Simulation system, work determination apparatus, work determination method, and program

The simulation system efficiently classifies routine and non-routine work by using resource presence data, enhancing the accuracy of production line simulations through automated data comparison and classification.

JP2024168306APending Publication Date: 2024-12-05MITSUBISHI ELECTRIC CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023084856
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing production line simulation technologies fail to accurately separate routine and non-routine work times, leading to decreased prediction accuracy due to insufficient data parameters and manual effort in distinguishing between these work types.

Method used

A simulation system and method that includes a first operation input section, simulation execution, textbook data generation, measurement data acquisition, coordinate estimation, and performance data generation, followed by a collation and determination unit to automatically classify work as routine or non-routine based on resource presence data.

Benefits of technology

Enables efficient and accurate determination of routine and non-routine work by comparing textbook and performance data, improving the accuracy of production line simulations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168306000001_ABST
    Figure 2024168306000001_ABST
Patent Text Reader

Abstract

To efficiently determine whether a task carried out in a process of a production line is a steady task or a non-steady task.SOLUTION: A simulation system 100 includes: an operation input unit 12 which generates a model of a production line; a simulation execution unit 13 which simulates behavior of the production line and generates simulation result information; a textbook data generation unit 24 which generates textbook data on the basis of textbook generation condition information and the simulation result information; a measurement data acquisition unit 25 which acquires measurement data obtained by measuring radio waves received from tags attached to resources; a coordinate estimation unit 26 which generates coordinate data indicating coordinates of the resources; a past result data generation unit 27 which generates past result data on the basis of past-result data generation condition information and the coordinate data; and a collation determination unit 28 which collates the textbook data with the past result data to determine whether a task represented by the past result data is a steady task or a non-steady task, and outputs determination result information.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a simulation system, an activity determination device, an activity determination method, and a program. [Background technology]

[0002] In manufacturing production line design, the behavior of the production line is simulated and the output and operation rate are calculated before the production line is launched. There are problems with manually anticipating complex manufacturing conditions and branching, so in recent years simulators have been developed that can register manufacturing conditions and branching and perform calculations. In simulators, the characteristics of the work are set for the processes that make up the production line and a simulation is performed. One of the work characteristics is the work time.

[0003] For example, Patent Document 1 discloses a process orchestration device that includes: a work sequence candidate generation means for generating work sequence candidates in which tasks are arranged in sequence in accordance with work constraints related to the scheduled order between specific tasks; a process candidate generation means for generating process candidates made up of process groups in which tasks are divided according to the work sequence candidates and arranged in sequence, the process groups being each made up of tasks whose required times fall within a scheduled takt time; a process evaluation means for calculating an evaluation value obtained by evaluating the process candidates using a predetermined index; and a process presentation means for presenting process candidates whose evaluation value is within a predetermined range as appropriate process candidates. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2021-170240 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, in the technology described in Patent Document 1, when evaluating a process, the work time is not distinguished between the required regular work that occurs every time in the process and the non-regular work that occurs under specific conditions. If the work time of each of the regular work and non-regular work in the process is not set, the prediction accuracy of the production line simulation will decrease. When setting the work time of each of the regular work and non-regular work based on the work results, for example, if a person watches a video of the manufacturing site and distinguishes whether the work performed in the process is regular or non-regular, it takes a huge amount of time. As a result, the population of data used to set the work time becomes small, which creates a problem of errors compared to the true value.

[0006] The present disclosure has been made to solve the above-mentioned problems, and aims to make it possible to efficiently determine whether work performed in a production line process is routine work or non-routine work. [Means for solving the problem]

[0007] In order to achieve the above object, the simulation system according to the present disclosure includes a first operation input unit, a simulation execution unit, a textbook data generation unit, a measurement data acquisition unit, a coordinate estimation unit, a performance data generation unit, and a comparison and determination unit. The first operation input unit receives a modeling operation of the production line and generates a model of the production line. The simulation execution unit simulates the behavior of the production line based on the model of the production line and generates simulation result information indicating the simulation result. The textbook data generation unit generates textbook data indicating the presence or absence of each resource within a zone during the time period from the start to the end of one work piece to be used as a textbook for the routine work of each process based on textbook data generation condition information including information indicating the start and end times of work for one work piece to be used as a textbook for the routine work of each process of the production line and information indicating a zone that is an area required for the work for one work piece of each process and simulation result information. The measurement data acquisition unit acquires measurement data obtained by measuring radio waves received from tags attached to each resource by a tag reader arranged at a production site having the resources. The coordinate estimation unit estimates the coordinates of each resource based on the measurement data and generates coordinate data indicating the coordinates of each resource. The performance data generation unit generates performance data indicating the presence or absence of each resource within a time zone from the start to the end of work for one work in each process, based on performance data generation condition information indicating conditions that stipulate the start to end of work for one work in each process and the coordinate data. The comparison and determination unit compares the textbook data with the performance data to determine whether the work indicated by the performance data is regular work or non-regular work, and outputs determination result information indicating the determination result. Effect of the Invention

[0008] According to the present disclosure, by comparing textbook data indicating the presence or absence of each resource within the time zone from the start to the finish of work for one work, which is used as a textbook for routine work in each process of a production line based on simulation results, with actual data indicating the presence or absence of each resource within the time zone from the start to the finish of work for one work in each process at the production site, it is automatically determined whether the work indicated by the actual data is routine work or non-routine work, and determination result information indicating the determination result is output, making it possible to efficiently determine whether the work performed in each process is routine work or non-routine work. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a simulation system according to a first embodiment; [Diagram 2] FIG. 1 is a diagram showing an example of work result information according to the first embodiment; [Diagram 3] FIG. 1 is a diagram showing an example of three-dimensional data according to the first embodiment; [Figure 4] FIG. 1 is a diagram showing an example of a manufacturing site where tags are added to resources according to the first embodiment; [Diagram 5] FIG. 13 shows an example of a setting screen for setting the start and end times of work for one workpiece as a textbook for routine work according to the first embodiment. [Figure 6] FIG. 13 is a diagram showing an example of a setting screen for setting an area required for work on one workpiece according to the first embodiment; [Figure 7] FIG. 1 is a diagram showing an example of textbook data according to the first embodiment; [Figure 8] FIG. 1 is a diagram showing an example of a measurement time chart according to the first embodiment; [Figure 9] FIG. 1 is a diagram showing an example of performance data according to the first embodiment; [Figure 10] A flowchart showing an example of the operation of a textbook data generation process according to the first embodiment. [Figure 11] A flowchart showing an example of the operation of a task determination process according to the first embodiment. [Figure 12] FIG. 13 is a diagram showing a configuration example of a simulation system according to a second embodiment. [Figure 13] FIG. 1 is a diagram showing an example of a hardware configuration of a simulation device and an operation determination device according to first and second embodiments. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] A simulation system, an operation judgment device, an operation judgment method, and a program according to the present embodiment will be described in detail below with reference to the drawings. Note that the same or corresponding parts in the drawings are given the same reference numerals. In the following embodiment, an example will be described in which the work time of each process on a product production line is separated into work time for regular work and work time for non-regular work. Hereinafter, workers on a product production line, work in progress that is the subject of work in a process, tools, materials, AGVs (Automatic Guided Vehicles), etc. will be collectively referred to as resources.

