Waterproof structure and waterproof construction method
A simplified waterproof structure for the joint between the ground cover and wall railing using water stop and protective layers addresses construction complexities and weather limitations, enhancing durability and reducing costs.
Patent Information
- Application Number
- JP2023079039
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-11-22
Smart Images

Figure 2024163444000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a waterproofing structure and a waterproofing method, and in particular to a technology suitable for waterproofing the joint between a ground covering rise portion integrally formed at the end of a deck slab and the ground covering main body portion on the wall balustrade side, or the joint between the end of a deck slab and the ground covering portion on the wall balustrade side. [Background technology]
[0002] Generally, highway and other road bridges are composed of main girders erected on piers, deck slabs installed on the top of the main girders, and wall parapets installed on the top of the deck slabs. The infiltration of chloride ions contained in antifreeze agents and water leakage can cause the deck slabs to deteriorate. For this reason, in new deck slab construction and replacement construction, after the deck slab is installed on the main girders, a waterproof layer made of sheet-based or coating-based waterproofing material (hereinafter referred to as the conventional waterproof layer) is constructed on the top surface of the deck slab.
[0003] However, the conventional waterproofing layer has a multi-layer structure and requires many steps, which makes it prone to construction defects and increases the construction period and cost. In addition, the conventional waterproofing layer cannot be installed in rainy or humid weather, which can lead to construction delays due to bad weather. Another issue is that the conventional waterproofing layer must be reapplied every time the pavement is replaced.
[0004] A technology for solving such problems is disclosed, for example, in Patent Document 1. The precast concrete deck described in Patent Document 1 is constructed by pouring ordinary concrete into a formwork at a factory to construct the deck concrete portion, and then pouring ultra high strength fiber reinforced concrete (hereinafter also referred to as UFC) on top of the deck concrete portion to construct a UFC waterproof layer, thereby eliminating the need for on-site waterproofing work. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2019-126991 A Summary of the Invention [Problem to be solved by the invention]
[0006] The precast concrete deck described in Patent Document 1 has a waterproof function for the deck, but no waterproofing measures are applied to the joint between the rising part of the pedestal on the deck side and the main part of the pedestal on the balustrade side. In other words, no end waterproof layer is provided. As an end waterproof layer, it is possible to install a conventional waterproof layer using a sheet-based or coating-based waterproofing material at the joint after the balustrade is installed. However, as mentioned above, the conventional waterproof layer has problems such as being prone to construction defects, increasing construction time and costs, and being affected by bad weather.
[0007] The technology disclosed herein has been made in consideration of the above-mentioned circumstances, and aims to provide a technology that has a simple configuration and that can shorten construction time and reduce construction costs regarding the waterproofing structure and waterproofing method for the joint between the ground covering rise portion that is integrally formed at the end of the deck slab and the ground covering main body portion on the wall balustrade side, or the joint between the end of the deck slab and the ground covering portion on the wall balustrade side. [Means for solving the problem]
[0008] The waterproof structure (10) of the present disclosure comprises: A waterproof structure (10) for a joint between a pedestal rising portion (25) integrally provided at an end of a floor slab (20) and a pedestal main body portion (81) on the wall balustrade (50) side, or a joint between an end of the floor slab (20) and a pedestal portion (80) on the wall balustrade side, A predetermined first space (S1) is provided at the end of the joint facing the road side, and a water-stopping material (11) is filled in the first space (S1) to prevent water from entering. It is characterized by:
[0009] Another aspect of the waterproof structure (10) of the present disclosure includes: A predetermined second space (S2) is provided at an end of the joint closer to the road than the first space (S1), and a protective layer (12) is provided in the second space (S2) to cover an end surface (11A) of the water-stopping material (11) facing the road. It is characterized by:
[0010] Another aspect of the waterproof structure (10) of the present disclosure includes: A first primer coating (13) for fixing the water-stopping material (11) is formed on a surface defining the first space (S1), and a second primer coating (14) for fixing the protective layer (12) is formed on a surface defining the second space (S2). It is characterized by:
[0011] In another aspect of the waterproof structure (10) of the present disclosure, The water-stopping material (11) is either a modified silicone water-stopping material or an epoxy resin water-stopping material, The protective layer (12) is a polymer cement mortar. It is characterized by:
[0012] In another aspect of the waterproof structure (10) of the present disclosure, A waterproof layer (26) formed by pouring ultra-high strength fiber reinforced concrete (UFC) is provided at least on the upper part of the deck (20) facing the joint. It is characterized by:
[0013] The waterproofing method disclosed herein is A waterproofing method for a joint between a pedestal rising portion (25) integrally provided at an end of a floor slab (20) and a pedestal main body portion (81) on the wall balustrade (50) side, or a joint between an end of the floor slab (20) and a pedestal portion (80) on the wall balustrade (50) side, A water-stopping material (11) is filled into a predetermined first space (S1) provided at the end of the joint facing the road side to prevent water from entering. It is characterized by:
