Steel pipe pile and construction method using the same

The innovative steel pipe pile design with an eccentric single edge blade and additional excavation features addresses blade slippage issues, enhancing penetration and reducing construction time by preventing soil adherence and improving excavation efficiency.

JP2024164459APending Publication Date: 2024-11-27DAIWA LANTEC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023079944
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-27

AI Technical Summary

Technical Problem

Conventional steel pipe piles face difficulties in penetrating hard strata due to excavation blade slippage caused by soil adherence and inadequate excavation depth, leading to reduced penetration performance and increased construction time.

Method used

The steel pipe pile design incorporates a single edge blade eccentric to the shaft's rotation center, excavating asymmetrically and directing excavated soil away from the blade, combined with additional excavation blades and wings to prevent soil compression and adherence, enhancing penetration efficiency.

Benefits of technology

The design improves penetration performance by preventing blade slippage and soil adherence, allowing for faster and more efficient construction without increasing pushing force.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024164459000001_ABST
    Figure 2024164459000001_ABST
Patent Text Reader

Abstract

To provide a steel pipe pile capable of smoothly pressing out excavated soil without compressing it and preventing attachment of clods on an excavation blade, while avoiding slippage of the excavation blade.SOLUTION: A steel pipe pile 1 has a shaft part 21 made of a steel pipe, on an end part of which an excavation blade is arranged projecting downward. The steel pipe pile is driven into the ground by excavating the ground with the excavating blade while rotating the shaft part 21. The steel pipe pile is provided with a single one-side blade 25 as a first excavating blade, wherein the width of the one-side blade 25 is smaller than the outer diameter of the shaft part 21, and the center axis of the one-side blade 25 in a vertical direction is offset from the rotation center of the shaft part 21. The one-side blade 25 excavates the ground asymmetrically during one rotation of the shaft part 21 to push out the excavated soil produced through excavation to the side where no one-side blade 25 is arranged right below the shaft part 21.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a steel pipe pile used as a foundation pile for buildings and various structures, and a construction method using the same. [Background technology]

[0002] Foundation piles are driven into soft ground to support buildings and structures. Steel pipe piles are a common type of foundation pile. Cylindrical steel pipe piles are driven deep into the ground and reach the supporting layer to form the foundation that supports the building or structure.

[0003] An example of a conventional steel pipe pile is the steel pipe pile described in Japanese Patent No. 5354410 (Patent Document 1). Figures 20(a) to (c) show a tip portion 20 of a conventional steel pipe pile 100. As shown in these drawings, the tip portion 20 of the conventional steel pipe pile 100 is a cast steel product in which a bottom plate 22, a drilling blade 23, and two spiral rotors 24 are integrally molded with a cylindrical shaft portion 21. Such a tip portion 20 is welded to the lower end of a cylindrical steel pipe pile main body (shaft steel pipe) 10 shown in Figure 21 to constitute the conventional steel pipe pile 100.

[0004] The shaft portion 21 and the bottom plate 22 have approximately the same outer diameter as the steel pipe pile main body 10. The excavation blade 23 protrudes downward from the bottom plate 22. The excavation blade 23 is composed of an excavation blade main body 23a and a pair of reinforcing portions 23b. The excavation blade main body 23a has an overall width equal to the outer diameter of the bottom plate 22, and passes in a straight line through the rotation center C of the bottom plate 22. Each of the pair of reinforcing portions 23b is provided at the end of the excavation blade main body 23a, and protrudes in the direction opposite to the rotation direction of the steel pipe pile main body 10 (see the arrow in Figure 20 (c)).

[0005] As shown in Fig. 21, a conventional steel pipe pile 100 is driven into the ground while rotating the steel pipe pile body 10. Then, the digging blade 23 excavates soil equivalent to the volume of the bottom plate 22 driven into the ground. The excavated soil 201 generated by the excavation is pushed out to the side of the shaft 21 along the side surface of the digging blade 23. The rotor 24 pushes the excavated soil 201 pushed out to the side by the digging blade 23 further out to the side. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent No. 5354410 Summary of the Invention [Problem to be solved by the invention]

[0007] As shown in Fig. 21, a typical ground has multiple layers 200, 300, such as a sand layer, a clay layer, and a gravel layer, stacked vertically. In the process of penetrating the ground, the conventional steel pipe pile 100 described above has a problem in that the excavation blade 23 slips near the boundary between the soft stratum 200 and the hard stratum 300, making it difficult to penetrate the hard stratum 300. The slippage of the excavation blade 23 refers to the excavation blade 23 spinning freely without being able to excavate the ground. When the excavation blade 23 slips, the steel pipe pile 100 cannot penetrate the ground.

[0008] A first cause of slippage of the digging blade 23 is thought to be that the excavated soil 201 excavated by the digging blade 23 is pushed out to the side of the shaft portion 21 along the side surface of the digging blade 23. The excavated soil 201 is compressed on the side of the shaft portion 21 as the steel pipe pile 100 rotates. As the steel pipe pile 100 penetrates further into the ground, the compressed excavated soil 201 tends to adhere to the periphery of the digging blade 23.

[0009] A second cause of the slippage of the excavation blade 23 is that the height of the excavation blade 23 is low and the overall height including the excavation blade body 23a and the pair of reinforcing parts 23b is constant. Specifically, the height of the excavation blade 23 is 17.9 mm to 38.2 mm (see

[0035] [Table 1] of Japanese Patent No. 5354410), and the downward protrusion of the excavation blade 23 is small. Such an excavation blade 23 is easily covered by the excavated soil 201 adhering to its periphery, and is also difficult to penetrate into a hard stratum 300 such as a clay layer or a gravel layer.

