiment, the time periods included in one cycle are roughly divided into green periods when you have the right to pass and red periods when you do not. Therefore, if the green periods are G, the red periods are R, and the cycle length is C, then there is a relationship of C=G+R. Therefore, in a calculation formula including R (for example, formula (10) and formula (11) described later), (CG) may be used instead of R. That is, the red time R in this embodiment may be a value calculated indirectly from the cycle length C and the green time G.

[0032] "Queue": A line of vehicles stopped in front of an intersection, for example, while waiting for a red light. "Link": A road section that connects nodes such as intersections and has an uphill or downhill direction. A link that flows into an intersection from the perspective of an intersection is called an inflow link, and a link that flows out of an intersection from the perspective of an intersection is called an outflow link.

[0033] "Travel time": The time required for a vehicle to travel a certain distance. Travel time may include stop times and delays along the way. "Link travel time": The travel time when the road section used as the unit of travel time calculation is a "link," that is, the travel time required for a vehicle to travel from the start point to the end point of a link.

[0034] "Traffic capacity": The traffic capacity of a road refers to the maximum number of vehicles that can comfortably pass through a road in one direction or a specified section of one lane within a certain period of time under road conditions such as the road shape, width, gradient, etc., and traffic conditions such as vehicle type composition, speed limit, etc. However, for two-lane or three-lane roads, both traffic volumes are taken into account.

[0035] "Traffic volume": The number of vehicles passing through within a unit time. Unless otherwise specified, it is expressed as the number of vehicles passing through in one hour, but for control and evaluation purposes, traffic volume over a short period of time, such as seconds, 5 minutes, or 15 minutes, may be used. Generally, traffic volume increases according to traffic demand, but decreases when traffic demand exceeds traffic capacity.

[0036] "Load rate": In an oversaturated state, it is necessary to consider the "load traffic volume," which is the sum of the traffic volume passing the stop line and the number of vehicles waiting in line that cannot be cleared, as a variable to be controlled. The ratio of the load traffic volume (traffic flow rate) per unit time to the saturation traffic flow rate is called the load rate. When the number of vehicles left unsold due to oversaturation is small, the load rate is equivalent to the demand rate. "Traffic demand": Traffic demand is the volume or traffic flow rate of traffic arriving at the stop line of an entrance road within a certain period of time for a given intersection or entrance road, or for a specific traffic route.

[0037] "Traffic flow rate": The number of vehicles passing through a certain section of a lane or roadway in a certain period of time (usually less than one hour) converted into a value per unit time (usually one hour). For example, if the traffic volume for 15 minutes is 90 vehicles, the traffic flow rate for this 15 minutes is 360 (vehicles / hour) or 6 (vehicles / minute). Traffic flow rate is the reciprocal of the average headway time of vehicles passing through during a given period of time.

[0038] "Oversaturated, non-saturated, near-saturated": When there is a backlog of people waiting in line at the end of the green light, traffic demand exceeds traffic capacity. This condition is called "oversaturated." Conversely, when traffic demand is below traffic capacity and the waiting line disappears when the green light ends, this is called a "non-saturated state." A state where the demand rate is high (for example, 0.85 or higher) but not oversaturated is called near-saturation. The demand rate is less than 1.

[0039] "Saturation flow rate": When there is sufficient traffic demand, the maximum number of vehicles that can pass the stop line per lane in a unit time (e.g., 1 second) at the entrance to an intersection is called the saturation flow rate. The value of the saturation flow rate differs depending on the traffic flow line, such as when there is a right-turn lane or a left-turn lane in addition to the straight-through lane. The value of the saturation flow rate also differs depending on the road or traffic conditions, such as lane width and the proportion of large vehicles.

[0040] "Point control": Traffic signal control can be classified into three types based on the number of intersections and spatial configuration: point control, system control, and area control. Of these, point control is a method of controlling signalized intersections individually.

[0041] "Systematic control": A method of controlling a series of adjacent intersections in a coordinated manner. The feature of this method is that a common cycle length (common cycle length of the system) and offset are determined for multiple signals that are systematically controlled. "Area control": A method of collectively controlling a large number of traffic signals installed on a road network that spreads over an area. It is an area-wide expansion of route system control.

[0042] "Fixed-cycle control": Traffic signal control can be classified into three types according to the method of setting signal control parameters: fixed-cycle control, traffic-responsive control, and traffic-adaptive control. Of these, fixed-cycle control is a method in which signal control parameters are set in advance according to the time of day. One of the combinations of signal control parameters (called a program) that are set in advance according to the time of day and day of the week (weekdays, Saturdays, Sundays, and holidays) is selected and implemented.

[0043] "Traffic-responsive control": A method of traffic signal control using vehicle detectors, which is executed by each signal controller. Also called terminal-responsive control. In traffic-responsive control, the start and end points of the green indication are determined in response to short-term changes in traffic demand, and the green time length and cycle length are changed as a result.

[0044] "Traffic adaptive control": A control method in which a central device in a traffic control center changes signal control parameters for traffic signal controllers at important intersections, or traffic signal controllers at multiple intersections that are system-controlled or area-controlled. Since the central device remotely controls one or multiple traffic signal controllers, this is also called "remote control" in this embodiment. Traffic adaptive control allows for highly systematic control that can respond to fluctuations in traffic flow, and is therefore applied to roads where traffic volume and its temporal fluctuations are large and high traffic processing efficiency is required.

[0045] Traffic adaptive control is classified into two types: "program selection control" and "program formation control." Program selection control is a method of selecting the most suitable program for the current traffic situation from multiple combinations (programs) prepared in advance, based on information from vehicle detectors, etc. Programmed control is a method that does not prepare a finite number of combinations of signal control parameters, but instantly determines the timing for switching signal control parameters or signal light colors based on information from vehicle detectors, etc.

[0046] "MODERATO" (Management by Origin-DEstination Related Adaptation for Traffic Optimization): The name of program formation control in Japan's Universal Traffic Management System (UTMS). MODERATO is a system that automatically generates signal control parameters based on the load rate for each approach road at an intersection (= (incoming traffic volume + number of queuing vehicles) / saturation traffic flow rate).

[0047] "SCOOT" (Split Cycle Offset Optimisation Technique): A program formation control method developed in the UK. It is widely adopted especially in European countries. SCOOT is a system that uses data from vehicle detectors installed on roads to automatically adjust the color of traffic lights to adapt to current traffic conditions in near real time.

[0048] "SCATS" (Sydney Coordinated Adaptive Traffic System): A program selection control method developed in Australia. It is used at approximately 42,000 intersections in over 1,800 cities in roughly 40 countries. SCATS is a system that finds the best signal control parameters (cycle length, split and offset) for the current traffic by selecting an automatic plan from a library in response to data obtained from loop detectors installed on the road.

