Data processing device, data processing system, and program
The data processing device integrates performance and work style data to address the burden of multiple surveys, enabling improved office layout design through data conversion and machine learning-based optimization.
Patent Information
- Application Number
- JP2023070773
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-24
- Publication Date
- 2024-11-06
AI Technical Summary
Conventional questionnaire systems burden workers with multiple surveys for different purposes, and information from these surveys is not effectively integrated for office design support, leading to separate systems for performance evaluation and layout design that hinder the utilization of worker data for office optimization.
A data processing device and system that processes performance data, work style data, and office layout data, converting between these to generate insights for various purposes, including a layout estimation model using machine learning to improve office design based on worker activities.
Enables the integration of performance and work style data for multiple purposes, facilitating improved office layout designs by reducing worker survey burden and enhancing data utilization across systems.
Smart Images

Figure 2024156369000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a data processing device, a data processing system, and a program, and more particularly to a data processing device, a data processing system, and a program that enable analysis results regarding an organization to be used for analysis for other purposes. [Background technology]
[0002] 2. Description of the Related Art As an information processing system for supporting the implementation of questionnaires in companies and other organizations, for example, a questionnaire support device disclosed in Patent Document 1 is known.
[0003] Furthermore, as an information processing system for supporting layout design in offices, factories, and other facilities, for example, a layout support device disclosed in Patent Document 2 is known. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2009-230302 A [Patent Document 2] JP 2020-170346 A Summary of the Invention [Problem to be solved by the invention]
[0005] 2. Description of the Related Art Today, businesses and other organizations use conventional techniques to conduct surveys of employees and other workers, for example to measure their performance or to investigate how they work.
[0006] On the other hand, in the conventional surveys, the survey is usually conducted for a specific purpose. As described above, companies and other organizations conduct surveys for various purposes, but there is a problem that a survey conducted for each purpose may increase the burden on workers to answer the survey.
[0007] In addition, the information analyzed through the above-mentioned surveys and other methods can be important information for designing an organization's office, but in conventional technology, the information system that supports the survey and the information system that supports the layout design are typically built as separate information systems, which makes it difficult to utilize information obtained from employees in office design.
[0008] In view of the above problems, an object of the present invention is to provide a data processing device, a data processing system, and a program that enable analysis results regarding an organization to be used for analysis for other purposes. [Means for solving the problem]
[0009] The data processing device of the present invention, which has been made to solve the above-mentioned problems, is characterized by having an input unit that inputs first data, which is any one of performance data indicating an evaluation of a worker's performance in an organization to which a plurality of workers belong, work style data indicating the activity patterns of workers related to their work in the organization to which a plurality of workers belong, and office data related to the office layout of the organization to which a plurality of workers belong, and an output unit that generates and outputs second data, which is at least one of the other two data, based on the first data inputted to the input unit.
[0010] In the data processing device according to the present invention, the first data is the performance data, The performance data may be output based on the worker's or organization's responses to questions.
[0011] In the data processing device according to the present invention, the first data is the work style data, 2. The data processing apparatus according to claim 1, wherein the work style data is output based on answers of the worker or organization to questions.
[0012] In the data processing device according to the present invention, the questions may be a group of questions made up of a plurality of categories.
[0013] The data processing device of the present invention may be configured so that the performance data includes a style evaluation value relating to the worker's work, communication and lifestyle style, a state evaluation value relating to the worker's organizational, mental and physical state, and a performance evaluation value relating to the worker's performance.
[0014] The data processing device of the present invention may be configured so that the work style data includes a teleworking evaluation value relating to the proportion of the worker's work time spent working from home, and a relationship building evaluation value relating to the proportion of time the worker spends building relationships with other workers.
[0015] In the data processing device according to the present invention, the office data may be data including the number of seats for each area allocated according to the activities of workers in the office.
[0016] In the data processing device of the present invention, when the first data is one of the performance data and the office data, and the second data is the other of the performance data and the office data, the output unit may generate the work style data based on the first data input to the input unit, and generate and output the second data based on the generated work style data.
[0017] The data processing device of the present invention may be configured so that the output unit outputs the second data based on the first data using an estimation model that uses any one of the performance data, the work style data, and the office layout data as input data and any one of the other two data as output data.
[0018] The data processing device of the present invention may include a performance / workstyle conversion unit in which the output unit generates the work style data based on the performance data, and the performance / workstyle conversion unit generates a telecommuting evaluation value related to the proportion of the worker's telecommuting included in the work style data based on at least one of the worker's working style, job position, and job type, and generates a relationship building evaluation value related to the proportion of the worker's time spent building relationships with other workers included in the work style data based on a style evaluation value related to the worker's communication style included in the performance data.
[0019] In the data processing device according to the present invention, the output unit includes a work-style / performance conversion unit that generates the performance data based on the work-style data; The work style / performance conversion unit includes a style evaluation value generation unit that generates a style evaluation value related to the work, communication and lifestyle of the worker included in the performance data based on the work style data, a state evaluation value generation unit that generates a state evaluation value related to the organization, mental and physical state of the worker included in the performance data based on the style evaluation value, and a performance evaluation value generation unit that generates a performance evaluation value related to the worker's performance based on the state evaluation value, and the style evaluation value generation unit may generate a style evaluation value related to the communication style based on a relationship building evaluation value related to the proportion of the time the worker spends on building relationships with other workers included in the work style data, and generate the style evaluation values related to the work and lifestyle based on the industry and / or size of the organization.
[0020] The data processing device of the present invention may include an office / work style conversion unit in which the output unit generates the work style data based on the office data, and the office / work style conversion unit generates a telecommuting evaluation value related to the proportion of telecommuting of the worker included in the work style data based on the number of seats included in the office data and the proportion of the worker's position and job type in the organization, and generates a relationship building evaluation value related to the proportion of time the worker spends building relationships with other workers included in the work style data based on the generated telecommuting evaluation value and a predetermined coefficient set in advance.
[0021] The data processing system of the present invention, which has been made to solve the above-mentioned problems, comprises a data processing device comprising: an input unit for inputting first data, which is any one of performance data indicating an evaluation of a worker's performance in an organization to which a plurality of workers belong, work style data indicating the activity patterns of a worker related to the work of the organization to which a plurality of workers belong, and office data related to the layout of an office in the organization to which a plurality of workers belong, and an output unit for generating and outputting second data, which is at least one of the other two data, based on the first data inputted to the input unit; and a layout drawing analysis device for analyzing a layout drawing of the office, wherein the layout drawing analysis device comprises: a layout estimation model having the layout drawing as input data and the office data as output data; a machine learning unit for generating the layout estimation model by machine learning as teacher data generated based on the layout drawing and the office data output by the data processing device as the second data; and an analysis unit for generating the office data from the layout drawing using the layout estimation model.
[0022] In the data processing system according to the present invention, the layout drawing analysis device may further include a layout improvement unit that generates an improved layout drawing that improves the layout of the office based on the difference between the office data generated by the analysis unit based on the layout drawing and the office data output by the data processing device based on the performance data or the work style data. Effect of the Invention
[0023] According to the configuration of the present invention, a data processing device inputs, as first data, any one of performance data indicating an evaluation of the performance of a worker in an organization to which a plurality of workers belong, work style data indicating the activity patterns of a worker in the organization to which a plurality of workers belong, and office data regarding the layout of an office in the organization to which a plurality of workers belong, and outputs, as second data, at least any other data. With this configuration, the analysis results of the organization can be used for analysis for other purposes. [Brief description of the drawings]
[0024] [Figure 1] 1 is a diagram showing a configuration of a data processing system including a data processing device in an example of an embodiment of the present invention. [Diagram 2] FIG. 13 is a diagram showing an overview of data in an example of the same embodiment. [Diagram 3] FIG. 13 is a diagram showing the configuration of a performance evaluation screen in an example of the same embodiment. [Figure 4] FIG. 13 is a diagram showing a category structure of questions used for performance analysis in one example of the embodiment. [Diagram 5] FIG. 13 is a diagram showing examples of questions used in performance analysis in the embodiment. [Figure 6] FIG. 13 is a diagram showing a first configuration of a work style evaluation screen in an example of the same embodiment. [Figure 7]FIG. 13 is a diagram showing a second configuration of the work style evaluation screen in the example of the same embodiment. [Figure 8] FIG. 13 is a diagram showing examples of questions used in a work style analysis according to an example of the same embodiment. [Figure 9] FIG. 2 is a diagram showing an example of an office layout drawing in the embodiment; [Figure 10] FIG. 13 is a diagram showing a configuration of an office evaluation screen in the example of the same embodiment. [Figure 11] FIG. 13 is a diagram showing an example of a state in which a wall is extracted from a layout drawing in the example of the embodiment. [Figure 12] FIG. 13 is a diagram showing an example of a state in which a layout drawing is divided into one or more sections in the example of the embodiment. [Figure 13] FIG. 13 is a diagram showing an example of a state in which an area of a layout drawing has been determined in the example of the embodiment. [Figure 14] FIG. 13 is a diagram showing an overview of a process for generating work style data from performance data in an example of the same embodiment. [Figure 15] FIG. 13 is a diagram showing an overview of a process for generating performance data from work style data in an example of the same embodiment. [Figure 16] FIG. 11 is a diagram showing an overview of a process for generating work style data from office data in the example of the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] An example of an embodiment of the present invention will be described below with reference to the drawings. Fig. 1 is a diagram showing the configuration of a data processing system according to an example of the embodiment of the present invention. As shown in Fig. 1, in the data processing system 1 according to this example of the present embodiment, a performance analysis device 3, a work style analysis device 4, and a layout drawing analysis device 5, which are communicatively connected to a data processing device 2, are connected to a user terminal 6 via a network 7.
