Injection material construction management system

The injection material construction management system automates data organization and chart generation for injection holes, addressing the inefficiencies of manual data rearrangement and ensuring reliable construction management.

JP2024162575APending Publication Date: 2024-11-21KFC LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023078216
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

The manual rearrangement of injection data from multiple pump units onto chart paper is labor-intensive and inefficient, especially in long injection holes or large cross-section tunnels, where numerous pump units require significant labor to organize and manage injection data accurately.

Method used

An injection material construction management system that includes a management server and pump units, which automatically organizes and outputs injection data using display templates and extraction keys, eliminating the need for manual rearrangement and allowing for efficient data management and automated chart generation.

Benefits of technology

The system efficiently organizes injection data for each injection hole, automates chart output, and prevents data tampering, ensuring reliable and efficient construction management without reducing construction efficiency, even when incorrect hole numbers are input.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162575000001_ABST
    Figure 2024162575000001_ABST
Patent Text Reader

Abstract

To automatically output a chart using a predefined extraction key.SOLUTION: In an injection material construction management system, a management server 1 imports identification information of a pump unit 4, including information capable of identifying a divided area in which an injection pump 43 is responsible for injecting the injection material, which is stored in a registry storage unit 422 of the pump unit 4, injection start date and time, injection end date and time, trend data of a discharge flow rate of the injection material that changes over time and an accumulated flow rate of the injection material, and injection data corresponding to a specific confirmed injection hole number having initial injection pressure and final injection pressure, and stores these in a confirmed injection hole operation information storage unit 124 as an operating status record corresponding to the specific confirmed injection hole number, and extracts data for display items from this operating status record and management items of a management item storage unit 123 using the construction cross-section identification information and the corresponding confirmed injection hole number as extraction keys, and outputs a display template showing the extracted data.SELECTED DRAWING: Figure 8
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an injection material construction management system that manages the construction of injection material to be injected into the ground, for example, in tunnel auxiliary construction methods such as the long-length pre-supporting method (AGF method) and mirror reinforcement work, and in reinforcement of ground such as slopes. [Background technology]

[0002] Conventionally, as an injection material construction management system for managing the construction of injection material to be injected into the natural ground, there is an injection material construction management system disclosed in Patent Document 1, which can continue the injection work of the injection material regardless of the input of the injection hole number by the worker. In this injection material construction management system, in response to the input of the injection hole number of the injection hole in the natural ground and the injection material injection request for the injection hole number, a server device checks the presence or absence of an operation state record for the injection hole number against the stored operation state record, and if an operation state record for the injection hole number is present, a temporary hole number is assigned in place of the injection hole number, a grout injection start command is generated corresponding to the temporary hole number, and the grout injection start command and an operation state record command are transmitted to the pump unit in a recording area corresponding to the temporary hole number in the registry storage unit of the pump unit.

[0003] The server device reads the operating status records in the registry storage unit of the pump unit at a predetermined interval, and when the accumulated injection amount of the injection material reaches the target injection amount, it sends to the pump unit a command to end injection of the injection material and a command to end recording of the operating status to the recording area corresponding to the temporary hole number in the registry storage unit, obtains and stores the operating status record corresponding to the temporary hole number stored in the registry storage unit of the pump unit, and when the temporary hole number is corrected to the correct injection hole number, it corrects the temporary hole number of the operating status record of the stored temporary hole number to the operating status record of the correct injection hole number and stores it. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 7063529 Summary of the Invention [Problem to be solved by the invention]

[0005] Incidentally, pump units that inject grout into injection holes in the ground, such as the pump unit in Patent Document 1, generally store identification information of the injection pump of the pump unit in a memory unit, and also store injection data such as identification information of the work section (STA), the start and end dates and times of injection of the grout for each injection work, the accumulated injection volume of the grout, the initial and final injection pressures of the grout, and pressure changes during injection of the grout, in the memory unit until a reset button is pressed, and generally have a function to print out from the output unit in the form of chart paper with chronological injection order numbers attached to the injection data (see Figure 11).

[0006] In managing the construction of injection materials, it is required to manage the start and end dates and times of each injection work for each injection pump, the accumulated injection volume of the injection material, and the initial and final injection pressures of the injection material as a daily injection report, as well as to manage the injection data based on printed chart paper.

[0007] For example, in the long-length pre-supporting method, the injection hole and the steel pipe to be installed in the injection hole are typically long, such as 12.5 m, so the injection area of ​​one injection hole is divided into multiple sections, such as three sections, in the length direction, and multiple injection pumps, such as three units, are used to inject simultaneously. Furthermore, in large-section tunnels, one construction section is sometimes injected with two sets of injection pumps, so for example, if one injection hole is divided into three sections and injected with three injection pumps and two sets of injection pumps are used, the number of injection pumps used will be six, and workers will collect the chart paper printed out from six pump units corresponding to the six injection pumps.

[0008] Workers will manage the injection data based on the collected chart paper, but since the injection order numbers attached to the chart paper printed out by each pump unit are simply injection order numbers that indicate the order in which the injection pumps of the pump unit injected the injection material, currently the injection hole number of the corresponding injection hole and information which identifies which of the injection hole's divided areas the injection pump injected into - in other words, information which identifies the injection hole's divided area - are written by hand in the injection data for each injection order number, and the parts with the injection hole number and divided area identification information written are cut out with scissors or the like, and each cut-out part is pasted on a mount, and the injection data for the injection hole and its divided area are organized.

[0009] However, for example, if 30 injection holes are drilled in one construction section and each injection hole is divided into three separate areas to inject the grout, three injection pumps are used for each injection hole x 30 injection holes, resulting in a huge amount of printed chart paper (90 sheets). Therefore, the task of reorganizing the large amount of chart paper into injection data for each injection hole and its separate areas is a labor-intensive manual task.