[0010] Due to these structural reasons, the excavated soil 201 adhering to the periphery of the digging blade 23 becomes a large lump near the boundary where the soft stratum 200 transitions to the hard stratum 300, causing slippage of the digging blade 23. The slippage of the digging blade 23 reduces the penetration performance of the steel pipe pile 100 into the hard stratum 300, causing problems such as an increase in the pushing force of the steel pipe pile 100 and an increase in the time required for construction of the steel pipe pile 100.

[0011] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a steel pipe pile and a construction method using the same that can smoothly push out excavated soil without compressing it, prevent soil lumps from adhering to the excavation blade, and prevent the excavation blade from slipping. [Means for solving the problem]

[0012] (1) In order to achieve the above-mentioned object, the steel pipe pile of the present invention is a steel pipe pile having a digging blade protruding downwardly at the end of a shaft made of a steel pipe, and is inserted into the ground by excavating the ground with the digging blade while rotating the shaft, characterized in that the pile pile has a single single-edged first digging blade, the width of the single-edged blade is smaller than the outer diameter of the shaft, the vertical central axis of the single-edged blade is eccentric from the center of rotation of the pile body, and the single-edged blade excavates the ground asymmetrically during one rotation of the shaft, and pushes the excavated soil produced by the excavation to the side directly below the shaft where the single-edged blade is not provided.

[0013] (2) In the steel pipe pile of the above (1), preferably, the width of the one edge is about 30% to 70% of the outer diameter of the shaft portion.

[0014] (3) In the steel pipe pile described above in (1), preferably, the height of the one edge is not less than about 20% of the outer diameter of the shaft portion.

[0015] (4) Preferably, in the steel pipe pile of (1) above, in addition to the single blade, a second digging blade composed of at least one part is provided, the second digging blade is arranged symmetrically with respect to the center of rotation of the shaft portion, the height of the second digging blade is equal to or less than the height of the single blade, the single blade is connected to at least one part constituting the second digging blade, and the second digging blade symmetrically excavates the ground that has been asymmetrically excavated by the single blade.

[0016] (5) Preferably, in the steel pipe pile of (1) above, at least one wing is provided at the end of the shaft portion, protruding outward beyond the side surface of the shaft portion, and the wing pushes the excavated soil outwardly of the shaft portion.

[0017] (6) Preferably, in the steel pipe pile described above in (5), the wing is formed of at least one plate-like member curved in a spiral shape.

[0018] (7) Preferably, in the steel pipe pile of (5) above, the wings are made up of two plate-like members disposed at an angle so as to intersect with each other when the shaft is viewed from the side.

[0019] (8) Preferably, in the steel pipe pile of (6) above, the steel pipe pile is composed of the shaft portion and a cylindrical tip portion connected to the end of the shaft portion, the single blade is provided at the lower end of the tip portion, and the wing is provided on the side of the tip portion.

[0020] (9) Preferably, in the steel pipe pile of (7) above, the steel pipe pile is composed of the shaft portion and a cylindrical tip portion connected to the end of the shaft portion, the single blade is provided at the lower end of the tip portion, and the wing is provided on the side of the tip portion.

[0021] (10) Preferably, in the steel pipe pile of (8) above, the tip portion, the cutting edge and the wing are integrally formed by casting.

[0022] (11) Preferably, in the steel pipe pile of (9) above, the tip portion, the cutting edge and the wing are integrally formed by casting.

[0023] (12) In order to achieve the above object, a construction method of the present invention is a construction method using a steel pipe pile according to any one of (1) to (11) above, characterized in that it includes a first step of suspending the steel pipe pile at a predetermined position in the ground using a construction machine, aligning the steel pipe pile to a pile center position, and restraining the steel pipe pile, a second step of rotating the steel pipe pile using the construction machine and rotary-penetrating the steel pipe pile into the ground, and a third step of terminating the rotary penetration of the steel pipe pile when the steel pipe pile reaches a predetermined depth and satisfies a predetermined condition.

[0024] (13) Preferably, in the second step of the construction method using a steel pipe pile as described in (12) above, when the penetration amount per rotation of the steel pipe pile decreases, a pushing force is applied to the steel pipe pile to assist rotational penetration.

[0025] (14) Preferably, in the second step of the construction method using a steel pipe pile as described in (12) above, a second shaft portion is suspended above the shaft portion by the construction machine, the second shaft portion is joined to the shaft portion, and the steel pipe pile is then rotated and driven into the ground. Effect of the Invention

[0026] The steel pipe pile of the present invention has a single blade that is eccentrically disposed from the center of rotation of the shaft. The single blade excavates the ground asymmetrically during one rotation of the shaft, and pushes the excavated soil generated by the excavation to the side directly below the shaft where the single blade is not disposed. According to such a steel pipe pile of the present invention, the excavated soil excavated by the single blade is always pushed to the side where the single blade is not disposed, and is not compressed by the rotating single blade. This makes it possible to prevent adhesion of soil lumps to the single blade, and the single blade does not slip. Therefore, according to the steel pipe pile of the present invention and the construction method using the same, it is possible to improve the penetration performance of the steel pipe pile, and as a result, it is possible to shorten the time required for construction of the steel pipe pile without increasing the pushing force of the steel pipe pile. [Brief description of the drawings]