[0026] The data processing device 2 is a device that uses any one of performance data, work style data, and office data described later as first data, which is input data, and outputs at least any one of the other two data as second data, which is output data. Note that the performance data is output data of a performance analysis device 3 described later, the work style data is output data of a work style analysis device 4 described later, and the office data is output data of a layout drawing analysis device 5 described later. The data processing device 2 includes an input unit 21 and an output unit 22.
[0027] Any one of performance data, work style data, and office data is input as first data to the input unit 21. The input data is converted into other data by the output unit 22, which will be described later, and is output.
[0028] The output unit 22 generates and outputs at least one of the other data based on any one of the performance data, work style data, and office data input as the first data. In one example of this embodiment, the output unit 22 includes a performance / work style conversion unit 221 that generates work style data based on the performance data, a work style / performance conversion unit 222 that generates performance data based on the work style data, a work style / office conversion unit 223 that generates office data based on the work style data, and an office / work style change unit 224 that generates work style data based on the office data.
[0029] The data processing device 1 in one example of this embodiment is configured using a well-known server computer. A program is stored in advance in a storage device such as a hard disk drive (HDD) or a solid state drive (SSD) of the server computer, and the stored program is loaded into memory and executed by a central processing unit (CPU), thereby making the server computer function as the data processing device 1. The hardware configuration of the data processing device 1 may be selected arbitrarily, and for example, the data processing device 1 may be configured using two or more computers. Also, the data processing device 1 may be configured using a well-known personal computer instead of a server computer, and the data processing device 1 may be configured using a well-known computer that satisfies the required performance such as processing speed and fault tolerance.
[0030] The performance analysis device 3 presents questions to a plurality of workers belonging to an organization, and generates performance data indicating an evaluation of the worker's performance in the organization based on the worker's answers to the presented questions. The performance analysis device 3 in one example of this embodiment includes a question presenting unit 31, an answer input unit 32, a performance data generating unit 33, a performance data output unit 34, and a performance analysis database 35.
[0031] The performance analysis device 3 in one example of this embodiment is configured using a well-known server computer, similar to the data processing device 2. Similarly, the server computer is made to function as the performance analysis device 3 using a pre-stored program, and similar to the data processing device 2, the performance analysis device 3 may be configured using a well-known computer that satisfies the required performance such as processing speed, fault tolerance, and the like.
[0032] The question presentation unit 31 acquires questions recorded in a performance analysis database 35, which will be described later, and presents them to the worker. As described above, the performance analysis device 3 in one example of this embodiment is configured using a server computer, and the worker answers the questions using the user terminal 6. The question presentation unit 31 presents the acquired questions to the worker by displaying them on the display of the user terminal 6 or other display device (not shown).
[0033] The answer input unit 32 inputs the worker's answer to the question presented by the above-mentioned question presentation unit 31. As described above, in one example of this embodiment, the worker answers the question using the user terminal 6. The worker's answer is input to the answer input unit 32 via the user terminal 6 and the network 7, and the answer input unit 32 records the answer in a performance analysis database 35 described below.
[0034] The performance data generation unit 33 generates performance data indicating an evaluation of the worker's performance in the organization based on the answer input by the answer input unit 32. As described above, in one example of this embodiment, the answer input unit 32 records the input answer in a performance analysis database 35 described later. The performance evaluation unit 33 acquires the answer recorded in the performance analysis database 35 and generates performance data by executing a predetermined evaluation process. The generated performance data is recorded in the performance analysis database 35 and output to the data processing device 2 or the user terminal 6 by a performance output unit 34 described later.
[0035] The performance output unit 34 outputs the performance data generated by the performance evaluation unit 33. In one example of this embodiment, the performance data output unit 34 outputs the performance data to the data processing device 2 or the user terminal 6. The user terminal 6 displays the performance data in a predetermined area of a performance evaluation screen, which will be described later.
[0036] The performance analysis database 35 is a database that manages information handled by the performance analysis device 3. In one example of this embodiment, the questions presented by the question presentation unit 31 described above are also recorded in advance in the performance analysis database 35. In one example of this embodiment, the performance analysis database 35 is an RDBMS (Relational Database Management System) provided in the performance analysis device 3, but a method for managing the information handled by the performance analysis device 3 may be selected from any known methods, and for example, instead of an RDBMS, the information may be managed using any area of a storage device of the performance analysis device 3.
[0037] In addition, the organization in the example of this embodiment is a company, an organization, or other organization. The organization may be any group consisting of multiple workers, regardless of whether it is for-profit or non-profit, whether it has legal personality, etc. For example, the organization may be a single company, or a single department or team within the company.
[0038] In addition, in one example of this embodiment, a worker is an operator who performs the business of an organization, a manager, or other personnel belonging to the organization. For example, if the organization is a company, the workers may be personnel who make up the organization or personnel who perform the business of the organization, and may include not only regular employees and members of a company, but also contract employees, part-time workers, and other personnel.
[0039] The work style analysis device 4 conducts questionnaires and other surveys on multiple workers belonging to an organization, and generates and outputs work style data indicating the activity patterns of the workers in the organization related to their work from the results of the conducted survey. The work style analysis device 4 in one example of this embodiment includes a question presentation unit 41, an answer input unit 42, a work style data generation unit 43, a work style data output unit 44, and a work style analysis database 45.
[0040] The work style analysis device 4 in one example of this embodiment is configured using a well-known server computer, similar to the data processing device 2 and the performance analysis device 3. Similarly, the server computer is made to function as the work style analysis device 4 using a pre-stored program, and the work style analysis device 4 may be configured using a well-known computer that satisfies the required performance such as processing speed and fault tolerance. Also, similar to the performance analysis device 3, it is configured so that workers use user terminals 6 to answer questions.
[0041] The question presenting unit 41 acquires questions recorded in a work style analysis database 45 described later and presents them to the worker. As with the performance analysis device 3 described above, the work style analysis device 4 in one example of this embodiment is configured using a server computer, and the worker answers the questions using the user terminal 6 used by the worker. The question presenting unit 41 presents the acquired questions to the worker by displaying them on the display of the user terminal 6 or other display device.
[0042] The answer input unit 42 inputs the worker's answer to the question presented by the above-mentioned question presentation unit 41. As described above, in one example of this embodiment, the worker answers the question using the user terminal 6. The worker's answer is input to the answer input unit 42 via the user terminal 6 and the network 7, and the answer input unit 42 records the answer in the work style analysis database 45 described later.
[0043] The work style data generation unit 43 generates work style data indicating the activity modes of workers related to their work in an organization to which multiple workers belong, based on the answers inputted to the answer input unit 42. As described above, in one example of this embodiment, the answer input unit 42 records the input answers in a work style analysis database 45 described later. The work style data generation unit 43 acquires the answers recorded in the work style analysis database 45 and generates work style data by executing a predetermined evaluation process. The generated work style data is recorded in the work style analysis database 45 and is outputted to the data processing device 2 or the user terminal 6 by the work style output unit 44 described later.
[0044] The work style data output unit 44 outputs the work style data generated by the work style data generation unit 43. In one example of this embodiment, the work style data output unit 44 outputs the work style data to the data processing device 2 or the user terminal 6. The user terminal 6 displays the work style data in a predetermined area of a work style evaluation screen, which will be described later.
[0045] The workstyle analysis database 45 is a database that manages information handled by the workstyle analysis device 4. In one example of this embodiment, the questions presented by the question presentation unit 41 described above are also pre-recorded in the workstyle analysis database 45. The workstyle analysis database 45 in one example of this embodiment is configured as an RDBMS provided in the workstyle analysis device 4, but as with the performance analysis database 35 described above, any well-known method may be selected as the method for managing information.
[0046] The layout drawing analysis device 5 generates and outputs office data regarding the office layout of an organization from a layout drawing of the office of the organization. The layout drawing analysis device 5 in one example of this embodiment includes a layout estimation model 51, a machine learning unit 52, an analysis unit 53, and a layout improvement unit 54.
