AGV dispatching method and AGV dispatching system

By obtaining the AGV's site layout and production order information, and using the quadruple model to automatically generate the AGV's scheduling strategy, it solves the problem of difficulty in balancing AGV scheduling simulation efficiency and effect in the existing technology, and achieves more efficient AGV scheduling.

WO2024221303A1PCT designated stage expired Publication Date: 2024-10-31CONTEMPORARY AMPEREX TECHNOLOGY CO LTD

Patent Information

Application Number
PCT/CN2023/090984
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-26
Publication Date
2024-10-31

Smart Images

  • Figure CN2023090984_31102024_PF_FP_ABST
    Figure CN2023090984_31102024_PF_FP_ABST
Patent Text Reader

Abstract

An AGV dispatching method and an AGV dispatching system, which belong to the technical field of intelligent logistics. The AGV dispatching method comprises: acquiring layout information and production order information of a station (110); according to the layout information, determining path information of an AGV corresponding to the station (120); and determining a dispatching strategy of the AGV according to the path information of the AGV and the production order information (130). By means of the method, the dispatching efficiency of AGVs can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

AGV scheduling method and AGV scheduling system Technical Field

[0001] The present application relates to the fields of intelligent logistics, transportation and manufacturing, and in particular to an AGV scheduling method and an AGV scheduling system. Background Art

[0002] Smart logistics plays an important supporting role in smart manufacturing and smart factories. The scheduling of transport units is an important part of smart logistics, and the scheduling of AGVs is crucial to smart logistics.

[0003] Therefore, how to provide an AGV scheduling method to improve the scheduling efficiency of AGV is a technical problem that needs to be solved urgently.

[0004] Summary of the Invention

[0005] The present application provides an AGV scheduling method and an AGV scheduling system, which can improve the scheduling efficiency of AGVs.

[0006] In a first aspect, an AGV scheduling method is provided, comprising: obtaining layout information and production order information of a site; determining path information of the AGV corresponding to the site based on the layout information; and determining a scheduling strategy for the AGV based on the path information and the production order information of the AGV.

[0007] In an embodiment of the present application, the path information of the AGV corresponding to the site can be determined based on the acquired site layout information, thereby converting the site layout information into the path information of the AGV, which facilitates the simulation of the AGV scheduling; after determining the AGV path information, the AGV scheduling strategy can be determined based on the AGV path information and the acquired production order information. In this way, the AGV scheduling method of the present application can determine the AGV scheduling strategy based on the site layout information and production order information, without the need to manually write a large amount of code for simulation calculations, which is conducive to improving the efficiency of the simulation; in addition, it can reduce the impact of manual labor on the scheduling strategy, which is conducive to improving the effect of the simulation. Therefore, when the simulation has high efficiency and effect, the AGV scheduling method of the embodiment of the present application can improve the scheduling efficiency of the AGV.

[0008] In one possible implementation, determining the path information of the AGV corresponding to the site based on the layout information includes: determining a layout model corresponding to the site based on the layout information, the layout model including parameter information of the AGV and parameter information of the site; and determining the path information of the AGV based on the layout model. This facilitates obtaining the path information of the AGV based on the layout model, thereby facilitating determining an AGV scheduling strategy based on the AGV path information.

[0009] In one possible implementation, determining the path information of the AGV based on the layout model includes: determining a quadruple corresponding to the layout model based on the layout model; wherein the quadruple includes a first set, a second set, a third set and a fourth set, the first set represents a set of places corresponding to the sites, the second set represents a set of transitions between the places, the third set represents a set of flow relationships between the places and the transitions, and the fourth set represents the weights of the flow relationships; determining the path information of the AGV based on the quadruple.

[0010] In the above technical solution, by determining the quadruple, the path information of the AGV may include information such as AGV parameter information and site parameter information, thereby facilitating determination of the AGV scheduling strategy based on the AGV path information.

[0011] In one possible implementation, determining the quadruple corresponding to the layout model based on the layout model includes: traversing the first sites, mapping each of the first sites into a library, the first sites being sites corresponding to the operating track of the AGV; traversing the directed arcs between the first sites, mapping each of the directed arcs into a transition.

[0012] In the above technical solution, information related to the running track of the AGV can be set in the quadruple, so as to facilitate the scheduling of the AGV according to the situation of the running track of the AGV.

[0013] In one possible implementation, determining a quadruple corresponding to the layout model based on the layout model includes: determining a resource place and a first newly added node place based on the number of the next place of the current place; and determining a first newly added transition associated with the resource place and / or the first newly added node place.

[0014] In the above technical solution, in the process of establishing the quadruple, the resource location and the first newly added node location are determined in combination with the relationship between the locations, and the first newly added transition associated with the resource location and the first newly added node location is determined. This is conducive to solving path conflicts, deadlocks and other problems that occur during AGV scheduling.

[0015] In one possible implementation, determining the resource place and the first newly added node place based on the number of the next place of the current place includes: adding the resource place when the number of the next place of the current place is greater than or equal to 2; and adding the first newly added node place when the number of the next place of the current place is greater than or equal to 2 and the number of the previous place of the current place is greater than or equal to 2, wherein the number of the first newly added node place is the product of the number of the next place and the number of the previous place.

[0016] In the above technical solution, the number of resource places to add is determined based on the number of the next place after the current place, and the number of the first newly added node places is determined based on the number of the next place after the current place and the number of the previous place. This allows for the construction of a more specific quadruple, making it easier to determine the AGV's path information based on the quadruple.

[0017] In one possible implementation, determining a quadruple corresponding to the layout model based on the layout model includes: traversing the second sites, mapping each of the second sites to a production line warehouse, where the second site is the site of the corresponding production line; determining a first production line transition and a second production line transition based on the production line warehouse, where the first production line transition indicates that the production line starts processing, and the second production line transition indicates that the production line ends processing.

[0018] In the above technical solution, information related to the production line can be set in the quadruple, so as to facilitate the scheduling of the AGV according to the situation of the production line.

[0019] In one possible implementation, determining a quadruple corresponding to the layout model based on the layout model includes: determining an action library and a second newly added node library based on the function of the site; and determining a second newly added transition associated with the action library and / or the second newly added node library.

[0020] In the above technical solution, information related to the function of the site can be set in the quadruple, so as to facilitate the scheduling of AGVs according to the function of the site.