[0010] The present invention has been proposed in consideration of the above-mentioned problems, and aims to provide an injection material construction management system that eliminates the need to manually reorganize the injection data on chart paper printed out by the pump unit of an injection pump as injection data for each injection hole, efficiently organizes the injection data stored in the pump unit as injection data for each injection hole, and can automatically output a chart using a specified extraction key. [Means for solving the problem]

[0011] The injection material construction management system of the present invention includes a management server and a plurality of pump units each having an injection pump for injection material, the management server stores a display template that defines a display form in a display template storage section, stores management items in a management item storage section that include at least construction section identification information, a confirmed injection hole number corresponding to the construction section identification information, a construction method name, and a construction date, and stores identification information of the pump unit, which includes information that can identify a division area in the length direction of the injection hole that is responsible for injecting the injection material by the injection pump, and information on the injection pump of the injection pump possessed by the pump unit, which is stored in a registry storage section of the pump unit. The method is characterized in that injection data corresponding to the specific confirmed injection hole number, which includes the start and end dates and times of injection of the material, trend data on the discharge flow rate of the injection material that changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material, is imported and stored in a confirmed injection hole operation information storage unit as an operating status record corresponding to the specific confirmed injection hole number, and data for the display items of the display template is extracted from the management items of the management item storage unit and the operating status record of the confirmed injection hole operation information storage unit using the construction cross section identification information and the corresponding confirmed injection hole number as extraction keys, and the display template showing the extracted data is output. According to this, the management server extracts data for the display items of the display template from the management items in the management item storage section and the operating state record in the confirmed injection hole operating information storage section imported from the pump unit, using the construction section identification information and the corresponding confirmed injection hole number as extraction keys, and outputs a display template showing the extracted data, thereby eliminating the need to manually reorganize the injection data on the chart paper printed out by the pump unit of the injection pump as injection data for each injection hole, and the management server efficiently organizes the injection data stored in the pump unit as injection data for each injection hole, and automatically outputs a chart using a predetermined extraction key. Furthermore, since the required items of the injection data output in the display template are imported from the pump unit, it is possible to prevent the operator from tampering with the injection data, and it is possible to output a display template showing the required items of highly reliable injection data.

[0012] The injection material construction management system of the present invention is characterized in that the pump unit is communicatively connected to the management server, the management server sends a data reset command to the pump unit, and the pump unit sends the injection data stored in a registry storage unit of the pump unit to the management server in response to receiving the data reset command. According to this, a data reset command can be sent to the pump unit at the timing of a work shift change that is a convenient division of the grout material injection work, and the injection data for each division of the grout material injection work can be automatically imported into the management server.

[0013] The injection material construction management system of the present invention is characterized in that the management server imports injection data to which a temporary hole number is assigned as injection data corresponding to the specific confirmed injection hole number, and stores the operating status record in the confirmed injection hole operation information storage unit in a form in which the temporary hole number is corrected to the specific confirmed injection hole number. According to this, when the injection hole number entered into the management server differs from the regular confirmed injection hole number, a temporary hole number is assigned, the injection work of the injection material is carried out by injecting the injection material into the injection hole with the temporary hole number, and the temporary hole number is later corrected to the regular confirmed injection hole number for construction management. Therefore, regardless of an input error in the injection hole number, the injection work of the injection material can be continued without interruption, and a decrease in construction efficiency can be prevented. Effect of the Invention

[0014] According to the injection material construction management system of the present invention, the work of manually reorganizing the injection data on chart paper printed out by the pump unit of the injection pump as injection data for each injection hole is eliminated, and the injection data stored in the pump unit is efficiently organized as injection data for each injection hole, and the chart can be automatically output using a specified extraction key. [Brief description of the drawings]

[0015] [Figure 1]1 is a block diagram showing the overall configuration of an injection material construction management system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram of an operation terminal in the injection material construction management system of the embodiment. [Diagram 3] FIG. 2 is a block diagram of a pump unit in the grouting material application management system of the embodiment. [Figure 4] FIG. 2 is an explanatory diagram of a pump unit in the grouting material application management system of the embodiment. [Diagram 5] FIG. 2 is a cross-sectional explanatory diagram showing an example of an injection hole in the ground into which injection material is injected and its surroundings using the injection material construction management system of the embodiment. [Figure 6] FIG. 1 is an explanatory diagram showing an example of a tunnel into which injection material is injected using the injection material construction management system of an embodiment. [Figure 7] 4 is a flowchart showing an operating state recording process performed by the injection material construction management system of the embodiment. [Figure 8] 1A is a flowchart showing a first example of an operation status display process by the injection material construction management system of the embodiment, and FIG. 1B is a flowchart showing a second example of an operation status display process by the injection material construction management system of the embodiment. [Figure 9] FIG. 13 shows an example of a display screen that displays the injection pressure and injection volume of each injection pump for one injection hole. [Figure 10] FIG. 13 is a diagram showing an example of a display screen displaying the injection status of each injection pump during one work shift. [Figure 11] FIG. 13 is a diagram showing an example of chart paper on which a conventional pump unit prints out. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] [Injection material construction management system according to an embodiment] As shown in Figures 1 to 3, an injection material construction management system of an embodiment of the present invention comprises a management server 1 such as a PC server installed in a management office or the like, a communication control server 2 such as a Web server communicatively connected to the management server 1 via a communication line CL, an operation terminal 3 such as an operation tablet, smartphone or portable personal computer communicatively connected to the management server 1 via the communication line CL and communicatively connected to the communication control server 2 via the communication line CL, and a plurality of pump units 4 communicatively connected to the communication control server 2 via the communication line CL and communicatively connected to the management server 1 via the communication control server 2, and which inject injection material into injection holes 101 in the ground 100 using injection pumps 43.

[0017] The management server 1 comprises a control unit 11 such as an MPU or CPU, a memory unit 12 consisting of an HDD, SSD, ROM, RAM, etc., an input unit 13 such as a mouse, keyboard, touch panel, etc., an output unit 14 such as a display, printer, etc., a built-in timer 15, and a communication unit 16 that connects the management server 1 to a wireless or wired communication line.