[0014] A waterproofing method according to another aspect of the present disclosure includes: After the first space (S1) is filled with the water-stopping material (11), a protective layer (12) is formed in a predetermined second space (S2) provided at an end of the joint closer to the road than the first space (S1) to cover an end surface (11A) of the water-stopping material (11) facing the road. It is characterized by:
[0015] In another aspect of the waterproofing method of the present disclosure, Prior to filling the first space (S1) with the water-stopping material (11), a first primer is applied to a surface defining the first space (S1) in order to fix the water-stopping material (11); After the water-stopping material (11) is filled into the first space (S1), and before the protective layer (12) is formed in the second space (S2), a second primer is applied to a surface defining the second space (S2) in order to fix the protective layer (12). It is characterized by:
[0016] In the above description, in order to facilitate understanding of the present disclosure, the symbols used in the embodiments are added in parentheses to components corresponding to the embodiments, but each component is not limited to the embodiment defined by the symbol. Effect of the Invention
[0017] According to the technology disclosed herein, the waterproofing structure and waterproofing method for the joint between the raised part of the floor slab and the main part of the floor slab on the balustrade side, or the joint between the end of the floor slab and the floor slab on the balustrade side, can shorten the construction period and reduce the construction cost with a simple configuration. In addition, the conventional waterproof layer requires the end waterproofing work to be re-applied every time the asphalt pavement is re-laid, but by adopting the technology disclosed herein, the end waterproofing work does not need to be re-applied. In other words, it is possible to simplify the maintenance work. [Brief description of the drawings]
[0018] [Figure 1] FIG. 2 is a schematic perspective view showing a floor slab and a wall parapet equipped with a waterproof structure according to this embodiment. [Diagram 2] This is a schematic vertical cross-sectional view showing the joint between the ground covering rising portion and the ground covering main body portion on the wall balustrade side in this embodiment, and the waterproof structure. [Diagram 3] FIG. 3 is an enlarged view of a main part of FIG. 2. [Figure 4] FIG. 2 is a schematic perspective view illustrating a process for forming a primer coating film for a waterproofing material. [Diagram 5] FIG. 11 is a schematic perspective view illustrating a water-stopping material filling step. [Figure 6] FIG. 2 is a schematic perspective view illustrating a protective mortar primer coating film forming step. [Figure 7] FIG. 11 is a schematic perspective view illustrating a protective layer forming step. [Figure 8] FIG. 2 is a flow diagram illustrating a construction procedure (waterproofing construction method) of the waterproof structure according to the present embodiment. [Figure 9] FIG. 1 is a schematic diagram for explaining an outline of a chemical resistance test. [Figure 10] FIG. 2 is a schematic diagram illustrating a specimen used in a temperature change and chemical load test. [Figure 11] FIG. 11 is a schematic vertical cross-sectional view showing a waterproof structure according to another embodiment. [Figure 12] 13A and 13B are schematic diagrams showing a waterproof structure according to another embodiment. [Figure 13] 13A and 13B are schematic diagrams showing a waterproof structure according to another embodiment. [Figure 14] 13A and 13B are schematic diagrams showing a waterproof structure according to another embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, a waterproof structure and a waterproofing method according to the present embodiment will be described with reference to the accompanying drawings.
[0020] [Overall configuration] 1 is a schematic perspective view showing the deck 20, 20' and the wall balustrade 50 equipped with the waterproof structure 10 according to this embodiment. For convenience, the cross-sectional view shows the deck 20, 20' cut in the bridge axis direction Y, and approximately half of the configuration in the direction perpendicular to the bridge axis X (road width direction) is omitted from the illustration. Furthermore, the number and shape of the deck 20, 20' and the wall balustrade 50 are not limited to the illustrated example.
[0021] As shown in FIG. 1, multiple deck slabs 20, 20' are installed on top of the main girder 90 and connected to each other in the bridge axis direction Y to form a road bridge. The deck slabs 20, 20' are precast concrete deck slabs manufactured in advance at a factory or the like, and are transported to the construction site and installed. The deck slabs 20, 20' are provided with dowel holes (not shown) into which stud dowels provided on the upper flange 91 of the main girder 90 are inserted. The deck slabs 20, 20' are solidified to the main girder 90 by inserting the stud dowels into the dowel holes and pouring a filler such as mortar into the dowel holes.
[0022] The deck 20, 20' has a plate-shaped deck body 21, 21' and a ground guard rising portion 25, 25' provided at the end of the deck body 21, 21' in the bridge axis orthogonal direction X. The ground guard rising portion 25, 25' protrudes upward in the vertical direction Z from the deck body 21, 21'. The protruding height of the ground guard rising portion 25, 25' is not particularly limited, but is about 110 mm as an example. The ground guard rising portion 25, 25' may be lower than the leveling layer, or may be approximately the same height as the leveling layer, or may be higher than the leveling layer. In this embodiment, the deck body 21, 21' and the ground guard rising portion 25 are preferably formed integrally without any joints. The deck body 21, 21' and the ground guard rising portion 25, 25' may be PC concrete or RC concrete. The ground covering rising portions 25, 25' constitute the ground covering portion 80 by being joined with a ground covering main body portion 81, which will be described later.
