Battery charge system, battery charge control method and battery charge control device
The distributed battery charging system optimizes power generation and charging by selecting a major and secondary module based on predicted charging power and fuel efficiency, addressing inefficiencies in managing power output from multiple power supply devices.
Patent Information
- Application Number
- JP2023072152
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-26
- Publication Date
- 2024-11-08
AI Technical Summary
Existing power generation systems struggle to manage power output from multiple power supply devices efficiently, particularly in distributed systems using renewable energy sources, leading to inefficiencies in engine fuel consumption and battery charging precision.
A distributed battery charging system that includes a switching connection unit, a main controller, and multiple power generation modules, each with a sub-controller, to optimize power generation and charging by selecting a major and secondary module based on predicted charging power and fuel efficiency, ensuring high precision and efficiency.
The system achieves high power generation efficiency and precise battery charging by optimizing the use of multiple power generation modules, reducing fuel consumption and minimizing power fluctuations during the charging process.
Smart Images

Figure 2024157671000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a battery charging system, a battery charging control method, and a battery charging control device. [Background technology]
[0002] As background art in this technical field, the following Patent Documents 1 and 2 describe techniques for managing power output from a plurality of power supply devices. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2006-298330 A [Patent Document 2] JP 2013-055839 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the above-mentioned technology, there is a demand for more appropriate management of the power output from a plurality of power supply devices (power generation modules). The present invention has been made in consideration of the above-mentioned circumstances, and aims to provide a battery charging system, a battery charging control method, and a battery charging control device that can appropriately manage the power output from multiple power generation modules. [Means for solving the problem]
[0005] In order to solve the above problem, a battery charging system of the present invention comprises a plurality of power generating modules each including an engine, a generator driven by the engine, and a converter that converts a voltage output from the generator into a charging voltage and supplies the voltage to a battery to be charged, and a battery charging control device that controls the power generating modules, and the battery charging control device comprises a function allocation unit that selects one of the power generating modules as a major module and selects one or more of the power generating modules other than the major module that are used to charge the battery as secondary modules in accordance with a predicted charging power that is power predicted to be supplied to the battery, a power command unit that outputs secondary power command values that are command values for the power generated by each of the secondary modules, a major control unit that increases the output power of the converter in the major module as the result of subtracting a battery voltage that is the voltage of the battery from a predetermined battery voltage command value becomes larger, and a secondary control unit that brings the power output by each of the secondary modules closer to the corresponding secondary power command value. Effect of the Invention
[0006] According to the present invention, the power output from a plurality of power generation modules can be appropriately managed. [Brief description of the drawings]
[0007] [Figure 1] 1 is a block diagram showing a configuration of a distributed battery charging system according to a first embodiment; [Diagram 2] FIG. 4 is a diagram showing an example of a battery voltage and a charging current. [Diagram 3] FIG. 1 is a block diagram of a computer. [Figure 4] FIG. 4 is a diagram showing an example of a fuel efficiency map of an engine. [Diagram 5] FIG. 4 is a block diagram of a control system of a sub-controller in a comparative example. [Figure 6] FIG. 2 is a block diagram of a control system in the first embodiment. [Figure 7] FIG. 2 is a block diagram of a major control unit. [Figure 8] FIG. 2 is a block diagram of a secondary control unit. [Figure 9] 4 is a flowchart of a main control process. [Figure 10] 13 is a flowchart of a sub-control process. [Figure 11] FIG. 4 is a diagram illustrating an example of charging power and fuel efficiency in the first embodiment. [Figure 12] FIG. 11 is a block diagram of a control system in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] [Overview of the embodiment] As renewable energy expands toward the decarbonization of energy, the importance of power generation systems that use renewable energy-derived fuels (hereinafter referred to as RE fuels) such as hydrogen to respond to power fluctuations is increasing. While large-scale gas-fired power generation can be used as a power source for adjustment, the output adjustment range is often limited to 30% to 100% of rated operation, which does not provide sufficient adjustment power. In addition, large-scale thermal power generation facilities are installed in fixed locations, which requires the reinforcement of power lines, resulting in high facility costs. Furthermore, large-scale thermal power generation facilities are limited in the range of fuel procurement, making it difficult to effectively utilize RE fuels that are ubiquitous in the region.
[0009] Distributed power generation systems using engine generators compatible with RE fuel are promising as systems that can respond to fluctuations in renewable energy while utilizing RE fuel, which is ubiquitous in the region. In particular, by utilizing mass-produced engines such as existing automobile engines and industrial engines and combining multiple of them to use as stationary power generation systems, it is possible to minimize initial equipment costs. Furthermore, it is expected that electric vehicles (EVs) will increase in the future as one of the loads on the aforementioned engine power generation systems. Batteries installed in electric vehicles can be considered to be almost lithium batteries (high-energy density storage batteries), and such new batteries require a wide range of output changes, from a high output range in the early stages of charging to a low output range in the later stages of charging, and voltage control with high precision.
