Energy optimization plant and method for operating same

The energy-optimized plant addresses the limitations of gas turbine plants by integrating a power control unit to switch energy between power grid and cryptocurrency mining, enhancing profitability through real-time optimization.

JP2024541473AActive Publication Date: 2024-11-08NUOVO PIGNONE SPA
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2024531010
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-11-23
Filing Date
2022-11-15
Publication Date
2024-11-08
Estimated Expiration
2042-11-15

AI Technical Summary

Technical Problem

Gas turbine plants are limited in their operational flexibility and profitability due to being directly connected to the power grid, with energy generation paid based on current market prices, lacking alternative uses and profitability determination systems.

Method used

An energy-optimized plant integrating a power generation unit, communication network, distributed computing system for cryptocurrency mining, and power control unit that switches energy between power grid and mining system based on real-time energy and cryptocurrency value comparison.

Benefits of technology

Enables more profitable use of energy by switching between power grid and cryptocurrency mining, maximizing benefits in peak load applications through real-time optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024541473000001_ABST
    Figure 2024541473000001_ABST
Patent Text Reader

Abstract

An energy optimization plant for peak load applications. The plant has power generation units, and the generated energy is switched to feed a distributed computing system for mining cryptocurrencies or to be injected into the power grid for distribution. A power control unit switches the power generated by the power generation units based on data obtained from a communication network such as the Internet.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to energy optimized plants, in particular plants comprising gas turbines, intended to be used for producing energy in peak load applications, i.e. applications in which electricity is generated and sold only when there is a high demand for electricity. [Background technology]

[0002] In the field of energy production, gas turbine plants are usually installed to supply energy to compensate for load peak applications. In particular, when the power grid to which the gas turbine is connected needs to bear the energy peak, for example, during the summer when domestic and industrial chillers are all switched on at a certain moment of the day, or in other situations, the gas turbine of the plant starts to operate or increases the power generated to make up for the excess power demand.

[0003] Gas turbines, typically used in peak load applications, are systems based on the combustion of fuels. The energy transition leads to clean fuels such as H2 and / or CH3OH, NH3, biodiesel and biomethane. Such fuels can be used as stand-alone fuels or can be mixed with other fossil fuels or clean fuels.

[0004] Operators of plants that run gas turbines that inject energy into the grid are paid according to the present value of the energy traded onto the international energy market. Summary of the Invention [Problem to be solved by the invention]

[0005] Therefore, the operator has no choice when it comes to knowing if a better use of the generated energy is available. For these reasons too, gas turbine plants are only directly connected to the power grid.

[0006] The possibility of alternative uses of energy, along with a system capable of determining which source is more beneficial, would be welcomed in the field.

[0007] Generally, cryptocurrency mining systems refer to the process of obtaining cryptocurrency by solving cryptographic equations using high-powered computers. The process involves verifying blocks of data and adding transaction records to a public record known as the blockchain. There are facilities equipped with all the equipment necessary to mine cryptocurrencies such as Bitcoins, Ethereum, and / or other cryptocurrencies.

[0008] Cryptocurrency mining is energy intensive: the Bitcoin network, for example, is estimated to consume nearly 80 terawatt-hours per year.

[0009] In one aspect, the subject matter disclosed herein relates to an energy optimization plant for peak load applications. The plant comprises a power generation unit and a communication network, such as the Internet, that may retrieve information on technical and / or economic optimization parameters. The plant also comprises a distributed computing system for mining cryptocurrency, which requires energy to operate, and a power grid for distributing electricity. The plant also comprises a power control unit connected to the power generation unit and the distributed computing system. The power control unit is also connected to the communication network to retrieve data. Through the power control unit, it is possible to switch energy generated by the power generation unit to the power grid or the distributed computing system according to at least one energy optimization criterion based on one or more technical or economic optimization parameters.

[0010] In another aspect, the subject matter disclosed herein relates to the fact that technical or economic optimization parameters are a function of energy data and cryptocurrency mining data, such as regarding the price of electrical energy and the value of cryptocurrencies such as Bitcoin.

[0011] A further aspect of the invention is directed to the fact that the power generating unit is a gas turbine based on fossil fuels and / or clean fuels and / or a mixture thereof. In particular, the clean fuels include hydrogen, or ethanol, or methanol, or ammonia, or biogas, or biodiesel. These can be used as single compounds or can be mixed with other clean fuels or fossil fuels.

[0012] In another aspect, disclosed herein is a power switching device for switching energy generated by a power generation unit to a power grid or a distributed computing system, in which the power control unit comprises a processing unit configured to obtain energy data and cryptocurrency mining data over a communication network.