[0023] The deck 20, 20' has a UFC waterproof layer 26, 26' formed by UFC. The UFC waterproof layer 26, 26' is constructed by pouring ordinary concrete into a predetermined formwork in advance at a factory to construct the deck body 21, 21' and the ground guard rising portion 25, 25', and then pouring UFC, preferably of room temperature hardening type, on the upper surface of the deck body 21, 21', the upper surface of the ground guard rising portion 25, 25' and the side surface on the road side. UFC is a high-strength and highly durable concrete containing steel fibers, etc. UFC has a small hydraulic conductivity and high watertightness, so that the UFC waterproof layer 26, 26' can function as a waterproof layer for the deck body 21, 21' and the ground guard rising portion 25, 25'.
[0024] A convex shear key 22, 22' is provided at the end of the deck body 21, 21' in the bridge axis direction Y. In addition, the deformed steel bar 23, 23' is provided on the shear key 22, 22' so as to protrude in the bridge axis direction Y. Each deck 20, 20' is connected by pouring joint concrete 24 between the deck body 21, 21'. The joint concrete 24 is not particularly limited, but it is preferable to use UFC of room temperature hardening type. In this embodiment, a part of the shear key 22, 22' is formed in the cover part of the deformed steel bar 23, 23'. With such a configuration, the adhesion resistance and shear resistance between the deck body 21, 21' and the joint concrete 24 are increased. That is, it is possible to effectively improve the connection strength between the end of each deck body 21, 21' and the joint concrete 24.
[0025] At the end of the UFC waterproof layers 26, 26' in the bridge axis direction Y, a plurality of convex portions 27, 27' having a substantially triangular shape in a top view are provided in the direction perpendicular to the bridge axis X. The joint concrete 24 described above is poured between the convex portions 27 and 27' facing each other in the bridge axis direction Y. In this way, by providing a plurality of convex portions 27, 27' having a substantially triangular shape at the end of the UFC waterproof layers 26, 26', which is the joint surface of the UFC waterproof layers 26, 26', the adhesion resistance and shear resistance between the UFC waterproof layers 26, 26' and the joint concrete 24 are increased. In other words, it is possible to effectively improve the connection strength between the end of each UFC waterproof layer 26, 26' and the joint concrete 24.
[0026] The wall parapet 50 is a precast concrete wall parapet that is manufactured in advance in a factory or the like, and is transported to the construction site and installed there.
[0027] The wall parapet 50 is formed so that its longitudinal direction extends in the bridge axis direction Y, and its lower end portion spreads out toward the road side in a cross-sectional view in the direction orthogonal to the bridge axis X. Hereinafter, the lower end portion of the wall parapet 50 will be referred to as the ground guard main body portion 81. After the deck slabs 20, 20' are installed on the main girders 90, the wall parapet 50 is joined to the upper part of the ground guard rising portions 25, 25' which form the ends of the deck slabs 20, 20' in the direction orthogonal to the bridge axis X. By being connected in multiple parts in the bridge axis direction Y, the wall parapets 50 function as a protective fence for the road bridge.
[0028] The gap between the balustrade 50 and the ground guard rising portion 25, 25' (UFC waterproof layer 26, 26') is filled with, for example, non-shrink mortar M1 to solidify the balustrade 50 and the ground guard rising portion 25, 25' together. The non-shrink mortar M1 is injected through an injection hole 51 provided in the balustrade 50, and excess non-shrink mortar is discharged from a groove portion 52. The waterproof structure 10 of this embodiment is provided along the bridge axis direction Y at the portion of the joint between the ground guard rising portion 25, 25' and the ground guard main body 81 on the balustrade 50 side, facing the road. The joint between the ground guard rising portion 25, 25' and the ground guard main body 81 and the waterproof structure 10 will be described in detail below.
[0029] [Joint part] 2 is a schematic vertical cross-sectional view showing a joint between the ground cover rising parts 25, 25' and the ground cover main body 81 according to this embodiment, and the waterproof structure 10. Note that the symbol R in the figure indicates a reinforcing bar embedded in the concrete of the deck main body 21.
[0030] A lower fixing part 61 is embedded in the deck body 21. The lower fixing part 61 includes a flat anchor plate 62 that supports the anchor bolt AB, and a lower nut 63 that is connected to the underside of the anchor plate 62 and can be screwed into the lower threaded portion of the anchor bolt AB. The anchor plate 62 and the lower nut 63 are preferably formed integrally by welding or the like. The anchor bolt AB fixed to the lower fixing part 61 is inserted into an insertion hole 53 formed in the wall balustrade 50. An upper fixing part 70 is fixed to the upper side of the anchor bolt AB.