[0010] Therefore, in the power generation system using the engine as the drive source, it is preferable to first perform power generation with good fuel efficiency for the engine across a range from high to low power output. By applying the technology of the above-mentioned Patent Document 1, it is considered possible to operate the system while applying an operating point that is as efficient as possible. In other words, when low-cost power supply such as regenerative power is available in a vehicle power supply system, it is considered possible to reduce the average power cost by increasing the degree of use of the power supply. It is considered that this technology makes it possible to effectively utilize low-cost power generated by regenerative power generation, etc., while suppressing frequent charging and discharging of the battery.
[0011] Furthermore, by applying the technology of the above-mentioned Patent Document 2, it is believed that it is possible to construct a power supply system equipped with multiple power supply devices and an integrated control unit that can integrate and control each of the power supply devices in response to the total power required for power generation. That is, it is believed that it is possible to select at least one of the multiple power supply devices, and control the voltage control unit of the selected power supply device so that the selected power supply device generates power at a maximum power generation power that is less than the total power required for power generation at the generator rotation speed. It is believed that this technology makes it possible to operate multiple power supply devices using generators with less energy consumption, and generate power corresponding to the total power required for power generation by the multiple power supply devices.
[0012] Among the above technologies, the technology to which Patent Document 1 is applied aims to increase the power of the load and reduce the amount of energy consumption in an operating state with good power consumption in a power supply system, i.e., in a regenerative state. Therefore, when trying to improve the engine efficiency (fuel consumption) during power generation in an engine generator, it is difficult to achieve the objective. In addition, the technology to which Patent Document 2 is applied controls the voltage of each of the power storage devices connected to multiple power supply devices. Therefore, in a power generation system in which multiple power generation modules control a specific battery, it is difficult to achieve the objective of charging the battery with high accuracy while operating each power generation module with high efficiency. Therefore, the embodiment described below provides a control device that realizes high power generation efficiency and high-accumulation charging of the connected battery in a distributed charging system consisting of multiple engine power generation modules.
[0013] [First embodiment] Hardware Configuration of the First Embodiment FIG. 1 is a block diagram showing the configuration of a distributed battery charging system 100 according to the first embodiment. 1, the distributed battery charging system 100 includes a switching connection unit 4, a main controller 7 (charging control device), and a plurality (n units) of power generation modules 30-1 to 30-n. In the following description, a plurality of components or information having the same or similar functions or meanings may be expressed by adding "-" and alphanumeric characters to the same reference numeral, for example, "power generation modules 30-1, 30-2". However, when it is not necessary to distinguish between these multiple components, the "-" and alphanumeric characters may be omitted, for example, "power generation module 30".
[0014] The distributed battery charging system 100 is connected to a battery 52 and a battery controller 54. The battery 52 may be a battery for a power facility or a battery for a mobile body such as an electric vehicle. The voltage of the battery 52 is called a battery voltage Vb, the current supplied from the distributed battery charging system 100 to the battery 52 is called a charging current Ib, and the product of the two is called a charging power Pb. The battery controller 54 measures the battery voltage Vb, the charging current Ib, and other various states of the battery 52, and supplies the results to the main controller 7.
[0015] The power generation modules 30-1 to 30-n each include an engine 1-1 to 1-n, a generator 2-1 to 2-n, a converter 3-1 to 3-n which is an AC / DC converter, and a sub-controller 6-1 to 6-n (a charging control device). The switching connection unit 4 selects one or more power generation modules 30, and supplies the power output from the selected power generation module 30 to the battery 52. The battery controller 54 performs various controls on the battery 52.
[0016] Each sub-controller 6 transmits and receives various command signals and status signals to and from the main controller 7 located at a higher level. The main controller 7 also controls and monitors the switching and connection status of the power generation module 30 by communicating with the switching connection unit 4. The main controller 7 also establishes communication with the battery controller 54. As a result, the main controller 7 collects data such as the specifications and charging status of the battery 52 from the battery controller 54 at any time, and executes control according to the charging status of the battery 52. The battery 52 is, for example, a lithium-ion battery.
[0017] FIG. 2 is a diagram showing an example of the battery voltage Vb and the charging current Ib. When charging the battery 52 (see FIG. 1), which is a lithium-ion battery, the sub-controller 6 and the main controller 7 charge the battery 52 in a CC charging mode during an initial CC (Constant Current) charging period. In the example of FIG. 2, the period from time t0 to t1 is the CC charging period, during which the charging current Ib coincides with a predetermined limited current value Im (e.g., rated current) and the charging power becomes relatively large. The battery voltage Vb gradually approaches a predetermined battery voltage command value Vb*, i.e., a charging completion voltage.
[0018] Next, when the battery voltage Vb reaches the battery voltage command value Vb*, the sub-controller 6 and the main controller 7 charge the battery 52 in a CV (Constant Voltage) charging period in a CV charging mode. In the example of FIG. 2, the period from time t1 onwards is the CV charging period. During this period, the sub-controller 6 and the main controller 7 control the charging current Ib so as to maintain the battery voltage Vb at the battery voltage command value Vb*. Therefore, during the CV charging period, the charging power is relatively small, and the charging current Ib decreases over time.
[0019] Fig. 3 is a block diagram of a computer 980. Each of the sub-controller 6, the main controller 7, and the battery controller 54 shown in Fig. 1 includes one or more computers 980 shown in Fig. 3. 3, the computer 980 includes a CPU 981, a storage unit 982, a communication I / F (interface) 983, an input / output I / F 984, and a media I / F 985. Here, the storage unit 982 includes a RAM 982a, a ROM 982b, and a HDD 982c. The communication I / F 983 is connected to a communication circuit 986. The input / output I / F 984 is connected to an input / output device 987. The media I / F 985 reads and writes data from a recording medium 988.
