Socket holding device and rope terminal machining method
The socket holding device stabilizes the socket and rope using a through groove and elastic holding mechanism, simplifying the fixing process and enabling efficient Babbitt metal injection.
Patent Information
- Application Number
- JP2023078621
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2043-05-11
AI Technical Summary
Conventional socket supporters fail to maintain the socket vertical during Babbitt metal injection, requiring manual effort to prevent tilting, thus complicating the fixing process.
A socket holding device with a base part and holding mechanism, featuring a through groove and elastic rope holding parts that secure the socket and rope in place, allowing for easy alignment and stabilization.
Facilitates the fixing process by maintaining the socket vertical, reducing manual effort, and allowing for efficient injection of Babbitt metal, while accommodating various socket and rope sizes.
Smart Images

Figure 2024162755000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a socket holding device that holds a socket provided at an end of a rope, and a rope end processing method. [Background technology]
[0002] Conventionally, there is known a rope end processing method in which a socket is fixed to a rope end by injecting molten metal as babbitt metal into the socket into which the end of the rope is inserted and hardening the metal. Patent Document 1 discloses a rope end processing method in which babbitt metal is injected into a socket while the socket is supported on a socket support part in order to facilitate the injection of babbitt metal into the socket. The conventional socket support part disclosed in Patent Document 1 is provided with an insertion groove. The socket is supported by the socket support part while inserted into the insertion groove. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2017-48472 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the conventional socket support disclosed in Patent Document 1 only supports the socket by inserting it into the insertion groove. Therefore, depending on the state of the rope hanging from the socket, the socket is likely to tilt relative to the vertical direction. This requires the worker to inject babbitt metal into the socket while holding the socket and keeping the axis of the socket vertical. Therefore, the task of fixing the socket to the end of the rope is time-consuming.
[0005] The present disclosure is intended to solve the above-mentioned problems, and aims to provide a socket holding device and a rope end processing method that can facilitate the task of fixing a socket to the end of a rope. [Means for solving the problem]
[0006] The socket holding device of the present disclosure comprises a base portion and a holding mechanism portion provided on the base portion, the holding mechanism portion having a socket holding portion and a rope holding portion arranged at a position away from the socket holding portion in a reference direction, the socket holding portion having a through groove passing through the socket holding portion along the reference direction, the rope holding portion having a first opposing portion and a second opposing portion facing each other, at least one of the first opposing portion and the second opposing portion being an elastic portion that can elastically deform, the socket holding portion holds the socket provided on the end of the rope with the socket inserted into the through groove, and the rope holding portion holds the rope by the elastic restoring force of the elastic portion with the rope passed between the first opposing portion and the second opposing portion. Effect of the Invention
[0007] According to the socket holding device and rope end processing method of the present disclosure, the task of fixing a socket to the end of a rope can be facilitated. [Brief description of the drawings]
[0008] [Figure 1] 1 is a side view showing a socket holding device according to a first embodiment. [Diagram 2] 2 is a front view showing the socket holding device of FIG. 1. [Diagram 3] FIG. 2 is a cross-sectional view taken along line III-III in FIG. [Figure 4] FIG. 2 is a cross-sectional view taken along line IV-IV in FIG. [Diagram 5] FIG. 2 is a side view showing the socket retainer when the base portion of FIG. 1 is attached to a pallettina mesh panel. [Figure 6]FIG. 6 is a front view showing the socket holding device of FIG. 5. [Figure 7] 3 is a flowchart showing a rope end processing method according to the first embodiment. [Figure 8] 8 is a side view showing a state in which the socket and rope are held by the socket holding device after the rope holding step of FIG. 7 and before the Babbitt injection step. FIG. [Figure 9] 8 is a side view showing the respective states of the socket and the rope when being removed from the holding mechanism in the removal step of FIG. 7. FIG. [Figure 10] 9 is a side view showing a state in which a socket of a different type from the socket in FIG. 8 is held in the socket holding portion. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] The embodiments for carrying out the subject of the present disclosure will be described with reference to the attached drawings. In each drawing, the same or corresponding parts are given the same reference numerals, and duplicated descriptions are appropriately simplified or omitted. Note that the subject of the present disclosure is not limited to the following embodiments, and any component of the embodiment may be modified or omitted within the scope of the gist of the present disclosure.
[0010] Embodiment 1 FIG. 1 is a side view showing a socket holding device according to a first embodiment. FIG. 2 is a front view showing the socket holding device of FIG. 1. The socket holding device 1 has a base portion 2 and one or more holding mechanism portions 3. The base portion 2 has a base portion main body 21 and a removal prevention device 22. The one or more holding mechanism portions 3 are provided on the base portion main body 21. In this embodiment, as shown in FIG. 2, four holding mechanism portions 3 are provided on one base portion main body 21. Each holding mechanism portion 3 has a socket holding portion 4 and a rope holding portion 5.