[0049] [Overall system configuration] FIG. 1 is an overall configuration diagram of a traffic signal control system 1 according to this embodiment. FIG. 2 is a block diagram of the information processing device 2, the in-vehicle device 4 of the probe vehicle 3, and the central device 5 included in the traffic signal control system 1. As shown in Figures 1 and 2, the traffic signal control system 1 includes an information processing device 2 installed in a data center or the like, an on-board device 4 mounted on a probe vehicle 3, a central device 5 installed in a traffic control center, and a traffic signal controller 6 installed at each intersection.

[0050] The traffic signal control system 1 of this embodiment is a system in which an information processing device 2 collects probe information including vehicle positions and their passing times from a probe vehicle 3, obtains intersection signal information from a central device 5, and uses the probe information and signal information to calculate traffic indicators such as a load factor required to generate intersection signal control parameters.

[0051] In this way, the information processing device 2 of this embodiment functions as a "traffic index calculation device" necessary for generating signal control parameters. The information processing device 2 of this embodiment also functions as a "delay time calculation device" for each vehicle due to waiting at a traffic light on an incoming road, which is the source data for traffic indexes such as load factor.

[0052] There is no particular limitation on the operator of the information processing device 2. For example, the operator of the information processing device 2 may be a manufacturer of the vehicle 3 or an IT company that provides various types of information, or may be a public business entity in charge of traffic control that operates the central device 5. The server of the information processing device 2 may be operated as either an on-premise server or a cloud server.

[0053] The on-board device 4 of the probe vehicle 3 is capable of wireless communication with wireless base stations 7 (for example, mobile base stations) in various locations. The wireless base stations 7 are capable of communication with the information processing device 2 via a public communication network 8 such as the Internet. Therefore, the in-vehicle device 4 can wirelessly transmit the uplink information S1 addressed to the information processing device 2 to the wireless base station 7. In addition, the information processing device 2 can transmit the downlink information S2 addressed to a specific in-vehicle device 4 to the public communication network 8.

[0054] [Configuration of information processing device] 2, the information processing device 2 includes a server computer 10 formed of a workstation, and various databases 21 to 24 connected to the server computer 10. The server computer 10 includes an information processing unit 11, a storage unit 12, and a communication unit 13. The storage unit 12 is a storage device including at least one nonvolatile memory (recording medium) of a hard disk drive (HDD) and a solid state drive (SSD), and a volatile memory (recording medium) such as a random access memory. The nonvolatile memory may be removable.

[0055] The information processing unit (hereinafter also referred to as the “processing unit”) 11 is composed of an arithmetic processing device including a CPU (Central Processing Unit) that reads a computer program 14 stored in a non-volatile memory of the storage unit 12 and processes information in accordance with the program 14. The computer program 14 of the information processing device 2 includes a program that causes the CPU of the processing unit 11 to execute calculation processing of predetermined traffic indicators, such as calculating the delay time due to waiting at traffic lights of the probe vehicle 3 and calculating the load factor based on the delay time.

[0056] The communication unit 13 is composed of a communication interface for communicating with the central device 5 and the wireless base station 7 via the public communication network 8 . The communication unit 13 can receive uplink information S1 transmitted by the wireless base station 7 to the device itself, and can transmit downlink information S2 generated by the device itself to the wireless base station 7. The uplink information S1 includes probe information transmitted from the vehicle-mounted device 4. The downlink information S2 includes the link travel time calculated by the processing unit 11, etc.

[0057] The communication unit 13 can receive traffic light information of intersections included in the traffic control area that is transmitted to the local device by the central device 5. The traffic light information of the intersection includes at least the cycle length and red time length of the intersection. The communication unit 13 may be connected to the central device 5 of the traffic control center via a dedicated communication line 9 instead of the public communication network 8.

[0058] The various databases 21 to 24 are made up of large-capacity storage devices including HDDs, SSDs, etc. These databases 21 to 24 are each connected to the server computer 10 so as to be able to transfer data thereto. The databases 21 to 24 include a map database 21, a probe database 22, a member database 23, and a traffic light information database 24.

[0059] Road map data 25 covering the entire country is recorded in the map database 21. The road map data 25 includes "intersection data" and "link data." "Intersection data" is data that associates intersection IDs given to domestic intersections with location information of the intersections. "Link data" is data that associates the following information 1) to 4) with link IDs of specific links given corresponding to domestic roads.

[0060] Information 1) Location information of the start point, end point, and interpolation point of a specific link Information 2) Link ID connecting to the start point of a specific link Information 3) Link ID connecting to the end point of a specific link Information 4) Link cost of a specific link

[0061] The road map data 25 constitutes a network corresponding to the actual road alignment and driving direction of the road. For this reason, the road map data 25 is a network in which road sections between nodes n representing intersections are connected by directed links l (lowercase L). Specifically, the road map data 25 is a directed graph in which a node n is set for each intersection, and each node n is connected by a pair of opposite directed links l. Therefore, in the case of a one-way road, the node n is connected only by a one-way directed link l.

[0062] The road map data 25 also includes road type information indicating whether a specific directional link l corresponding to each road on the map is a general road or a toll road, and facility information indicating the type of facility, such as a toll gate or parking area, included in the directional link l.

[0063] In the probe database 22, the probe information received from the probe vehicle 3 registered in advance in the information processing device 2 is accumulated for each piece of identification information of the vehicle 3. The accumulated probe information includes at least the vehicle position and its passing time. The probe information may include vehicle data such as vehicle speed, vehicle direction, and vehicle status information (stop / running events). The sensing cycle of the probe information is at a granularity that allows accurate identification of the running history of the probe vehicle 3, and is, for example, 0.5 to 1.0 seconds.

[0064] The member database 23 records personal information such as the address and name of the owner (registered member) of the probe vehicle 3, the vehicle identification number (VIN), and identification information of the in-vehicle device 4 (e.g., at least one of the MAC address, email address, and telephone number, etc.). In the traffic light information database 24, traffic light information including the cycle length and red light duration of the approach road of each intersection is stored for each intersection ID and link ID.

[0065] The traffic signal controllers 6 installed at each intersection in the traffic control area include the following two types of traffic signal controllers: a first controller 6A and a second controller 6B. First controller 6A: A traffic signal controller that performs point control (such as fixed-period control) that determines the signal light color independently and is not subject to remote control (such as system control and area control) by the central device 5. Second controller 6B: A traffic signal controller that is the subject of remote control (system control, area control, etc.) by the central device 5

[0066] The central device 5 transmits the signal information of the first controller 6A to the information processing device 2 only when the operation is changed. The processing unit 11 updates the signal information of the first controller 6A included in the signal information database 24 to the received signal information. The central device 5 transmits the signal information of the second controller 6B to the information processing device 2 at predetermined control intervals (for example, 1.0 to 2.5 minutes). The processing unit 11 updates the signal information of the second controller 6B included in the signal information database 24 to the received signal information.

[0067] [Configuration of the in-vehicle device] As shown in FIG. 2, the in-vehicle device 4 is a computer device including a processing unit 31, a storage unit 32, a communication unit 33, and the like. The processing unit 31 is made up of an arithmetic processing device including a CPU that reads out a computer program stored in the non-volatile memory of the storage unit 32 and performs various information processing in accordance with the program .