[0020] The ROM 982b stores an IPL (Initial Program Loader) and the like to be executed by the CPU. The HDD 982c stores a control program, various data, and the like. The CPU 981 realizes various functions by executing the control program and the like read from the HDD 982c into the RAM 982a. The internal configurations such as the sub-controller 6 and the main controller 7 (see FIGS. 6, 7, and 8) described later show the functions realized by the control program and the like as blocks.
[0021] FIG. 4 is a diagram showing an example of a fuel consumption map of the engine 1. For example, diesel engines and the like used in the industrial field and the transportation field have characteristics such as those of the fuel consumption map shown in FIG. 4. And the engine 1 (see FIG. 1) in the present embodiment also has similar characteristics.
[0022] In FIG. 4, the horizontal axis represents the engine speed, and the vertical axis represents the torque. In FIG. 4, the contour lines H1 to H7 connect the operating points with the same fuel consumption (fuel economy), and the fuel economies related to these contour lines have the relationship of H1 < H2 < H3 < H4 < H5 < H6 < H7. As shown in the figure, at the operating points with large output, the fuel economy tends to be low, and at the operating points with small output, the fuel economy tends to be high.
[0023] Although details will be described later, in the present embodiment, the engines 1 of the respective power generation modules 30 are each made to generate power at an operating point with the best fuel economy in the vicinity, so as to bring the efficiency of the entire system close to the maximum value. Here, as shown in FIG. 2, during the CV charging period, the charging current Ib gradually decreases. Assuming that the required power for charging is generated using one power generation module 30, the fuel economy becomes high in the latter stage of charging, and extra fuel will be consumed. On the other hand, the distributed battery charging system 100 of the present embodiment can apply an optimal combination of power generation modules 30 to the required charging current Ib. As a result, throughout the charging period, the distributed battery charging system 100 can always generate power with a fuel economy close to the best.
[0024] Comparative Example Before describing the operation of the first embodiment, a comparative example will be described. The hardware configuration of the comparative example is similar to that of the first embodiment (see FIG. 1). However, in this comparative example, the main controller 7 and the switching connection unit 4 select only one of the power generation modules 30 and connect it to the battery 52. FIG. 5 is a block diagram of a control system of the sub-controller 6 in the comparative example. The sub-controller 6 of the comparative example includes a voltage control unit 10, a current limiting unit 11, and a current control unit 12.
[0025] The voltage control unit 10 subtracts the battery voltage Vb from the battery voltage command value Vb*, which is the battery voltage Vb when charging of the battery 52 is completed, and outputs a current request value Ir that increases as the subtraction result increases. The current limiting unit 11 outputs a current target value It that becomes the limited current value Im when the current request value Ir exceeds a predetermined limited current value Im, and becomes the current request value Ir in other cases. Here, the limited current value Im is, for example, the rated current value of the charging current Ib, as shown in FIG. 2.
[0026] The current control unit 12 outputs a current command value Ic* to the converter 3 (see FIG. 1) that brings the charging current Ib closer to the current target value It. The converter 3 outputs a current according to the current command value Ic* to the battery 52. When the battery voltage Vb is relatively low, that is, when the SOC (State of Charge) is low, the current request value Ir (see FIG. 5) becomes large, but since the current target value It is limited by the current limiting unit 11, the current target value It becomes equal to the limited current value Im. As a result, the sub-controller 6 (see FIG. 5) executes control of the CC charging mode.
[0027] That is, the current control unit 12 outputs a current command value Ic* to the converter 3 so that the current limiting unit 11 outputs the current target value It = the limited current value Im. Thereafter, as charging progresses and the battery voltage Vb increases and the SOC becomes higher, the battery voltage Vb eventually reaches the battery voltage command value Vb* (see FIG. 2). As a result, when the current request value Ir decreases, the current target value It and the current request value Ir become equal, and the control of the sub-controller 6 transitions to the CV charging mode.
[0028] As described above, in this comparative example, only one of the power generation modules 30 is connected to the battery 52 via the switching connection unit 4. The reason for this is that if multiple power generation modules 30 are connected to the battery 52 via the switching connection unit 4, the control systems (see FIG. 5) in the respective power generation modules 30 may interfere with each other, possibly causing pulsation in the charging power.
[0029] <Control System of First Embodiment> FIG. 6 is a block diagram of a control system in the first embodiment. The main controller 7 includes an information acquisition unit 71, a function allocation unit 72, a power instruction unit 74, and an output change suppression unit 76. The information acquisition unit 71 acquires various types of information from the power generation modules 30-1 to 30-n and the battery controller .
[0030] Further, the function allocation unit 72 selects at least two power generation modules 30 from among all the power generation modules 30 to be used for charging the battery 52. In the example of Fig. 6, it is assumed that all the power generation modules 30-1 to 30-n are selected as the power generation modules 30 to be used for charging. Furthermore, the function allocation unit 72 selects one of the power generation modules 30 to be used for charging as the major module 30M, and selects the other power generation modules 30 as the secondary modules 30S. In the example shown in the figure, it is assumed that the power generation module 30-1 is selected as the major module 30M, and the other power generation modules 30-k (where 2 < k < n) are selected as the secondary modules 30S.
