Server device, power control system, and operation method for power control system

The server device optimizes power supply and demand control by adjusting power load operations, addressing inefficiencies and reducing costs in communities.

JP2024166947AActive Publication Date: 2024-11-29TOYOTA JIDOSHA KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023083389
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-19
Publication Date
2024-11-29
Estimated Expiration
2043-05-19

AI Technical Summary

Technical Problem

Communities face inefficiencies in power supply and demand control, leading to additional costs when electricity supply decreases, necessitating power purchase from the grid.

Method used

A server device with a communication and control unit adjusts the operation timing and number of power loads based on power supply shortages, using a power control system to optimize power usage.

Benefits of technology

This approach improves efficiency in power supply and demand control, reducing additional costs by managing power loads effectively during shortages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024166947000001_ABST
    Figure 2024166947000001_ABST
Patent Text Reader

Abstract

To enable improvement of efficiency in power supply-demand control in a community.SOLUTION: A server device has a communication unit, and a control unit that communicates with a plurality of first power loads that operate for a plurality of charging targets with different timings and amounts of power by the communication unit, and communicates with a plurality of second power loads that operate with a predetermined amount of power when processing targets are accumulated. The control unit sends, by the communication unit, a first instruction for changing operation timings of the first and second power loads when a shortage of the amount of power supplied to the first and second power loads is a first period, and a second instruction for reducing the number of the first and second power loads that operate when the shortage is a second period that is longer than the first period.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a server device, a power control system, and a method of operating a power control system. [Background technology]

[0002] In communities managed by local governments, companies, etc., the concept of a community EMS (Community Energy Management System, or CEMS) is being developed to manage power generation by power generation facilities distributed within the community, power supply by the power grid of a power company, and power demand occurring within the community as a whole. In order to supply power that matches the power demand within the community, various technologies have been proposed for predicting the amount of power consumption in the community. As a related technology, Patent Document 1 discloses a power consumption control device that systematically controls the power consumption of home appliances within a specified area. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2013-074698 A Summary of the Invention [Problem to be solved by the invention]

[0004] When a community is self-sufficient in electricity, if the power supply drops for some reason, it becomes necessary to purchase the shortage of electricity from the grid, which incurs additional costs. There is room for improving the efficiency of controlling such electricity supply and demand in order to reduce costs.

[0005] The present disclosure relates to a server device and the like that enables improved efficiency in controlling power supply and demand in a community. [Means for solving the problem]

[0006] The server device of the present disclosure has a communication unit and a control unit that communicates with a plurality of first power loads that operate for a plurality of charging targets at different timings and amounts of power via the communication unit, and communicates with a plurality of second power loads that operate at a predetermined amount of power when the processing target accumulates, and the control unit sends a first instruction via the communication unit to change the operation timing of the first and second power loads when there is a shortage of the amount of power supplied to the first and second power loads during a first period, and a second instruction to reduce the number of the first and second power loads in operation when the shortage is during a second period longer than the first period.

[0007] The power control system of the present disclosure is a power control system having a server device, a plurality of first power loads capable of communicating with the server device and operating at different timings and amounts of power for a plurality of charging targets, and a plurality of second power loads that operate at a predetermined amount of power when the processing targets accumulate, wherein the server device sends a first instruction to change the operation timing of the first and second power loads when there is a shortage of the amount of power supplied to the first and second power loads during a first period, and a second instruction to reduce the number of the first and second power loads in operation when the shortage occurs during a second period longer than the first period.

[0008] An operation method of a power control system in the present disclosure is an operation method of a power control system having a server device, a plurality of first power loads capable of communicating with the server device and operating at different timings and amounts of power for a plurality of charging targets, and a plurality of second power loads that operate at a predetermined amount of power when the processing targets accumulate, the operation method including a step of the server device sending a first instruction to change the operation timing of the first and second power loads when there is a shortage of the amount of power supplied to the first and second power loads during a first period, and a second instruction to reduce the number of the first and second power loads in operation when the shortage is during a second period longer than the first period. Effect of the Invention

[0009] According to the server device and the like of the present disclosure, it is possible to improve the efficiency of power supply and demand control in a community. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a diagram illustrating an example of the configuration of a CEMS. [Diagram 2] FIG. 4 is a diagram illustrating an example of the operation of the server device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] The following describes the embodiments.