[0031] The upper fixing part 70 is disposed in a recess 54 recessed inward from the side surface of the ground covering main body part 81 of the wall balustrade 50. By screwing into the anchor bolt AB, the upper fixing part 70 presses at least a part of the upper opening periphery of the insertion hole 53 of the wall balustrade 50, and fixes the wall balustrade 50 to the ground covering rising part 25. The upper fixing part 70 has an upper nut 71 that screws into the upper threaded part of the anchor bolt AB, and a support plate 72 that is pressed downward by the upper nut 71 by screwing into the anchor bolt AB, and presses the periphery of the insertion hole 53.
[0032] The wall parapet 50 is installed on the ground guard rising portion 25 in accordance with the following steps (1) to (5). (1) Placement process: With the wall balustrade 50 positioned above the ground guard rising portion 25, the anchor bolts AB protruding from the ground guard rising portion 25 are aligned so as to be inserted into the insertion holes 53 of the wall balustrade 50. Once the alignment is complete, the wall balustrade 50 is lowered from above onto the deck slab 20. (2) Temporary fixing process: An anchor bolt AB is inserted into the support plate 72, and an upper nut 71 is screwed onto the anchor bolt AB to temporarily fix the wall balustrade 50. (3) First mortar filling step: Non-shrink mortar M1 is filled into the gap S between the wall parapet 50 and the eaves rising portion 25 through the injection hole 51 (see FIG. 1). (4) Final fixing process: After the non-shrink mortar M1 has hardened, the upper nuts 71 threaded onto the anchor bolts AB are further tightened to finalize the wall balustrade 50. (5) Second mortar filling process: Non-shrink mortar M2 is filled into the recess 54. When the non-shrink mortar M2 has sufficiently hardened, the joining between the lintel rising portion 25 and the lintel main body portion 81 on the wall parapet 50 side is completed.
[0033] Incidentally, the end of the deck 20 in the direction perpendicular to the bridge axis X is a waterway for road surface drainage, and is prone to deformation due to leakage from the ground cover rising part and around the drainage basin. If waterproofing is not applied to the joint between the ground cover rising part 25 of the deck 20 and the wall parapet 50, rainwater, etc. will penetrate through the joint, causing deterioration, etc. For this reason, it is necessary to apply a waterproof layer at the end. As the waterproof layer at the end, there is a conventional waterproof layer that uses a sheet-based or coating-based waterproof material. However, the conventional waterproof layer has a multi-layer structure and many processes, so there are problems such as a tendency for construction defects to occur, and furthermore, the construction period and construction costs are increased. In addition, the conventional waterproof layer cannot be applied in rainy or humid weather, and there is also a problem that the construction period will be delayed due to bad weather. In addition, there is also a problem that the conventional waterproof layer must be reapplied every time the pavement is replaced.
[0034] Therefore, in this embodiment, a waterproof structure 10 is applied to the joint between the ground covering rising portion 25 and the ground covering upper side portion 81 on the wall parapet 50 side as a substitute for an end waterproof layer, which can shorten the construction period and reduce the construction cost compared to conventional waterproof layers, is less likely to cause construction defects, can be constructed even in rainy weather or when humid (however, rain curing is required in rainy weather), and does not require re-construction when the pavement is replaced. The waterproof structure 10 will be described in detail below.
[0035] [Waterproof structure] As shown in FIG. 2 and FIG. 3, the waterproof structure 10 of this embodiment includes a water-stopping material 11 and a protective layer 12.
[0036] The water-stopping material 11 is filled in a space S1 (first space) that is an end of the gap S between the upper surface of the UFC waterproof layer 26 formed on the upper part of the ground guard rising part 25 and the lower surface of the wall parapet 50, the end being the end closer to the road than the non-shrink mortar M1, over the entire length of the wall parapet 50 in the bridge axis direction Y. The water-stopping material 11 is filled so that the end face 11A (see FIG. 3) on the road side is preferably flush with the side face 26A (see FIG. 3) of the UFC waterproof layer 26 of the ground guard rising part 25 in the vertical direction Z. The space S1 may be formed, for example, by placing a mold material such as a sponge at the end of the gap S between the upper surface of the UFC waterproof layer 26 and the lower surface of the wall parapet 50 in the "(3) first mortar filling step" when installing the wall parapet 50 described above, and removing the mold material after filling with the non-shrink mortar M1.
[0037] In this embodiment, the water-stopping material 11 has the following characteristics. (1) Excellent water-stopping performance. (2) It must be durable. (3) It is possible to use a caulking gun. (4) Capable of being densely filled in the joint between the ground cover rising portion 25 (UFC waterproof layer 26) and the wall parapet 50. (5) Construction can be carried out even in rainy or humid weather (however, rain protection measures must be taken in the event of rain). Examples of waterproofing materials having such properties (1) to (5) include modified silicone waterproofing materials and epoxy resin waterproofing materials.
