Battery charger
The charger design reduces costs by using a control unit to estimate charging power and control phase shift, eliminating the need for a current sensor, thereby enhancing charging power accuracy and control.
Patent Information
- Application Number
- JP2023081755
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-17
- Publication Date
- 2024-11-28
- Estimated Expiration
- 2043-05-17
AI Technical Summary
The high manufacturing costs of chargers are attributed to the need for multiple current and voltage sensors, which increase the overall cost.
A charger design that utilizes a bridge circuit with switching elements on both primary and secondary sides of a transformer, along with a control unit to calculate current and voltage inputs, estimates charging power, and controls phase shift to match target power without needing a current sensor for the DAB circuit.
This design reduces manufacturing costs by eliminating the need for a current sensor, while improving charging power estimation accuracy and control performance.
Smart Images

Figure 2024165500000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a charger. [Background technology]
[0002] There is a charger that converts AC power output from a system power supply into DC power using an AC / DC conversion circuit and a capacitor, and then converts the DC power into target power using a DAB (Dual Active Bridge) circuit to supply the target power to a battery.
[0003] The charger also includes a current sensor that detects a current input to an ACDC conversion circuit to convert AC power to DC power, a voltage sensor that detects a voltage input to the ACDC conversion circuit, and a voltage sensor that detects a voltage across a capacitor.The charger also includes a current sensor that detects a current output from the DAB circuit and a voltage sensor that detects a voltage output from the DAB circuit to match the charging power supplied to the battery from the DAB circuit with a target power.
[0004] As described above, the charger needs to include multiple current sensors and multiple voltage sensors, which may increase manufacturing costs. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2022-110235 A Summary of the Invention [Problem to be solved by the invention]
[0006] An object according to one aspect of the present invention is to reduce the manufacturing costs of a charger. [Means for solving the problem]
[0007] A charger according to one embodiment of the present invention includes a plurality of first switching elements that form a bridge circuit on the primary side of a transformer and a plurality of second switching elements that form a bridge circuit on the secondary side of the transformer, and is equipped with a DAB circuit that supplies charging power to a battery according to a phase difference between a first drive signal that drives the plurality of first switching elements and a second drive signal that drives the plurality of second switching elements, a capacitor, an ACDC conversion circuit that converts input AC power to DC power and outputs the DC power to the DAB circuit via the capacitor, a current sensor that detects the current input to the ACDC conversion circuit, a first voltage sensor that detects the voltage input to the ACDC conversion circuit, a second voltage sensor that detects the voltage across the capacitor, a third voltage sensor that detects the voltage of the battery, and a control unit that controls the operation of the ACDC conversion circuit and outputs the first and second drive signals to the first and second switching elements.
[0008] The control unit controls the phase shift amount of the second drive signal so that an estimated charging power obtained by subtracting a loss estimated based on the current detected by the current sensor and the voltages detected by the first to third voltage sensors from the input power determined by the current detected by the current sensor and the voltage detected by the first voltage sensor matches a target power.
[0009] This eliminates the need for a current sensor in the charger to detect the current output from the DAB circuit in order to determine the charging power supplied from the DAB circuit to the battery, thereby reducing the manufacturing costs of the charger.
[0010] The control unit may be configured to obtain the estimated loss based on the current detected by the current sensor, the voltages detected by the first to third voltage sensors, and a temperature of the charger.
[0011] This allows the accuracy of estimating losses to be improved compared to when estimating losses without using the temperature of the charger, thereby improving the accuracy of estimating the estimated charging power and improving the control performance during the charging process. Effect of the Invention
[0012] According to the present invention, the manufacturing costs of the charger can be reduced. [Brief description of the drawings]
[0013] [Figure 1] FIG. 2 is a diagram illustrating an example of a charger according to an embodiment. [Diagram 2] 4 is a flowchart showing the operation of a control unit. [Diagram 3] 11 is a diagram showing the correspondence relationship between the phase difference of drive signals S9 to S12 with respect to drive signals S5 to S8 and charging power Pc. [Figure 4] FIG. 4 is a diagram showing an example of drive signals S5 to S12. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, the embodiments will be described in detail with reference to the drawings.
[0015] FIG. 1 is a diagram illustrating an example of a charger according to an embodiment.
