Check dam and training levee

The check dam and dike system using square blocks and wave-dissipating blocks addresses the challenges of emergency construction by ensuring stability, flexibility, and efficient debris capture, reducing dam height and damage from debris flows, mudflows, and driftwood.

JP2024160758AActive Publication Date: 2024-11-15原田 好也
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023076061
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-02
Publication Date
2024-11-15
Estimated Expiration
2043-05-02

AI Technical Summary

Technical Problem

Existing emergency construction methods for debris flows, volcanic mudflows, and driftwood using steel pipes and concrete blocks face challenges such as the need for pre-stocking of various materials, difficulty in transporting and installing construction machinery, and inadequate flexibility to adapt to ground deformation, leading to potential displacement and leakage.

Method used

A check dam and dike system using square blocks and wave-dissipating foot protection blocks, with projections on the upper and lower surfaces to enhance stability, flexibility, and water permeability, allowing for rapid construction and effective debris capture.

Benefits of technology

The system provides stable debris flow resistance, rapid construction, and flexibility to adapt to ground deformation, enhancing the capture rate of debris and reducing dam height by separating water and sediment, thus minimizing damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024160758000001_ABST
    Figure 2024160758000001_ABST
Patent Text Reader

Abstract

To provide a check dam and training levee that can be easily and quickly constructed on-site and that can provide a highly resistant structure to debris flows, volcanic mud flows, and driftwood when installed in a valley or river, and to provide the check dam that has a high ability to capture soil and sand with ability to follow ground deformation even when constructed on soft ground.SOLUTION: A check dam (100) or training levee includes a dam structure (10) that is built by piling up square concrete blocks (11) with desirable interlocking strength between the concrete blocks and water permeability, and a wave dissipating structure (20) that is built by piling up wave dissipating blocks (21) on the upstream side of the dam structure (10). Thanks to the structure that is a combination of these two types of blocks, stability against debris flows (1) can be increased. In addition, thanks to the permeability of the dam structure (10) a capture rate of debris flows (1), volcanic mud-flows, and driftwood can be increased even in a sand-filled check dam (100).SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a check dam and a training embankment for preventing debris flows, volcanic mud flows, and driftwood. [Background technology]

[0002] In situations immediately following a volcanic eruption where it is necessary to urgently construct facilities to protect against debris flows, volcanic mud flows, and driftwood, factory-manufactured products such as concrete blocks can be transported to the construction site in an emergency to construct erosion-control dams and training dikes. Under such circumstances, in sabo dams and training dikes constructed with ordinary concrete blocks, when debris flows, volcanic mudflows, or driftwood flow downstream, the fluid forces carry the individual pieces of material, which can cause the blocks to displace and be washed away. Therefore, construction methods have been proposed for sabo dams that are capable of emergency construction and highly resistant to debris flows and volcanic mudflows. However, there have been no established training dikes to date. In addition, a sand-control dam or guide embankment has been proposed, which is formed by stacking square blocks, each of which has a concrete-filled steel pipe as its axis and has a through hole for the steel pipe, skewered onto the concrete-filled steel pipe (see Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication 2000-290969 (Measures against debris flow and their construction method) Summary of the Invention [Problem to be solved by the invention]

[0004] However, these methods have the following drawbacks: Since emergency construction is required, it is necessary to stockpile steel pipe materials in advance, but since the height to be piled up varies with the size of debris flow, volcanic mudflow, and driftwood, it is difficult to stockpile steel pipes of various lengths and plate thicknesses in advance to accommodate the height and external forces acting. As a result, it is impossible to change the shape of the dam. In addition, in order to erect the steel pipes by excavation on site, it is necessary to secure construction machinery for large-scale excavation and installation, and there is a concern that it will be difficult to transport and install the construction machinery on site. In addition, it is expected that emergency construction will be difficult because it takes time to secure the concrete material to be filled and poured into the steel pipes and to pour it on site. Furthermore, in the case of ground that deforms due to the effects of volcanoes, etc., the expected bending performance in the interlocking between the concrete blocks cannot be expected, so the scale of the countermeasure structure may become very large. On the other hand, it is necessary to construct a countermeasure structure with a high effect of capturing soil and sand.