[0038] In this way, by providing the water-stopping material 11 at the joint between the ground cover rising portion 25 and the ground cover upper side portion 81 on the wall parapet 50 side, it is possible to effectively prevent the infiltration of rainwater and chlorides contained in the antifreeze agent into the non-shrink mortar M1 which forms the joint between the ground cover rising portion 25 and the wall parapet 50 (ground cover upper side portion 81). Furthermore, by preventing the infiltration of rainwater, chlorides, etc., it is also possible to effectively suppress deterioration of the wall parapet 50 and the deck slab 20.
[0039] The timing for filling the space S1 with the water-stopping material 11 may be before the non-shrink mortar M1 hardens, as long as it is after the completion of "(3) first mortar filling step" for installing the wall balustrade 50. A primer for the water-stopping material is preferably applied to the lower surface of the wall balustrade 50 that defines the space S1, the end surface of the non-shrink mortar M1 on the road side, and the upper surface 26B of the UFC waterproof layer 26 (see FIG. 3). Reference numeral 13 in FIG. 2 and FIG. 3 indicates a primer coating for the water-stopping material. The primer for the water-stopping material is applied before filling the space S1 with the water-stopping material 11. For example, a urethane resin-based primer can be used as the primer for the water-stopping material. By providing the primer coating 13 for the water-stopping material, it is possible to reliably improve the adhesion and fixation of the water-stopping material 11.
[0040] The protective layer 12 is provided at the end of the joint between the ground cover rising portion 25 and the wall balustrade 50 (ground cover upper portion 81) closer to the road than the water-stopping material 11, so as to cover the end surface 11A of the water-stopping material 11. In this embodiment, the wall balustrade 50 is provided with a notched recess 57 (see FIG. 3) in which the lower corner on the road side is cut out in a substantially L-shape. The wall balustrade 50 is installed so that the side surface 58 of the notched recess 57 facing the road side is substantially flush with the side surface 26A of the UFC waterproof layer 26 in the vertical direction Z. The protective layer 12 is formed by troweling mortar using, for example, a plasterer's trowel into a concave space S2 (second space) defined by the upper surface 59 and the side surface 58 of the notched recess 57, the end surface 11A of the water-stopping material 11, and the side surface 26A and upper surface 26C of the UFC waterproof layer 26. As the mortar for forming the protective layer 12, for example, it is preferable to use a polymer cement mortar that can be applied with a trowel.
[0041] In this way, by providing the protective layer 12 covering the end surface 11A of the water-stopping material 11, it is possible to effectively prevent the water-stopping material 11 from being damaged by impact during paving, the heat of the asphalt mixture during paving, etc. Furthermore, when the water-stopping material 11 is put into service after the construction is completed, the protective layer 12 blocks ultraviolet rays, making it possible to effectively prevent ultraviolet deterioration of the water-stopping material 11. In other words, it is possible to reliably improve weather resistance.
[0042] The timing of applying the mortar of the protective layer 12 to the recessed space S2 is not particularly limited as long as it is after the completion of "(3) first mortar filling step" of installing the wall balustrade 50 and after the water-stopping material 11 is filled. A protective mortar primer is preferably applied to the side surface 58 and the top surface 59 of the cutout recess 57 that defines the recessed space S2, the end surface 11A of the water-stopping material 11, and the side surface 26A and the top surface 26C of the UFC waterproof layer 26. Reference numeral 14 in Figs. 2 and 3 indicates a protective mortar primer coating. The protective mortar primer is applied before applying the mortar to the recessed space S2. For example, an ethylene vinyl acetate primer can be used as the protective mortar primer. By providing the protective mortar primer coating 14, it is possible to reliably improve the adhesion and fixation of the protective layer 12.
[0043] [Waterproofing method] Next, a construction procedure (waterproofing method) of the waterproof structure 10 according to this embodiment will be described with reference to Figs. 4 to 8. This construction can be started after filling the non-shrink mortar M1 in "(3) first mortar filling process" when installing the wall balustrade 50 described above. This construction may also be started before the non-shrink mortar M1 hardens. In the following description, it is assumed that the internal space S1 provided in the gap S between the pedestal rising portion 25 and the wall balustrade 50 has already been completed.
[0044] In the first step (see FIG. 4 and S100 in FIG. 8), a primer for a water-stopping material is applied to a surface defining the space S1 to form a primer coating film 13 for the water-stopping material (primer coating film forming step for the water-stopping material).
[0045] Next, in a second step (see FIG. 5 and S200 in FIG. 8), the inside of the space S1 is filled with the water-stopping material 11 along the bridge axis direction Y using a caulking gun or the like (water-stopping material filling step).