[0016] Charger 1 shown in Fig. 1 includes an ACDC conversion circuit 2, a DAB circuit 3, a capacitor Cc, a current sensor Si, a voltage sensor Sv1 (first voltage sensor), a voltage sensor Sv2 (second voltage sensor), a voltage sensor Sv3 (third voltage sensor), and a control unit 4. For example, charger 1 is mounted on a vehicle such as an electric vehicle or a plug-in hybrid vehicle, and converts AC power output from a system power supply P via a charging station or the like into DC power and supplies the DC power to battery B. Charger 1 also converts DC power output from battery B into AC power and supplies the AC power to system power supply P. Battery B is composed of a lithium ion secondary battery or the like, and supplies power to a load such as a driving motor mounted on the vehicle.
[0017] The AC / DC conversion circuit 2 is a so-called interleaved PFC (Power Factor Correction) circuit, and includes an inductor L and switching elements Q1 to Q4. Each of the switching elements Q1 to Q4 is, for example, configured with an IGBT (Insulated Gate Bipolar Transistor) and a diode connected in parallel to the IGBT.
[0018] One terminal of the inductor L is connected to one terminal of the power supply system P via the voltage sensor Sv1 and the current sensor Si, and the other terminal of the inductor L is connected to the connection point between the emitter terminal of the switching element Q1 and the collector terminal of the switching element Q2. The other terminal of the power supply system P is connected to the connection point between the emitter terminal of the switching element Q3 and the collector terminal of the switching element Q4. The collector terminals of the switching elements Q1 and Q3 are connected to one terminal of the capacitor Cc, and the emitter terminals of the switching elements Q2 and Q4 are connected to the other terminal of the capacitor Cc.
[0019] The DAB circuit 3 includes a transformer T, switching elements Q5 to Q8 (first switching elements) that configure a bridge circuit on the primary side of the transformer T, switching elements Q9 to Q12 (second switching elements) that configure a bridge circuit on the secondary side of the transformer T, and a capacitor C. Note that the switching elements Q5 to Q12 are each formed of, for example, a MOSFET (Metal Oxide Semiconductor Field-Effect Transistor).
[0020] The drain terminals of the switching elements Q5 and Q7 are connected to one terminal of the capacitor Cc, and the source terminals of the switching elements Q6 and Q8 are connected to the other terminal of the capacitor Cc. The connection point between the source terminal of the switching element Q5 and the drain terminal of the switching element Q6 is connected to one terminal of the primary coil L1 of the transformer T, and the connection point between the source terminal of the switching element Q7 and the drain terminal of the switching element Q8 is connected to the other terminal of the primary coil L1. The drain terminals of the switching elements Q9 and Q11 are connected to one terminal of the capacitor C, and the source terminals of the switching elements Q10 and Q12 are connected to the other terminal of the capacitor C. The connection point between the source terminal of the switching element Q9 and the drain terminal of the switching element Q10 is connected to one terminal of the secondary coil L2 of the transformer T, and the connection point between the source terminal of the switching element Q11 and the drain terminal of the switching element Q12 is connected to the other terminal of the secondary coil L2.
[0021] The capacitor Cc is connected between the ACDC conversion circuit 2 and the DAB circuit 3 .
[0022] The current sensor Si is composed of a Hall element, a shunt resistor, etc., and detects the current I output from the power supply system P to the ACDC conversion circuit 2 or the current I output from the ACDC conversion circuit 2 to the power supply system P, and sends the detected current I to the control unit 4.
[0023] The voltage sensor Sv1 is composed of a voltage dividing resistor or the like, and detects the voltage V1 output from the system power supply P to the ACDC conversion circuit 2 or the voltage V1 output from the ACDC conversion circuit 2 to the system power supply P, and sends the detected voltage V1 to the control unit 4.
[0024] The voltage sensor Sv2 is configured with a voltage dividing resistor and the like, detects a voltage V2 applied to the capacitor Cc, and sends the detected voltage V2 to the control unit 4.
[0025] The voltage sensor Sv3 is configured with a voltage dividing resistor and the like, detects the voltage V3 of the battery B, and sends the detected voltage V3 to the control unit 4.
