System and method for scheduling transportation in a multi-level warehouse to realize cargo picking

JP7554848B2Active Publication Date: 2024-09-20BEIJING GEEKPLUS TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022566699
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-07-24
Filing Date
2021-06-02
Publication Date
2024-09-20
Estimated Expiration
2041-06-02

AI Technical Summary

Benefits of technology

【0010】 本明細書における実施例で用いられる上記少なくとも1つの技術案では、以下のような有益な効果が得られる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007554848000014
    Figure 0007554848000014
  • Figure 0007554848000008
    Figure 0007554848000008
  • Figure 0007554848000007
    Figure 0007554848000007
Patent Text Reader

Abstract

The present disclosure provides a system and method for scheduling transport in a multi-story warehouse for picking cargo. The system includes one or more control centers (100), one or more first transport devices (102), one or more second transport devices (104), at least one multi-story warehouse (106), and at least one lifting device (108), where one multi-story warehouse (106) has multiple levels, and each level of the multi-story warehouse is connected by at least one lifting device (108), and the control center (100) is in communication with each of the first transport devices (102) and the second transport devices (104). In this system, the first and second conveying equipment are used in combination in a multi-story warehouse, and the conveying function of the lifting equipment in the multi-story warehouse is utilized so that the first and second conveying equipment work together to transport cargo within a densely stored warehouse. This avoids the need to lay rails on the bottom floor of the warehouse, allows for flexible changes to the warehouse layout, and reduces the number of first conveying equipment required, reducing warehouse operating costs and improving conveying efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] This disclosure claims priority to a Chinese patent, application number 202010722774.0, filed with the China Patent Office on July 24, 2020, for “Multi-level warehouse transport scheduling system and method for realizing cargo picking,” the entire contents of which are incorporated herein by reference.

[0002] The present disclosure relates to the technical field of warehouse storage logistics, and in particular to a transport scheduling system and method for a multi-level warehouse for realizing cargo picking. [Background technology]

[0003] Currently, with the rapid development of the logistics industry, automated transport equipment such as automated guided vehicles (AGVs) are generally used to improve the operating rate of warehouses, and the automation of cargo transportation is realized. At the same time, warehouses generally have limited land area, so the cost of acquiring and using land is high. In order to maximize the utilization rate of space and reduce operating costs, cargo is sometimes stored densely in existing warehouses.

[0004] In the prior art, in order to simultaneously achieve two goals, namely, improving efficiency through automation of transportation and reducing costs through dense storage, a four-way shuttle car (hereinafter, abbreviated as a four-way car) used in dense storage warehouses and a warehouse for running the four-way car are designed as shown in Figs. 1a-1b. Fig. 1a shows a cross-sectional view of a warehouse, in which each floor of the warehouse includes a plurality of adjacent cargo positions for storing cargo, in which several aisles are laid out for the transportation of cargo by the four-way car, and the shelves of each floor include rails for the travel of the four-way car, and each cargo position is provided with a bracket for placing a carrier, and the cargo positions are supported by a common upright. Fig. 1b shows a plan view of a warehouse, in which cargo is stacked densely, a large amount of space can be saved, and a small four-way car can flexibly pass between each cargo position, so that the cargo on the carrier is placed and transported to the cargo position, or the cargo is transported to the transfer station of the warehouse for shipment.

[0005] However, four-way cars are expensive transport equipment and must run on rails, so in warehouses where cargo is moved in and out using four-way cars, the installation of rails means that the warehouse layout cannot be flexibly changed, resulting in higher construction and utilization costs. Summary of the Invention [Problem to be solved by the invention]

[0006] The embodiments in this specification aim to provide a transport scheduling system, method, and device for a multi-story warehouse to realize cargo picking, thereby solving the problems present in the prior art that in densely stored warehouses using four-way shuttle cars, rails must be placed on the bottom floor, meaning that transport tasks can only be performed by the four-way shuttle cars, resulting in high warehouse operating costs and an inability to flexibly change the warehouse layout. [Means for solving the problem]

[0007] In this specification, the following technical solutions are used as examples.

[0008] The present specification provides a transport scheduling system for a multi-story warehouse, the transport scheduling system including one or more control centers, one or more first transport devices, one or more second transport devices, at least one multi-story warehouse, and at least one lifting device, wherein a plurality of floors are provided in one of the multi-story warehouses, and each floor of the multi-story warehouse is connected by the at least one lifting device, and the control center is in communication with each of the first transport devices and the second transport devices, At least one bottom layer transfer station is provided on the bottom layer of the multi-level warehouse, and at least one of a carrier and a carrier bracket is disposed in at least a part of the bottom layer cargo positions on the bottom layer, and the carrier bracket in the bottom layer cargo position is for placing a carrier to be transported by the second transport device; In the multi-story warehouse, at least one high-rise transfer station is provided in each of the other high-rise floors other than the bottom floor, rails along which the first conveying device runs are provided in each of the high-rise floors, and carriers are disposed in at least some of the high-rise cargo positions in the high-rise floors; the control center is for identifying a first conveying device, a second conveying device, and an elevator device that execute the conveying task according to the conveying task, and for transmitting conveying commands to the first conveying device, the second conveying device, and the elevator device to execute the conveying task, respectively; the first conveying device is for, in response to a conveying command transmitted from the control center, loading and unloading a carrier designated by the conveying command to and from the high-floor cargo position, and for conveying the carrier designated by the conveying command between the high-floor cargo position and the high-floor transfer station; the second conveying device is for, in response to a conveying command transmitted from the control center, loading and unloading a carrier designated by the conveying command to and from the bottom layer cargo position, and for conveying a carrier designated by the conveying command between the lifting device and the bottom layer cargo position, between the bottom layer cargo position and the bottom layer transfer station, or between the lifting device and the bottom layer transfer station; The lifting equipment is configured to lift and lower to a designated layer in response to a transport command transmitted from the control center, and to transport at least one or a combination of the carrier, the first transport equipment, and the second transport equipment indicated in the transport command between each layer.

[0009] The present specification provides a method for scheduling transportation in a multi-story warehouse, the method comprising: providing at least one or more multi-story warehouses, each floor of the multi-story warehouse being connected by at least one lifting device; providing at least one bottom-layer transfer station in the bottom layer of the multi-story warehouse; providing carriers and carrier brackets at at least some bottom-layer cargo positions in the bottom layer; and providing carriers to be transported by the second transport device at the bottom-layer cargo positions for placing carriers thereon; providing at least one high-layer transfer station in each of the other higher floors of the multi-story warehouse other than the bottom layer; providing rails for the first transport device to run on in each of the high-layer cargo positions; and providing carriers at at least some high-layer cargo positions in the high-layer cargo positions. Identifying a transport task to be performed; Identifying a first transport device, a second transport device, and an elevator device that execute the transport task according to the transport task; The method includes transmitting transport commands to the identified first transport equipment, second transport equipment, and lifting equipment, respectively, to cause the first transport equipment, the second transport equipment, and the lifting equipment to cooperate with each other to transport a carrier from a high-level cargo position or a bottom-level cargo position of the multi-story warehouse to a bottom-level transfer station, or to transport a carrier at the bottom-level transfer station to a high-level cargo position or a bottom-level cargo position of the multi-story warehouse.

[0010] The at least one technical solution used in the embodiments of this specification can provide the following beneficial effects:

[0011] By using a mixture of the first and second conveying equipment in a multi-story warehouse and utilizing the conveying function of the lifting equipment in the multi-story warehouse so that the first and second conveying equipment work together to transport cargo within a densely stored warehouse, it is possible to avoid laying rails on the bottom floor of the warehouse, make it possible to flexibly change the warehouse layout and reduce the number of first conveying equipment required, thereby reducing warehouse operating costs and improving conveying efficiency.

[0012] In order to more clearly describe the technical solutions of the embodiments of the present disclosure, the following briefly introduces the accompanying drawings used in the embodiments. The accompanying drawings herein are incorporated into the specification and constitute a part of this specification. These accompanying drawings show embodiments suitable for the present disclosure and are used to explain the technical solutions of the present disclosure together with the specification. It should be understood that the following accompanying drawings are only for illustrating some embodiments of the present disclosure and should not be regarded as limiting the scope. For those skilled in the art, other related accompanying drawings can also be obtained from these accompanying drawings without any creative effort. [Brief description of the drawings]

[0013] [Figure 1a] FIG. 1a is a schematic cross-sectional view of a conventional warehouse. [Figure 1b] FIG. 1b is a schematic diagram of the planar structure of a conventional warehouse. [Diagram 2] FIG. 2 is a schematic diagram of a transportation scheduling system for a multi-story warehouse for realizing cargo picking provided by an embodiment of this specification. [Diagram 3] FIG. 3 is a schematic plan view of a multi-story warehouse provided by an embodiment of this specification. [Figure 4a] FIG. 4a is a schematic diagram of a warehouse layout provided by an embodiment herein. [Figure 4b] FIG. 4b is a schematic diagram of a warehouse layout provided by an embodiment herein. [Diagram 5] FIG. 5 is a schematic diagram illustrating a first transport device according to an embodiment of the present specification that transports carriers in and out from the side. [Figure 6] FIG. 6 is a schematic diagram of the distribution of lifting devices provided by the embodiments of this specification. [Figure 7] FIG. 7 is a schematic diagram showing that rails are provided in the lifting equipment of the multi-story warehouse provided by the embodiment of this specification. [Figure 8] FIG. 8 is a schematic diagram of a non-communicated area in a multi-level warehouse provided by an embodiment of the present specification. [Figure 9a] FIG. 9a is a schematic diagram showing that the ground surfaces of two multi-storey warehouses provided by the embodiments in this specification are connected to each other. [Figure 9b] FIG. 9b is a schematic diagram showing that the ground surfaces of two multi-storey warehouses provided by the embodiments in this specification are connected to each other. [Figure 10] FIG. 10 is a schematic diagram of a transfer device in a system provided by an embodiment of this specification. [Figure 11] FIG. 11 is a schematic diagram illustrating a designated area in a system provided by an embodiment herein, which is a transfer station on a bottom layer. [Figure 12] FIG. 12 is a schematic diagram of the flow of transport scheduling in a multi-story warehouse to realize cargo picking provided by an embodiment of this specification. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] In order to make the objectives, technical solutions and advantages of the present specification clearer, the following will clearly and completely describe the technical solutions of the present disclosure in combination with specific embodiments in the present specification and corresponding accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, and are not all of the embodiments. Based on the embodiments in the present specification, all other embodiments obtained by those skilled in the art without paying creative effort are all within the scope of protection of the present disclosure.

[0015] The following describes in detail the technical solutions provided by the embodiments of the present disclosure in combination with the accompanying drawings.

[0016] FIG. 2 is a schematic diagram of a transport scheduling system for a multi-level warehouse for realizing picking of cargo provided by an embodiment of this specification. The system includes one or more control centers 100, one or more first transport devices 102, one or more second transport devices 104, at least one multi-level warehouse 106, and at least one lifting device 108. The multi-level warehouse 106 has a plurality of layers, and each layer of the multi-level warehouse 106 is connected by at least one lifting device 108, and the control center 100 communicates with each of the first transport devices 102 and the second transport devices 104. Here, the multi-level warehouse 106 may be divided into a bottom layer and a few higher layers. The cargo position provided on the bottom layer is referred to as a bottom layer cargo position, and the cargo positions provided on each higher layer are referred to as a high layer cargo position. For ease of understanding, FIG. 2 shows only one control center 100 and one multi-level warehouse 106.

[0017] The purpose of storing cargo in a warehouse is to store a large amount of multiple types of cargo in a concentrated manner, so that it is easy to pick the required cargo according to an order request, for example. In the system provided in this specification, the cargo in the multi-level warehouse is placed on a carrier, and the carrier needs to be transported by the first transport device 102, the second transport device 104, and the lifting device 108. Therefore, the transport task in this specification is similarly for realizing the picking of the cargo, and may be specified by the control center 100 according to an order.

