Demand response management device, demand response management method and program
The demand response management device efficiently balances power supply and demand by selecting consumers for power adjustment and enabling task migration between systems, addressing inefficiencies in existing systems due to transmission losses and prediction inaccuracies.
Patent Information
- Application Number
- JP2023504897
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-03-08
- Publication Date
- 2024-09-18
- Estimated Expiration
- 2041-03-08
AI Technical Summary
Existing demand response systems face challenges in efficiently balancing power supply and demand due to transmission and distribution losses across different power systems, and poor prediction accuracy in adjusting electricity usage based on renewable energy fluctuations.
A demand response management device that includes a customer selection unit to identify consumers whose power usage can be adjusted to meet demand requests, utilizing tables to associate consumer and aggregator information for efficient power suppression or promotion, and task migration between systems when necessary to balance demand.
Enables efficient balancing of power supply and demand by adjusting consumer power usage in real-time, even across different power systems, improving prediction accuracy and reducing transmission losses.
Smart Images

Figure 0007552857000002 
Figure 0007552857000007 
Figure 0007552857000001
Abstract
Description
[Technical field]
[0001] The present invention relates to a demand response management device, a demand response management method, and a program for controlling the amount of power supplied by a power company to a consumer so that the consumer reduces or promotes the amount of power usage. [Background technology]
[0002] Many countries are making efforts to increase the proportion of renewable energy (also called regenerative energy) in the total amount of electricity generated in their countries. In order for power companies to provide a stable supply of electricity to consumers, it is necessary to maintain a balance between the supply and demand of electricity. However, renewable energy is easily affected by the weather of the day, making it difficult to stabilize supply and demand. When the balance between supply and demand of electricity is disrupted, the process of restoring the balance by adjusting the amount of electricity used by consumers to suppress or promote it is called demand response (also called DR).
[0003] In DR, a power company requests an aggregator, which stands between the power company and consumers and controls the balance of supply and demand, to adjust the amount of power used by consumers. The aggregator selects an appropriate consumer in response to the request through demand response, and performs processing to suppress or promote the amount of power used. Consumers who adjust their amount of power use receive incentives (remuneration) according to the amount of adjusted power, for example. Examples of conventional technologies related to such DR include those described in Patent Document 1 and Non-Patent Document 1. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-191766 A [Non-patent literature]
[0005] [Non-Patent Document 1] “What is Virtual Power Plant (VPP) and Demand Response (DR)?” Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry, [online], [Retrieved February 19, 2021], Internet <https: / / www.enecho.meti.go.jp / category / saving_and_new / advanced_systems / vpp_dr / negawatt.html> Summary of the Invention [Problem to be solved by the invention]
[0006] However, when carrying out the above-mentioned DR processing, there are restrictions such as the fact that the longer the distance, the greater the transmission and distribution losses in the outside power transmission area of power companies divided into multiple systems, so in principle, all generated power must be used within the same power company system. For this reason, power adjustment between power companies of different systems is not possible.
[0007] In addition, because the amount of electricity generated by renewable energy changes from moment to moment, it is necessary to implement DR to efficiently balance the supply and demand of electricity in line with the changes in the amount of electricity generated.However, current DR only adjusts the power for the next day according to predictions based on measurement results on a daily basis.This results in poor prediction accuracy, and there is an issue that DR cannot efficiently balance the supply and demand of electricity.
[0008] The present invention has been made in consideration of the above circumstances, and has an object to perform a demand response that efficiently balances the supply and demand of electricity when performing a demand response to adjust the amount of electricity used at a consumer's facility. [Means for solving the problem]
[0009] In order to solve the above problems, the demand response management device of the present invention includes a selection unit that selects one or more consumers in response to a consumer selection instruction in a power demand adjustment request from an aggregator that performs a demand response that adjusts the amount of power used by consumers who consume power. a storage unit that stores a first table in which a consumer number, which is a unique number of a consumer, an aggregator number, which is a unique number of an aggregator, and a suppressible amount that can suppress the amount of power usage of the consumer are associated with each other; Equipped with The selection unit, when the power demand adjustment request is a suppression request, searches the suppressible amount from the first table, and when the sum of the searched suppressible amounts satisfies the power suppression request amount related to the suppression request, selects a consumer having a consumer number associated with the searched suppressible amount, and notifies the selected consumer to the aggregator. It is characterized by: Effect of the Invention
[0010] According to the present invention, when a demand response is performed to adjust the amount of power used by a consumer, a demand response that efficiently balances the supply and demand of power can be performed. [Brief description of the drawings]
[0011] [Figure 1] 1 is a block diagram showing a configuration of a power transmission and distribution system including a demand response (DR) management device according to an embodiment of the present invention. [Diagram 2] FIG. 13 is a diagram showing a data array of a demand adjustment data table. [Diagram 3] FIG. 13 is a diagram showing a data array of a task transition data table. [Figure 4] FIG. 2 is a block diagram showing a configuration of a computer that realizes the DR management device according to the present embodiment. [Diagram 5] 13 is a flowchart for explaining an operation of a power demand suppression process performed by the DR management device. [Figure 6] 11 is a first flowchart for explaining an operation of a power demand promotion process by the DR management device. [Figure 7] 13 is a second flowchart for explaining the operation of the power demand promotion process by the DR management device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. However, in all the drawings in this specification, components having corresponding functions are given the same reference numerals, and the description thereof will be omitted as appropriate. <Configuration of the embodiment> FIG. 1 is a block diagram showing a configuration of an electric power transmission and distribution system including a demand response (DR) management device according to an embodiment of the present invention.
[0013] A power transmission and distribution system (also referred to as a system) 10 shown in Fig. 1 is configured to generate, transmit, and distribute power, and includes a DR management device 20 between power system areas A and B that are spaced apart from each other. Note that the power system areas A and B are also referred to as power systems A and B or systems A and B. The power system area A constitutes a first power system as recited in the claims, and the power system area B constitutes a second power system as recited in the claims.
[0014] The DR management device 20 is configured to include a consumer management unit 21 having a memory unit 21a, a DR task management unit 22 having a memory unit 22a and a task transition instruction unit 22c, a consumer selection unit 23, and a power estimation unit 24.
[0015] The power system area A includes an electric power company 32 having a renewable energy power plant 31 using a solar power generation system 31a or the like, an aggregator 33, and a plurality of data centers (also referred to as DCs) 34a to 34n as consumers. The power system area B includes an electric power company 42 that includes a renewable energy power plant 41 using a wind power generation system 41a or the like, an aggregator 43, and a plurality of data centers 44a to 44n.