[0031] Here, as charging of the battery 52 progresses, the charging current Ib that can be supplied to the battery 52 decreases. Therefore, the function allocation unit 72 reduces the number of secondary modules 30S in response to the decrease in the charging current Ib. In addition, the function allocation unit 72 also has a function of setting one of the secondary modules 30S as a new major module 30M when the major module 30M stops for some reason.
[0032] The power command unit 74 calculates a predicted charging power Pbest (not shown), which is a predicted value of the charging power Pb, based on the capacity of the battery 52, the current battery voltage Vb, the charging current Ib, the charging rate, etc. The power command unit 74 also calculates a predicted measured power Pmest (not shown), which is a predicted value of the output power at which good fuel efficiency (equal to or less than a predetermined threshold) can be obtained, based on the engine fuel efficiency characteristic data DE of the measure module 30M.
[0033] The power command unit 74 also determines the result of subtracting the predicted measure power Pmest from the predicted charging power Pbest as the total secondary power command value Psa*, which is the sum of the power to be generated by all the secondary modules 30S. Furthermore, the power command unit 74 allocates the total secondary power command value Psa* to each secondary module 30S, that is, the power generation module 30-k (where 2≦k≦n) in the example of Fig. 6, and determines the secondary power command value Pk*, which is the command value for the power to be output by each power generation module 30-k.
[0034] In other words, the total secondary power command value Psa* is the sum of the secondary power command values Pk*. When determining the secondary power command value Pk* for each secondary module 30S, the power command unit 74 determines the secondary power command value Pk* based on the engine fuel efficiency characteristic data DE so as to achieve good fuel efficiency (equal to or less than a predetermined threshold).
[0035] When the output of any of the power generation modules 30 drops for some reason, the output change suppression unit 76 increases the output of the other power generation modules 30, or designates any of the power generation modules 30 that is not producing any output as a new secondary module 30S. In this way, the output change suppression unit 76 suppresses changes in the charging power supplied to the battery 52.
[0036] The sub-controller 6 in the major module 30M, that is, the sub-controller 6-1 in the illustrated example, is called the major controller 6M, and the sub-controller 6 in the secondary module 30S, that is, the sub-controller 6-k (where 2≦k≦n) in the illustrated example, is called the secondary controller 6S.
[0037] The sub-controllers 6-1 to 6-n store engine fuel efficiency characteristic data DE-1 to DE-n relating to the engines 1-1 to 1-n that they control. The engine fuel efficiency characteristic data DE is a fuel efficiency map (see FIG. 4) of the engine 1 expressed in a table format or the like. Each sub-controller 6 supplies the engine fuel efficiency characteristic data DE of its own machine to the main controller 7.
[0038] The major controller 6M also includes a major setting unit 18 and a major control unit 21. In other words, when the power generation module 30-1 is designated as the major module 30M, the sub-controller 6-1 that becomes the major controller 6M enables the functions of the major setting unit 18 and the major control unit 21.
[0039] Further, the secondary controller 6S, i.e., the sub-controller 6-k (where 2≦k≦n) each includes a secondary setting unit 19-k and a secondary control unit 22-k. That is, when the power generation module 30-k is designated as the secondary module 30S, the sub-controller 6-k that becomes the secondary controller 6S activates the functions of the secondary setting unit 19-k and the secondary control unit 22-k.
[0040] FIG. 7 is a block diagram of the measure control unit 21. 7, the major control unit 21 includes a voltage control unit 212 (major voltage control unit), a current limiting unit 214 (major current limiting unit), a current calculation unit 215 (addition current calculation unit), an adder 216, and a current control unit 218 (major current control unit). The voltage control unit 212 subtracts the battery voltage Vb from the battery voltage command value Vb*, and outputs a major current request value Irm that increases as the subtraction result increases.
[0041] Moreover, the current limiting unit 214 outputs a major current target value Itm that becomes the limited current value Im (see FIG. 2) when the major current request value Irm exceeds the limited current value Im, and becomes the major current request value Irm otherwise. The current calculation unit 215 outputs a current sum command value Iad that is an estimate of the sum of the output currents of the secondary modules 30S based on the above-mentioned total secondary power command value Psa* and the battery voltage Vb.
[0042] The adder 216 adds the major current target value Itm and the current addition command value Iad, and outputs the addition result as the charging current command value Ib*. The current control unit 218 outputs the major current command value Icm* to the converter 3-1 so that the charging current Ib approaches the charging current command value Ib*.
[0043] As a result, the converter 3-1 outputs a current according to the major current command value Icm*. In other words, the major control unit 21 has a function of increasing the output power of the major module 30M as the result of subtracting the battery voltage Vb from the battery voltage command value Vb* increases. Since the power output by the major module 30M becomes close to the predicted major power Pmest calculated by the power command unit 74, good fuel economy can be obtained in the engine 1 of the major module 30M.