[0005] Therefore, the present invention has been made in consideration of the above-mentioned problems, and has an object to provide a sabo dam and training embankment which are mainly made of materials that can be stockpiled in advance, thereby eliminating the need for steel pipes, and which can be easily constructed in an emergency and has a highly debris-flow resistant structure that can prevent debris flows, volcanic mudflows, and the outflow of driftwood, as well as the damage that comes with them. [Means for solving the problem]

[0006] In order to solve the above problems, the present invention provides a sabo dam comprising square block blocks stacked in a direction crossing a valley or river, and wave-dissipating foot protection blocks stacked in a direction crossing the valley or river on the upstream side of the square block blocks.

[0007] It is also preferable that the sand-control dam has the characteristic that horizontal displacement of the square block is suppressed by protrusions provided on the upper and lower surfaces of the block made of rectangular concrete at the horizontal joints between the upper and lower parts of the square block in the vertical direction.

[0008] It is also preferable that the erosion control dam has water permeability between the rectangular blocks due to protrusions provided on the upper and lower surfaces of the blocks made of rectangular concrete at the horizontal joints between the upper and lower blocks in the vertical direction.

[0009] Furthermore, it is preferable that the horizontal joints between the top and bottom of the square block in the vertical direction and the side joints in the horizontal direction have protrusions on the top and bottom surfaces of the block made of rectangular concrete and the planar shape of the square block on the sides, giving the square block flexibility to follow deformations of the ground and the ability to suppress vertical downward displacement of the square block located at the topmost tier.

[0010] It is also preferable that the sabo dam has the characteristic that the dam shape can be changed by changing the method of combining or stacking the block blocks and the wave-dissipating foot protection blocks.

[0011] The dike is also characterized by comprising square block blocks stacked in a direction crossing the river, and wave-dissipating foot protection blocks stacked in the direction crossing the river upstream of the square block blocks. Effect of the Invention

[0012] According to the present invention, a sabo dam or training embankment comprising square block blocks piled up in a direction crossing a valley or a river and wave-dissipating foot protection blocks piled up upstream of the square block blocks in a direction crossing the valley or the river can suppress damage caused by debris flow, volcanic mudflow, and driftwood. A combination of highly debris flow-resistant countermeasure structures and easily stockpiled components can provide a stable countermeasure structure with rapid construction. The permeability of the dam structure made of the square block blocks can increase the capture rate of debris flow, volcanic mudflow, and driftwood even in a sand-filled sabo dam. Furthermore, a sabo dam and training embankment can be constructed on deforming ground that has the flexure to follow the deformation of the ground and the ability to suppress the vertical downward displacement of the square block located at the top. [Brief description of the drawings]

[0013] [Figure 1] FIG. 2 is a schematic diagram showing the side of a sabo dam constructed according to the present invention. [Diagram 2] FIG. 1 is a perspective view showing a valley in which a sabo dam constructed according to the present invention is installed. [Diagram 3] This is a side view showing a dam structure made of square block blocks constructed in accordance with the present invention. [Figure 4] FIG. 2 is a side view showing a wave-dissipating structure using wave-dissipating foot protection blocks constructed in accordance with the present invention. [Diagram 5] FIG. 2 is a perspective view showing a square block used in the present invention. [Figure 6] FIG. 2 is a perspective view showing a wave-dissipating foot protection block used in the present invention. [Figure 7] FIG. 1A is a plan view showing a square block used in the present invention, FIG. 1B is a cross-sectional view taken along line AA in FIG. 1A, and FIG. [Figure 8] FIG. 1A is a plan view showing a wave-dissipating foot protection block used in the present invention, FIG. 1B is a cross-sectional view taken along line AA of FIG. 1A, and FIG. 1C is a cross-sectional view taken along line BB of FIG. [Figure 9]FIG. 2 is an enlarged schematic diagram of a dam structure, showing the mechanism for suppressing horizontal displacement expected in the present invention. [Figure 10] Schematic diagrams showing an experiment to understand the behavior of a dam structure on the ground during deformation as expected in the present invention, where (a) is a front view, (b) is a side view showing the case where a hole for allowing soil and sand to flow is provided at a position outside the vertical line below the dam structure, and (c) is a side view showing the case where a hole for allowing soil and sand to flow is provided at a position inside the vertical line below the dam structure. [Figure 11] FIG. 1 is a schematic diagram showing the behavior of a dam structure on deforming ground as expected in the present invention, obtained through experiments. [Figure 12] FIG. 1(a) is a schematic diagram showing a cross-section of a sabo dam constructed according to the present invention, with unsaturated sediment deposited upstream of it; FIG. 1(b) is a schematic diagram showing a cross-section of a sabo dam constructed using conventional concrete, with saturated sediment deposited upstream of it. [Figure 13] 1(a) is a schematic diagram obtained from an experiment showing a cross-section of a sabo dam constructed according to the present invention and the situation when a debris flow is stopped above the sediment deposited upstream of the dam, and 1(b) is a schematic diagram obtained from an experiment showing a cross-section of a sabo dam constructed with conventional concrete and the situation when a debris flow passes above the sediment deposited upstream of the dam. [Figure 14] FIG. 1 is a perspective view showing a river on which a training embankment constructed according to the present invention is installed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described with reference to the accompanying drawings. Note that the embodiment described below is merely an example, and various other forms are possible within the scope of the present invention.