[0016] However, the consumer refers to a communication base where a group of servers capable of processing and transferring tasks (described later), such as a communication office, is located in addition to the data centers 34a-34n, 44a-44n. The data centers 34a-34n, 44a-44n include servers that perform data processing according to various programs using power supplied from the power companies 32, 42. A task refers to data processing by various programs executed by the server, and power is consumed according to this task.
[0017] The same components of power systems A and B will be explained using power system A as a representative. In the power system A, the aggregator 33 performs a demand response in response to an adjustment request from the power company 32 to increase or decrease the amount of power usage at the data centers 34a to 34n. The demand response is an adjustment process for selecting an appropriate data center from the data centers 34a to 34n and suppressing or promoting the amount of power usage at the selected data center. Note that a DR that suppresses the amount of power usage is called a lowering DR, and a DR that promotes the amount of power usage is called an increasing DR.
[0018] When the aggregator 33 receives a request for suppression or promotion of power demand from the electric power company 32 in the same system A, the aggregator 33 notifies the consumer selection unit 23 of the DR management device 20 of the demand suppression request amount (also called suppression request amount) or the demand promotion request amount (also called promotion request amount) corresponding to the suppression request or promotion request, and issues an instruction to select a consumer. However, when there are multiple aggregators 33 in the same system A, the consumer selection instruction is issued after making adjustments such as distribution of the suppression request amount or promotion request amount between the aggregators 33. As this adjustment, there are cases where the suppression request amount or promotion request amount is selected in order according to the size of the amount, or where the aggregators 33 operate in cooperation with each other. In such a cooperative operation, the consumer selection unit 23 has information on consumers under multiple aggregators, so there is an advantage that more optimal selection is possible than on an aggregator basis.
[0019] The power demand suppression request or promotion request is an adjustment request as described in the claims. The demand suppression request amount (suppression request amount) or the demand promotion request amount (promotion request amount) is an adjustment request amount as described in the claims.
[0020] The consumer selection unit 23 refers to the demand adjustment data table 21b (also referred to as table 21b) (FIG. 2) stored in the storage unit 21a of the consumer management unit 21, and selects a data center 34a-34n that satisfies the suppression request amount or the promotion request amount from among the multiple data centers 34a-34n associated with the aggregator 33 that issued the consumer selection instruction. In this selection, one or multiple data centers 34a-34n can be selected. The detailed process of this selection will be described later. Note that table 21b constitutes a first table recited in the claims.
[0021] The consumer management unit 21 stores in the storage unit 21a a table 21b shown in Fig. 2, which indicates the amount of power that can be suppressed or promoted in each of the data centers 34a to 34n. In response to requests for registration, deletion, change, and the like from the aggregator 33 or the data centers 34a to 34n, the consumer management unit 21 processes the requests for each data item in the table 21b.
[0022] In the table 21b, the customer number, the aggregator number, the demand suppressible amount [Kwh] (amount of downward DR possible), the demand promotionable amount [Kwh] (amount of upward DR possible), the server's free resource amount (number of cores), the baseline power [Kw], and the current power [Kw] are arranged and described. The demand suppressible amount or the demand promotionable amount constitutes the adjustable amount described in the claims. However, the free resource amount being the number of cores is just an example.
[0023] The customer number is a unique number of each of the data centers 34a to 34n, and is, for example, the unique number "01" of the data center 34a written in the first row of the table 21b. Hereinafter, the number in the first row will be taken as a representative example. This customer number is registered or deleted in response to a request from the aggregator 33 to register or delete the data centers 34a to 34n.
[0024] The aggregator number is a unique number for each aggregator, and the unique number of the aggregator 33, "01", is written in the first line.
[0025] The possible demand suppression amount is the amount of power that can be reduced by the amount of power usage of each of the data centers 34a to 34n, and the first row is 100 [Kwh] for the data center 34a. In other words, the amount of power usage of the data center 34a can be reduced by 100 [Kwh]. This possible demand suppression amount is changed in response to requests from the data centers 34a to 34n.
[0026] The demand promotion possible amount is the amount of power that can be increased by the power usage of each of the data centers 34a to 34n, and the first line shows 50 [Kwh] for the data center 34a. In other words, the power usage of the data center 34a can be increased by 50 [Kwh]. This demand promotion possible amount is changed according to requests from the data centers 34a to 34n.
[0027] The amount of free resources is the amount of free resources (the number of cores in this example) of the servers in each of the data centers 34a to 34n. The number of cores, "60", is entered in the first line. The number of cores refers to the number of cores, "60", that the server in the data center 34a uses to perform calculations when processing a task. This amount of free resources is changed in response to requests from the data centers 34a to 34n.
[0028] The baseline power is a reference power when the incentives for each of the data centers 34a to 34n are calculated in advance, and the first line lists 1000 [Kwh] for the data center 34a.
[0029] The current power is the power currently being used by each of the data centers 34a to 34n, and the first line lists the power of 900 [Kwh] for the data center 34a.
[0030] <Power demand reduction processing> Next, a detailed process will be described in which the consumer selection unit (also referred to as the selection unit) 23 selects a data center 34a-34n that satisfies the suppression request amount in response to a consumer selection instruction from the aggregator 33. However, when there are multiple aggregators 33 in the same system A, the consumer selection instruction may be performed after making adjustments such as distribution of the suppression request amount among the aggregators 33.
[0031] The selection unit 23 searches the table 21b shown in FIG. 2 for the aggregator number "01" of the aggregator 33 that issued the above consumer selection instruction, and searches for consumer numbers "01, 02, 03" associated with the searched aggregator number "01". Next, the selection unit 23 adds up the demand suppressible amounts "100, 80, 30" [Kwh] associated with the data centers (hereinafter, referred to as data centers 34a to 34n) of the consumer numbers "01, 02, 03" in descending order from largest to smallest. Next, the selection unit 23 selects the data centers 34a to 34n related to this addition until the added value becomes equal to or greater than the suppression request amount (e.g., 210 [Kwh]) notified in pair with the above consumer selection instruction. This selection method is one example.
[0032] In this way, when the data centers 34a to 34n that satisfy the suppression request amount are selected, the selector 23 returns the selected data centers 34a to 34n to the aggregator 33. At this time, if the demand suppressible amount of the selected data centers 34a to 34n exceeds the suppression request amount, this excess demand suppressible amount is returned to the aggregator 33 as the last added excess suppression amount of the data center.
[0033] On the other hand, if the suppression request amount is not met, the selection unit 23 calculates the suppression shortage amount by which the suppression request amount is not met, and returns the calculated amount to the aggregator 33. The aggregator 33 notifies the power company 32 that the suppression request amount cannot be met. However, if the suppression request amount is not met, task transfer can be performed in the same way as in the case where the promotion request amount described below is not met.