[0018] Specifically, when sorting cargo in a multi-story warehouse, first, the storage location of the cargo must be specified according to the cargo that needs to be sorted, and then, by executing a transport task by each device, the cargo is taken out and brought to the sorting area, sorted, and after the sorting is completed, the remaining cargo is brought in and stored, thereby realizing the sorting of the cargo. Thus, the transport task in this specification is the transport of the carrier on which the cargo is placed, which is executed to realize the sorting of the cargo.

[0019] When sorting cargo, the control center 100 identifies the location of each cargo included in the order according to the received order, and then identifies a route from the cargo location to the bottom layer transfer station 100, and further identifies the first transport device 102, the second transport device 104, and the lifting device 108 that will perform the transport task according to the route, and is used to send transport commands to the first transport device 102, the second transport device 104, and the lifting device 108 to perform the transport task. After the sorting of cargo in the sorting area is completed, the control center 100 may further identify a route from the bottom layer transfer station 110 to the cargo location based on the bottom layer transfer station 100 where the carrier is located and the cargo location where the cargo is stored, and may identify the first transport device 102, the second transport device 104, and the lifting device 108 that will perform the transport task according to the route, and send transport commands to the first transport device 102, the second transport device 104, and the lifting device 108 to perform the transport task. Through the above process, the sorting of cargo in the multi-story warehouse is completed.

[0020] It should be noted that the multi-level warehouse and related methods for realizing cargo picking in this specification can be applied not only to picking goods in a warehouse storage scene, but also to picking goods such as finished goods, semi-finished goods, or semi-processed goods in a factory production scene, and the picked goods are used for the realization of a part of the production or a certain node in the production. In this specification, the application scene of cargo picking is not specifically limited. Therefore, in this specification, at least one bottom layer transfer station 110 is provided in the bottom layer of the multi-level warehouse 106, and at least one of the carrier 114 and the carrier bracket 116 is arranged in at least a part of the bottom layer cargo position in the bottom layer, and the carrier bracket 116 in the bottom layer cargo position is for placing the carrier 114 transported by the second conveying device 104. Here, the carrier bracket 116 may be attached to the bottom cargo position or removed from the bottom cargo position as required, but when the carrier bracket 116 is selected to be attached to a different bottom cargo position, different areas where the carriers 114 are placed may be formed in the bottom cargo position, and the space between the areas where the carriers 114 are placed may be a passageway for the second conveying device 104 to run while placing the carriers 114. The carrier bracket 116 is for placing the carriers 114 by the second conveying device 104, and the second conveying device 104 places the carriers 114 with the cargo on the carrier bracket 116 at the bottom cargo position, that is, the cargo is stored in the warehouse.

[0021] The bottom transfer station 110 of the multi-level warehouse 106 is a transfer station that docks outside the multi-level warehouse 106. For example, a forklift or other transport equipment may take out a carrier 114 that needs to be removed from the bottom transfer station 110 or transport a carrier 114 that needs to be loaded to the bottom transfer station 110, and then at least one of the first transport equipment 102, the second transport equipment 104, and the lifting equipment 108 may transport the carrier 114 from the bottom transfer station 110 to a bottom cargo position or a high cargo position according to a transport command sent from the control center 110.

[0022] In this specification, the carrier 114 is a carrier on which cargo is placed, but the specification is not limited to a specific type of the carrier 114. For example, the carrier 114 may be a pallet or a container, and may be anything that can store or carry cargo.

[0023] In the multi-story warehouse 106, at least one high-rise transfer station 112 is provided in each of the high levels other than the bottom level, rails 118 for the first conveying device 102 to run on are provided in each of the high levels, and carriers 114 are disposed in at least some of the high-rise cargo positions in the high levels. A structure for placing the carriers 114 is provided for each high-rise cargo position in each high level, and examples of such structures include support rods and support plates.

[0024] Furthermore, in this specification, the carriers 114 arranged on each floor of the multi-story warehouse 106 may be loaded with cargo stored in the warehouse, or other vacant carriers 114 may be loaded. The ratio of the cargo positions where the carriers 114 are arranged to the total number of cargo positions, which is the occupancy rate of the cargo positions on each floor, may be set as necessary. In this case, the occupancy rate of the high-floor cargo positions on the high floor may be set within a range of 0 to 100%, and the occupancy rate of the bottom cargo positions on the bottom floor may be set within a range of 0 to 100%.

[0025] Furthermore, due to structures such as reinforcing ribs and cross beams in the multi-story warehouse 106, and the presence of carriers 114 stored at the cargo positions, the first conveying equipment 102 or the second conveying equipment 104 cannot travel directly from one cargo position to another adjacent cargo position when transporting the carrier 114, and therefore, on each floor of the multi-story warehouse 106, an aisle is provided for the first conveying equipment 102 or the second conveying equipment 104 to travel along when transporting the carrier 114.

[0026] 3 provided in this specification is a schematic plan view of a multi-story warehouse, in which the left side is a schematic view of a high-rise, which clearly includes a rail 118 along which the first conveying device 102 can run, and the right side is a schematic view of the bottom layer, which clearly does not include a rail 118. In addition, the plan view clearly shows that each layer of the multi-story warehouse 106 is provided with an aisle along which the first conveying device 102 or the second conveying device 104 can run.

[0027] It should be noted that in this specification, the layout of the aisles in different layers is not necessarily completely similar, and may be installed according to specific needs. Here, in a dense storage warehouse, when it is necessary to transport cargo at a cargo position not adjacent to the aisle, the cargo at the cargo position adjacent to the aisle must first be removed, the cargo position adjacent to the aisle must be made a temporary aisle, and then the cargo at the cargo position not adjacent to the aisle must be removed by a conveying device. Therefore, in consideration of the transport efficiency, the cargo positions not adjacent to the aisle and the cargo positions adjacent to the aisle are usually the same in stock keeping units (SKUs) of the stored cargo. In this case, the arrangement sequence of cargo positions and aisles in the warehouse is 1 aisle, 4 cargo positions, 1 aisle, which not only increases the density of cargo storage, but also does not affect the operation efficiency of the warehouse, as shown in Figure 4a.

[0028] However, in a single SUK, if the amount of cargo is not so large that it requires storage in two or more cargo locations, using the layout shown in Figure 4a may have an impact on the operational efficiency of the warehouse, so generally, the layout shown in Figure 4b may be used, i.e., the cargo location and aisle arrangement sequence in the warehouse is one aisle, two cargo locations, and one aisle. In this specification, the layout shown in FIG. 4a or FIG. 4b may be used for each floor of the multi-storey warehouse, or the two layouts may be mixed, but this specification is not limited thereto. Moreover, depending on the storage requirements of the cargo, layouts that are not completely similar may be used for each floor. For example, the A floor stores large goods and occupies a large space. In a single SUK, if the number of goods is large enough to require storage in more than one cargo position, the A floor may entirely use the layout shown in FIG. 4a. If the A+1 floor stores small goods, the A+1 floor may entirely use the layout shown in FIG. 4b.

[0029] In this specification, the first conveying device 102 may be specifically a conveying device running on a rail, such as a four-way shuttle car, and the second conveying device 104 may be specifically a conveying device running on a flat surface, such as an AGV. Of course, the present disclosure is not limited to the specific form of the first conveying device 102 and the second conveying device 104. Specifically, they may be installed as needed, as long as the first conveying device 102 runs along the rail and can transport the carrier 114 at the high-floor cargo position, and the second conveying device 104 runs on the bottom layer and can transport the carrier 114 at the bottom-floor cargo position.

[0030] When the control center 110 identifies a transport task to be performed in response to an order, the control center 100 may first identify the transport task to be performed, and then identify a first transport device 102 that will perform the transport task in response to the transport task, and send a transport command to the first transport device 102.

[0031] In response to a transport command transmitted from the control center 110, the first transport equipment 102 may take in and out the carrier 114 instructed by the transport command to the high-rise cargo position, and may also transport the carrier instructed by the transport command between the high-rise cargo position and the high-rise transfer station 1102.

[0032] In response to a transport command transmitted from the control center 100, the second conveying device 104 may take in and out the carrier 114 instructed by the transport command to the bottom layer cargo position, and may transport the carrier 114 instructed by the transport command between the lifting device 108 and the bottom layer cargo position, between the bottom layer cargo position and the bottom layer transfer station 110, or between the lifting device 108 and the bottom layer transfer station 110. The bottom surface of the multi-story warehouse 106 is a flat surface on which the second conveying device 104 runs, and the bottom surface may specifically be the ground on which the multi-story warehouse 106 is located, or may be a platform provided on the bottom layer of the multi-story warehouse 106 for the second conveying device 104 to run. For example, it may be a steel platform provided on the bottom layer of the multi-story warehouse 106 for the second conveying device 104 to run.

[0033] The lifting equipment 108 is adapted to lift up and down to a designated layer in response to a transport command transmitted from the control center 100, and to transport at least one or a combination of the carrier, the first transport equipment, and the second transport equipment as specified in the transport command between layers.

[0034] Here, the designated layer is a layer that the lifting device 108 needs to reach when performing a transport task. For example, when the carrier 114 is transported from the third layer to the bottom layer, the control center 100 may transmit two transport commands to the lifting device 108, respectively. The transport device 108 may reach the third layer (i.e., the designated layer specified by the transport command received the first time) in response to the transport command received the first time, and when the carrier 114 is transported into the lifting device 108, the transport device 108 may reach the bottom layer (i.e., the designated layer specified by the transport command received the second time) in response to the transport command received the second time. Of course, the above is merely one example. In the above example, the control center 100 may transmit only one transport command. In this case, the third layer and the bottom layer are designated layers in sequence, and the lifting device 108 may reach the third layer and the bottom layer one after the other in response to the transport command, and transport the carrier 114 in the third layer to the bottom layer.

[0035] In addition, in this specification, at least some of the high-floor cargo positions in the high-floor are further provided with carrier brackets 114 for placing carriers, and the carrier brackets 114 are the same as the carrier brackets 114 provided in the bottom cargo positions described above. The specific arrangement has been described above, so the description will be omitted here.

[0036] Furthermore, in this specification, the distance between the carrier bracket 116 provided at the high cargo position or the structure for placing the carrier 114 provided at the high cargo position and the rail 118 is greater than the height of the first conveying equipment 102 when the carrier 114 is not placed thereon, so the first conveying equipment 102 can travel below the high cargo position and transport the carrier 114 from below the high cargo position in a piggyback manner to move away from the high cargo position.

[0037] In one embodiment provided in this specification, the flow of executing a transport task by the transport scheduling system of a multi-story warehouse is explained using the example of the outbound flow of cargo transporting a carrier 114 from any high-level cargo position to the bottom-level transfer station 110.

[0038] When the control center 100 in the transport scheduling system for the multi-story warehouse determines that cargo located at a high-level cargo location needs to be transported to the bottom-level transfer station 110 for release in accordance with the transport task to be performed, it may first identify each first transport equipment 102 on the level where the high-level cargo location is located.

[0039] Then, the control center 100 identifies the first transport device 102 that will execute the transport task from among the identified first transport devices 102, and transmits a transport command. Here, the control center 100 may identify the first transport device 102 that will execute the transport task from among the first transport devices 102 depending on whether each first transport device 102 is available or not, or the number of transport commands to be executed.

[0040] Of course, in the present disclosure, there is no limitation on the method of selecting the first conveying device 102, and it may be set according to specific needs. For example, the control center 100 may simply select any one of the vacant first conveying devices 102 as the first conveying device 102 that will perform the conveying task. Furthermore, from among the vacant first conveying devices 102, the first conveying device 102 that is closest to the high-floor cargo position where the cargo related to the conveying task is located is identified as the first conveying device 102 that will perform the conveying task.