[0012] [Example of CEMS configuration] FIG. 1 is a diagram showing a configuration example of a CEMS in an embodiment. In this CEMS, a server device 10 manages power supply and reception in a community 1. In the following, the community 1 is an arbitrary block or area unit managed by a local government, a company, or the like. The server device 10, as a CEMS server, is connected to a plurality of power loads 13 and 14, one or more storage batteries 15, and one or more power generation facilities 16 via a network 11 so as to be able to communicate information. The server device 10 is also connected to a grid 12 via a network 17 so as to be able to communicate information. The server device 10 executes information processing for instructing the power generation facility 16 to generate power and purchasing power (purchasing power) from the grid 12 in response to the power demand of the power loads 13 and 14 distributed in the community 1. By the operation of the server device 10, the power loads 13 and 14 receive power supply from the power generation facility 16 and the grid 12. The server device 10 may control the operation of the storage battery 15 to perform additional power supply to the power loads 13 and 14. The storage battery 15 and the power generation facility 16 may be disposed within the community 1 or may be installed outside the community 1.

[0013] The server device 10 is, for example, a server computer belonging to a cloud computing system or other computing system. The networks 11 and 17 are, for example, the Internet, an ad-hoc network, a LAN, a MAN (Metropolitan Area Network), or other networks, or any combination thereof. The power loads 13 operate for a plurality of charging targets at different times and with different amounts of power. The power loads 13 are charging stations that operate for charging different amounts of power for each mobile store at the timing when each mobile store stops by. The power loads 14 operate with a predetermined amount of power when processing targets are accumulated. The power loads 14 are washing and drying equipment that operates with a predetermined amount of power for washing and drying pallets when an arbitrary reference amount of pallets used for transporting cargo by a mobile body is accumulated. The storage battery 15 is a large-scale storage battery for stationary use, for example, a lithium-ion battery, a nickel-metal hydride battery, or the like, and a control device thereof. The power generation equipment 16 is, for example, a power generation device using alternative energy such as solar power or wind power, and a control device thereof, or various fuel cells and a control device thereof.

[0014] In this embodiment, the server device 10 has a communication unit 101 and a control unit 103. The control unit 103 communicates with a plurality of first power loads 13 that operate for a plurality of charging targets with different timings and amounts of power through the communication unit 101, and communicates with a plurality of second power loads 14 that operate with a predetermined amount of power when the processing targets are accumulated. In addition, the control unit 103 transmits, through the communication unit 101, a first instruction (hereinafter referred to as a plan change instruction) for changing the operation timing of the plurality of power loads 13, 14 when the shortage of the amount of power supplied to the plurality of power loads 13, 14 occurs during a first period, and a second instruction (hereinafter referred to as a load reduction instruction) for reducing the number of the operating power loads 13, 14 when the shortage occurs during a second period longer than the first period. The power loads 13 perform charging in response to relatively random charging demands of individual mobile stores, while the power loads 14 start operating in a batch processing manner when a certain amount of pallets accumulate. When the community 1 self-supplies power for the power loads 13, 14 using the power generation equipment 16 and the storage battery 15, a malfunction in the power supply can cause a temporary power shortage, making it necessary to purchase power from the grid 12, i.e., incurring additional costs for purchasing power. In this regard, the operation of the server device 10 as described above can change the operation timing of the power loads 13, 14 or reduce the number of loads in operation depending on the length of the power shortage period, thereby quickly resolving the power shortage and suppressing additional costs. This makes it possible to improve the efficiency of power supply and demand control in the community 1.

[0015] [Configuration of server device 10] As shown in Fig. 1, the server device 10 includes a communication unit 101, a storage unit 102, and a control unit 103. The server device 10 may be a single server computer, or may be configured with two or more computers that are communicatively connected and operate in cooperation with each other. In the case of two or more computers, the configuration shown in Fig. 1 is appropriately arranged in the two or more computers.