[0034] The aggregator 33 requests the data centers 34a to 34n selected by the selector 23 to implement demand reduction, and in response to this request, the data centers 34a to 34n implement demand reduction for power.
[0035] <Electricity demand promotion processing> Next, when the aggregator 33 receives a promotion request for power demand from the electric power company 32 in the same system A, the aggregator 33 notifies the selection unit 23 of the promotion request amount corresponding to the promotion request, and instructs the selection of a consumer. However, when there are multiple aggregators 33 in the same system A, the consumer selection instruction may be given after making adjustments such as distribution of the promotion request amount between the aggregators 33.
[0036] The selection unit 23 searches the table 21b (FIG. 2) and selects a data center 34a-34n that satisfies the promotion request amount from among the multiple data centers 34a-34n associated with the aggregator 33 that has issued the consumer selection instruction. In this selection, one or multiple data centers 34a-34n can be selected.
[0037] The selection unit 23 searches the table 21b shown in FIG. 2 for the aggregator number "01" of the aggregator 33 that issued the above consumer selection instruction, and searches for the consumer numbers "01, 02, 03" associated with the searched aggregator number "01". Next, the selection unit 23 adds the demand promotion possible amounts "50, 100, 50" [Kwh] associated with the data centers 34a to 34n of the consumer numbers "01, 02, 03" in descending order from largest to smallest. Next, the selection unit 23 selects the data centers 34a to 34n related to this addition until the added value becomes equal to or greater than the promotion request amount (e.g., 200 [Kwh]) notified in pair with the above consumer selection instruction.
[0038] In this way, when the data centers 34a to 34n that satisfy the promotion request amount are selected, the selector 23 returns the selected data centers 34a to 34n to the aggregator 33. At this time, if the demand promotion possible amount of the selected data centers 34a to 34n exceeds the promotion request amount, the selector 23 returns this excess demand promotion possible amount to the aggregator 33 as the excess promotion amount of the data center that was added last.
[0039] The aggregator 33 requests the data centers 34a to 34n selected by the selection unit 23 to implement demand promotion, and in response to this request, the data centers 34a to 34n implement demand promotion for power.
[0040] <Inter-DC Task Migration Process> On the other hand, in the above data center selection, if the promotion requirement amount is not satisfied, the selection unit 23 calculates the insufficient promotion power amount that is less than the promotion requirement amount and notifies the DR task management unit 22 of it.
[0041] Upon receiving this notification, the DR task management unit 22 issues an instruction by the task migration instruction unit (also referred to as the instruction unit) 22c to migrate task data (described later) from the data centers 44a to 44n of another power grid B (source of migration) different from the power grid A where the insufficient promotion power amount occurred to the data centers 34a to 34n of the power grid A (destination of migration) with insufficient promotion (referred to as inter-DC task migration). Task data is data that is the target for the servers in the data center to consume power for task processing. The power consumption amount thereof becomes the power consumption amount of the data center.
[0042] When the instruction unit 22c issues an inter-DC task migration instruction, while estimating the promotion power amount of each task data in the source data centers 44a to 44n by the power estimation unit 24, the task data is combined so as to be equal to or greater than the insufficient promotion power amount.
[0043] In response to the inter-DC task migration instruction, the source data centers 44a to 44n of migration migrate the task data for which the power amount corresponding to the insufficient promotion power amount is consumed during data processing to the destination data centers 34a to 34n of migration by controlling a VM (Virtual Machine) or the like. The servers in the destination data centers 34a to 34n of migration perform data processing related to the migrated task data.
[0044] The promotion power amount of the data centers 34a to 34n during this data processing is measured in the data centers 34a to 34n, and this measured power amount is notified to the power estimation unit 24 of the DR management device 20.
[0045] The power estimation unit 24 performs feedback processing so as to eliminate the difference between the measured power amount from the data centers 34a to 34n and the promotion power estimated amount (estimated power consumption) estimated based on the demand promotion possible amount (in this example, the number of cores) of each task data selected to make up for the promotion power shortage during inter-DC task transfer.
[0046] In the inter-DC task transfer performed prior to this feedback process, the task transfer instruction unit 22c performs a combination of task data by referring to a task transfer data table 22b (also called table 22b) (FIG. 3) stored in the storage unit 22a of the DR task management unit 22. The table 22b constitutes a second table described in the claims.
[0047] 3, the customer number, the task number, the demand promotion possible amount (the number of cores), the execution time, the migration ease, and the requested incentive are arranged and described. However, the table 22b shows each data related to the migration source data centers 44a to 44n.
[0048] The customer number is a unique number of each of the data centers 44a to 44n. For example, the first row of the table 22b lists the unique number "01" of the data center 44a.
[0049] The task number is a unique number for the migratable task data.
[0050] The amount of demand promotion that can be performed is expressed in terms of the number of cores. This number of cores is the number of cores that the server in each of the data centers 44a to 44n uses to perform calculations when processing a task. The amount of demand promotion that can be performed during task processing (data processing) in each of the data centers 44a to 44n is expressed in terms of the number of cores as the amount of server resources. For example, the number of cores in the first line indicates that the number of cores in the data center will be consumed. Note that while the number of cores is used as the amount of free resources of the server to represent the amount of demand promotion that can be performed, the capacity of the server's memory or storage disk may also be used.
[0051] The execution time is the execution time of the task processing (data processing) related to the task data. For example, the execution time "20" indicates that the task data to be migrated will take "20" minutes to execute on the number of cores "10" in order to consume the promotion power amount corresponding to the target promotion power shortage amount.
[0052] Migration ease indicates the difficulty of migrating task data, with the higher the value (01, 02, 03), the higher the difficulty. In this example, it is expressed in three levels, with "01" being easy, "02" being acceptable, and "03" not recommended. An example of a low migration ease value (low difficulty) is task data related to task processing that can be completed with batch processing or pre-calculation, which is easy to migrate. Conversely, task data that is currently being processed or task data with large data size that places a load on the migration or takes a long time is more difficult to migrate.
[0053] The requested incentive is a numerical representation of a different incentive requested by a consumer.
[0054] Next, when the task transfer instruction unit 22c shown in Fig. 1 is notified of the promotion power shortage amount from the selection unit 23, it refers to the table 22b shown in Fig. 3 and performs a combination of task data to be transferred. This is a two-stage sorting in which, first, the transfer ease numerical values are arranged in ascending order from small to large as "01, 02, 03", and second, the number of cores x execution time are arranged in descending order from large to small (in other words, the promotion power amount is arranged in descending order from large to small).
[0055] In addition, the selection order is also based on the shortest distance between the source and destination data centers. In this case, the data centers are connected to a network independent of the components of power system A or B, so the selection order is based on the shortest network distance.