[0021] In one possible implementation, determining the action location and the second newly added node location based on the station's function includes: adding the action location when an unloading or loading operation occurs at the station; and adding the second newly added node location based on the number of operational types of the AGV at the station. In this way, the quadruple contains information related to the station's function and the AGV's operations, making it easier to determine the AGV's path information based on the quadruple, and to determine the AGV's scheduling strategy based on the AGV's path information.

[0022] In one possible implementation, the quaternary group corresponding to the layout model is determined based on the layout model, including: when an unloading operation occurs at the site and a loading point exists on the corresponding production line, a first loading transition and a second loading transition are added, wherein the first loading transition indicates that the production line has started loading, and the second loading transition indicates that loading has ended on the production line; when a loading operation occurs at the site and an unloading point exists on the corresponding production line, a first unloading transition and a second unloading transition are added, wherein the first unloading transition indicates that the production line has started unloading, and the second unloading transition indicates that unloading has ended on the production line. In this way, transitions related to loading and unloading of the production line are constructed in the quaternary group, making it easier to schedule AGVs based on the loading and unloading conditions of the production line.

[0023] In one possible implementation, determining a quadruple corresponding to the layout model based on the layout model includes adding a resource location if no unloading or loading operation occurs at the site and no resource location is connected to the location corresponding to the site. In this way, the quadruple includes information related to the site's function, allowing AGVs to be scheduled based on the site's function and the availability of resource locations.

[0024] In one possible implementation, determining a quadruple corresponding to the layout model based on the layout model includes initializing the quadruple based on the initial position of the AGV to obtain an initial identification of the quadruple and an association matrix corresponding to the flow relationship. In this way, by initializing the quadruple based on the initial position of the AGV, the initial identification of the quadruple and the association matrix corresponding to the flow relationship can be obtained, thereby facilitating determination of AGV path information based on the quadruple.

[0025] In one possible implementation, determining the path information of the AGV based on the layout model includes: determining, based on the four-tuple, a power model graph corresponding to the path information of the AGV, wherein the power model graph is used to represent the power information of the AGV, the power information of the AGV corresponds to the number of tokens in the power model graph, and the position of the AGV corresponds to the position of the tokens in the power model graph and the position of the tokens in the path information of the AGV; updating the number of tokens in the power model graph based on the movement, unloading, loading, waiting, or charging operation of the AGV, wherein the AGV stops moving when the number of tokens is 0. In this way, it is convenient to schedule the AGV based on the power information of the AGV.

[0026] In one possible implementation, the AGV's battery information is used to schedule the AGV to locate a charging station and charge at the station if the AGV's battery level falls below a preset threshold. This can reduce the risk of the AGV stalling due to insufficient battery and help resolve deadlocks caused by stalled AGVs.

[0027] In one possible implementation, determining the AGV's path information based on the layout model includes, when multiple raw materials or multiple finished products are involved, establishing the corresponding transport information for the multiple raw materials or finished products in the AGV's parameter information. This facilitates scheduling AGVs based on the types of raw materials and finished products.

[0028] In one possible implementation, determining the AGV scheduling strategy based on the AGV path information and the production order information includes: determining the AGV process information based on the production order information; and determining the AGV scheduling strategy based on the AGV process information and the AGV path information. In this way, the AGV scheduling strategy can meet the needs of the production order.

[0029] In one possible implementation, determining the AGV scheduling strategy based on the AGV's process information and the AGV's path information includes: obtaining the AGV's process information; determining, based on the AGV's process information and the AGV's path information, multiple triggerable transition sequences for the AGV between multiple stations at multiple time points; and determining an optimal transition sequence among the multiple triggerable transition sequences. This facilitates the acquisition of the optimal transition sequence.

[0030] In one possible implementation, determining multiple triggerable transition sequences for the AGV between multiple stations at multiple time points based on the AGV's process information and the AGV's path information includes: obtaining external disturbance information; and updating the multiple triggerable transition sequences based on the external disturbance information. In this way, when an external disturbance occurs, the multiple triggerable transition sequences can be updated based on the external disturbance information, thereby facilitating determination of an optimal transition sequence based on the multiple triggerable transition sequences.

[0031] In one possible implementation, determining the optimal transition sequence among the multiple triggerable transition sequences includes: obtaining an objective function, determining the required times of the multiple triggerable transition sequences based on the objective function and the multiple triggerable transition sequences; and determining the optimal transition sequence based on the minimum required time of the multiple triggerable transition sequences. In this way, AGV scheduling has the minimum scheduling time, which is conducive to improving AGV scheduling efficiency.

[0032] In one possible implementation, the method further includes: obtaining updated layout information; updating the AGV's path information based on the updated layout information; determining the AGV's process information based on the production order information; and updating the AGV's scheduling policy based on the updated AGV's path information and the AGV's process information. This facilitates determining the updated AGV's path information based on the updated layout information, thereby determining the updated AGV's scheduling policy based on the updated AGV's path information.

[0033] In a second aspect, an AGV scheduling method is provided, comprising: presenting a display interface including a first area, a second area, and a third area, wherein the first area includes a first operating unit for obtaining layout information of a site, the third area includes a second operating unit for obtaining production order information, a third operating unit for obtaining a scheduling target, and a fourth operating unit connected to an algorithm optimization module; in response to a first operation, displaying a layout model corresponding to the site in the second area, wherein the first operation is an operation of dragging the first operating unit to the second area based on the production order information, the first operating unit being used to form the layout model, the layout model including parameter information of the AGV and parameter information of the site; in response to a second operation on the second operating unit, importing the production order information; in response to a third operation on the third operating unit, importing the scheduling target into the layout model, the scheduling target being a target determined based on the production order information; and displaying a movement path of the AGV in the layout model displayed in the second area, wherein a scheduling strategy for the AGV movement path is generated based on the layout model, the production order information, and the scheduling target. In this way, it is convenient to obtain the AGV scheduling strategy based on the movement path of the AGV displayed on the display interface.

[0034] In one possible implementation, the first operating unit includes a production line operation key, an AGV operation key, an AGV running track operation key, and a warehouse operation key; in response to the first operation, displaying a layout model corresponding to the site in the second area includes: in response to the first operation, adding at least one of a production line, an AGV, a running track, and a warehouse to the layout model, the first operation being an operation of dragging at least one of the production line operation key, the AGV operation key, the AGV running track operation key, and the warehouse operation key to the second area based on the production order information, and the parameter information of the site in the layout model includes at least one of the parameter information of the production line, the parameter information of the running track, and the parameter information of the warehouse. In this way, it is convenient to establish corresponding layout models according to different actual situations.