[0044] FIG. 8 is a block diagram of the secondary control unit 22-k. 8, secondary control unit 22-k includes a current calculation unit 222-k (secondary current calculation unit), a current limiting unit 224-k (secondary current limiting unit), and a current control unit 228-k (secondary current control unit). Current calculation unit 222-k outputs a secondary current request value Irsk that is a current value that realizes the secondary power command value Pk* based on the secondary power command value Pk* and the battery voltage Vb.
[0045] The current limiting unit 224-k outputs a secondary current target value Itsk that becomes the limited current value Im when the secondary current request value Irsk exceeds the limited current value Im, and becomes the secondary current request value Irsk otherwise. The current control unit 228-k outputs a secondary current command value Icsk* to the converter 3-k based on the output current Ibsk of the converter 3-k and the secondary current target value Itsk so as to bring the output current Ibsk closer to the secondary current target value Itsk.
[0046] Converter 3-k outputs a current according to secondary current command value Icsk* to battery 52. In this manner, secondary control unit 22-k has a function of bringing the power output by each secondary module 30S closer to the corresponding secondary power command value Pk*.
[0047] FIG. 9 is a flowchart of the main control process. When the battery 52 and the battery controller 54 are connected to the distributed battery charging system 100 of this embodiment, the main controller 7 starts the processing of this routine. When the process proceeds to step S12 in FIG. 9, the information acquisition unit 71 of the main controller 7 (see FIG. 6) acquires various pieces of information from the battery controller 54 and the sub-controller 6.
[0048] That is, the information acquisition unit 71 acquires the charge completion voltage and the limit current value Im (see FIG. 2) of the battery 52 from the sub-controller 6. Then, the information acquisition unit 71 sets the acquired charge completion voltage to the battery voltage command value Vb*. In addition, the information acquisition unit 71 acquires engine fuel consumption characteristic data DE for the corresponding engine 1 from each power generation module 30.
[0049] Next, when the process proceeds to step S14, the power command unit 74 calculates the predicted charging power Pbest, which is a predicted value of the charging power Pb, based on the current state of the battery 52. Next, when the process proceeds to step S16 (function assignment process), the function assignment unit 72 assigns functions to the power generation modules 30 based on the predicted charging power Pbest. That is, the function assignment unit 72 selects those to be charged from all the power generation modules 30, selects one of the power generation modules 30 to be charged as a major module 30M, and selects the rest as secondary modules 30S.
[0050] Next, when the process proceeds to step S18 (power command process), the power command unit 74 sets various data for each power generation module 30. That is, the power command unit 74 calculates the predicted measure power Pmest, and determines the result of subtracting the predicted measure power Pmest from the predicted charging power Pbest as the total secondary power command value Psa*. Next, the power command unit 74 determines the secondary power command value Pk* by allocating the total secondary power command value Psa* to each secondary module 30S so that good fuel efficiency (below a predetermined threshold) can be achieved.
[0051] Next, the power command unit 74 supplies the total secondary power command value Psa*, the battery voltage command value Vb*, the limit current value Im, and the charging current Ib to the major controller 6M. The power command unit 74 also supplies the secondary power command value Pk* and the limit current value Im to each secondary controller 6S.
[0052] Thereafter, the process returns to step S14, and the processes of steps S14 to S 18 are repeated. In the process, as the charging current Ib gradually decreases, the function allocation unit 72 decreases the number of secondary modules 30S in step S16.
[0053] Although not shown, the main controller 7 successively determines whether charging of the battery 52 is completed based on whether the charging current Ib is less than a predetermined value. When the charging current Ib is less than the predetermined value, the main controller 7 stops each power generation module 30 via each sub-controller 6.
[0054] FIG. 10 is a flowchart of the sub-control process. When the battery 52 and the battery controller 54 are connected to the distributed battery charging system 100 of this embodiment, the sub-controller 6 starts the processing of this routine. 10, when the process proceeds to step S32, the sub-controller 6 acquires various information from the main controller 7. Next, when the process proceeds to step S34, the sub-controller 6 determines whether or not the sub-controller 6 itself has been designated as the major controller 6M.
[0055] If the result of step S34 is "Yes", the process proceeds to step S36 (major control process). As described above with respect to the process of step S18 (see FIG. 9), the main controller 7 supplies the total secondary power command value Psa*, the battery voltage command value Vb*, the limit current value Im, and the charging current Ib to the major controller 6M. Therefore, in step S36, the major setting unit 18 sets these parameters for the major control unit 21.
[0056] On the other hand, if the result of step S34 is "No", the process proceeds to step S38 (secondary control process). As described above with respect to the process of step S18 (see FIG. 9), the main controller 7 supplies the secondary power command value Pk* and the limit current value Im to the secondary controller 6S. Then, in step S38, the secondary setting unit 19-k sets these parameters in the secondary control unit 22-k.
[0057] Next, when the process proceeds to step S40 (secondary control process, major control process), the sub-controller 6 performs charging control on the battery 52. That is, the major controller 6M controls the converter 3-1 according to the algorithm of the major control unit 21 (see FIG. 7). Also, the secondary controller 6S controls the converter 3-k according to the algorithm of the secondary control unit 22-k (see FIG. 8).
[0058] Thereafter, the process returns to step S32, and the processes of steps S32 to S40 are repeated. In particular, in this embodiment, since the determination process of step S34 is repeatedly executed, the main controller 7 can appropriately switch the function of the sub-controller 6 to the major controller 6M or the secondary controller 6S.