[0016] The communication unit 101 includes one or more communication interfaces. The communication interface is, for example, a LAN interface. The communication unit 101 receives information used in the operation of the server device 10, and transmits information obtained by the operation of the server device 10. The server device 10 is connected to a network 11 by the communication unit 101, and communicates information with power loads 13, 14, a storage battery 15, a power generation facility 16, etc. via the network 11.

[0017] The storage unit 102 includes, for example, one or more semiconductor memories, one or more magnetic memories, one or more optical memories, or a combination of at least two of them, functioning as a main storage device, an auxiliary storage device, or a cache memory. The semiconductor memory is, for example, a random access memory (RAM) or a read only memory (ROM). The RAM is, for example, a static RAM (SRAM) or a dynamic RAM (DRAM). The ROM is, for example, an electrically erasable programmable ROM (EEPROM). The storage unit 102 stores information used in the operation of the server device 10 and information obtained by the operation of the server device 10.

[0018] The control unit 103 includes one or more processors, one or more dedicated circuits, or a combination of these. The processor is, for example, a general-purpose processor such as a CPU (Central Processing Unit), or a dedicated processor such as a GPU (Graphics Processing Unit) specialized for a specific process. The dedicated circuit is, for example, an FPGA (Field-Programmable Gate Array), an ASIC (Application Specific Integrated Circuit), etc. The control unit 103 executes information processing related to the operation of the server device 10 while controlling each unit of the server device 10.

[0019] The functions of the server device 10 are realized by executing a control program in a processor included in the control unit 103. The control program is a program for making a computer execute processing of steps included in the operation of the server device 10, thereby making the computer realize a function corresponding to the processing of the steps. In other words, the control program is a program for making a computer function as the server device 10. Also, some or all of the functions of the server device 10 may be realized by a dedicated circuit included in the control unit 103. Also, the control program may be stored in a non-transitory recording / storage medium readable by the server device 10, and read by the server device 10 from the medium.

[0020] [Example of operation of server device 10] Fig. 2 is a flow chart for explaining the operation procedure of the server device 10. The procedure shown in Fig. 2 is executed by the control unit 103 at an arbitrary period, for example, every one minute to every few minutes.

[0021] In step S21, the control unit 103 determines that a power shortage has occurred. For example, the control unit 103 acquires information on the generated power and information on the presence or absence of an abnormality detection from the power generation equipment 16 at an arbitrary period, for example, every few seconds to every few tens of seconds. If the generated power falls below an arbitrary standard indicating a malfunction of the power generation equipment 16, if the control unit 103 acquires information indicating the detection of an abnormality, or if both of these are the case, the control unit 103 determines that a power shortage has occurred (Yes) and proceeds to step S22. If the control unit 103 determines that a power shortage has not occurred (No), it ends the processing cycle of FIG. 2.

[0022] In step S22, the control unit 103 judges whether the power shortage will continue until the control target time. The control target time is set arbitrarily, for example, one hour to several hours after the current time, or the earliest time among the times that are set intermittently in advance. The time from the current time to the control target time corresponds to the "first period" in this embodiment. The control unit 103 judges whether the power shortage will continue until the control target time based on various information acquired from other servers, etc. For example, when the amount of power generated by the power generation equipment 16 by photovoltaic power generation or wind power generation is insufficient and insufficient sunlight or no wind is predicted based on weather forecast information, the control unit 103 judges that the power shortage will continue until the control target time. Also, for example, when the type of abnormality of the power generation equipment 16 is detected and the type of abnormality requires a long time to recover, the control unit 103 judges that the power shortage will continue until the control target time. Information on the correspondence between the type of abnormality and the recovery time used for the judgment is stored in the storage unit 102 in advance. The control unit 103 may obtain remaining charge information from the storage battery 15 and determine that the power shortage will continue until the target control time on condition that the power shortage caused by the malfunction of the power generation equipment 16 cannot be compensated for by the remaining charge of the storage battery 15. If the control unit 103 determines that the power shortage will continue until the target control time (Yes), it proceeds to step S25. If the control unit 103 determines that the power shortage will not continue until the target control time (No), it proceeds to step S23.