[0011] 1, the base body 21 has a fixing portion 23, a hook portion 24, and a receiving portion 25. In this embodiment, the fixing portion 23, the hook portion 24, and the receiving portion 25 are formed by bending a single metal plate.
[0012] A reference direction A is set in the base body 21. The reference direction A is a direction that serves as a reference for setting the position of the rope holding part 5 relative to the socket holding part 4 in each holding mechanism part 3. The fixing part 23 is a plate-shaped part that is disposed along the reference direction A.
[0013] The fixed portion 23 has a first base surface 231 and a second base surface 232 formed along the reference direction A. Each of the first base surface 231 and the second base surface 232 is a surface perpendicular to the thickness direction of the fixed portion 23. The first base surface 231 and the second base surface 232 face in opposite directions with the fixed portion 23 in between.
[0014] A hook portion 24 and a receiving portion 25 are provided on the second base surface 232. Of one end and the other end of the fixed portion 23 in the reference direction A, the one end is a first end 23a and the other end is a second end 23b. The hook portion 24 is provided on the first end 23a of the fixed portion 23. The receiving portion 25 is provided on the second end 23b of the fixed portion 23. As a result, the receiving portion 25 is disposed at a position separated from the hook portion 24 in the reference direction A.
[0015] The hook portion 24 has a protruding portion 241 and a barb portion 242 .
[0016] The protruding portion 241 protrudes from the second base surface 232 of the fixed portion 23 in a direction intersecting the reference direction A. In this embodiment, a plate-shaped portion perpendicular to the reference direction A serves as the protruding portion 241.
[0017] The return portion 242 protrudes from the protruding portion 241 toward the receiving portion 25 at a position away from the fixed portion 23. As a result, an insertion space 26 is formed between the second base surface 232 of the fixed portion 23 and the return portion 242. In this embodiment, a plate-shaped portion parallel to the second base surface 232 of the fixed portion 23 serves as the return portion 242.
[0018] The receiving portion 25 protrudes from the second base surface 232 of the fixing portion 23 in a direction intersecting the reference direction A. In this embodiment, a plate-shaped portion perpendicular to the reference direction A serves as the receiving portion 25. The length of the receiving portion 25 protruding from the second base surface 232 is shorter than the length of the protruding portion 241 protruding from the second base surface 232.
[0019] The detachment prevention device 22 is detachably attached to the barbed portion 242 of the hook portion 24. In this embodiment, a thumbscrew is used as the detachment prevention device 22. The barbed portion 242 has a screw hole. The detachment prevention device 22 is attached to the barbed portion 242 by being screwed into the screw hole of the barbed portion 242.
[0020] When the removal prevention device 22 is attached to the return portion 242, the amount by which the removal prevention device 22 is screwed into the threaded hole of the return portion 242 can be adjusted to allow the removal prevention device 22 to move relative to the return portion 242 in a direction intersecting the reference direction A. As a result, when the removal prevention device 22 is attached to the return portion 242, the amount by which the removal prevention device 22 is screwed into the threaded hole of the return portion 242 increases, causing a part of the removal prevention device 22 to protrude from the return portion 242 into the insertion space 26.
[0021] In each holding mechanism 3, a socket holding portion 4 and a rope holding portion 5 are provided on a first base surface 231 of a fixed portion .
[0022] The rope holding part 5 is disposed at a position away from the socket holding part 4 in the reference direction A. The rope holding part 5 is also disposed at a position closer to the second end 23b of the fixed part 23 than the socket holding part 4. As a result, when the base part main body 21 is disposed with the socket holding part 4 positioned above the rope holding part 5, the hook part 24 is positioned above the receiving part 25.
[0023] Fig. 3 is a cross-sectional view taken along line III-III in Fig. 1. Fig. 3 shows the socket holding portion 4 in one holding mechanism unit 3. The socket holding portion 4 is fixed to the first base surface 231 by welding or the like. The socket holding portion 4 is provided with a through groove 41. The through groove 41 is a groove that passes through the socket holding portion 4 along the reference direction A. The through groove 41 has an insertion hole portion 42 and a slit portion 43.
[0024] The insertion hole 42 penetrates the socket holding part 4 along the reference direction A. In this embodiment, the cross-sectional shape of the insertion hole 42 in a plane perpendicular to the reference direction A is circular. The inner diameter of the insertion hole 42 is constant at any position of the socket holding part 4 in the reference direction A. The insertion hole 42 is formed by the inner circumferential surface of the socket holding part 4.
[0025] The slit portion 43 penetrates the socket holding portion 4 along the reference direction A. The slit portion 43 is also connected to both the outer circumferential surface and the inner circumferential surface of the socket holding portion 4. As a result, the insertion hole portion 42 is open to the outside of the socket holding portion 4 through the slit portion 43 at any position of the socket holding portion 4 in the reference direction A. The socket holding portion 4 is disposed with the slit portion 43 facing the opposite side to the fixed portion 23.