[0046] Next, in the third step (see FIG. 6 and S300 in FIG. 8), a protective mortar primer is applied to the surface defining the recessed space S2 to form a protective mortar primer coating film 14 (protective mortar primer coating film formation step).
[0047] Next, in a fourth step (see FIG. 7 and S400 in FIG. 8), mortar is applied to the inside of the recessed space S2 with a trowel along the bridge axis direction Y to form the protective layer 12 (protective layer forming step). Once the protective layer 12 is formed, the construction of the waterproof structure 10 is completed.
[0048] According to the waterproofing method according to the present embodiment described above, all of the first to fourth steps can be carried out even in bad weather such as during rainfall (but rain curing is performed) or snowfall. That is, it is possible to effectively prevent delays in the construction period due to bad weather. In addition, the method can be carried out even at night when humidity is relatively high, and since the number of steps is as few as four, lane restrictions and road closures associated with the construction can be limited to nighttime. That is, it is possible to effectively reduce the impact on the surroundings associated with traffic restrictions. In addition, after the "(3) first mortar filling step" for installing the wall balustrade 50 is completed, the "(4) main fixing step" or "(5) second mortar filling step" for installing the wall balustrade 50 can be carried out in parallel, so that it is possible to reliably shorten the construction period compared to the conventional waterproofing layer, which can only be carried out after the installation of the wall balustrade 50 is completed.
[0049] [Performance evaluation test] Performance evaluation tests were conducted on the water-stopping material 11 and protective layer 12 according to this embodiment. The performance evaluation tests were conducted in accordance with the various tests applied to the waterproof layer in the concrete deck shown in "Pavement Construction Management Guidelines (July 2020)" II of East Nippon Expressway Company Limited, Central Nippon Expressway Company Limited, and West Nippon Expressway Company Limited, and a total of four tests were conducted: (1) chemical resistance test, (2) temperature change and chemical load test, (3) crack opening and closing load test, and (4) waterproof performance test. Details of each test are described below.
[0050] [(1) Chemical resistance test] In the chemical resistance test, the alkali resistance and salt water resistance of the water-stopping material 11 were evaluated. The test method was based on JIS K 5600, a handbook for waterproofing road bridge decks. Specifically, as shown in FIG. 9, a test specimen 110 was prepared by applying the water-stopping material 11 to a stainless steel plate 100, and the test specimen 110 was immersed in a test liquid F in a container 120. A modified silicone water-stopping material (Konishi: MS Seal Super Durability) was used as the water-stopping material 11. As the test liquid F, a saturated calcium hydroxide solution, a 3% sodium chloride solution, and a 3% calcium chloride solution were prepared.
[0051] In the chemical resistance test, the specimen 110 was immersed in the test liquid F (saturated calcium hydroxide solution, 3% sodium chloride solution, and 3% calcium chloride solution) at 23±2°C for a predetermined period of time, and the water-stopping material 11 was visually checked for abnormalities such as cracks, swelling, and peeling. In the pavement construction management guidelines, the immersion period is set to 15 days to apply a load equivalent to 30 years, but in the test, the immersion period was set to 50 days (≒15 days x 3.3) to evaluate durability equivalent to 100 years.
[0052] After the test specimen 110 was immersed in the test liquid F for 50 days, the test specimen 110 was taken out of the container 120 and visually observed, and no abnormality such as cracks, swelling, or peeling was found in the water-stopping material 11. In other words, it was confirmed that the water-stopping material 11 constituting the waterproof structure 10 of this embodiment has a durability equivalent to 100 years in terms of chemical resistance.
[0053] [(2) Temperature change and chemical load test] In the temperature change and chemical load tests, the weather resistance and chemical resistance of the water stop material 11 were evaluated by applying loads equivalent to weather changes and effects from concrete during the service period to the water stop material 11. The test method complied with 6. Temperature change and chemical load test in "Deck slab waterproofing quality test method (Test method 252-2020)" in "NEXCO Test Methods, Part 2, Asphalt Pavement Related Test Methods (July 2020)" of East Nippon Expressway Company Limited, Central Nippon Expressway Company Limited, and West Nippon Expressway Company Limited.
[0054] FIG. 10 is a schematic perspective view of the prepared specimen 210. The specimen 210 is substantially rectangular and includes a UFC portion 220 and a concrete portion 230. A water-stopping material 11 is filled in the recess between the UFC portion 220 and the concrete portion 230, and a protective layer 12 is provided on the UFC portion 220, the concrete portion 230, and the upper portion of the water-stopping material 11. A modified silicone water-stopping material (MS Seal Super Durability, manufactured by Konishi Co., Ltd.) is used for the water-stopping material 11. A polymer cement mortar (RIS Light Hard Ace, manufactured by Denka Co., Ltd.) is used for the protective layer 12. A notch 240 is provided on the upper portion of the protective layer 12 to induce cracks in a crack opening and closing load test described later. The notch 240 may be formed after the temperature change and chemical load tests are completed, but before the crack opening and closing load test is started.