[0015] <Configuration of sabo dam> FIG. 1 is a schematic diagram showing the side of a sabo dam 100 constructed according to the present invention. FIG. 2 is a perspective view showing a valley V in which the sabo dam 100 is installed. FIG. 3 is a side view showing a dam construction 10 made of a square block 11 constructed according to the present invention. FIG. 4 is a side view showing a wave-dissipating construction 20 made of a wave-dissipating foot protection block 21 constructed according to the present invention. FIG. 5 is a perspective view showing the square block 11. FIG. 6 is a perspective view showing the wave-dissipating foot protection block 21. FIG. 7(a) is a plan view showing the square block 11, (b) is an AA cross-sectional view of (a), and (c) is a BB cross-sectional view of (a). FIG. 8(a) is a plan view showing the wave-dissipating foot protection block 21, (b) is an AA cross-sectional view of (a), and (c) is a BB cross-sectional view of (a). FIG. 9 is an enlarged schematic view of the dam construction 10 showing a mechanism for suppressing horizontal displacement expected in the present invention. 2, the sabo dam 100 is constructed to cross the valley V where there is a possibility of a debris flow 1, a volcanic mudflow, accumulation of driftwood, or flooding, for example. The sabo dam 100 captures the debris flow 1 flowing down from the upstream side of the valley V, thereby preventing landslides in residential areas. As shown in Fig. 1, the sabo dam 100, into which the debris flow 1 flows, is provided with the wave dissipating works 20 constructed by randomly stacking the wave dissipating foot protection blocks 21 constituting the upstream side, and the dam work 10 constructed by stacking the square blocks 11 in layers on the downstream side of the wave dissipating works 20. The wave dissipating works 20 constructed on the upstream side reduce the acting force and flow velocity of the debris flow 1, thereby stabilizing the sabo dam 100. The dam work 10 constructed on the downstream side of the wave dissipating works 20 receives, accumulates, and captures the soil and driftwood carried by the debris flow 1, preventing it from flowing downstream, thereby protecting houses and the like downstream from damage caused by the debris flow 1.

[0016] <Composition of dam works> As shown in FIG. 3, the dam work 10 is constructed by stacking the square blocks 11 in layers from the bottom up to a required height, aligning them in a plane. This allows the shape of the dam work 10 to be freely changed. As shown in FIG. 5 and FIG. 7, the square blocks 11 are rectangular blocks made of concrete and have protrusions 111 on the top and bottom surfaces. The square blocks 11 are constructed by joining a side surface 112 of the square block 11 to the side surface 112 of another square block 11 adjacent to the square block 11. Here, as shown in FIG. 3, when stacking the square blocks 11 from the bottom, the protrusions 111 of the square blocks 11 are joined to each other when the square blocks 11 are engaged with each other in the horizontal direction due to the difference in the arrangement of the protrusions 111 on the square blocks 11 in the planar positions. Specifically, the square blocks 11 are rotated at a right angle (90 degrees) for each layer in which the square blocks 11 are stacked, and the horizontal protrusions 111 of each layer are interlocked with each other. As a result, as shown in Fig. 9, the interlocking of the protrusions 111 suppresses horizontal displacement between the square blocks 11.