[0026] In this embodiment, the width of the slit portion 43 is smaller than the inner diameter of the insertion hole portion 42. In this embodiment, the shape of the socket holding portion 4 when viewed along the reference direction A is C-shaped.
[0027] As shown in Fig. 1, the rope holding part 5 is fixed to the first base surface 231 of the fixed part 23 by a plurality of screws 50. The rope holding part 5 protrudes from the first base surface 231 in a direction intersecting the reference direction A. The direction in which the rope holding part 5 protrudes from the first base surface 231 coincides with the longitudinal direction of the rope holding part 5. In this embodiment, the longitudinal direction of the rope holding part 5 is perpendicular to the first base surface 231.
[0028] Fig. 4 is a cross-sectional view taken along line IV-IV in Fig. 1. Fig. 4 shows the rope holding part 5 in one holding mechanism part 3. The rope holding part 5 has a first opposing part 51, a second opposing part 52, and a connecting part 53. In this embodiment, the first opposing part 51, the second opposing part 52, and the connecting part 53 are formed by bending a single metal plate.
[0029] The first opposing portion 51 and the second opposing portion 52 are opposed to each other in a direction perpendicular to the reference direction A. In this embodiment, the first opposing portion 51 and the second opposing portion 52 are opposed to each other in a direction perpendicular to both the reference direction A and the longitudinal direction of the rope holding portion 5.
[0030] Each of the first opposing portion 51 and the second opposing portion 52 is a plate-like elastic portion that is elastically deformable. Each of the first opposing portion 51 and the second opposing portion 52 is elastically deformable in a direction in which the distance between the first opposing portion 51 and the second opposing portion 52 changes.
[0031] Each of the first opposing portion 51 and the second opposing portion 52 has a base end portion 501 and a free end portion 502 in the longitudinal direction of the rope holding portion 5. Each of the first opposing portion 51 and the second opposing portion 52 is arranged with the base end portion 501 facing the first base surface 231 and the free end portion 502 facing the opposite side to the first base surface 231.
[0032] The free ends 502 of the first opposing portion 51 and the second opposing portion 52 face each other while being spaced apart from each other. As a result, a rope insertion opening 54 is formed between the free ends 502 of the first opposing portion 51 and the second opposing portion 52. The rope holding portion 5 is disposed with the rope insertion opening 54 facing the opposite side to the fixed portion 23.
[0033] A base end side bent portion 503 and a free end side bent portion 504 are formed in each of the first opposing portion 51 and the second opposing portion 52. The base end side bent portion 503 and the free end side bent portion 504 are located between the base end portion 501 and the free end portion 502 in the longitudinal direction of the rope holding portion 5. The base end side bent portion 503 is located closer to the base end portion 501 than the free end side bent portion 504 is.
[0034] The base end side bent portion 503 of the first opposing portion 51 and the base end side bent portion 503 of the second opposing portion 52 face each other at the same position in the longitudinal direction of the rope holding portion 5. In addition, the free end side bent portion 504 of the first opposing portion 51 and the free end side bent portion 504 of the second opposing portion 52 face each other at the same position in the longitudinal direction of the rope holding portion 5.
[0035] The distance between the two opposing free end side bent portions 504 is smaller than the distance between the two opposing base end side bent portions 503. The distance between the two opposing free end side bent portions 504 is smaller than the distance between the two free end portions 502. The distance between the two opposing base end side bent portions 503 is larger than the distance between the two free end portions 502. The distance between the two free end portions 502, the distance between the two opposing base end side bent portions 503, and the distance between the two opposing free end side bent portions 504 change according to the elastic deformation of each of the first opposing portion 51 and the second opposing portion 52.
[0036] The connecting portion 53 is a plate-like portion that connects the base ends 501 of the first opposing portion 51 and the second opposing portion 52 to each other. The connecting portion 53 is provided with a plurality of screw through holes through which the screws 50 are passed.
[0037] The fixing portion 23 is provided with a plurality of screw holes into which the screws 50 are screwed. The connecting portion 53 is fixed to the fixing portion 23 by screwing the screws 50 passed through the screw through holes into the screw holes of the fixing portion 23.
[0038] Here, for example, at a construction site where an elevator is being renovated, a task of fixing a socket to the end of a rope may be required. In this case, of the multiple tools used at the construction site, a tool capable of supporting the base portion 2 can be used as the installation object for the socket holding device 1. The installation object is the tool on which the socket holding device 1 is to be installed. The installation object includes a base detachable portion to which the base portion 2 can be detached. The task of fixing a socket to the end of a rope is performed with the base portion 2 attached to the base detachable portion of the installation object.
[0039] In this embodiment, a device called Pallettina is used as the installation object. Pallettina is a storage box made of a metal mesh panel. In this embodiment, the base part 2 is detachable from the Pallettina mesh panel. That is, in this embodiment, the Pallettina mesh panel serves as the base detachable part.
