Adjustment force setting device, adjustment force setting method, and adjustment force setting program
The adjustment force setting device addresses prediction errors in electricity demand and solar power generation by calculating and setting adjustment forces based on standard deviations, ensuring balanced electricity supply and demand through precise power generation and non-generation period adjustments.
Patent Information
- Application Number
- JP2023080187
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-15
- Publication Date
- 2024-11-27
- Estimated Expiration
- 2043-05-15
AI Technical Summary
Retail electricity utilities and registered specified electricity transmission and distribution utilities face challenges in adjusting to prediction errors in electricity demand and solar power generation under the planned value simultaneous consumption system, necessitating the ability to set necessary adjustment power to maintain local electricity supply and demand balance.
An adjustment force setting device and method that utilize standard deviations from power demand and generation prediction models to calculate and set adjustment forces for specific time periods, incorporating power generation and non-generation periods, using a control unit to output these forces for each time zone.
Enables precise setting of necessary adjustment power to absorb prediction errors, ensuring accurate balance between electricity demand and supply by accounting for forecast uncertainties in power generation and demand.
Smart Images

Figure 2024164590000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a regulation power setting device, a regulation power setting method, and a regulation power setting program. [Background technology]
[0002] Patent Document 1 discloses a supply and demand control device that controls the supply and demand of electricity in a system to which an internal combustion power generation device, a renewable energy power generation device, a power storage device, and a load are connected.
[0003] Patent Document 2 discloses a supply and demand balance control device that creates a supply plan for a predetermined period. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2016-093049 A [Patent Document 2] JP 2012-060789 A Summary of the Invention [Problem to be solved by the invention]
[0005] Electricity retailers and registered specified electricity transmission and distribution businesses must comply with the Planned Value Simultaneous Balancing System to avoid disrupting the electricity supply and demand in the region. The Planned Value Simultaneous Balancing System requires the submission of facility operation plans within the jurisdiction to OCCTO, or to the representative contractor if joining a balancing group. "OCCTO" is the abbreviation for Organization for Cross-regional Coordination of Transmission Operators. Facility operation plans are created in the following steps: (i) forecasting electricity demand and solar power generation, and (ii) creating a facility operation plan that can cover the shortage in (i) and minimize costs.
[0006] The facility operation plan must ensure that there is enough capacity to absorb the forecast error caused by (i).
[0007] The objective of this disclosure is to set the necessary adjustment capacity for absorbing forecast errors during the planning period. [Means for solving the problem]
[0008] The adjustment power setting device according to the present disclosure comprises: The control unit is provided with: for a first prediction model used to predict power demand in a plurality of time periods, a first standard deviation is obtained as the standard deviation of the power demand forecast values for each time period; for a second prediction model used to predict power generation in the plurality of time periods, a second standard deviation is obtained as the standard deviation of the power generation forecast values for each time period; for a time period among the plurality of time periods where power generation occurs, set an adjustment capacity using the first standard deviation and the second standard deviation; for a time period among the plurality of time periods where no power generation occurs, set an adjustment capacity using the first standard deviation; and output a setting value of the adjustment capacity for each time period.
[0009] The adjustment capability setting method according to the present disclosure includes the steps of: acquiring, by a control unit, a standard deviation of the power demand forecast value for each time period as a first standard deviation for a first forecast model used for forecasting power demand in a plurality of time periods; acquiring, by the control unit, a standard deviation of a power generation amount prediction value for each time period for a second prediction model used for predicting the power generation amount in the plurality of time periods as a second standard deviation; setting an adjustment capability by the control unit using the first standard deviation and the second standard deviation for a time period in which power generation is present among the plurality of time periods; setting an adjustment capability by the control unit using the first standard deviation for a time period in which no power generation is performed among the plurality of time periods; outputting a set value of adjustment power for each time period by the control unit; Includes.
[0010] The adjustment capacity setting program according to the present disclosure includes: acquiring a standard deviation of the power demand forecast value for each time period as a first standard deviation for a first forecasting model used for forecasting power demand in a plurality of time periods; acquiring a standard deviation of the power generation amount prediction value for each time period as a second standard deviation for a second prediction model used for predicting the power generation amount in the plurality of time periods; setting an adjustment capability using the first standard deviation and the second standard deviation for a time period in which power generation is present among the plurality of time periods; setting an adjustment capability using the first standard deviation for a time period in which no power generation is generated among the plurality of time periods; Outputting the adjustment power setting value for each time period The method causes a computer to perform operations including: Effect of the Invention
[0011] According to the present disclosure, it is possible to set the necessary adjustment capacity for absorbing forecast errors during the planning period. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a block diagram showing a configuration of an adjustment power setting device according to an embodiment of the present disclosure. [Diagram 2] 1 is a graph showing an example of the required adjustment capacity for absorbing forecast errors during a planning period. [Diagram 3] 4 is a flowchart showing an operation of the adjustment power setting device according to the embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings.