[0056] Next, the instruction unit 22c selects the task data in the order arranged in the above two-stage sorting, that is, the task data related to the task that is easy to transfer and easy to increase power.
[0057] The power estimation unit 24 calculates whether the selected task data satisfies the promotion power amount P corresponding to the promotion power shortage using the following formula (1). Formula (1) is a relational expression between the required promotion power amount P and the number of cores C, which will be described later. The promotion power amount P corresponding to the promotion power shortage is also expressed as the required promotion power amount P.
[0058] P = (α × C + β) × t … (1) Here, P is the amount of promotion power corresponding to the amount of promotion power shortage, C is the number of cores, α and β are coefficients, and t is the execution time for the number of cores.
[0059] In the calculation using the above formula (1), in the initial stage, the amount of promotion power P may be determined in advance using a benchmark load or the like, and then learning may be performed using an estimation method such as regression analysis to improve the accuracy of the promotion power P. Also, although the number of cores has been given as an example of a parameter used to estimate the required promotion power P, parameters such as the utilization rates of the server's CPU, memory, disk, etc., or parameters that are a combination of multiple of these parameters may also be used. When estimating the required promotion power P from multiple parameters, multiple regression analysis is used.
[0060] The instruction unit 22c selects task data to be transferred from the top until the required promotion power amount P is reached or greater, but if there is no selectable task data at the time of selection, the instruction unit 22c calculates the number of cores that are insufficient due to the absence of this task data and responds to the aggregator 33.
[0061] The instruction unit 22c selects the destination data centers 34a-34n after selecting the task data corresponding to the required promotion power amount P described above. In this case, the instruction unit 22c refers to the table 21b (FIG. 2) of the consumer management unit 21 and arranges the numbers of cores, which are the amounts of free resources, in descending order from largest to smallest. Next, the instruction unit 22c selects the data centers 34a-34n in descending order of the number of cores and accumulates them, selecting the destination data centers 34a-34n until the accumulated number of cores becomes equal to or greater than the required promotion power amount P.
[0062] The instructing unit 22c issues an instruction to migrate task data consuming the required promotion power amount P or more to the selected migration destination data center 34a to 34n, that is, issues an inter-DC task migration instruction.
[0063] Selection of a combination of task data to be subjected to inter-DC task transfer is defined as an optimization problem of finding a combination of task data that satisfies the required promotion power amount P from a plurality of task data, so various algorithms can be selected. The same method is used to select the destination data centers 34a to 34n.
[0064] Next, an incentive that the data centers 34a to 34n and 44a to 44n receive in association with the inter-DC task migration will be described.
[0065] The task transfer instruction unit 22c acquires data on the demand promotion possible amount, the number of cores as the amount of free resources, the baseline power, and the current power from the table 21b in the demand management unit 21 related to each of the transfer destination data centers 34a to 34n.
[0066] Next, the instruction unit 22c performs a two-stage sorting in which the calculation results of the baseline power minus (current power plus the amount of demand promotion possible) are arranged in ascending order for each of the data centers 34a to 34n, and the number of cores, which is the amount of free resources, for each of the data centers 34a to 34n are arranged in descending order.
[0067] However, the baseline power is the reference power at the time of incentive calculation and is determined in advance. The current power + the demand promotion possible amount is the predicted power amount after the upward DR is applied to the tasks in the data centers 34a to 34n. Therefore, the calculation result of the baseline power - (current power + the demand promotion possible amount) is the calculation result obtained by subtracting the predicted power amount after the upward DR from the reference power at the time of incentive calculation, and therefore the larger the power amount at the upward DR, the smaller the value becomes.
[0068] Next, the instruction unit 22c selects the migration destination data centers 34a to 34n according to the order arranged in the above two-stage sorting until the required accelerated power amount exceeds the number of cores consuming the accelerated power amount. In this selection, the incentive (incentive value) is higher for a data center with a larger number of cores, which is the amount of free resources, and a larger difference between the total power consumption after the acceleration and the baseline power.
[0069] The requested incentive for each of the data centers 34a to 34n is determined in advance as shown in table 22b in Fig. 3. Therefore, the instruction unit 22c calculates an incentive from the selection result of the data centers 34a to 34n, and only the data centers 34a to 34n for which the calculation result is equal to or greater than the requested incentive value are targeted for inter-DC task transfer. However, the proportion of the incentive that the data center 34a to 34n that is the transfer destination due to the inter-DC task transfer will be divided between the data centers 44a to 44n that are the transfer source is determined in advance.
[0070] <Hardware configuration> The DR management device 20 according to the embodiment described above is realized by a computer 100 having a configuration as shown in Fig. 4. The computer 100 includes a CPU (Central Processing Unit) 101, a ROM (Read Only Memory) 102, a RAM (Random Access Memory) 103, a HDD (Hard Disk Drive) 104, an input / output I / F (Interface) 105, a communication I / F (Interface) 106, and a media I / F 107.
[0071] The CPU 101 operates based on a program stored in the ROM 102 or the HDD 104, and controls each functional unit. The ROM 102 stores a boot program executed by the CPU 101 when the computer 100 is started up, programs related to the hardware of the computer 100, and the like.
[0072] The CPU 101 controls an output device 111 such as a printer or a display, and an input device 110 such as a mouse or a keyboard, via the input / output I / F 105. The CPU 101 obtains data from the input device 110 via the input / output I / F 105, or outputs generated data to the output device 111.
[0073] The HDD 104 stores programs executed by the CPU 101 and data used by the programs, etc. The communication I / F 106 receives data from other devices (not shown) via a communication network 112 and outputs the data to the CPU 101, and also transmits data generated by the CPU 101 to other devices via the communication network 112.
[0074] The media I / F 107 reads a program or data stored in the recording medium 113 and outputs it to the CPU 101 via the RAM 103. The CPU 101 loads a program related to a target process from the recording medium 113 onto the RAM 103 via the media I / F 107, and executes the loaded program. The recording medium 113 is an optical recording medium such as a DVD (Digital Versatile Disc) or a PD (Phase change rewritable Disc), a magneto-optical recording medium such as an MO (Magneto Optical disk), a magnetic recording medium, a conductive memory tape medium, a semiconductor memory, or the like.
[0075] For example, when the computer 100 functions as the DR management device 20 according to the embodiment, the CPU 101 of the computer 100 executes a program loaded on the RAM 103 to realize the function of the DR management device 20. Furthermore, the HDD 104 stores data in the RAM 103. The CPU 101 reads and executes a program related to a target process from the recording medium 113. In addition, the CPU 101 may read a program related to a target process from another device via the communication network 112.