[0068] The storage unit 32 is a storage device including at least one non-volatile memory (recording medium) of an HDD and an SSD, and a volatile memory (recording medium) such as a random access memory. The computer program 34 of the in-vehicle device 4 includes programs that cause the CPU of the processing unit 31 to execute sensing and generation of probe information, route search processing for the probe vehicle 3, image processing for displaying search results on the display of the navigation device, and the like.

[0069] The communication unit 33 is composed of a wireless communication device permanently installed in the probe vehicle 3, or a data communication terminal (for example, a smartphone, a tablet computer, or a node type personal computer) temporarily installed in the probe vehicle 3. The communication unit 33 has, for example, a GPS (Global Positioning System) receiver. The processing unit 31 monitors the current position of the vehicle in almost real time based on the GPS position information received by the communication unit 33. For positioning, it is preferable to use a global navigation satellite system such as GPS, but other methods may be used.

[0070] The processing unit 31 measures vehicle data such as the vehicle position, vehicle speed, vehicle direction, and CAN information of the host vehicle at predetermined sensing intervals (for example, 0.5 to 1.0 seconds), and records the data in the storage unit 32 together with the measurement time. When vehicle data has been accumulated in the memory unit 32 for a predetermined recording time (e.g., 1 minute), the communication unit 33 generates probe information including the accumulated vehicle data and identification information of the vehicle itself, and transmits the generated probe information via uplink to the information processing device 2.

[0071] The in-vehicle device 4 includes an input interface (not shown) that accepts operational inputs from the driver. The input interface is, for example, an input device associated with a navigation device or an input device of a data communication terminal mounted on the probe vehicle 3.

[0072] [Configuration of the central device] 2, the central device 5 is a server computer that comprehensively controls traffic signal controllers 6 at multiple intersections included in a traffic control area. The central device 5 includes a processing unit 51, a storage unit 52, a communication unit 53, and the like.

[0073] The traffic signal controllers 6 within the traffic control area include a first controller 6A of a point control type that operates independently (standalone), and a second controller 6B that is the subject of remote control (traffic adaptive control) by the central device 5. The processing unit 51 is made up of an arithmetic processing device including a CPU that reads out a computer program 54 stored in the non-volatile memory of the storage unit 52 and performs various information processing in accordance with the program 54 .

[0074] The storage unit 52 is a storage device including at least one non-volatile memory (recording medium) of an HDD and an SSD, and a volatile memory (recording medium) such as a random access memory. The computer program 54 of the central device 5 includes a program for remote control (traffic adaptive control) of at least one of MODERATO, SCOOT, and SCATS.

[0075] When the processing unit 51 generates the signal control parameters by remote control, it generates a signal control command to be executed by the second controller 6B which is the control target of the remote control. The signal control command is information related to the timing of changing the light color of a signal lamp corresponding to the newly generated signal control parameters, and is generated every control period of the remote control (for example, 1.0 to 2.5 minutes).

[0076] The communication unit 53 is composed of a communication interface that communicates with the information processing device 2 via the public communication network 8 and communicates with the second controller 6B via a dedicated communication line 9. The communication unit 53 may be connected to the information processing device 2 via the dedicated communication line 9.

[0077] The communication unit 53 transmits the signal control command that the processing unit 51 generates for each control period of the signal control parameters to the second controller 6B that is the target of remote control. The communication unit 53 transmits traffic light information including the cycle length and red time length in operation in the first and second controllers 6A and 6B to the information processing device 2. The traffic light information of the second controller 6B is transmitted to the information processing device 2 at every control period (for example, 1.0 to 2.5 minutes) of the remote control.

[0078] [Outline and problems of remote control according to the comparative example] FIG. 3 is a flowchart showing an outline of remote control (traffic adaptive control) according to a comparative example. As shown in FIG. 3, the remote control in the comparative example includes “measuring traffic flow” (step S1), “calculating traffic indexes” (step S2), “calculating signal control parameters” (step S3), and “reflecting the signal control parameters” (step S4).

[0079] The processing unit 51 of the central device 5 repeatedly executes each process of steps S1 to S4 at predetermined control intervals (for example, 1.0 to 2.5 minutes). Traffic flow measurement (step S1) is a process of measuring the traffic flow for each approach road at a target intersection. Conventional traffic flow measurement is a process of calculating actual measurement data based on detection signals (such as pulse signals) from vehicle detectors. The actual measurement data includes actual measurements of traffic volume Vin, number of queuing vehicles Qin, and saturation traffic flow rate Sf. Sf may be a set value based on the road structure.

[0080] Calculation of traffic indices (step S2) is a process of calculating traffic indices for each approach road required for calculation of signal control parameters, using the measurement results of step S1. The traffic index used in MODERATO is the load factor Lr, which is the ratio of traffic demand to the maximum traffic volume that can be handled during one cycle. The traffic index used in SCOOT and SCATS is the current saturation degree Ds, which is the ratio of arriving traffic volume to the maximum traffic volume that can be handled during green hours.

[0081] The calculation formula for the load factor Lr is as follows: (1) The calculation formula for the current saturation degree Ds is as follows: (2) Lr = (Vin + k × Qin) / Sf …… (1) Ds = Vin × C / (Sf × G) ……(2) Where, Vin: traffic volume entering the intersection (vehicles / sec) k: weighting coefficient (for example, use 1.0) Qin: Traffic volume equivalent of the number of queued vehicles (vehicles / sec) Sf: Saturation traffic flow rate (vehicles / second) G: Effective green time (seconds) C: Cycle length (seconds)

[0082] As shown in formula (1), the calculation formula for the load factor Lr includes the inflow traffic volume Vin and the number of queueing vehicles Qin as traffic variables for the inflow road. As shown in formula (2), the calculation formula for the current saturation degree Ds includes the inflow traffic volume Vin as a traffic variable for the inflow road. The processing unit 51 of the central device 5 substitutes the actual measured values ​​of Vin, Qin, and Sf obtained in step S1 into the formula (1) or (2) to calculate at least one traffic index of the load factor Lr and the current saturation degree Ds.

[0083] Calculation of signal control parameters (step S3) is a process of calculating signal control parameters such as the split and cycle length of the intersection to be controlled, using the traffic index calculated in step S2. Here, it is assumed that the central device 5 employs MODERATO to calculate the split and cycle length of a crossroads intersection that includes only two aspects. Also, the number of the aspect is represented as "i" (i=1,2), and the direction of the incoming lane of each aspect i is represented as "j" (j=1,2).