[0011] (Embodiment 1) The configuration of a simulation system 100 according to the first embodiment will be described with reference to Fig. 1. The simulation system 100 includes a simulation device 1 that simulates the behavior of a production line, and an operation determination device 2 that determines whether an operation actually performed at each process on the production line is a regular operation or a non-regular operation, based on textbook data on the regular operation at each process.

[0012] The simulation device 1 includes a storage unit 11 that stores various information, an operation input unit 12 that accepts modeling operations for the production line, a simulation execution unit 13 that simulates the behavior of the production line, and a communication unit 14 that transmits and receives information to and from the work judgment device 2. The operation input unit 12 is an example of a first operation input unit.

[0013] The storage unit 11 includes a simulation condition storage unit 111 that stores simulation condition information indicating conditions for executing a simulation, and a simulation result storage unit 112 that stores simulation result information indicating the results of the simulation.

[0014] The operation input unit 12 generates an operation screen for receiving modeling operations of the production line based on a library of objects such as workers, workpieces, tools, materials, and AGVs, processes constituting the production line, and tasks in each process, which are included in the simulation condition information stored in the simulation condition storage unit 111. The workpieces are objects to be processed or assembled in a process. The modeling operations of the production line include arranging objects on the production line, setting process paths for workpieces and materials, setting tasks in each process, and the like. The operation input unit 12 outputs the generated operation screen. The operation screen may be output by displaying the screen or by transmitting it to a user terminal used by a user. In the latter case, the user terminal outputs the operation screen, and the operation input unit 12 receives information indicating the modeling operations input to the operation screen from the user terminal.

[0015] The operation input unit 12 generates a model of the production line in accordance with the modeling operation inputted on the operation screen. The operation input unit 12 sends the generated model of the production line to the simulation execution unit 13.

[0016] The simulation execution unit 13 simulates the behavior of the production line based on the model of the production line received from the operation input unit 12. Specifically, the simulation execution unit 13 simulates the behavior of the production line based on work time information indicating the work time for one workpiece in each process and travel time information indicating the travel time between processes, which are included in the simulation condition information stored in the simulation condition storage unit 111, and outputs the output for each task, the travel path of people and goods, the operation rate, and the like, as simulation results. The simulation execution unit 13 stores simulation result information indicating the simulation results and the model of the production line in the simulation result storage unit 112.

[0017] The simulation result information includes work result information showing the work results for each process. The work result information is, for example, a Gantt chart showing the work results for each process, as shown in FIG. 2. The example in FIG. 2 is a Gantt chart showing the work results of worker W09 and AGV01 in process A, the work results of worker W10 and AGV02 in process B, the work results of worker W11 and AGV03 in process C, and the work results of worker W12 and AGV04 in process D. The work result information is not limited to information showing the work results of workers and AGVs, and may be information showing the work results of only workers, or may be information including the work results of other resources.

[0018] The production line model includes three-dimensional data that represents the production line in three dimensions. The three-dimensional data is, for example, a three-dimensional model of the production line in which objects are arranged in a digital space, as shown in FIG.

[0019] The communication unit 14 transmits the simulation result information and the production line model stored in the simulation result storage unit 112 to the work judgment device 2.

[0020] Here, a manufacturing site where an actual production line exists will be described with reference to FIG. 4. At the manufacturing site, a tag is attached to each resource, and a tag reader that receives radio waves emitted by the tag is arranged. The tag is, for example, an RF (Radio Frequency) tag. In the example of FIG. 4, tags are attached to AGVs, tools, and workers, and a tag reader receives radio waves emitted by each tag. There may be multiple tag readers. Tags are attached to all resources at the manufacturing site, not limited to AGVs, tools, and workers. The tag reader transmits measurement data obtained by measuring radio waves received from tags attached to each resource to the work judgment device 2. The measurement data includes, for example, the reception strength, incidence angle, phase, and reception time of the radio waves.

[0021] 1, the work judgment device 2 includes a memory unit 21 that stores various information, a communication unit 22 that transmits and receives information to and from the simulation device 1, an operation input unit 23 that accepts a setting operation to set conditions for generating textbook data for one unit of routine work in each process, a textbook data generation unit 24 that generates textbook data, a measurement data acquisition unit 25 that acquires measurement data, a coordinate estimation unit 26 that estimates the coordinates of each resource based on the measurement data and generates coordinate data indicating the coordinates of each resource, a performance data generation unit 27 that generates performance data indicating the performance of work for one unit of work in each process based on the coordinate data, and a comparison judgment unit 28 that compares the textbook data with the performance data to judge whether the work indicated by the performance data is routine work or non-routine work. The operation input unit 23 is an example of a second operation input unit.

[0022] The memory unit 21 includes a data generation condition memory unit 211 that stores textbook data generation condition information indicating the conditions for generating textbook data and achievement data generation condition information indicating the conditions for generating achievement data, a textbook data memory unit 212 that stores textbook data, a coordinate data memory unit 213 that stores coordinate data, and an achievement data memory unit 214 that stores achievement data.

[0023] The communication unit 22 stores the simulation result information and the production line model received from the simulation device 1 in the data generation condition storage unit 211 of the storage unit 21 .

[0024] The operation input unit 23 displays the work result information included in the simulation result information stored in the data generation condition storage unit 211 and the three-dimensional data included in the production line model, and generates a setting screen that accepts setting operations for setting conditions for generating textbook data. The operation input unit 23 outputs the generated setting screen. The setting screen may be output by displaying it on the screen, or may be transmitted to a user terminal used by a user. In the latter case, the user terminal outputs the setting screen, and the operation input unit 23 receives information indicating the setting operations input to the setting screen from the user terminal.

[0025] The operation input unit 23 generates textbook data generation condition information indicating conditions for generating textbook data according to the setting operation inputted on the setting screen. The operation input unit 23 stores the textbook data generation condition information in the data generation condition storage unit 211. The textbook data generation condition information includes information indicating the start and end points of work for one workpiece that serves as a textbook for routine work in each process, and information indicating the area required for work on one workpiece in each process. Hereinafter, the area required for work on one workpiece is referred to as a zone.

[0026] Here, the setting screen output by the operation input unit 23 will be described with reference to FIG. 5 and FIG. 6. In the example of the setting screen shown in FIG. 5, a Gantt chart showing the work results for each process, which is an example of the work result information shown in FIG. 2, is displayed, and the start and end times of work for one workpiece to be used as a textbook for routine work in sections (1) to (4) are set for the work of process A. The start and end times can be set, for example, by clicking once on the Gantt chart displayed on the setting screen to set the start time, and by double-clicking to set the end time. The operation input unit 23 generates textbook data generation condition information showing the start and end times of work for one workpiece to be used as a textbook for routine work according to the setting operation inputted to the setting screen, and stores the information in the data generation condition storage unit 211. Note that the setting screen is not limited to the example of FIG. 5, and may be any screen that allows the user to set the start and end times of work for one workpiece to be used as a textbook for routine work. In addition, the number of sections for which the start and end times of work for one workpiece to be used as a textbook for routine work are set is not limited to four, and may be one or more.