[0035] In one possible implementation, the method further includes: displaying an updated layout model in the second area in response to a fifth operation, wherein the fifth operation is an update of the layout model based on the production order information; and displaying the AGV's movement path in the updated layout model displayed in the second area, wherein a scheduling strategy for the AGV's movement path is generated based on the updated layout model, the production order information, and the scheduling target. Thus, after the layout model is updated, the AGV's scheduling strategy can be obtained through the updated AGV's movement path displayed on the display interface.

[0036] In a third aspect, an AGV scheduling system is provided, comprising: a model library module for importing and creating a path model corresponding to the site layout information and the AGV path information; an order management module for managing production order information and the status information of the production order; an algorithm optimization module for obtaining the path model from the model library module and the production order information from the order management module, and determining the path information of the AGV corresponding to the site based on the layout information and the path model; determining the AGV scheduling strategy based on the AGV path information and the production order information; and a display module for obtaining the AGV target path information determined according to the AGV scheduling strategy from the algorithm optimization module and displaying the AGV target path information. The coordination between the various modules enables AGV scheduling.

[0037] In one possible implementation, the AGV scheduling system further includes a data storage module for storing the path model of the model library module, the production order information and status information of the production order of the order management module, and the AGV scheduling strategy of the algorithm optimization module. This facilitates storage of data from the remaining modules through the data storage module.

[0038] In one possible implementation, the algorithm optimization module is further configured to obtain data and process information about the AGV and the site based on the AGV scheduling policy. The AGV scheduling system further includes a visualization module configured to obtain the data and process information about the AGV and the site from the algorithm optimization module, visualize the data and process information about the AGV and the site, and transmit the visualized information to the display module. In this way, the visualization module can visualize the AGV scheduling policy for easier observation.

[0039] In a fourth aspect, an electronic device is provided, comprising a memory and a processor, wherein the memory stores computer instructions, and the processor calls the computer instructions to enable the electronic device to implement the method described in the first aspect or any implementation of the first aspect, or the method described in the second aspect or any implementation of the second aspect.

[0040] In a fifth aspect, a computer-readable storage medium is provided for storing a computer program, which, when executed by a computing device, enables the computing device to implement the method described in the first aspect or any implementation of the first aspect, or the method described in the second aspect or any implementation of the second aspect.

[0041] In a sixth aspect, a computer program product is provided, comprising a computer-readable code, or a non-volatile computer-readable storage medium carrying the computer-readable code. When the computer-readable code runs in an electronic device, the processor in the electronic device executes the method described in the first aspect or any implementation of the first aspect, or the method described in the second aspect or any implementation of the second aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments of the present application. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the drawings without creative work.

[0043] FIG1 is a schematic diagram of a scheduling system according to an embodiment of the present application;

[0044] FIG2 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application;

[0045] FIG3 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application;

[0046] FIG4 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application;

[0047] FIG5 is a schematic diagram of sites having a unidirectional path relationship according to an embodiment of the present application;

[0048] FIG6 is a schematic diagram of the structure of the quaternary group corresponding to FIG5;

[0049] FIG7 is a schematic diagram of sites with a bidirectional path relationship according to an embodiment of the present application;

[0050] FIG8 is a schematic diagram of the structure of the quaternary group corresponding to FIG7;

[0051] FIG9 is a schematic diagram of sites having a selection path relationship according to an embodiment of the present application;

[0052] FIG10 is a schematic diagram of the structure of the quaternary group corresponding to FIG9;

[0053] FIG11 is a schematic diagram of sites with conflicting path relationships according to an embodiment of the present application;

[0054] FIG12 is a schematic diagram of the structure of the quaternary group corresponding to FIG11;

[0055] FIG13 is a schematic diagram of a site with an offloading function according to an embodiment of the present application;

[0056] FIG14 is a schematic diagram of the structure of the quaternary group corresponding to FIG13;

[0057] FIG15 is a schematic diagram of an electric quantity model diagram according to an embodiment of the present application;

[0058] FIG16 is a schematic diagram of type switching according to an embodiment of the present application;

[0059] FIG17 is a flow chart of an AGV scheduling method according to an embodiment of the present application;

[0060] FIG18 is a schematic diagram of a display interface according to an embodiment of the present application;

[0061] FIG19 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application;

[0062] FIG20 is a schematic diagram of an AGV scheduling system according to an embodiment of the present application;

[0063] FIG21 is a schematic block diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0064] The following embodiments of the technical solution of the present application will be described in detail with reference to the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application and are therefore only examples and are not intended to limit the scope of protection of the present application.

[0065] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned figure descriptions are intended to cover non-exclusive inclusions.

[0066] In the description of the embodiments of this application, the technical terms "first" and "second" are used only to distinguish different objects and should not be understood to indicate or imply relative importance or implicitly specify the quantity, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, the meaning of "plurality" is more than two, unless otherwise clearly and specifically defined.

[0067] References herein to "embodiments" mean that a particular feature, structure, or characteristic described in connection with the embodiments may be included in at least one embodiment of the present application. The appearance of this phrase in various places in the specification does not necessarily refer to the same embodiment, nor does it constitute an independent or alternative embodiment that is mutually exclusive of other embodiments. It is understood, both explicitly and implicitly, by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0068] In the description of the embodiments of this application, the term "and / or" is simply a description of the association relationship between associated objects, indicating that three relationships can exist. For example, A and / or B can represent the following three situations: A exists alone, A and B exist simultaneously, and B exists alone. In addition, the character " / " in this document generally indicates that the associated objects are in an "or" relationship.

[0069] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces).

[0070] In the description of the embodiments of the present application, the technical terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they should not be understood as limiting the embodiments of the present application.

[0071] In the description of the embodiments of the present application, unless otherwise expressly specified or limited, technical terms such as "installed," "connected," "connect," and "fixed" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integration; mechanical connections or electrical connections; direct connections or indirect connections through an intermediate medium; internal connections between two components or interactions between two components. Those skilled in the art can understand the specific meanings of the above terms in the embodiments of the present application based on specific circumstances.

[0072] Under the guidance of intelligent manufacturing, manufacturing companies, logistics companies, etc. are gradually transforming towards digitalization and intelligence. As an important component of the intelligent logistics system, the automated guided vehicle (AGV) system is conducive to improving the automation level of the manufacturing system, reducing production costs, and improving production efficiency. In some large-scale manufacturing systems with complex processes, it is often necessary to coordinate the scheduling and control of multiple different types of AGVs. During the operation of multiple AGVs, it is necessary not only to consider the task allocation of each AGV and the path selection of the AGV, but also to consider conflicts, deadlocks, etc. of the running AGVs. Therefore, the scheduling of AGVs in the AGV system is an important task.