[0027] [Figure 1] FIG. 1 shows the tip of a steel pipe pile according to a first embodiment of the present invention, where FIG. 1(a) is a front view, FIG. 1(b) is a right side view, and FIG. 1(c) is a bottom view. [Diagram 2] 2(a) to (d) are schematic diagrams showing a series of excavation operations of the steel pipe pile according to the first embodiment. [Diagram 3] 3(a) to (d) are schematic diagrams showing a series of excavation operations of the steel pipe pile according to the first embodiment following FIG. 2(d). [Figure 4] 4(a) to (d) are schematic diagrams showing a series of excavation operations of the steel pipe pile according to the first embodiment following FIG. 3(d). [Diagram 5] FIG. 5 is a schematic diagram showing the state of the steel pipe pile according to the first embodiment when the tip portion reaches the vicinity of the boundary where the soft stratum transitions to the hard stratum. [Figure 6] FIG. 6 is a schematic diagram showing one step of a construction method using a steel pipe pile according to the first embodiment. [Figure 7] FIG. 7 is a schematic diagram showing one step of the construction method using a steel pipe pile according to the first embodiment, following FIG. [Figure 8] FIG. 8 is a schematic diagram showing one step of the construction method using a steel pipe pile according to the first embodiment, following FIG. [Figure 9]FIG. 9 is a schematic diagram showing one step of the construction method using a steel pipe pile according to the first embodiment, following FIG. [Figure 10] FIG. 10 is a schematic diagram showing one step of the construction method using a steel pipe pile according to the first embodiment, following FIG. [Figure 11] FIG. 11 is a schematic diagram showing one step of the construction method using a steel pipe pile according to the first embodiment, following FIG. [Figure 12] FIG. 12 shows the tip portion of a steel pipe pile according to a second embodiment of the present invention, where FIG. 12(a) is a partially sectional front view and FIG. 12(b) is a bottom view. [Figure 13] FIG. 13 shows the tip portion of a steel pipe pile according to a third embodiment of the present invention, where FIG. 13(a) is a partially sectional front view, and FIG. 13(b) is a bottom view. [Figure 14] FIG. 14 shows the tip portion of a steel pipe pile according to a fourth embodiment of the present invention, where FIG. 14(a) is a partial sectional front view and FIG. 14(b) is a bottom view. [Figure 15] FIG. 15 shows a tip portion of a steel pipe pile according to a fifth embodiment of the present invention, where FIG. 15(a) is a partial sectional front view and FIG. 15(b) is a bottom view. [Figure 16] FIG. 16 shows a tip portion of a steel pipe pile according to a sixth embodiment of the present invention, where FIG. 16(a) is a partial sectional front view and FIG. 16(b) is a bottom view. [Figure 17] FIG. 17 shows the tip portion of a steel pipe pile according to the seventh embodiment of the present invention, where FIG. 17(a) is a partial sectional front view, and FIG. 17(b) is a bottom view. [Figure 18] FIG. 18 shows the tip portion of a steel pipe pile according to the eighth embodiment of the present invention, where FIG. 18(a) is a partial sectional front view, and FIG. 18(b) is a bottom view. [Figure 19] FIG. 19 shows a tip portion of a steel pipe pile according to a ninth embodiment of the present invention, where FIG. 19(a) is a partial sectional front view, and FIG. 19(b) is a bottom view. [Figure 20] FIG. 20 shows the tip of a conventional steel pipe pile, where FIG. 20(a) is a front view, FIG. 20(b) is a right side view, and FIG. 20(c) is a bottom view. [Figure 21] FIG. 21 is a schematic diagram showing the state of a conventional steel pipe pile when its tip reaches the vicinity of the boundary where the soft stratum transitions to the hard stratum. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] Hereinafter, an embodiment of a steel pipe pile and a construction method using the same of the present invention will be described with reference to the drawings.

[0029] 1. Steel pipe pile according to the first embodiment First, a steel pipe pile according to a first embodiment of the present invention will be described with reference to Figures 1 to 5. The steel pipe pile 1 of the first embodiment described below is based on a conventional steel pipe pile 100 (Japanese Patent No. 5354410) shown in Figures 20 and 21, and the same components as those of the conventional steel pipe pile 100 are given the same reference numerals and detailed descriptions thereof will be omitted.

[0030] 1.1 Structure of steel pipe piles 1(a) to (c) show a tip 20 of a steel pipe pile according to a first embodiment of the present invention. The tip 20 is a cast steel product in which a bottom plate 22, an excavation blade 23, and two spiral rotors 24 are integrally molded with a cylindrical shaft 21. The tip 20 of this embodiment further includes a single blade 25. The blade 25 is, for example, a rectangular steel plate, and is welded to the excavation blade body 23a. The blade 25 may be cast integrally with the tip 20. In this embodiment, the width of the blade 25 is about 1 / 2 the outer diameter of the shaft 21. The height of the blade 25 is about 1 / 2 the outer diameter of the shaft 21 and about twice the height of the excavation blade 23. The vertical central axis of the blade 25 is eccentric from the rotation center C of the shaft 21. Such a tip portion 20 is welded to the lower end of a cylindrical steel pipe pile main body (shaft steel pipe) 10 shown in Figs. 2(a) to (d), thereby forming the steel pipe pile 1 of this embodiment.