[0014] In each drawing, the same or corresponding parts are denoted by the same reference numerals. In the description of this embodiment, the description of the same or corresponding parts will be omitted or simplified as appropriate.
[0015] The present embodiment will be outlined with reference to FIG. 1 and FIG.
[0016] The adjustment power setting device 10 is a general-purpose computer such as a PC, a server computer such as a cloud server, or a dedicated computer used or operated by an electric utility such as a retail electric utility or a registered specified electric utility. "PC" is an abbreviation for personal computer.
[0017] The adjustment capability setting device 10 acquires, as a first standard deviation, the standard deviation of the power demand forecast values for each time period for a first prediction model used to predict power demand in the multiple time periods P. The adjustment capability setting device 10 acquires, as a second standard deviation, the standard deviation of the power generation forecast values for each time period for a second prediction model used to predict power generation in the multiple time periods P. The multiple time periods P correspond to a planning period. The length of the planning period is, for example, 24 hours or 72 hours. Each time period Ti included in the multiple time periods P corresponds to each frame of the planning period. The length of one frame is, for example, 30 minutes.
[0018] The adjustment capability setting device 10 sets an adjustment capability Ax for a time period Tx in which power is generated among the multiple time periods P, using the first standard deviation and the second standard deviation. "Adjustment capability" refers to the capacity of power generation facilities (including pumped storage power generation facilities), power storage facilities, DR and other systems that control power supply and demand, and other similar facilities (excluding distribution facilities) that are required for frequency control, supply and demand balance adjustment, and other system stabilization operations in a supply area. "DR" is an abbreviation for demand response. The adjustment capability setting device 10 sets an adjustment capability Ay for a time period Ty in which no power is generated among the multiple time periods P, using the first standard deviation. The adjustment capability setting device 10 outputs a setting value of adjustment capability Ai for each time period. The setting value of adjustment capability Ai for each time period includes a setting value of adjustment capability Ax for a time period Tx in which power is generated among the multiple time periods P, and includes a setting value of adjustment capability Ay for a time period Ty in which no power is generated among the multiple time periods P.
[0019] According to this embodiment, it is possible to set the required adjustment capability 20 for absorbing the forecast error in the planning period, as shown in Fig. 2. The required adjustment capability 20 for absorbing the forecast error in the planning period includes the required adjustment capability 21 for absorbing the demand forecast error and the required adjustment capability 22 for absorbing the power generation forecast error. The unit is kW.
[0020] In this embodiment, the second prediction model is a statistical model used to predict the amount of power generated by a solar panel. That is, the second prediction model is used to predict the amount of solar power generated in a plurality of time slots P. Therefore, the sunshine time slots correspond to the time slots Tx where power is generated, and the non-sunshine time slots correspond to the time slots Ty where no power is generated. That is, the adjustment capability setting device 10 sets the adjustment capability Ax for the sunshine time slots among the plurality of time slots P using the first and second standard deviations, and sets the adjustment capability Ay for the non-sunshine time slots among the plurality of time slots P using the first standard deviation.
[0021] 2, the planning period is 24 hours from midnight to midnight. Therefore, each frame included in the time range R1 from sunrise to sunset corresponds to a time slot Tx with power generation, and each frame included in the time range R2 from midnight to sunrise and from sunset to midnight corresponds to a time slot Ty with no power generation. For the time range R2 where no power generation is generated, the adjustment capability setting device 10 sets the power generation prediction error to 0, and calculates the adjustment capability using the standard deviation calculated from the prediction by the statistical model.
[0022] As a modified example of this embodiment, the second prediction model may be a statistical model used to predict the amount of power generation of other types of power generation facilities in which the presence or absence of power generation depends on the time of day, similar to a solar panel.
[0023] The configuration of an adjustment power setting device 10 according to this embodiment will be described with reference to FIG.
[0024] The adjustment power setting device 10 includes a control unit 11, a storage unit 12, a communication unit 13, an input unit 14, and an output unit 15.