[0084] If the load factor of each inlet j of aspect i is "Lij", the traffic volume at inlet j is "Vij", the number of queueing vehicles at inlet j is "Qij", and the saturation traffic flow rate at inlet j is "Sij", the load factor Lij is given by the following equation (3). Lij = (Vij + Qij) / Sij ……(3)

[0085] The processing unit 51 of the central device 5 calculates the load factor Lri of the aspect i by the following formula (4), and calculates the load factor Lrt of the entire intersection by the following formula (5). In formula (4), "maxj" means the maximum value among the j load factors Lij included in the aspect i. Lri=maxj(Lij) ……(4) Lrt = Lr1 + Lr2 ……(5)

[0086] Then, the processing unit 51 of the central device 5 calculates the split λi and cycle length C of the aspect i by the following equations (6) and (7). In the equation (6), K represents the lost time, and a1 to a3 are coefficients. λi=Lri / Lrt ……(6) C=(a1×K+a2) / (1-a3×Lrt) ……(7)

[0087] The reflection of the signal control parameters (step S4) is a process of causing the second controller 6B of the target intersection to execute the signal control parameters calculated in step S3. Specifically, the processing unit 51 of the central device 5 calculates a signal control command including the light color change timing from the new signal control parameters, and transmits the calculated signal control command to the second controller 6B. Note that, in the case of the second controller 6B that can calculate the light color change timing from the signal control parameters, the signal control parameters may be transmitted to the second controller 6B as is.

[0088] As described above, in the remote control of the comparative example, the traffic indicators Lr and Ds are calculated by substituting the actual measured values ​​of Vin, Qin, and Sf obtained from the detection signal of the vehicle detector into the definition equation for the traffic indicators Lr and Ds (equation (1) or (2)). Therefore, the remote control according to the comparative example has a problem in that the control target is limited to the traffic signal controller 6 at the intersection where the vehicle detector is installed. Also, as long as the load factor of MODERATO and the phase saturation degree of SCOOT and SCATS are used, there is a fixed idea that a vehicle detector is necessary for remote control.

[0089] As shown in equations (1) and (2), the definition equations of the load factor Lr and the current saturation degree Ds include Vin and Qin in the numerator and the saturation flow rate Sf in the denominator. Therefore, if the traffic volume Vin and the number of queueing vehicles Qin input into equations (1) and (2) are defined as variables representing the ratio to the saturation flow rate Sf, it becomes possible to calculate the load factor Lr and the current saturation degree Ds even if the true values ​​of Vin, Qin, and Sf are unknown.

[0090] In other words, by defining the traffic volume on the inlet road as Vin = α × Sf, and the number of queueing vehicles as Qin = β × Sf, and substituting these into equations (1) and (2), Sf is offset by the numerator / denominator on the right-hand side, as shown in the following calculation equations (8) and (9). This means that as long as α and β can be determined, the load factor Lr and current saturation degree Ds can be calculated even if any value is used for the saturation flow rate Sf in the calculation process. By using the traffic volume Vin (=α×Sf) normalized by Sf and the number of queued vehicles Qin (=β×Sf) normalized by Sf, the load factor Lr and the current saturation degree Ds can be calculated without determining the values ​​of Vin, Qin, and Sf themselves.

[0091] Lr = (Vin + k × Qin) / Sf =(α×Sf+k×β×Sf) / Sf =α+k×β ……(8) Ds = Vin × C / (Sf × G) =α×Sf×C / (Sf×G) =α×C / G ……(9)

[0092] Hereinafter, the traffic volume Vin (=α×Sf) and the number of queueing vehicles Qin (=β×Sf) expressed as a ratio to Sf are referred to as the "normalized traffic volume" and the "normalized number of queueing vehicles", respectively. The "normalized traffic volume" and the "normalized number of queueing vehicles" are collectively referred to as the "normalized data". As mentioned above, the saturation flow rate Sf here can take any value. On the other hand, as described below, the above-mentioned α and β can be determined by using the calculation results of the probe information, so that the signal control parameters can be calculated from the load factor Lr and the current saturation degree Ds even without a vehicle detector.

[0093] Therefore, in this embodiment, the normalized traffic volume Vin (=α×Sf) and the normalized number of queued vehicles Qin (=β×Sf), which can be calculated from probe information, are adopted as traffic variables of the entering road used to calculate the traffic index (see FIG. 5). In this way, if the traffic index used to calculate the signal control parameters is calculated using normalized data obtained from the probe information, etc., it becomes possible to execute remote control even if the vehicle detector is not installed. Hereinafter, an overview of the remote control of this embodiment will be described with reference to FIG.

[0094] [Outline of remote control according to this embodiment] FIG. 4 is a flowchart showing an outline of the remote control (traffic adaptive control) of this embodiment. As shown in FIG. 4, the remote control of this embodiment includes "measuring traffic flow" (step S11), "calculating traffic indexes" (step S12), "calculating signal control parameters" (step S13), and "reflecting the signal control parameters" (step S14).

[0095] The processing unit 11 of the information processing device 2 repeatedly executes the processes of steps S11 to S12 at predetermined control intervals (for example, 1.0 to 2.5 minutes). The processing unit 51 of the central device 5 repeatedly executes the processes of steps S13 to S14 at the same control period (for example, 1.0 to 2.5 minutes).

[0096] Traffic flow measurement (step S11) is a process of measuring the traffic flow for each entrance road of the target intersection. The traffic flow measurement in this embodiment is a process of calculating normalized data using probe information as original data. The normalized data includes a normalized traffic volume Vin (=α×Sf) that indicates a ratio to Sf, and a normalized number of queued vehicles Qin (=β×Sf) that indicates a ratio to Sf.

[0097] Calculation of traffic indices (step S12) is a process of calculating traffic indices for each approach road required for calculation of signal control parameters, using the measurement results of step S11. The calculation formula for the load factor Lr is as shown in formula (1) above. The calculation formula for the current saturation degree Ds is as shown in formula (2) above.

[0098] The processing unit 11 of the information processing device 2 substitutes the normalized data Vin (=α×Sf) and Qin (=β×Sf) obtained in step 11 into equation (1) or (2) to calculate at least one traffic index of the load factor Lr and the current saturation degree Ds. In this case, as is clear from the above-mentioned equations (8) and (9), Sf is offset by the numerator / denominator on the right-hand side, so that the load factor Lr and the current saturation degree Ds can be calculated even if the values ​​of Vin, Qin, and Sf themselves are unknown.

[0099] The processing unit 11 of the information processing device 2 transmits to the central device 5 the calculation result of the load factor Lr or the current saturation degree Ds obtained in step S13. When the processing unit 51 of the central device 5 receives the calculation result of the load factor Lr or the current saturation degree Ds from the information processing device 2, the processing unit 51 executes the calculation process of steps S13 and S14 using the received calculation result.

[0100] Calculation of signal control parameters (step S13) is a process of calculating signal control parameters such as the split and cycle length of the control target using the traffic index received from the information processing device 2. The process content of step S13 is similar to that of step S3 in FIG. Reflection of the signal control parameters (step S14) is a process of causing the second controller 6B of the target intersection to execute the signal control parameters calculated in step S13. The process content of step S14 is similar to that of step S4 in FIG.

[0101] [Calculation method for normalized data for single intersections] 5 is an explanatory diagram showing an example of a method for calculating normalized data when the target intersection of remote control is a single intersection. The meanings of variables and the like included in FIG. It should be noted that an "independent intersection" is an intersection that is subject to remote control and is controlled independently of other intersections.