[0017] <Configuration of wave dissipating works> As shown in FIG. 4, the wave-dissipating works 20 are constructed by stacking the wave-dissipating foot fixing blocks 21 from the bottom up in a random manner without aligning them to a required height. Therefore, the shape of the wave-dissipating works 20 can be freely changed. As shown in FIG. 6 and FIG. 8, the wave-dissipating foot fixing blocks 21 are provided with, for example, four legs 211. Due to the legs 211, the gaps between the wave-dissipating foot fixing blocks 21 are remarkably wide, unlike the gaps between the square blocks 11, and the gaps become wider. Therefore, when the debris flow 1 passes through this wide gap, it is expected that the external force acting due to the fluid force of the debris flow 1 will be reduced by friction influenced by the roughness of the surface of the wave-dissipating foot fixing blocks 21. In addition, the strong interlocking structure of the legs 211 ensures stability (debris flow resistance) against external forces acting in conjunction with the debris flow 1, volcanic mudflow, and driftwood flowing downstream, and can suppress strong horizontal displacement between the wave-dissipating foot protection blocks 21. This ensures the stability of the wave-dissipating works 20 and the dam work 10.

[0018] <Permeability of dam construction> As shown in FIG. 3, when the dam work 10 is constructed by stacking the block blocks 11, the dam work 10 can block and prevent the passage of fine soil and sand, and only allow water to pass through and be discharged downstream of the dam work 10. This allows the soil and water to be separated and captured, so that the upstream capture volume of the dam 10 can be reduced, and as a result, the height of the dam work 10 can be reduced, making it possible to reduce the size of the dam work 10. In addition, the effect of allowing water to pass through the dam work 10 reduces the water pressure acting on the dam work 10, making it possible to construct a more stable sabo dam 100. Furthermore, even if soil is piled up in a sand-filled state on the upstream side of the sabo dam 100, the debris flow 1 passing from the upstream side can be stopped and captured above the accumulated soil and sand. In order to confirm the drainage performance of the dam structure 10 and the wave dissipating structure 20, an experiment shown in FIG. 1 was conducted in a straight waterway. The scale was 1 / 25, and the waterway width (transverse direction of the sabo dam 100) was set to three rows of the square block 11. The experiment was conducted for two cases, namely, water only and debris flow 1 with sediment mixed in, and the flow rate and waterway gradient were changed to ascertain the permeability due to the flow rate from the sabo dam 100 (the dam structure 10 and the wave dissipating structure 20) in the case of water only, and the capture performance of the outflow amount from the sabo dam 100 in the case of sediment mixed in. The experimental results showed that the drainage performance was approximately 40% or more of the flow rate, and the capture performance (amount of sediment not flowing out) was 95% or more of the amount of sediment input by the sabo dam 100. These experimental results confirmed that the protrusions 111 provided on the upper and lower surfaces of the square block 11, which is made of rectangular concrete, at the horizontal joints between the top and bottom of the square block 11, provide water permeability between the square blocks 11.

