Demand response effect calculation system, demand response effect calculation method, and program

The demand response effect calculation system accurately estimates power demand by analyzing air conditioning load and power consumption data to address the deviation issue in conventional methods, ensuring precise evaluation of demand response effectiveness.

JP2026048148AActive Publication Date: 2026-03-17TOKYO GAS ENG SOLUTIONS
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2026-03-17

Smart Images

  • Figure 2026048148000001_ABST
    Figure 2026048148000001_ABST
Patent Text Reader

Abstract

This helps to prevent the baseline electricity demand from deviating from actual demand. [Solution] In the control unit 11 of the management server 10 that constitutes the demand response effect calculation system, the management unit 112 records air conditioning load performance information regarding the actual air conditioning load of the air-conditioned space on days when DR is not implemented, and power consumption performance information regarding the actual power consumption of air conditioning equipment installed for air conditioning of the air-conditioned space. The demand amount calculation unit 113 calculates the expected power demand amount (baseline) that would be expected if demand response were not implemented during the DR implementation period, based on the correlation between the air conditioning load and power consumption of the air-conditioned space, which is identified from the air conditioning load performance information and power consumption performance information. The effect calculation unit 114 calculates the effect of the demand response based on the expected power demand amount and power consumption performance information during the DR implementation period.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Industrial demand-response implementation system, industrial demand-response implementation method, and program

    JP2016081074A