[0026] The control unit 4 is configured with a processor or a programmable device (such as an FPGA (Field Programmable Gate Array) or a PLD (Programmable Logic Device)), and controls the operation of the ACDC conversion circuit 2 and the DAB circuit 3. The operation of the ACDC conversion circuit 2 may be controlled by a control unit other than the control unit 4. In this case, the control unit 4 controls the operation of the DAB circuit 3 in cooperation with the other control unit.
[0027] When a charging command for charging the battery B is input from the outside (such as a charging station) to start the charging process, the control unit 4 controls the operation of each of the ACDC conversion circuit 2 and the DAB circuit 3 so that the AC power output from the system power supply P is converted into DC power and supplied to the battery B. In addition, when a discharging command for supplying the power stored in the battery B to the system power supply P is input from the outside to start the discharging process, the control unit 4 controls the operation of each of the ACDC conversion circuit 2 and the DAB circuit 3 so that the DC power output from the battery B is converted into AC power and supplied to the system power supply P.
[0028] For example, during charging, the control unit 4 uses the current I detected by the current sensor Si, the voltage V1 detected by the voltage sensor Sv1, and the voltage V2 detected by the voltage sensor Sv2 to control the driving of the switching elements Q1 to Q4 so that the waveform of the AC current output from the system power source P to the ACDC conversion circuit 2 approaches a sine wave and the phase between the AC current output from the system power source P to the ACDC conversion circuit 2 and the AC voltage output from the system power source P to the ACDC conversion circuit 2 becomes zero, that is, the power factor approaches 1. As a result, the rectified power with the power factor improved by the ACDC conversion circuit 2 is supplied to the capacitor Cc. Then, the capacitor Cc smoothes the power rectified by the ACDC conversion circuit 2. That is, during charging, the AC power output from the system power source P is converted to DC power by the ACDC conversion circuit 2 and the capacitor Cc and supplied to the DAB circuit 3.
[0029] During charging, the control unit 4 controls the driving of the switching elements Q5-Q8 by the driving signals S5-S8 (first driving signals) and controls the driving of the switching elements Q5-Q12 by the driving signals S9-S12 (second driving signals) so that the charging power Pc supplied from the DAB circuit 3 to the battery B follows the target power Pt. The target power Pt is set based on, for example, the voltage of the battery B when the constant current charging control is switched to the constant voltage charging control and the current flowing to the battery B when the constant voltage charging control is terminated. The duty ratios of the driving signals S5-S12 are each 50[%]. The driving signals S5 and S8 are the same as each other, the driving signals S6 and S7 are the same as each other, the driving signals S9 and S12 are the same as each other, and the driving signals S10 and S11 are the same as each other. The phases of the drive signals S5, S8 and S6, S7 are different from each other by 180°, and the phases of the drive signals S9, S12 and S10, S11 are different from each other by 180°. Dead times are provided at the rising and falling timings of the drive signals S5, S6, the rising and falling timings of the drive signals S7, S8, the rising and falling timings of the drive signals S9, S10, and the rising and falling timings of the drive signals S11, S12.
[0030] Fig. 2 is a flowchart showing the operation of the control unit 4 during charging processing. Note that the flowchart shown in Fig. 2 is executed at every control period (e.g., 20 [ms]) corresponding to the frequency (e.g., 50 Hz) of the system power supply P, and only shows the operation control of the DAB circuit 3.
[0031] First, the control unit 4 acquires the effective value of the current I detected by the current sensor Si, the effective value of the voltage V1 detected by the voltage sensor Sv1, the voltage V2 detected by the voltage sensor Sv2, and the voltage V3 detected by the voltage sensor Sv3 (step ST1).
[0032] Next, the control unit 4 obtains the product of the effective value of the current I and the effective value of the voltage V1 acquired in step ST1 as the input power Pin of the charger 1 (step ST2).