[0041] In addition, when the control center 100 transmits a transport command to the first conveyance device 102, the control center 100 may also transmit a transport command asynchronously to the lifting device 108 so that the lifting device 108 ascends or descends to the floor where the high-rise cargo position is located (i.e., the designated floor), that is, the floor where the carrier 114 related to the transport task is located. In this way, the lifting device 108 can move to the floor in response to the transport command, and when the first conveyance device 102 transports the carrier 114 to the high-rise transfer station 112, the lifting device 108 can receive the carrier 114 from the high-rise transfer station 112. Note that in this specification, the transport commands transmitted from the control center 100 to different conveyance devices are not completely the same.

[0042] Then, in response to the received transport command, the first transport device 102 travels via the passage of the location level below the high-rise cargo position where the carrier 114 related to the transport task is located, and carries the carrier 114 out of the high-rise cargo position in a piggyback manner, and then travels again via the passage of the location level to the high-rise transfer station 112 of the location level, and the high-rise transfer station 112 places the carrier 114 on the lifting device 108. After the placement operation is completed, the first transport device 102 transmits information to the control center 100 that the execution of the transport command has been completed.

[0043] In addition, the transport command sent to the first transport device 102 includes an identifier of the high-rise cargo position where the transport task should be executed, an identifier of the high-rise transfer station 112, and a route from the high-rise cargo position to the high-rise transfer station 112, and when the multi-story warehouse 106 includes a plurality of high-rise transfer stations 112, the control center 100 may optimize the route to specify the identifier and route of the high-rise transfer station 112 as information included in the first transport command and send it to the first transport device 102. As a result, the first transport device 102 transports the carrier 114 to the high-rise transfer station 112 along the optimized route.

[0044] Based on the information that the execution of the transportation command sent from the first transportation equipment 102 has been completed, the control center 100 can determine that the lifting equipment 108 has acquired the carrier 114 by the high-rise transfer station 112, and according to the transportation task corresponding to the currently transported carrier 114, send a transportation command to the lifting equipment 108, including a designated layer that the lifting equipment 108 needs to reach next, in this example, the designated layer is the bottom layer.

[0045] In this case, the lifting equipment 108 may, in response to the transport command re-transmitted from the control center 100, determine that the currently transported carrier 114 should be transported to the bottom level of the multi-story warehouse 106, and may also transmit information to the control center 100 that the execution of the transport command has been completed.

[0046] The control center 100 can determine that the carrier 114 has been transported to the bottom layer based on the information that the execution of the transport command transmitted from the lifting device 108 has been completed. Thereafter, the control center 100 may identify the second transport device 104 that will perform the transport task from each of the second transport devices 104, and transmit the transport command to the identified second transport device 104. Here, the logic for identifying the second transport device 104 that will perform the transport task from each of the second transport devices 104 may be the same as the logic for identifying the first transport device 102 that will perform the transport task from each of the first transport devices 102, but the description thereof will be omitted in this specification.

[0047] In response to a transport command sent from the control center 110, the second transport device 104 travels to the lifting device 108 via the passage on the bottom layer and transports the carrier 114 transported by the lifting device 108. After that, the second transport device 104 travels again to the bottom layer transfer station 110 via the passage on the bottom layer, places the carrier at the bottom layer transfer station 110, and transmits information to the control center 100 that the execution of the transport command has been completed.

[0048] Finally, the control center 100 can determine that the execution of the transport task is completed based on the information that the execution of the transport command transmitted from the second transport equipment 104 is completed.

[0049] Here, the bottom layer transfer station 110 may include a carrier bracket 116. The carrier bracket 116 may be in the form of a conveyor and may be connected to a transport line to allow cargo transferred from the second conveying device 104 to the transfer station 110 to be transported along the transport line to a designated area (e.g., a picking area or a packing area, etc.).

[0050] Finally, after the control center 100 receives information that the execution of the third transport command has been completed, it determines that the cargo has been properly transported to the transfer station 110 and the execution of the transport task has been completed.

[0051] In another embodiment of the present specification, when cargo that needs to be released is located at a bottom cargo position, the control center 100 may identify, from each second transport equipment 104, the second transport equipment 104 that will perform the transport task, and send a transport command to the identified second transport equipment 104.

[0052] In response to the received transport command, the second transport device 104 travels to the bottom layer cargo position via the bottom layer passage and transports the carrier 114 stored at the bottom layer cargo position.

[0053] Thereafter, the second transport device 104 again travels through the bottom layer passage to the bottom layer transfer station 110, deposits the carrier at the bottom layer transfer station 110, and transmits information to the control center 100 that the execution of the transport command has been completed.

[0054] Finally, after the control center 100 receives information that the execution of the transport command sent from the second transport equipment 104 has been completed, it determines that the carrier 114 has been properly transported to the bottom layer transfer station 110 and the execution of the transport task has been completed.

[0055] In one embodiment provided in this specification, the flow of transporting a carrier 114 from a bottom-layer transfer station 110 to one of the higher-layer cargo positions for storage is used as an example to explain the flow of transport task execution by a transport scheduling system for a multi-story warehouse to realize cargo picking.

[0056] First, when the control center 100 in the system determines that the carrier 114 already transported to the bottom layer transfer station 110 needs to be transported to the high layer cargo position and stored according to the transport task to be executed, the control center 100 may first identify the second transport device 104 that will execute the transport task from each second transport device 104 and send a transport command to the identified second transport device 104. Of course, the logic for identifying the second transport device 104 that will execute the transport task will not be described in this specification.

[0057] Thereafter, in response to the received transport command, the second transport device 104 travels to the bottom layer transfer station 110 via the bottom layer passage to transport the carrier 114, and then travels again to the lifting device 108 via the bottom layer passage to place the carrier on the lifting device 108. After the placement operation is completed, the second transport device 104 transmits information to the control center 100 indicating that the execution of the transport command has been completed.

[0058] In addition, when the control center 100 transmits a transport command to the second transport device 104, the control center 100 may also transmit a transport command asynchronously to the lifting device 108 so that the lifting device 108 moves to the bottom layer (i.e., the designated layer), i.e., the layer where the bottom layer transfer station 110 is located. In this way, the lifting device 108 can move to the bottom layer in response to the transport command, and wait until the second transport device 104 transports the carrier 114 to the lifting device 108.

[0059] After receiving the information indicating that the execution of the transport command transmitted from the second transport device 104 has been completed, the control center 100 may continue to transmit a transport command to the lifting device 108 based on the information indicating that the execution of the transport command has been completed and the floor of the high-rise cargo location where the cargo included in the transport task is stored. The designated floor corresponding to the transport command is the floor of the high-rise cargo location where the cargo is stored.

[0060] The lifting device 108 transports the carrier 114 to the floor where the high-floor cargo position is located in response to the transport command received again from the control center 100, and transmits information indicating that the execution of the transport command has been completed to the control center 100. When the lifting device 108 reaches the designated floor, the carrier 114 may be removed from the transport device 108 by the high-floor transfer station 112.

[0061] Based on information that the execution of the transport command sent from the lifting equipment 108 has been completed, the control center 100 identifies the first transport equipment 102 that will execute the transport task from among the first transport equipment 102 on the floor where the high-floor cargo position is located, and sends a transport command to the identified first transport equipment 102.

[0062] In response to the received transport command, the first transport equipment 102 travels through the passage of the location layer to the high-rise transfer station 112 to transport the carrier 114 lifted from the bottom layer by the lifting equipment 108, and then travels again through the passage of the location layer below the high-rise cargo position to place the carrier 114 at the high-rise cargo position.

[0063] Finally, after the first transport equipment 102 finishes placing the carrier 114, it may send information to the control center 100 that the execution of the transport command is completed. After receiving the information that the execution of the transport command sent from the first transport equipment 102 is completed, the control center 100 determines that the carrier 114 has been properly transported to the high cargo position and the execution of the transport task is completed.

[0064] Further, as used herein, the first transport device 102 can facilitate removal or storage of the carriers 114 at the high cargo location in a number of ways.

[0065] Specifically, the control center 100 identifies a high-rise cargo location corresponding to the transportation task according to the transportation task. For example, the high-rise cargo location where the carrier 114 is stored may be regarded as the high-rise cargo location corresponding to the transportation task, or the high-rise cargo location when it is determined that the carrier 114 is stored may also be regarded as the high-rise cargo location corresponding to the transportation task.

[0066] The control center 100 may then transmit transport instructions to the identified first transport device 102 based on the location of the high rise cargo location and the location of the aisle adjacent to the high rise cargo location.

[0067] Then, as shown in Fig. 5, the first conveying device 102 may take out the carrier 114 from the side of the high cargo position to the first conveying device 102 at the position of the rail adjacent to the high cargo position, or may put the carrier 114 conveyed on the first conveying device 102 into the high cargo position from the side of the high cargo position, according to a conveying command sent from the control center 100. Fig. 5 is a schematic diagram showing that the first conveying device provided in this specification takes in and takes out the carrier from the side, and the first conveying device 102 is located at the position of the passage adjacent to the high cargo position, and takes in and takes out the cargo from the side of the high cargo position.

[0068] Alternatively, the control center 100 identifies a high-rise cargo position corresponding to the transport task, and then sends a transport command to the identified first transport equipment 102 based on the high-rise cargo position and other cargo positions above the high-rise cargo position.

[0069] Then, in response to a transport command transmitted from the control center 100, the first transport device 102 may remove the carrier 114 from above the high-rise cargo position to the first transport device 102, or may move the carrier 114 on the first transport device 102 into the high-rise cargo position from above the high-rise cargo position.

[0070] Further, herein, the second transport device 104 may similarly facilitate removal or storage of the carriers 114 at the bottom cargo location in a number of ways.

[0071] Specifically, the control center 100 identifies a bottom cargo location corresponding to the transport task according to the transport task. For example, the bottom cargo location where the carrier 114 is stored may be regarded as the bottom cargo location corresponding to the transport task, or the bottom cargo location when the carrier 114 is stored may be regarded as the high cargo location corresponding to the transport task.

[0072] The control center 100 may then transmit transport commands to the identified second transport equipment 104 based on the bottom cargo location and the location of the aisle adjacent to the bottom cargo location.

[0073] In this case, in response to a transport command transmitted from the control center 100, the second transport equipment 104 may remove the carrier 114 from the side of the bottom cargo position onto the second transport equipment 104 at a rail position adjacent to the bottom cargo position, or may insert the carrier 114 being transported on the second transport equipment 104 into the bottom cargo position from the side of the bottom cargo position.

[0074] Alternatively, the control center 100 identifies a bottom layer cargo position corresponding to the transport task, and then transmits a transport command to the identified second transport equipment 104 based on the bottom layer cargo position.

[0075] Then, in response to a transport command sent from the control center 100, the second conveying equipment 104 may enter below the bottom cargo position at a rail position adjacent to the bottom cargo position and remove the carrier 114 from below the bottom cargo position to the second conveying equipment 104, or may place the carrier 114 instructed by the transport command in the second conveying equipment 104 into the bottom cargo position.

[0076] Also, in this specification, for each multi-story warehouse 106, at least one lifting device 108 may be provided in the multi-story warehouse 106, so that in order to enable the carrier 114 to be placed on any layer in the multi-story warehouse 106, if the multi-story warehouse 106 includes multiple lifting devices 108, there will be at least an overlap between the designated layers that can be reached by the multiple lifting devices 108.

[0077] That is, by using the overlapping layers, each lifting device 108 can realize communication between each layer in the multi-story warehouse 106. As shown in Fig. 6, the multi-story warehouse 106 has a total of four layers, and the bottom layer and the first layer, the first layer and the second layer, and the second layer and the third layer are each connected by three lifting devices 108. Of course, each lifting device 108 may be disposed at a different position in the multi-story warehouse 106.