[0076] <Operation of the embodiment> Next, the operation of the demand response process by the DR management device 20 according to this embodiment will be described with reference to the flowcharts of Fig. 5 to Fig. 7. In this description, Fig. 1 to Fig. 3 will be referenced. Also, the consumers shown in Fig. 5 to Fig. 7 correspond to the data centers 34a to 34n and 44a to 44n shown in Fig. 1.
[0077] <Power demand suppression processing operation> FIG. 5 is a flowchart for explaining the operation of the power demand suppression process by the DR management device 20. In FIG.
[0078] 5, when the aggregator 33 receives a request for suppression of power demand from the power company 32 in the same system A, the aggregator 33 notifies the consumer selection unit 23 of the DR management device 20 of a demand suppression request amount (suppression request amount) corresponding to the suppression request. At the same time, in step S2, the aggregator 33 instructs the selection unit 23 to select a consumer, i.e., to select one of the data centers 34a to 34n.
[0079] In step S3, the selection unit 23 searches the table 21b of the consumer management unit 21 for the aggregator number (e.g., "01") of the aggregator 33 that issued the selection instruction, and searches for the three consumer numbers "01, 02, 03" associated with the searched aggregator number "01." Furthermore, the selection unit 23 acquires three demand suppressible amounts (also called suppression amounts) "100, 80, 30" [Kwh] associated with the three data centers corresponding to the consumer numbers "01, 02, 03" from among the data centers 34a to 34n.
[0080] Next, in step S4, the selection unit 23 sorts the three suppression amounts "100, 80, 30" [Kwh] in descending order.
[0081] In step S5, the selection unit 23 adds the three suppression amounts sorted in descending order one by one in descending order.
[0082] In step S6, the selection unit 23 judges whether the sum is equal to or greater than the suppression request amount. However, if there is one suppression amount in step S5, it is judged in step S6 whether the one suppression amount is equal to or greater than the suppression request amount.
[0083] If the result of this determination is less than the suppression request amount (No), then in step S7 it is determined whether or not there is a next suppression amount sorted in descending order in step S4. If the result of this determination is that there is a suppression amount (Yes), then the process returns to step S5 and the next suppression amount is added.
[0084] After this addition, it is assumed that it is determined in step S6 that the added value is equal to or greater than the suppression request amount (Yes). In this case, in step S8, a plurality of data centers related to the addition that is equal to or greater than the suppression request amount are selected.
[0085] In step S9, the selection unit 23 notifies the aggregator 33 of the selected data centers.
[0086] In step S10, the aggregator 33 responds to the power company 32 with the total suppression amount (reducible demand amount) that is added up until it becomes equal to or greater than the suppression request amount.
[0087] In step S11, the aggregator 33 instructs the selected data centers to implement demand reduction. In response to this instruction, the data centers reduce their demand for power. In step S12, when the aggregator 33 receives a notification that the demand reduction has been completed in the data centers, the aggregator 33 responds to the power company 32 that the demand reduction has been completed.
[0088] On the other hand, suppose that it is determined in step S7 that there is no next suppression amount sorted in descending order (No). In this case, in step S13, the selector 23 calculates a suppression shortage amount that is less than the suppression request amount, and returns the calculated amount to the aggregator 33. In step S14, the aggregator 33 notifies the power company 32 that the suppression request amount cannot be satisfied.
[0089] <Operation of power demand promotion processing> FIG. 6 is a flowchart for explaining the operation of the power demand promotion process by the DR management device 20. In FIG.
[0090] 6, when there is a promotion request for power demand from the power company 32 in the same system A, the aggregator 33 notifies the consumer selection unit 23 of the DR management device 20 of a demand promotion request amount (promotion request amount) corresponding to the promotion request. At the same time, in step S22, the aggregator 33 instructs the selection unit 23 to select a consumer, i.e., to select one of the data centers 34a to 34n.
[0091] In step S23, the selection unit 23 searches the table 21b of the consumer management unit 21 for the aggregator number (e.g., "01") of the aggregator 33 that issued the selection instruction, and searches for the three consumer numbers "01, 02, 03" associated with the searched aggregator number "01." Furthermore, the selection unit 23 acquires three demand promotion possible amounts (also called promotion amounts) "50, 100, 50" [Kwh] associated with the three data centers corresponding to each of the consumer numbers "01, 02, 03" from among the data centers 34a to 34n.
[0092] Next, in step S24, the selection unit 23 sorts the three promotion amounts "50, 100, 50" [Kwh] in descending order.
[0093] In step S25, the selection unit 23 adds the three promotion amounts sorted in descending order one by one in descending order.
[0094] In step S26, the selection unit 23 judges whether the added value is equal to or greater than the promotion request amount. However, if there is one promotion amount in step S25, it is judged in step S26 whether the one promotion amount is equal to or greater than the promotion request amount.
[0095] If the result of this determination is that the amount is less than the promotion request amount (No), then in step S27 it is determined whether or not there is a next promotion amount sorted in descending order in step S24. If the result of this determination is that there is a promotion amount (Yes), then the process returns to step S25 and the next promotion amount is added.
[0096] After this addition, it is assumed that it is determined in step S26 that the added value is equal to or greater than the promotion request amount (Yes). In this case, in step S28, the selector 23 selects a plurality of data centers related to the addition that is equal to or greater than the promotion request amount.
[0097] In step S29, the selector 23 notifies the aggregator 33 of the selected data centers.
[0098] In step S30, the aggregator 33 responds to the electric power company 32 with the total promotion amount (demand promotion possible amount) that is added up to be equal to or greater than the promotion request amount.
[0099] In step S31, the aggregator 33 instructs the selected data centers to implement demand promotion. In response to this instruction, the data centers promote the demand for electricity. In step S32, when the aggregator 33 receives a notification that the demand promotion is completed in the data centers, the aggregator 33 responds to the power company 32 of the power system A that the demand promotion is completed.
[0100] On the other hand, in the above step S27, it is assumed that the selection unit 23 determines that there is no next promotion amount sorted in descending order (No). In this case, the promotion amount does not satisfy the suppression request amount, and the process proceeds to step S33 shown in FIG.
[0101] <Operation of task transfer processing between consumers> In step S33, the selection unit 23 calculates the promotion power shortage amount, which is the amount that is less than the promotion request amount, and notifies the DR task management unit 22 of the amount.
[0102] In step S34, the instruction unit 22c selects task data from the data centers 44a to 44n of another power system B (transfer source) different from the power system A in which the promoted power shortage amount occurred. That is, the instruction unit 22c selects task data for combination based on the task transfer data table 22b stored in the storage unit 22a according to the promoted power shortage amount. For example, the instruction unit 22c selects task data related to tasks for which the task data is easy to transfer and power is easy to promote in the order in which the task data is arranged by the above-mentioned two-stage sorting.