[0013] A further aspect of the present disclosure relates to a method for switching energy generated by a power generation unit, the method including: acquiring energy data and cryptocurrency mining data by a communication network through a power control unit, evaluating the use of the energy generated by the power generation unit based on the energy data and cryptocurrency mining data acquired in the steps, determining the convenience of supplying energy to a distributed computing system or injecting electricity generated by the power generation unit into a power grid based on one or more technical or economic optimization parameters according to an energy optimization criterion, and switching the energy generated by the power generation unit to the distributed computing system or the power grid by a power switching device. [Brief description of the drawings]

[0014] A complete understanding of the disclosed embodiments of the present invention and many of the attendant advantages thereof will be readily obtained as the same become better understood by reference to the following detailed description when considered in connection with the accompanying drawings, in which: [Figure 1] FIG. 1 shows a schematic diagram of an energy optimization plant according to an embodiment. [Diagram 2] FIG. 2 shows a schematic diagram of a power control unit included in the energy optimization plant of FIG. [Diagram 3] FIG. 3 shows a block diagram of a method of operation of the energy optimization plant of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] In the field of power generating units, gas turbines are often used to provide energy in case of peak energy demand of the power grid. In such situations, the energy produced by the gas turbine is usually paid for based on the current price of the traded energy. The present disclosure relates to an energy optimization plant and a method of operating the same, which compares in real time the current price of the traded energy with the value of one or more cryptocurrencies, so that the generated energy can be used more profitably, and in some cases, the produced energy can be diverted to a cryptocurrency mining system that requires a significant amount of energy to operate.

[0016] Below, the switching operations of an energy optimized plant are disclosed to show how the plant switches to possible alternative energy usage options.

[0017] Referring now to the drawings, Figure 1 shows one embodiment of an energy optimizing plant, generally designated with the reference letter P. Hereinafter, and solely for ease of reference, the energy optimizing plant P may also be referred to as plant P.

[0018] The plant P generally comprises a power generation unit 1, a power control unit 2 connected to the power generation unit 1, a distributed computing system 3, and a power grid 4. Both the distributed computing system 3 and the power grid 4 are each connected to the power control unit 2.

[0019] As shown in Fig. 1, a power generating unit 1, such as a gas turbine, is configured to generate electricity. In particular, in this embodiment, the power generating unit 1 is a gas turbine, which may be based on fossil fuels and / or clean fuels and / or a mixture thereof, making it possible to convert fuels into mechanical energy to generate electrical energy. According to the present disclosure, clean fuels include hydrogen, or ethanol, or methanol, or ammonia, or biogas, or biodiesel, which may be used as a single compound or may be mixed with other clean fuels or fossil fuels. In other embodiments, other gases or fuels may be used.

[0020] The gas turbine can be started whenever energy is needed by the power grid 4 .

[0021] As mentioned above, the power generation unit 1 is operatively connected to a power control unit 2, which, as can be seen with reference to Fig. 2, comprises a circuit board having a bus 203 thereon, a programmable processor or processing unit 200 coupled to the bus 203, a computer readable memory or storage means 201 for storing data coupled to the bus 203, and a human interface 204, such as a common laptop or computer, by which a human operator may control or track the operation of the plant P. The power control unit 2 also comprises a power switching device 202 configured to switch the energy generated by the power generation unit 1 to the power grid 4 or the distributed computing system 3, and has input / output ports connected to the bus 203 and configured to connect to the human machine interface 204.

[0022] Further, according to the present disclosure, the power control unit 2 is also connected to a communication network N, i.e., a connected network system that facilitates communication and access to data, such as the Internet, and obtains data from the communication network N regarding energy data and cryptocurrency mining data, as well as information regarding one or more technical or economic optimization parameters. In other embodiments, the power control unit 2 may be connected to a computer or multiple computers connected to the communication network N.

[0023] The processing unit 200 is a functional part of the power control unit 2 of the plant P according to the present disclosure. In particular, the processing unit 200 comprises calculation and processing means arranged to execute computer programs for making beneficial use of the energy produced by the power generation unit 1, as well as performing interfaces with the other elements of the power control unit 2.

[0024] In accordance with the present disclosure, the processing unit 200 is a microcontroller, however, in other embodiments, the processing unit 200 may include one computer or multiple computers connected to each other in a network or cloud-connected, for example.

[0025] Furthermore, the processing unit 200 is also configured to control and coordinate the operation of the elements of the power control unit 2 with which it is connected and in communication.