[0018] The memory unit 12 of the management server 1 is provided with a control program storage unit 121 which stores a main control program that works in cooperation with the control unit 11 to perform the main control of the management server 1, a display template storage unit 122 which stores display templates that define the display form, a management item storage unit 123 which stores management items, a confirmed injection hole operation information storage unit 124 which stores operating status records corresponding to confirmed injection hole numbers, and a temporary injection hole operation information storage unit 125 which stores operating status records corresponding to injection hole numbers before confirmation and operating status records corresponding to temporary hole numbers. Note that the confirmed injection hole operation information storage unit 124 and the temporary injection hole operation information storage unit 125 are functionally set in the memory area of ​​the memory unit 12, and the memory area in which the injection hole numbers before confirmation and temporary hole numbers of the temporary injection hole operation information storage unit 125 are corrected to confirmed injection hole numbers and stored may be referred to as the confirmed injection hole operation information storage unit 124.

[0019] The display template storage unit 122 stores, for example, display templates for a display screen that displays the injection pressure and injection volume of each injection pump for one injection hole 101 in Figure 6, and display templates for a display screen that displays the injection status of each injection pump in one work shift in Figure 7, and a display screen is generated by inserting extracted data into specified items of the display template.

[0020] The management items stored in the management item storage unit 123 include the construction section identification information (STA identification information), the confirmed injection hole number corresponding to the construction section identification information, the construction method name, the construction date, etc., and, if necessary, the pouring pipe length, injection management conditions, etc. are set. Each management item is acquired by the management server 1, for example, by input from the input unit 13 to the management server 1, by importing from the communication control server 2, by importing from the operation terminal 3, etc., and is stored in the management item storage unit 123.

[0021] The confirmed injection hole operation information storage section 124 associates identification information of the pump unit 4, including information capable of identifying the divided area in the longitudinal direction of the injection hole 101 where the injection pump 43 is responsible for injecting the injection material, the start date and time and the end date and time of injection of the injection material by the injection pump 43 possessed by the pump unit 4, trend data of the discharge flow rate of the injection material that changes over time and the accumulated flow rate of the injection material, the initial injection pressure of the injection material, the final injection pressure of the injection material, and other injection data with the confirmed injection hole number and stores them as operating status records corresponding to each confirmed injection hole number.

[0022] The temporary injection hole operation information storage unit 125 stores identification information of the pump unit 4, including information that can identify the divided area in the longitudinal direction of the injection hole 101 where the injection pump 43 is responsible for injecting the injection material, the start date and time and the end date and time of injection of the injection material by the injection pump 43 of the pump unit 4, trend data on the discharge flow rate of the injection material that changes over time and the accumulated flow rate of the injection material, the initial injection pressure of the injection material, the final injection pressure of the injection material, and in the embodiment, injection data such as the change in injection pressure over time, corresponding to the injection hole number before confirmation or the temporary hole number, and stores them as an operating status record corresponding to the injection hole number before confirmation or an operating status record corresponding to the temporary hole number.

[0023] The communication control server 2 includes a control unit 21 such as an MPU or CPU, a storage unit 22 configured with an HDD, SSD, ROM, RAM, etc., an input unit 23 such as a mouse, keyboard, touch panel, etc., an output unit 24 such as a display, printer, etc., a built-in timer 25, and a communication unit 26 that connects the communication control server 2 to a wireless or wired communication line. The communication control server 2 is provided in functional correspondence with each pump unit 4, and it is possible to physically provide one communication control server 2 corresponding to all pump units 4, physically provide multiple server devices corresponding to each of the multiple pump units 4, and configure the communication control server 2 with the multiple server devices, or physically provide one server device corresponding to a pump unit set described later, and configure the communication control server 2 with the multiple server devices corresponding to each pump unit set, etc.

[0024] The memory unit 22 of the communication control server 2 is provided with a control program storage unit 221 that stores a main control program that works in cooperation with the control unit 21 to perform main control of the communication control server 2, a duplication determination program storage unit 222 that stores a duplication determination program that causes the control unit 21 of the communication control server 2 to execute a duplication determination process for injection hole numbers, a unit main control program storage unit 223 that stores a unit main control program that performs main control of the pump unit 4, and a pump operating condition storage unit 224 that variably stores the pump operating conditions of the pump unit 4 and also variably stores the target injection amount of the injection material.

[0025] Furthermore, memory unit 22 is provided with injection hole operation information storage unit 225 which stores injection hole operation information including the injection hole number before confirmation, and temporary hole operation information storage unit 226 which stores temporary hole operation information including the temporary hole number. In the case of injection hole operation information of injection hole 101 where injection material has not yet been injected into injection hole 101, the injection hole operation information stored in injection hole operation information storage unit 225 is basically the injection hole number before confirmation, and in the case of injection hole operation information of injection hole 101 where injection material has already been injected into injection hole 101, in addition to the injection hole number before confirmation, the information is an operating status record including the injection start date and time, the injection end date and time, transition data of the discharge flow rate of the injection material which changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, the final injection pressure of the injection material, and other injection data.

[0026] The temporary hole operation information stored in the temporary hole operation information storage unit 226 is basically the temporary hole number in the case of temporary hole operation information for an unused temporary hole number, and in the case of temporary hole operation information in which injection material has been injected into an injection hole corresponding to the temporary hole number, in addition to the temporary hole number, the information stored is an operating status record of injection start date and time, injection end date and time, trend data of the discharge flow rate of the injection material that changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, the final injection pressure of the injection material, and other injection data.

[0027] The operation terminal 3 includes a control unit 31 such as a CPU, a storage unit 32 configured with a ROM, a RAM, a flash memory, etc., an input unit 33 such as a touch panel, a mouse, a keyboard, etc., an output unit 34 such as a touch panel or a display that also serves as the input unit 33, and a communication unit 35 that connects the operation terminal 3 to a wireless or wired communication line. The storage unit 32 includes a control program storage unit 321 that stores a control program that cooperates with the control unit 31 to control the operation terminal 3.

[0028] The pump unit 4 includes a unit control unit 41 such as a CPU, a unit memory unit 42 consisting of a HDD, ROM, RAM, flash memory, etc., an injection pump 43 that injects the injection material, an output unit 44 capable of printing out chart paper, an electromagnetic valve 45, a pressure detection unit 461, a flow rate detection unit 462, a built-in timer 47, and a communication unit 48 that connects the pump unit 4 or its control unit 41 to a wireless or wired communication line.