[0055] In the temperature change and chemical load tests, specimen 210 was immersed in a saturated calcium hydroxide solution at 23±2°C for 16 hours, then cooled in an incubator at -30±2°C for 4 hours, and then heated in an incubator at 50±3°C for 4 hours, this cycle being repeated. The pavement construction management guidelines state that the cycle should be repeated 30 times to apply a load equivalent to 30 years, but in this test, the cycle was repeated 100 times (≒30 times x 3.3) to evaluate weather resistance and chemical resistance equivalent to 100 years.
[0056] After repeating the cycle 100 times, the test specimen 210 was visually observed, and no abnormalities such as cracks, blistering, or peeling were found in the water-stopping material 11 or the protective layer 12. In other words, it was confirmed that the water-stopping material 11 and the protective layer 12 constituting the waterproof structure 10 of this embodiment have performance equivalent to 100 years in terms of weather resistance and chemical resistance during their service life.
[0057] [(3) Crack opening and closing load test] The crack opening and closing load test evaluated the deformation resistance and durability of the waterstop material 11 during its service life. The test method was based on 7. Crack opening and closing load test in "Deck Waterproofing Quality Test Method (Test Method 252-2020)" and conformed to Appendix-1 Test Method 14. Crack opening and closing load test in the "Road Bridge Deck Waterproofing Handbook." The test specimen used was the test specimen 210 that had completed the aforementioned (2) temperature change and chemical load test.
[0058] In the crack opening and closing load test, the specimen 210 was placed in a crack opening and closing tester, and the initial crack width was adjusted to 0.25 mm. In addition, the crack amplitude was set to ±0.15 mm, and the crack was repeatedly opened and closed with a sine wave of 5 to 10 Hz. In the pavement construction management guidelines, the number of cycles is set to 4.8 million times to apply a load equivalent to 30 years, but in the test, the number of cycles was set to 16 million times (≒4.8 million times x 3.3) to evaluate the deformation resistance and durability equivalent to 100 years.
[0059] After repeatedly opening and closing the cracks 16 million times, it moved on to waterproof performance testing.
[0060] [(4) Waterproof performance test] In the waterproof performance test, the waterproof performance of the water-stopping material 11 during its service period was evaluated. The test method was based on the "Road Bridge Deck Waterproofing Handbook" Appendix 1, Test Method 3. Waterproofing Test II. The test specimen used was the test specimen 210 that had completed the crack opening and closing load test described above.
[0061] In the waterproof performance test, a cylindrical test specimen was prepared from the test specimen 210 that had completed the above-mentioned (3) crack opening and closing load test, and was placed in a waterproof tester so that the protective layer 12 was the pressurized surface. In addition, a test liquid (uranine aqueous solution) was poured from the inlet of the waterproof tester, and the pressurized interior was filled with the test liquid. In a test room at a temperature of 23±2°C, pressure was applied for 24 hours using a compressor. In the pavement construction management guidelines, the pressure is set to 0.5 MPa. This is because the ground pressure of the wheels during normal driving of a large truck is approximately 0.5 MPa. However, the ground pressure of the wheels does not act on the ground cover end that is the target of this embodiment. For this reason, in the test, the pressure applied was set to 0.1 MPa, anticipating a safety of 10 times the maximum possible water retention amount.
[0062] After applying a pressure of 0.1 MPa for 24 hours, the test specimen was removed from the waterproofing tester, dried, and then split between the UFC section 220 and the concrete section 230. A black light was irradiated onto the cross section of the split test specimen, and the presence or absence of penetration of the test liquid into the water-stopping material 11 was visually confirmed, and no penetration of the test liquid was found. In other words, it was confirmed that the water-stopping material 11 and the protective layer 12 constituting the waterproof structure 10 of this embodiment have a performance equivalent to 100 years in terms of deformation resistance and durability during the service period, and further waterproofness.
[0063] [others] The present disclosure is not limited to the above-described embodiments, and can be modified as appropriate without departing from the spirit of the present disclosure.
[0064] For example, in the above embodiment, the wall parapet 50 has been described as having the cutout recess 57, but it does not have to have the cutout recess 57. In this case, as shown in Fig. 11, a water-stopping material 11 and a protective layer 12 may be provided in the gap S between the upper surface of the UFC waterproof layer 26 formed on the upper part of the ground covering rising portion 25 and the lower surface of the ground covering main body portion 81 on the wall parapet 50 side, in that order from the outside of the road.
[0065] In the above embodiment, a protective coating film made by applying a protective paint may be further formed on the end face of the protective layer 12 facing the road. By providing the protective coating film, it becomes possible to effectively prevent cracks and the like of the protective layer 12 during the service period.