[0027] In the example of the setting screen shown in FIG. 6, a three-dimensional model of a production line, which is an example of the three-dimensional data shown in FIG. 3, is displayed, and a zone Z of process A is set. For example, when an object is clicked on the three-dimensional model of the production line displayed on the setting screen, a rectangular parallelepiped zone of a predetermined size centered on the object is set. Alternatively, the user may set the size of the zone by dragging and deforming the vertices of the rectangular parallelepiped. The operation input unit 23 generates textbook data generation condition information indicating the coordinates of the zone on the three-dimensional model of the production line according to the setting operation inputted on the setting screen, and stores the information in the data generation condition storage unit 211. Note that the setting screen is not limited to the example of FIG. 6, and may be any screen on which the user can set the zone of each process.

[0028] Returning to Fig. 1, textbook data generation unit 24 generates textbook data based on the simulation result information and textbook data generation condition information stored in data generation condition storage unit 211. The textbook data indicates the presence or absence of each resource within a zone for the time from start to finish of work for one workpiece, which is used as a textbook for routine work for each process. Hereinafter, the time from start to finish of work for one workpiece is referred to as the work time for one workpiece, and data indicating the presence or absence of each resource within a zone is referred to as resource presence or absence data.

[0029] The textbook data will be described with reference to Fig. 7. Fig. 7 shows the presence or absence of each resource in the zone of process A during the work time for one workpiece, which is set as the textbook for the routine work set in section (3) of Fig. 5. In the example of Fig. 7, in process A, worker W09, workpiece, tool T1, member P1 and AGV01 are present in the zone during the work time for one workpiece. The textbook data generation unit 24 stores the resource presence or absence data shown in Fig. 7 in the data generation condition storage unit 211 as textbook data showing the routine work for one workpiece in section (3) of process A.

[0030] 1, measurement data acquisition unit 25 acquires the above-mentioned measurement data from a tag reader (not shown) arranged at a manufacturing site where an actual production line exists. Measurement data acquisition unit 25 sends the acquired measurement data to coordinate estimation unit 26.

[0031] The coordinate estimation unit 26 estimates the coordinates of each resource based on the measurement data received from the measurement data acquisition unit 25, and generates coordinate data indicating the coordinates of each resource. The method of estimating the coordinates of each resource is, for example, to estimate the context by using the reception strength, incidence angle, phase, reception time, etc. of the radio waves from the tag included in the measurement data. The coordinate data is data indicating the coordinates of each resource from the start of measurement by the tag reader to the end of measurement. The time from the start of measurement by the tag reader to the end of measurement is, for example, the time during which the production line is operating in one day. Hereinafter, the time from the start of measurement to the end of measurement is referred to as the measurement time. The coordinate estimation unit 26 sends the generated coordinate data to the performance data generation unit 27.

[0032] Based on the coordinate data received from the coordinate estimation unit 26, the performance data generation unit 27 determines whether the coordinates of each resource are included in the coordinate space of the zone of each process, and generates a time chart showing the presence or absence of each resource in the zone of each process during the measurement time of the tag reader. Hereinafter, the time chart showing the presence or absence of each resource in the zone of each process during the measurement time of the tag reader is referred to as a measurement time chart. Based on the performance data generation condition information stored in the data generation condition storage unit 211, the performance data generation unit 27 extracts the work time for one work from the measurement time chart, and generates performance data showing the results of the work for one work in each process. The conditions for generating performance data shown in the performance data generation condition information are, for example, conditions that specify the start to end of the work for one work in each process, such as the work starting when the work enters the zone and the work ending when the work leaves the zone.

[0033] Here, the measurement time chart and the performance data will be explained with reference to Fig. 8 and Fig. 9. Fig. 8 shows the measurement time chart of process A. In the example of Fig. 8, the performance data generation unit 27 extracts the working time for one workpiece in sections (5) to (8) from the measurement time chart of process A based on the performance data generation condition information, and generates performance data showing the results of the work for one workpiece in process A. Fig. 9 shows the performance data of process A. The example of Fig. 9 shows the presence or absence of each resource in the zone of process A during the working time for one workpiece extracted in section (7) of Fig. 8.

[0034] Returning to FIG. 1, the matching and judging unit 28 matches the textbook data with the performance data to judge whether the work indicated by the performance data is regular or non-regular work. At this time, if there are multiple sections of the textbook data and multiple sections of the performance data, the textbook data and performance data of the corresponding sections may be matched. The matching and judging unit 28 matches the resource presence / absence data of the textbook data with the resource presence / absence data of the performance data to judge whether they match. If they match, the matching and judging unit 28 judges that the work for one workpiece indicated by the performance data is regular work. If they do not match, the matching and judging unit 28 judges that the work for one workpiece indicated by the performance data is non-regular work.

[0035] When the verification and judgment unit 28 judges that the work is a regular work, it outputs regular judgment result information that sets the work time for one workpiece of the actual data as the work time of the regular work. The regular judgment result information may be output by displaying it on a screen, sending it to a user terminal, or printing it out. When the regular judgment result information is output, the user accumulates the regular judgment result information, sets information indicating the average value of the work time for one workpiece of the actual data included in the regular judgment result information as the work time information of the regular work, and updates the work time information stored in the simulation condition storage unit 111. As a result, the accuracy of the work time of the regular work used in the simulation increases as the amount of regular judgment result information increases. When the verification and judgment unit 28 judges that the work is a non-regular work, it outputs non-regular judgment result information that sets the work time for one workpiece of the actual data as the work time when the non-regular work was performed together with a measurement time chart. The user judges the work time of the non-regular work based on the output measurement time chart and the work time when the non-regular work was performed indicated by the non-regular judgment result information, and adds the non-regular work work time information indicating the work time of the non-regular work to the work time information stored in the simulation condition storage unit 111. The steady-state determination result information and the non-steady-state determination result information are examples of determination result information.

[0036] For example, when the comparison / determination unit 28 compares the resource presence / absence data of the textbook data shown in Fig. 7 with the resource presence / absence data of the textbook data shown in Fig. 9, they do not match and therefore it is determined that it is non-stationary work. The comparison / determination unit 28 outputs non-stationary work determination result information, in which the work time for one workpiece shown in Figs. 7 and 9 is taken as the work time during which non-stationary work was performed, together with the measurement time chart shown in Fig. 8. Based on the measurement time chart shown in Fig. 8 and the work time for one workpiece shown in Figs. 7 and 9 indicated by the non-stationary work determination result information, the user determines that the work time of the non-stationary work is, for example, the time of section (9) shown in Fig. 8, and adds the work time information of the non-stationary work indicating the time of section (9) to the work time information stored in the simulation condition storage unit 111.

[0037] Here, the flow of the textbook data generation process executed by the work determination device 2 will be described with reference to Fig. 10. The textbook data generation process shown in Fig. 10 starts when the work determination device 2 is powered on.

[0038] If the communication unit 22 of the work judgment device 2 does not receive the simulation result information and the production line model from the simulation device 1 (step S11; NO), the processing proceeds to step S16. If the communication unit 22 receives the simulation result information and the production line model from the simulation device 1 (step S11; YES), the communication unit 22 stores the simulation result information and the production line model in the data generation condition memory unit 211 of the memory unit 21.