[0047] An office is a place where workers perform work for an organization. An office may be, for example, a building or other structure, or may be a floor of the structure or a section within the floor.
[0048] Moreover, the performance analysis device 3 in one example of this embodiment is configured using a well-known server computer, similar to the data processing device 2, the performance analysis device 3, and the work style analysis device 4. Similarly, the server computer is made to function as the layout drawing analysis device 5 using a pre-stored program, and the layout drawing analysis device 5 may be configured using a well-known computer that satisfies the required performance such as processing speed, fault tolerance, and the like.
[0049] The layout estimation model 51 is an estimation model generated by machine learning that estimates office data based on an office layout drawing. The layout estimation model 51 is generated by a machine learning unit 52 (described later) and is used in the analysis process of an analysis unit 53 (described later).
[0050] The machine learning unit 52 generates the above-mentioned layout estimation model 51 by machine learning. The above-mentioned layout estimation model 51 is a trained model that estimates office data based on an office layout drawing, and the machine learning unit 52 generates the layout estimation model 51 by machine learning using training data generated based on the layout drawing and the office data. Note that the office data used as the training data may be office data created by a worker or other operator from the layout drawing, may be office data output by the above-mentioned data processing device 2 as the second data, or may be office data created by a worker or other operator based on the office data output by the layout analysis device 5 and / or the office data output by the data processing device 2 as the second data.
[0051] The analysis unit 53 uses the layout estimation model 51 to generate office data from the office layout drawing.
[0052] The layout improvement unit 54 generates an improved layout drawing by improving the office layout based on the difference between the office data generated by the analysis unit 53 and the office data output by the data processing device 2. The generated improved layout drawing is displayed on the display device of the user terminal 6, which will be described later.
[0053] The user terminal 6 is a terminal used by a worker, a specified administrator, or other users of the data processing system 1. The user terminal 6 may be configured using a known computer, and may be, for example, a smartphone, tablet computer, or other mobile terminal owned by a worker or other user, or may be a personal computer used by a worker.
[0054] The network 7 is a computer network that connects the user terminal 6 to the performance analysis device 3, the work style analysis device 4, and the layout drawing analysis device 5 so that they can communicate with each other. The network 7 may be configured using a known computer network, for example, a wide area network such as the Internet, a LAN (Local Area Network) provided in an organization's office, or a VPN (Virtual Private Network) configured on a wide area network. The network 7 may be a wired network, a wireless network, or a combination of a wired network and a wireless network. In one example of this embodiment, the data processing device 2 is connected to the performance analysis device 3, the work style analysis device 4, and the layout drawing analysis device 5 so that they can communicate with each other without going through the network 7, but whether or not the data processing device 2 is connected to the network 7 may be selected arbitrarily. For example, when there is a requirement that the data output by the data processing device 2 as the second data be viewed from the user terminal 6 via the data processing device 2, the data processing device 2 may be configured to be connected to the other devices 3 to 5 and the user terminal 5 so that they can communicate with each other via the network 7.
[0055] The above is the configuration of the data processing system 1 in one example of this embodiment. As described above, the specific configurations of the devices 2 to 5, the user terminal 6, and the network 7 constituting the data processing system 1 may be changed arbitrarily, and for example, the data processing system 2 may be configured using two or more computers.
[0056] Next, a description will be given of data handled by the data processing system 1 including the data processing device 2 in one example of this embodiment. Fig. 2 is a diagram showing an overview of data handled by the data processing system 1 in one example of this embodiment. As shown in Fig. 2, performance data D1, work style data D2, and office data D3, which are input data or output data of the data processing device 2, are data output by a performance analysis device 3, a work style analysis device 4, and a layout drawing analysis device 5, respectively.
[0057] The performance data D1 is data indicating an evaluation of the performance of a worker in an organization to which a plurality of workers belong. The performance analysis device 3 presents a predetermined number of questions Q1 to some or all of the workers in the organization, and outputs the performance data D1 based on the answers A1 of the workers to the questions Q1. The performance data D1 includes a performance evaluation value D11 regarding the performance of the worker's work in the organization, a state evaluation value D12 regarding the state of the worker's organization D12a, mental state D12b, and physical state D12c, and a style evaluation value D13 regarding the style of the worker's work D13a, communication D13b, and life D13c. The performance data D1 may be data generated for each worker based on the answers A1 from the worker, or may be data generated for the entire organization based on the answers A1 of the organization by treating the answers A1 from one or more workers representing the organization as the answers A1 of the organization. Furthermore, the data generated for each worker and the data for the entire organization generated by aggregating the data for each worker may coexist.
[0058] Fig. 3 is a diagram showing the configuration of a performance evaluation screen in one example of this embodiment. As described above, in one example of this embodiment, the performance data output unit 34 of the performance analysis device 3 outputs performance data D1 to the data processing device 2 or the user terminal 6. The performance evaluation screen W1 is a screen that displays the performance data D1 output to the user terminal 6, and as shown in Fig. 3, includes a performance evaluation area W11, a state evaluation area W12, and a style evaluation area W13.
[0059] The performance evaluation area W11 is an area for displaying the performance evaluation value D11 included in the performance data D1. In one example of this embodiment, the performance evaluation value D11, the evaluation value analyzed previously, and the average value of other organizations are displayed in the performance evaluation area W11 as numerical values W11a and a graph W11b.
[0060] The condition evaluation area W12 is an area that displays the condition evaluation value D12 included in the performance data D1. In one example of this embodiment, the condition evaluation value D12 includes a social capital evaluation value related to the social capital in the worker's organization as an organizational condition evaluation value D12a related to the state of the worker's organization, a work engagement evaluation value related to the worker's motivation and a psychological stress evaluation value related to the worker's psychological stress as a mental condition evaluation value D12b related to the worker's mental state, and a musculoskeletal complaint evaluation value related to the subjective symptoms in the worker's musculoskeletal system, a lifestyle-related disease evaluation value related to the worker's lifestyle-related disease, and an infection evaluation value related to the worker's infection as a physical condition evaluation value D12c related to the worker's body. The condition evaluation area W12 displays a radar chart W12a with each of the condition evaluation values D12 as an item, and a comparison table W12b that compares each of the condition evaluation values D12 with the previous analyzed value and the average value of other organizations.
[0061] The style evaluation area W13 is an area for displaying the style evaluation value D13 included in the performance data D1. In one example of this embodiment, the style evaluation value D13 includes, as a work style evaluation value D13a relating to the work style of the worker, a remuneration evaluation value relating to remuneration, a discretion evaluation value relating to discretion, a work aptitude evaluation value relating to work aptitude, a work burden evaluation value relating to the burden in the work, a psychological safety evaluation value relating to psychological safety, and a job crafting evaluation value relating to job crafting, as a style evaluation value D13b relating to the communication style of the worker, a communication evaluation value relating to communication, a rest / refreshment evaluation value relating to rests and refreshment, and a physical activity evaluation value relating to physical activity evaluation value. The performance evaluation screen W1 includes a physical activity evaluation value, a food evaluation value related to meals, a comfort evaluation value related to comfort, a cleanliness evaluation value related to cleanliness, and a health consciousness evaluation value related to health consciousness, and includes an exercise evaluation value related to exercise, a nutrition evaluation value related to nutrition, and a rest (sleep) evaluation value related to rest and sleep as a lifestyle evaluation value D13c related to the worker's lifestyle, and includes a strength style evaluation area W13a that displays the style evaluation value D13 that is the strength of the organization, and a weakness style evaluation area W13b that displays the style evaluation value D13 that is the weakness of the organization among the style evaluation values D13. A method for selecting the style evaluation value D13 that is the strength of the organization and the style evaluation value D13 that is the weakness of the organization may be selected from any known method, but in one example of this embodiment, each style evaluation value D13 in the organization is compared with the average of a plurality of organizations including the organization, and a high value is set as the style evaluation value D13 that is the strength of the organization, and a low value is set as the style evaluation value D13 that is the weakness of the organization.
[0062] 4 is a diagram showing a category structure of a question Q1 used in performance analysis in one example of this embodiment. In the performance analysis device 3 in one example of this embodiment, question categories consisting of three hierarchical levels, a first question category C1, a second question category C2, and a third question category C3, are preset.
[0063] The first question category C1 is the highest-level question category of the hierarchical question categories. In one example of this embodiment, the first question category C1 is composed of an organization category C11 indicating a viewpoint regarding the worker's relationship with the organization and / or other employees in the organization, a mental category C12 indicating a viewpoint regarding the worker's psychological state, and a physical category C13 indicating a viewpoint regarding the worker's physical state.