[0031] 1.2 Example of tip part For example, the tip 20 is a cast steel product conforming to the type symbol "SCW410" specified in JIS G 5102 "cast steel products for welded structures." The single blade 25 may be molded integrally with the tip 20, or may be welded to the tip 20. For example, the single blade 25 is a steel material conforming to the type symbol "SS400" specified in JIS G 3101 "rolled steel material for general structures," or a designated building material specified in Article 37 of the Building Standards Act, with a standard strength of allowable stress of 235 N / mm 2 It will be manufactured using steel materials specified above.

[0032] The preferred dimensions of the width (mm), height (mm) and thickness (mm) of single-edged blade 25 relative to the outer diameter (mm) of shaft 21 of tip portion 20 are shown in Table 1 below.

[0033] [Table 1]

[0034] 1.3 Excavation of steel pipe piles When the steel pipe pile 1 of this embodiment is driven into the ground, first the single blade 25 bites into the surface of the ground, as shown in Fig. 2(a). As shown in Figs. 2(b) to (d), the single blade 25 excavates the ground asymmetrically during one rotation of the steel pipe pile main body 10, and pushes out excavated soil 201 generated by the excavation to the side directly below the shaft portion 21 (see Figs. 1(a) to (c)) where the single blade 25 is not provided.

[0035] Next, as shown in FIG. 3(a), the single blade 25 bites deeper into the surface of the ground while the steel pipe pile main body 10 rotates once. Also, the digging blade 23 reaches the height of the excavated soil 201 excavated by the single blade 25. As shown in FIGS. 3(b) to (d), the single blade 25 asymmetrically excavates a deeper part of the ground while the steel pipe pile main body 10 rotates once. The single blade 25 pushes out the newly generated excavated soil 201 together with the excavated soil 201 shown in FIG. 2(d) to the side directly below the shaft portion 21 where the single blade 25 is not provided. At this time, the digging blade 23 pushes out a part of the excavated soil 201 excavated by the single blade 25 along the side surface of the digging blade 23 and to the side of the shaft portion 21.

[0036] Thereafter, as shown in FIG. 4(a), the single blade 25 and the digging blade 23 dig deeper into the ground surface while the steel pipe pile main body 10 rotates once. Also, the tips of the two rotors 24 dig into the ground surface. As shown in FIG. 4(b) to (d), the single blade 25 asymmetrically excavates a deeper part of the ground while the steel pipe pile main body 10 rotates once. The single blade 25 pushes out the newly generated excavated soil 201, together with the excavated soil 201 shown in FIG. 3(d), to the side directly below the shaft 21 where the single blade 25 is not provided. At this time, the digging blade 23 pushes out a part of the excavated soil 201 excavated by the single blade 25 along the side surface of the digging blade 23 to the side of the shaft 21. The two rotors 24 push out the excavated soil 201 pushed out to the side of the shaft 21 further to the side.

[0037] 1.4 Effects of steel pipe piles As described above, the steel pipe pile 1 of this embodiment has the single blade 25 provided eccentrically from the rotation center C of the shaft portion 21. The single blade 25 excavates the ground asymmetrically while the steel pipe pile body 10 makes one rotation, and pushes out the excavated soil 201 generated by the excavation to the side directly below the shaft portion 21 where the single blade 25 is not provided. The excavated soil 201 pushed out by the single blade 25 is pushed out to the side of the shaft portion 21 by the excavation blade 23, and is further pushed out to the side by the two rotors 24.

[0038] According to the steel pipe pile 1 of this embodiment, the excavated soil 201 excavated by the single blade 25 is always pushed out to the side where the single blade 25 is not provided, and is not compressed by the rotating single blade 25. This makes it possible to prevent soil lumps from adhering to the single blade 25, and the single blade 25 does not slip. Furthermore, the single blade 25 is eccentric from the rotation center C of the shaft 21, and has a sufficient height that exceeds the excavation blade 23. This allows the single blade 25 to exhibit good penetrating performance into the ground.

[0039] As a result, as shown in Fig. 5, in the process of penetrating the steel pipe pile 1 of this embodiment into the ground, slippage of the single blade 25 does not occur near the boundary where the soft stratum 200 transitions to the hard stratum 300, and the single blade 25 can be satisfactorily inserted into the hard stratum 300. Therefore, according to the steel pipe pile 1 of this embodiment, the penetration performance of the steel pipe pile 1 can be improved, and the time required for construction of the steel pipe pile 1 can be shortened without increasing the pushing force of the steel pipe pile 1.

[0040] 2. Construction method using the steel pipe pile of the first embodiment Next, a construction method using the steel pipe pile 1 of the above-mentioned first embodiment will be described with reference to Figs.