[0078] The control center 100 may transport the carrier to any of the layers in the multi-story warehouse 106 by one or more lifting devices 108. For example, in FIG. 6, to transport the cargo on the third layer to the bottom layer, the control center may schedule the first transport devices 102 and the corresponding lifting devices 108 on the first to third layers, respectively, and each lifting device 108 and the first transport device 102 on each layer may relay the cargo from the third layer to the bottom layer.

[0079] The lifting device 108 in this specification may be provided with rails 118. This allows the rails 118 in the lifting device 108 to be connected to the rails 118 provided in the upper floor of the multi-storey warehouse 106, so that, as shown in FIG. 7, the first transport device 102 travels in the lifting device 108 when moving along the rails in the upper floor, and may directly place the carrier 114 in the lifting device 108, or may transport the first transport device 102 to another floor by the lifting device 108.

[0080] Further, in this specification, if the lifting device 108 is also provided with a rail 118, the control center 100 may further schedule the first transport device 102 between different layers by the lifting device 108.

[0081] Specifically, in this specification, the control center 100 may specify the number of first conveyance devices 102 required for each high floor according to the transportation tasks to be performed corresponding to some or all of the high floors. Here, the control center 100 may set the floor where the high floor cargo position related to the transportation task is located as the high floor corresponding to the transportation task. For example, when the transportation task A requires the carrier 114 to be carried out from the third floor, the third floor becomes the high floor corresponding to the transportation task A, or when the transportation task B requires the carrier 114 to be transported to a certain high floor cargo position on the third floor, the third floor becomes the high floor corresponding to the transportation task B. In addition, the control center 100 may specify the number of first conveyance devices 102 required for each high floor according to the number of transportation tasks to be performed corresponding to each high floor. The more transportation tasks to be performed corresponding to a high floor, the more the number of first conveyance devices 102 required for the high floor. Of course, since the space of each floor in the warehouse is limited, if the number of first conveying devices 102 is too large, the number of routes that the devices can travel on may decrease or congestion may occur on the routes. Therefore, in this specification, the control center 100 may further specify the number of first conveying devices 102 required for each high floor according to a preset maximum number of first conveying devices 102 on each high floor. Here, the maximum number of first conveying devices 102 may differ depending on the layout of each floor. When the number of carriers 114 arranged on a high floor is reduced, it is indicated that the number of areas in which the first conveying devices 102 can travel is increased.

[0082] The control center 100 may then identify the first transport equipment 102 that needs to be scheduled on each high floor based on the number of first transport equipment 102 required on each high floor and the current number of first transport equipment 102 on each high floor, and send scheduling instructions to the first transport equipment 102 that needs to be scheduled.

[0083] Then, the first conveying equipment 102 further travels along the rails 118 within the lifting equipment 108 in response to the scheduling command transmitted from the control center 100 received, and the first conveying equipment 102 reaches the high floor specified in the scheduling command by the lifting equipment 108.

[0084] In addition, in the above description of the structure of the multi-story warehouse 106 in this specification, the high-rise transfer stations 112 provided on each of the high floors are all individually provided outside the lifting equipment 108. This is because, when the first conveying equipment 102 cannot reach the inside of the lifting equipment 108, the high-rise transfer stations 112 must transport the carriers 114 into the lifting equipment 108, and then the carriers 114 must be transported to the designated floor by the lifting equipment 108.

[0085] However, if rails 118 are also provided within the lifting equipment 108 and the first transport equipment 102 can run within the lifting equipment 108, the high-rise transfer station 112 in this specification may be provided to be located within the lifting equipment 108.

[0086] The first transport device 102 then travels to a high-rise transfer station 112 within the lifting device 108 and places the carrier 114 at the high-rise transfer station 112 or removes the carrier 114 from the high-rise transfer station 112 in response to a transport command transmitted from the control center 100.

[0087] Furthermore, in this specification, a warehouse may be influenced from all directions during construction, so the layout of each floor is different. If the upper floors of the multi-story warehouse 106 include a high floor that cannot be connected to all areas by rails, as shown in Figure 8, when the first conveying device 102 needs to be scheduled between two areas, the control center 100 can perform the following control.

[0088] When the control center 100 needs to schedule the first transport equipment 102 between different areas of a high rise whose entire area cannot be connected by rails 118, the area from which the first transport equipment 102 exits may be designated as the departure area, the area from which the first transport equipment 102 enters may be designated as the destination area, and another high rise that is closest to the high rise and whose entire area is connected by rails may be identified as the intermediate rise.

[0089] The control center 100 sends a scheduling command to the first transport device 102 in the departure area, sends a transport command to the lifting device 108 connecting the middle layer and the departure area, and sends a transport command to the lifting device 108 connecting the middle layer and the destination area, so that the first transport device 102 reaches the destination area from the departure area by means of the two lifting devices 108 and the middle layer rails 116.

[0090] Furthermore, in the system provided herein, when there are two or more multi-storey buildings 106, the bottom surfaces of each multi-storey building 106 are connected to each other, as shown in Figures 9a and 9b. Here, Figure 9a is a simplified schematic diagram showing that the grounds of two multi-storey buildings corresponding to Figure 8 are connected to each other, showing that the two multi-storey buildings may be regarded as a whole since only the bottom layers are connected, and Figure 9b is a detailed schematic diagram showing that the two multi-storey buildings are each provided individually on the bottom surface.

[0091] Moreover, the control center 100 may specify the number of first transport devices 102 required for each multi-storey warehouse 106 according to the transport tasks to be performed corresponding to at least some of the multi-storey warehouses 106 .

[0092] The control center 100 may identify the first transport equipment 102 that needs to be scheduled at each multi-level warehouse 106 based on the number of first transport equipment 102 required for each multi-level warehouse 106 and the current number of first transport equipment 102 in each multi-level warehouse 106.

[0093] The control center 100 may designate the three-dimensional warehouse 106 from which the first conveying equipment 102 leaves as the departure warehouse, and the three-dimensional warehouse 106 to which the first conveying equipment 102 enters as the destination warehouse, and may send a scheduling command to the first conveying equipment 102 at the departure warehouse, and send a conveying command to the second conveying equipment 104, the lifting equipment 108 at the departure warehouse, and the lifting equipment 108 at the destination warehouse, so that the first conveying equipment 102 is scheduled from the departure warehouse to the destination warehouse by the two lifting equipment 108 and the second conveying equipment 104.

[0094] Here, the second conveying equipment 104 is further for conveying the first conveying equipment 102 from the bottom level of the origin warehouse to the bottom level of the destination warehouse in response to a scheduling command.

[0095] It should be noted that since the first transport device 102 can travel inside the lifting device 108 by rails, the second transport device 104 can regard the first transport device 102 inside the lifting device 108 as a carrier 114 inside the lifting device 108 and transport the first transport device 102 out of the lifting device 108 in a manner similar to the transportation of the carrier 114. Moreover, since the bottom layers of the respective multi-storey warehouses 106 are connected to each other, the second transport device 104 can reach from one multi-storey warehouse 106 to another multi-storey warehouse 106 via the bottom layer, and schedule the first transport device 102 between different multi-storey warehouses 106.

[0096] In this specification, the lifting device 108 is provided with a non-powered transfer device 120 or a powered transfer device 120, and the high-rise transfer station 112 includes at least the transfer device 120 located in the lifting device. Here, the powered transfer device 120, such as a roller line, a conveyor line, or a bidirectional telescopic fork, can actively transfer the carrier 114 placed on the transfer device 120, and is not limited to a specific form. The non-powered transfer device 120 may include at least a carrier bracket 116 for placing the carrier 114.

[0097] The first transport device 102 is further adapted to travel to a loading device 120 serving as a high-rise transfer station 112 within the lifting device 108 to place the carrier 114 on the loading device 120 or to remove the carrier 114 from the loading device 120 serving as the high-rise transfer station 112.

[0098] Further, in this specification, as shown in Fig. 10, in each high-rise in the multi-story warehouse 106, a non-powered transfer device 120 or a powered transfer device 120 is provided at least partially outside the position where the lifting device 108 and the high-rise are docked. Thus, the high-rise transfer station in this specification further includes at least a transfer device located outside the lifting device.

[0099] When the lifting equipment 108 is located on a high floor, the transfer equipment 120 located outside the lifting equipment 108 docks with the transfer equipment 120 located inside the lifting equipment 108, and transports the carrier 114 from the transfer equipment 120 inside the lifting equipment 108 to the transfer equipment 120 outside the lifting equipment 108, or transports the carrier 114 from the transfer equipment 120 located outside the lifting equipment 108 to the transfer equipment 120 inside the lifting equipment 108.

[0100] It should be noted that in this specification, when the transfer devices 120 located inside and outside the lifting device 108 are both non-powered transfer devices 120, the first conveying device 102 may push the carrier 114 to the transfer device 120 by taking out or putting in the carrier 114 from the side. When any of the transfer devices 120 located inside and outside the lifting device 108 is a powered transfer device 120, the powered transfer device 120 can press the carrier 114.

[0101] Also, in this specification, at least one bottom layer transfer station 110 is provided in a designated area on the bottom layer of the multi-level warehouse 106, that is, the bottom layer transfer station 110 may refer to one designated area on the bottom layer.

[0102] The second transport device 104 is then for removing the carrier 114 from the bottom layer cargo location or the lifting device 108 and transporting the carrier 114 to the bottom layer transfer station 110 for depositing in the designated area. Alternatively, the second transport device 104 is for removing the carrier 114 from the bottom layer transfer station 110 in the designated area and transporting the carrier 114 to the bottom layer cargo location or the lifting device 108.

[0103] At the bottom cargo position, a carrier bracket 116 may be provided for placing the carrier 114, and the minimum distance between the carrier bracket 116 and the bottom layer may be greater than the height of the second transport equipment 104, so there is generally a difference in height between the carrier bracket 116 at the bottom cargo position and the bottom layer. For the same reason, the lifting equipment 108 needs to pick up cargo from the high-rise transfer station 112, but because the height of the high-rise transfer station 112 is adapted to the first transport equipment 102, there is also generally a difference in height between the lifting equipment 108 and the bottom layer.

[0104] Thus, if the bottom layer transfer station 110 is a designated area on the bottom layer, the second transport device 104 must be provided with a device for lifting the carrier 114 and a device for placing the carrier 114, such as forks that can be raised and lowered, so that the second transport device 104 can transport the carrier 114 from the designated area on the bottom layer to a bottom layer cargo position or lifting device 108 at a different height.

[0105] Furthermore, in this specification, when the lifting device 108 has a built-in transfer device 120, a powered transfer device 120 may also be provided in the bottom layer of the multi-level warehouse 106. Thereby, when the lifting device 108 is in the bottom layer, the bottom layer transfer device 120 is docked with the transfer device 120 located in the lifting device 108, so that the carrier 114 can be transported from the transfer device 120 in the lifting device 108 to the transfer device 120 in the bottom layer, and the second transport device 104 can take out the carrier 114 from the transfer device 120 in the bottom layer, or when the carrier 114 is placed on the transfer device 120 in the bottom layer by the second transport device 104, the transfer device 120 in the bottom layer can transport the carrier 114 from the transfer device 120 in the bottom layer to the transfer device 120 in the lifting device 108.

[0106] In this case, the second transport device 104 in this specification is further for removing the carrier 114 from the bottom layer transfer device 120 and transporting the carrier to the bottom layer transfer station 112, and placing the carrier 114 in the designated area. Alternatively, the second transport device 104 may remove the carrier 114 from the bottom layer transfer station 112 in the designated area and transport the carrier 114 to the bottom layer transfer device 120. As shown in Figure 11, the dotted line indicates the movement path of the carrier 114.