[0102] dav: average delay time per vehicle while waiting at traffic lights (seconds) L: Link length between intersections (m) Tt: Average travel time of the probe vehicle (= link travel time between J1 and J2) (seconds) Ve: Assumed speed (e.g., regulated speed) (km / h) J1: Intersection upstream of the target intersection J2: Target intersection for remote control (isolated intersection)

[0103] As shown in FIG. 5, in the case of remote control of an isolated intersection, the processing unit 11 of the information processing apparatus 2 calculates the normalized traffic volume Vin and the normalized number of vehicles in the queue Qin using the following formula (10) or formula (11) according to the saturation state (non-saturated / over-saturated) of the intersection. In formulas (10) and (11), "R" is the red time (seconds).

[0104] If dav ≦ R / 2 (in the case of non-saturation) Vin = {1 - R 2 / (2 × dav × C)} × Sf......(10) If R / 2 < dav (in the case of over-saturation) Vin = (1 - R / C) × Sf Qin = {(dav - R / 2) / R} × (1 - R / C) × Sf......(11) Hereinafter, with reference to FIGS. 5 to 7, the basis for the establishment of formulas (10) and (11) will be described.

[0105] (Relationship between link travel time and delay time) The graph at the bottom of FIG. 5 is a graph representing the driving trajectories when a plurality of vehicles pass through the link between intersections J1 and J2. The horizontal axis of the graph is the distance from intersection J1, and the vertical axis of the graph is the travel time.

[0106] When a plurality of vehicles pass through the link between intersections J1 and J2, the delay time dav per vehicle due to signal waiting is the value obtained by dividing the total delay time (area of the triangle) of all vehicles passing through intersection J2 after signal waiting by the number of vehicles. The average travel time Tt of the plurality of probe vehicles 3 can be regarded as including the above-mentioned delay time dav per vehicle.

[0107] Therefore, the delay time dav per vehicle due to waiting at a traffic light is calculated by subtracting the travel time (=L / (Ve / 3.6)) when traveling on the link at an assumed speed Ve without waiting at a traffic light from the average travel time Tt of the multiple probe vehicles 3. In other words, the delay time dav can be defined by the following equation (12). dav=Tt-{L / (Ve / 3.6)} ……(12)

[0108] The processing unit 11 of the information processing device 2 extracts probe information of multiple probe vehicles 3 that have passed through the link between intersections J1 and J2 during the current control period (for example, 1.0 to 2.5 minutes) from the position and time of the probe information contained in the probe database 22. Then, the processing unit 11 calculates the average travel time Tt of the link for the probe vehicle 3 based on the positions and times (or speed) of the extracted multiple pieces of probe information, and substitutes the calculated Tt into equation (12) to obtain the delay time dav.

[0109] (When the single intersection is unsaturated) FIG. 6 is an explanatory diagram showing the traffic situation at the intersection J2 in a non-saturated state and the relational expression required to derive the traffic volume Vin normalized by Sf. In the example of Figure 6, it is assumed that the vehicles stopped just before intersection J2 overlap and stop at the same position just before the stop line (vertical train image). Also, in Figure 6, "D" is the total delay time (seconds) in one cycle, and "Gc" is the time (seconds) with the green light start point as the origin, and represents the time when the rearmost vehicle passes the stop line at intersection J2.

[0110] When the approach road to intersection J2 is not saturated (dav≦R / 2), the number of vehicles that have entered after the red light starts (=(R+Gc)×Vin) is equal to the number of vehicles that have entered by time Gc (=Gc×Sf). Therefore, the time Gc when the rearmost vehicle crosses the stop line is given by the following formula (13). Gc=Vin×R / (Sf-Vin) ……(13)

[0111] The calculation formulas for the total delay time D of the train in one cycle and the delay time dav per vehicle are given by the following formulas (14) and (15), respectively. D=0.5×{(R+Gc)×R×Vin} ……(14) dav=D / (C×Vin)=0.5×{(R+Gc)×R} / C ……(15) By substituting Gc in equation (13) into equation (15) and solving for Vin, the calculation equation for the normalized traffic volume Vin when the intersection J2 is unsaturated becomes the above-mentioned equation (10).

[0112] (When a single intersection is oversaturated) FIG. 7 is an explanatory diagram showing an example of a traffic situation at the intersection J2 when the traffic is oversaturated. As shown in Fig. 7, a simple model of only driving and stopping is assumed as a model representing an oversaturated state that includes vehicles waiting at traffic lights for two or more times. In this case, the stopping time per stop at a traffic light from the second time onwards is equal to the red time R.

[0113] Pattern 1 in FIG. 7 shows the traffic situation when the queue is cleared in the current cycle (0 cycle wait), that is, when intersection J2 is just saturated. Pattern 2 in FIG. 7 shows the traffic situation when the queue is cleared in the next cycle (waiting one cycle), and pattern 3 in FIG. 7 shows the traffic situation when the queue is cleared in the cycle after that (waiting two cycles).

[0114] In pattern 1, dav=0.5R and Qin=0. In pattern 2, dav = 1.5R, Qin = (1-R / C) x Sf. In pattern 3, dav = 2.5R and Qin = 2 × (1 - R / C) × Sf. Therefore, when the intersection J2 is oversaturated, the calculation formula for the normalized traffic volume Vin and the normalized queue Qin is the above-mentioned formula (11).

[0115] [Problems with using average link travel time] FIG. 8 is an explanatory diagram showing an example of a stop event that affects the accuracy of the delay time dav per vehicle due to waiting at a traffic light. As shown in FIG. 8, possible stop events that may occur when the probe vehicle 3 travels along the link from the intersection J1 to the intersection J2 include waiting for a traffic light at the intersection J2, as well as the following events E1 and E2. Event E1: Stopping due to being the following vehicle of bus 3X that has stopped at the bus stop Event E2: Stopping due to following another vehicle, 3Y, entering or exiting the parking lot

[0116] However, in the above-mentioned equation (12), the link travel time between the intersections J1 and J2 is used as the average travel time Tt obtained from the probe information. Therefore, if the above events E1 and E2 occur to the probe vehicle 3, the average travel time Tt will include the stop times of the events E1 and E2, and the delay time dav based on equation (12) will be greater than the actual time.

[0117] In this case, the normalized traffic volume Vin and normalized queue Qin, which have the delay time dav as their original data, become inaccurate, and the load factor Lr and current saturation degree Ds, which have the normalized traffic volume Vin and normalized queue Qin as their original data, also become inaccurate. Therefore, the accuracy of the signal control parameters calculated from the load factor Lr and the current saturation degree Ds may decrease.

[0118] [Solution method using average travel time in traffic light waiting sections] In this embodiment, in order to solve the above problems, instead of the "average travel time Tt of the link" which may include stop times for events E1 and E2 other than waiting at traffic lights, the "average travel time Ttt of the traffic light waiting section" on the entrance road to the intersection J2 is calculated (see formula (16)), and the delay time dav per vehicle due to waiting at traffic lights on the entrance road to the intersection J2 is calculated using this average travel time Ttt (see formula (17)).