[0040] Fig. 5 is a side view showing the socket holding device 1 when the base portion 2 of Fig. 1 is attached to the mesh panel of the pallettina. Fig. 6 is a front view showing the socket holding device 1 of Fig. 5. The mesh panel 61 of the pallettina 6 is arranged along the vertical direction. The dimension of the mesh panel 61 in the vertical direction is larger than the dimension of the base portion 2 in the reference direction A. The base portion 2 is supported by the pallettina 6 by being attached to the mesh panel 61.
[0041] When the base portion 2 is attached to the mesh panel 61, the hook portion 24 is hooked onto the upper end portion of the mesh panel 61, and the receiving portion 25 receives the side portion of the mesh panel 61 at a position below the hook portion 24. As a result, when the base portion 2 is attached to the mesh panel 61, the first end portion 23a of the fixing portion 23 is located higher than the second end portion 23b of the fixing portion 23.
[0042] When the hook portion 24 is hung on the upper end of the mesh panel 61, the upper end of the mesh panel 61 is inserted into the insertion space 26. Furthermore, when the hook portion 24 is hung on the upper end of the mesh panel 61, the protruding portion 241 rests on the upper end of the mesh panel 61, and the return portion 242 overlaps the mesh panel 61 in the horizontal direction.
[0043] When the receiving portion 25 is receiving the side portion of the mesh panel 61, the distance between the second end 23b of the fixing portion 23 and the mesh panel 61 is maintained at a constant distance by the receiving portion 25. Therefore, when the hook portion 24 is hooked onto the upper end portion of the mesh panel 61 and the receiving portion 25 is receiving the side portion of the mesh panel 61, the reference direction A of the base portion main body 21 coincides with the vertical direction.
[0044] Furthermore, when the base portion 2 is attached to the mesh panel 61, the removal prevention device 22 attached to the turned-back portion 242 can be inserted into the mesh of the mesh panel 61. The removal prevention device 22 is inserted into the mesh of the mesh panel 61 by being screwed into the screw hole of the turned-back portion 242 and penetrating the turned-back portion 242.
[0045] With the removal prevention device 22 inserted into the mesh of the mesh panel 61, when the hook portion 24 moves upward relative to the mesh panel 61, the removal prevention device 22 hooks onto the mesh panel 61. This prevents the upper end of the mesh panel 61 from coming out of the insertion space 26, and prevents the base body 21 from coming out of the mesh panel 61.
[0046] When the base portion 2 is attached to the mesh panel 61, the socket holding portion 4 in each holding mechanism 3 is located above the rope holding portion 5. The socket holding portion 4 holds the socket 10 provided at the end of the rope 11. The rope holding portion 5 holds the rope 11 extending from the socket 10. Therefore, each holding mechanism 3 holds the socket 10 and the rope 11 in a state in which the rope 11 extends downward from the socket 10.
[0047] The socket 10 has a tapered portion 101 and a connecting portion 102. The connecting portion 102 is integral with the tapered portion 101.
[0048] The tapered portion 101 is a cylindrical portion disposed coaxially with the axis of the socket 10. As shown in Fig. 5, of one end and the other end of the tapered portion 101 in the axial direction of the socket 10, the one end is a rope side end 101a and the other end is a connection side end 101b.
[0049] A connecting portion 102 is provided at a connecting end portion 101b of the tapered portion 101. The connecting portion 102 is connectable to a fastener (not shown).
[0050] An opening formed in the rope side end 101a of the tapered portion 101 serves as a rope-passing hole 103 through which the rope 11 is passed. When the work of fixing the socket 10 to the end of the rope 11 is performed, the socket 10 and the rope 11 are held by the holding mechanism 3 in a state in which the socket 10 is temporarily connected to the end of the rope 11.
[0051] When the socket 10 is temporarily connected to the end of the rope 11, the rope 11 is passed through the rope-passing hole 103, and the end of the rope 11 is inserted into the tapered portion 101. When the socket 10 is temporarily connected to the end of the rope 11, a plurality of strands at the end of the rope 11 are folded back within the tapered portion 101. The socket 10 is held by the socket holding portion 4 with the rope-passing hole 103 facing downward.
[0052] The outer diameter and inner diameter of the tapered portion 101 are continuously smaller from the connection side end 101b toward the rope side end 101a. Therefore, the outer diameter and inner diameter of the tapered portion 101 are maximum at the connection side end 101b and minimum at the rope side end 101a. The maximum outer diameter of the tapered portion 101 in the socket 10 can be 16 mm, 18 mm, or the like.
[0053] The inner diameter of insertion hole 42 in through groove 41 provided in socket holding portion 4 is larger than the minimum outer diameter of tapered portion 101 and smaller than the maximum outer diameter of tapered portion 101. As a result, tapered portion 101 inserted into insertion hole 42 is held by socket holding portion 4 with the outer circumferential surface of tapered portion 101 in contact with socket holding portion 4 without coming out of insertion hole 42.