[0059] FIG. 11 is a diagram showing an example of charging power Pb and fuel efficiency F in the first embodiment. The fuel efficiency FC in the comparative example is also shown by a dashed line in Figure 11. "Fuel efficiency" refers to the electrical energy obtained from a certain amount of fuel, and can be thought of as the reciprocal of the above-mentioned "fuel efficiency." As described above, the charging power Pb decreases as time t passes. In the comparative example in which one of the power generation modules 30 is fixedly applied, the fuel efficiency FC decreases significantly as time passes. On the other hand, according to the first embodiment, the function allocation unit 72 reduces the number of power generation modules 30 as time passes, so that the fuel efficiency F can be maintained at a relatively high level. Furthermore, according to the first embodiment, the control for changing the charging power Pb according to the battery voltage Vb is mainly performed only by the major module 30M. This makes it possible to realize highly accurate charging control that suppresses pulsation of the charging power Pb.
[0060] [Second embodiment] 12 is a block diagram of a control system in the second embodiment. In the following description, the same reference numerals are used to designate parts corresponding to those in the first embodiment, and the description thereof may be omitted. In the second embodiment, there is provided a power generation module state detection unit 25 connected to the main controller 7. The other configurations are similar to those of the first embodiment (see Figs. 1 and 6).
[0061] The power generation module status detection unit 25 detects the status of each power generation module 30, determines whether or not a failure has occurred in each power generation module 30, and supplies the result to the main controller 7. This enables the main controller 7 to appropriately select the power generation modules 30 in operation and, among these, the power generation modules 30 to be the major modules 30M.
[0062] [Effects of the embodiment] As described above, according to the embodiment, the battery charging system (100) includes a plurality of power generation modules 30 each including an engine 1, a generator 2 driven by the engine 1, and a converter 3 that converts a voltage output from the generator 2 into a charging voltage and supplies the charging voltage to a battery 52 to be charged, and a battery charging control device (6, 7) that controls the power generation modules 30. The battery charging control device (6, 7) selects one of the power generation modules 30 as a major module 30M in accordance with a predicted charging power Pbest that is power predicted to be supplied to the battery 52, and controls one or more of the power generation modules 30 other than the major module 30M that is used to charge the battery 52. The power supply control system includes a function allocation unit 72 that selects a plurality of power generating modules 30 as secondary modules 30S, a power command unit 74 that outputs a secondary power command value Pk* that is a command value for the power generated by each secondary module (30-k), a major control unit 21 that increases the output power of the converter 3 in the major module 30M as the result of subtracting the battery voltage Vb that is the voltage of the battery 52 from a predetermined battery voltage command value (Vb*) increases, and a secondary control unit 22-k that brings the power output by each secondary module 30S closer to the corresponding secondary power command value Pk*. This allows the power output from the plurality of power generating modules to be appropriately managed. In other words, using the plurality of power generating modules, it is possible to realize high power generation efficiency and highly accurate charging of the connected battery 52.
[0063] Furthermore, it is more preferable that the power command unit 74 determines the secondary power command value Pk* of the secondary module 30S that provides a fuel efficiency equal to or lower than a predetermined threshold value based on the fuel efficiency characteristic (DE) of the generator 2 of each secondary module 30S. This makes it possible to determine an appropriate secondary power command value Pk* based on the fuel efficiency characteristic (DE).
[0064] Further, it is more preferable that the power command unit 74 has a function of calculating a predicted measure power Pmest, which is a predicted value of the output power of the major module 30M that will provide a fuel efficiency of a predetermined threshold or less based on the fuel efficiency characteristic (DE) of the generator 2 of the major module 30M, a function of calculating a total secondary power command value Psa*, which is the sum of the secondary power command values Pk*, by subtracting the predicted measure power Pmest from the predicted charging power Pbest, and a function of determining a secondary power command value Pk* of the secondary module 30S that will provide a fuel efficiency of a predetermined threshold or less based on the total secondary power command value Psa* and the fuel efficiency characteristic (DE) of the generator 2 of each secondary module 30S. This makes it possible to determine a more appropriate secondary power command value Pk* based on the fuel efficiency characteristic (DE), the predicted measure power Pmest, and the predicted charging power Pbest.
[0065] Moreover, it is more preferable that when the major module 30M stops, the function allocation unit 72 sets one of the secondary modules 30S as the new major module 30M. This allows the distributed battery charging system 100 to continue operating even if the major module 30M stops for some reason.
[0066] Moreover, it is more preferable that the battery charge control device (6, 7) further includes an output change suppression unit 76 that, when the output of any of the power generation modules 30 drops, increases the output of the other power generation modules 30, or designates any of the power generation modules 30 that is not outputting power as a new secondary module (30-k), thereby suppressing a change in the charging power supplied to the battery 52. In this way, even if the output of any of the power generation modules 30 drops, it is possible to suppress a change in the charging power supplied to the battery 52.
[0067] In addition, the function allocation unit 72 determines the number of secondary modules 30S in accordance with the capacity of the battery 52, and then reduces the number of secondary modules 30S in accordance with a decrease in the charging current Ib flowing through the battery 52. This makes it possible to operate an appropriate number of secondary modules 30S in accordance with the decrease in the charging current Ib.