[0119] The average travel time Ttt in the traffic light waiting section does not include stop times for events E1 and E2 other than waiting at traffic lights, or the possibility of including such stop times is extremely small. Therefore, by adopting the above calculation method, it is possible to accurately calculate the delay time dav per vehicle due to waiting at a traffic light on the approach road into intersection J2, regardless of the presence or absence of stopping events other than waiting at a traffic light, such as events E1 and E2.

[0120] 9 is an explanatory diagram showing an example of the definition of variables used to calculate the average travel time Ttt in a traffic light waiting section. The variables include section i (i=1, 2....N), the length Li (m) of section i, and the average speed Vi (km / h) of the probe vehicle 3 passing through section i. Section i is made up of multiple small sections obtained by dividing the link between intersections J1 and J2 by ​​a predetermined division number N. The length Li of section i (hereinafter also referred to as the "section length") is a calculated value or a set value that is determined to be sufficiently shorter than the link length L between intersections J1 and J2.

[0121] The processing unit 11 of the information processing device 2 executes the following processes a1 and a2 as pre-processing of the calculation process of the delay time dav (see FIG. 10). Process a1: The link length L is divided by the division number N (=L / N) to obtain the section length Li. Process a2: Assign identification numbers (i=1, 2...N) for section i in sequence from the downstream side of the link to the upstream side. Specifically, the identification number for the most downstream side is set to "1", and the identification numbers are incremented toward the upstream side until the final identification number is set to "N".

[0122] The processing unit 11 of the information processing device 2 may execute the following processes b1 and b2 as pre-processing of the calculation process of the delay time dav (see FIG. 10). Process b1: The quotient M obtained by dividing the link length L by a predetermined distance Lo is added with 1 (=M+1), and the result is set as the number of divisions N of the link. The remaining distance value is set as the section length LN of the last section N. Process b2: Assign an identification number (i=1, 2...N) for section i in sequence from the downstream side to the upstream side of the link. Specifically, process b2 is the same as process a2.

[0123] In the above pre-processing, if the link between the intersections J1 and J2 has a branch node such as an unsignalized intersection, the section i may be divided at the branch node. In addition, the section length Li of each section i (i=1, 2...N) included in the link does not have to be a constant distance, and the section length Li included in one link may be changed, such as by making the downstream portion of the link shorter and the upstream portion longer.

[0124] In the above pre-processing, the length (section length) Li of each of the multiple sections i may be set to a value smaller than the installation interval (e.g., 200 m) of vehicle detectors that are actually installed on roads to measure vehicle speed. In this way, the measurement granularity of the average vehicle speed is finer than when the average vehicle speed is measured by a vehicle detector, and therefore the signal waiting section determined according to the total number of sections I can be calculated more precisely, improving the calculation accuracy of the delay time dav.

[0125] The average speed Vi of the probe vehicle 3 in the section i (hereinafter also referred to as the "section speed") is the average speed of the probe vehicle 3 calculated from the positions and times of multiple pieces of probe information. The method of calculating the average speed Vi for each section i will be described later.

[0126] [Delay Time Calculation Process] FIG. 10 is a flowchart showing an example of a calculation process of a delay time dav per vehicle due to waiting at a traffic light, which is executed by the processing unit 11 of the information processing device 2. As shown in FIG. 10, the processing unit 11 of the information processing device 2 first extracts probe information of multiple probe vehicles 3 that have passed through the link between intersections J1 and J2 during the current control period (e.g., 1.0 to 2.5 minutes) from the positions and times of the probe information contained in the probe database 22 as a collection process of data necessary for calculating the delay time dav (step ST10).

[0127] Next, as a first process of the calculation process of the delay time dav, the processing unit 11 calculates the average speed Vi of each section i (i=1, 2 . . . N) included in the link (step ST11). Specifically, the processing unit 11 calculates the travel speed in section i for each probe vehicle 3 that has passed through the link, based on the position and time (or speed) included in the probe information. Next, the processing unit 11 divides the total travel speed in section i for each probe vehicle 3 by the number of probe vehicles 3, and determines the average speed Vi for section i.

[0128] Next, as a second process of the calculation process of the delay time dav, the processing unit 11 calculates the total number I of sections in the signal waiting section on the entrance road of the intersection J2 to be controlled (step ST12). The total number of sections I corresponds to the identification number of the section i located at the most upstream of the traffic light waiting section on the entrance road of the intersection J2 to be controlled. Details of the calculation process of the total number of sections I (see FIG. 11) will be described later.

[0129] Next, as a third process of the calculation process of the delay time dav, the processing unit 11 calculates the average travel time Ttt of the signal waiting section by using the calculated total number of sections I (step ST13). Specifically, the processing unit 11 calculates the average travel time Ttt by the following formula (16). As shown in equation (16), the average travel time Ttt in the traffic light waiting section is the sum of the average travel time (= Li / (Vi / 3.6)) of the probe vehicle 3 in each section i for sections i from section 1 to the total number of sections I.

[0130]

number

[0131] Finally, as a fourth process of the delay time dav calculation process, the processing unit 11 calculates the delay time dav per vehicle due to waiting at a traffic light in the traffic light waiting section by using the calculated total number of sections I and the average travel time Ttt (step ST14). Specifically, the processing unit 11 calculates the delay time dav by the following formula (17). As shown in equation (17), the delay time dav in the traffic light waiting section is the average travel time Ttt in the traffic light waiting section minus the travel time (=Σ(Li / (Ve / 3.6)) when traveling at the assumed speed Ve in the traffic light waiting section (section 1 to section I) without waiting at the traffic light.

[0132]

number

[0133] In the calculation process of the delay time dav in FIG. 10, the third process in step ST13 and the fourth process in step ST14 may be performed by a single formula formed by substituting formula (16) for Ttt on the right-hand side of formula (17).

[0134] [Calculation process of the total number of sections within a signal waiting section] FIG. 11 is a flowchart showing an example of a calculation process for the total number I of sections in a signal waiting section, which is executed by the processing unit 11 of the information processing device 2. 11, "ML" is a variable that indicates the section length in which the section speed Vi exceeds the speed threshold TS. "TS" is the speed threshold, and "TL" is the distance threshold.

[0135] The speed threshold value TS is an estimated average speed of the vehicle when the vehicle stops before the intersection J2 to wait for a traffic light. The speed threshold value TS is a set value that is determined according to the length of the section Li, and is set to TS=25 km / hour here. The distance threshold TL is an estimated value of the cruising distance when a vehicle traveling at an average speed exceeding the speed threshold TS continues traveling without intending to stop. The distance threshold TS is a set value determined according to the speed threshold TS, and here it is assumed that TL = 100 m.

[0136] 11, the processing unit 11 of the information processing device 2 first performs initial setting of variables (step ST20). Specifically, the processing unit 11 sets the initial values ​​of the total number of sections I, the section length ML (the length obtained by adding up the respective section lengths Li), and the section i to I=0, ML=0, and i=1, respectively.