[0107] Furthermore, in another embodiment in this specification, the control center 100 may transmit a transport command to the second transport device 104 to transport the carrier 114 to a designated area outside the multi-story warehouse 106 as necessary. Then, the second transport device 104 may transport the carrier 114 to the designated area in response to the transport command. That is, in this specification, the second transport device 104 is not limited to traveling only within the multi-story warehouse 106. Since the second transport device 104 travels on the platform of the bottom layer, it is not restricted by rails, and the carrier 114 can be loaded and unloaded by flexibly docking with equipment outside the system or outside the multi-story warehouse 106. Here, the external equipment may be a forklift controlled by an operator, a roller line that transports the carrier 114, a production line, an area where an operator sorts cargo, etc., but is not limited in this specification.

[0108] Furthermore, the system may further include one or more external buffer areas whose form is at least one of three-dimensional storage and flat storage, but is not limited thereto in the present specification. When the external buffer area is in the form of three-dimensional storage, the external buffer area may be provided with a lifting device 108 for communicating each layer in the external buffer area. Of course, when the external buffer area is not provided with the lifting device 108, the high-layer carriers 114 in the external buffer area may be transported by a three-dimensional transport device such as a forklift. Moreover, the layout structure of the external buffer area may be the form shown in the above Figures 2 to 4b.

[0109] In this specification, the external buffer area may share each second conveying device 104 with the multi-level warehouse 106. The second conveying device 104 conveys and / or transfers the carrier 114 between the external buffer area and at least one multi-level warehouse 106. For example, when cargo in the multi-level warehouse 106 needs to be conveyed to the external buffer area, the control center 100 may send a conveying command to the second conveying device. Then, the second conveying device 104 may convey the carrier 114 to the external buffer area for buffering.

[0110] Of course, when the external buffer area is in the form of flat storage, the external buffer area may be a buffer area composed of carrier brackets 116 installed on the ground. The external buffer area may be for placing cargo that is frequently entered and removed from the warehouse. This reduces the frequency of entering and removing the carriers 114 from the multi-story warehouse 106, thereby reducing the transport time by each transport device that is occupied by transporting cargo that is frequently entered. Generally speaking, the external buffer area may be one that has a smaller storage capacity than the multi-story warehouse 106, has a simpler structure, and can provide a cargo buffer, so it may be one that is composed only of carrier brackets 116 installed on the ground, as described above.

[0111] As can be seen from the description of the transport scheduling system for a multi-story warehouse for realizing cargo picking shown in Figure 2 and the execution process of the above-mentioned transport tasks, the system provided in this specification uses a mixture of the first transport equipment and the second transport equipment in a multi-story warehouse, and utilizes the transport function of the lifting equipment in the multi-story warehouse so that the first transport equipment and the second transport equipment work together to transport cargo within a dense storage warehouse, thereby avoiding the need to lay rails on the bottom floor of the warehouse, allowing the warehouse layout to be flexibly changed and the required quantity of the first transport equipment to be reduced, thereby reducing warehouse operating costs and improving transport efficiency.

[0112] Also, in this specification, in order to improve the flexibility of route selection when the second conveying equipment 104 is not transporting the carrier 114, the height of the carrier bracket 116 at at least some of the bottom cargo positions on the bottom level of the multi-story warehouse 106 is higher than the height of the second conveying equipment 104 when the carrier 114 is not placed thereon.

[0113] The second conveying device 104 is further adapted to selectively run beneath at least a portion of the bottom cargo locations when not carrying a carrier 114, or to transport the carrier 114 in a piggyback manner from beneath at least a portion of the bottom cargo locations.

[0114] Furthermore, the spacing between the uprights between at least some of the bottom layer cargo positions in the bottom layer of the multi-story warehouse 106 is greater than the width of the second conveying device 104, and the height at the lowest point of the connecting member between at least some of two adjacent uprights in the bottom layer of the multi-story warehouse 106 is greater than the height of the second conveying device 102 when the carrier 114 is not placed thereon. The second conveying device 102 is further for selectively traveling between at least some of two adjacent uprights in the bottom layer when the carrier 114 is not placed thereon.

[0115] Based on the system shown in FIG. 2, this specification further provides a transportation scheduling method for a multi-level warehouse, as shown in FIG.

[0116] 12 is a schematic diagram of the flow of transport scheduling in a multi-level warehouse provided in the present specification. There is at least one multi-level warehouse, and each level of the multi-level warehouse is connected by at least one lifting device, and at least one bottom-level transfer station is provided in the bottom level of the multi-level warehouse, and carriers and carrier brackets are arranged at at least some of the bottom-level cargo positions in the bottom level, and the carrier brackets at the bottom-level cargo positions are for placing carriers transported by the second transport device, and at least one high-level transfer station is provided in each of the other high-level levels in the multi-level warehouse, and rails for the first transport device to run on are provided in each of the high-level levels, and carriers are arranged at at least some of the high-level cargo positions in the high-level levels, and the transport flow may include the following steps.

[0117] In step S200, a transport task to be executed is identified. It should be noted that the transport task is an operation in which the transport equipment transports carriers in order to realize sorting of cargo in a multi-story warehouse, and may be specified according to a received order.

[0118] In step S202, a first transport device, a second transport device, and an elevation device that execute the transport task are identified according to the transport task.

[0119] In step S204, by sending transport commands to the identified first transport equipment, second transport equipment, and lifting equipment, respectively, the first transport equipment, the second transport equipment, and the lifting equipment are caused to cooperate to transport the carrier from the high-level cargo position or the bottom-level cargo position of the multi-story warehouse to the bottom-level transfer station, or to transport the carrier at the bottom-level transfer station to the high-level cargo position or the bottom-level cargo position of the multi-story warehouse.

[0120] The transportation method provided in this specification may be specifically executed by a control center. The control center may be one or more devices. For example, it may be a distributed server consisting of multiple servers. This specification is not limited thereto. Of course, since there may be one or more multi-storey warehouses, one control center may be installed to identify transportation tasks by multiple multi-storey warehouses and schedule equipment to execute the transportation tasks, or multiple control centers may identify different transportation tasks and schedule equipment to execute the transportation tasks. Moreover, when there are multiple control centers, each control center may share the identified transportation tasks. As a result, multiple control centers can cooperate to complete multiple transportation tasks.

[0121] For details of the execution process of the method, please refer to the description of the execution process of the transport task in the transport scheduling system for a multi-level warehouse for realizing the above-mentioned cargo picking. Repetitive explanation will not be repeated in this specification.

[0122] Further, in this specification, a flow of the control center executing the transportation scheduling will be described as an example. Since the first transportation device can transport carriers from above or from the side of the high-rise cargo position, when a transportation command is sent to the specified first transportation device to have the first transportation device execute a transportation task, the control center may specify the high-rise cargo position corresponding to the transportation task according to the transportation task, and send a transportation command to the specified first transportation device based on the high-rise cargo position and the position of the aisle adjacent to the high-rise cargo position, so that the first transportation device may take out the carrier specified by the transportation command from the side of the high-rise cargo position at the aisle position according to the transportation command, or the first transportation device may put the carrier specified by the transportation command in the first transportation device into the high-rise cargo position from the side according to the transportation command.

[0123] Here, the position of the aisle adjacent to the high-rise cargo position is the position of an aisle that has no warehouse structure such as a reinforcing structure (e.g., reinforcing rib) of the multi-story warehouse or a partition board between the high-rise cargo position and the aisle. The aisle is an aisle along which the first conveying device travels while conveying the carrier, and since the first conveying device needs to carry out the carrier from the high-rise cargo position and travel along the aisle, there is always one aisle without blocks between each high-rise cargo position and its adjacent aisle. Of course, as described for the above system, there may be a plurality of planar layouts of the multi-story warehouse. In that case, at least any of the high-rise cargo positions can be connected to the aisle by conveying another carrier.

[0124] Alternatively, the control center identifies a high-rise cargo location corresponding to the transport task in accordance with the transport task, and sends a transport command to the identified first transport equipment based on the high-rise cargo location and other cargo locations above the high-rise cargo location, thereby causing the first transport equipment to retrieve a carrier indicated by the transport command from above the high-rise cargo location at the other cargo location above the high-rise cargo location to the first transport equipment in accordance with the transport command, or to lower a carrier indicated by the transport command on the first transport equipment to the high-rise cargo location in accordance with the transport command.

[0125] Also, in this specification, the second conveying equipment may remove cargo from the bottom layer cargo position in a different manner, for example, may transport a carrier from below or from the side of the bottom layer cargo position, so that when a transport command is sent to an identified second conveying equipment to have the second conveying equipment perform a transport task, the control center may identify a bottom layer cargo position corresponding to the transport task according to the transport task, and send a transport command to the second conveying equipment based on the bottom layer cargo position and the position of the aisle adjacent to the bottom layer cargo position, so that the second conveying equipment removes the carrier instructed by the transport command from the side of the bottom layer cargo position at the position of the aisle adjacent to the bottom layer cargo position, or enters the carrier instructed by the transport command on the second conveying equipment from the side to the bottom layer cargo position.

[0126] Furthermore, the control center may identify a bottom layer cargo position corresponding to the transport task depending on the transport task, and send a transport command to the second transport equipment based on the bottom layer cargo position, so that the second transport equipment enters below the bottom layer cargo position at an aisle position adjacent to the bottom layer cargo position and removes a carrier indicated by the transport command from below the bottom layer cargo position to the second transport equipment, or causes a carrier indicated by the transport command in the second transport equipment to enter the bottom layer cargo position.

[0127] In addition, in the case where a rail is provided in the lifting device, the rail is connected to a rail provided on a higher floor so that the first conveying device can travel in the lifting device, The control center may further determine the number of first transportation devices required for each high floor based at least in part on the transportation tasks to be performed on each high floor, and then determine the first transportation devices that need to be scheduled on each high floor based on the number of first transportation devices required for each high floor and the current number of first transportation devices on each high floor. Thereafter, the control center may transmit a scheduling command to the determined first transportation devices that need to be scheduled, so that the first transportation devices further travel within the lifting device in response to the received scheduling command and reach the high floor specified in the scheduling command by the lifting device.

[0128] Furthermore, when the high-rise transfer station is arranged to be located within the lifting equipment, when the control center sends a transport command to the first transport equipment, it identifies the high-rise transfer station within the lifting equipment that corresponds to the transport task according to the transport task, and sends a transport command to the identified first transport equipment based on the position of the high-rise transfer station within the lifting equipment, so that the first transport equipment travels to the high-rise transfer station within the lifting equipment and places the carrier at the high-rise transfer station or removes the carrier from the position of the high-rise transfer station.

[0129] Furthermore, the lifting device is provided with a non-powered transfer device or a powered transfer device, and the high-rise transfer station includes at least a transfer device located in the lifting device. Then, the control center may specify a high-rise transfer station in the lifting device corresponding to the transfer task according to the transfer task. The control center transmits a transfer command to the specified first transfer device based on the position of the high-rise transfer station in the lifting device, so that the first transfer device travels to the transfer device serving as the high-rise transfer station in the lifting device and places the carrier in the transfer device or takes the carrier out of the transfer device serving as the high-rise transfer station.

[0130] Furthermore, when a non-powered transfer equipment or a powered transfer equipment is further provided outside the lifting equipment, and the high-rise transfer station further includes at least a transfer equipment located outside the lifting equipment, the control center identifies the high-rise transfer station corresponding to the transfer task according to the transport task, and sends a transport command to the lifting equipment according to the floor where the high-rise transfer station is located, so that the lifting equipment transports the carrier from the transfer equipment within the lifting equipment to the transfer equipment serving as a high-rise transfer station outside the lifting equipment by docking the transfer equipment located outside the lifting equipment with the transfer equipment located within the lifting equipment at the floor where the high-rise transfer station is located, or transports the carrier in the transfer equipment serving as a high-rise transfer station located outside the lifting equipment to the transfer equipment within the lifting equipment.