[0041] 2.1 Construction conditions The maximum construction depth of the steel pipe pile 1 is 130d (d = the outer diameter of the steel pipe pile body 10 and shaft portion 21) from the ground surface where the steel pipe pile 1 is constructed. However, if the ground where the steel pipe pile 1 is constructed is clayey, the maximum construction depth is 35m. In addition, the pile foundation using the steel pipe pile 1 can be constructed up to a total floor area of ​​500,000m2. 2 The following buildings:

[0042] 2.2 Ground investigation The ground on which the steel pipe pile 1 is to be constructed is surveyed to confirm whether it is possible to obtain the bearing capacity of the steel pipe pile 1 as designed. The ground survey is conducted in a range of 5Dp (Dp = diameter of a circle when the effective cross-sectional area of ​​the tip 20 is a circle) or more downward from the tip 20 when the steel pipe pile 1 is assumed to be constructed. Based on the results of such ground survey, it is determined whether or not to weld the single blade 25 to the tip 20. When the ground is composed of a relatively soft stratum 200, the steel pipe pile 1 is constructed with the tip 20 provided with only the excavation blade 23 without welding the single blade 25 (i.e., the conventional tip 20 shown in Fig. 20(a) to (c)). On the other hand, when the ground includes a hard stratum 300 such as a clay layer or a gravel layer, the single blade 25 is welded to the excavation blade 23 of the tip 20 at the construction site, and the steel pipe pile 1 is constructed. Alternatively, another steel pipe pile 1 having a single edge 25 at its tip 20 may be prepared in advance, and the other steel pipe pile 1 may be constructed.

[0043] 2.3 Construction machinery A crawler-type or wheel-type construction machine is used for constructing the steel pipe pile 1. FIG. 6 shows a crawler-type construction machine 3. The construction machine 3 includes a rotary drive unit 31, a chucking unit 32, and a vibration prevention unit 33. The rotary drive unit 31 is configured to be movable vertically along the leader. The rotary drive unit 31 includes a motor and a reducer, and rotates the chucking unit 32 with a rotation torque according to the ground. The chucking unit 32 grips the upper end of the steel pipe pile main body 10 constituting the steel pipe pile 1. The chucking unit 32 transmits the rotation torque of the rotary drive unit 31 to the steel pipe pile main body 10. The vibration prevention unit 33 restrains the steel pipe pile main body 10, and limits the horizontal movement of the steel pipe pile 1 while allowing the vertical movement of the steel pipe pile 1. The vibration prevention unit 33 prevents the position of the steel pipe pile 1 from shifting as it is rotated and inserted into the ground.

[0044] 2.4 Structure of steel pipe piles The steel pipe pile 1 to be constructed is composed of one tip portion 20 and three steel pipe pile bodies 10. The three steel pipe pile bodies 10 are rotated and driven into the ground in sequence by the construction machine 3. The steel pipe pile body 10 that is rotated and driven into the ground first is called the "lower pile" and has the tip portion 20. The steel pipe pile body 10 that is rotated and driven into the ground second is called the "middle pile" and is welded to the upper end of the steel pipe pile body 10 that is the lower pile. The steel pipe pile body 10 that is rotated and driven into the ground third is called the "upper pile" and is welded to the upper end of the steel pipe pile body 10 that is the middle pile.

[0045] 2.5 Rotational penetration of the lower pile As shown in Fig. 6, a steel pipe pile main body 10, which is the lower pile, is hoisted up using a winch (not shown) provided on the construction machine 3. The upper end of the steel pipe pile main body 10 is gripped by the chucking portion 32. The lower end of the steel pipe pile main body 10 is restrained by the anti-sway portion 33. The tip portion 20 is positioned below the anti-sway portion 33. The position of the leader of the construction machine 3 is adjusted to align the lower pile with the pile center position.

[0046] As shown in FIG. 7, the rotary drive unit 31 of the construction machine 3 is operated to rotate and penetrate the steel pipe pile main body 10 and tip 20, which are the lower piles, into the ground. Rotary penetration is performed by the propulsive force of the two rotors 24 at the tip 20. If the penetration amount per rotation decreases, a pushing force is applied to the upper end of the steel pipe pile main body 10 to assist the rotary penetration. From the start to the end of rotary penetration, the depth, rotation torque, rotation speed and pressure input of the steel pipe pile main body 10 are managed. The position and verticality of the steel pipe pile main body 10 are always visually confirmed. Rotary penetration is terminated when the steel pipe pile main body 10 reaches a predetermined depth.

[0047] 2.6 Rotational penetration of intermediate pile As shown in Fig. 8, the steel pipe pile main body 10, which is the middle pile, is hoisted using a winch (not shown) provided on the construction machine 3. The upper end of the steel pipe pile main body 10, which is the middle pile, is gripped by the chucking portion 32. The lower end of the steel pipe pile main body 10, which is the middle pile, is welded to the upper end of the steel pipe pile main body 10, which is the lower pile. Note that the joining of the middle pile and the lower pile is not limited to welding, and may be mechanically joined.

[0048] As shown in Figure 9, the rotary drive unit 31 of the construction machine 3 is operated to rotate and penetrate the steel pipe pile main body 10, which is the middle pile, and the steel pipe pile main body 10 and tip portion 20, which are the lower pile, into the ground. As described above, the depth, rotation torque, rotation speed, and press-in force of the two steel pipe pile main bodies 10 are managed from the start to the end of the rotary penetration. The position and verticality of the steel pipe pile main body 10, which is the middle pile, are constantly checked visually. The rotary penetration is terminated when the two steel pipe pile main bodies 10 reach a predetermined depth.

[0049] 2.7 Rotational penetration of the lower pile As shown in Fig. 10, the steel pipe pile main body 10, which is the upper pile, is hoisted using a winch (not shown) provided on the construction machine 3. The upper end of the steel pipe pile main body 10, which is the upper pile, is gripped by the chucking portion 32. The lower end of the steel pipe pile main body 10, which is the upper pile, is welded to the upper end of the steel pipe pile main body 10, which is the middle pile. As above, the joining of the upper pile and the middle pile is not limited to welding, and may be mechanically joined.