[0137] Next, the processing unit 11 judges whether or not Vi≦TS is satisfied (step ST21). If the determination result of step ST21 is positive (if the section speed Vi of the section i being determined is equal to or lower than the speed threshold value TS), the processing unit 11 sets I=i (step ST22) and then increments the section i (step ST23).

[0138] Next, the processing unit 11 judges whether or not i≧N is satisfied (step ST24). If the determination result in step ST24 is positive, the processing section 11 ends the process. If the determination result in step ST24 is negative, the processing section 11 returns the process to before step ST21. A search process is executed in which a loop including steps ST21 to ST24 searches for a section i that satisfies a speed condition in which the section speed Vi is equal to or less than the speed threshold TS, starting from the downstream side of the entrance road, and counts the section that satisfies the speed condition as a section i that is included in a waiting-for-traffic-signal section.

[0139] If the judgment result of step ST21 is negative (if the section speed Vi of the section i being judged exceeds the speed threshold TS), the processing unit 11 adds the section length Li of the section i being judged to the variable ML (step ST25), and then judges whether ML≧TL is satisfied (step ST26).

[0140] If the determination result in step ST26 is negative (if the variable ML is less than the distance threshold TL), the processing unit 11 resets the variable ML to 0 (step ST27) on the condition that Vi+1≦TS is established, and returns the process to before step ST23. Therefore, if Vi+1>TS, the value of the variable ML is not reset but maintained, and the process returns to before step ST23.

[0141] The reason why the variable ML is reset to 0 when Vi+1≦TS is established is that if the section speed Vi+1 of the next section i+1 is equal to or less than the speed threshold TS, it is clear that the variable ML will not increase in the next section i+1. If the judgment result of step ST26 is positive (if the variable ML is equal to or greater than the distance threshold TL), the processing unit 11 determines the number value of the last section i that satisfies Vi≦TS as the total number of sections I in the signal waiting section (step ST28), and terminates the processing.

[0142] [Example of calculating the total number of sections within a signal waiting area] FIG. 12 is an explanatory diagram showing an actual calculation example of the total number of sections I. 12, the numerical values ​​"u1" to "u5" are actual measured values ​​of section speeds Vi obtained from the probe information of multiple probe vehicles 3, and are assumed to be the following numerical values. Also, the number of divisions N of the link is 15, the section length Li of each section i is 50 m, TS is 25 km / hour, and TL is 100 m.

[0143] u1 = speed below 10km / h u2 = 15km / h or less u3 = Speeds below 20km / h u4 = Speed ​​below 25km / h u5 = speeds over 25km / h

[0144] 12, the section speeds V1, V2 (=u1) are equal to or less than the speed threshold value TS, and the section speeds V3, V4 (=u3) are also equal to or less than the speed threshold value TS. Therefore, the total number of sections I is counted up to "4" by the loop of steps ST21 to ST24 in FIG. Since the section speed V5 (=u5) exceeds the speed threshold value TS (No in step ST21 in FIG. 11), the loop of steps ST21 to ST24 in FIG. 11 is exited, and the variable ML becomes equal to L5 (step ST25 in FIG. 11).

[0145] Since the value of the variable ML (L5=50 m) is less than the distance threshold TL (=100 m) and the section speed V6 (=u4) of the next section 6 is less than the speed threshold TS (No in step ST26 in FIG. 11), ML is reset to 0 and the search for the total number of sections I continues (step ST27 in FIG. 11). Therefore, the total number of sections I is counted up to "5".

[0146] The section speeds V6, V7 (=u4) are equal to or lower than the speed threshold value TS. Therefore, the total number of sections I is counted up to "7" by the loop of steps ST21 to ST24 in FIG. Since the section speed V8 (=u5) exceeds the speed threshold TS (No in step ST21 in FIG. 11), the loop of steps ST21 to ST24 in FIG. 11 is exited, and the variable ML becomes equal to L8 (step ST25 in FIG. 11).

[0147] Since the value of the variable ML (L8=50 m) is less than the distance threshold TL (=100 m) and the section speed V9 (=u5) of the next section 9 is equal to or greater than the speed threshold TS (No in step ST26 in FIG. 11), the search for the total number of sections I continues while maintaining ML=L8 (step ST27 in FIG. 11). Therefore, the total number of sections I is counted up to "8".

[0148] Since the section speed V9 (=u5) exceeds the speed threshold value TS (No in step ST21 in FIG. 11), the loop of steps ST21 to ST24 in FIG. 11 is exited, and the variable ML becomes equal to L8+L9 (step ST25 in FIG. 11).

[0149] Since the value of the variable ML (L8+L9=100 m) is greater than or equal to the distance threshold TL (=100 m) (Yes in step ST26 in FIG. 11), the last section i (=7) that satisfies Vi≦TS is determined as the value of the total number of sections I (step ST28 in FIG. 11), and the processing ends. In this case, the most upstream end of the last section i (=7) is regarded as the end of the signal waiting section. Therefore, the speed Vi and section length Li of sections 8 to 15 upstream of section 7 are excluded from the data for calculating the average travel time Ttt.

[0150] [How to calculate delay time when there are multiple lanes] 13 and 14 are explanatory diagrams showing an example of a method for calculating the delay time dav when the link between the intersections J1 and J2 has multiple lanes. As shown in Figures 13 and 14, the approach road from intersection J1 to intersection J2 includes multiple lanes R1 to R3, where lane R1 is a lane for left turns and going straight, lane R2 is a lane for going straight, and lane R3 is a lane exclusively for right turns.

[0151] In addition, at the approach to intersection J2, the right-of-way for lanes R1 and R2 for going straight and turning left is defined by a phase φ1, and lane R3 for turning right only is defined by another phase φ2. In this case, as shown in Figure 13, when there are multiple lanes R1, R2 processed by the same current signal φ1, the processing unit 11 of the information processing device 2 executes the calculation process (Figure 11) of the total section number I for each of the multiple lanes R1, R2, and calculates the delay time dav of the approach road at intersection J2 based on the maximum total section number I among the calculated total section numbers I.

[0152] For example, in Figure 13, the total number of sections I (= 10) of lane R2 is greater than the total number of sections I (= 7) of lane R1, so the processing unit 11 executes the processing of steps ST13 and ST14 in Figure 10 based on the total number of sections I (= 10) of lane R2. In addition, the processing unit 11 applies the calculated delay time dav of lane R2 to equation (10) or equation (11) to calculate the normalized traffic volume Vin and the normalized number of queued vehicles Qin, and calculates the load factor Lr or the current saturation degree Ds based on these traffic indexes.

[0153] In this case, of the multiple lanes R1 and R2 processed by the same phase φ1, the delay time dav of the lane R2, which has a larger degree of backlog, is calculated. Therefore, the traffic indexes (Vin and Qin) of the intersection J2 that correspond to the actual traffic conditions can be accurately calculated, and the calculation accuracy of the signal control parameters can be improved.