[0025] The control unit 11 includes at least one processor, at least one programmable circuit, at least one dedicated circuit, or any combination thereof. The processor is a general-purpose processor such as a CPU or GPU, or a dedicated processor specialized for a specific process. "CPU" is an abbreviation for central processing unit. "GPU" is an abbreviation for graphics processing unit. The programmable circuit is, for example, an FPGA. "FPGA" is an abbreviation for field-programmable gate array. The dedicated circuit is, for example, an ASIC. "ASIC" is an abbreviation for application specific integrated circuit. The control unit 11 executes processes related to the operation of the adjustment capacity setting device 10 while controlling each part of the adjustment capacity setting device 10.
[0026] The storage unit 12 includes at least one semiconductor memory, at least one magnetic memory, at least one optical memory, or any combination thereof. The semiconductor memory is, for example, a RAM, a ROM, or a flash memory. "RAM" is an abbreviation for random access memory. "ROM" is an abbreviation for read only memory. The RAM is, for example, an SRAM or a DRAM. "SRAM" is an abbreviation for static random access memory. "DRAM" is an abbreviation for dynamic random access memory. The ROM is, for example, an EEPROM. "EEPROM" is an abbreviation for electrically erasable programmable read only memory. The flash memory is, for example, an SSD. "SSD" is an abbreviation for solid-state drive. The magnetic memory is, for example, an HDD. "HDD" is an abbreviation for hard disk drive. The storage unit 12 functions, for example, as a main storage device, an auxiliary storage device, or a cache memory. The storage unit 12 stores information used in the operation of the adjustment force setting device 10 and information obtained by the operation of the adjustment force setting device 10.
[0027] The communication unit 13 includes at least one communication module. The communication module is, for example, a module compatible with a wired LAN communication standard such as Ethernet (registered trademark) or a wireless LAN communication standard such as IEEE802.11. "LAN" is an abbreviation for local area network. "IEEE" is an abbreviation for Institute of Electrical and Electronics Engineers. The communication unit 13 receives information used in the operation of the adjustment power setting device 10, and transmits information obtained by the operation of the adjustment power setting device 10.
[0028] The input unit 14 is, for example, a physical key, a capacitive key, a pointing device, a touch screen integral with a display, a camera, or a microphone. The input unit 14 accepts an operation to input information used for the operation of the adjustment force setting device 10. The input unit 14 may be connected to the adjustment force setting device 10 as an external input device instead of being provided in the adjustment force setting device 10. As a connection interface, an interface compatible with a standard such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used. "USB" is an abbreviation for Universal Serial Bus. "HDMI (registered trademark)" is an abbreviation for High-Definition Multimedia Interface.
[0029] The output unit 15 is, for example, a display, a speaker, or a printer. The display is, for example, an LCD or an organic EL display. "LCD" is an abbreviation for liquid crystal display. "EL" is an abbreviation for electro luminescent. The output unit 15 outputs information obtained by the operation of the adjustment force setting device 10. The output unit 15 may be connected to the adjustment force setting device 10 as an external output device instead of being provided in the adjustment force setting device 10. As a connection interface, an interface compatible with standards such as USB, HDMI (registered trademark), or Bluetooth (registered trademark) can be used.
[0030] The functions of the adjustment force setting device 10 are realized by executing an adjustment force setting program according to this embodiment on a processor serving as the control unit 11. That is, the functions of the adjustment force setting device 10 are realized by software. The adjustment force setting program causes a computer to execute the operations of the adjustment force setting device 10, thereby causing the computer to function as the adjustment force setting device 10. That is, the computer functions as the adjustment force setting device 10 by executing the operations of the adjustment force setting device 10 in accordance with the adjustment force setting program.
[0031] The program may be stored in a non-transitory computer-readable medium. Examples of the non-transitory computer-readable medium include a flash memory, a magnetic recording device, an optical disk, a magneto-optical recording medium, or a ROM. The program may be distributed, for example, by selling, transferring, or lending a portable medium such as an SD card, DVD, or CD-ROM on which the program is stored. "SD" is an abbreviation for Secure Digital. "DVD" is an abbreviation for digital versatile disc. "CD-ROM" is an abbreviation for compact disc read only memory. The program may be distributed by storing the program in the storage of a server and transferring the program from the server to another computer. The program may be provided as a program product.
[0032] A computer temporarily stores in a main storage device, for example, a program stored in a portable medium or a program transferred from a server. Then, the computer reads the program stored in the main storage device with a processor, and executes processing according to the read program with the processor. The computer may read the program directly from a portable medium and execute processing according to the program. The computer may execute processing according to the received program each time a program is transferred from the server to the computer. Processing may be executed by a so-called ASP-type service that realizes functions only by execution instructions and result acquisition without transferring a program from the server to the computer. "ASP" is an abbreviation for application service provider. A program is information used for processing by a computer, and includes those equivalent to a program. For example, data that is not a direct command to a computer but has the property of defining computer processing falls under "those equivalent to a program."