[0050] As shown in FIG. 11, the rotary drive unit 31 of the construction machine 3 is operated to rotate and penetrate the steel pipe pile main body 10, which is the upper pile, the steel pipe pile main body 10, which is the middle pile, the steel pipe pile main body 10, which is the lower pile, and the tip portion 20 into the ground. As described above, the depth, rotation torque, rotation speed, and press-in force of the three steel pipe pile main bodies 10 are managed from the start to the end of the rotary penetration. The position and verticality of the steel pipe pile main body 10, which is the upper pile, are always visually confirmed. The rotary penetration is terminated when the three steel pipe pile main bodies 10 reach a predetermined depth. When the rotary penetration is terminated, it is confirmed that the value of the rotation torque is 80% or more of the managed value. With the above, the construction method using the steel pipe pile 1 composed of one tip portion 20 and three steel pipe pile main bodies 10 is completed.

[0051] 3. Changes in the configuration of steel pipe piles The steel pipe pile of the present invention is not limited to the configuration of the steel pipe pile 1 according to the first embodiment described above. For example, the steel pipe pile 1 of the first embodiment is configured with at least one steel pipe pile main body 10 and a tip portion 20, but the steel pipe pile of the present invention is not limited to this configuration. The tip portion 20 may be omitted, and the excavation blade 23 and the rotor 24 may be provided directly on the lower end of the steel pipe pile main body 10. In addition, the bottom plate 22 is not an essential component of the steel pipe pile of the present invention, and may be omitted from the configuration of the steel pipe pile.

[0052] Furthermore, the digging blade 23, the rotor 24 and the single blade 25 are not limited to the shapes shown in Fig. 1(a) to (c). In particular, the single blade 25 may have a width smaller than the outer diameter of the shaft portion 21 and the steel pipe pile main body 10, and may be configured to be eccentric from the center of rotation C of the shaft portion 21 and the steel pipe pile main body 10. The width of the single blade 25 is preferably about 30% to 70% of the outer diameter of the shaft portion 21 and the steel pipe pile main body 10. In addition, the height of the single blade 25 is preferably about 20% of the outer diameter of the shaft portion 21 and the steel pipe pile main body 10.

[0053] 4. Steel pipe pile according to the second embodiment 12(a) and (b) show a steel pipe pile 2 according to a second embodiment of the present invention. The steel pipe pile 2 of the second embodiment includes a steel pipe pile main body 10, a digging blade 23, two rotors 24, and a single blade 25. The digging blade 23 and the two rotors 24 are directly welded to the lower end of the steel pipe pile main body 10. The digging blade 23 is a steel plate having a substantially pentagonal shape and has an obtuse cutting edge. The width of the digging blade 23 exceeds the outer diameter of the steel pipe pile main body 10. Each of the two rotors 24 is a steel plate having a 1 / 4 shape of an oblong, and is inclined in two directions symmetrical to each other. The single blade 25 is a square steel plate and has a width of about 1 / 2 the outer diameter of the steel pipe pile main body 10. The single blade 25 is welded to one side from the center of the digging blade 23, and protrudes downward beyond the cutting edge of the digging blade 23. Note that a bottom plate 22 is not provided at the lower end of the steel pipe pile main body 10. The steel pipe pile 2 of the second embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the above-mentioned first embodiment.

[0054] 5. Steel pipe pile according to the third embodiment 13(a) and (b) show a steel pipe pile 3 according to a third embodiment of the present invention. The steel pipe pile 3 of the third embodiment includes a steel pipe pile main body 10, a bottom plate 22, a digging blade 23, two rotors 24, and a single blade 25. The bottom plate 22, the digging blade 23, and the two rotors 24 are directly welded to the lower end of the steel pipe pile main body 10. The lower end opening of the steel pipe pile main body 10 is closed by the bottom plate 22. The bottom plate 22 is located slightly above the lower end edge of the steel pipe pile main body 10. The digging blade 23 is a steel plate having a substantially pentagonal shape and has an obtuse cutting edge. The width of the digging blade 23 is the same as the inner diameter of the steel pipe pile main body 10 and the outer diameter of the bottom plate 22. Each of the two rotors 24 is a semicircular steel plate and is inclined in two directions symmetrical to each other. The single blade 25 is a rectangular steel plate, and has a width approximately half the inner diameter of the steel pipe pile main body 10 and the outer diameter of the bottom plate 22. The single blade 25 is welded to one side from the center of the digging blade 23, and protrudes downward beyond the cutting edge of the digging blade 23. The steel pipe pile 3 of the third embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the first embodiment described above.

[0055] 6. Steel pipe pile according to the fourth embodiment 14(a) and (b) show a steel pipe pile 4 according to a fourth embodiment of the present invention. The steel pipe pile 4 of the fourth embodiment includes a steel pipe pile main body 10, a bottom plate 22, a drilling blade 23, a spiral rotor 24, and a single blade 25. The bottom plate 22, the drilling blade 23, and the spiral rotor 24 are directly welded to the lower end of the steel pipe pile main body 10. The lower end opening of the steel pipe pile main body 10 is closed by the bottom plate 22. The drilling blade 23 is a substantially pentagonal steel plate and has an obtuse cutting edge. The width of the drilling blade 23 is the same as the inner diameter of the steel pipe pile main body 10. The spiral rotor 24 has a constant width, goes around the outer surface of the steel pipe pile main body 10, and reaches near the lower end of the steel pipe pile main body 10. The single blade 25 is a rectangular steel plate and has a width of about 1 / 2 the outer diameter of the steel pipe pile main body 10. The single blade 25 is welded to one side from the center of the digging blade 23 and protrudes downward beyond the cutting edge of the digging blade 23. The steel pipe pile 4 of the fourth embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the first embodiment described above.