[0029] The unit memory section 42 of the pump unit 4 is provided with a unit auxiliary control program storage section 421 which stores a unit auxiliary control program responsible for auxiliary control of the pump unit 4, a registry storage section 422 which stores operating status records of injection of injection material into the injection hole 101 corresponding to the injection hole number and temporary hole number, and a pump unit identification information storage section 423 which stores identification information of the pump unit including information capable of identifying divided areas such as a tip area R1, a middle area R2, and a terminal area R3 which are responsible for injection of injection material by the injection pump 43 in the longitudinal direction of the injection hole 101.

[0030] The unit control unit 41 of the pump unit 4 cooperates with control commands consisting of main control commands based on the unit main control program transmitted from the communication control server 2 and the unit control program stored in the unit auxiliary control program storage unit 421, to drive and control the operation of the injection pump 43 based on the pump operating conditions transmitted from the communication control server 2, and stores in the registry storage unit 422 a record of the pump operating status of injection of injection material into the injection hole 101 corresponding to the injection hole number and temporary hole number.

[0031] Registry storage unit 422 stores, as pump operating status records, injection data including the injection start date and time and injection end date and time of injection pump 43 of pump unit 4, transition data of the discharge flow rate of the injection material that changes over time, the integrated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material, in correspondence with the pump unit identification information stored in pump unit identification information storage unit 423 and the injection hole number before confirmation or the temporary hole number. This injection data is finally imported into management server 1 and stored in confirmed injection hole operation information storage unit 124 as injection data corresponding to a specific confirmed injection hole number.

[0032] The unit auxiliary control program is a program that assists in the execution of main control commands transmitted from the communication control server 2 to the pump unit 4, and is, for example, a program that controls the unit control unit 41 so that the injection pump 43 operates under pump operating conditions such as the injection flow rate and injection pressure of the injection material transmitted from the communication control server 2 together with the main control command, or a program that controls the unit control unit 41 to store the operating status in the registry storage unit 422 in response to an operating status record command to a recording area corresponding to a specific injection hole number before confirmation of the registry storage unit 422, which corresponds to the main control command transmitted from the communication control server 2.

[0033] 4 and 5, when the injection hole 101 is divided into three regions in the length direction, a tip region R1, a middle region R2, and a terminal region R3, an injection pump 43a is provided as the injection pump 43 of the pump unit 4, which injects the injection material into the tip region R1, an injection pump 43b is provided as the injection pump 43c is provided as the injection pump 43 of the pump unit 4, which in turn injects the injection material into the middle region R2, and an injection pump 43c is provided as the injection pump 43 of the pump unit 4. The number of the regions in the length direction of the injection hole 101 and the number of the pump units 4 and the injection pumps 43 used corresponding to each region are appropriate as needed. For example, when the injection hole 101 is divided into four regions in the length direction, four pump units 4 and injection pumps 43 are used for injecting the injection material into each of the regions.

[0034] Each of the injection pumps 43a, 43b, and 43c is composed of an injection pump section 431 that sucks up a first liquid from a first liquid tank 5 storing a first liquid of a two-liquid mixed hardening type injection material supplied to the pump unit 4 and discharges it to a first liquid transfer path 491, and an injection pump section 432 that sucks up a second liquid from a second liquid tank 6 storing a second liquid of a two-liquid mixed hardening type injection material and discharges it to a second liquid transfer path 492, and is directly driven and controlled by the unit control section 41. The injection operation of the injection pump sections 431 and 432 is controlled by the unit control section 41 so that the first liquid and the second liquid of the two-liquid mixed hardening type injection material are discharged at a predetermined ratio according to the type of injection material.

[0035] The first liquid transfer path 491 and the second liquid transfer path 492 are respectively provided with an electromagnetic valve 45, a pressure detection unit 461 constituted by a pressure gauge, and a flow rate detection unit 462 constituted by a flow meter, and a manually operated ball valve 71 is provided near the tip of the first liquid transfer path 491 and the second liquid transfer path 492 derived from the pump unit 4, and the tip of the first liquid transfer path 491 and the tip of the second liquid transfer path 492 are connected to a junction pipe 72 that joins the first liquid and the second liquid. The injection pump units 431 and 432 are controlled in injection operation by the unit control unit 41 so as to discharge the first liquid and the second liquid toward the junction pipe 72. An injection pipe 73 of the injection material is connected to the discharge side of the junction pipe 72 that discharges a mixture of the first liquid and the second liquid that constitutes the injection material.

[0036] The electromagnetic valves 45, pressure detection unit 461, and flow rate detection unit 462 provided corresponding to each of the injection pump units 431, 432 are each electrically connected to the unit control unit 41. The electromagnetic valves 45 of the first liquid transport path 491 and the electromagnetic valves 45 of the second liquid transport path 492 are opened and closed by drive control of the unit control unit 41, so that the inflow / transport and inflow stop of the first liquid to the first liquid transport path 491 and the inflow / transport and inflow stop of the second liquid to the second liquid transport path 492 are executed.

[0037] The pressure detection unit 461 and the flow detection unit 462 detect the discharge pressure and discharge flow rate of the first liquid of the injection pump unit 431 and the discharge pressure and discharge flow rate of the second liquid of the injection pump unit 432. The detected discharge pressure and discharge flow rate of the first liquid and the detected discharge pressure and discharge flow rate of the second liquid are each taken into the unit control unit 21, and the higher of the discharge pressure of the first liquid and the discharge pressure of the second liquid is stored in the registry storage unit 422 as the injection pressure of the injection material, the total flow rate of the discharge flow rate of the first liquid and the discharge flow rate of the second liquid is stored in the registry storage unit 422 as the discharge flow rate of the injection material, and further the accumulated flow rate of the injection material, obtained by accumulating the discharge flow rate of the injection material, is stored in the registry storage unit 422.