[0103] In step S35, the power estimation unit 24 determines whether the selected task data is equal to or greater than the promotion power amount P (required promotion power amount P) corresponding to the promotion power amount shortage by calculating using the above-mentioned formula (1).
[0104] If the result of this determination is less than the required promotion power amount P (No), the process returns to step S34, where the instruction unit 22c further selects and adds task data. Next, in step S35, the power estimation unit 24 determines whether the added value of the selected task data is equal to or greater than the required promotion power amount P.
[0105] If the result of this determination is that the amount of required promotion power P is greater than or equal to the required amount of promotion power P (Yes), then in step S36, the instruction unit 22c issues an inter-DC task transfer instruction to the source data centers 44a to 44n to transfer task data corresponding to the required amount of promotion power P to the data centers 34a to 34n in power system A (destination).
[0106] In step S37, the source data centers 44a to 44n migrate the task data corresponding to the required promotion power amount P to the destination data centers 34a to 34n in response to the inter-DC task migration instruction.
[0107] In step S38, the servers in the destination data centers 34a to 34n perform data processing related to the migrated task data.
[0108] In step S39, the data centers 34a to 34n of the migration destination measure the amount of power consumed during data processing in the data centers 34a to 34n, and notify the power estimating unit 24 of the measured amount of power consumed.
[0109] In step S40, the power estimation unit 24 compares each of the notified measured power amounts with each of the required promotion power amounts P of the task data for the inter-DC task shift in step S38 (both of the individual amounts).
[0110] In step S41, the power estimation unit 24 determines whether or not there is a difference between the two individual values by the comparison.
[0111] If the result of this determination is that there is no difference (No), in step S32 (Figure 6), when the aggregator 33 receives a notification that demand facilitation has been completed at multiple data centers, it responds to the power company 32 of power system A that demand facilitation has been completed.
[0112] On the other hand, if the determination result indicates that there is a difference (Yes), the power estimation unit 24 increases the estimation accuracy so as to eliminate the difference in step S42. That is, the coefficients α and β in the above-mentioned formula (1) are changed so as to obtain the required promotion power amount P that eliminates the difference. After this increase in estimation accuracy, in the above-mentioned step S32 (FIG. 6), the aggregator 33 performs the above-mentioned response process and waits for the next power demand promotion request (step S21) from the power company 32.
[0113] <Effects of the embodiment> The effects of the demand response management device 20 according to the embodiment of the present invention will be described.
[0114] (1a) The demand response management device 20 includes a selection unit 23 that selects one or more data centers 34a-34n in response to a consumer selection instruction in a power demand adjustment request from an aggregator 33 that performs demand response to adjust the amount of power used by the data centers 34a-34n as consumers consuming power. The selection unit 23 is configured to select a number of data centers 34a-34n such that the adjustable amount of power of the data centers 34a-34n satisfies the adjustment request amount of power related to the adjustment request, and notify the aggregator 33 of the selected data centers 34a-34n.
[0115] According to this configuration, when there is a consumer selection instruction in a power demand adjustment request from the aggregator 33, the selector 23 selects the number of data centers 34a-34n whose adjustable amounts of power of the data centers 34a-34n satisfy the amount of power adjustment requested in the adjustment request, and notifies the aggregator 33 of the selected data centers 34a-34n. Therefore, when there is a request from the power company 32 to the aggregator 33 to suppress the power demand of the data centers 34a-34n, the aggregator 33 performs a demand response to adjust the power of the data centers 34a-34n selected by the selector 23. This demand response makes it possible to adjust the demand at the data centers 34a-34n in accordance with changes in the amount of power generated by the power company 32, so that it is possible to efficiently balance the supply and demand of power.
[0116] (2a) The demand response management device 20 includes a storage unit 21a that stores a table 21b in which a consumer number, which is a unique number of the consumer, an aggregator number, which is a unique number of the aggregator 33, and a suppressible amount by which the amount of power usage by the consumer can be suppressed are associated with one another. When the power demand adjustment request is a suppression request, the selection unit 23 searches the table 21b for the suppressible amounts in descending order, and when the sum of the searched suppressible amounts satisfies the power suppression request amount related to the suppression request, selects the data center 34a-34n of the consumer number associated with the searched suppressible amount, and notifies the aggregator 33 of the selected data center 34a-34n.
[0117] According to this configuration, when the power company 32 requests the aggregator 33 to reduce the power demand of the data centers 34a-34n, the aggregator 33 performs a demand response to reduce power for the data centers 34a-34n selected by the selection unit 23. This demand response makes it possible to reduce the demand at the data centers 34a-34n in accordance with the reduction in the amount of power generated by the power company 32, thereby making it possible to efficiently balance the supply and demand of power.
[0118] (3a) The demand response management device 20 includes a storage unit 21a that stores a table 21b in which a consumer number, which is a unique number of the consumer, an aggregator number, which is a unique number of the aggregator 33, and an expeditable amount that can expedite the amount of power used by the consumer are associated with each other. When the power demand adjustment request is an acceleration request, the selection unit 23 searches the table 21b for the expeditable amount in descending order, and when the sum of the searched expeditable amounts satisfies the amount of power promotion related to the promotion request, selects the data center 34a-34n of the consumer number associated with the searched expeditable amount, and notifies the aggregator 33 of the selected data center 34a-34n.
[0119] According to this configuration, when the power company 32 requests the aggregator 33 to increase the power demand of the data centers 34a-34n, the aggregator 33 performs a demand response to increase the power supply to the data centers 34a-34n selected by the selection unit 23. This demand response can increase the demand in the data centers 34a-34n in accordance with an increase in the amount of power generated by the power company 32, so that the supply and demand of power can be balanced efficiently.
[0120] (4a) When the promotion request amount of power related to the promotion request cannot be satisfied by the selectable data centers 34a to 34n, the selection unit 23 determines the promotion shortage power amount by the shortfall that is not satisfied by the promotion request amount. The demand response management device 20 includes a storage unit 22a that stores a table 22b in which a consumer number that is a unique number of a consumer, a task number that is a unique number of task data that is a data processing target that consumes the promotion shortage power amount and can be transferred between consumers, and an amount that can be promoted during data processing of the task data are associated with each other.
[0121] Furthermore, the demand response management device 20 includes an instruction unit 22c that refers to the table 22b to select task data to be processed that consumes an acceleration power amount corresponding to the acceleration power shortage from the data center 34a-34n of the source consumer number associated with the aggregator 43 of the power system B different from the power system A in which the aggregator 33 associated with the data center 34a-34n in which the acceleration power shortage occurs, and instructs the source data center 34a-34n to migrate the task data to the destination data center 34a-34n associated with the aggregator 33 of the power system A. The configuration is such that the source data center 34a-34n migrates the task data to the destination data center 34a-34n in response to the instruction, and the destination data center 34a-34n consumes the acceleration request amount by the migrated task data.