[0068] Further, it is more preferable that the major control unit 21 includes a major voltage control unit (212) that outputs a major current request value Irm that increases as the result of subtracting the battery voltage Vb from the battery voltage command value (Vb*) increases, an additive current calculation unit (215) that outputs a current additive command value Iad corresponding to the sum of currents output by the secondary modules 30S, based on a total secondary power command value Psa* that is the sum of the secondary power command values Pk* and the battery voltage Vb, a major current limiting unit (214) that outputs a major current target value Itm that becomes a predetermined limit current value Im when the major current request value Irm exceeds the limit current value Im and becomes the major current request value Irm in other cases, and a major current control unit (218) that controls the output current of the converter (3-1) in the major module 30M so that the charging current Ib flowing to the battery 52 approaches the charging current command value (Ib*), which is the sum of the major current target value Itm and the current additive command value Iad. This allows the measurer control unit 21 to more appropriately control the output power of the converter 3 in the measure module 30M.
[0069] Further, it is more preferable that the secondary control unit 22-k includes a secondary current calculation unit (222-k) that calculates a secondary current request value Irsk in each secondary module 30S based on a secondary power command value Pk* for each secondary module 30S and a battery voltage Vb, a secondary current limiting unit (224-k) that outputs a secondary current target value Itsk that becomes the limit current value Im when each secondary current request value Irsk exceeds the limit current value Im and becomes the corresponding secondary current request value Irsk otherwise, and a secondary current control unit (228-k) that controls a secondary output current (Ibsk), which is the output current of the converter (3-k) in each secondary module 30S, so as to approach each secondary current target value Itsk. This allows the secondary control unit 22-k to more appropriately control the power output by each secondary module 30S.
[0070] [Variations] The present invention is not limited to the above-mentioned embodiment, and various modifications are possible. The above-mentioned embodiment is exemplified to explain the present invention in an easy-to-understand manner, and is not necessarily limited to those having all the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to delete a part of the configuration of each embodiment, or to add or replace other configurations. In addition, the control lines and information lines shown in the figure show those that are considered necessary for explanation, and do not necessarily show all the control lines and information lines necessary on the product. In reality, it may be considered that almost all the configurations are connected to each other. Possible modifications of the above-mentioned embodiment are, for example, as follows.
[0071] (1) The hardware of the sub-controller 6 and main controller 7 in the above embodiment can be realized by a general-purpose computer. Therefore, the flowcharts shown in FIGS. 9 and 10 and other programs for executing the various processes described above may be stored on a storage medium (a computer-readable recording medium on which a program is recorded) or distributed via a transmission path.
[0072] (2) In the above embodiment, the processes shown in FIGS. 9 and 10 and the other processes described above have been described as software-based processes using a program. However, some or all of the processes may be replaced with hardware-based processes using an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array), etc.
[0073] (3) In each of the above embodiments, the power command unit 74 determines the predicted major power Pmest (not shown) and the secondary power command value Pk* based on the engine fuel efficiency characteristic data DE so as to achieve good fuel efficiency (equal to or less than a predetermined threshold). However, instead of using the engine fuel efficiency characteristic data DE, an output power range in which good fuel efficiency (equal to or less than a predetermined threshold) can be calculated in advance for each power generation module 30, and the predicted major power Pmest (not shown) and the secondary power command value Pk* may be determined so as to be included within that output power range.
[0074] (4) In the above embodiment, the limit current value Im in the major control unit 21 (see FIG. 7) and the limit current value Im in each secondary control unit 22-k (see FIG. 8) are the same value. However, these limit current values Im may be different values. For example, the rated output current in each power generation module 30 may be set to the limit current value Im.
[0075] (5) The various processes executed in the above-described embodiments may be executed by a server computer via a network (not shown), and the various data stored in the above-described embodiments may also be stored in the server computer. [Explanation of symbols]
[0076] 1 Engine 2. Generator 3. Converter 6 Sub-controller (battery charging control device) 7 Main controller (battery charging control device) 21 Major control section 22-k Secondary control section 30 Power generation module 30M measuring module 30S Secondary Module 52 Battery 72 Functional Allocation Section 74 Electric Power Command Department 76 Output change suppression section 100 Distributed Battery Charging System (Battery Charging System) 212 Voltage control section (major voltage control section) 214 Current limiting section (major current limiting section) 215 Current calculation unit (addition current calculation unit) 218 Current control section (major current control section) 222-k Current calculation unit (secondary current calculation unit) 224-k Current limiter (secondary current limiter) 228-k Current control section (secondary current control section) DE engine fuel consumption characteristics data (fuel consumption characteristics) Ib charging current Im limit current value Vb Battery voltage Pk* Secondary power command value Iad Current command value Irm Major current requirement Itm Major current target value S16 Step (Function allocation process) S18 Step (power command process) S36 Step (Major Control Process) S38 Step (Secondary Control Process) S40 step (secondary control process, major control process) Psa* Total secondary power command value Ibsk output current (secondary output current) Irsk Secondary current demand Itsk Secondary current target value Pbest predicted charging power Pmest predicted measure power
Claims
1. a plurality of power generation modules each including an engine, a generator driven by the engine, and a converter that converts a voltage output from the generator into a charging voltage and supplies the charging voltage to a battery to be charged; a battery charge control device that controls the power generation module, The battery charging control device includes: a function allocation unit that selects one of the power generation modules as a major module according to a predicted charging power that is power predicted to be supplied to the battery, and selects one or more of the power generation modules other than the major module that is used to charge the battery as secondary modules; a power command unit that outputs a secondary power command value that is a command value for the power generated by each of the secondary modules; a measure control unit that increases an output power of the converter in the measure module as a result of subtracting a battery voltage, which is a voltage of the battery, from a predetermined battery voltage command value increases; a secondary control unit that causes the power output by each of the secondary modules to approach the corresponding secondary power command value. A battery charging system comprising:
2. The power command unit determines the secondary power command value of the secondary module that provides a fuel efficiency equal to or lower than a predetermined threshold value based on a fuel efficiency characteristic of the generator of each of the secondary modules.