[0033] Next, the control unit 4 obtains an estimated loss PL^[W] occurring in the entire charger 1 based on the effective value of the current I, the effective value of the voltage V1, the voltage V2, and the voltage V3 obtained in step ST1 (step ST3). For example, a map showing the correspondence between the effective value of the current I, the effective value of the voltage V1, the voltage V2, and the voltage V3, and the loss PL occurring in the entire charger 1 is obtained in advance by an experiment, a simulation, or the like, and the control unit 4 refers to the map and determines the loss PL corresponding to the effective value of the current I, the effective value of the voltage V1, the voltage V2, and the voltage V3 as the estimated loss PL^. Alternatively, the control unit 4 determines the calculation result obtained by substituting the effective value of the current I, the effective value of the voltage V1, the voltage V2, and the voltage V3 into the relational expression between the effective value of the current I, the effective value of the voltage V1, the voltage V2, and the voltage V3, and the loss PL occurring in the entire charger 1 as the estimated loss PL^.
[0034] Next, the control unit 4 subtracts the estimated loss PL^ determined in step ST3 from the input power Pin determined in step ST2 to determine the estimated charging power Pc^ to be supplied from the DAB circuit 3 to the battery B (step ST4).
[0035] Next, the control unit 4 determines a phase shift amount Δθ of the drive signals S9 to S12 generated in the previous control cycle, so that the estimated charging power Pc^ determined in step ST4 matches the target power Pt (step ST5). The phases of the drive signals S9 to S12 are shifted by the phase shift amount Δθ, and the phases of the drive signals S5 to S8 are fixed. When the estimated charging power Pc^ matches the target power Pt, the phase shift amount Δθ becomes zero or approximately zero, and the greater the difference between the target power Pt and the estimated charging power Pc^, the greater the phase shift amount Δθ.
[0036] During charging, the control unit 4 outputs the drive signals S5-S8 to the switching elements Q5-Q8 in a switching period shorter than the control period, and outputs the drive signals S9-S12, which have been phase-shifted by the phase shift amount Δθ calculated in step ST5, to the switching elements Q9-Q12, relative to the drive signals S9-S12 generated in the previous control period. When the estimated charging power Pc^ calculated in the current control period is smaller than the target power Pt, the control unit 4 outputs the drive signals S9-S12, which have been phase-delayed by the phase shift amount Δθ, relative to the drive signals S9-S12 generated in the previous control period, to the switching elements Q9-Q12. Furthermore, when the estimated charging power Pc^ calculated in the current control cycle is greater than the target power Pt compared to the previous control cycle, the control unit 4 outputs to the switching elements Q9-Q12 the driving signals S9-S12 whose phases are advanced by the phase shift amount Δθ with respect to the driving signals S9-S12 calculated in the previous control cycle. This makes it possible to bring the charging power Pc supplied from the DAB circuit 3 to the battery B closer to the target power Pt during the charging process.
[0037] Here, assume that at time t1 of the current control period, the target power Pt changes so that the target power Pt becomes greater than the estimated charging power Pc^, or the input power Pin or the estimated loss PL^ changes so that the estimated charging power Pc^ becomes smaller than the target power Pt. Note that the horizontal axis of the two-dimensional coordinate system shown in FIG. 3 indicates the phase of the drive signal, the vertical axis indicates power, and the solid line indicates information D indicating the correspondence between the phase difference of the drive signals S9 to S12 with respect to the drive signals S5 to S8 and the charging power Pc supplied from the DAB circuit 3 to the battery B. Also, the horizontal axis of each of the two-dimensional coordinate systems in FIG. 4(a) to FIG. 4(d) indicates time, and the vertical axis indicates voltage. Also, the solid line in FIG. 4(a) indicates the drive signals S5 and S8, the solid line in FIG. 4(b) indicates the drive signals S6 and S7, the solid line in FIG. 4(c) indicates the drive signals S9 and S12, and the solid line in FIG. 4(d) indicates the drive signals S10 and S11. In addition, in the control period before time t1, the estimated charging power Pc^ and the target power Pt are assumed to match each other. When the phase difference between the driving signals S9 to S12 and the driving signals S5 to S8 is 0°, the charging power Pc is minimum, and when the phase difference between the driving signals S9 to S12 and the driving signals S5 to S8 is 90°, the charging power Pc is maximum.
[0038] In such a case, at time t1 of the current control period, the control unit 4 first obtains the phase θt corresponding to the target power Pt and the phase θc corresponding to the estimated charging power Pc^ by referring to the information D shown in Fig. 3. Next, the control unit 4 obtains the phase shift amount Δθ by subtracting the phase θc from the phase θt.