[0122] According to this configuration, demand response for promoting and adjusting the amount of power used in the data centers 34a to 34n can be performed between the power companies 32, 42 associated with the aggregators 33, 43 of different power systems.
[0123] (5a) The demand response management device 20 includes a power estimation unit 24 that estimates task data consuming an accelerated power amount corresponding to an accelerated power shortage amount and instructs the instructing unit 22c to select the estimated task data. The power estimation unit 24 is configured to increase the estimation accuracy so as to eliminate the difference when there is a difference between the amount of accelerated power measured in the data centers 34a to 34n of the power system A during processing of the task data after migration in the migration destination data centers 34a to 34n and the amount of accelerated power corresponding to the estimated accelerated power shortage amount of the task data after migration.
[0124] According to this configuration, when the instruction unit 22c selects task data that consumes a promotion power amount corresponding to the promotion power shortage amount, the power estimation unit 24 can accurately estimate the task data of the promotion power amount corresponding to the promotion power shortage amount and instruct the instruction unit 22c to make the selection.
[0125] (6a) When instructing the migration of task data from the source data center 34a-34n to the destination data center 34a-34n, the instruction unit 22c calculates an incentive that becomes higher the greater the amount of free resources and the promoted power amount of the server of the data center 34a-34n that processes the selected task data, and is configured to select only data centers 34a-34n for which the calculated incentive is equal to or greater than a preset requested incentive as the migration target for task data.
[0126] According to this configuration, when task data is transferred from the source data centers 34a to 34n to the destination data centers 34a to 34n, the incentive requested by the data centers 34a to 34n involved in the transfer can be satisfied.
[0127] Next, a program executed by the computer of this embodiment will be described. The computer is assumed to be a demand response management device 20 that instructs an aggregator 33, which performs a demand response to adjust the amount of power used by power consumers, on the consumers to be adjusted.
[0128] This program causes the computer to function as a means for selecting one or more data centers 34a-34n in response to a customer selection instruction in a power demand adjustment request from the aggregator 33, and in the selection, selecting a number of data centers 34a-34n whose adjustable amount of power satisfies the power adjustment request amount related to the adjustment request, and notifying the aggregator 33 of the selected data centers 34a-34n.
[0129] According to this program, similar to the effect of the demand response management device 20 described above, the demand at the data centers 34a to 34n can be adjusted in accordance with changes in the amount of power generated by the power company 32, so that the supply and demand of power can be balanced efficiently.
[0130] <Effects> (1) A demand response management device comprising a selection unit that selects one or more consumers in response to a consumer selection instruction in a power demand adjustment request from an aggregator that performs demand response to adjust the amount of power used by consumers that consume power, and the selection unit selects a number of consumers whose adjustable amount of power satisfies the amount of power adjustment required for the adjustment request, and notifies the aggregator of the selected consumers.
[0131] According to this configuration, when the aggregator issues a consumer selection instruction in a power demand adjustment request, the selection unit selects a number of consumers whose adjustable power amounts satisfy the power adjustment request amount related to the adjustment request, and notifies the aggregator of the selected consumers. Therefore, when the power company issues a request to the aggregator to suppress the power demand of the consumers, the aggregator performs a demand response to adjust the power for the consumers selected by the selection unit. This demand response allows the demand at the consumers to be adjusted in accordance with changes in the amount of power generated by the power company, so that the supply and demand of power can be balanced efficiently.
[0132] (2) A demand response management device as described in (1) above, further comprising a memory unit that stores a first table in which a consumer number, which is a unique number of a consumer, an aggregator number, which is a unique number of an aggregator, and a suppressible amount by which the consumer's power usage can be suppressed are associated with each other, and the selection unit, when the request for adjusting power demand is a suppression request, searches for the suppressible amount from the first table, and when the sum of the searched suppressible amounts satisfies the power suppression request amount related to the suppression request, selects the consumer having the consumer number associated with the searched suppressible amount, and notifies the aggregator of the selected consumer.
[0133] According to this configuration, when a power company requests the aggregator to reduce the power demand of a consumer, the aggregator performs a demand response to reduce power for the consumer selected by the selection unit. This demand response makes it possible to reduce the demand of the consumer in accordance with the reduction in the amount of power generated by the power company, thereby efficiently balancing the supply and demand of power.
[0134] (3) A demand response management device as described in (1) above, further comprising a memory unit that stores a first table in which a consumer number, which is a unique number of a consumer, an aggregator number, which is a unique number of an aggregator, and an amount of promotion that can promote the amount of electricity used by the consumer are associated with each other, and the selection unit, when the request for adjusting the electricity demand is a promotion request, searches for the amount of promotion that can be promoted from the first table, and when the added value of the searched amount of promotion satisfies the amount of promotion required for the electricity related to the promotion request, selects the consumer having the consumer number associated with the searched amount of promotion, and notifies the aggregator of the selected consumer.
[0135] According to this configuration, when a power company requests the aggregator to promote the power demand of a consumer, the aggregator performs a demand response to promote power to the consumer selected by the selection unit. This demand response can promote demand at the consumer in accordance with an increase in power generation by the power company, so that the supply and demand of power can be balanced efficiently.
[0136] (4) When the promotion request amount of power related to the promotion request cannot be satisfied by the selectable consumer, the selection unit calculates a promotion shortage power amount by the amount of power that is not sufficient for the promotion request amount, and stores a second table in which a consumer number that is a unique number of the consumer, a task number that is a unique number of task data that is a data processing target that consumes the promotion shortage power amount and can be transferred between consumers, and a promotion possible amount at the time of data processing of the task data are associated with each other, and an aggregator of a second power system different from a first power system in which an aggregator related to the consumer in which the promotion shortage power amount occurs is located. and an instruction unit that selects from the second table task data of a task number to be processed that consumes an accelerated power amount corresponding to the accelerated power shortage amount from a consumer having a source consumer number associated with the aggregator of the first power system, and instructs the source consumer to transfer the selected task data to the destination consumer associated with the aggregator of the first power system, wherein the demand response management device according to the above-mentioned (3) is characterized in that it includes an instruction unit that instructs the source consumer to transfer the task data to the destination consumer in accordance with the instruction, and causes the destination consumer to consume the accelerated request amount using the transferred task data.
[0137] According to this configuration, demand response that promotes and adjusts the amount of power used by consumers can be performed between power companies associated with aggregators of different power systems.
[0138] (5) A demand response management device as described in (4) above, further comprising a power estimation unit that estimates task data consuming a promotion power amount corresponding to the promotion power shortage amount and instructs the instruction unit to select the estimated task data, wherein when there is a difference between the promotion power amount measured at a consumer of the first power system and the promotion power amount corresponding to the estimated promotion power shortage amount of the post-transition task data at the destination consumer, the power estimation unit increases the estimation accuracy so that the difference is eliminated.