[0038] The injection material construction management system of this embodiment is used, for example, when injecting injection material into an injection hole 101 in natural ground 100 as shown in Fig. 5. In the example of Fig. 5, shotcrete 102 is applied to the tunnel mirror surface of the natural ground 100, and a reinforcing pipe 103 having an injection material discharge hole formed in the peripheral wall is cast into the natural ground 100 to form the injection hole 101. A mouth caulking 104 is provided at the mouth of the injection hole 101, and inside the mouth caulking 104, an in-pipe caulking 105 is provided.

[0039] In the intra-pipe caulking 105, the injection pipes 73 are inserted so as to penetrate the gap, and a predetermined number of the injection pipes 73 are inserted into the intra-pipe caulking 105 and set in advance in the reinforcing pipe 103. In the illustrated example, of the three injection pipes 73 inserted into the same injection hole 101 and reinforcing pipe 103, the first injection pipe 73 responsible for injecting the injection material into the terminal region R3, and the second and third injection pipes 73, 73 responsible for injecting the injection material into the tip region R1 and the middle region R2 are inserted into the intra-pipe caulking 105 and set in the reinforcing pipe 3.

[0040] Each injection pipe 73 is supplied with a grout consisting of a mixture of the first and second liquids through a junction pipe 72 provided at the rear end. Each injection pipe 73 promotes mixing of the first and second liquids with a static mixer 74 at its tip, and discharges the grout into the inside of the reinforcing pipe 103. The static mixers 74 of each injection pipe 73 are arranged at different positions in the depth direction of the same injection hole 101, and the grout is discharged into the inside of the reinforcing pipe 103 from each static mixer 74 arranged corresponding to different tip region R1, middle region R2, and terminal region R3 in the depth direction of the injection hole 101, and the grout is permeated through the discharge hole of the reinforcing pipe 103 into the natural ground regions corresponding to the tip region R1, middle region R2, and terminal region R3 of the natural ground 100 around the injection hole 101.

[0041] Furthermore, the injection material construction management system of this embodiment is used by setting pre-determined injection hole numbers or temporary hole numbers to each of a plurality of injection holes 101 provided radially in a construction cross section 107 of a tunnel space T as shown in Fig. 6, and injecting injection material into the injection holes 101 with the pre-determined injection hole numbers or the injection holes 101 with the temporary hole numbers. In this example, the injection holes 101 in the natural ground 100 are formed so as to penetrate the sprayed concrete 102 in the tunnel space T. Each injection hole 101 is divided into a tip region R1, a middle region R2, and a terminal region R3 in the length direction of the injection hole 101. Reference numeral 108 in Fig. 6 denotes lining concrete poured inside the sprayed concrete 102.

[0042] In the example of Fig. 6, two pump unit sets are provided, each consisting of three pump units 4, namely, pump unit 4a having injection pump 53a in Fig. 4, pump unit 4b having injection pump 53b, and pump unit 4c having injection pump 53c, and the operation of sequentially injecting the grout material into injection holes 101 located in the left range of Fig. 6 by one pump unit set and sequentially injecting the grout material into injection holes 101 located in the right range of Fig. 6 by the other pump unit set is performed in parallel. This grout material injection operation is performed, for example, by sequentially injecting the grout material into the injection holes with odd numbers in Fig. 6 for the left range into which the grout material is injected by one pump unit set and the right range into which the grout material is injected by the other pump unit set, and then sequentially injecting the grout material into the injection holes with even numbers.

[0043] When the operation status recording process for grout injection is performed in the grout construction management system of this embodiment, the operator who injects the grout sends the injection hole number and a grout injection request for this injection hole number from the operation terminal 3 to the communication control server 2. As shown in Fig. 7, in response to the input of the injection hole number received from the operation terminal 3 and the grout injection request for this injection hole number, the control unit 21 of the communication control server 2 checks whether or not there is an operation status record for the received injection hole number by comparing it with the operation status record stored in the injection hole operation information storage unit 225 according to the duplication determination program (S101, S102). The injection hole number and the grout injection request for this injection hole number can also be input to the communication control server 2 directly from the input unit 23 of the communication control server 2.

[0044] If there is no operating status record for the injection hole number received and input in injection hole operation information storage 225, control unit 21 of communication control server 2 generates a grout material injection start command corresponding to the input unconfirmed injection hole number in accordance with the main control program, and transmits to pump units 4a, 4b, 4c (S103) the grout material injection start command, the pump operating conditions stored in pump operating condition storage 224, an operating status record command to a recording area corresponding to the injection hole number in registry storage 422 constituting part of the unit main control program responsible for the main control of pump unit 4, and the injection start date and time corresponding to the transmission time obtained by built-in timer 25. Note that the injection start date and time can also use the time of receipt of the grout material injection start command obtained by pump unit 4 using built-in timer 47, etc.

[0045] In addition, when the control unit 21 of the communication control server 2 finds an operating status record for the injection hole number received and input in the injection hole operation information storage unit 225, it, in accordance with the main control program, extracts from the temporary hole numbers stored in the temporary hole operation information storage unit 226 which have no operating status records for injection of injection material, in ascending order or the like, instead of the input injection hole number, and assigns a temporary hole number while correlating it with the input injection hole number, generates an injection material injection start command corresponding to the assigned temporary hole number, and transmits to the pump units 4a, 4b, 4c the injection material injection start command, the pump operating conditions stored in the pump operating condition storage unit 224, an operating status record command to the recording area corresponding to the temporary hole number in the registry storage unit 422 which constitutes part of the unit main control program responsible for the main control of the pump unit 4, and the injection start date and time corresponding to the transmission time obtained by the built-in timer 25 (S104). In addition, the temporary hole number may be a different type of number from the injection hole number, for example, a number with a specific number sequence or a symbol such as "K" added to the first letter of the numeric injection hole number, or a larger number of the same type as the injection hole number that is not expected to be used for injecting injection material into tunnel bulkheads may be used.