[0131] In addition, in this specification, the bottom layer transfer station of the multi-story warehouse is an area for transferring carriers between the multi-story warehouse and the outside world, and at least one bottom layer transfer station may be provided in a designated area on the bottom layer of the multi-story warehouse outside the multi-story warehouse, as long as it is an equipment such as a forklift that lifts the carrier from the bottom layer. When transmitting a transport command to the specified second transport equipment, the control center may further specify a bottom layer transfer station provided in a designated area corresponding to the transport task according to the transport task, and transmit a transport command to the second transport equipment according to the bottom layer transfer station provided in the designated area, so that the second transport equipment takes out the carrier specified by the transport command from the bottom layer cargo position or the lifting equipment, transports the carrier to the bottom layer transfer station, and places the carrier in the designated area, or takes out the carrier specified by the transport command from the bottom layer transfer station in the designated area, and transports the carrier to the bottom layer cargo position or the lifting equipment.

[0132] Furthermore, a powered transfer device may be provided in the lifting device. In this case, a powered transfer device is correspondingly provided on the ground of the bottom layer of the multi-level warehouse. When the control center controls the lifting device to transport the carrier, it may specify a bottom layer transfer station corresponding to the transport task according to the transport task, and transmit a transport command to the lifting device to transport to the bottom layer, so that the lifting device moves to the bottom layer and the transport device on the bottom layer ground docks with the transport device located in the lifting device, thereby transporting the carrier from the transport device in the lifting device to the transport device on the bottom layer ground, or transporting the carrier in the transport device on the bottom layer ground to the transport device in the lifting device.

[0133] In the above case, the carrier is transported from the lifting device to the bottom layer transfer device in the bottom layer. Then, the control center identifies the bottom layer transfer station provided in the designated area corresponding to the transport task according to the transport task, and transmits a transport command to the second transport device according to the bottom layer transfer station provided in the designated area, so that the second transport device takes the carrier out of the transfer device on the bottom layer ground, transports the carrier to the bottom layer transfer station, and places the carrier in the designated area, or the second transport device transports the carrier to the lifting device, and when the lifting device transports the carrier to another layer, the second transport device may take the carrier designated by the transport command out of the bottom layer transfer station in the designated area and transport the carrier to the transfer device on the bottom layer ground according to the received transport command.

[0134] In addition, when the control center determines that it is necessary to schedule the first conveyance device between different areas of the high-rise where the entire area cannot be connected by rails, for example, as described for the above system, when it is necessary to schedule the first conveyance device according to the requirements of the transportation task to be executed, the area from which the first conveyance device leaves may be set as the departure area, the area from which the first conveyance device enters may be set as the destination area, and another high-rise that is closest to the high-rise and whose entire area is connected by rails may be set as the intermediate layer. In addition, the control center transmits a scheduling command to the first conveyance device in the departure area, transmits a transport command to the lifting device that connects the intermediate layer and the departure area, and transmits a transport command to the lifting device that connects the intermediate layer and the destination area, so that the first conveyance device reaches the destination area from the departure area by the two lifting devices and the intermediate layer.

[0135] Furthermore, when there are two or more multi-story warehouses, the bottom surfaces of the multi-story warehouses in this specification are connected to each other. When the control center determines that the first transport device needs to be scheduled between different multi-story warehouses, the multi-story warehouse from which the first transport device leaves is set as the departure warehouse, and the multi-story warehouse into which the first transport device enters is set as the destination warehouse; The first conveying equipment may be scheduled from the departure warehouse to the destination warehouse by sending a scheduling command to a first conveying equipment at the departure warehouse, and sending a conveying command to a second conveying equipment, a lifting equipment at the departure warehouse, and a lifting equipment at the destination warehouse, so that the first conveying equipment is scheduled from the departure warehouse to the destination warehouse by the two lifting equipment and the second conveying equipment.

[0136] In another embodiment provided herein, one or more external buffer areas having at least one of a three-dimensional storage and a flat storage form are provided outside the multi-level warehouse, and the external buffer area shares at least a portion of the second transport equipment with the multi-level warehouse, or the second transport equipment transports and / or transfers carriers between the external buffer area and the at least one multi-level warehouse.

[0137] In this case, when the control center identifies a transportation task to be performed, the control center may identify the transportation task to be performed based on the stored cargo inventory information and order information in the external buffer area and the multi-story warehouse. In other words, it is necessary to take into account the cargo stored in the external buffer area and the cargo storage capacity of the external buffer area.

[0138] According to the method shown in Figure 12, by using a mixture of the first and second conveying equipment in a multi-story warehouse and utilizing the conveying function of the lifting equipment in the multi-story warehouse so that the first and second conveying equipment work together to transport cargo within a densely stored warehouse, it is possible to avoid laying rails on the bottom floor of the warehouse, and the warehouse layout can be flexibly changed while also reducing the number of first conveying equipment required, thereby reducing warehouse operating costs and improving conveying efficiency.

[0139] In the 1990s, improvements to a technology could be clearly distinguished as either hardware improvements (e.g., improvements to circuit structures such as diodes, transistors, switches, etc.) or software improvements (improvements to methods and processes). However, with the development of technology, many improvements to methods and processes can now be considered as direct improvements to hardware circuit structures. Designers mostly obtain corresponding hardware circuit structures by programming the improved methods and processes into hardware circuits. Therefore, it cannot be said that improvements to a method and process cannot be realized by hardware entity modules. For example, a programmable logic device (PLD) (e.g., a field programmable gate array (FPGA)) is such an integrated circuit, whose logic functions are specified by users programming the device. It is not necessary for a designer to program and "integrate" a digital system into a PLD by himself, and for a chip manufacturer to design and manufacture a dedicated integrated circuit chip.Nowadays, instead of manually manufacturing integrated circuit chips, such programming is often realized by "logic compiler" software, which is similar to the software compiler used in program development and creation, and the original code before compilation must also be created in a specific programming language, which is called a Hardware Description Language (HDL). There is not just one type of HDL, but various types, such as ABEL (Advanced Boolean Expression Language), AHDL (Altera Hardware Description Language), Confluence, CUPL (Cornell University Programming Language), HDCal, JHDL (Java Hardware Description Language), Lava, Lola, MyHDL, PALASM, RHDL (Ruby Hardware Description Language), etc., and currently, the most commonly used are VHDL (Very-High-Speed ​​Integrated Circuit Hardware Description Language) and Verilog. It is clear to those skilled in the art that a hardware circuit that realizes a method flow can be easily obtained by simply programming a method flow into an integrated circuit by logic programming the method flow in one of the above hardware description languages.

[0140] The controller may be implemented in any suitable manner, for example, the controller may take the form of, for example, a microprocessor or a processor and a computer readable medium storing computer readable program code (e.g., software or firmware) executable by the (micro)processor, logic gates, switches, Application Specific Integrated Circuits (ASICs), programmable logic controllers, and embedded microcontrollers, examples of controllers include, but are not limited to, microcontrollers such as ARC 625D, Atmel AT91SAM, Microchip PIC18F26K20, and Silicone Labs C8051F320, and the memory controller may further be implemented as part of the control logic of the memory. As will be appreciated by those skilled in the art, other than implementing the controller purely in the form of computer readable program code, the controller may also realize the same functions in the form of logic gates, switches, application specific integrated circuits, programmable logic controllers, embedded microcontrollers, etc. by fully logically programming the method steps. Thus, such a controller may be considered as a hardware component, and the devices for implementing various functions contained therein may also be considered as structures within the hardware component. Alternatively or additionally, the apparatus for implementing various functions may be considered as both software modules implementing methods and structures within hardware components.

[0141] The system, device, module or unit described in the above embodiments may be specifically realized by a computer chip or entity, or may be realized by a product having a certain function. A typical implementation device may be a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a mobile phone, a camera phone, a smartphone, a personal digital assistant, a media player, a navigation device, an e-mail device, a game console, a tablet computer, a wearable device, or any combination of these devices.

[0142] For convenience of explanation, the above apparatus has been described by dividing it into various units according to their functions. Of course, when implementing this specification, the functions of each unit can be realized by the same or multiple pieces of software and / or hardware.

[0143] As will be appreciated by those skilled in the art, the embodiments of the present disclosure may be provided as a method, a system, or a computer program product. Therefore, the present disclosure may be used in the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware. Moreover, the present disclosure may be used in the form of a computer program product embodied in one or more computer usable storage media (including, but not limited to, magnetic disk memories, CD-ROMs, optical memories, etc.) containing computer usable program code.

[0144] The present disclosure has been described with reference to flowcharts and / or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the present disclosure. It should be understood that each flow and / or block in the flowcharts and / or block diagrams, or a combination of processes and / or blocks in the flowcharts and / or block diagrams, may be realized by computer program commands. Providing these computer program commands to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device causes an apparatus to be generated to realize a function specified in one or more flows in the flowcharts and / or one or more blocks in the block diagrams according to the commands to be executed by the processor of the computer or other programmable data processing device.

[0145] These computer program commands may be stored in a computer readable memory that can guide a computer or other programmable data processing apparatus to operate in a particular manner, such that the commands stored in the computer readable memory cause a product including a command device to implement the functions specified in one or more flows in the flowcharts and / or one or more blocks in the block diagrams.

[0146] These computer program commands may be loaded into a computer or other programmable data processing apparatus to cause the computer or other programmable apparatus to execute a series of operational steps to produce a computer-implemented process, and the commands to be executed by the computer or other programmable apparatus provide steps for implementing the functions specified in one or more flows in the flowcharts and / or one or more blocks in the block diagrams.

[0147] In a typical configuration, a computing device includes one or more processors (CPUs), input / output interfaces, network interfaces, and memory.

[0148] The memory may include any form of non-persistent memory, random access memory (RAM) and / or non-volatile memory in a computer readable medium, such as read only memory (ROM) or flash memory (flash RAM). The memory is one example of a computer readable medium.

[0149] Computer-readable media include permanent and non-permanent, removable and non-removable media, and may be implemented by any method or technology to store information. Information may be computer-readable commands, data structures, program modules, or other data. Examples of computer storage media may include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disc read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage device, magnetic cassette, magnetic tape magnetic disk storage device or other magnetic storage device, or any other non-transmission medium capable of storing information that can be accessed by a computing device. As defined herein, computer-readable media does not include transitory computer-readable media, such as modulated data signals or carriers.

[0150] It should be further explained that the terms "comprise", "including" or other variations are intended to cover non-exclusive "comprises", whereby a process, method, product, or apparatus that includes a set of elements includes not only those elements, but also other elements not expressly listed or inherent in such process, method, product, or apparatus. In the absence of too many limitations, an element limited by the phrase "comprises a ..." does not exclude the presence of other similar elements in the process, method, product, or apparatus that includes said element.

[0151] As will be appreciated by those skilled in the art, the embodiments herein may be provided as a method, a system, or a computer program product. As such, the embodiments herein may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware. Furthermore, the embodiments herein may take the form of a computer program product embodied in one or more computer usable storage media (including, but not limited to, magnetic disk memory, CD-ROM, optical memory, etc.) containing computer usable program code.

[0152] The specification may be described in the general context of computer-executable commands being executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types. The specification may also be implemented in distributed computing environments where tasks are performed by remote processing facilities that are linked through a communications network. In a distributed computing environment, program modules may be located in both local and remote computer storage media including storage facilities.