[0039] The operation input unit 23 displays the work result information included in the simulation result information stored in the data generation condition storage unit 211 and the three-dimensional data included in the production line model, and generates a setting screen for accepting a setting operation for setting the conditions for generating textbook data (step S12). The operation input unit 23 outputs the generated setting screen (step S13). The operation input unit 23 generates textbook data generation condition information indicating the conditions for generating textbook data according to the setting operation input to the setting screen (step S14). The operation input unit 23 stores the textbook data generation condition information in the data generation condition storage unit 211. The textbook data generation condition information includes information indicating the start and end points of work for one workpiece that is to be used as a textbook for routine work in each process, and information indicating the zone of each process.

[0040] In the example of the setting screen shown in FIG. 5, a Gantt chart showing the work results for each process, which is the example of the work result information shown in FIG. 2, is displayed, and for the work of process A, the start and end times of work for one workpiece to be used as a textbook for routine work in sections (1) to (4) are set.

[0041] In the example of the setting screen shown in FIG. 6, a three-dimensional model of a production line, which is the example of the three-dimensional data shown in FIG.

[0042] 10, the textbook data generating unit 24 generates textbook data (step S15) based on the simulation result information and the textbook data generation condition information stored in the data generation condition storage unit 211. The textbook data is resource presence / absence data indicating the presence / absence of each resource within a zone of the work time for one workpiece as a textbook for routine work for each process.

[0043] The example of textbook data shown in Fig. 7 indicates the presence or absence of each resource in the zone of process A during the work time for one workpiece, which is the textbook for the routine work set in section (3) in Fig. 5. In the example of Fig. 7, in process A, worker W09, workpiece, tool T1, member P1, and AGV01 are present in the zone during the work time for one workpiece.

[0044] 10, if the power of the work determination device 2 is not turned off (step S16; NO), the process returns to step S11 and steps S11 to S16 are repeated. If the power is turned off (step S16; YES), the process ends.

[0045] Next, the flow of the work determination process executed by the work determination device 2 will be described with reference to Fig. 11. The work determination process shown in Fig. 11 starts when the work determination device 2 is powered on. If the measurement data acquisition unit 25 of the work determination device 2 does not acquire measurement data from a tag reader arranged at a manufacturing site where an actual production line exists (step S21; NO), the process proceeds to step S30. If measurement data has been acquired (step S21: YES), the measurement data acquisition unit 25 sends the acquired measurement data to the coordinate estimation unit 26. The coordinate estimation unit 26 estimates the coordinates of each resource based on the measurement data received from the measurement data acquisition unit 25, and generates coordinate data indicating the coordinates of each resource (step S22). The coordinate estimation unit 26 sends the generated coordinate data to the performance data generation unit 27.

[0046] Based on the coordinate data received from the coordinate estimation unit 26, the performance data generation unit 27 determines whether or not the coordinates of each resource are included in the coordinate space of the zone of each process, and generates a measured time chart (step S23). Based on the performance data generation condition information, the performance data generation unit 27 extracts the work time for one workpiece from the measured time chart, and generates performance data indicating the work results for one workpiece in each process (step S24). The performance data is resource presence / absence data indicating the presence or absence of each resource in the zone of the work time for one workpiece in each process.

[0047] In the example of the measured time chart shown in Fig. 8, the performance data generating unit 27 extracts the working time for one workpiece in sections (5) to (8) from the measured time chart based on the performance data generating condition information, and generates performance data indicating the results of the work for one workpiece in process A. The example of performance data shown in Fig. 9 indicates the presence or absence of each resource in the zone of process A during the working time for one workpiece extracted in section (7) in Fig. 8.

[0048] 11, the comparison / determination unit 28 compares the resource presence / absence data of the textbook data with the resource presence / absence data of the performance data to determine whether they match (step S25). If they match (step S25; YES), the comparison / determination unit 28 determines that the work for one workpiece indicated by the performance data is regular work (step S26). If they do not match (step S25; NO), the comparison / determination unit 28 determines that the work for one workpiece indicated by the performance data is non-regular work (step S27).

[0049] When it is determined that it is a regular task, the collation determination unit 28 outputs regular determination result information in which the work time for one workpiece in the performance data is set as the work time of the regular task (step S28). The user accumulates the regular determination result information, and sets information indicating the average value of the work time for one workpiece in the performance data included in the regular determination result information as the work time information of the regular task, and updates the work time information stored in the simulation condition storage unit 111.

[0050] If it is determined that the work is non-stationary, the collation determination unit 28 outputs non-stationary determination result information, which indicates that the work time for one workpiece in the performance data is the work time during which the non-stationary work was performed, together with the measurement time chart (step S29). The user determines the work time of the non-stationary work based on the output measurement time chart and the work time during which the non-stationary work was performed indicated by the non-stationary determination result information, and adds the work time information of the non-stationary work indicating the work time of the non-stationary work to the work time information stored in the simulation condition storage unit 111.

[0051] In step S25, when the comparison / determination unit 28 compares the resource presence / absence data of the textbook data shown in Fig. 7 with the resource presence / absence data of the textbook data shown in Fig. 9, they do not match in step S25, and therefore it is determined in step S27 that it is a non-stationary task. In step S29, the comparison / determination unit 28 outputs non-stationary task determination result information, in which the task time for one workpiece shown in Figs. 7 and 9 is the task time during which the non-stationary task was performed, together with the measurement time chart shown in Fig. 8. Based on the measurement time chart shown in Fig. 8 and the task time for one workpiece shown in Figs. 7 and 9 indicated by the non-stationary task determination result information, the user determines that the task time of the non-stationary task is, for example, the time of section (9) shown in Fig. 8, and adds information indicating the time of section (9) to the task time information stored in the simulation condition storage unit 111 as task time information of the non-stationary task.

[0052] 11, if the power of the work determination device 2 is not turned off (step S30; NO), the process returns to step S21 and steps S21 to S30 are repeated. If the power is turned off (step S30; YES), the process ends.

[0053] According to the simulation system 100 of the first embodiment, by comparing textbook data indicating the presence or absence of each resource within the zone of the working time for one workpiece, which is used as a textbook for routine work at each process on the production line based on the simulation results, with actual performance data indicating the presence or absence of each resource within the zone of the working time for one workpiece at each process at the production site, it is automatically determined whether the work indicated by the actual performance data is routine work or non-routine work, and judgment result information indicating the judgment result is output, thereby making it possible to efficiently determine whether the work performed at each process is routine work or non-routine work.

[0054] (Embodiment 2) In the simulation system 100 of the first embodiment, when the work for one workpiece indicated by the performance data is determined to be a regular work, the user accumulates regular judgment result information, and sets information indicating an average value of the work time for one workpiece of the performance data included in the regular judgment result information as the work time information for the regular work, and updates the work time information stored in the simulation condition storage unit 111. On the other hand, when the work for one workpiece indicated by the performance data is determined to be a non-regular work, the user determines the work time of the non-regular work based on the output measurement time chart and the work time for which the non-regular work indicated by the non-regular judgment result information was performed, and adds the non-regular work work time information indicating the work time of the non-regular work to the work time information stored in the simulation condition storage unit 111. In the second embodiment, these processes are performed within the simulation system 100.