[0154] As shown in Figure 14, when there is only one lane R3 processed with the same current signal φ2, the processing unit 11 of the information processing device 2 executes the calculation process (Figure 11) of the total number of sections I only for that lane R3, and adopts the delay time dav of that lane R3 as data for calculating the signal control parameters.

[0155] For example, in FIG. 14, only the total number of sections I (=3) of lane R3 is calculated, so the processing unit 11 executes the processes of steps ST13 and ST14 in FIG. 10 based on the total number of sections I (=3) of lane R3. In addition, the processing unit 11 applies the calculated delay time dav of lane R3 to equation (10) or equation (11) to calculate the normalized traffic volume Vin and the normalized number of queued vehicles Qin, and calculates the load factor Lr or the current saturation degree Ds based on these traffic indexes.

[0156] In addition, in the case where there are multiple right-turn-only lanes R3, R4 at the intersection J2 in FIG. 14, the calculation process of the total section number I (FIG. 11) is performed for each of the multiple lanes R3, R4, and the delay time dav of the approach road at the intersection J2 is calculated based on the total section number I of the lane R3 (or R4) with the larger total section number I.

[0157] [Other Modifications] The above-described embodiment (including the modified examples) is illustrative in all respects and is not restrictive. The scope of the present invention includes all modifications within the scope of the equivalents of the configurations described in the claims.

[0158] For example, in the above embodiment, the information processing device 2 may execute up to the measurement of traffic flow (step S11 in FIG. 4), and the central device 5 may execute the processes after the calculation of the traffic index (steps S12 to S14 in FIG. 4). Furthermore, if the central device 5 is capable of collecting and analyzing probe information, the central device 5 may perform all of the processes from measuring traffic flow to reflecting signal control parameters (steps S11 to S14 in FIG. 4). [Explanation of symbols]

[0159] 1. Traffic signal control system 2. Information processing device (delay time calculation device) 3. Probe vehicle 3X Bus 3Y Other vehicles 4 Onboard equipment 5. Central device (delay time calculation device) 6. Traffic signal controller 6A First controller 6B Second Controller 7 Radio base station 8 Public Communication Network 9. Communication Lines 10. Server Computers 11 Information Processing Section 12 Storage section 13. Communications Department (Acquisition Department) 14 Computer Programs 21 Map Database 22 Probe Database 23 Membership Database 24 Signal Information Database 25 Road map data 31 Processing section 32 Storage section 33 Communications Department 34 Computer Programs 51 Processing section 52 Storage section 53 Communications Department 54 Computer Programs

Claims

1. an acquisition unit that acquires probe information of a probe vehicle passing through an entrance road to an intersection; an information processing unit that uses the probe information as original data and executes a calculation process of a delay time per vehicle due to waiting at a traffic light on the entering road, The calculation process includes: A first process of calculating a plurality of section speeds, which are an average speed of a vehicle for each of a plurality of sections formed by dividing the entrance road, based on the probe information; A second process of calculating a total number of sections, which is a total number of the sections included in the signal waiting section on the entrance road, based on the plurality of section speeds; A third process of calculating an average travel time of the signal waiting section based on the total number of sections; and a fourth process of calculating the delay time based on the total number of sections and an average travel time of the signal waiting sections.

2. The second process includes: The delay time calculation device according to claim 1, further comprising a search process for searching for a section that satisfies a speed condition in which the section speed is equal to or less than a speed threshold, starting from the downstream side of the entrance road, and counting the section that satisfies the speed condition as a section included in the signal waiting section.

3. The second process includes: The delay time calculation device according to claim 2 , further comprising a process of continuing the search process when a length obtained by adding up the lengths of one or more sections that do not satisfy the speed condition is less than a distance threshold.

4. The second process includes: The delay time calculation device according to claim 2 or claim 3, further comprising a process for setting the count value of the most upstream section that satisfies the speed condition as the total number of sections when the sum of the section lengths of one or more sections that do not satisfy the speed condition is equal to or greater than a distance threshold.

5. The length of each of the plurality of sections is 5. The delay time calculation device according to claim 3, wherein the delay time calculation value is a value smaller than an installation interval of vehicle detectors for measuring vehicle speed.

6. The third process includes:

6. The delay time calculation device according to claim 1, further comprising a process for calculating an average travel time of the signal waiting section by the following equation (16). [0010] Where, Ttt: average travel time (seconds) in the signal waiting section Li: Length of section i (m) Vi: Average speed of section i (km / h) I: Total number of sections within the signal waiting section i: Identification number of the section assigned sequentially from the downstream side

7. The fourth process includes:

7. The delay time calculation device according to claim 1, wherein the delay time is calculated by the following equation (17). [0025] where dav is the average delay time per vehicle due to waiting at a traffic light (seconds) Ttt: Average travel time in the signal waiting section (seconds) Li: Length of section i (m) Ve: Estimated speed (e.g., regulated speed) (km / h) I: Total number of sections within the signal waiting section i: Identification number of the section assigned sequentially from the downstream side

8. The inlet passage is An approach where multiple lanes of right-of-way are defined by the same phase, The information processing unit includes:

8. A delay time calculation device as described in any one of claims 1 to 7, wherein the second process is performed for each of the plurality of lanes, and the third process and the fourth process are performed based on the maximum total number of sections among the total numbers of sections calculated by the second process.

9. acquiring probe information of a probe vehicle traveling on an entrance road to an intersection; and executing a calculation process of a delay time per vehicle due to waiting at a traffic light on the entering road using the probe information as original data, The calculation process includes: A first process of calculating a plurality of section speeds, which are an average speed of a vehicle for each of a plurality of sections formed by dividing the entrance road, based on the probe information; A second process of calculating a total number of sections, which is a total number of the sections included in the signal waiting section on the entrance road, based on the plurality of section speeds; A third process of calculating an average travel time of the signal waiting section based on the total number of sections; A fourth process of calculating the delay time based on the total number of sections and an average travel time of the signal waiting sections.

10. An acquisition unit that acquires probe information of a probe vehicle passing through an entrance road to an intersection; and A computer program for causing a computer to function as an information processing unit that performs a calculation process of a delay time per vehicle due to waiting at a traffic light on the entering road using the probe information as original data, The calculation process includes: A first process of calculating a plurality of section speeds, which are an average speed of a vehicle for each of a plurality of sections formed by dividing the entrance road, based on the probe information; A second process of calculating a total number of sections, which is a total number of the sections included in the signal waiting section on the entrance road, based on the plurality of section speeds; A third process of calculating an average travel time of the signal waiting section based on the total number of sections; and a fourth process of calculating the delay time based on the total number of sections and an average travel time of the traffic light waiting sections.

Citation Information

Patent Citations

  • Information collection device and information collection method

    JP2006031421A

  • Apparatus for generating congestion information, computer program, and method for generating congestion information

    JP2010044526A

  • Congestion determination device, computer program and congestion determination method

    JP2013167943A

  • Using connected vehicle data to optimize traffic signal timing plans

    US10559201B1

  • Traffic index computation device, computation method, traffic signal control system, and computer program

    WO2020071040A1