[0153] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between each embodiment are cross-referenced, and each embodiment is described with emphasis on the differences from other embodiments. In particular, since the system embodiments are basically the same as the method embodiments, the description thereof is simplified, and for the relevant parts, it is sufficient to refer to some of the descriptions in the method embodiments. The above description is merely an example of the present specification and is not intended to limit the present specification. For those skilled in the art, the present specification may be modified or changed in various ways. Any amendments, equivalent replacements, improvements, etc. made within the spirit and principle of the present specification are within the scope of the claims of the present specification. [Explanation of symbols]

[0154] 100 Control Center 102 First conveying equipment 104 Second conveying equipment 106 Multi-story warehouse 108 Lifting Equipment 110 Bottom Transfer Station 112 High-rise Transfer Station 114 Career 116 Carrier bracket 118 Rail

Claims

1. A transport scheduling system for a multi-story warehouse for realizing picking of cargo, comprising one or more control centers, one or more first transport devices, one or more second transport devices, at least one multi-story warehouse, and at least one lifting device, wherein a plurality of levels are provided in one multi-story warehouse, and each level of the multi-story warehouse is connected by the at least one lifting device, and the control center communicates with each of the first transport devices and the second transport devices, At least one bottom layer transfer station is provided on the bottom layer of the multi-level warehouse, and at least one of a carrier and a carrier bracket is disposed in at least a part of the bottom layer cargo positions on the bottom layer, and the carrier bracket in the bottom layer cargo position is for placing a carrier transported by the second transport device; In the multi-level warehouse, at least one high-rise transfer station is provided in each of the other high-rise floors other than the bottom floor, rails along which the first conveying device runs are provided in each of the high-rise floors, and carriers are disposed in at least some of the high-rise cargo positions in the high-rise floors; the control center is for identifying a first conveying device, a second conveying device, and an elevator device that execute the conveying task according to the conveying task, and for transmitting conveying commands to the first conveying device, the second conveying device, and the elevator device to execute the conveying task, respectively; the first conveying device is for, in response to a conveying command transmitted from the control center, taking in and out a carrier designated by the conveying command to the high-floor cargo position, and for conveying the carrier designated by the conveying command between the high-floor cargo position and the high-floor transfer station, the first conveying device being a conveying device running on a rail; the second conveying device is for, in response to a conveying command transmitted from the control center, loading and unloading a carrier designated by the conveying command to and from the bottom layer cargo position, and for conveying the carrier designated by the conveying command between the lifting device and the bottom layer cargo position, between the bottom layer cargo position and the bottom layer transfer station, or between the lifting device and the bottom layer transfer station, the second conveying device being a conveying device running on a plane, the lifting device is adapted to lift up and down to a designated floor in response to a transport command transmitted from the control center, and to transport at least one or a combination of the carrier, the first transport device, and the second transport device designated by the transport command between each floor; The high-rise transfer station is provided to be located within the lifting device, The first transport device is further configured to travel to a high-rise transfer station within the lifting device to place the carrier at the high-rise transfer station or to remove the carrier from the high-rise transfer station, in a transport scheduling system for a multi-story warehouse.

2. A transport scheduling system for a multi-story warehouse for realizing cargo picking, comprising one or more control centers, one or more first transport devices, one or more second transport devices, at least one multi-story warehouse, and at least one lifting device, wherein one of the multi-story warehouses has a plurality of layers, and each layer of the multi-story warehouse is connected by the at least one lifting device, and the control center communicates with each of the first transport devices and the second transport devices, At least one bottom layer transfer station is provided on the bottom layer of the multi-level warehouse, and at least one of a carrier and a carrier bracket is disposed in at least a part of the bottom layer cargo positions on the bottom layer, and the carrier bracket in the bottom layer cargo position is for placing a carrier transported by the second transport device; In the multi-level warehouse, at least one high-rise transfer station is provided in each of the other high-rise floors other than the bottom floor, rails along which the first conveying device runs are provided in each of the high-rise floors, and carriers are disposed in at least some of the high-rise cargo positions in the high-rise floors; the control center is for identifying a first conveying device, a second conveying device, and an elevator device that execute the conveying task according to the conveying task, and for transmitting conveying commands to the first conveying device, the second conveying device, and the elevator device to execute the conveying task, respectively; the first conveying device is for, in response to a conveying command transmitted from the control center, taking in and out a carrier designated by the conveying command to the high-floor cargo position, and for conveying the carrier designated by the conveying command between the high-floor cargo position and the high-floor transfer station, the first conveying device being a conveying device running on a rail; the second conveying device is for, in response to a conveying command transmitted from the control center, loading and unloading a carrier designated by the conveying command to and from the bottom layer cargo position, and for conveying the carrier designated by the conveying command between the lifting device and the bottom layer cargo position, between the bottom layer cargo position and the bottom layer transfer station, or between the lifting device and the bottom layer transfer station, the second conveying device being a conveying device running on a plane, the lifting device is adapted to lift up and down to a designated floor in response to a transport command transmitted from the control center, and to transport at least one or a combination of the carrier, the first transport device, and the second transport device designated by the transport command between each floor; A non-powered transfer device or a powered transfer device is provided in the lifting device, The high-rise transfer station includes at least the transfer equipment located within the lifting equipment, In the transport scheduling system for a multi-story warehouse, the first transport device is further configured to travel to the transfer device and place the carrier on the transfer device or remove the carrier from the transfer device.

3. A carrier bracket for placing the carrier is further disposed in at least a part of the high-rise cargo positions in the high-rise; a distance between the carrier bracket and the rail is greater than a height of the first conveyance device when the carrier is not placed thereon; 3. The system of claim 1 or 2, wherein the first transport device is further adapted to travel below the high cargo location to transport the carrier in a piggyback manner from below the high cargo location and away from the high cargo location.

4. The system of claim 1 or 2, wherein the first transport device is further configured to remove the carrier from the side of the high-rise cargo location to the first transport device at a rail position adjacent to the high-rise cargo location, or to insert the carrier on the first transport device into the high-rise cargo location from the side of the high-rise cargo location.

5. The system of claim 1 or 2, wherein the first transport device is further adapted to remove the carrier from above the high cargo location to the first transport device or to place the carrier on the first transport device from above the high cargo location to the high cargo location.

6. The system according to claim 1 or 2, wherein when the multi-story warehouse includes a plurality of lifting devices, there is at least an overlap between designated floors that can be reached by the plurality of lifting devices.

7. The system according to claim 1 , wherein a rail is provided within the lifting device, the rail being connected to a rail provided on the high rise, thereby allowing the first transport device to travel within the lifting device.

8. The control center is further configured to determine the number of first transportation devices required for each high tier based at least in part on the transportation tasks to be performed on each high tier, determine the first transportation devices that need to be scheduled on each high tier based on the number of first transportation devices required for each high tier and the current number of first transportation devices on each high tier, and send a scheduling command to the first transportation devices that need to be scheduled; The system of claim 7, wherein the first transport device is further adapted to travel within the lifting device in response to a received scheduling command and to reach a high floor specified in the scheduling command by the lifting device.

9. The upper floors of the multi-story warehouse include those where the entire area cannot be connected by rails, Regarding a high-rise building where all areas cannot be connected by rails, when it is necessary to schedule the first transport device between different areas of the high-rise building, The control center The area from which the first conveying device leaves is defined as a departure area, the area from which the first conveying device enters is defined as a destination area, and another high floor that is closest to the high floor and whose entire area is connected by rails is specified as an intermediate floor; The system of claim 8, wherein the first transportation device is configured to reach the destination area from the departure area by sending a scheduling command to a first transportation device in the departure area, sending a transportation command to an elevator device communicating the intermediate layer with the departure area, and sending a transportation command to an elevator device communicating the intermediate layer with the destination area, thereby causing the first transportation device to reach the destination area from the departure area by the two elevator devices and the intermediate layer.

10. At least two multi-level warehouses whose bottom surfaces are connected to each other, When it is necessary to schedule the first transport device between different multi-storey warehouses, The control center defines a multi-story warehouse from which a first conveying device leaves as a departure warehouse, defines a multi-story warehouse into which the first conveying device enters as a destination warehouse, and transmits a scheduling command to the first conveying device at the departure warehouse, and transmits a conveying command to a second conveying device, an elevator device at the departure warehouse, and an elevator device at the destination warehouse, so that the first conveying device is scheduled from the departure warehouse to the destination warehouse by the two elevator devices and the second conveying device, The system of claim 8 , wherein the second transport equipment is for transporting the first transport equipment from a bottom layer of the origin warehouse to a bottom layer of the destination warehouse in response to the scheduling command.

11. In addition to the lifting device, a non-powered transfer device or a powered transfer device is further provided, The high-rise transfer station further includes the transfer equipment located outside at least the lifting equipment, The system described in claim 2, wherein, when the lifting equipment is located on a high floor, the transfer equipment located outside the lifting equipment docks with the transfer equipment located inside the lifting equipment, and transports the carrier from the transfer equipment inside the lifting equipment to the transfer equipment outside the lifting equipment, or transports the carrier from the transfer equipment outside the lifting equipment to the transfer equipment inside the lifting equipment.

12. The non-powered transfer device includes at least a carrier bracket for mounting a carrier; The system according to claim 2 or 11, wherein the powered transfer equipment includes at least a conveying line and / or a bidirectional telescopic fork.

13. a height of a carrier bracket at at least a part of a bottom layer cargo position in the bottom layer of the multi-story warehouse is higher than a height of the second conveying device when the carrier is not placed thereon; The system of claim 1 or 2, wherein the second transport device is further configured to selectively run beneath at least some of the bottom cargo locations when the carrier is not loaded thereon, or to transport the carrier in a piggyback manner from beneath at least some of the bottom cargo locations and away from the bottom cargo locations.

14. A spacing between at least some of the bottom cargo positions in the bottom layer of the multi-story warehouse is greater than a width of the second conveying device; and a height of a lowest point of a connection member between at least two adjacent upright columns in a bottom layer of the multi-story warehouse is higher than a height of the second transport device when the carrier is not placed thereon; The system of claim 13 , wherein the second transport device is further adapted to selectively travel between at least a portion of two adjacent uprights in the bottom layer when not carrying the carrier.

15. The system described in claim 1 or 2, wherein the second transport device is for removing the carrier from the side of the bottom layer cargo position to the second transport device at a position in an aisle adjacent to the bottom layer cargo position, or for placing the carrier on the second transport device into the bottom layer cargo position from the side of the bottom layer cargo position.

16. The system described in claim 1 or 2, wherein the second transport device is for entering below the bottom layer cargo position at a position in an aisle adjacent to the bottom layer cargo position, removing the carrier from below the bottom layer cargo position to the second transport device, or for inserting the carrier indicated by the transport command from the second transport device into the bottom layer cargo position.

17. At least one bottom layer transfer station is provided in a designated area in the bottom layer of the multi-level warehouse, 2. The system of claim 1, wherein the second transport device is for removing the carrier from the bottom layer cargo location or the lifting device and transporting the carrier to the bottom layer transfer station and placing the carrier in the designated area, or for removing the carrier from the bottom layer transfer station in the designated area and transporting the carrier to the bottom layer cargo location or the lifting device.

18. A powered transfer device is further provided within the lifting device, The bottom floor of the multi-story warehouse is provided with powered transfer equipment, When the lifting device is located at the bottom layer, the bottom layer transfer device docks with the transfer device located in the lifting device, thereby transporting the carrier from the transfer device in the lifting device to the bottom layer transfer device, or transporting the carrier from the transfer device in the bottom layer to the transfer device in the lifting device; The system of claim 17, wherein the second transport device is further configured to remove the carrier from the bottom layer transfer device and transport the carrier to the bottom layer transfer station and place the carrier in the designated area, or remove the carrier from the bottom layer transfer station in the designated area and transport the carrier to the bottom layer transfer device.

19. further comprising one or more external buffer areas having at least one of a three-dimensional storage and a two-dimensional storage configuration; The external buffer area shares at least a part of a second transport device with the at least one multi-level warehouse, or the second transport device transports and / or transfers the carrier between the external buffer area and the at least one multi-level warehouse; 3. The system of claim 1 or 2, wherein the control center is further for storing cargo inventory information in the external buffer area and in the at least one multi-storey warehouse.