[0055] A simulation system 100 according to the second embodiment will be described with reference to Fig. 12. In the simulation system 100 according to the second embodiment, an update unit 15 is added to the simulation apparatus 1, and the functions of the communication unit 14 of the simulation apparatus 1 and the communication unit 22 and the comparison judgment unit 28 of the work judgment device 2 are different.

[0056] When the comparison determination unit 28 of the work determination device 2 determines that the work for one workpiece indicated by the performance data is regular work, it outputs regular determination result information, which sets the work time for one workpiece in the performance data as the work time of regular work, to the simulation device 1 via the communication unit 22. When the comparison determination unit 28 determines that the work is non-regular work, it outputs non-regular determination result information, which sets the time during which the same resource as the resource presence / absence data of the performance data is consecutively present as the work time of non-regular work, to the simulation device 1 via the communication unit 22.

[0057] When the communication unit 14 of the simulation device 1 receives steady-state judgment result information from the work judgment device 2, it sends it to the update unit 15. The update unit 15 cumulatively stores the steady-state judgment result information received from the communication unit 14, and updates the work time information stored in the simulation condition storage unit 111 with information indicating the average value of the work time for one workpiece of the performance data included in the steady-state judgment result information as work time information for steady work. When the communication unit 14 receives non-steady-state judgment result information from the work judgment device 2, it sends it to the update unit 15. The update unit 15 adds information indicating the work time of non-steady-state work included in the non-steady-state judgment result information as work time information for non-steady-state work to the work time information stored in the simulation condition storage unit 111. Other functions of the simulation device 1 and the work judgment device 2 are similar to those of the first embodiment.

[0058] According to the simulation system 100 of the second embodiment, the work time information used in the simulation of the production line can be automatically separated into work time information for regular tasks and work time information for non-regular tasks, thereby further improving efficiency.

[0059] The hardware configuration of the simulation device 1 and the work judgment device 2 will be described with reference to Fig. 13. As shown in Fig. 13, the simulation device 1 and the work judgment device 2 include a temporary storage unit 101, a storage unit 102, a calculation unit 103, an input unit 104, a transmission / reception unit 105, and a display unit 106. The temporary storage unit 101, the storage unit 102, the input unit 104, the transmission / reception unit 105, and the display unit 106 are all connected to the calculation unit 103 via a BUS.

[0060] The calculation unit 103 is, for example, a CPU (Central Processing Unit). The calculation unit 103 executes the processes of the operation input unit 12, the simulation execution unit 13, and the update unit 15 of the simulation device 1, and the operation input unit 23, the textbook data generation unit 24, the measurement data acquisition unit 25, the coordinate estimation unit 26, the performance data generation unit 27, and the comparison determination unit 28 of the task determination device 2 in accordance with a control program stored in the storage unit 102.

[0061] The temporary storage unit 101 is, for example, a random-access memory (RAM). The temporary storage unit 101 loads a control program stored in the storage unit 102 and is used as a working area for the calculation unit 103.

[0062] Storage unit 102 is a non-volatile memory such as a flash memory, a hard disk, a DVD-RAM (Digital Versatile Disc - Random Access Memory), or a DVD-RW (Digital Versatile Disc - ReWritable). Storage unit 102 pre-stores programs for causing calculation unit 103 to perform the processing of simulation apparatus 1 and work judgment device 2, and also supplies data stored by these programs to calculation unit 103 in accordance with instructions from calculation unit 103, and stores data supplied from calculation unit 103. Storage unit 11 of simulation apparatus 1 and storage unit 21 of work judgment device 2 are configured in storage unit 102.

[0063] The input unit 104 is an interface device that connects input devices such as a keyboard, a pointing device, and a voice input device to the BUS. Information input by the user is supplied to the calculation unit 103 via the input unit 104. When the operation input unit 12 of the simulation apparatus 1 and the operation input unit 23 of the work judgment device 2 are configured to directly accept operation input from the user, the input unit 104 functions as the operation input unit 12 of the simulation apparatus 1 and the operation input unit 23 of the work judgment device 2.

[0064] The transmitting / receiving unit 105 is a network termination device or a wireless communication device that connects to the network, and a serial interface or a LAN (Local Area Network) interface that connects to them. The transmitting / receiving unit 105 functions as the communication unit 14 of the simulation apparatus 1 and the communication unit 22 of the work judgment device 2. When the operation input unit 12 of the simulation apparatus 1 and the operation input unit 23 of the work judgment device 2 are configured to receive information indicating modeling operations and setting operations from a user terminal, respectively, the transmitting / receiving unit 105 functions as the operation input unit 12 of the simulation apparatus 1 and the operation input unit 23 of the work judgment device 2. When the comparison judgment unit 28 of the work judgment device 2 is configured to transmit steady-state judgment result information and non-steady-state judgment result information to the user terminal, the transmitting / receiving unit 105 functions as the comparison judgment unit 28.

[0065] Display unit 106 is a display device such as an LCD (Liquid Crystal Display), an organic EL (electroluminescence) display, etc. When the operation input unit 12 of simulation apparatus 1 and the operation input unit 23 of work judgment device 2 are configured to display an operation screen and a setting screen, respectively, display unit 106 functions as the operation input unit 12 of simulation apparatus 1 and the operation input unit 23 of work judgment device 2. Furthermore, when the comparison judgment unit 28 of work judgment device 2 is configured to display steady-state judgment result information and non-steady-state judgment result information on a screen, display unit 106 functions as the comparison judgment unit 28.

[0066] The processing of the memory unit 11, operation input unit 12, simulation execution unit 13, communication unit 14 and update unit 15 of the simulation device 1 shown in Figure 1, and the memory unit 21, communication unit 22, operation input unit 23, textbook data generation unit 24, measurement data acquisition unit 25, coordinate estimation unit 26, performance data generation unit 27 and comparison judgment unit 28 of the work judgment device 2 is executed by a control program using temporary memory unit 101, calculation unit 103, memory unit 102, input unit 104, transmission / reception unit 105, display unit 106, etc. as resources.

[0067] Additionally, the above hardware configuration and flowchart are merely examples and can be changed or modified as desired.

[0068] The core parts of the simulation device 1 and the work judgment device 2, such as the calculation unit 103, temporary storage unit 101, storage unit 102, input unit 104, transmission / reception unit 105, and display unit 106, can be realized using a normal computer system, not a dedicated system. For example, the computer program for executing the above-mentioned operations may be stored and distributed on a computer-readable recording medium, such as a flexible disk, a CD-ROM (Compact Disc - Read Only Memory), or a DVD-ROM (Digital Versatile Disc - Read Only Memory), and the computer program may be installed on a computer to configure the simulation device 1 and the work judgment device 2 that executes the above-mentioned processes. In addition, the computer program may be stored in a storage device of a server device on a communication network, such as the Internet, and downloaded by a normal computer system to configure the simulation device 1 and the work judgment device 2.

[0069] In addition, when the functions of the simulation device 1 and the work judgment device 2 are realized by sharing the functions of an OS (Operating System) and an application program, or by cooperation between the OS and an application program, only the application program portion may be stored in a recording medium or storage device.