[0073] Usually, before scheduling an AGV, simulation software is used to simulate the scheduling of the AGVs in the AGV system. For example, when using Plant Simulation software for simulation, during the simulation process, it is necessary to write a complete set of AGV scheduling codes, or call the written AGV scheduling code through an interface. Such AGV scheduling simulation usually has the following problems. On the one hand, the amount of code development is relatively large, the AGV scheduling code relies on manual development, and the code often needs to be written or modified. On the other hand, the scheduling strategy corresponding to the AGV scheduling code is developed through manual programming, which makes it difficult to achieve optimal simulation. Therefore, the above-mentioned AGV scheduling method is difficult to take into account the efficiency and effect of scheduling simulation, which is not conducive to improving the efficiency of scheduling.

[0074] In view of this, this application provides an AGV scheduling method. In this method, the layout information and production order information of the site can be obtained. Based on the layout information, the path information of the AGV corresponding to the site is determined. Based on the AGV path information and production order information, the AGV scheduling strategy is determined. This AGV scheduling method can take into account the efficiency and effectiveness of simulation, which is conducive to improving the scheduling efficiency of AGVs.

[0075] The AGV scheduling method of the embodiments of the present application can be used, but is not limited to, in the fields of logistics, warehousing, and manufacturing. Examples of the logistics field include, but are not limited to, areas such as docks, ports, and airports. Examples of the warehousing and manufacturing fields include, but are not limited to, areas such as tobacco, medicine, food, chemicals, machinery production, hazardous locations, and specialized industries. The AGV scheduling method of the embodiments of the present application can also be applied to areas such as libraries, restaurants, and express delivery where the delivery of items involves a large workload.

[0076] FIG1 is a schematic diagram of a scheduling system according to an embodiment of the present application. As shown in FIG1 , the scheduling system 10 includes a transportation unit 11 , a production unit 12 , a scheduling unit 13 and a cache unit 14 .

[0077] The scheduling unit 13 can be used to schedule the production behavior of the production unit 12 and can also be used to schedule the transportation behavior of the transportation unit 11.

[0078] The transport unit 11 can move between the production unit 12 and the buffer unit 14 along the running track.

[0079] The transport unit 11 can be moved from the production unit 12 to the cache unit 14, for example, to transport products prepared by the production unit 12 to the cache unit 14 for storage. The transport unit 11 can be moved from the cache unit 14 to the production unit 12, for example, to transport raw materials from the cache unit 14 to the production unit 12 so that the production unit 12 can carry out production activities. The transport unit 11 can be moved from one cache unit 14 to another cache unit 14. The transport unit 11 can be moved from one production unit 12 to another production unit 12.

[0080] Optionally, the cache unit 14 includes a warehouse.

[0081] Optionally, the cache unit 14 includes a storage point for the transport unit 11, for storing the transport unit 11. Optionally, a charging device is provided at the storage point for charging the transport unit 11.

[0082] Optionally, the production unit 12 includes any one of a machine in a production line, a loading point of a machine, and a unloading point of a machine.

[0083] In the embodiments of the present application, the transport unit 11 may refer to an AGV. AGV, as a general term for the transport unit 11, includes but is not limited to AGVs. For example, the AGV in the present application may also refer to an overhead hoist transport (OHT).

[0084] FIG2 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application. As shown in FIG2 , the AGV scheduling method 100 includes the following steps.

[0085] Step 110: Acquire site layout information and production order information.

[0086] The site includes the AGV's running track, production line, warehouse, charging pile, etc. The charging pile can be set up separately or on the running track, at the loading point of the production line, at the unloading point of the production line, in the warehouse, etc.

[0087] Warehouses can be used to store raw materials, products, etc. For example, AGVs can obtain raw materials from warehouses, and AGVs can also deliver products to warehouses.

[0088] Optionally, the warehouse can also be used to store AGVs.

[0089] Production lines are used to produce products. For example, AGVs deliver raw materials to the production line at the loading point. After processing, the raw materials are transformed into finished products, which are then retrieved by AGVs at the unloading point.

[0090] The AGV's track is used for AGV movement. For example, the AGV can move along the track from the warehouse to the loading point of the production line, from the unloading point of the production line to the warehouse, or from the warehouse to the charging station.

[0091] The layout information of the site can reflect the layout of the AGV scheduling system. For example, for a workshop, the layout information of the site can reflect the layout information within the workshop. For example, through the layout information of the site, you can obtain the number of production lines in the workshop, the location of the loading point of the production line, the location of the unloading point of the production line, the number and location of the warehouse, the location of the AGV's running track, the number and location of the charging piles, the number of AGVs, the type of AGV, the location of the AGV, and other information. For another example, for an express warehouse that stores goods, the layout information of the site can reflect the AGV's loading location, the AGV's unloading location, and the passages available for AGVs to pass through.

[0092] Production order information can be the goals that the AGV system needs to meet. For example, production order information includes the type and quantity of products to be produced. After the AGV system is dispatched, the production line completes the production task (producing the required products), and the AGV completes the transportation task (for example, transporting raw materials from the warehouse to the loading point of the production line, and transporting the finished products from the unloading point of the production line to the warehouse).

[0093] Step 120: Determine the path information of the AGV corresponding to the site based on the layout information.

[0094] AGV path information can include the AGV's movement path information, AGV status information, and site status information. For example, AGV status information includes the AGV's location, and site status information includes the current inventory quantity in the warehouse and the number of products produced on the production line. For example, AGV movement path information includes the routes along which the AGV can move.

[0095] Step 130 : Determine the scheduling strategy of the AGV based on the path information and production order information of the AGV.

[0096] AGV scheduling strategies can include, for example, AGV routes. For example, in an AGV system with multiple AGVs, the scheduling strategy might control the first AGV to follow a first route, the second AGV to follow a second route, and the third AGV to follow a third route. As the AGVs follow their respective routes, they will pass through or stop at corresponding stations to perform their tasks, according to the scheduling strategy.

[0097] Optionally, the AGV scheduling strategy is the optimal scheduling strategy for user needs while satisfying the production order. For example, if the user needs the shortest time, the AGV scheduling strategy is the strategy with the minimum time length while satisfying the production order.