[0054] The width of the slit portion 43 is equal to or larger than the outer diameter of the rope 11. This allows the rope 11 to pass through the slit portion 43.
[0055] The rope holding part 5 holds the rope 11 passed between the first opposing part 51 and the second opposing part 52 by the elastic restoring force of each of the first opposing part 51 and the second opposing part 52. As shown in FIG. 4, the rope 11 is pushed from the rope insertion opening part 54 toward the joint part 53, so that the rope 11 is passed through the space between the first opposing part 51 and the second opposing part 52. At this time, the rope 11 moves beyond the position of the free end side bent part 504 into the space between the first opposing part 51 and the second opposing part 52 while pushing the space between the first opposing part 51 and the second opposing part 52 apart. In the state where the rope 11 is passed through the space between the first opposing part 51 and the second opposing part 52, the elastic restoring force of each of the first opposing part 51 and the second opposing part 52 is applied to the rope 11. As a result, the rope 11 is held by the rope holding part 5.
[0056] Next, a rope end processing method for fixing the socket 10 to the end of the rope 11 using the socket holding device 1 will be described. Fig. 7 is a flowchart showing the rope end processing method according to the first embodiment. The rope end processing method has a base portion attachment step S1, a socket holding step S2, a rope holding step S3, a Babbitt injection step S4, and a removal step S5. The worker fixes the socket 10 to the end of the rope 11 by carrying out each step in the order of the base portion attachment step S1, the socket holding step S2, the rope holding step S3, the Babbitt injection step S4, and the removal step S5.
[0057] <Base part installation process S1> In the base portion attachment process S1, the base portion 2 is attached to the mesh panel 61 of the palletina 6. At this time, the socket holding portion 4 is positioned above the rope holding portion 5.
[0058] In the base portion attachment process S1, the hook portion 24 is hooked onto the mesh panel 61 while inserting the upper end of the mesh panel 61 into the insertion space 26. At this time, the removal prevention device 22 is retracted relative to the return portion 242 so that the removal prevention device 22 does not protrude into the insertion space 26. Thereafter, the receiving portion 25 is brought into contact with the side portion of the mesh panel 61 so that the receiving portion 25 receives the side portion of the mesh panel 61. As a result, the base portion main body 21 is attached to the mesh panel 61 with the reference direction A coinciding with the vertical direction. At this time, the upper surface of the socket holding portion 4 is positioned horizontally perpendicular to the vertical direction.
[0059] In the base portion attachment process S1, after the base portion main body 21 is attached to the mesh panel 61, the removal prevention device 22 is inserted into the mesh of the mesh panel 61 in the insertion space 26 by screwing the removal prevention device 22 into the screw hole of the return portion 242. In this way, the base portion 2 is attached to the mesh panel 61.
[0060] <Socket holding process S2> After the base part attachment step S1, the socket holding step S2 is performed. In the socket holding step S2, the socket 10 is temporarily connected to the end of the rope 11 in advance. In the socket holding step S2, the socket 10 temporarily connected to the end of the rope 11 is held by the socket holding part 4. At this time, with the rope 11 hanging downward from the socket 10, the rope 11 is inserted into the through groove 41 from the outside of the socket holding part 4 in the horizontal direction. The rope 11 is inserted into the insertion hole part 42 through the slit part 43. After this, the socket 10 is inserted into the insertion hole part 42 of the through groove 41 from above. As a result, the outer peripheral surface of the tapered part 101 in the socket 10 comes into contact with the socket holding part 4, and the socket 10 is held by the socket holding part 4. In the state where the socket 10 is held by the socket holding part 4, the socket 10 is arranged with the axial direction of the socket 10 aligned with the vertical direction.
[0061] <Rope holding process S3> After the socket holding step S2, the rope holding step S3 is performed. In the rope holding step S3, the rope 11 is held in the rope holding part 5 by inserting the rope 11 between the first opposing part 51 and the second opposing part 52 from the outside of the rope holding part 5 in the horizontal direction. At this time, the rope 11 is pushed between the first opposing part 51 and the second opposing part 52 while the first opposing part 51 and the second opposing part 52 are elastically deformed by the rope 11. As a result, the rope 11 is held in the rope holding part 5 by the elastic restoring forces of the first opposing part 51 and the second opposing part 52. In a state in which the rope 11 is held in the rope holding part 5, the rope 11 is passed between the first opposing part 51 and the second opposing part 52 along the vertical direction by the guides of the first opposing part 51 and the second opposing part 52.
[0062] 8 is a side view showing a state in which the socket 10 and the rope 11 are held by the socket holding device 1 after the rope holding step S3 and before the Babbitt injection step S4 in FIG. 7. The palletina 6 is placed on a floor surface 12. The floor surface 12 receives the rope 11 hanging downward from the socket 10. As a result, the rope 11 that reaches the floor surface 12 from the socket 10 is bent in a direction along the floor surface 12. When the base part 2 is attached to the mesh panel 61, the height from the floor surface 12 to the base part 2 is ensured to be a height that does not cause the base part 2 to tilt in the vertical direction due to the reaction force of the rope 11 bent at the floor surface 12.