[0139] According to this configuration, when the instruction unit selects task data that consumes an amount of promotion power corresponding to the amount of promotion shortage power, the power estimation unit can accurately estimate the task data of the amount of promotion power corresponding to the amount of promotion shortage power and instruct the instruction unit to make the selection.
[0140] (6) The demand response management device described in (4) or (5) above is characterized in that, when instructing the transfer of task data from the source consumer to the destination consumer, the instruction unit calculates an incentive that becomes higher the greater the amount of free resources and the amount of promoted power of the server of the consumer that processes the selected task data, and only consumers whose calculated incentive is equal to or greater than a predetermined requested incentive are targeted for the transfer of the task data.
[0141] According to this configuration, when task data is transferred from a source consumer to a destination consumer, an incentive requested by the consumer involved in the transfer can be satisfied.
[0142] In addition, the specific configuration can be modified as appropriate without departing from the spirit of the present invention. [Explanation of symbols]
[0143] 10 Electricity Transmission and Distribution System 20 Demand response (DR) management device 21 Customer Management Department 21a Storage section 21b Demand Adjustment Data Table 22 DR Task Management Department 22a Storage section 22b Task transition data table 22c Task transition instruction section 23 Customer Selection Department 24 Power estimation section 31a Solar power generation 41a Wind power generation 31,41 Renewable energy power plants 32,42 Electric power companies 33,43 Aggregator 34a~34n, 44a~44n Data Center (Consumer) A,B Power system area
Claims
1. a selection unit that selects one or more consumers in response to a consumer selection instruction in a power demand adjustment request from an aggregator that performs a demand response to adjust the amount of power used by the consumers that consume power; a storage unit that stores a first table in which a consumer number, which is a unique number of a consumer, an aggregator number, which is a unique number of an aggregator, and a suppressible amount by which the amount of power usage of the consumer can be suppressed are associated with each other; The selection unit, when the power demand adjustment request is a suppression request, searches the suppressible amount from the first table, and when the sum of the searched suppressible amounts satisfies the power suppression request amount related to the suppression request, selects a consumer having a consumer number associated with the searched suppressible amount, and notifies the selected consumer to the aggregator. A demand response management device comprising:
2. a selection unit that selects one or more consumers in response to a consumer selection instruction in a power demand adjustment request from an aggregator that performs a demand response to adjust the amount of power used by the consumers that consume power; a storage unit that stores a first table in which a consumer number, which is a unique number of a consumer, an aggregator number, which is a unique number of an aggregator, and an extensible amount that can be promoted for promoting an amount of power usage of the consumer are associated with each other; The selection unit, when the power demand adjustment request is a promotion request, searches the promotion possible amount from the first table, and when an added value of the searched promotion possible amount satisfies the promotion requested amount of power related to the promotion request, selects a consumer having a consumer number corresponding to the searched promotion possible amount, and notifies the selected consumer to the aggregator. A demand response management device comprising:
3. the selection unit, when a promotion request amount of power related to the promotion request cannot be satisfied by the selectable consumer, calculates a promotion shortage power amount that is a shortfall of the promotion request amount; a storage unit that stores a second table in which a consumer number, which is a unique number of a consumer, a task number, which is a unique number of task data that is a data processing target that consumes the promotion shortage power amount and can be transferred between consumers, and an amount of promotion possible at the time of data processing of the task data are associated with each other; an instruction unit that selects from the second table task data having a task number that is a data processing target consuming an accelerated power amount corresponding to the accelerated power shortage amount from a consumer having a source consumer number associated with an aggregator of a second power system different from a first power system in which an aggregator associated with a consumer having the accelerated power shortage amount is located, and issues an instruction to transfer the selected task data to a destination consumer associated with the aggregator of the first power system; The source consumer is caused to transfer task data to the destination consumer in response to the instruction, and the destination consumer is caused to consume the promotion request amount by the transferred task data. The demand response management device according to claim 2 .
4. a power estimation unit that estimates task data consuming an acceleration power amount corresponding to the acceleration power shortage amount and instructs the instruction unit to select the estimated task data; When there is a difference between the amount of promotion power measured at the consumer of the first power system during processing of the task data after the transfer at the transfer destination consumer and the amount of promotion power corresponding to the estimated promotion shortage amount of the task data after the transfer, the power estimation unit increases the estimation accuracy so as to eliminate the difference. The demand response management device according to claim 3 .
5. When instructing the transfer of task data from the source consumer to the destination consumer, the instruction unit obtains an incentive that increases as the amount of free resources of the server of the consumer that processes the selected task data increases and the amount of promoted power increases, and only consumers whose obtained incentive is equal to or exceeds a preset requested incentive are targeted for the transfer of the task data.
5. The demand response management device according to claim 3 or 4.
6. A demand response management method of a demand response management device that instructs an aggregator that performs a demand response to adjust an amount of power used by a consumer consuming power, the consumer being the target of the adjustment, comprising: The demand response management device includes: A storage unit is provided that stores a first table in which a consumer number, which is a unique number of the consumer, an aggregator number, which is a unique number of the aggregator, and a suppressible amount by which the amount of power usage of the consumer can be suppressed are associated with each other, selecting one or more consumers in response to a consumer selection instruction in a power demand suppression request from the aggregator; a step of searching the first table for the suppressible amount in the selection, and if a sum of the searched suppressible amounts satisfies the suppression request amount of the power related to the suppression request, selecting a consumer having a consumer number associated with the searched suppressible amount, and notifying the aggregator of the selected consumer; A demand response management method comprising the steps of:
7. A demand response management method of a demand response management device that instructs an aggregator that performs a demand response to adjust an amount of power used by a consumer consuming power, the consumer being the target of the adjustment, comprising: The demand response management device includes: A storage unit is provided for storing a first table in which a consumer number, which is a unique number of the consumer, an aggregator number, which is a unique number of the aggregator, and an extensible amount of energy usage of the consumer are associated with each other, selecting one or more consumers in response to a consumer selection instruction in a power demand facilitation request from the aggregator; In the selection, the promotion possible amount is searched for from the first table, and if an added value of the searched promotion possible amount satisfies the promotion request amount of the power related to the promotion request, a consumer having a consumer number associated with the searched promotion possible amount is selected, and the selected consumer is notified to the aggregator. A demand response management method comprising the steps of:
8. A program for causing a computer to function as the demand response management device according to any one of claims 1 to 5.
Citation Information
Patent Citations
Demand response system
JP2019110698A
Power management system
JP2020191766A