[0039] Then, from time t2 of the next control cycle onwards, the control unit 4 generates drive signals S9, S12 by delaying the phase of the drive signals S9, S12 generated in the previous control cycle by the phase shift amount Δθ, as shown in Figure 4(c), and generates drive signals S10, S11 by delaying the phase of the drive signals S10, S11 generated in the previous control cycle by the phase shift amount Δθ, as shown in Figure 4(d).
[0040] As a result, even if the estimated charging power Pc^ does not match the target power Pt at time t1, the estimated charging power Pc^ can be made to approach the target power Pt from time t2 onwards.
[0041] In this manner, the charger 1 of this embodiment is configured to control the phase shift amount Δθ so that the estimated charging power Pc^ obtained by subtracting the estimated loss PL^ obtained from the current I detected by the current sensor Si and the voltages V1 to V3 detected by the voltage sensors Sv1 to Sv3, respectively, from the input power Pin obtained from the current I detected by the current sensor Si and the voltage V1 detected by the voltage sensor Sv1, matches the target power Pt.
[0042] As a result, there is no need to provide the charger 1 with a current sensor for detecting the current output from the DAB circuit 3 in order to determine the charging power Pc supplied from the DAB circuit 3 to the battery B, thereby reducing the manufacturing costs of the charger 1.
[0043] The present invention is not limited to the above-described embodiment, and various improvements and modifications are possible without departing from the gist of the present invention.
[0044] <Variation 1> The control unit 4 may be configured to calculate an estimated loss PL1^ occurring in the ACDC conversion circuit 2 based on the current I and voltages V1, V2, etc., and to calculate an estimated loss PL2 occurring in the DAB circuit 3 based on the current I and voltages V2, V3, etc., and to set the sum of the estimated loss PL1^ and the estimated loss PL2^ as the estimated loss PL^ occurring in the entire charger 1.
[0045] <Variation 2> The charger 1 may further include a temperature sensor such as a thermistor, and the control unit 4 may be configured to determine the estimated loss PL^ using the temperature of the charger 1 detected by the temperature sensor in addition to the current I and the voltages V1 to V3.
[0046] This allows the estimation accuracy of the estimated loss PL^ to be improved compared to when the estimated loss PL^ is calculated without using the temperature of the charger 1, thereby improving the estimation accuracy of the estimated charging power Pc^ and improving the control performance during the charging process. [Explanation of symbols]
[0047] 1 charger 2 ACDC conversion circuit 3 DAB circuit 4. Control section P grid power supply Silicon current sensor Sv1~Sv3 voltage sensor Cc, C capacitor L Inductor Q1~Q12 Switching elements T transformer B Battery
Claims
1. a DAB circuit including a plurality of first switching elements forming a bridge circuit on a primary side of a transformer and a plurality of second switching elements forming a bridge circuit on a secondary side of the transformer, the DAB circuit supplying a charging power to a battery according to a phase difference between a first drive signal that drives the plurality of first switching elements and a second drive signal that drives the plurality of second switching elements; A capacitor; an ACDC conversion circuit that converts input AC power into DC power and outputs the DC power to the DAB circuit via the capacitor; A current sensor that detects a current input to the ACDC conversion circuit; A first voltage sensor that detects a voltage input to the ACDC conversion circuit; a second voltage sensor for detecting a voltage across the capacitor; a third voltage sensor that detects a voltage of the battery; a control unit that controls an operation of the ACDC conversion circuit and outputs the first and second drive signals to the first and second switching elements; Equipped with The control unit controls a phase shift amount of the second drive signal so that an estimated charging power obtained by subtracting an estimated loss obtained by the current detected by the current sensor and the voltages detected by the first to third voltage sensors from an input power obtained by the current detected by the current sensor and the voltage detected by the first voltage sensor matches a target power. charger.
2. 2. The charger according to claim 1, The control unit obtains the estimated loss based on the current detected by the current sensor, the voltages detected by the first to third voltage sensors, and the temperature of the charger. charger.
Citation Information
Patent Citations
Charger control system
JP2013247817A
Power conversion device and power correction method
JP2014230368A
Control method for power converter and power converter
JP2016214005A
Electric power conversion system
JP2022191544A
Bidirectional isolation-type DC-DC converter and control method
JP2022110235A