[0098] Optionally, the AGV scheduling method of the present application can also be used to schedule other units in the AGV system, such as the scheduling of the production unit 12, to analyze the utilization rate of the production unit 12, the production capacity of the production unit 12, the number of production units 12 required, etc.

[0099] Optionally, the scheduling simulation method of the present application may be executed by a processor or controller of a computer system, etc., and no specific limitation is made here.

[0100] In an embodiment of the present application, the path information of the AGV corresponding to the site can be determined based on the acquired site layout information, thereby converting the site layout information into the path information of the AGV, which facilitates the simulation of the AGV scheduling; after determining the AGV path information, the AGV scheduling strategy can be determined based on the AGV path information and the acquired production order information. In this way, the scheduling simulation method of the present application can determine the AGV scheduling strategy based on the AGV path information, without the need to manually write a large amount of code for simulation calculations, and at the same time, a better AGV scheduling strategy can be obtained based on the path information, thereby taking into account both the efficiency and effect of the simulation. Therefore, the embodiment of the present application can improve the scheduling efficiency of the AGV.

[0101] Figure 3 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application. In some embodiments, as shown in Figure 3, step 120 includes the following steps.

[0102] Step 121: Determine a layout model corresponding to the site based on the layout information.

[0103] The layout model is a model of the location of corresponding sites. It can reflect the location relationship and path relationship between sites. Path relationships can include one-way path relationships, two-way path relationships, selection path relationships, conflicting path relationships, etc. In other words, the layout model can intuitively reflect the layout information of the sites.

[0104] The layout model includes parameter information of AGV and site.

[0105] The parameter information of the AGV may include at least one of: the number of the AGV, the type of the AGV, the moving speed of the AGV, the number of AGVs, the initial position of the AGV, the current position of the AGV, the power of the AGV, the type of goods carried by the AGV, etc.

[0106] The parameter information of the site may include: at least one of the type of site and the distance between adjacent sites. The types of sites include: the site is a production line, the site is a warehouse, and the site is an AGV running track. For example, in the case where the site is a warehouse, the parameter information of the site may include the capacity of the warehouse, the types and quantities of goods stored in the warehouse (such as the types and quantities of raw materials stored in the warehouse, the types and quantities of products stored in the warehouse); in the case where the site is a production line, the parameter information of the site may include the processing time of the production line, the processing capacity of the production line, the type of production line (for example, the production line is a welding production line, an assembly production line), etc.; in the case where the site is an AGV running track, the parameter information of the site may include the length of the AGV running track. Other unlisted parameter information can be determined based on the actual layout information of the site, and this embodiment includes but is not limited to this.

[0107] Optionally, the layout model can be converted into a JSON format file through a compiler.

[0108] Optionally, the layout model may be converted into files in other lightweight data exchange formats through a compiler.

[0109] Step 122: Determine the path information of the AGV according to the layout model.

[0110] In this embodiment, the layout model corresponds to the layout information of the site, and the path information of the AGV corresponds to the layout model. In this way, the path information of the AGV corresponds to the layout information of the site, thereby facilitating the determination of the AGV scheduling strategy based on the path information of the AGV.

[0111] Figure 4 is a schematic diagram of an AGV scheduling method according to an embodiment of the present application. In some embodiments, as shown in Figure 4, step 122 includes the following steps.

[0112] Step 1221: Determine, according to the layout model, a quadruple corresponding to the layout model.

[0113] The quadruple includes a first set, a second set, a third set and a fourth set. The first set represents the set of places corresponding to sites, the second set represents the set of transitions between places, the third set represents the set of flow relationships between places and transitions, and the fourth set represents the weights of flow relationships.

[0114] As an example, the quaternion can be expressed as N=(P, T, F, W), where the first set is expressed as P, the second set is expressed as T, the third set is expressed as F, and the fourth set is expressed as W. Specifically, P={p1, p2, ..., p n}, T={t1,t2,…,t m}, W:F→N is the weight of the arc. Each element in the first set is a place, which corresponds to a site; each element in the second set is a transition, which is a transition between places.

[0115] The third set represents the flow relationship between places and transitions. The flow relationship can be expressed by two association matrices: Pre∈N n×m and Post∈N n×m , Pre(p,t)=W(p,t)=w, or Post(p,t)=W(t,p)=w. Wherein, the value of w is the numerical value of the weight. In the embodiment of the present application, as an example, w is 1.

[0116] The fourth set represents the weight of the flow relationship. In the embodiment of the present application, as an example, the value of each element in the fourth set is 1.

[0117] Step 1222: Determine the path information of the AGV based on the quadruple.

[0118] In this embodiment, the quaternary group corresponds to the layout model, and the path information of the AGV corresponds to the quaternary group. By converting the layout model into the quaternary group, it is convenient to perform calculations based on the quaternary group, thereby determining the path information of the AGV.

[0119] In some embodiments, step 1221 includes: traversing the first sites, mapping each first site to a place, where the first site is a site corresponding to the AGV's running track; traversing the directed arcs between the first sites, mapping each directed arc to a transition.

[0120] The following describes step 1221 in detail using FIG. 5 to FIG. 10 as an example.

[0121] FIG5 is a schematic diagram of sites with a unidirectional path relationship according to an embodiment of the present application, and FIG6 is a schematic diagram of the structure of a quadruple corresponding to FIG5 .

[0122] As shown in Figure 5, black dots represent stations, corresponding to the stations on AGV1's trajectory. Black circles represent AGV1, and black arrows represent directed arcs (also known as path relationships) between stations. Figure 5 shows station n1, station n2, and AGV1 located at station n1. AGV1 can only travel from station n1 to station n2, but not from station n2 to station n1. This means that the path relationship between stations n1 and n2 is one-way.

[0123] As shown in Figure 6, black circles represent places, black dots represent AGV1, and black boxes represent transitions. In Figure 6, places p1 and p2 are shown. Place p1 corresponds to site n1 in Figure 5, and place p2 corresponds to site n2 in Figure 5. Transition t 1-2 Corresponding to the directed arc in Figure 5, it represents the transition from place p1 to place p2.

[0124] FIG7 is a schematic diagram of sites with a bidirectional path relationship according to an embodiment of the present application; FIG8 is a schematic diagram of the structure of a quadruple corresponding to FIG7 .

[0125] As shown in FIG. 7 , AGV1 is at site n1 . AGV1 can move from site n1 to site n2 , or after moving to site n2 , move from site n2 to site n1 .