[0046] When the corresponding injection pipes 73 of the injection pumps 43a, 43b, 43c are inserted into the injection hole 101 of the ground 100 (see Figure 5) and the injection pumps 43a, 43b, 43c of the pump units 4a, 4b, 4c are started, the unit control units 41 of the pump units 4a, 4b, 4c cooperate with the unit auxiliary control program to receive an injection material injection start command, pump operating conditions, an operating status record command to the record area corresponding to the injection hole number before confirmation in the registry storage unit 422, and the injection start date and time, and control the operation of the injection pumps 43a, 43b, 43c under the received pump operating conditions, thereby injecting the injection material into the tip region R1, middle region R2, and terminal region R3 of the injection hole 101 of the ground 100 into which the injection pipes 73 are inserted.

[0047] Each of the unit control units 41 of pump units 4a, 4b, 4c, in parallel with controlling the operation of injection pumps 43a, 43b, 43c, acquires the detection value of pressure detection unit 461, the detection value of flow detection unit 462, and the date and time of built-in timer 56, and based on the detection value of pressure detection unit 461, the detection value of flow detection unit 462, and the date and time of built-in timer 56, records injection data including the injection start date and time and the injection end date and time of the injection pumps 43a, 43b, 43c, trend data of the discharge flow rate of the injection material that changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material in correspondence with the identification information of pump unit 4 and the injection hole number before confirmation in the registry storage unit 422 (S105).

[0048] In addition, when the corresponding injection pipes 73 of the injection pumps 43a, 43b, 43c are inserted into the injection hole 101 of the ground 100 (see Figure 5) and the injection pumps 43a, 43b, 43c of the pump units 4a, 4b, 4c are started, the unit control units 41 of the pump units 4a, 4b, 4c cooperate with the unit auxiliary control program to receive an injection material injection start command, pump operating conditions, an operating status record command to the record area corresponding to the temporary hole number of the registry storage unit 422, and the injection start date and time, and control the operation of the injection pumps 43a, 43b, 43c under the received pump operating conditions, thereby injecting the injection material into the tip region R1, middle region R2, and terminal region R3 of the injection hole 101 of the ground 100 into which the injection pipes 73 are inserted.

[0049] In parallel with controlling the operation of injection pumps 43a, 43b, 43c, each of unit control units 41 of pump units 4a, 4b, 4c acquires the detection value of pressure detection unit 461, the detection value of flow rate detection unit 462, and the date and time of built-in timer 56, and based on the detection value of pressure detection unit 461, the detection value of flow rate detection unit 462, and the date and time of built-in timer 56, records injection data including the injection start date and time and the injection end date and time of injection pumps 43a, 43b, 43c, trend data of the discharge flow rate of the injection material that changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material in correspondence with the identification information of pump unit 4 and the temporary hole number in registry storage unit 422 (S105).

[0050] Then, the control unit 21 of the communication control server 2 reads and acquires the identification information and integrated flow rate of the pump unit 4a, the identification information and integrated flow rate of the pump unit 4b, and the identification information and integrated flow rate of the pump unit 4c stored in the registry storage unit 422 of each of the pump units 4a, 4b, and 4c that have started grouting material injection at a predetermined cycle in accordance with the main control program, compares the acquired integrated flow rate with the target flow rate stored in the memory unit 22 (S106), and transmits to the pump units 4a, 4b, and 4c a grouting material injection end command, an operating state recording end command to the recording area corresponding to the injection hole number or the recording area corresponding to the temporary hole number in the registry storage unit 422, and the injection end date and time corresponding to the date and time acquired by the built-in timer 25 in response to the reaching of the integrated flow rate of each of the pump units 4a, 4b, and 4c (S107). Note that the injection end date and time may be the date and time of receipt of the grouting material injection end command acquired by the built-in timer 47 by the pump units 4a, 4b, and 4c.

[0051] The unit control unit 41 of each pump unit 4a, 4b, 4c, in cooperation with the unit auxiliary control program, stops the operation of the injection pumps 43a, 43b, 43c in response to receiving a command to end injection of the injection material, a command to end recording of the operating status in the recording area corresponding to the injection hole number or temporary hole number, and the injection end date and time, records the injection end date and time in the recording area corresponding to the injection hole number or temporary hole number in the registry storage unit 422, and ends the operating status recording (S108).

[0052] In addition, the injection pumps 43a, 43b, 43c of each pump unit 4a, 4b, 4c may stop operation without waiting for a command to end recording of the operating status due to the pump's own operation control mechanism, for example, when a predetermined pressure is exceeded, in order to avoid putting a strain on the motor. In such a case, the unit control unit 41 sends injection data including the final injection pressure at the time of operation stop and information on operation stop due to excessive pressure to the control unit 21 of the communication control server 2. The control unit 21 then updates the operating conditions stored in the operating condition storage unit 224 in accordance with the unit main control program, reallocates the target injection amounts of the other injection pumps, and continues recording the operating status of the remaining injection pumps.

[0053] Furthermore, in accordance with the main control program, the control unit 21 of the communication control server 2 executes a process of acquiring an operating status record corresponding to the unconfirmed injection hole number stored in the registry storage unit 422 of each of the pump units 4a, 4b, and 4c, and storing the operating status record corresponding to the acquired injection hole number in the injection hole operation information storage unit 225, or a process of acquiring an operating status record corresponding to the temporary hole number stored in the registry storage unit 422 of each of the pump units 4a, 4b, and 4c, and storing the operating status record corresponding to the acquired temporary hole number in the temporary hole operation information storage unit 226 (S109).

[0054] As a result of this processing, the injection hole operation information storage section 225 of the communication control server 2 stores injection data having the injection start date and time and injection end date and time of the injection pumps 43a, 43b, 43c, trend data of the discharge flow rate of the injection material that changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material, in correspondence with the identification information of the pump unit 4 and the injection hole number before confirmation, and the temporary hole operation information storage section 226 of the communication control server 2 stores injection data having the injection start date and injection end date and time of the injection pumps 43a, 43b, 43c, trend data of the discharge flow rate of the injection material that changes over time, the accumulated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material, in correspondence with the identification information of the pump unit 4 and the temporary hole number.