[0019] <Dam construction performance> Figure 10 is a schematic diagram showing an experiment to grasp the behavior of the dam work 10 on deforming ground expected in the present invention, where (a) is a front view, (b) is a side view showing a case where a hole 42 for allowing sand 41 spread in a water tank 4 to flow out from below is provided at a position outside the vertically below the dam work 10, and (c) is a side view showing a case where the hole 42 for allowing the sand 41 to flow out from below is provided at a position inside the vertically below the dam work 10. Figure 11 is a schematic diagram obtained from the experiment to show the behavior of the dam work 10 on deforming ground expected in the present invention. In order to grasp the ability of the dam work 10 to follow deformation on deforming ground due to subsidence, liquefaction, etc., the dam work 10 was constructed by piling up four layers of the square blocks 11 manufactured at 1 / 25 scale on a hypothetical ground prepared by spreading the sand 41 inside the water tank 4, as shown in Fig. 10. Then, as shown in the front view of Fig. 10(a), the sand 41 in the water tank 4 was discharged from below into the vertically lower center of the front of the dam work 10, causing deformation of the ground, and the behavior of the dam work 10 at that time was grasped. The experiment was carried out at two locations: one where the sand 41 was discharged from a position (one third) outside the vertical downward direction, which is generally assumed to be affected by water falling from the top of the dam structure 10, as shown in FIG. 10(b), and the other where the sand 41 was discharged from a position two thirds of the width of the dam structure 10 from the upstream side, which is generally assumed to be affected by a horizontal external force acting on the dam structure 10 from the right side of the figure and causing it to overturn and act on the ground, as shown in FIG. 10(c). For the evaluation, since it is important to suppress the displacement of the square block 11 at the top as a capture function of the sabo dam 100 and the training dike 200, the top height difference Δδ of the square block 11 at the top before and after the experiment was measured and compared. The outflow of the sand 41 was naturally stopped at a certain point due to the influence of the internal friction angle (shear resistance), which is a characteristic of the sand 41. According to the experimental results, it was newly found that in the cases of FIGS. 10( b ) and 10 ( c ), the final Δδ was less than 10% of the total height of the dam structure 10 . Furthermore, as shown in Figure 11, observations during the experiment revealed that as the sand 41 flowed out, the central bottom block 11 fell vertically downward together with the sand 41, but the other square blocks 11 were compressed and interlocked at the joints due to the protrusions 111 provided on the square blocks 11 and the shape of the side faces 112 of the square blocks 11, resulting in a new phenomenon (interlock beam effect) in which the square blocks 11 were stabilized by a beam structure with the lower ends of the dam structure 10 as fulcrums. As a result, it was found that at the horizontal joints between the top and bottom of the square block 11 and the joints at the side surfaces 112, the protrusions 111 provided on the top and bottom surfaces of the square block 11, which is made of rectangular concrete, and the planar shape of the side surfaces 112 of the square block 11, give the square block 11 flexibility to follow deformations of the ground and the ability to suppress vertical downward displacement of the topmost square block 11.

[0020] As described above, according to the sabo dam 100, when the debris flow 1, volcanic mud flow, or driftwood flows out from the upstream of the valley V, the wave dissipating works 20 and the dam work 10 installed in a direction crossing the valley V ensure debris flow resistance and can safely dam and capture the debris. Meanwhile, due to the permeability of the dam work 10 and the wave dissipating works 20, compared to a conventional impermeable sabo dam, the capture capacity can be significantly reduced by separating water and soil immediately upstream of the sabo dam 100 and discharging the water downstream through gaps between the blocks of the sabo dam 100 (the square block 11 and the wave dissipating foot protection block 21), and therefore it is possible to reduce the scale (height) of the sabo dam 100.

[0021] It should be noted that the present invention is not limited to the above-described shapes, and can be freely modified within the scope of the present invention without changing the essential parts thereof.

[0022] Next, a modified example of the sabo dam 100 will be described. The same components as those in the above embodiment are denoted by the same reference numerals and will not be described. Fig. 14 is a perspective view showing a river R on which a training dike 200 constructed according to the present invention is installed. As shown in Fig. 14, in the river R flowing on flat land sandwiched between mountains M, in an area where the debris flow 1, volcanic mudflow, and driftwood may flood the surrounding area, the training dike 200 for preventing flood damage to the surrounding area is similarly arranged by the wave dissipating works 20 and the dam works 10 along a diagonal direction intersecting the river R, taking into consideration daily land use. This makes it possible to rapidly construct the guide embankment 200, which is safe against external forces caused by the debris flow 1, in any shape using the blocks (the square blocks 11 and the wave-dissipating foot protection blocks 21) that have been stockpiled in advance.