[0126] As shown in Figure 8, place p1 corresponds to site n1 in Figure 7, place p2 corresponds to site n2 in Figure 7, and transition t 1-2 The directed arc from site n1 to site n2 in Figure 7 represents the transition from place p1 to place p2; the transition t 2-1 The directed arc from site n2 to site n1 in FIG7 represents the transition from place p2 to place p1.

[0127] FIG9 is a schematic diagram of sites with a selected path relationship according to an embodiment of the present application; FIG10 is a schematic diagram of the structure of a quadruple corresponding to FIG9 .

[0128] As shown in FIG9 , AGV1 is at site n1 , and AGV1 can move to site n2 or site n3 .

[0129] As shown in Figure 10, place p1 corresponds to site n1 in Figure 9, place p2 corresponds to site n2 in Figure 9, and place p3 corresponds to site n3 in Figure 9. 1-2 The directed arc from site n1 to site n2 in Figure 9 represents the transition from place p1 to place p2; the transition t 1-3 Corresponding to the directed arc from site n1 to site n3 in Figure 9, it represents the library p 12 Transition to place p3.

[0130] Combined with the examples of Figures 5 to 10, by traversing the first site and the directed arcs between the first sites, the basic structure of the quadruple of layout information of the corresponding sites as shown in Figures 6, 8, and 10 can be obtained, so that the basic structure of the quadruple of information including the running track of the AGV can be established.

[0131] In some embodiments, based on the layout model, a quadruple corresponding to the layout model is determined, including: determining the resource place and the first newly added node place based on the number of the next place of the current place; and determining the first newly added transition associated with the resource place and / or the first newly added node place.

[0132] FIG11 is a schematic diagram of sites with conflicting path relationships according to an embodiment of the present application; FIG12 is a schematic diagram of the structure of a quadruple corresponding to FIG11 .

[0133] As shown in Figure 11, AGV1 is at station n1 and AGV2 is at station n2. While AGV1 and AGV2 are moving simultaneously, they may encounter each other at station n3, resulting in a path conflict. Transport units AGV1 and AGV2 can move from stations n1 and n2 to station n3, respectively. However, if both transport units AGV1 and AGV2 move to station n3 simultaneously, a conflict will occur.

[0134] As shown in Figure 12, let's take the current place as the place corresponding to site n3 at the node as an example. The next places after the current place include places p4 and p5. In this case, the resource place and the first newly added node place can be determined based on places p4 and p5, as well as the first newly added transition associated with the resource place and / or the first newly added node place. This further improves the structure of the quadruple and resolves the path conflict between AGV1 and AGV2.

[0135] In some embodiments, the resource place and the first newly added node place are determined based on the number of the next place of the current place, including: adding a resource place when the number of the next place of the current place is greater than or equal to 2; adding a first newly added node place when the number of the next place of the current place is greater than or equal to 2 and the number of the previous place of the current place is greater than or equal to 2, and the number of the first newly added node place is the product of the number of the next place and the number of the previous place.

[0136] As shown in FIG12 , the next place of the current place includes place p4 and place p5, and the number of the next place of the current place is 2. In this case, the resource place p is increased. o3 The previous place of the current place includes place p1 and place p2. The number of places before the current place is 2. In this case, 4 first newly added node places are added. The first newly added node places can be represented as p 3,1-5 , p 3,1-4 , p 3,2-5 , p 3,2-4 .

[0137] The difference between resource place and place p4, place p5 and the first newly added node place is that resource place p o3 A black dot is set in the corresponding black circle, and the black dot represents the token.

[0138] Optionally, the quadruple may correspond to a Petri net structure. In the Petri net structure, the token may also be referred to as a token.

[0139] Optionally, the quaternary model is event-driven. Compared to time-driven models, event-driven models improve the efficiency of quaternary simulations. For example, event-driven models can mean that, in the quaternary model, the transition of an AGV from place n1 to place n2 occurs instantaneously, without requiring the actual time of the AGV's movement.

[0140] As shown in FIG11 and FIG12, when AGV1 moves from site n1 to site n3, AGV1 obtains the resource library p o3 The token in can be transferred to p 3,1-5 or p 3,1-4 ; AGV1 moves to p 3,1-5 or p 3,1-4 After that, AGV1 returns the resource library to o3 Token in. That is, by setting the quadruple structure shown in Figure 12, when AGV1 moves to site n3 and needs to move to site n4 or site n5, AGV2 will not move to site n3. This can resolve the conflict between AGV1 and AGV2 at site n3 and further resolve deadlocks and other situations that may occur during AGV movement. Deadlock refers to a situation where an AGV is unable to continue moving due to reasons such as path conflicts.

[0141] In some embodiments, based on the layout model, a quadruple corresponding to the layout model is determined, including: traversing the second site, mapping each second site to a production line location, and the second site is the site of the corresponding production line; based on the production line location, determining the first production line transition and the second production line transition, the first production line transition indicates that the production line starts processing, and the second production line transition indicates that the production line ends processing.

[0142] The production line may include various types of production lines. For example, it may include a welding line, an assembly line, a gluing line, etc. In the embodiment of the present application, the production line information may be included in the corresponding quadruple according to the specific type and number of the production line.

[0143] In this embodiment, the production lines in the site are mapped to production line locations, and the first and second production line transitions are determined based on the production line locations, thereby establishing a four-tuple structure including production line information. In this way, AGVs can be scheduled based on the production status of the production lines.

[0144] In some embodiments, according to the layout model, a quadruple corresponding to the layout model is determined, including: determining an action library and a second newly added node library according to the function of the site; and determining a second newly added transition associated with the action library and / or the second newly added node library.

[0145] A station can have multiple functions. For example, a station can have an unloading function, meaning the AGV can unload at the station; a station can have a loading function, meaning the AGV can load at the station. Optionally, the AGV can also perform operations such as moving forward and waiting at the station.

[0146] In this embodiment, the action library and the second newly added node library are determined according to the function of the site, and the second newly added transition associated with the action library and / or the second newly added node library is determined, which can better schedule the AGV and reduce the deadlock phenomenon.

[0147] In some embodiments, the action library and the second newly added node library are determined according to the function of the site, including: adding an action library when there is an unloading or loading operation at the site; adding a second newly added node library according to the number of operable types of AGV at the site.