[0070] It is also possible to superimpose a computer program on a carrier wave and provide it via a communication network. For example, the computer program may be posted on a bulletin board system (BBS) on the communication network and provided via the communication network. The computer program may then be started and executed under the control of the OS in the same way as other application programs, thereby enabling the above-mentioned processing to be performed.

[0071] In the above first and second embodiments, the simulation system 100 includes the simulation device 1 and the work judgment device 2 separately, but this is not limiting, and the simulation device 1 and the work judgment device 2 may be realized by a single device.

[0072] In the above-mentioned first embodiment, when the comparison / determination unit 28 of the work determination device 2 determines that the work for one workpiece indicated by the performance data is non-steady work, it outputs non-steady-state determination result information indicating that the work time for one workpiece in the performance data is the work time during which the non-steady-state work was performed, together with a measurement time chart, but this is not limited to the above. For example, when the comparison / determination unit 28 determines that the work for one workpiece indicated by the performance data is non-steady-state work, it may output non-steady-state determination result information indicating that the work time for one workpiece in the performance data is the work time during which the non-steady-state work was performed, together with video data capturing a zone of the work time for one workpiece in the performance data and a measurement time chart.

[0073] In this case, a camera is placed at the manufacturing site, and the camera transmits video data capturing the zones of each process to the work judgment device 2. The user checks the video data output by the comparison judgment unit 28 to judge whether the work is regular or non-regular. If it is judged to be regular work, the user updates the work time information stored in the simulation condition storage unit 111 with information indicating the average value of the work time for one workpiece of the performance data included in the regular judgment result information as work time information for regular work. If it is judged to be non-regular work, the user judges the work time of the non-regular work based on the measurement time chart output by the comparison judgment unit 28 and the work time for one workpiece of the performance data, and adds the work time information of the non-regular work to the work time information stored in the simulation condition storage unit 111.

[0074] In the above-mentioned first and second embodiments, the simulation device 1 includes the storage unit 11, but this is not limiting, and the storage unit 11 may be provided by an external device or system. The work judgment device 2 includes the storage unit 21, but this is not limiting, and the storage unit 21 may be provided by an external device or system.

[0075] In the above-mentioned first and second embodiments, the work judgment device 2 includes the operation input unit 23, but this is not limiting, and if the data generation condition storage unit 211 stores textbook data generation condition information in advance, the work judgment device 2 does not need to include the operation input unit 23. In this case, the textbook data generation condition information includes, for example, information indicating conditions that stipulate the start and end times of work for one workpiece that is to be used as a textbook for the routine work of each process, and information indicating conditions that stipulate the zone of each process.

[0076] In the above-mentioned embodiments 1 and 2, the measurement data acquisition unit 25 of the work judgment device 2 acquires measurement data from a tag reader placed at the manufacturing site where the actual production line is located, but this is not limited to the above, and positioning data may be acquired from a device or system other than a tag reader, or positioning data may be input from a user.

[0077] In the above first and second embodiments, the textbook data is resource presence / absence data indicating the presence / absence of each resource within the zone of the work time for one workpiece, which is the textbook for the routine work of each process on the production line, and the performance data is resource presence / absence data indicating the presence / absence of each resource within the zone of the work time for one workpiece in each process, and the presence / absence of each resource is in two patterns, "present" or "absent", but the presence / absence of each resource is not limited to two patterns. For example, the presence / absence of each resource may be in three patterns, "always present", "present but not always", and "absent", or in four patterns, "always present", "present in the first half", "present in the second half", and "absent" for the work time for one workpiece.

[0078] In the above first and second embodiments, an example has been described in which the working time of each process in a product production line is separated into routine work time and non-routine work time. However, this is not limited to this, and as long as the production line has a process for producing goods at a production site with multiple resources, it is possible to separate the working time of the process into routine work time and non-routine work time.

[0079] Although the preferred embodiments have been described in detail above, the present invention is not limited to the above-described embodiments, and various modifications and substitutions can be made to the above-described embodiments without departing from the scope of the claims.

[0080] Various aspects of the present disclosure are summarized below as appendices.