[0063] <Babbitt injection process S4> After the rope holding step S3, the Babbitt injection step S4 is carried out. In the Babbitt injection step S4, molten metal as Babbitt metal is injected into the socket 10. At this time, the molten metal is poured from above into the socket 10 held by the socket holding portion 4. The molten metal is poured into the socket 10 until the end of the rope 11 inside the socket 10 is buried in the molten metal. Thereafter, the molten metal injected into the socket 10 hardens by cooling, and the socket 10 is fixed to the end of the rope 11.
[0064] <Removal process S5> After the Babbitt injection step S4, a removal step S5 is carried out. In the removal step S5, the socket 10 and the rope 11 are removed from the holding mechanism part 3. At this time, the socket 10 fixed to the end of the rope 11 is removed from the socket holding part 4, and the rope 11 is removed from the rope holding part 5.
[0065] Fig. 9 is a side view showing the states of the socket 10 and the rope 11 when they are removed from the holding mechanism part 3 in the removal step S5 of Fig. 7. In the removal step S5, the socket 10 is pulled upward to remove it from the insertion hole part 42 of the through groove 41. As a result, the socket 10 is removed upward from the socket holding part 4. At this time, the rope 11 connected to the socket 10 is pulled up into the insertion hole part 42 of the through groove 41, following the socket 10.
[0066] Thereafter, the socket 10 and the rope 11 are moved horizontally to remove the rope 11 from the through groove 41. The rope 11 passes through the slit portion 43 and comes out of the insertion hole portion 42 to the outside of the socket holding portion 4.
[0067] Even at the position of the rope holding part 5, the rope 11 is moved horizontally. As a result, the rope 11 is removed from between the first opposing part 51 and the second opposing part 52 to the outside of the rope holding part 5. At this time, the rope 11 comes out from the space between the first opposing part 51 and the second opposing part 52, passing the position of the free end side bent part 504, and into the rope insertion opening part 54 while pushing the space between the first opposing part 51 and the second opposing part 52 apart. In this manner, the socket 10 and the rope 11 are removed from the holding mechanism part 3.
[0068] In a removal process S5, the base portion 2 is removed from the mesh panel 61. When removing the base portion 2 from the mesh panel 61, the removal prevention device 22 is first retracted relative to the return portion 242 to remove the removal prevention device 22 from the mesh of the mesh panel 61. Thereafter, the base portion 2 is lifted upward to remove the base portion 2 from the mesh panel 61.
[0069] In such a socket holding device 1, the rope holding part 5 is disposed at a position away from the socket holding part 4 in the reference direction A. The socket holding part 4 holds the socket 10 in a state where the socket 10 is inserted into the through groove 41. The rope holding part 5 holds the rope 11 by the elastic restoring forces of the first opposing part 51 and the second opposing part 52 in a state where the rope 11 is passed between the first opposing part 51 and the second opposing part 52. Therefore, the rope 11 coming out of the socket 10 can be held by the rope holding part 5. This makes it possible to prevent the socket 10 held by the socket holding part 4 from receiving a biased force from the rope 11. Therefore, it is possible to more reliably prevent the socket 10 held by the socket holding part 4 from tilting. This makes it unnecessary for the worker to hold the socket 10 when pouring the molten metal into the socket 10, and makes it easier to fix the socket 10 to the end of the rope 11. In addition, it is possible to reduce the number of workers to hold the socket 10 so that the socket 10 does not tilt.
[0070] Moreover, the rope 11 can be held in the rope holding part 5 simply by inserting the rope 11 between the first opposing part 51 and the second opposing part 52. This allows the rope 11 to be easily held in the rope holding part 5 even in a state in which the socket 10 is held in the socket holding part 4. This makes it even easier to fix the socket 10 to the end of the rope 11.
[0071] Furthermore, socket 10 can be held in socket holding portion 4 simply by inserting socket 10 into through groove 41. Therefore, socket 10 can be easily held in socket holding portion 4. Also, any of a plurality of types of sockets 10 of different sizes can be held by the common socket holding portion 4.
[0072] Fig. 10 is a side view showing a state in which another socket 20, which is a different type from the socket 10 in Fig. 8, is held by the socket holding portion 4. The size of the other socket 20 is smaller than the size of the socket 10. The maximum outer diameter of the tapered portion 101 in the other socket 20 is larger than the inner diameter of the insertion hole portion 42 of the through groove 41. The minimum outer diameter of the tapered portion 101 in the other socket 20 is smaller than the inner diameter of the insertion hole portion 42 of the through groove 41. The maximum outer diameter of the tapered portion 101 in the other socket 20 is, for example, 12 mm.