[0148] Figure 13 is a schematic diagram of a station with unloading functionality according to an embodiment of the present application, and Figure 14 is a schematic diagram of the structure of the quadruple corresponding to Figure 13 . As shown in Figure 13 , AGV 1 is at station n1, and station n2 is the unloading point. AGV 1 can depart from station n1, arrive at station n2, and unload at station n2. Accordingly, an AGV (not shown in Figure 13 ) can also be installed in the warehouse, and the AGV in the warehouse can move to station n2 to retrieve the goods unloaded at station n2. After AGV 1 completes the unloading operation at station n2, it can move from station n2 to station n3.

[0149] Combined with Figure 14, corresponding to Figure 13, Figure 14 shows the warehouse place p w , the unloading warehouse p w A token is set up, represented by a black dot, which represents that an AGV is set up in the warehouse. Figure 14 also shows the action library. o2 , action library p o2 In addition, FIG14 also shows two second newly added node libraries p 02-1 , p 02-2 . Accordingly, in increasing the action library p o2 After that, create the action library o2The first action selection transition and the second action selection transition are associated, the first action selection transition indicates the start of the uninstallation action, and the second action selection transition indicates the end of the uninstallation action.

[0150] The number of the second newly added node places can be set according to the number of types of operability of the AGV at the site. For example, if the AGV can perform both unloading and loading operations at site n2, the number of the second newly added node places is 2.

[0151] As an example, as shown in FIG14, the AGV can pass through the node library n 02-2 , the unloading action is not performed at site n2; it can also be performed at node library site n 02-1 , perform the unloading action at site n2.

[0152] Optionally, if a loading operation occurs at a site, an action location is added, and a second node location is added based on the number of types of operations that the AGV can perform at the site. For the remaining details, please refer to the case where an unloading operation occurs at the site, and will not be repeated here.

[0153] In this embodiment, when there is an unloading operation or a loading operation at the site, an action library is added, and a second new node library is added according to the number of types of AGVs that can be operated at the site. Information corresponding to the function of the site can be included in the quadruple, so as to facilitate the simulation of AGV unloading and loading operations through the quadruple, and further facilitate the determination of the AGV's path information.

[0154] In some embodiments, based on the layout model, a quadruple corresponding to the layout model is determined, including: when there is an unloading operation at the site and there is a loading point on the corresponding production line, a first loading transition and a second loading transition are added, the first loading transition indicates that the production line starts loading, and the second loading transition indicates that the production line ends loading; when there is a loading operation at the site and there is an unloading point on the corresponding production line, a first unloading transition and a second unloading transition are added, the first unloading transition indicates that the production line starts unloading, and the second unloading transition indicates that the production line ends unloading.

[0155] When there is an unloading operation at a site and a loading point exists on the production line corresponding to the site, the first loading transition and the second loading transition are added. This makes it easier to represent the loading of the production line through a quadruple and to schedule the AGV according to the status of the production line.

[0156] When there is a loading operation at a site and there is a material unloading point on the production line corresponding to the site, the first material unloading transition and the second material unloading transition are added. This makes it easier to represent the material unloading of the production line through a quadruple and to schedule the AGV according to the status of the production line.

[0157] In some embodiments, determining a quad corresponding to the layout model according to the layout model includes: adding a resource place when there is no unloading or loading operation at the site and the place corresponding to the site is not connected to a resource place.

[0158] When a station is not unloading or loading, the AGV may be waiting or moving forward at the station. For example, when an AGV is waiting at a station, it may be accompanied by production activities on the production line, and the AGV is in a state of continuously occupying the station. In this case, if the location corresponding to the station is not connected to a resource location, a resource location is added. This makes it easier to represent the AGV status and the status of other stations through a quadruple, thereby facilitating the scheduling of the AGV based on the AGV status and the status of other stations.

[0159] In some embodiments, determining a quadruple corresponding to the layout model according to the layout model includes initializing the quadruple according to the initial position of the AGV to obtain an initial identification of the quadruple and an association matrix of corresponding flow relationships.

[0160] In this embodiment, the quadruple is initialized according to the initial position of the AGV, and the quadruple can start to be calculated, so as to obtain the initial identification of the quadruple and the association matrix of the corresponding flow relationship.

[0161] In some embodiments, the path information of the AGV is determined according to the layout model, including: determining an electric power model diagram corresponding to the path information of the AGV according to the quadruple, wherein the electric power model diagram is used to represent the electric power information of the AGV, the electric power information of the AGV corresponds to the number of tokens in the electric power model diagram, and the position of the AGV corresponds to the position of the tokens in the electric power model diagram and the position of the tokens in the path information of the AGV; updating the number of tokens in the electric power model diagram according to the movement, unloading, loading, waiting or charging operations of the AGV, wherein when the number of tokens is 0, the AGV stops moving.

[0162] The power model graph corresponds to the path information of the AGV. As an example, the power model graph can have the same configuration as the structure of the quadruple, that is, the position of the AGV in the power model graph is the same as the position of the AGV shown in the quadruple structure. The tokens in the power model graph represent the power information of the AGV, specifically, the remaining power of the AGV. In the quadruple structure, at least some tokens indicate the presence of an AGV and the number of AGVs at that location. In some examples, there is at most one AGV at a site, that is, the number of tokens is 0 or 1.

[0163] The movement of the AGV corresponds to a transition. After each transition, a certain number of tokens in the power model diagram are consumed. When the number of tokens consumed reaches 0, the AGV stops moving, and accordingly, the tokens in the quadruple lose the right to move.

[0164] FIG15 is a schematic diagram of an electric quantity model diagram according to an embodiment of the present application. FIG15 shows a portion of the electric quantity model diagram.

[0165] As shown in Figure 15, after the charging process, the AGV's power level is initialized to 0. After charging is complete, it becomes fully charged, with the power level represented by 20 units. Each transition consumes 0.5 units of power. It should be noted that the AGV's charge level and power consumption can be set based on actual needs. Figure 14 of the embodiment of this application is only an example.

[0166] In this embodiment, the power consumption of the AGV can be represented by the power model diagram, thereby facilitating the scheduling of the AGV according to the power consumption of the AGV.

[0167] In some implementations, the power information of the AGV is used to schedule the AGV to obtain the location of a charging pile and charge at the charging pile when the power of the AGV is lower than a preset threshold.

[0168] When the AGV's battery level drops below a preset threshold, the AGV is dispatched to obtain the location of the charging station and control the AGV to move to the charging station and charge there. This allows the AGV to be dispatched based on its battery level, reducing the risk of the AGV stalling due to low battery levels, and thus reducing the risk of deadlock caused by stalled AGVs.