[0033] A part or all of the functions of the adjustment force setting device 10 may be realized by a programmable circuit or a dedicated circuit as the control unit 11. In other words, a part or all of the functions of the adjustment force setting device 10 may be realized by hardware.
[0034] The operation of the adjustment capability setting device 10 according to this embodiment will be described with reference to Fig. 3. The operation shown in Fig. 3 corresponds to the adjustment capability setting method according to this embodiment.
[0035] The processing from step S1 to step S5 is executed for each frame of the planning period, that is, for each time slot Ti included in the multiple time slots P.
[0036] In step S1, the control unit 11 acquires the standard deviation of the power demand forecast value for the time slot Ti as the first standard deviation for the first forecast model. For example, the control unit 11 receives information about the first standard deviation from the manager's terminal device or an external server device via the communication unit 13. Alternatively, the control unit 11 may directly accept input of the information about the first standard deviation from the manager via the input unit 14.
[0037] The first prediction model is a machine learning model that takes, for example, an operator input value, calendar data, weather forecast data, actual measurement data, people flow data, or any combination thereof as input, and outputs a predicted value of power demand. The calendar data includes a day of the week, an operating day flag for considering holidays, or any combination thereof. The weather forecast data includes a temperature prediction for predicting air conditioning demand, a humidity prediction for considering whether it is fine or rainy, a solar radiation prediction for predicting air conditioning demand, or any combination thereof. The actual measurement data includes a demand record, a temperature record for predicting air conditioning demand, a humidity record for considering whether it is fine or rainy, a solar radiation record for predicting air conditioning demand, or any combination thereof. The people flow data includes a prediction of population distribution in a city, a prediction of individual behavior, or any combination thereof. Wind speed, wind direction, or any combination thereof may be further input to consider the sensible temperature or to predict air conditioning demand. A date may be further input to consider a people flow or logistics event. For example, the first prediction model may be constructed to predict small demand due to an increase in the number of travelers during long holidays, large demand due to increased logistics during Christmas, or changes in demand due to changes in factory operation modes depending on the season.
[0038] In step S2, the control unit 11 determines whether power generation occurs during time period Ti. In the example shown in Fig. 2, the control unit 11 determines whether the frame corresponding to time period Ti is included in time range R1 or time range R2.
[0039] If the frame corresponding to time period Ti is included in time range R1, i.e., if there is power generation during time period Ti, the process of step S3 is executed. If the frame corresponding to time period Ti is included in time range R2, i.e., if there is no power generation during time period Ti, the process of step S5 is executed.
[0040] In step S3, the control unit 11 acquires the standard deviation of the power generation amount prediction value for the time slot Ti as the second standard deviation for the second prediction model. For example, the control unit 11 receives information about the second standard deviation from the manager's terminal device or an external server device via the communication unit 13. Alternatively, the control unit 11 may directly accept input of information about the second standard deviation from the manager via the input unit 14. After step S3, the process of step S4 is executed.
[0041] The second prediction model is a machine learning model that takes, for example, an operator input value, weather forecast data, actual measurement data, or any combination thereof as input, and outputs a predicted value of PV power generation. "PV" is an abbreviation of photovoltaic. The weather forecast data includes a prediction of solar radiation to consider the rate of decline due to clouds or the atmosphere, a prediction of aerosol amount to consider the transmittance of sunlight, a prediction of cloud amount to consider the rate of shading of sunlight, or any combination thereof. The actual measurement data includes a record of cloud amount to improve the accuracy of the prediction of cloud amount, a record of PV power generation to improve the accuracy of the prediction of aerosol or cloud amount, a panel conversion efficiency, the number of days since installation to consider the rate of decline in efficiency due to aging, a panel surface temperature to consider the rate of decline in efficiency due to surface temperature, a power conditioner conversion efficiency, or any combination thereof. A geometrical solar radiation to consider the celestial position relationship or the installation angle of the PV panel, a decline rate due to the shadow of a building, a decline rate due to the installation direction and angle of the panel, or any combination thereof may be further input.
[0042] In step S4, the control unit 11 sets the adjustment power Ai for the time period Ti using the first standard deviation acquired in step S1 and the second standard deviation acquired in step S3. For example, when σdemand is the first standard deviation, σPV is the second standard deviation, and α and β are coefficients, the control unit 11 calculates the required adjustment power as α×σdemand+β×σPV. The units of σdemand and σPV are kW. α and β are adjusted appropriately.