[0064] The second question category C2 is a question category that is an intermediate layer of the hierarchical question categories, and is a question category that subdivides each of the first question categories C into one or more categories. In one example of this embodiment, the second question category C2 is composed of a social capital category C21 indicating a viewpoint regarding the social capital of the worker in the organization, a work engagement category C22 indicating a viewpoint regarding the motivation of the worker, a psychological stress category C23 indicating a viewpoint regarding the psychological stress of the worker, a musculoskeletal complaint category C24 indicating a viewpoint regarding the subjective symptoms of the musculoskeletal system of the worker, a lifestyle-related disease category C25 indicating a viewpoint regarding the lifestyle-related disease of the worker, and an infectious disease category C26 indicating a viewpoint regarding the infectious disease of the worker. Each of the second question categories C2 corresponds to each of the above-mentioned condition evaluation values D12, and each of the condition evaluation values D12 is a value obtained by evaluating the answer to the question belonging to the corresponding category of the second question category C2 as a numerical value.
[0065] The third question category C3 is the lowest level question category in the hierarchical question category, and is a question category linked to one or more of the second question categories C2. In one example of this embodiment, the third question category C3 includes a reward category C31a indicating a perspective on reward, a discretionary category C31b indicating a perspective on discretion, a task suitability category C31c indicating a perspective on task suitability, a task burden category C31d indicating a perspective on task burden, a psychological safety category C31e indicating a perspective on psychological safety, a task category C31 including a job crafting category C31f indicating a perspective on job crafting, a communication category C32a indicating a perspective on communication, and a task cost category C32b indicating a perspective on breaks and refreshments. The third question category C3 includes a communication category C32 including a rest / refreshment category C32b indicating a viewpoint on physical activity, a physical activity category C32c indicating a viewpoint on physical activity, a food category C32d indicating a viewpoint on food, a comfort category C32e indicating a viewpoint on comfort, a cleanliness category C32f indicating a viewpoint on cleanliness, a health consciousness category C32f indicating a viewpoint on health consciousness, an exercise category C33a indicating a viewpoint on exercise, a nutrition category C33b indicating a viewpoint on nutrition, and a rest (sleep) category C33c indicating a viewpoint on rest and sleep. Each of the third question categories C3 corresponds to each of the above-mentioned style evaluation values D13, and each of the style evaluation values D13 is a value obtained by evaluating, as a numerical value, the answer to the question belonging to the corresponding category of the third question category C3.
[0066] Fig. 5 is a diagram showing an example of question Q1 used for performance analysis in one example of this embodiment. As shown in Fig. 5, in one example of this embodiment, question Q1 includes question sentence Q11, answer options Q12, and question category Q13. Question category Q13 is an item indicating to which of the above-mentioned question categories C1 to C3 question Q1 belongs, and in one example of this embodiment, it is configured to set a value indicating either the second question category C2 or the third question category C3.
[0067] In one example of this embodiment, the performance analysis device 3 has the question presentation unit 31 obtain a question group consisting of a predetermined number of questions Q1 from the performance analysis database 35 and present them by displaying them on the user terminal 6. When the user operates the user terminal 6 to input an answer A1 to the presented question Q1, the answer A1 is transmitted from the user terminal 6 to the performance analysis device 3. The performance analysis device 3 receives the transmitted answer A1 by the answer input unit 32 and records it in the performance analysis database 35.
[0068] The answer A2 recorded in the performance analysis database 35 is treated as input data for performance analysis processing by the performance data generation unit 33 of the performance analysis device 3. When the performance data generation unit 33 generates performance data D1 based on the answer A2, the performance data generation unit 34 outputs the generated performance data D1. As described above, the performance data D1 may be output to the data processing device 2 or to the user terminal 6, and when output to the user terminal 6, the performance data D1 is displayed in a predetermined area of the performance evaluation screen W1 of the user terminal 6.
[0069] In the performance data generation in this embodiment, specifically, a state evaluation value D12, a style evaluation value D13, and a performance evaluation value D11 are generated.
[0070] The state evaluation value D12 is an evaluation value based on the answer A1 of the worker to the question Q1 belonging to any of the second question categories C2 described above. In one example of this embodiment, as described above, each evaluation value constituting the state evaluation value D12 corresponds to each category constituting the second question category C2. A score is set in advance for each answer option Q12 provided for the question Q1, and is generated by adding up the scores of the options Q12 selected by the worker for each of the second question categories C2 and converting them so that the maximum score is 100 points.
[0071] The style evaluation value D13 is an evaluation value generated based on the answer A1 of the worker to the question Q1 belonging to any of the third question categories C3 described above. In one example of this embodiment, as described above, each evaluation value constituting the style evaluation value D13 corresponds to each category constituting the third question category C3. As with the generation of the state evaluation value D12 described above, a score is set in advance for each answer option Q12, and the style evaluation value D13 is generated by adding up the scores of the options Q12 selected by the worker for each of the third question categories C3 and converting them so that the total is 100 points.
[0072] In one example of this embodiment, the performance evaluation value D11 of the performance data D1 is generated based on the above-mentioned state evaluation value D12. In one example of this embodiment, the performance evaluation value is generated by weighting and adding up each of the state evaluation values D12. When the generation of the performance evaluation value D11, the state evaluation value D12, and the style evaluation value D13 is completed, the performance analysis device 3 generates performance data D1 including the generated evaluation values D11 to D13.
[0073] As described above, the performance data D1 may be data for each worker or data for the entire organization. In one example of this embodiment, performance data D1 for each worker is generated based on the worker's answer A1, and then the generated performance evaluation value D1 for each worker is aggregated to generate a performance evaluation value D1 for the entire organization.
[0074] The work style data D2 is data showing the activity patterns of the workers in the organization to which the workers belong. The work style analysis device 4 presents a group of questions consisting of a predetermined number of questions Q2 to some or all of the workers in the organization, and outputs the work style data D2 based on the answers A2 of the workers to the questions Q2. The work style data D2 includes a telecommuting evaluation value D21 regarding the ratio of telecommuting of the worker, a relationship building evaluation value D22 regarding the ratio of the time the worker spends building relationships with other workers, the number of office attendance days D23 indicating the number of days in the office in one week, the office stay time D24 indicating the time spent in the office on the office attendance days, and the task / behavior allocation D25 indicating the allocation of tasks / behaviors during the office stay time. As with the performance data D1, the work style data D2 may be data generated for each worker based on the answers A2 of the workers, or may be data generated for the entire organization based on the answers A2 of the organization by treating the answers A2 of one or more workers representing the organization as the answers A2 of the organization. Furthermore, data generated for each worker and data generated for the entire organization by aggregating that data may coexist.
[0075] Fig. 6 is a diagram showing the configuration of the first work style evaluation screen in one example of this embodiment. As described above, the work style data D2 in one example of this embodiment includes a telecommuting evaluation value D21 related to the ratio of telecommuting of the worker and a relationship building evaluation value D22 related to the ratio of the time spent by the worker building relationships with other workers, and as shown in Fig. 6, the work style analysis device 4 is configured to display the number of people W25 and the weight W26 for each of the first quadrant W24a to the fourth quadrant W24d of the two-dimensional coordinate system W23 in which the telecommuting evaluation value D21 is the first axis W21 and the relationship building evaluation value D22 is the second axis W22 on the first work style evaluation screen W2 displayed on the display device of the user terminal 6. In addition, an icon W27 indicating the magnitude of the weight W26 is displayed in each of the quadrants W24a to W24d.
[0076] The at-home evaluation value D21 used as the first axis W21 is an evaluation value related to the proportion of the worker who works at home. The range of work styles recognized as at-home work may be selected arbitrarily, and only cases where work is performed strictly at home may be treated as at-home work. However, in one example of this embodiment, even if the work is performed at a place other than home but outside the organization's office, such as a hotel on a business trip or a specified remote office, it is treated as at-home work. In one example of this embodiment, in the work style evaluation screen W2, a state in which the at-home evaluation value D21, which is the first axis W21, is high is displayed as "telework," and a state in which the at-home evaluation value D21 is low is displayed as "office."
[0077] The relationship building evaluation value D22 used as the second axis W22 is an evaluation value regarding the proportion of time that a worker spends on building relationships with other workers. In one example of this embodiment, in the work that a worker is responsible for in an organization, in addition to directly performing the work content or performing actions that contribute to the performance of the work, such as meetings regarding the work content, the worker also performs actions that do not directly contribute to the performance of the work but contribute to the formation of the organization in which the work is performed, such as personnel interviews, chatting with project members, and recreation, and the proportion of the time that the worker performs actions that contribute to the formation of the organization during working hours is set as the relationship building evaluation value D22. In one example of this embodiment, in the work style evaluation screen W2, a state in which the relationship building evaluation value D22, which is the second axis W22, is high is displayed as "lively", and a state in which the relationship building evaluation value D22 is low is displayed as "steady".