2. The battery charging system according to claim 1.
3. The power command unit is A function of calculating a predicted measure power, which is a predicted value of the output power of the major module that achieves a fuel consumption rate equal to or lower than a predetermined threshold value based on the fuel consumption characteristics of the generator of the major module; a function of calculating a total secondary power command value, which is a sum of the secondary power command values, by subtracting the predicted measure power from the predicted charging power; and determining the secondary power command value of the secondary module that provides a fuel consumption rate equal to or lower than a predetermined threshold value based on the total secondary power command value and the fuel consumption characteristic of the generator of each of the secondary modules.
2. The battery charging system according to claim 1.
4. When the major module stops, the function allocation unit sets one of the secondary modules as a new major module.
2. The battery charging system according to claim 1.
5. The system further includes an output change suppression unit that, when the output of any one of the power generation modules decreases, increases the output of the other power generation modules, or designates any one of the power generation modules that is not outputting as a new secondary module, thereby suppressing a change in the charging power supplied to the battery.
5. The battery charging system according to claim 4.
6. The function allocation unit determines the number of the secondary modules in accordance with the capacity of the battery, and thereafter reduces the number of the secondary modules in accordance with a reduction in the charging current flowing through the battery.
2. The battery charging system according to claim 1.
7. The major control unit is a major voltage control unit that outputs a major current request value that increases as a result of subtracting the battery voltage from the battery voltage command value increases; a current addition calculation unit that outputs a current addition command value corresponding to a sum of currents output by the secondary modules, based on a total secondary power command value that is a sum of the secondary power command values and the battery voltage; a major current limiting unit that outputs a major current target value that becomes a predetermined limit current value when the major current request value exceeds the predetermined limit current value, and that becomes the major current request value in other cases; a major current control unit that controls the output current of the converter in the major module so that the charging current flowing through the battery approaches a charging current command value that is the sum of the major current target value and the current addition command value.
6. The battery charging system according to claim 5.
8. The secondary control unit is a secondary current calculation unit that calculates a secondary current requirement value in each of the secondary modules based on the secondary power command value for each of the secondary modules and the battery voltage; a secondary current limiting unit that outputs a secondary current target value that becomes the limited current value when each of the secondary current request values exceeds the limited current value, and otherwise becomes the corresponding secondary current request value; a secondary current control unit that controls a secondary output current, which is an output current of the converter in each of the secondary modules, so as to approach each of the secondary current target values.
8. The battery charging system according to claim 7.
9. A battery charging control method applied to a battery charging system including a plurality of power generation modules each including an engine, a generator driven by the engine, and a converter that converts a voltage output from the generator into a charging voltage and supplies the charging voltage to a battery to be charged, and a battery charging control device that controls the power generation modules, comprising: a function allocation step of selecting one of the power generation modules as a major module and selecting one or more of the power generation modules other than the major module that is used to charge the battery as secondary modules according to a predicted charging power that is predicted to be supplied to the battery; a power command step of outputting a secondary power command value which is a command value of power generated by each of the secondary modules; a major control step of increasing an output power of the converter in the major module as a result of subtracting a battery voltage, which is a voltage of the battery, from a predetermined battery voltage command value increases; a secondary control process for controlling the power output by each of the secondary modules to approach the corresponding secondary power command value.
2. A battery charging control method comprising:
10. a function allocation unit for controlling a plurality of power generation modules each including an engine, a generator driven by the engine, and a converter for converting a voltage output from the generator into a charging voltage and supplying the charging voltage to a battery to be charged, the function allocation unit selecting one of the power generation modules as a major module and selecting one or more of the power generation modules other than the major module that is used to charge the battery as secondary modules in accordance with a predicted charging power that is power predicted to be supplied to the battery; a power command unit that outputs a secondary power command value that is a command value for the power generated by each of the secondary modules; a measure control unit that increases an output power of the converter in the measure module as a result of subtracting a battery voltage, which is a voltage of the battery, from a predetermined battery voltage command value increases; a secondary control unit that causes the power output by each of the secondary modules to approach the corresponding secondary power command value. A battery charging control device comprising:
Citation Information
Patent Citations
Electric power equilibrium control type power source system for vehicle
JP2006298330A
Power supply system
JP2013055839A