[0056] 7. Steel pipe pile according to the fifth embodiment 15(a) and (b) show a steel pipe pile 5 according to a fifth embodiment of the present invention. The steel pipe pile 5 of the fifth embodiment includes a steel pipe pile main body 10, a bottom plate 22, two digging blades 23, a spiral rotor 24, and a single blade 25. The bottom plate 22, the two digging blades 23, and the spiral rotor 24 are directly welded to the lower end of the steel pipe pile main body 10. The lower end opening of the steel pipe pile main body 10 is closed by the bottom plate 22. Each of the two digging blades 23 is a claw-shaped steel plate that slopes downward toward the center of the steel pipe pile main body 10. The width of each of the two digging blades 23 is slightly smaller than about 1 / 2 the outer diameter of the steel pipe pile main body 10. The spiral rotor 24 has a constant width, goes around the outer surface of the steel pipe pile main body 10, and reaches near the lower end of the steel pipe pile main body 10. The single blade 25 is a square steel plate and has a width of about 1 / 2 the outer diameter of the steel pipe pile main body 10. The single blade 25 is welded to one of the digging blades 23 and protrudes downward beyond the cutting edge of the digging blade 23. The steel pipe pile 5 of the fifth embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the first embodiment described above.

[0057] 8. Steel pipe pile according to the sixth embodiment 16(a) and (b) show a steel pipe pile 6 according to a sixth embodiment of the present invention. The steel pipe pile 6 of the sixth embodiment includes a steel pipe pile main body 10, a bottom plate 22, a drilling blade 23, a spiral rotor 24, and a single blade 25. The bottom plate 22, the drilling blade 23, and the spiral rotor 24 are directly welded to the lower end of the steel pipe pile main body 10. The lower end opening of the steel pipe pile main body 10 is closed by the bottom plate 22. The drilling blade 23 is a substantially pentagonal steel plate and has an obtuse cutting edge. The width of the drilling blade 23 exceeds the outer diameter of the steel pipe pile main body 10. The spiral rotor 24 has a certain width, goes around the outer surface of the steel pipe pile main body 10, and reaches near the lower end of the steel pipe pile main body 10. The single blade 25 is a rectangular steel plate and has a width of about 1 / 2 the outer diameter of the steel pipe pile main body 10. The single blade 25 is welded to one side from the center of the digging blade 23 and protrudes downward beyond the cutting edge of the digging blade 23. The steel pipe pile 6 of the sixth embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the first embodiment described above.

[0058] 9. Steel pipe pile according to the seventh embodiment 17(a) and (b) show a steel pipe pile 7 according to a seventh embodiment of the present invention. The steel pipe pile 7 of the seventh embodiment includes a steel pipe pile main body 10, a bottom plate 22, four digging blades 23, a spiral rotor 24, and a single blade 25. The bottom plate 22, the four digging blades 23, and the spiral rotor 24 are directly welded to the lower end of the steel pipe pile main body 10. The lower end opening of the steel pipe pile main body 10 is closed by the bottom plate 22. Each of the four digging blades 23 is a claw-shaped steel plate that slopes downward toward the outside of the steel pipe pile main body 10. The width of each of the four digging blades 23 is about 1 / 4 of the outer diameter of the steel pipe pile main body 10. Two of the four digging blades 23 are symmetrically arranged on the outer edge of the steel pipe pile main body 10. The other two of the four digging blades 23 are symmetrically arranged in the center of the steel pipe pile main body 10. The spiral rotor 24 has a certain width and goes around the outer surface of the steel pipe pile main body 10, reaching near the lower end of the steel pipe pile main body 10. The single blade 25 is a rectangular steel plate and has a width of about 1 / 2 the outer diameter of the steel pipe pile main body 10. The single blade 25 is welded to one digging blade 23 arranged in the center of the steel pipe pile main body 10, and protrudes downward beyond the cutting edges of each of the four digging blades 23. The steel pipe pile 7 of the seventh embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the first embodiment described above.

[0059] 10. Steel pipe pile according to the eighth embodiment 18(a) and (b) show a steel pipe pile 8 according to an eighth embodiment of the present invention. The steel pipe pile 8 of the eighth embodiment includes a steel pipe pile main body 10, a bottom plate 22, three digging blades 23, two rotors 24, and a single blade 25. The bottom plate 22, the three digging blades 23, and the two rotors 24 are directly welded to the lower end of the steel pipe pile main body 10. The lower end opening of the steel pipe pile main body 10 is closed by the bottom plate 22. The bottom plate 22 is located above the lower end edge of the steel pipe pile main body 10. The first of the three digging blades 23 is a rectangular steel plate extending laterally and having a width equal to the inner diameter of the steel pipe pile main body 10 and a height equal to the length from the bottom plate 22 to the lower end of the steel pipe pile main body 10. The first digging blade 23 is disposed at the center of the steel pipe pile main body 10. The second and third excavation blades 23 of the three are rectangular steel plates extending in the vertical direction having a width of about 1 / 5 of the inner diameter of the steel pipe pile main body 10 and a height about three times that of the first excavation blade 23. The second and third excavation blades 23 are located at both ends of the first excavation blade 23. Each of the two rotors 24 is a semicircular steel plate and inclined in two directions symmetrical to each other. The single blade 25 is a rectangular steel plate and has a width smaller than 1 / 2 of the outer diameter of the steel pipe pile main body 10 and a height greater than the second and third excavation blades 23. The single blade 25 is adjacent to either one of the second and third excavation blades 23 and welded to the first excavation blade 23. The steel pipe pile 8 of the eighth embodiment having such a configuration also has the same effects as the steel pipe pile 1 of the first embodiment described above.