[0078] The coordinate system W23 in this embodiment is a coordinate system showing which of the first quadrant W24a to the fourth quadrant W24d the worker's activity mode is based on the telecommuting evaluation value D21, which is the first axis W21, and the relationship building evaluation value D22, which is the second axis W22. The first quadrant W24a shows an activity mode in which the proportion of telecommuting and the proportion of time contributing to relationship building are both low, that is, workers gather in the office to perform work. The second quadrant W24b shows an activity mode in which the proportion of telecommuting is high and the proportion of time contributing to relationship building is low, that is, workers are dispersed to their homes and other remote locations to perform work. The third quadrant W24c shows an activity mode in which the proportion of telecommuting is high and the proportion of time contributing to relationship building is high, that is, workers are dispersed to their homes and other remote locations to perform work. The fourth quadrant W24d shows an activity pattern where the proportion of telecommuting is low and the proportion of time spent on relationship building is high, that is, workers gather in the office to build relationships. Note that in the work style evaluation screen W2 in one example of this embodiment, the activity patterns shown in the first quadrant W24a to the fourth quadrant W24d are displayed as "hard work in the office," "hard work at telework," "lively at telework," and "lively at the office," respectively.
[0079] The number of people W25 is the number of workers in the organization who correspond to each of the activity modes shown in the first quadrant W24a to the fourth quadrant W24d. The weight W26 indicates the ratio of the number of people W25 to the total number of people in the organization. The first work style evaluation screen W2 in one example of this embodiment is a screen that displays, using a coordinate system W23, which of the activity modes shown in the first quadrant W24a to the fourth quadrant W24d the workers in the organization are working in, with which weight is placed. In one example of this embodiment, the number of people W24 is a value obtained by aggregating the number of workers who correspond to each of the activity modes shown in the first quadrant W24a to the fourth quadrant W24d from the work style data D2 for each worker in the organization, and the weight W26 is a value obtained by dividing each number of people W25 by the total number of workers. In one example of this embodiment, for each activity mode shown in each quadrant W24a to W24d, the performance W28 in the organization of the worker who corresponds to the activity mode is displayed.
[0080] Fig. 7 is a diagram showing the configuration of the second work style evaluation screen in one example of this embodiment. In one example of this embodiment, the work style analysis device 4 is configured to selectively display the first work style evaluation screen W2 and the second work style evaluation screen W3 on the display device of the user terminal 6, and as shown in Fig. 7, the second work style evaluation screen W3 is a screen that displays the above-mentioned office attendance days D23, office stay time D24, and task / activity allocation D25 as the office attendance days W32, office stay time W33, and task / activity time graph W34 for each of the activity patterns W31a to W31d corresponding to the first quadrant W24a, the fourth quadrant W24d, the second quadrant W24b, and the third quadrant W24c, respectively, in the first work style evaluation screen W2. In addition, the task / activity time graph W34 in one example of this embodiment classifies the worker's task / activity into any of desk work W35a, meetings W35b, interviews between superior and subordinate W35c, conversations necessary for work W35d, casual conversations W35e, refreshment W35f, and at home / out W35g, and displays the percentage of task / activity time for each classification.
[0081] FIG. 8 is a diagram showing an example of a question used in a work style analysis in an example of this embodiment. The work style analysis device 4 in this example of this embodiment presents by acquiring a question group consisting of a predetermined number of questions Q2 from the work style analysis database 45 and displaying them on the user terminal 6. As shown in FIG. 8, the question Q2 used in the work style analysis includes a question number Q21, a classification Q22, a related index Q23, a question sentence Q24, and an answering method Q25. In addition, in this example of this embodiment, it is configured so that two or more questions can be linked to one question group Q26. The question group Q26 includes a group question sentence Q26a. In addition, in this example of this embodiment, it is configured so that both a case where one question Q2 is linked to any question group Q26 and a case where it is not linked to any question group Q26 are allowed.
[0082] In one example of this embodiment, the question Q2 used in the work style analysis is configured to include questions about each of the activity modes indicated by the first quadrant W24a to the fourth quadrant W24d described above, that is, the activity mode in which workers gather in the office to perform work, the activity mode in which workers distribute to homes and perform work, the activity mode in which workers distribute to homes and build relationships, and the activity mode in which workers gather in the office to build relationships, and includes questions that ask for answers in the form of time allocation, number of days, percentage, and other formats for the activity modes indicated by each of the first quadrant W24a to the fourth quadrant W24d. The answers A2 to the questions about the above activity modes are used as input values for generating a telecommuting evaluation value D21 and a relationship building evaluation value D22 for each individual worker.
[0083] In addition, in one example of this embodiment, the questions Q2 used in the work style analysis are configured to include questions about time allocation when workers gather in the office and when workers are distributed to their homes, etc. Answers A2 to the questions about time allocation are used as input values for generating the number of days in the office D23, time spent in the office D24, and task / activity allocation D25 for each individual worker, and are used for the purpose of displaying the task / activity time graph W33 on the second work style evaluation screen W3 mentioned above.
[0084] As described above, the work style analysis device 3 in one example of this embodiment obtains a predetermined number of questions Q2 from the work style analysis database 45 and presents them to the worker by displaying them on the display device of the user terminal 6 used by the worker. When the worker operates the user terminal 6 to answer the presented questions Q2, the answer A2 is recorded in the work style analysis database 45 by the answer input unit 42. The work style analysis device 4 generates work style data D2 for the worker by the work style data generation unit 43 based on the answers A2 recorded in the work style analysis database 45, and generates work style data D2 for the entire organization by aggregating the work style data D2 for some or all of the workers in the organization. As described above, the predetermined number of questions Q2 presented to the worker include questions Q2 that ask for answers in the form of time allocation, number of days, ratio, or other formats regarding the activity modes indicated by each of the first quadrants W24a to W24d described above, and the work style data generation unit 43 generates a telecommuting evaluation value D21 and a relationship building evaluation value D22 for the worker based on the answers.
[0085] The office data D3 is data related to the office layout of an organization to which multiple workers belong. The layout drawing analysis device 5 outputs the office data D3 based on the layout drawing D4 of the organization's office. In one example of this embodiment, the office data D3 includes the number of seats D32 and the area D33 for each area D31 assigned according to the activities of the workers in the office.
[0086] FIG. 9 is a diagram showing an example of an office layout drawing in one example of this embodiment. The layout drawing analysis device 5 in one example of this embodiment generates office data D3 related to the layout of the office based on the layout drawing of the office as described above. As shown in FIG. 9, the layout drawing D4 is a plan view showing the layout of an office D41 of an organization to which multiple workers belong. The layout drawing D4 is partitioned into one or more spaces by outer and inner walls, and desks, chairs, and other furniture are arranged. The furniture may be furniture in general that is arranged in an office, and may be, for example, a single-person work desk, a multiple-person work desk, a conference table, a single-person chair, a multiple-person chair, a whiteboard, a monitor stand, a partition, a cabinet, a locker, a shelf, storage furniture, plants, etc.
[0087] The format of the layout drawing D4 information may be selected arbitrarily. For example, the layout drawing D4 may be in a bitmap image format, or in a vector format image with walls and fixtures as shapes. It may also be information in a two-dimensional or three-dimensional CAD (Computer-Aided Design) format.
[0088] FIG. 10 is a diagram showing the configuration of an office evaluation screen in an example of this embodiment. As described above, the layout drawing analysis device 5 in an example of this embodiment outputs office data D3 related to the organization's office layout by the analysis unit 53 based on the office layout drawing D4. The office evaluation screen W4 is composed of a tree map W41 showing the area ratio for each area D31, a bar graph W42 showing the yearly change in the area ratio, a first line graph W43 showing the change in the office area per worker, and a second line graph W44 showing the change in the office area per worker, based on the information included in the office data D3, i.e., the number of seats D32 and the area D33 for each area D31 assigned according to the activity content of the worker, as shown in FIG. 10. Note that in this example of this embodiment, the office is composed of an office area including private rooms, a business support area, an executive-only area, a life support area, an information management area, and a passage area. Moreover, the transitions in the bar graph W42, the first line graph W43, and the second line graph W44 are configured to be displayed based on the most recent office data D4 and the past office data D4 in the organization.