[0023] In step S23, the control unit 103 creates a power suppression plan. The power suppression plan is a plan to change the operation timing of the power loads 13 and 14 in order to suppress the peak of power consumed by the operation of the power loads 13 and 14. The control unit 103 derives the time when the power load 13 operates to charge the mobile store and the time when the power load 14 operates to wash and dry the accumulated pallets using an arbitrary algorithm, based on, for example, information on the movement plan of the mobile store for that day, information on the transportation plan using the pallets, etc. The transportation plan using the pallets includes, for example, the time when each of the multiple pallets is brought to the washing facility after being used for transportation. The control unit 103 derives the time when a reference amount of pallets is accumulated in the washing facility, and derives the timing when the power load 14 operates after that time. The reference amount is determined in advance according to the processing capacity of the power load 14. Furthermore, the control unit 103 integrates the amount of power consumed by the operation of the power loads 13 and 14 for each arbitrary unit time period to derive the peak amount of power consumed. Information such as the movement plan of the mobile store, the amount of power consumed by the power load 13 for charging each mobile store, the transportation plan, and the amount of power consumed by the operation of the power load 14 is stored in advance in the storage unit 102. Then, the control unit 103 identifies a time period in which the peak exceeds an arbitrary standard, and changes the timing of the operation of the power load 13 for charging the mobile store or the operation of the power load 14 during that time period to, for example, an earlier or later time period. For example, the control unit 103 targets the operation of the power loads 13 and 14 with a lower priority. The priority is determined in advance in accordance with the economic value expected from the operation of the power loads 13 and 14. The economic value is arbitrarily set based on, for example, the profit expected from the operation of the mobile store, the profit expected from the transportation of pallets by the mobile body, and the like. The priority information is stored in advance in the storage unit 102.

[0024] In the power suppression plan, the control unit 103 may change the charging speed when the power load 13 operates to charge the mobile body. For example, when the power load 13 charges the mobile body, the control unit 103 can instruct the operation of the power load 13 to perform rapid charging until the SOC (State of Charge) value of the storage battery of the mobile body reaches 80%, and to perform slow charging thereafter. This makes it possible to level out the integrated value of power consumption in a unit time period and suppress peaks.

[0025] In step S24, the control unit 103 sends a plan change instruction. The control unit 103 sends an instruction for changing the operation timing to the power loads 13, 14 whose operation timing should be changed based on the power suppression plan. After executing step S24, the control unit 103 ends the processing cycle of FIG. 2.

[0026] In step S25, the control unit 103 determines whether the contracted power is exceeded. The control unit 103 determines whether the power shortage that continues until the control target time can be made up by the contracted power from the grid 12, based on information on the amount of power available from the contracted power. Information on the amount of power available from the contracted power is stored in advance in the storage unit 102. The control unit 103 may determine whether the power shortage can be made up by taking into account the remaining capacity of the storage battery 15 being used for consumption. If the control unit 103 determines that the power shortage cannot be made up by the contracted power, that is, that the contracted power is exceeded (Yes), the control unit 103 proceeds to step S26. If the control unit 103 determines that the contracted power is not exceeded (No), the control unit 103 ends the processing cycle of FIG. 2.

[0027] In step S26, the control unit 103 creates a power restriction plan in the same manner as in step S23. Then, in step S27, the control unit 103 determines whether or not the contracted power will be exceeded when the power restriction plan is executed. If the control unit 103 determines that the contracted power will be exceeded (Yes), the control unit 103 proceeds to step S28. If the control unit 103 determines that the contracted power will not be exceeded (No), the control unit 103 proceeds to step S24, sends a plan change instruction, and ends the processing cycle of FIG. 2.

[0028] In step S28, the control unit 103 creates a load reduction plan. The load reduction plan is a plan to reduce the number of operating power loads 13, 14 in order to suppress the total amount of power consumed by the operation of the operating power loads 13, 14. The control unit 103 derives the time when the power loads 13, 14 will operate using an arbitrary algorithm, for example, based on information on the movement plan of the mobile store for that day, information on the transportation plan using pallets, etc. Furthermore, the control unit 103 integrates the amount of power consumed by the operation of the power loads 13, 14 for each arbitrary unit time period to derive the peak amount of power consumed. The amount of power consumed by the operation of the power loads 13, 14 is determined in advance for each power load based on actual measured values, etc., and the information is stored in the storage unit 102. The control unit 103 derives the amount of power consumed by the operation of the power loads 13, 14 using the information stored in the storage unit 102. Then, the control unit 103 identifies a time period in which the peak exceeds an arbitrary standard, and suspends operation of the power load 13 or the power load 14 during that time period. For example, the control unit 103 suspends the operation of the power load 13, 14 that has a lower priority, i.e., a lower economic value.