[0055] The operation status recording process for grout injection in the grout material construction management system of this embodiment continues until a predetermined milestone, for example, the end of work for that day, and when the operation status recording process for grout injection ends, a data reset command is sent from the management server 1 to each pump unit 4 via the communication control server 2. The data reset command may be a data reset command entered into the input unit 33 of the operation terminal 3, which is sent to the management server 1, and the control unit 11 of the management server 1 sends a corresponding data reset command to the pump unit 4, or a data reset command entered into the input unit 13 of the management server 1, which is sent to the pump unit 4.

[0056] In response to receiving the data reset command, the unit control unit 41 of the pump unit 4 executes a process of transmitting the identification information of the pump unit 4 and injection data corresponding to the injection hole number before confirmation stored in the registry storage unit 422 to the management server 1 via the communication control server 2, and a process of transmitting the injection data corresponding to the identification information of the pump unit 4 and the temporary hole number stored in the registry storage unit 422 to the management server 1 via the communication control server 2, and also erases and resets the injection data corresponding to the identification information of the pump unit 4 and the injection hole number before confirmation and the injection data corresponding to the identification information of the pump unit 4 and the temporary hole number stored in the registry storage unit 422 from a specified memory area of ​​the registry storage unit 422 (S110).

[0057] The control unit 11 of the management server 1 receives from each pump unit 4 via the communication control server 2 the identification information of the pump unit 4 and injection data corresponding to the injection hole number before confirmation, and the identification information of the pump unit 4 and injection data corresponding to the temporary hole number, and stores the received identification information of the pump unit 4 and injection data corresponding to the injection hole number before confirmation, and the identification information of the pump unit 4 and injection data corresponding to the temporary hole number in the temporary injection hole operation information storage unit 125 as an operating status record of each pump unit 4 (S111).

[0058] Then, in response to input from the input unit 13 of the regular injection hole number for each temporary hole number, the control unit 11 of the management server 1 corrects the temporary hole number of the operating status record of the temporary hole number stored in the temporary injection hole operation information storage unit 125 to the operating status record of the regular confirmed injection hole number, and stores the operating status record of the injection hole number before confirmation stored in the temporary injection hole operation information storage unit 125 as the operating status record of the confirmed injection hole number (S112) as it is in the confirmed injection hole operation information storage unit 124. Note that the recognition and identification of the regular injection hole number for a particular temporary hole number is performed, for example, by comparing an injection order table showing the order in which injection material is injected into the injection holes of each injection hole number, the injection start time and injection end time and date in the operating status record for a particular temporary hole number, and the injection start time and injection end time and date in the operating status record for the injection hole numbers before and after that.

[0059] Next, when the operation status display process of the grouting material injection is performed in the grouting material injection management system of this embodiment, for example, as shown in Fig. 8 (a), the construction section identification information (STA identification information) input by the worker from the input unit 33 of the operation terminal 3 and the specific confirmed injection hole number corresponding thereto are transmitted to the management server 1 (S201). The control unit 11 of the management server 1 uses the construction section identification information (STA identification information) received from the operation terminal 3 and the specific confirmed injection hole number corresponding thereto as an extraction key to extract data of the required display items of the display template from the management items in the management item storage unit 123 and the operation status record in the confirmed injection hole operation information storage unit 125 (S202), and outputs the display template showing the extracted data using the display template in the display template storage unit 122 at the output unit 14 (S203). By this output, the output unit 14 displays a display screen showing the injection pressure and injection amount of each injection pump 43a, 43b, 43c in one injection hole 101, for example, as shown in Fig. 9.

[0060] In addition, as another grout injection operation status display process, for example, as shown in FIG. 8(b), The construction section identification information (STA identification information) input by the worker from the input unit 33 of the operation terminal 3 and the corresponding odd-numbered confirmed injection hole numbers are transmitted to the management server 1 (S301). The control unit 11 of the management server 1 uses the construction section identification information (STA identification information) received from the operation terminal 3 and the corresponding odd-numbered confirmed injection hole numbers as extraction keys to extract data of required display items of the display template from the management items in the management item storage unit 123 and the operation state records in the confirmed injection hole operation information storage unit 125 (S302), and outputs the display template showing the extracted data using the display template in the display template storage unit 122 at the output unit 14 (S303). As a result of this output, a display screen is displayed on the output unit 14, showing the injection status of each injection pump 43a, 43b, 43c in one work shift, as shown in FIG. 10, for example.

[0061] According to the injection material construction management system of this embodiment, the management server 1 extracts data of the display items of the display template from the management items of the management item storage unit 123 and the operation state record of the fixed injection hole operation information storage unit 124 imported from the pump unit 4 using the construction section identification information (STA identification information) and the corresponding fixed injection hole number as extraction keys, and outputs a display template showing the extracted data, thereby eliminating the need to manually rearrange the injection data of the chart paper printed out by the pump unit 4 of the injection pump 43 as injection data for each injection hole, and the management server 1 efficiently rearranges the injection data stored by the pump unit 4 as injection data for each injection hole, and automatically outputs the chart using a predetermined extraction key. In addition, since the required items of the injection data output in the display template are imported from the pump unit 4, it is possible to prevent the operator from tampering with the injection data, and it is possible to output a display template and a display screen showing the required items of the injection data with high reliability.

[0062] In addition, when the management server 1 sends a data reset command to the pump unit 4, and the pump unit 4 sends the injection data stored in the registry storage unit 422 of the pump unit 4 to the management server 1 in response to receiving the data reset command, the data reset command can be sent to the pump unit 4 at the timing of a work shift change that provides a convenient division of the injection material injection work, and the injection data for each division of the injection material injection work can be automatically imported into the management server 1.

[0063] Furthermore, by configuring the management server 1 to import injection data to which a temporary hole number has been assigned as injection data corresponding to a specific confirmed injection hole number, and to store the operating status record in the confirmed injection hole operation information storage unit 124 with the temporary hole number corrected to the specific confirmed injection hole number, when the injection hole number input to the management server 1 from the operation terminal 3 differs from the regular confirmed injection hole number, a temporary hole number can be assigned, the injection work of the injection material can be carried out as the injection work of the injection material into the injection hole 101 of the temporary hole number, and the temporary hole number can later be corrected to the confirmed injection hole number of the regular injection hole 101 to manage the construction. Therefore, regardless of an incorrect input of the injection hole number, the injection work of the injection material can be continued without interruption, and a decrease in construction efficiency can be prevented.