[0081] (Appendix 1) a first operation input unit that receives a modeling operation of a production line and generates a model of the production line; a simulation execution unit that simulates a behavior of the production line based on the model of the production line and generates simulation result information indicating a simulation result; a textbook data generating unit that generates textbook data indicating the presence or absence of each resource within a zone during the time period from the start to the end of one piece of work to be used as a textbook for the routine work of each process on the production line, based on textbook data generating condition information including information indicating the start and end times of one piece of work to be used as a textbook for the routine work of each process and information indicating a zone that is an area required for the work of one piece of work in each process, and the simulation result information; a measurement data acquisition unit that acquires measurement data obtained by measuring radio waves received from tags attached to the resources by a tag reader disposed at a production site having the resources; a coordinate estimation unit that estimates coordinates of each resource based on the measurement data and generates coordinate data indicating the coordinates of each resource; a performance data generating unit that generates performance data indicating the presence or absence of each resource within the zone during the time period from the start to the end of work for one work in each process, based on performance data generating condition information indicating conditions that define the time period from the start to the end of work for one work in each process and the coordinate data; a comparison / determination unit that compares the textbook data with the performance data to determine whether the work indicated by the performance data is a routine work or a non-routine work, and outputs determination result information that indicates the determination result; A simulation system comprising: (Appendix 2) A second operation input unit is further provided for receiving a setting operation for setting the start and end times of a work for one workpiece to be used as a textbook for a routine operation of each process of the production line and the zone of each process, and for generating the textbook data generation condition information. 2. The simulation system of claim 1. (Appendix 3) the matching determination unit matches the presence or absence of each resource in the zone of the textbook data with the presence or absence of each resource in the zone of the performance data to determine whether or not they match, and if they match, determines that the work indicated by the performance data is routine work, and if they do not match, determines that the work indicated by the performance data is non-routine work; 3. The simulation system of claim 1 or 2. (Appendix 4) the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone in each process of the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; When the collation / determination unit determines that the work indicated by the performance data is a regular work, it outputs regular determination result information that indicates the work time for one workpiece in the time chart of the performance data as the work time of the regular work, and when the collation / determination unit determines that the work indicated by the performance data is a non-regular work, it outputs non-regular determination result information that indicates that the work time for one workpiece in the time chart of the performance data is the work time during which the non-regular work was performed, together with the measurement time chart. 4. A simulation system according to any one of claims 1 to 3. (Appendix 5) the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone in each process of the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; the simulation execution unit simulates a behavior of the production line based on simulation condition information including task time information indicating a task time for one workpiece in each process of the production line model; when the comparison / determination unit determines that one task indicated by the performance data is a routine task, it outputs routine determination result information which sets the task time of one task in the time chart of the performance data as the task time of the routine task, and when the comparison / determination unit determines that one task indicated by the performance data is a non-routine task, it outputs non-routine determination result information which sets the time in the measurement time chart during which the same resources as in the time chart of the performance data are present consecutively as the task time of the non-routine task; and an update unit which, when the steady-state determination result information is output, cumulatively stores the steady-state determination result information, updates the work time information with information indicating an average value of work times for one time chart of performance data included in the steady-state determination result information as work time information for steady work, and, when the non-steady-state determination result information is output, adds information indicating the work time of non-steady-state work included in the non-steady-state determination result information to the work time information as work time information for non-steady-state work. 4. A simulation system according to any one of claims 1 to 3. (Appendix 6) the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone in each process of the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; When the collation / determination unit determines that the work indicated by the performance data is regular work, it outputs regular determination result information that sets the work time for one workpiece on the time chart of the performance data as the work time of regular work, and when the collation / determination unit determines that the work indicated by the performance data is non-regular work, it outputs non-regular determination result information that sets the work time for one workpiece on the time chart of the performance data as the work time during which non-regular work was performed, together with the measurement time chart and video data capturing the zone of the work time for one workpiece on the time chart of the performance data. 4. A simulation system according to any one of claims 1 to 3. (Appendix 7) a textbook data generating unit that generates textbook data indicating the presence or absence of each resource within a zone during the time from the start to the end of one piece of work to be used as a textbook for routine work in each process of the production line, based on textbook data generating condition information including information indicating the start and end times of one piece of work to be used as a textbook for routine work in each process, and information indicating a zone which is an area required for the work of one piece of work in each process, and simulation result information indicating a simulation result obtained by simulating the behavior of the production line based on a model of the production line; a measurement data acquisition unit that acquires measurement data obtained by measuring radio waves received from tags attached to the resources by a tag reader disposed at a production site having the resources; a coordinate estimation unit that estimates coordinates of each resource based on the measurement data and generates coordinate data indicating the coordinates of each resource; a performance data generating unit that generates performance data indicating the presence or absence of each resource within the zone during the time period from the start to the end of work for one work in each process, based on performance data generating condition information indicating conditions that define the time period from the start to the end of work for one work in each process and the coordinate data; a comparison / determination unit that compares the textbook data with the performance data to determine whether the work indicated by the performance data is a routine work or a non-routine work, and outputs determination result information that indicates the determination result; An operation determination device comprising: (Appendix 8) The simulation system executes accepting a modeling operation for a production line and generating a model of the production line; simulating a behavior of the production line based on the model of the production line, and generating simulation result information indicating a simulation result; generating textbook data indicating the presence or absence of each resource within a zone during the time from the start to the end of one work piece to be used as a textbook for routine work in each process of the production line, based on textbook data generation condition information including information indicating the start and end times of the work piece to be used as a textbook for routine work in each process, and information indicating a zone that is an area required for the work piece to be used as a textbook for routine work in each process, and the simulation result information; A step of estimating coordinates of each resource based on measurement data obtained by measuring radio waves received from tags attached to each resource by a tag reader disposed in a production site having the resources, and generating coordinate data indicating the coordinates of each resource; generating performance data indicating the presence or absence of each resource within said zone during the time period from the start to the end of work for one work in each process, based on performance data generation condition information indicating conditions defining the start to end of work for one work in each process and said coordinate data; a step of collating the textbook data with the performance data to determine whether the work indicated by the performance data is a regular work or a non-regular work, and outputting determination result information indicating the determination result; The work determination method includes the steps of: (Appendix 9) Computer, a textbook data generating unit that generates textbook data indicating the presence or absence of each resource within a zone during the time period from the start to the end of one piece of work to be used as a textbook for the routine work of each process on the production line, based on textbook data generating condition information including information indicating the start and end times of one piece of work to be used as a textbook for the routine work of each process on the production line, and information indicating a zone which is an area required for the work of one piece of work in each process, and simulation result information indicating a simulation result obtained by simulating the behavior of the production line based on a model of the production line; a coordinate estimation unit that estimates the coordinates of each resource based on measurement data obtained by measuring radio waves received from tags attached to each resource by a tag reader disposed at a production site having the resources, and generates coordinate data indicating the coordinates of each resource; a performance data generating unit that generates performance data indicating the presence or absence of each resource within the zone during the time period from the start to the end of work for one workpiece in each process, based on performance data generating condition information indicating conditions that define the time period from the start to the end of work for one workpiece in each process and the coordinate data; and a comparison / determination unit that compares the textbook data with the performance data to determine whether the work indicated by the performance data is a regular work or a non-regular work, and outputs determination result information that indicates the determination result; A program that functions as a [Explanation of symbols]

[0082] 1 Simulation device, 2 Work judgment device, 11 Memory unit, 12 Operation input unit, 13 Simulation execution unit, 14 Communication unit, 15 Update unit, 21 Memory unit, 22 Communication unit, 23 Operation input unit, 24 Textbook data generation unit, 25 Measurement data acquisition unit, 26 Coordinate estimation unit, 27 Performance data generation unit, 28 Comparison judgment unit, 100 Simulation system, 101 Temporary memory unit, 102 Memory unit, 103 Calculation unit, 104 Input unit, 105 Transmission / reception unit, 106 Display unit, 111 Simulation condition memory unit, 112 Simulation result memory unit, 211 Textbook data generation condition memory unit, 212 Textbook data memory unit, 213 Coordinate data memory unit, 214 Performance data memory unit, Z zone.

Claims

1. a first operation input unit that receives a modeling operation of a production line and generates a model of the production line; a simulation execution unit that simulates a behavior of the production line based on the model of the production line and generates simulation result information indicating a simulation result; a textbook data generating unit that generates textbook data indicating the presence or absence of each resource within a zone during the time period from the start to the end of one piece of work to be used as a textbook for the routine work of each process on the production line, based on textbook data generating condition information including information indicating the start and end times of one piece of work to be used as a textbook for the routine work of each process and information indicating a zone that is an area required for the work of one piece of work in each process, and the simulation result information; a measurement data acquisition unit that acquires measurement data obtained by measuring radio waves received from tags attached to the resources by a tag reader disposed at a production site having the resources; a coordinate estimation unit that estimates coordinates of each resource based on the measurement data and generates coordinate data indicating the coordinates of each resource; a performance data generating unit that generates performance data indicating the presence or absence of each resource within the zone during the time period from the start to the end of work for one work in each process, based on performance data generating condition information indicating conditions that define the time period from the start to the end of work for one work in each process and the coordinate data; a comparison / determination unit that compares the textbook data with the performance data to determine whether the work indicated by the performance data is a routine work or a non-routine work, and outputs determination result information that indicates the determination result; A simulation system comprising:

2. a second operation input unit that receives a setting operation for setting the start and end times of a work for one workpiece to be used as a textbook for a routine operation of each process of the production line and the zone of each process, and generates the textbook data generation condition information; The simulation system according to claim 1 .

3. the matching determination unit matches the presence or absence of each resource in the zone of the textbook data with the presence or absence of each resource in the zone of the performance data to determine whether or not they match, and if they match, determines that the work indicated by the performance data is routine work, and if they do not match, determines that the work indicated by the performance data is non-routine work; The simulation system according to claim 1 or 2.

4. the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone of each process during the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; When the collation / determination unit determines that the work indicated by the performance data is regular work, it outputs regular determination result information which sets the work time for one workpiece in the time chart of the performance data as the work time of the regular work, and when the collation / determination unit determines that the work indicated by the performance data is non-regular work, it outputs non-regular determination result information which sets the work time for one workpiece in the time chart of the performance data as the work time when the non-regular work was performed, together with the measurement time chart. The simulation system according to claim 1 or 2.