20. A transport scheduling method for a multi-story warehouse for realizing cargo picking, comprising: at least one or more multi-story warehouses, each floor of which is connected by at least one lifting device; at least one bottom layer transfer station is provided on a bottom layer of the multi-story warehouse; carriers and carrier brackets are arranged at at least some of the bottom layer cargo positions on the bottom layer, and the carrier brackets at the bottom layer cargo positions are for placing carriers transported by a second transport device; at least one high layer transfer station is provided on each of the other higher layers of the multi-story warehouse other than the bottom layer, each of the higher layers is provided with rails for a first transport device to run on, and carriers are arranged at at least some of the high layer cargo positions on the higher layers, the first transport device is a transport device that runs on rails, and the second transport device is a transport device that runs on a plane, Identifying a transport task to be performed; Identifying a first transport device, a second transport device, and an elevator device that execute the transport task according to the transport task; by transmitting a transport command to the specified first transport equipment, the specified second transport equipment, and the specified lifting equipment, respectively, the specified first transport equipment, the specified second transport equipment, and the specified lifting equipment cooperate with each other to transport a carrier from a high-floor cargo position or a bottom-floor cargo position of the multi-story warehouse to a bottom-floor transfer station, or to transport a carrier at the bottom-floor transfer station to a high-floor cargo position or a bottom-floor cargo position of the multi-story warehouse, The high-rise transfer station is provided to be located within the lifting device, Specifically, transmitting a transport command to the identified first transport device includes: Identifying a high-rise transfer station in the elevator device corresponding to the transport task in response to the transport task; A transport scheduling method for a multi-story warehouse, comprising: sending a transport command to an identified first transport device based on the position of a high-rise transfer station in the lifting equipment, thereby causing the first transport device to travel to the high-rise transfer station in the lifting equipment and place a carrier at the high-rise transfer station or remove a carrier from the position of the high-rise transfer station.

21. A transport scheduling method for a multi-story warehouse for realizing cargo picking, comprising: at least one or more multi-story warehouses, each floor of which is connected by at least one lifting device; at least one bottom layer transfer station is provided on the bottom layer of the multi-story warehouse; carriers and carrier brackets are arranged at at least some of the bottom layer cargo positions on the bottom layer; the carrier brackets at the bottom layer cargo positions are for placing carriers transported by a second transport device; at least one high layer transfer station is provided on each of the other higher layers other than the bottom layer of the multi-story warehouse; rails are provided on each of the higher layers for a first transport device to run on; carriers are arranged at at least some of the high layer cargo positions on the higher layers; the first transport device is a transport device running on rails; and the second transport device is a transport device running on a flat surface, Identifying a transport task to be performed; Identifying a first transport device, a second transport device, and an elevator device that execute the transport task according to the transport task; by transmitting a transport command to the specified first transport equipment, the specified second transport equipment, and the specified lifting equipment, respectively, the specified first transport equipment, the specified second transport equipment, and the specified lifting equipment cooperate with each other to transport a carrier from a high-floor cargo position or a bottom-floor cargo position of the multi-story warehouse to a bottom-floor transfer station, or to transport a carrier at the bottom-floor transfer station to a high-floor cargo position or a bottom-floor cargo position of the multi-story warehouse, A non-powered transfer device or a powered transfer device is provided in the lifting device, and the high-rise transfer station includes at least the transfer device located in the lifting device; Specifically, transmitting a transport command to the identified first transport device includes: Identifying a high-rise transfer station in the elevator device corresponding to the transport task in response to the transport task; A transport scheduling method for a multi-story warehouse, comprising: sending a transport command to the identified first transport equipment based on the position of a high-rise transfer station within the lifting equipment, so that the first transport equipment travels to a transfer equipment serving as a high-rise transfer station within the lifting equipment and places a carrier on the transfer equipment or removes the carrier from the transfer equipment serving as the high-rise transfer station.

22. Specifically, transmitting a transport command to the identified first transport device includes: Identifying a high-rise cargo location corresponding to the transportation task according to the transportation task; The method according to claim 20 or 21, comprising sending a transport command to the identified first conveying equipment based on the position of the high-rise cargo location and the position of the aisle adjacent to the high-rise cargo location, so that the first conveying equipment, in response to the transport command, removes a carrier indicated in the transport command from the side of the high-rise cargo location at the position of the aisle to the first conveying equipment, or causes a carrier indicated in the transport command on the first conveying equipment to enter the high-rise cargo location from the side.

23. Specifically, transmitting a transport command to the identified first transport device includes: Identifying a high-rise cargo location corresponding to the transportation task according to the transportation task; The method of claim 20 or 21, comprising sending a transport command to the identified first conveying equipment based on the high-rise cargo position and another cargo position above the high-rise cargo position, so that the first conveying equipment, in response to the transport command, retrieves a carrier indicated in the transport command from above the high-rise cargo position at another cargo position above the high-rise cargo position, or lowers a carrier indicated in the transport command in the first conveying equipment to the high-rise cargo position.

24. The method according to claim 20, wherein a rail is provided within the lifting device, the rail being connected to a rail provided on the higher floor, so that the first transport device can run within the lifting device.

25. determining a number of first transport devices required for each higher tier as a function at least in part of the transport tasks to be performed for each higher tier; Identifying first transport devices that need to be scheduled in each high tier based on the number of first transport devices required for each high tier and the current number of first transport devices in each high tier; The method of claim 24, further comprising sending a scheduling command to a first transport device that needs to be identified and scheduled, the first transport device further comprising causing the first transport device to travel within the lifting device in response to the received scheduling command and to reach a high floor specified in the scheduling command by the lifting device.

26. The upper floors of the multi-story warehouse include those where the entire area cannot be connected by rails, Identifying, for a high rise in which all areas cannot be connected by rails, scheduling the first transport device between different areas of the high rise; An area from which the first conveying device leaves is defined as a departure area, an area from which the first conveying device enters is defined as a destination area, and another high floor that is closest to the high floor and whose entire area is connected by rails is specified as an intermediate floor; The method of claim 25, further comprising sending a scheduling command to a first transportation device in the departure area, sending a transportation command to an elevator device communicating the intermediate layer with the departure area, and sending a transportation command to an elevator device communicating the intermediate layer with the destination area, so that the first transportation device reaches the destination area from the departure area by the two elevator devices and the intermediate layer.

27. There are at least two of the three-dimensional warehouses, and the bottom surfaces of the three-dimensional warehouses are connected to each other, Specifying scheduling of the first transport device between different multi-level warehouses; A multi-story warehouse from which the first transport device leaves is set as a departure warehouse, and a multi-story warehouse into which the first transport device enters is set as a destination warehouse; The method of claim 25, further comprising sending a scheduling command to a first transport device at the departure warehouse, and sending transport commands to a second transport device, a lifting device at the departure warehouse, and a lifting device at the destination warehouse, thereby causing the first transport device to be scheduled from the departure warehouse to the destination warehouse by the two lifting devices and the second transport device.

28. In addition to the lifting device, a non-powered transfer device or a powered transfer device is further provided, The high-rise transfer station further includes at least the transfer equipment located outside the lifting equipment, Specifically, transmitting a transport command to the identified lifting device includes: Identifying a high rise transfer station corresponding to the transport task in response to the transport task; The method according to claim 21, comprising: transmitting a transport command to the lifting equipment in accordance with the floor where the high-rise transfer station is located; and causing the lifting equipment to transport a carrier from a transport equipment within the lifting equipment to a transport equipment serving as a high-rise transfer station outside the lifting equipment by docking a transport equipment located outside the lifting equipment with a transport equipment located within the lifting equipment at the floor where the high-rise transfer station is located, or transporting a carrier in a transport equipment serving as a high-rise transfer station outside the lifting equipment to a transport equipment within the lifting equipment.

29. Specifically, transmitting a transport command to the identified second transport device includes: In response to the transport task, identifying a bottom cargo location corresponding to the transport task; The method of claim 20 or 21, comprising sending a transport command to the second transport equipment based on the bottom layer cargo position and the position of an aisle adjacent to the bottom layer cargo position, causing the second transport equipment to remove a carrier indicated in the transport command from the side of the bottom layer cargo position at the position of the aisle adjacent to the bottom layer cargo position, or to input a carrier indicated in the transport command on the second transport equipment from the side to the bottom layer cargo position.

30. Specifically, transmitting a transport command to the identified second transport device includes: In response to the transport task, identifying a bottom cargo location corresponding to the transport task; The method of claim 20 or 21, comprising sending a transport command to the second conveying equipment based on the bottom layer cargo position, so that the second conveying equipment enters below the bottom layer cargo position at an aisle position adjacent to the bottom layer cargo position and removes a carrier indicated in the transport command from below the bottom layer cargo position to the second conveying equipment, or causes the second conveying equipment to insert a carrier indicated in the transport command into the bottom layer cargo position.

31. At least one bottom layer transfer station is provided in a designated area in the bottom layer of the multi-level warehouse, Specifically, transmitting a transport command to the identified second transport device includes: Identifying a bottom layer transfer station provided in a designated area corresponding to the transport task in response to the transport task; The method of claim 20, comprising sending a transport command to the second transport equipment based on a bottom layer transfer station provided in the designated area, causing the second transport equipment to remove a carrier indicated in the transport command from the bottom layer cargo position or the lifting equipment, transport the carrier to the bottom layer transfer station, and place the carrier in the designated area, or remove a carrier indicated in the transport command from the bottom layer transfer station in the designated area, and transport the carrier to the bottom layer cargo position or the lifting equipment.

32. A powered transfer device is further provided within the lifting device, and a powered transfer device is provided on the bottom ground of the multi-story warehouse, Specifically, transmitting a transport command to the identified lifting device includes: In response to the transfer task, identifying a bottom layer transfer station corresponding to the transfer task; The method of claim 31, comprising sending a transport command to the lifting equipment to transport to the bottom layer, causing the lifting equipment to move to the bottom layer and dock the transfer equipment of the bottom layer ground with the transfer equipment located in the lifting equipment, thereby transporting a carrier from the transfer equipment in the lifting equipment to the transfer equipment of the bottom layer ground, or transporting a carrier in the transfer equipment of the bottom layer ground to the transfer equipment in the lifting equipment.

33. Specifically, transmitting a transport command to the identified second transport device includes: Identifying a bottom layer transfer station provided in a designated area corresponding to the transport task in response to the transport task; The method of claim 32, comprising sending a transport command to the second transport device based on a bottom layer transfer station provided in the designated area, causing the second transport device to remove the carrier from the transfer device of the bottom layer ground and transport the carrier to the bottom layer transfer station and place the carrier in the designated area, or remove the carrier indicated by the transport command from the bottom layer transfer station in the designated area and transport the carrier to the transfer device of the bottom layer ground.

34. The present invention further includes providing one or more external buffer areas outside the multi-level warehouse, the external buffer areas having at least one of a multi-level storage and a flat storage, the external buffer areas sharing at least a part of a second transport device with the multi-level warehouse, or the second transport device transporting and / or transferring the carriers between the external buffer area and the at least one multi-level warehouse; Specifically, the identification of the transportation task to be executed includes:

22. The method according to claim 20 or 21, further comprising identifying a transportation task to be performed based on stored cargo inventory information and order information in the external buffer area and the multi-level warehouse.

Citation Information

Patent Citations

  • Intelligent logistics picking storage system and method

    CN107472787A

  • A system for collecting products as well as a method for using the same

    EP2923971A1

  • Tensile strength member having tensile strength of 400 ton or more

    JP1984088984A

  • Storage facility using self-propelled conveying cart

    JP2017036128A

  • System for dynamically preparing and commissioning especially pallets and other storage units

    US20060239801A1