[0089] In the layout drawing analysis device 5 according to the embodiment, the analysis unit 53 outputs the above-mentioned office data D3 using the layout estimation model 51 based on the above-mentioned layout drawing D4. The layout estimation model 51 may be configured as a single trained model to directly estimate the office data D3 from the layout drawing D4, or the layout estimation model 51 may be configured by two or more trained models to estimate the office data D3 through two or more processes. Hereinafter, a configuration will be described in which the analysis process by the analysis unit 53 is divided into three processes: a process of extracting fixtures and / or walls from the layout drawing D4, a process of dividing the layout drawing D4 into one or two or more sections using the extracted walls, and a process of determining which of the areas D31 each of the one or two or more divided sections corresponds to. As described above, the layout estimation model 51 is generated by the machine learning unit 52 through machine learning, but the specific configuration of the machine learning performed by the machine learning unit 52 may be selected arbitrarily depending on the configuration of the layout estimation model 51 to be generated, and for example, when the layout estimation model 51 is two or more trained models as in the above example, the machine learning unit 52 may generate some or all of the two or more trained models through machine learning. The specific configuration of the training data may also be selected depending on the specific configuration of the machine learning unit 52, and for example, when generating a trained model that determines the area D31 in the above example as part of the layout estimation model 51, training data may be generated based on data obtained by dividing the layout drawing D4 into one or more sections in the previous process in the above example and the office data D3, and the trained model may be generated by machine learning using the generated training data.
[0090] Fig. 11 is a diagram showing an example of a state in which the layout drawing analyzing device 5 extracts walls from a layout drawing in one example of this embodiment. As shown in Fig. 11, the layout drawing analyzing device 5 extracts walls D42 that divide an office D41 into one or more spaces from a layout drawing D4. In addition, in one example of this embodiment, the layout drawing analyzing device 5 extracts chairs for one or multiple people, similar to the walls D42.
[0091] 12 is a diagram showing an example of a state in which the layout drawing analyzing device 5 divides a layout drawing into one or more sections in one example of this embodiment. As shown in Fig. 12, the layout drawing analyzing device 5 divides an office D41 shown in the layout drawing D4 into one or more sections D43 based on a wall D42 extracted from the layout drawing D4.
[0092] FIG. 13 is a diagram showing an example of a state in which the layout drawing analysis device 5 has determined the area of the layout drawing in one example of this embodiment. As shown in FIG. 13, the layout drawing analysis device 5 determines which of the above-mentioned areas D31 each of one or more sections D43 corresponds to. In one example of this embodiment, the area D31 assigned according to the activity of the worker is determined to be one of the following areas: an office area D31a in which many workers share work; an executive office, an executive reception room, a secretary's office, an executive meeting reception room, and other executive-only areas D31b in which executives work; a private room area D31c in which a worker works alone; a business support area D31d in which business support is performed such as a conference room, a training room, a printing room, a reception room, a lobby, and other areas; an information management area D31e in which server rooms, libraries, archives, warehouses, and other information are managed; a rest room, a lounge, a dining room, a locker room, and other life support areas D31f; and a passage area D31g used as a passage. In addition, in the aforementioned office evaluation screen W4, the number of seats D32 and the area D33 of the work area D31 and the private room area D31c are added together and displayed as the work area including the private rooms.
[0093] The layout drawing analysis device 5 determines which area D31 each of the sections D43 obtained by dividing the office D41 into one or more sections D43 corresponds to, and then adds up the area and number of seats of the sections D43 corresponding to each area D31, and generates and outputs office data D3 including the number of seats D32 and area D33 for each area D31.
[0094] The above is an overview of the data in one example of this embodiment. The specific contents of the performance data D1, the work style data D2, and the office data D3 are not limited to the above, and may be changed arbitrarily according to the configuration of each of the analysis devices 3 to 5. For example, in one example of this embodiment, the office data D3 includes the number of seats D32 and the area D33 for each area D31, but the area D33 may be omitted and the number of seats D32 may be included for each area D31, and the area per seat may be set in advance in the office evaluation screen W4, and the set area may be multiplied by the number of seats D32 to calculate and display the area for each area D31. Alternatively, in addition to the number of seats D32 and the area D33, the information for each area D31 may include information on furniture other than seats, for example. Furthermore, the format and other forms of the office data D3 may be selected arbitrarily. For example, the office data D3 may be configured as an identifier indicating the area D31 and numerical values indicating each of the number of seats D32 and the area D33, or may be configured by linking graphical information indicating one or more sections D43 mentioned above with an identifier indicating the corresponding area D31 and a numerical value indicating the number of seats D31 or other information for each of the graphical information.
[0095] Next, data conversion by the data processing device 2 in one example of this embodiment will be described. As described above, the data processing device 2 in one example of this embodiment takes any one of the performance data D1, the work style data D2, and the office data D3 as the first data, which is input data, and outputs at least any other data as the second data based on the first data. The data processing device 2 in one example of this embodiment includes a performance-work style conversion unit 221 that generates work style data D2 based on the performance data D1, a work style-performance conversion unit 222 that generates performance data D1 based on the work style data D2, a work style-office conversion unit 223 that generates office data D3 based on the work style data D2, and an office-work style conversion unit 224 that generates work style data D2 based on the office data D3. The output unit 22 generates and outputs second data based on the first data using the conversion units 221 to 224.
[0096] The performance / work style conversion unit 221 generates work style data D2 based on the performance data D1. Fig. 14 is a diagram showing an outline of a process for generating work style data D2 from performance data D1 in an example of this embodiment. As shown in Fig. 14, the performance / work style conversion unit 221 in an example of this embodiment generates a telecommuting evaluation value D21 of the work style data D2 based on at least one of the worker's working style, job title, and job type, and generates a relationship building evaluation value D22 of the work style data D2 based on the style evaluation value D13 of the performance data D1, thereby generating the work style data D2.
[0097] In one example of this embodiment, when generating work style data D2 based on performance data D1, a telecommuting evaluation value D21 of the work style data D2 is generated using worker information D5 including information on the worker's age D51, job title D52, job type D53, and working style D54. The worker information D5 may be obtained from, for example, an employee database or other information system, or the performance data D1 and / or work style data D2 for the worker may be configured to include the above information on the worker who answered the questionnaire A1 and / or A2. Alternatively, instead of or in addition to the worker information, organizational information including the number of workers in the organization who match each of the age, job title, job type, and working style may be included in the performance data D1 for the entire organization, the work style data D2 for the entire organization, or part or all of the office data D3. In one example of this embodiment, the working style D54 classifies the working style of the worker into three types: office work, telecommuting, and combined office and telecommuting. When the worker's working style D54 is office work, the percentage of working from home indicated by the telecommuting evaluation value D21 is 0%, and when the worker works from home, the percentage of working from home indicated by the telecommuting evaluation value D21 is 100%. In the case of combined office and telecommuting, the telecommuting evaluation value D21 of the worker is generated by calculating based on values preset according to the worker's age D51, position D52, and job type D53.
[0098] In addition, in one example of this embodiment, a relationship building evaluation value D22 of the work style data D2 is generated based on the style evaluation value D13 included in the performance data D1. As described above, the style evaluation value D13 is composed of the work style evaluation value D13a, the communication style evaluation value D13b, and the life style evaluation value D13c. In one example of this embodiment, the style evaluation value D13 is generated by calculating based on the communication evaluation value included in the communication style evaluation value D13b and a value preset according to the industry and size of the organization, and the work style data D2 including the generated relationship building evaluation value D22 and the above-mentioned telecommuting evaluation value D22 is generated. Note that the work style data D2 in one example of this embodiment includes the number of days in the office D23, the time spent in the office D24, and the task / behavior allocation D25 in addition to the telecommuting evaluation value D21 and the relationship building evaluation value D22, and may be generated using the above-mentioned information linked to each evaluation value, organization, and / or worker included in the performance data D1. For example, the relaxation time allocation in the work / exercise allocation D25 may be calculated based on the rest (sleep) evaluation value included in the communication style evaluation value D13b and a value preset according to the industry and size of the organization.
[0099] The work style / performance conversion unit 222 generates performance data D1 based on the work style data D2. Fig. 15 is a diagram showing an outline of a process for generating performance data D1 from the work style data D2 in one example of this embodiment. As shown in Fig. 15, in one example of this embodiment, a style evaluation value D13 included in the performance data D1 is generated from the work style data D2, a state evaluation value D12 is generated from the style evaluation value D13, and a performance evaluation value D11 is generated from the state evaluation value D12 to generate the performance data D1.
[0100] As described above, the work style data D2 in one example of this embodiment includes a telecommuting evaluation value D21 and a relationship building evaluation value D22. In one example of this embodiment, a communication style evaluation value D13b is generated from the relationship building evaluation value D22 included in the work style data D2, among the style evaluation values D13 included in the performance data D1. As described above, the communication style evaluation value D13b includes a communication evaluation value, a rest / refreshment evaluation value, a physical activity evaluation value, a food evaluation value, a comfort evaluation value, a cleanliness evaluation value, and a health consciousness evaluation value. In one example of this embodiment, each evaluation value is calculated based on the relationship building evaluation value D22 and a value preset for each evaluation value according to the industry and size of the organization, and the communication style evaluation value D13b is generated. The style evaluation value D13 is generated based on the generated communication style evaluation value D13b, and the work style evaluation value D13a and the lifestyle evaluation value D13c preset according to the industry and size of the organization.