[0026] In particular, the processing unit 200 is configured to obtain energy data and cryptocurrency mining data by means of the communication network N. Furthermore, the processing unit 200 is also configured to control the power switching device 202 and thus the switching of the energy generated by the power generation unit 1 to the power grid 4 or to the distributed computing system 3 according to an energy optimization criterion based on one or more technical or economic optimization parameters.

[0027] The one or more technical or economic optimization parameters are functions of the energy data and the cryptocurrency mining data. More specifically, according to the present embodiment, such optimization parameters are related to the current (generally real-time) price of electric energy and the current (generally real-time) value of a cryptocurrency, such as Bitcoin or other alternative coin, provided in real-time to the processing unit 200 by the communication network N. In other embodiments, such optimization parameters may be related to historical data, technical analysis, and trends related to electric energy and cryptocurrency.

[0028] Specifically, the programs executed by the computing device 200 may be based not only on current energy prices and cryptocurrency values, but also on prediction-based algorithms.

[0029] Thus, the computing device 200 is configured to determine the convenience of supplying energy to the distributed computing system 3 or injecting electricity generated by the power generation unit 1 into the power grid 4 according to an energy optimization criterion based on at least one optimization parameter.

[0030] As mentioned above, the power control unit 2 also comprises storage means 201. The storage means 201, for example a database, allows for storing, for example, historical energy data and historical cryptocurrency mining data obtained by the processing device 200 over time.

[0031] The storage means 201 is included in the power control unit 2. However, in other embodiments, the storage means 201 may be external to the power control unit 2 and operatively connected thereto.

[0032] As mentioned above, the power control unit 2 also includes a power switching device 202 operably connected to the processing unit 200. In particular, the power switching device 202 is configured to switch the energy generated by the power generation unit 1 to the power grid 4 or the distributed computing system 3 in response to commands from the processing unit 200.

[0033] The power-switching device 202 may be a power semiconductor switch, such as a metal-oxide-silicon transistor (MOSFET), an insulated-gate bipolar transistor (IGBT), or a bipolar junction transistor (BJT), designed to handle large amounts of power between an energy source and an associated load. In other embodiments, the type of power-switching device 202 may be different.

[0034] The distributed computing system 3 is configured for cryptocurrency mining and requires energy to operate. In particular, according to the present disclosure, the distributed computing system 3 is a cryptocurrency mining farm, i.e., a facility equipped with all the equipment necessary to mine cryptocurrency.

[0035] However, in other embodiments, the type and number of distributed computing systems 3 may differ. For example, distributed computing system 3 may comprise one or more structures, such as a room or warehouse, that house multiple computers configured to mine one or several cryptocurrencies.

[0036] A block diagram of a method M for switching the energy generated by a power generating unit 1 according to the present disclosure is shown in FIG.

[0037] First, the arithmetic processing device 200 of the power control unit 2 acquires energy data and cryptocurrency mining data via the communication network N (step M1).

[0038] Next, the processing unit 200 compares the energy data obtained in step M1 with the cryptocurrency mining data (step M2). In other words, the processing unit 200 checks whether the price of electricity is higher than the value of the cryptocurrency. In other embodiments, the processing unit 200 may execute more sophisticated algorithms to evaluate more advantageous energy usage, possibly based on historical parameter data, or other additional technical or economic optimization parameters, as described above.

[0039] Next, according to an energy optimization criterion based on at least one optimization parameter, the computing device 200 determines the convenience of supplying energy to the distributed computing system 3 or injecting the electricity generated by the power generation unit 1 into the power grid 4 (step M3).

[0040] In particular, if cryptocurrency mining is advantageous, the power control unit 2 switches the energy generated by the power generation unit 1 to the distributed computing system 3 via the power switching device 202 (step M4) to obtain a proportional amount of cryptocurrency.

[0041] Alternatively, if it is convenient to inject the power generated by the power generation unit 1 into the power grid 4, the power control unit 2 switches the energy generated by the power generation unit 1 to the power grid 4 via the power switching device 202 (step M4).

[0042] Additionally, the power control unit 2 may stop any crypto mining currently running on the distributed computing system 3 in order to switch to electrical energy generation.

[0043] An advantage of the present disclosure is that it provides a system that can compare the current price of energy being traded with the value of one or more cryptocurrencies in real time to make more profitable use of the energy being generated.

[0044] Another advantage of the present disclosure is maximizing the profits of peak load applications where gas turbine service rates are low through crypto mining.

[0045] While aspects of the invention have been described in terms of various specific embodiments, it will be apparent to those skilled in the art that many modifications, changes, and omissions are possible without departing from the spirit and scope of the claims. Furthermore, unless otherwise specified herein, the order or sequence of any process or method steps may be modified or rearranged according to alternative embodiments.