[0073] As a result, tapered portion 101 of another socket 20 can be inserted into insertion hole 42 and will not come out of insertion hole 42. In this manner, even another socket 20 having a size smaller than that of socket 10 can be held by socket holding portion 4.
[0074] The diameter of the rope 11 also differs depending on the size of the socket 10. However, any of the multiple types of ropes 11 having different diameters can be inserted between the first opposing portion 51 and the second opposing portion 52, and therefore can be held by the common rope holding portion 5. In this case, the width of the slit portion 43 is made larger than the diameter of the rope 11 having the largest diameter among the multiple types of ropes 11.
[0075] In addition, the base portion 2 is detachably attached to the mesh panel 61 of the palletina 6. This eliminates the need to make the base portion 2 stand on the floor surface 12 to hold the socket 10 and the rope 11. This allows the base portion 2 to be made more compact, and the socket holding device 1 to be made more compact. This makes it easier to transport the socket holding device 1, and also saves on the working space.
[0076] Further, the second base surface 232 of the fixing portion 23 is provided with a hook portion 24 and a receiving portion 25. The receiving portion 25 is disposed at a position away from the hook portion 24 in the reference direction A. Therefore, the base portion 2 can be attached to the mesh panel 61 by hanging the hook portion 24 on the upper end of the mesh panel 61 and receiving the side portion of the mesh panel 61 with the receiving portion 25. This makes it possible to easily attach the base portion 2 to the mesh panel 61. Furthermore, by receiving the side portion of the mesh panel 61 with the receiving portion 25, the reference direction A of the base portion main body 21 can be easily aligned with the vertical direction. This makes it possible to easily match the axial direction of the socket 10 held by the socket holding portion 4 with the vertical direction. Therefore, the liquid level of the molten metal poured into the socket 10 can be made less likely to tilt with respect to the axis of the socket 10, and the molten metal can be more effectively poured into the socket 10.
[0077] In addition, the base portion 2 has a detachment prevention device 22 that is detachable from the hook portion 24. Therefore, by inserting the detachment prevention device 22 attached to the hook portion 24 into the mesh of the mesh panel 61, it is possible to prevent the base portion 2 from detaching from the mesh panel 61.
[0078] In addition, in such a rope end processing method, in the socket holding step S2, the socket 10 is inserted into the through groove 41 from above to hold the socket 10 in the socket holding section 4. Furthermore, in the rope holding step S3, the rope 11 is inserted between the first opposing section 51 and the second opposing section 52 from the outside of the rope holding section 5 in the horizontal direction to hold the rope 11 in the rope holding section 5. Therefore, the socket 10 can be easily held in the socket holding section 4, and the rope 11 can be easily held in the rope holding section 5. Furthermore, since the rope 11 is held in the rope holding section 5, the socket 10 held in the socket holding section 4 can be more reliably prevented from tilting. This makes it possible to eliminate the work of holding the socket 10 in the Babbitt injection step S4. As a result, the work of fixing the socket 10 to the end of the rope 11 can be made easier. Furthermore, since the number of workers who hold the socket 10 in the Babbitt injection step S4 can be reduced, the number of workers can also be reduced.
[0079] In the base part attachment step S1, the base part 2 is attached to the mesh panel 61. This eliminates the need to make the base part 2 stand on the floor surface 12 to hold the socket 10 and the rope 11. This allows the base part 2 to be made smaller, and the socket holding device 1 to be made smaller. This makes it easier to transport the socket holding device 1, and also saves space in the work area. Furthermore, by adjusting the position where the base part 2 is attached to the mesh panel 61, the height from the floor surface 12 to the socket holding device 1 can be determined at the construction site. This makes it even easier to hold the socket 10 and the rope 11 in the socket holding device 1.
[0080] In the above embodiment, the base portion 2 has the removal prevention device 22. However, if there is no risk of the base portion main body 21 coming off the mesh panel 61, the removal prevention device 22 is not necessary. Even in this way, the base portion 2 can be made detachable from the mesh panel 61.
[0081] In the above embodiment, the base body 21 has the fixing portion 23, the hook portion 24, and the receiving portion 25. However, the configuration of the base 2 is not limited to this. For example, the base 2 may be a plate-like member that can be fastened to the mesh panel 61 by wire or the like.
[0082] Also, in the above embodiment, the base portion 2 is detachably attached to the mesh panel 61. However, the base portion 2 may be configured to stand on the floor surface 12. For example, the base portion 2 may be a support stand that stands on the floor surface 12. In this case, the base portion 2 is placed on the floor surface 12 with the reference direction A of the base portion 2 coinciding with the vertical direction. Also, in this case, the base portion 2 is placed on the floor surface 12 with the socket holding portion 4 located above the rope holding portion 5.