[0043] In step S5, the control unit 11 sets the adjustment power Ai for the time period Ti using only the first standard deviation acquired in step S1. For example, the control unit 11 calculates α×σdemand as the required adjustment power. σdemand, α, and β are the same as in step S4. It may be considered that σPV=0.
[0044] When the processes from step S1 to step S5 are executed for a plurality of time slots P, in step S6, the control unit 11 outputs the set value of the adjustment power Ai for each time slot. For example, the control unit 11 transmits the set value of the adjustment power Ai for each time slot to the manager's terminal device or an external server device via the communication unit 13. Alternatively, the control unit 11 may directly output the set value of the adjustment power Ai for each time slot to the manager via the output unit 15. After step S6, the operation shown in FIG. 3 ends.
[0045] In this embodiment, during time periods when no PV power generation is generated, the PV power generation prediction value = 0, and therefore the prediction error of the PV power generation = 0. Furthermore, since predictions are made using a statistical model, the standard deviation can be calculated. Therefore, by taking care to reduce the adjustment power in sections where there is confidence, it is possible to calculate the necessary adjustment power 20 for absorbing the prediction error during the planning period as precisely as possible.
[0046] The present disclosure is not limited to the above-mentioned embodiment. For example, two or more blocks shown in the block diagram may be integrated, or one block may be divided. Instead of executing two or more steps shown in the flowchart in chronological order as described, they may be executed in parallel or in a different order depending on the processing capacity of the device executing each step, or as necessary. Other modifications are possible without departing from the spirit of the present disclosure. [Explanation of symbols]
[0047] 10 Adjustment force setting device 11 Control section 12 Storage section 13. Communications Department 14 Input section 15 Output section 20,21,22 Necessary adjustment force
Claims
1. an adjustment capability setting device comprising: a control unit that acquires, for a first prediction model used to predict power demand in a plurality of time periods, a standard deviation of power demand forecast values for each time period as a first standard deviation; acquires, for a second prediction model used to predict power generation in the plurality of time periods, a standard deviation of power generation forecast values for each time period as a second standard deviation; sets adjustment capability for time periods among the plurality of time periods when power generation occurs using the first and second standard deviations; sets adjustment capability for time periods among the plurality of time periods when no power generation occurs using the first standard deviation; and outputs a setting value of adjustment capability for each time period.
2. The second prediction model is used to predict the amount of solar power generation in the plurality of time periods; 2. The adjustment capability setting device according to claim 1, wherein the control unit sets an adjustment capability for sunshine time periods among the plurality of time periods using the first standard deviation and the second standard deviation, and sets an adjustment capability for non-sunshine time periods among the plurality of time periods using the first standard deviation.
3. acquiring, by a control unit, a standard deviation of a power demand forecast value for each time period for a first forecast model used for forecasting power demands in a plurality of time periods as a first standard deviation; acquiring, by the control unit, a standard deviation of a power generation amount prediction value for each time period for a second prediction model used for predicting the power generation amount in the plurality of time periods as a second standard deviation; setting an adjustment capability by the control unit using the first standard deviation and the second standard deviation for a time period in which power generation is present among the plurality of time periods; setting an adjustment capability by the control unit using the first standard deviation for a time period in which no power generation is performed among the plurality of time periods; outputting a set value of adjustment power for each time period by the control unit; A method for setting adjustment power, including:
4. The second prediction model is used to predict the amount of solar power generation in the plurality of time periods; Among the plurality of time periods, a time period during which power is generated is a sunshine time period, The method for setting adjustment capability according to claim 3 , wherein among the plurality of time periods, a time period during which no power is generated is a time period during which no sunlight is shining.
5. acquiring a standard deviation of the power demand forecast value for each time period as a first standard deviation for a first forecasting model used for forecasting power demands in a plurality of time periods; acquiring a standard deviation of a power generation amount prediction value for each time period as a second standard deviation for a second prediction model used for predicting the power generation amount in the plurality of time periods; setting an adjustment capability for a time period in which power generation is present among the plurality of time periods, using the first standard deviation and the second standard deviation; setting an adjustment capability using the first standard deviation for a time period in which no power generation is performed among the plurality of time periods; Outputting the adjustment power setting value for each time period An adjustment power setting program that causes a computer to execute an operation including the steps of:
Citation Information
Patent Citations
Supply-demand balance control device
JP2012060789A
Power generation plan determination system, power generation plan determination method, and program
JP2020065368A
Adjustment force delivery device and adjustment force delivery method
JP2021027658A
Supply / demand adjustment support device, supply / demand adjustment support method, and supply / demand adjustment support program
JP2023062936A
Regulated power procurement device and regulated power procurement method
WO2021024554A1