[0046] Reference will now be made in detail to embodiments of the present disclosure, one or more examples of which are illustrated in the drawings. Each example is provided as an explanation of the present disclosure, not as a limitation of the present disclosure. Indeed, it will be apparent to those skilled in the art that various modifications and variations can be made to the present disclosure without departing from the scope or spirit of the present disclosure. References throughout this specification to "one embodiment" or "an embodiment" or "some embodiments" mean that a particular feature, structure, or characteristic described in connection with an embodiment is included in at least one embodiment of the disclosed subject matter. Thus, the appearance of the phrases "in one embodiment" or "in an embodiment" or "in some embodiments" in various places throughout this specification do not necessarily refer to the same embodiment. Furthermore, particular features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.

[0047] When presenting elements of various embodiments, the articles "a," "an," "the," and "said" are intended to mean that there are one or more of the elements. The terms "comprising," "including," and "having" are intended to be inclusive and mean that there may be additional elements other than the listed elements.

Claims

1. 1. An energy optimized plant for peak load applications, comprising: a power generation unit for generating energy; a communications network for providing information regarding one or more technical or economic optimization parameters; At least one distributed computing system for mining cryptocurrency, which requires energy to operate; a power transmission grid for distributing the electricity; a power control unit operably connected to the power generation unit and to the distributed computing system, the power control unit also operatively connected to the communication network for retrieving data relating to the one or more technical or economic optimization parameters; The energy optimization plant, wherein the power control unit is configured to switch the energy generated by the power generation units to the power grid or to the distributed computing system according to at least one energy optimization criterion based on the one or more technical or economic optimization parameters.

2. 2. The energy optimization plant of claim 1, wherein the one or more technical or economic optimization parameters are a function of energy data and cryptocurrency mining data relating to the price of electric energy and the value of cryptocurrency.

3. 2. Energy optimization plant according to claim 1, wherein the power generating unit (1) is a gas turbine based on fossil fuels and / or clean fuels and / or a mixture thereof.

4. 4. The energy optimization plant of claim 3, wherein the clean fuel comprises hydrogen, or ethanol, or methanol, or ammonia, or biogas, or biodiesel, which may be used as a single compound or may be mixed with other clean fuels or fossil fuels.

5. the power control unit comprises a power switching device configured to switch the energy generated by the power generation unit to the power grid or to the distributed computing system; the power control unit comprises a processor configured to acquire energy data and cryptocurrency mining data over the communication network; 2. The energy optimized plant of claim 1.

6. 6. The energy optimization plant of claim 5, wherein the processor is also configured to control the power switching device to switch the energy generated by the power generation unit and to determine the convenience of supplying energy to the distributed computing system or the power grid.

7. 2. The energy optimization plant according to claim 1, wherein the power control unit comprises a storage means connected to the processing unit for storing the energy data and the cryptocurrency mining data obtained by the processing unit.

8. 10. The energy optimization plant of claim 1, wherein the distributed computing system is a facility housing a plurality of computers configured to mine one or several cryptocurrencies, such as Bitcoin.

9. 10. The energy optimization plant of claim 1, wherein the communication network is a connected network system that facilitates communication and access to data, such as the Internet.

10. 1. A method for switching the energy produced by a power generation unit, comprising: acquiring energy data and cryptocurrency mining data through a communication network via a power control unit; evaluating the use of the energy generated by the power generation unit based on the energy data and the cryptocurrency mining data obtained in the steps; determining the convenience of supplying energy to the distributed computing system or injecting the electricity generated by the power generating units into the power grid based on the one or more technical or economic optimization parameters according to at least one energy optimization criterion; switching, by a power switching device, the energy generated by the power generating unit to the distributed computing system or to the power grid.

11. 11. The method of claim 10, wherein the step of evaluating the use of the energy generated by a power generating unit includes a comparison between the energy data and the cryptocurrency mining data.

12. 11. The method of claim 10, wherein the one or more technical or economic optimization parameters are a function of energy data and cryptocurrency mining data relating to the price of the electric energy and the value of the cryptocurrency, such as Bitcoin or other alternative coins.

Citation Information

Patent Citations

  • Demand control method, control device, program, and power system

    JP2020202702A

  • Electric transaction system, electric transaction method, and electric power device

    JP2021034826A

  • Distributing substation

    JP2021132484A

  • Method and system for cryptocurrency mining center

    US20210192499A1

  • Methods and systems for meeting rapidly fluctuating power demands using interruptible load and stable power production

    US20210287309A1