[0023] <Example> Next, an embodiment of the sabo dam 100 having the above-mentioned configuration will be described. A 1 / 25 scale model of the conventional sabo dam 101 constructed of concrete and the sabo dam 100 constructed of concrete blocks were created and installed at the downstream end of a straight waterway. Then, the debris flow 1 containing water and sediment was made to flow down from the upstream side, and an experiment was conducted to grasp the capture form at each of the sabo dams. The straight waterway used to simulate the valley V had a width of 200 mm, a length of 2,000 mm, and a height of 100 mm. The waterway conditions were as follows: the bottom of the waterway was covered with sand and gravel (a mixture of 7 mm, 4 mm, and 0.6 mm diameters in equal proportions) and the waterway was inclined at 15 degrees, and water was supplied from upstream to generate the debris flow 1, and the weight of the sediment that was not captured by each of the sabo dams installed at the downstream part of the waterway and flowed downstream was measured. Fig. 12(a) is a schematic diagram of a cross section of the sabo dam 100 constructed according to the present invention and the sediment 30 due to unsaturated sediment upstream of it, and (b) is a schematic diagram of a cross section of the sabo dam 101 constructed of conventional concrete and the sediment 30 due to saturated sediment upstream of it. As shown in Fig. 12(b), in the conventional sabo dam 101, the sediment 30 deposited upstream is saturated with water supplied from upstream because water does not pass through the sabo dam 101. On the other hand, as shown in Fig. 12(a), due to the permeability expected for the sabo dam 100, the water of the sediment 30 upstream is drained from the sabo dam 100 and is not saturated. The supply time of the debris flow 1 was set to 30 seconds, and the behavior during that time was understood. Fig. 13(a) is a schematic diagram showing a cross section of the sabo dam 100 constructed according to the present invention, obtained from an experiment, in which the debris flow 1 is stopped above the upper part of the sediment 30 on its upstream side, and Fig. 13(b) is a schematic diagram showing a cross section of the sabo dam 101 constructed from conventional concrete, obtained from an experiment, in which the debris flow 1 passes above the upper part of the sediment 30 on its upstream side. As shown in Fig. 13(b), most of the debris flow 1 passes directly above the upper part of the sediment 30 without being captured by the conventional sabo dam 101.On the other hand, as shown in Figure 13(a), it was found that when the debris flow 1 passes over the upper part of the sediment 30 upstream of the sabo dam 100, water seeps from the debris flow 1 into the sediment 30 below, causing the debris flow 1 to stop midway and finally be captured. As described above, it has been confirmed that the proposed sabo dam 100 is more effective at capturing the debris flow 1 than the conventional sabo dam 101 and is a useful structure. [Explanation of symbols]

[0024] 1 Debris flow 4. Aquarium 10. Dam Construction 11 Square block 20 Wave-breaking works 21 Wave-dissipating root-stabilizing block 30 Sediment 41 Sand 42 holes 100 Erosion control dam 101 Conventional erosion control dams made of concrete cast on-site 111 Protrusion 112 Side 200 Stream dike 211 legs M mountain V valley R river

Claims

1. Blocks stacked in a direction across a valley or river; A wave-dissipating foot protection block is piled up along a direction crossing the valley or the river on the upstream side of the block; A sabo dam comprising:

2. A sand-control dam as described in claim 1, characterized in that at the horizontal joints between the upper and lower parts of the square block in the vertical direction, horizontal displacement of the square block is suppressed by protrusions provided on the upper and lower surfaces of the block made of rectangular concrete.

3. A sabo dam as described in claim 1, wherein the rectangular blocks have permeability due to protrusions provided on the upper and lower surfaces of the blocks made of rectangular concrete at the horizontal joints between the upper and lower blocks in the vertical direction.

4. A sabo dam as described in claim 1, wherein the horizontal joints between the upper and lower parts of the square block in the vertical direction and the side joints in the horizontal direction have protrusions on the upper and lower surfaces of the block made of rectangular concrete and the planar shape of the square block on the sides, which give the square block flexibility to follow deformations of the ground and the ability to suppress vertical downward displacement of the square block located at the topmost tier.

5. 2. The sabo dam according to claim 1, characterized in that the shape of the dam can be changed by changing the method of combining or stacking the block blocks and the wave-dissipating foot protection blocks.

6. The square blocks are piled up along the direction crossing the river, A wave-dissipating foot protection block piled up along a direction crossing the river on the upstream side of the block; A training dike comprising:

Citation Information

Patent Citations

  • Sand control method for upstream of river of brook

    JP1981119010A

  • Construction work of check dam

    JP1984177412A

  • Construction method of checkdam and rolling block for erosion and sedimentation control

    JP1996284138A

  • Countermeasure structure for debris flow and construction method therefor

    JP2000290969A

  • Header stop block attached submerged dyke

    JP2002194722A