[0060] 11. Steel pipe pile according to the ninth embodiment 19(a) and (b) show a steel pipe pile 9 according to a ninth embodiment of the present invention. The steel pipe pile 9 of the ninth embodiment includes a steel pipe pile main body 10, a spiral rotor 24, and a single blade 25. The rotor 24 is directly welded to the lower end of the steel pipe pile main body 10. The single blade 25 is a rectangular steel plate and has a width of about 1 / 2 the outer diameter of the steel pipe pile main body 10. The single blade 25 is welded to the bottom surface of the spiral rotor 24 so as to be located on one side from the center of rotation of the steel pipe pile main body 10. The steel pipe pile 9 of the ninth embodiment having such a configuration also achieves the same effects as the steel pipe pile 1 of the first embodiment described above. [Explanation of symbols]

[0061] 1~9, 100 steel pipe piles 10 Steel pipe pile body (shaft steel pipe) 20 Tip 21 Shaft 22 Bottom plate 23 Excavation blade (second excavation blade) 23a Excavation blade body 23b Reinforcement part 24 Rotor (wing) 25 Single-edged (first digging blade) 3 Construction machinery 31 Rotation drive unit 32 Chucking section 33 Vibration prevention part

Claims

1. A steel pipe pile having a digging blade protruding downward from the end of a shaft portion made of a steel pipe, which is inserted into the ground by excavating the ground with the digging blade while rotating the shaft portion, A single blade is provided as a first digging blade, The width of the blade is smaller than the outer diameter of the shaft portion, The vertical center axis of the blade is eccentric from the rotation center of the shaft portion, This steel pipe pile is characterized in that the single blade excavates the ground asymmetrically during one rotation of the shaft, and pushes the excavated soil produced by the excavation to the side directly below the shaft where the single blade is not provided.

2. The steel pipe pile according to claim 1, wherein the width of the single edge is approximately 30% to 70% of the outer diameter of the shaft portion.

3. The steel pipe pile according to claim 1 , wherein the height of the one edge is equal to or greater than about 20% of the outer diameter of the shaft portion.

4. In addition to the single blade, a second digging blade composed of at least one part is provided, The second digging blade is arranged symmetrically with respect to the rotation center of the shaft portion, The height of the second digging blade is equal to or less than the height of the single blade, The one blade is coupled to at least one component constituting the second digging blade, The second excavation blade symmetrically excavates the ground excavated asymmetrically by the single blade. The steel pipe pile according to claim 1.

5. 2. The steel pipe pile according to claim 1, wherein the end of the shaft portion is provided with at least one wing that protrudes outward beyond the side surface of the shaft portion, the wing pushing the excavated soil outwardly of the shaft portion.

6. The steel pipe pile according to claim 5 , wherein the wing is composed of at least one plate-shaped member that is curved in a spiral shape.

7. The steel pipe pile according to claim 5 , wherein the wings are formed of two plate-like members arranged at an angle so as to intersect with each other when the shaft portion is viewed from the side.

8. The steel pipe pile according to claim 6, wherein the steel pipe pile is composed of the shaft portion and a cylindrical tip portion connected to the end of the shaft portion, the single blade is provided at the lower end of the tip portion, and the wing is provided on the side of the tip portion.

9. The steel pipe pile according to claim 7, wherein the steel pipe pile is composed of the shaft portion and a cylindrical tip portion connected to the end of the shaft portion, the single blade is provided at the lower end of the tip portion, and the wing is provided on the side of the tip portion.

10. The steel pipe pile according to claim 8 , wherein the tip portion, the single edge, and the wing are integrally formed by casting.

11. The steel pipe pile according to claim 9 , wherein the tip portion, the single edge, and the wing are integrally formed by casting.

12. A construction method using a steel pipe pile according to any one of claims 1 to 11, A first step of hanging the steel pipe pile at a predetermined position on the ground by a construction machine, aligning the steel pipe pile to a pile center position, and restraining the steel pipe pile; A second step of rotating the steel pipe pile by the construction machine and rotating and penetrating the steel pipe pile into the ground; A third step of terminating the rotational penetration of the steel pipe pile when the steel pipe pile reaches a predetermined depth and satisfies a predetermined condition; A construction method comprising:

13. The construction method according to claim 12, wherein in the second step, when a penetration amount per rotation of the steel pipe pile decreases, a pushing force is applied to the steel pipe pile to assist the rotational penetration.

14. 13. The construction method according to claim 12, wherein in the second step, a second shaft portion is suspended above the shaft portion by the construction machine, the second shaft portion is joined to the shaft portion, and the steel pipe pile is then rotated and driven into the ground.

Citation Information

Patent Citations

  • CRT hard copying machine

    JP1978054410A