[0101] In one example of this embodiment, the state evaluation value D12 is generated based on the style evaluation value D13. As described above, the state evaluation value D12 in one example of this embodiment is composed of an organization state evaluation value D12a including a social capital evaluation value, a mental state evaluation value D12b including a work engagement evaluation value and a psychological stress evaluation value, and a physical state evaluation value D12c including a musculoskeletal complaint evaluation value, a lifestyle-related disease evaluation value, and an infectious disease evaluation value, and each evaluation value is calculated based on one or more of the evaluation values included in the style evaluation value D13 and a value preset for each state evaluation value according to the industry and size of the organization, and the state evaluation value D12 is generated. The style evaluation value D13 used to calculate the condition evaluation value D12 may be selected arbitrarily, but in one example of this embodiment, the work style evaluation value D13a is used to generate a social capital evaluation value, the work style evaluation value D13a and the communication style evaluation value D13b are used to generate a work engagement evaluation value, the work style evaluation value D13a and the lifestyle evaluation value D13c are used to generate a psychological stress evaluation value and a musculoskeletal complaint evaluation value, the communication style evaluation value D13b and the lifestyle evaluation value D13c are used to generate a lifestyle-related disease evaluation value, and the work style evaluation value D13a, the communication style evaluation value D13b, and the lifestyle evaluation value D13c are used to generate an infectious disease evaluation value.
[0102] When the state evaluation value D13 is generated, in one example of this embodiment, a performance evaluation value D11 is generated based on the state evaluation value D13. In one example of this embodiment, the performance evaluation value D11 is calculated based on the social capital evaluation value, the work engagement evaluation value, the psychological stress evaluation value, and a value preset according to the industry and size of the organization, thereby generating performance data D1 including the performance evaluation value D11. Note that in one example of this embodiment, the work style data D2 is converted into the performance data D1 by the work style / performance conversion unit 222. As described above, the conversion by the work style / performance conversion unit 222 is composed of three steps, namely, generating the style evaluation value D13, generating the state evaluation value D12, and generating the performance evaluation value D11. As a specific configuration of the work style / performance conversion unit 222, for example, a style evaluation value generation unit that generates the style evaluation value D13, a state evaluation value generation unit that generates the state evaluation value D12, and a performance evaluation value generation unit that generates the performance evaluation value D11 may be provided.
[0103] The work style / office conversion unit 223 generates office data D3 based on the work style data D3. In one example of this embodiment, the work style / office conversion unit 223 generates the office data D3 by calculating the telecommuting evaluation value D21 and the relationship building evaluation value D22 of the work style data D2 and values set in advance according to the industry and size of the organization.
[0104] The office / work style conversion unit 224 generates work style data D2 based on the office data D3. Fig. 16 is a diagram showing an outline of a process for generating work style data D2 from the office data D3 in an example of this embodiment. As shown in Fig. 16, in this example of this embodiment, first, the number and ratio of workers for each job title and work style in the job type organization are calculated as intermediate data I1.
[0105] As described above, the working style in this embodiment has three types: office work, telecommuting, and office / telecommuting. The office / work style conversion unit 224 further divides the office / telecommuting into two types: telecommuting (high), which has a high ratio of telecommuting, and telecommuting (low), which has a low ratio of telecommuting, and treats them as four types of working styles in total. The number of people and the ratio for each working style may be calculated based on the number of seats D32 for each area D31 included in the office data D3 and the ratio of the worker's job title and job type in the organization. For example, two types of worker job titles, section manager or above and below section manager, and two types of job titles, sales and non-sales, may be set, and the number of people and the ratio for each working style may be calculated from the number of seats D32 and the number of workers for each combination pattern of the job title and job type.
[0106] Next, in one example of this embodiment, a telecommuting evaluation value D21 of the work style data D2 is generated based on the generated intermediate data I1. In one example of this embodiment, when the working style is office work, the telecommuting ratio is 0%, and when it is telecommuting, it is 100%. The telecommuting ratios of telecommuting (high) and telecommuting (low) are determined using values preset according to the industry and size of the organization, and these are added according to the number of people and the ratio to generate the telecommuting evaluation value D21.
[0107] In addition, in one example of this embodiment, a relationship building evaluation value D22 is generated based on the generated telecommuting evaluation value D31 and a predetermined coefficient and other values that have been set in advance.
[0108] In generating the relationship building evaluation value D31, in one example of this embodiment, for each of the four types of work styles described above, the activity mode of the worker corresponding to each of the work styles is determined, and then the ratio of relationship building in each work style is determined based on a distribution previously set according to the industry and size of the organization. The activity modes in one example of this embodiment are the four types of activity modes shown in the first quadrant W24a to the fourth quadrant W24d described above, and one of the activity modes is previously set according to the job position, job type, work style, and industry and size of the organization, and it is determined that each work style corresponds to one activity mode based on the ratio of the number of people for each job position and job type in the work style and the industry and size of the organization. In one example of this embodiment, the ratio of relationship building of the worker is calculated for each work style based on the generated telecommuting evaluation value D21 and coefficients and other values previously set based on the industry and size of the organization.
[0109] When the ratio of relationship building for each work style is determined, the office / work style conversion unit 224 adds up the determined ratio of relationship building based on the number of people and the ratio for each work style to generate a relationship building evaluation value D22 for the work style data D2, and generates office data D2 including the generated relationship building evaluation value D22 and the telecommuting evaluation value 21. Note that the office data D2 in one example of this embodiment includes the number of days in the office D23, the time spent in the office D24, and the task / behavior allocation D25, and generates the number of days in the office D23, the time spent in the office D24, and the task / behavior allocation D25 based on the telecommuting evaluation value D21 and the relationship building evaluation value D22, and values preset based on the industry and size of the organization and other information.
[0110] In one example of this embodiment, the data processing device 2 can arbitrarily set any one of the performance data D1, the work style data D2, and the office data D3 as the first data, which is input data, and can set at least any one of the other data as the second data, which is output data. When the first data is input to the input unit 21 of the data processing device 2, the output unit 22 of the data processing device 2 generates and outputs the output data, which is the second data, using one or more of the performance performance / work style conversion unit 221 to the office / work style conversion unit 224, based on the type of data specified as the first and second data.
[0111] In one example of this embodiment, as described above, the data processing device 2 includes a performance-workstyle conversion unit 221 and a workstyle-performance conversion unit 222 that convert the performance data D1 and the workstyle data D2, and a workstyle-office conversion unit 223 and an office-workstyle conversion unit 224 that convert the workstyle data D2 and the office data D3. When the performance data D1 is the first data and the office data D3 is the second data, the output unit 22 first outputs the workstyle data D2 by the performance-workstyle conversion unit 221, and then outputs the office data D3 from the workstyle data D2 by the workstyle-office conversion unit 223. When the first data is the office data D3 and the second data is the performance data D1, the office-workstyle conversion unit 224 first generates the workstyle data D2, and then the workstyle-performance conversion unit 222 outputs the performance data D1.
[0112] How the data converted by the data processing device 2 is viewed or otherwise used may be selected arbitrarily, but in one example of this embodiment, the performance data D1, work style data D2, and office data D3 converted by the data processing device 2 are output to the analysis devices 3 to 5 that output the data, and are recorded in the same manner as the data output by the analysis devices 3 to 5. The output units 34, 44, and 54 of the analysis devices 3 to 5 output the performance data D1, work style data D2, and office data D3 requested by the user terminal 6 to the user terminal 6 without distinguishing between the performance data D1, work style data D2, and office data D3 generated by the analysis devices 3 to 5 based on the questions Q1 and Q2 or the layout drawing D4, and the performance data D1, work style data D2, and office data D3 output by the data conversion device 2.
[0113] In addition, in one example of this embodiment, the office data D3 output by the data processing device 2 as the second data is also used in the office analysis device 5 to generate teacher data when the machine learning unit 52 generates the layout estimation model 51 by machine learning. As described above, the data processing device 2 in one example of this embodiment has a function of mutually converting the performance data D1, the work style data D2, and the office data D3. When the office data D3 is generated using the performance data D1 or the work style data D2 output from the answer A1 or A2 from the worker of the organization as the first data, the office data D3 is the office data D3 generated without analyzing the layout drawing D4 of the organization's office, and is the office data D3 that the layout estimation model 51 should estimate from the layout drawing D4 of the organization's office. In one example of this embodiment, the machine learning unit 52 of the layout drawing analysis device 5 generates the layout estimation model 51 by machine learning using the teacher data generated based on the layout drawing D4 of the organization's office and the office data D3 output by the data processing device 2. As described above, the layout estimation model 51 may be a single trained model or may be two or more trained models, and when generating the layout estimation model 51 from two or more trained models, the machine learning unit 52 may generate training data for generating each trained model based on the layout drawing D4 and the office data D2, and generate each trained model by machine learning. The training data may be generated directly using the office data D3 output by the data processing device 2 as the second data, or may be generated by a worker or other operator correcting the office data D3 output by the data processing device 2 and using the corrected office data D3.