[0064] [Scope of the invention disclosed herein] The inventions disclosed in this specification include, in addition to the inventions and embodiments listed as inventions, those specified by changing partial contents of these to other contents disclosed in this specification, those specified by adding other contents disclosed in this specification to these contents, or those specified by deleting partial contents of these to the extent that partial effects can be obtained, and specifying them as a higher-level concept. The inventions disclosed in this specification also include the following contents and modifications.

[0065] For example, in the above embodiment, the unit control unit 41 of the pump unit 4 is configured to transmit the injection data stored in the registry storage unit 422 to the management server 1 via the communication control server 2 in response to receiving a data reset command, but the pump unit 4 may be provided with a display unit and a removable media insertion unit, and the removable media inserted into the removable media insertion unit may store the injection data corresponding to the identification information of the pump unit 4 and the injection hole number before confirmation and the injection data corresponding to the identification information of the pump unit 4 and the temporary hole number stored in the registry storage unit 422, and the removable media storing these injection data may be inserted into the removable media insertion unit provided in the management server 1, and the control unit 11 of the management server 1 may obtain the injection data corresponding to the identification information of the pump unit 4 and the injection hole number before confirmation and the injection data corresponding to the identification information of the pump unit 4 and the temporary hole number from the removable media, and store them in the temporary injection hole operation information storage unit 125.

[0066] In this case, for example, in response to receiving a data reset command, the unit control unit 41 of the pump unit 4 displays on the display unit a message indicating that the data reset command has been received and a message encouraging the user to insert a removable media into the removable media insertion portion, and in response to inserting a removable media into the removable media insertion portion, stores the identification information of the pump unit 4, the injection data corresponding to the injection hole number before confirmation, and the injection data corresponding to the identification information of the pump unit 4 and the temporary hole number stored in the registry storage unit 422 in the removable media, and erases and resets the identification information of the pump unit 4, the injection data corresponding to the injection hole number before confirmation, and the injection data corresponding to the identification information of the pump unit 4 and the temporary hole number stored in the registry storage unit 422 from a specified memory area of ​​the registry storage unit 422. [Industrial Applicability]

[0067] The present invention can be used, for example, in managing the injection of injection material into the ground in tunnel auxiliary construction methods such as the AGF method and mirror reinforcement work, and in reinforcing the ground on slopes, etc. [Explanation of symbols]

[0068] 1... Management server 11... Control unit 12... Memory unit 121... Control program storage unit 122... Display template storage unit 123... Management item storage unit 124... Confirmed injection hole operation information storage unit 125... Temporary injection hole operation information storage unit 13... Input unit 14... Output unit 15... Built-in timer 16... Communication unit 2... Communication control server 21... Control unit 22... Memory unit 221... Control program storage unit 222... Duplicate determination program storage unit 223... Unit main control program storage unit 224... Pump operation condition storage unit 225... Injection hole operation information storage unit 226... Temporary hole operation information storage unit 23... Input unit 24... Output unit 25... Built-in timer 26... Communication unit 3... Operation terminal 31... Control unit 32... Memory unit 321... Control program storage unit 33... Input unit 34... Output unit 35... Communication unit 4, 4a, 4b, 4c... Pump unit 41... Unit control unit 42... Unit memory unit 421... Unit auxiliary control program storage unit 422... Registry storage unit 423... Pump unit identification information storage unit 43, 43a, 43b, 43c... Injection pump 431, 432... Injection pump unit 44... Output unit 45... Solenoid valve 461... Pressure detection unit 462... Flow rate detection unit 47... Built-in timer 48... Communication unit 491... First liquid transfer path 492... Second liquid transfer path 5... First liquid tank 6... Second liquid tank 71... Ball valve 72... Junction pipe 73... Injection pipe 74... Static mixer 100... Natural ground 101... Injection hole 102... Sprayed concrete 103... Reinforcing pipe 104... Mouth caulking 105... Pipe caulking 107... Construction section 108...Lining concrete CL...Telecommunication line R1...Tip region R2...Middle region R3...Terminal region T...Tunnel space

Claims

1. The system includes a management server and a plurality of pump units each having an injection pump for an injection material, The management server, storing a display template defining a display form in a display template storage unit; storing management items including at least the construction section identification information, the confirmed injection hole number corresponding to the construction section identification information, the construction method name, and the construction date in a management item storage unit; identification information of the pump unit, including information capable of identifying a division area in the length direction of the injection hole in which the injection pump is responsible for injecting the injection material, which is stored in a registry storage unit of the pump unit, injection data corresponding to the specific confirmed injection hole number, including the start date and time of injection and the end date and time of injection of the injection material of the injection pump possessed by the pump unit, transition data of the discharge flow rate of the injection material that changes over time and the integrated flow rate of the injection material, the initial injection pressure of the injection material, and the final injection pressure of the injection material, are taken in, and stored in a confirmed injection hole operation information storage unit as an operating state record corresponding to the specific confirmed injection hole number; This is an injection material construction management system characterized by extracting data for the display items of the display template from the management items in the management item storage section and the operating status records in the confirmed injection hole operation information storage section using the construction cross section identification information and the corresponding confirmed injection hole number as extraction keys, and outputting the display template showing the extracted data.

2. the pump unit is communicatively connected to the management server; The management server transmits a data reset command to the pump unit, The injection material application management system according to claim 1, characterized in that the pump unit transmits the injection data stored in the registry storage unit of the pump unit to the management server in response to receiving the data reset command.

3. The injection material construction management system described in claim 1 or 2, characterized in that the management server imports injection data to which a temporary hole number is assigned as injection data corresponding to the specific confirmed injection hole number, and stores the operating status record in the confirmed injection hole operation information storage unit in a form in which the temporary hole number is corrected to the specific confirmed injection hole number.

Citation Information

Patent Citations

  • Injection material construction management system

    JP7063529B1