[0083] When the base portion 2 is configured to stand on the floor surface 12, the base portion attachment step S1 is not performed in the rope end processing method. In this case, the base portion 2 is installed on the floor surface 12 in advance, so that the socket holding portion 4 is positioned above the rope holding portion 5 before the socket holding step S2. Also, in this case, in the socket holding step S2, with the socket holding portion 4 positioned above the rope holding portion 5, the socket 10 is inserted into the through groove 41 from above to hold the socket 10 in the socket holding portion 4.
[0084] In the above embodiment, the Pallettina 6 is used as the object to be installed, and the mesh panel 61 of the Pallettina 6 serves as the base attachment / detachment part. However, the tool used as the object to be installed is not limited to the Pallettina 6 as long as it is an tool capable of supporting the base part 2.
[0085] In the above embodiment, each of the first opposing portion 51 and the second opposing portion 52 is an elastic portion that is elastically deformable. However, only one of the first opposing portion 51 and the second opposing portion 52 may be an elastic portion that is elastically deformable. That is, it is sufficient that at least one of the first opposing portion 51 and the second opposing portion 52 is an elastic portion that is elastically deformable. Even in this case, the rope holding portion 5 can hold the rope 11 by the elastic restoring force of the elastic portion.
[0086] The configurations shown in the above embodiments are examples of the contents of the present disclosure. The embodiments can be combined with other known technologies. A part of the configuration of the embodiments can be omitted or modified without departing from the gist of the present disclosure. [Explanation of symbols]
[0087] 1 Socket holding device, 2 Base portion, 3 Holding mechanism portion, 4 Socket holding portion, 5 Rope holding portion, 6 Pallettina (installation object), 10, 20 Socket, 11 Rope, 21 Base portion main body, 22 Anti-detachment device, 23 Fixing portion, 24 Hook portion, 25 Receiving portion, 41 Through groove, 51 First opposing portion 51, 52 Second opposing portion, 61 Mesh panel, 231 First base surface, 232 Second base surface.
Claims
1. A base portion; A holding mechanism provided on the base portion; Equipped with The holding mechanism includes a socket holding portion and a rope holding portion disposed at a position spaced apart from the socket holding portion in a reference direction, the socket holding portion is provided with a through groove that passes through the socket holding portion along the reference direction, The rope holding portion has a first opposing portion and a second opposing portion opposed to each other, At least one of the first opposing portion and the second opposing portion is an elastic portion that is elastically deformable, The socket holding portion holds a socket provided at an end of a rope in a state where the socket is inserted into the through groove, The rope holding portion is a socket holding device that holds the rope by the elastic restoring force of the elastic portion while the rope is passed between the first opposing portion and the second opposing portion.
2. The base portion is detachably attached to a base detachable portion included in an object capable of supporting the base portion, 2. The socket holding device according to claim 1, wherein, when the base portion is attached to the base detachable portion, the socket holding portion is located above the rope holding portion.
3. The base portion has a base portion main body, the base body has a fixing portion having a first base surface and a second base surface formed along the reference direction, a hook portion provided on the second base surface, and a receiving portion provided on the second base surface at a position spaced apart from the hook portion in the reference direction, The socket holding portion and the rope holding portion are provided on the first base surface, The receiving portion protrudes from the second base surface in a direction intersecting the reference direction, 3. A socket holding device as described in claim 2, wherein when the base portion is attached to the base detachable portion, the hook portion is hooked onto the upper end portion of the base detachable portion, and the receiving portion receives the side portion of the base detachable portion at a position below the hook portion.
4. The base attachment / detachment portion is a mesh panel, The base portion has a detachment prevention device that is detachable to the hook portion, 4. The socket holding device according to claim 3, wherein the fall-off prevention device attached to the hook portion is insertable into mesh of the mesh panel when the hook portion is hooked on the mesh panel.
5. a socket holding step of holding the socket in the socket holding portion by inserting the socket temporarily connected to the end of the rope from above into the through groove in a state in which the socket holding portion in the socket holding device according to claim 1 is positioned above the rope holding portion; a rope holding step of holding the rope in the rope holding portion by inserting the rope between the first opposing portion and the second opposing portion from an outer side of the rope holding portion in a horizontal direction after the socket holding step; a babbitt injection step of injecting molten metal into the socket after the rope holding step; The rope end processing method includes the steps of:
6. a base portion mounting step of mounting the base portion to the base detachment portion in a state in which the socket holding portion in the socket holding device according to claim 2 is positioned above the rope holding portion; a socket holding step of holding the socket in the socket holding portion by inserting the socket temporarily connected to the end of the rope into the through groove from above after the base portion mounting step; a rope holding step of holding the rope in the rope holding portion by inserting the rope between the first opposing portion and the second opposing portion from an outer side of the rope holding portion in a horizontal direction after the socket holding step; a babbitt injection step of injecting molten metal into the socket after the rope holding step; The rope end processing method includes the steps of:
Citation Information
Patent Citations
Rope end processing device and rope end processing method
JP2017048472A