5. the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone of each process during the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; When the collation / determination unit determines that the work indicated by the performance data is regular work, it outputs regular determination result information which sets the work time for one workpiece in the time chart of the performance data as the work time of the regular work, and when the collation / determination unit determines that the work indicated by the performance data is non-regular work, it outputs non-regular determination result information which sets the work time for one workpiece in the time chart of the performance data as the work time when the non-regular work was performed, together with the measurement time chart. The simulation system according to claim 3 .

6. the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone of each process during the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; the simulation execution unit simulates a behavior of the production line based on simulation condition information including task time information indicating a task time for one workpiece in each process of the production line model; when the comparison / determination unit determines that one task indicated by the performance data is a routine task, it outputs routine determination result information which sets the task time of one task in the time chart of the performance data as the task time of the routine task, and when the comparison / determination unit determines that one task indicated by the performance data is a non-routine task, it outputs non-routine determination result information which sets the time in the measurement time chart during which the same resources as those in the time chart of the performance data exist consecutively as the task time of the non-routine task, an update unit that, when the steady-state determination result information is output, cumulatively stores the steady-state determination result information, updates the work time information with information indicating an average value of work times for one time chart of performance data included in the steady-state determination result information as work time information for steady work, and, when the non-steady-state determination result information is output, adds information indicating the work time of non-steady-state work included in the non-steady-state determination result information to the work time information as work time information for non-steady-state work; The simulation system according to claim 1 or 2.

7. the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone of each process during the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; the simulation execution unit simulates a behavior of the production line based on simulation condition information including task time information indicating a task time for one workpiece in each process of the production line model; when the comparison / determination unit determines that one task indicated by the performance data is a routine task, it outputs routine determination result information which sets the task time of one task in the time chart of the performance data as the task time of the routine task, and when the comparison / determination unit determines that one task indicated by the performance data is a non-routine task, it outputs non-routine determination result information which sets the time in the measurement time chart during which the same resources as those in the time chart of the performance data exist consecutively as the task time of the non-routine task, an update unit that, when the steady-state determination result information is output, cumulatively stores the steady-state determination result information, updates the work time information with information indicating an average value of work times for one time chart of performance data included in the steady-state determination result information as work time information for steady work, and, when the non-steady-state determination result information is output, adds information indicating the work time of non-steady-state work included in the non-steady-state determination result information to the work time information as work time information for non-steady-state work; The simulation system according to claim 3 .

8. the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone of each process during the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; When the collation / determination unit determines that the work indicated by the performance data is regular work, it outputs regular determination result information that sets the work time for one workpiece on the time chart of the performance data as the work time of regular work, and when the collation / determination unit determines that the work indicated by the performance data is non-regular work, it outputs non-regular determination result information that sets the work time for one workpiece on the time chart of the performance data as the work time during which non-regular work was performed, together with the measurement time chart and video data capturing the zone of the work time for one workpiece on the time chart of the performance data. The simulation system according to claim 1 or 2.

9. the performance data generation unit generates a measurement time chart indicating the presence or absence of each resource in the zone of each process during the measurement time of the tag reader based on the coordinate data, and generates the performance data by extracting the operation time for one work from the measurement time chart based on the textbook data generation condition information; When the collation / determination unit determines that the work indicated by the performance data is regular work, it outputs regular determination result information that sets the work time for one workpiece on the time chart of the performance data as the work time of regular work, and when the collation / determination unit determines that the work indicated by the performance data is non-regular work, it outputs non-regular determination result information that sets the work time for one workpiece on the time chart of the performance data as the work time during which non-regular work was performed, together with the measurement time chart and video data capturing the zone of the work time for one workpiece on the time chart of the performance data. The simulation system according to claim 3 .

10. a textbook data generating unit that generates textbook data indicating the presence or absence of each resource within a zone during the time from the start to the end of one piece of work to be used as a textbook for routine work in each process of the production line, based on textbook data generating condition information including information indicating the start and end times of one piece of work to be used as a textbook for routine work in each process, and information indicating a zone which is an area required for the work of one piece of work in each process, and simulation result information indicating a simulation result obtained by simulating the behavior of the production line based on a model of the production line; a measurement data acquisition unit that acquires measurement data obtained by measuring radio waves received from tags attached to the resources by a tag reader disposed at a production site having the resources; a coordinate estimation unit that estimates coordinates of each resource based on the measurement data and generates coordinate data indicating the coordinates of each resource; a performance data generating unit that generates performance data indicating the presence or absence of each resource within the zone during the time period from the start to the end of work for one work in each process, based on performance data generating condition information indicating conditions that define the time period from the start to the end of work for one work in each process and the coordinate data; a comparison / determination unit that compares the textbook data with the performance data to determine whether the work indicated by the performance data is a routine work or a non-routine work, and outputs determination result information that indicates the determination result; An operation determination device comprising:

11. The simulation system executes accepting a modeling operation for a production line and generating a model of the production line; simulating a behavior of the production line based on the model of the production line, and generating simulation result information indicating a simulation result; generating textbook data indicating the presence or absence of each resource within a zone during the time from the start to the end of one work piece to be used as a textbook for routine work in each process of the production line, based on textbook data generation condition information including information indicating the start and end times of the work piece to be used as a textbook for routine work in each process, and information indicating a zone that is an area required for the work piece to be used as a textbook for routine work in each process, and the simulation result information; A step of estimating coordinates of each resource based on measurement data obtained by measuring radio waves received from tags attached to each resource by a tag reader disposed in a production site having the resources, and generating coordinate data indicating the coordinates of each resource; generating performance data indicating the presence or absence of each resource within said zone during the time period from the start to the end of work for one work in each process, based on performance data generation condition information indicating conditions defining the start to end of work for one work in each process and said coordinate data; a step of collating the textbook data with the performance data to determine whether the work indicated by the performance data is a regular work or a non-regular work, and outputting determination result information indicating the determination result; The work determination method includes the steps of:

12. Computer, a textbook data generating unit that generates textbook data indicating the presence or absence of each resource within a zone during the time from the start to the end of one piece of work to be used as a textbook for the routine work of each process on the production line, based on textbook data generating condition information including information indicating the start and end times of the work for one piece of work to be used as a textbook for the routine work of each process on the production line, and information indicating a zone which is an area required for the work for one piece of work in each process, and simulation result information indicating a simulation result obtained by simulating the behavior of the production line based on a model of the production line; a coordinate estimation unit that estimates the coordinates of each resource based on measurement data obtained by measuring radio waves received from tags attached to each resource by a tag reader disposed at a production site having the resources, and generates coordinate data indicating the coordinates of each resource; a performance data generating unit that generates performance data indicating the presence or absence of each resource within the zone during the time period from the start to the end of work for one workpiece in each process, based on performance data generating condition information indicating conditions that define the time period from the start to the end of work for one workpiece in each process and the coordinate data; and a comparison / determination unit that compares the textbook data with the performance data to determine whether the work indicated by the performance data is a regular work or a non-regular work, and outputs determination result information that indicates the determination result; A program that functions as a