[0066] In addition, in the above embodiment, as shown in Figures 4 to 8, the construction of the waterproof structure 10 is described as commencing after the completion of "(3) first mortar filling process" of the wall parapet 50. However, if a member for blocking the water-stopping material 11 is placed in the gap S between the ground covering rising portion 25 and the wall parapet 50, it is also possible to start the construction of the waterproof structure 10 after the completion of "(2) temporary fixing process" of the wall parapet 50.
[0067] In addition, the deck 20 has been described as having the UFC waterproof layer 26 on the deck main body 21 and the upper part of the ground cover rising portion 25, but the deck may have a waterproof function other than the UFC waterproof layer 26. For example, the waterproof structure 10 of the present disclosure can be applied to cases where an existing deck not having the UFC waterproof layer 26 is not replaced and only the wall parapet is renewed.
[0068] In addition, in the above embodiment, the ground covering main body 81 is integrally formed with the wall parapet 50, but the waterproof structure 10 disclosed herein can also be applied to a configuration in which the ground covering main body 81 and the wall parapet 50 are formed separately, as shown in Figure 12.
[0069] The waterproof structure 10 of the present disclosure can also be applied to a deck 20 that does not have a ground guard rising portion 25. Specifically, as shown in FIG. 13(A), the waterproof structure 10 of the present disclosure can also be applied to a joint between an end of the deck 20 in a direction perpendicular to the bridge axis and a ground guard portion 80 that is integral with the wall balustrade 50. As shown in FIG. 13(B), the waterproof structure 10 of the present disclosure can also be applied to a joint between an end of the deck 20 in a direction perpendicular to the bridge axis and a ground guard portion 80 in which the wall balustrade 50 is separate. As shown in FIG. 14, the waterproof structure 10 of the present disclosure can also be applied to a joint with a cast-in-place concrete wall balustrade 500, and can also be applied to a joint with a steel wall balustrade, although detailed illustration is omitted. [Explanation of symbols]
[0070] 10... waterproof structure, 11... water-stopping material, 12... protective layer, 13... primer coating for water-stopping material, 14... primer coating for protective mortar, 20, 20'... floor slab, 21, 21'... main body of floor slab, 22, 22'... Shear key, 23, 23'... deformed steel bar, 24... concrete joint, 25, 25'... raised part of ground cover, 26, 26'... UFC waterproof layer, 27, 27'... convex part, 50... wall parapet, 51... injection hole, 52... groove, 53... insertion hole, 54... recess, 61... lower fixing part, 62... anchor plate, 63... lower nut, 70... upper fixing part, 71... upper nut, 72... support plate, 80... ground cover, 81... upper part of ground cover, AB... anchor bolt, S1... space (first space), S2... concave space (second space), M1... non-shrink mortar
Claims
1. A waterproof structure for a joint between a raised portion of a floor slab and a main body of the floor slab on the wall balustrade side, or a joint between an end of the floor slab and a floor slab on the wall balustrade side. A first space is provided at an end of the joint facing the road, and a water-stopping material is filled in the first space to prevent water from entering. A waterproof structure characterized by:
2. 2. The waterproof structure according to claim 1, A second space is provided at an end of the joint closer to the road than the first space, and a protective layer is provided in the second space to cover the end surface of the water-stopping material facing the road. A waterproof structure characterized by:
3. The waterproof structure according to claim 2, A first primer coating film for fixing the water-stopping material is formed on a surface defining the first space, and a second primer coating film for fixing the protective layer is formed on a surface defining the second space. A waterproof structure characterized by:
4. The waterproof structure according to claim 2 or 3, The water-stopping material is either a modified silicone-based water-stopping material or an epoxy resin-based water-stopping material, The protective layer is a polymer cement mortar. A waterproof structure characterized by:
5. The waterproof structure according to any one of claims 1 to 3, A waterproof layer formed by pouring ultra-high strength fiber reinforced concrete is provided at least on the upper portion of the deck facing the joint. A waterproof structure characterized by:
6. A waterproofing method for a joint between a rising part of a floor covering integrally provided at the end of the floor slab and a main part of the floor covering on the wall balustrade side, or a joint between an end of the floor slab and a floor covering on the wall balustrade side, A water-stopping material is filled into a predetermined first space provided at an end of the joint facing the road side to prevent water from entering. A waterproofing method characterized by the above.
7. The waterproofing method according to claim 6, After filling the first space with the water-stopping material, a protective layer is formed in a second space provided at an end of the joint closer to the road than the first space, to cover an end surface of the water-stopping material facing the road. A waterproofing method characterized by the above.
8. The waterproofing method according to claim 7, applying a first primer to a surface defining the first space for fixing the water-stopping material thereto before filling the first space with the water-stopping material; After filling the first space with the water-stopping material, and before forming the protective layer in the second space, a second primer is applied to a surface defining the second space to fix the protective layer. A waterproofing method characterized by the above.