[0114] In addition, in one example of this embodiment, the office data D3 output by the data processing device 2 as the second data is also used for the purpose of generating an improvement proposal for the current office layout of the organization by comparing it with the office data D3 output by the office analysis device 5. As described above, the office analysis device 5 in one example of this embodiment includes a layout improvement unit 54. When both the office data D3 generated by the analysis unit 53 and the office data D3 output by the data processing device 2 exist, the layout improvement unit 54 compares the office data D3 generated by the analysis unit 53 as data indicating the current office of the organization, and the office data D3 output by the data processing device 2 as data indicating an office improved based on the performance and / or activity mode of the workers of the organization. The layout improvement unit 54 generates an improved layout drawing by improving the office layout drawing D4 based on the result of the comparison, i.e., the difference between the office data D3 generated by the analysis unit 53 and the office data D3 output by the data processing device 2. The generation method may be selected from any well-known drawing creation method, and may be, for example, generated using a learned model that estimates an improved layout drawing by using the layout drawing D4 analyzed by the analysis unit 53 and the above-mentioned difference as input data.
[0115] In addition, the data processing device 2 in one example of this embodiment includes the performance / workstyle conversion unit 221, the workstyle / performance conversion unit 222, the workstyle / office conversion unit 223, and the office / workstyle conversion unit 224 included in the output unit 22, but in addition to the conversion units 221 to 224, an estimation model may be generated by machine learning using any one of the performance data D1, the workstyle data D2, and the office data D3 as input data and at least any other data as output data, and conversion between each data may be performed using this. In this case, for example, until a sufficient number of teacher data is obtained to perform machine learning, the conversion units 221 to 224 may be used to convert the performance data D1, the workstyle data D2, and the office data D3, and teacher data may be generated based on the data resulting from the conversion and the first data that is the input data for the conversion, and the estimation model may be generated by machine learning at the timing when a sufficient number of teacher data is accumulated, and thereafter, data conversion may be performed using the generated estimation model. The estimation model may be generated for each pattern of data transformation, that is, for each combination of the first data and the second data.
[0116] The above is an explanation of an example of the present embodiment. However, the embodiment of the present invention is not limited to the above. For example, the specific configurations of the performance data D1, the work style data D2, and the office data D3 may be changed arbitrarily, and for example, the office data D3 may be composed only of the number of seats D31 for each area D31.
[0117] Other specific configurations are not limited to those of the present embodiment, and various modifications are possible without departing from the spirit of the present invention. [Explanation of symbols]
[0118] 1 Data Processing System 2 Data Processing Device 21 Input section 22 Output section 221 Performance Work Style Transformation Department 222 Work Style Performance Conversion Section 223 Work Style Office Conversion Department 224 Office Work Style Conversion Department 3. Performance Analysis Equipment 31 Question presentation section 32 Answer input section 33 Performance Data Generation Division 24 Performance data output section 4. Work Style Analysis Device 41 Question presentation section 42 Answer input section 43 Work Style Data Generation Department 44 Work Style Data Output Unit 5. Layout drawing analysis device 51 Layout Estimation Model 52 Machine Learning Department 53 Analysis Department 54 Layout Improvement Department 6 User terminal 7 Network
Claims
1. an input unit for inputting first data which is any one of performance data indicating an evaluation of a performance of a plurality of workers in an organization to which the plurality of workers belong, work style data indicating an activity mode of the plurality of workers in relation to the work of the organization to which the plurality of workers belong, and office data regarding an office layout of the organization to which the plurality of workers belong; an output unit that generates and outputs second data, which is at least one of the other two data, based on the first data input to the input unit; A data processing device comprising:
2. the first data is the performance data; The performance data is output based on the worker's or the organization's responses to questions.
2. The data processing device according to claim 1, wherein the data processing device comprises:
3. the first data is the work style data, The work style data is output based on the worker's or organization's responses to questions.
2. The data processing device according to claim 1, wherein the data processing device comprises:
4. The questions are a group of questions consisting of multiple categories.
3. A data processing device according to claim 2.
5. The performance data is A style evaluation value regarding the worker's work, communication and life style; A status evaluation value regarding the organizational, mental and physical status of the worker; A performance evaluation value relating to the worker's performance; 2. The data processing apparatus according to claim 1, further comprising:
6. The work style data is A telecommuting evaluation value regarding the proportion of telecommuting of the worker; A relationship building evaluation value relating to the proportion of the worker's time spent building relationships with other workers; 2. The data processing apparatus according to claim 1, further comprising:
7. The office data includes: The data includes the number of seats for each area allocated according to the activities of the workers in the office.
2. The data processing device according to claim 1, wherein the data processing device comprises:
8. When the first data is one of the performance data and the office data, and the second data is the other of the performance data and the office data, The output unit generates the work style data based on the first data input to the input unit, and generates and outputs the second data based on the generated work style data.
2. The data processing device according to claim 1, wherein the data processing device comprises:
9. The output unit is Using an estimation model in which any one of the performance data, the work style data, and the office layout data is used as input data and any one of the other two data is used as output data, the second data is output based on the first data.
2. The data processing device according to claim 1, wherein the data processing device comprises:
10. the output unit includes a performance / work style conversion unit that generates the work style data based on the performance data, The performance / work style conversion unit generates a telecommuting evaluation value related to the proportion of telecommuting of the worker included in the work style data based on at least one of the worker's working style, job title, and job type, and generates a relationship building evaluation value related to the proportion of time the worker spends building relationships with other workers included in the work style data based on a style evaluation value related to the worker's communication style included in the performance data.
2. The data processing device according to claim 1, wherein the data processing device comprises:
11. the output unit includes a work style / performance conversion unit that generates the performance data based on the work style data; The work style performance conversion unit includes: a style evaluation value generating unit that generates a style evaluation value related to the work, communication and life style of the worker included in the performance data based on the work style data; a state evaluation value generating unit that generates a state evaluation value related to the organizational, mental, and physical states of the worker included in the performance data based on the style evaluation value; a performance evaluation value generating unit that generates a performance evaluation value regarding the performance of the worker based on the state evaluation value; Equipped with The style evaluation value generation unit includes: generating a style evaluation value related to the communication style based on a relationship building evaluation value related to a proportion of the time the worker spends building relationships with other workers, the relationship building evaluation value being included in the work style data; and generating a style evaluation value related to the work and life style based on the industry and / or size of the organization.
2. The data processing device according to claim 1, wherein the data processing device comprises:
12. the output unit includes an office / work style conversion unit that generates the work style data based on the office data, The office work style conversion unit includes: generating a telecommuting evaluation value relating to a proportion of telecommuting of the worker included in the work style data based on the number of seats included in the office data and the proportion of the worker's job title and job type in the organization; generating a relationship building evaluation value related to a proportion of the time the worker, which is included in the work style data, spends on building relationships with other workers, based on the generated telecommuting evaluation value and a preset coefficient; 2. The data processing device according to claim 1, wherein the data processing device comprises:
13. A program for causing a computer to function as the data processing device according to any one of claims 1 to 12.
14. a data processing device comprising: an input unit for inputting first data, which is any one of performance data indicating an evaluation of a worker's performance in an organization to which the plurality of workers belong, work style data indicating a worker's activity mode related to the work of the organization to which the plurality of workers belong, and office data related to an office layout of the organization to which the plurality of workers belong; and an output unit for generating and outputting second data, which is at least one of the other two data, based on the first data inputted to the input unit; a layout drawing analysis device for analyzing the layout drawing of the office; A data processing system comprising: The layout drawing analysis apparatus includes: a layout estimation model in which the layout drawing is input data and the office data is output data; a machine learning unit that generates the layout estimation model by machine learning using teacher data generated based on the layout drawing and the office data output by the data processing device as the second data; an analysis unit that generates the office data from the layout drawing using the layout estimation model; A data processing system comprising:
15. The layout drawing analysis apparatus further comprises: a layout improvement unit that generates an improved layout drawing by improving the layout of the office based on a difference between the office data generated by the analysis unit based on the layout drawing and the office data output by the data processing device based on the performance data or the work style data, 11. The data processing system of claim 10.
Citation Information
Patent Citations
Questionnaire support device
JP2009230302A
Layout assisting device, layout assisting method and program
JP2020170346A
Cited By
Attendance management device, attendance management method, and attendance management program
JP2026139516A
Attendance management device, attendance management method, and attendance management program
JP7778978B1