[0029] In step S29, the control unit 103 sends a load reduction instruction. Based on the load reduction plan, the control unit 103 sends an instruction to stop operation to the power loads 13, 14 that should be stopped. After executing step S29, the control unit 103 ends the processing cycle of FIG. 2.

[0030] In this way, according to this embodiment, by changing the operation timing of the power loads 13, 14 or reducing the number of operations depending on the length of the power shortage period, it is possible to quickly resolve the power shortage and reduce additional costs. Furthermore, by changing the operation depending on the economic value of the power loads 13, 14, it is possible to reduce additional costs associated with purchasing power and optimize the economic value. In other words, it is possible to improve the efficiency of power supply and demand control in the community 1.

[0031] In the above-described embodiment, the processing / control program that specifies the operation of the control unit 103 of the server device 10 may be stored in the memory unit 102 of the server device 10 or in a memory unit of another server device and downloaded to each device via the network 11, or may be stored in a non-transitory recording / storage medium readable by each device and read from the medium by each device.

[0032] In the above, the embodiment has been described based on the drawings and examples, but it should be noted that those skilled in the art can easily make various modifications and corrections based on the present disclosure. Therefore, it should be noted that these modifications and corrections are included in the scope of the present disclosure. For example, the functions included in each means, each step, etc. can be rearranged so as not to be logically inconsistent, and multiple means, steps, etc. can be combined into one or divided into one. [Explanation of symbols]

[0033] 1. Community 10. Server equipment 11, 17 Network 12 strains 13, 14 Power load 15. Storage battery 16 Power generation facilities 101 Communications Department 102 Storage section 103 Control section

Claims

1. The Communications Department and A control unit communicates with a plurality of first power loads that operate for a plurality of charging targets at different timings and amounts of power by the communication unit, and communicates with a plurality of second power loads that operate with a predetermined amount of power when a processing target is accumulated, the control unit transmits, via the communication unit, a first instruction for changing operation timings of the first and second power loads when a shortage of the amount of power supplied to the first and second power loads occurs during a first period, and a second instruction for reducing the number of the first and second power loads in operation when the shortage occurs during a second period longer than the first period. Server device.

2. In claim 1, The control unit further transmits an instruction to the plurality of first power loads to reduce a charging rate of the charging target. Server device.

3. In claim 1, The control unit transmits the first or second instruction to the first or second power load having a lower priority based on information of the priority of the first and second power loads. Server device.

4. A power control system having a server device, a plurality of first power loads capable of communicating with the server device and operating for a plurality of charging targets at different timings and amounts of power, and a plurality of second power loads operating at a predetermined amount of power when a processing target accumulates, the server device transmits a first instruction for changing operation timings of the first and second power loads when a shortage of the amount of power supplied to the first and second power loads occurs during a first period, and transmits a second instruction for reducing the number of the first and second power loads in operation when the shortage occurs during a second period longer than the first period; Power control system.

5. An operation method of a power control system having a server device, a plurality of first power loads capable of communicating with the server device and operating for a plurality of charging targets with different timings and amounts of power, and a plurality of second power loads operating with a predetermined amount of power when a processing target accumulates, comprising: the server device transmits a first instruction for changing operation timings of the first and second electric power loads when the shortage of the amount of electric power supplied to the first and second electric power loads occurs during a first period, and a second instruction for reducing the number of the first and second electric power loads in operation when the shortage occurs during a second period longer than the first period; A method for operating a power control system.

Citation Information

Patent Citations

  • Energy management system

    JP2014155344A

  • Systems and methods for EVSE-based energy automation, management and protection

    JP2016101087A

  • Power management device, power management method, power management program, facility, and refrigerator

    JP7759490B2

  • Power consumption control device, power consumption control method, and program

    JP2013074698A