[0169] In some embodiments, determining the path information of the AGV according to the layout model includes: if a charging pile is provided at the site, updating the power information in the parameter information of the AGV to a fully charged state.

[0170] In this embodiment, when a charging pile is provided at the site, the AGV is charged and the AGV is fully charged, thereby facilitating the scheduling of the AGV.

[0171] In some embodiments, the path information of the AGV is determined based on the layout model, including: in the case of including multiple raw materials or multiple finished products, establishing the transportation information corresponding to the multiple raw materials or finished products in the parameter information of the AGV.

[0172] Figure 16 is a schematic diagram of type switching in one embodiment of the present application. As shown in Figure 16, the AGV is located at place p1, and the state of place p1 is [1, 0, 0], which indicates that an AGV loaded with raw materials is located at place p1. At the same time, the states of places p2 and p3 are both [0, 0, 0]. After the unloading action, the state of place p2 is [0, 1, 0], indicating that an unloaded AGV is located at place p2. The state of place p3 is [0, 0, 1], indicating that the raw materials have arrived at the corresponding unloading station in place p3.

[0173] In this embodiment, by establishing the transportation information corresponding to a plurality of raw materials or finished products in the parameter information of the AGV, it is convenient to schedule the AGV according to the transportation information.

[0174] In some embodiments, determining the scheduling strategy of the AGV based on the path information and production order information of the AGV includes: determining the process information of the AGV based on the production order information; and determining the scheduling strategy of the AGV based on the process information of the AGV and the path information of the AGV.

[0175] After the production order information is determined, the process information of AGV can be obtained according to the production order information. The process information of AGV can be obtained by using the target state M F express.

[0176] In this embodiment, the moving path of the AGV can be obtained according to the process information of the AGV and the path information of the AGV, thereby obtaining the scheduling strategy of the AGV.

[0177] In some embodiments, the scheduling strategy of the AGV is determined based on the process information of the AGV and the path information of the AGV, including: obtaining the process information of the AGV; determining multiple triggerable transition sequences of the AGV between multiple sites at multiple time moments based on the process information of the AGV and the path information of the AGV; and determining the optimal transition sequence among the multiple triggerable transition sequences.

[0178] At each moment, the AGV has multiple triggerable transitions between multiple stations, but only one transition is actually triggered at each moment. The next triggerable transition is related to the transition actually triggered at the previous moment. By triggering each transition one by one, at multiple moments, there will be multiple triggerable transition sequences between multiple stations.

[0179] Triggerable transitions can be x k Expressed as x k ∈N n , x k represents the transition that can be triggered at step k, Table ith transition, x k (i)=1 if and only if transition ti In state M k The following can be triggered.

[0180] The actual triggered transition can be represented by x′ k Indicates that x′ k represents the transition actually triggered at step k, represents the i-th transition, x′ k (i)=1 if and only if transition t i In state M k The actual trigger is: k =λ k ·x k ,λ k is a diagonal matrix.

[0181] Assume that we reach the target state M from the initial state F There are m-step transitions, then in λ ki When it is 1, it means x k The changes that can actually be triggered in the

[0182] After determining multiple triggerable transition sequences, the optimal transition sequence among the multiple triggerable transition sequences can be determined. The optimal transition sequence constitutes the AGV scheduling strategy. In this way, the AGV can be optimally scheduled using the obtained AGV scheduling strategy, thereby improving the AGV scheduling efficiency.

[0183] In some embodiments, multiple triggerable transition sequences of the AGV between multiple sites at multiple time moments are determined based on the AGV process information and the AGV path information, including: obtaining external disturbance information; and updating the multiple triggerable transition sequences based on the external disturbance information.

[0184] Taking a production line as an example, in practice, failures may occur. During the simulation of AGV scheduling, it may be necessary to add commands such as failures to the production line. These commands can constitute external disturbance information. In this case, the external disturbance information can be obtained and used to update multiple triggerable transition sequences. The optimal transition sequence can then be determined based on these updated transition sequences.

[0185] In some implementations, determining an optimal transition sequence among multiple triggerable transition sequences includes: obtaining an objective function, and determining required times of the multiple triggerable transition sequences based on the objective function and the multiple triggerable transition sequences; and determining the optimal transition sequence based on the minimum required time of the multiple triggerable transition sequences.

[0186] The objective function can be expressed as: Assuming that K transitions are required to complete the production order, T k The time stated for each step of the transition.

[0187] Based on the objective function k Solve by finding the The actual change x′ at each moment can be obtained k In this way, the actual changes x′1, x′2, …, x′ at multiple moments can be obtained. k , then the actual transitions at multiple moments are the optimal transition sequence.

[0188] At each moment, k In each moment, there are multiple triggerable transitions. In multiple moments, there are multiple triggerable transition sequences. k During the solution process, multiple triggerable transition sequences and optimal transition sequences can be obtained.

[0189] In the actual change x′ k After triggering, the corresponding trigger and x′ in the structure of the quadruple k Concurrent transitions. For example, the actual transition x′ k After being triggered, the change of the production line starting production can also be triggered synchronously. Correspondingly, the AGV moves and the production line starts production.

[0190] Optionally, λ can also be adjusted based on the following conditions: k Solve:

[0191] M k-1 ≥C - ·x k

[0192] x′ k =λ k ·x k

[0193] M k =M k-1 +C·x′ k

[0194] A k ≥0

[0195] M k =M F

[0196] k=1,2,3…,K-1,K

[0197] A k Indicates the power of AGV, C - is the input association matrix in the flow relationship, C is the association matrix of the flow relationship, M k-1is the state at k-1 step transition, M k is the state at k-step transition, M F It is the target state, corresponding to the state when the production order is completed.

[0198] Optionally, the objective function can also be expressed as the minimum value of the power required for the transition. It should be noted that the objective function can be set according to actual needs, and the embodiments of the present application include but are not limited to this.

[0199] In some embodiments, the method further includes: obtaining updated layout information; updating the path information of the AGV according to the updated layout information; determining the process information of the AGV according to the production order information; and updating the scheduling strategy of the AGV according to the updated path information of the AGV and the process information of the AGV.

[0200] During the actual scheduling process, disturbance information may occur. Therefore, it is necessary to obtain updated layout information based on the disturbance information, and then update the AGV path information based on the updated layout information. Finally, the AGV scheduling policy is updated based on the updated AGV path information. This facilitates flexible adjustment of the AGV scheduling policy based on changes in actual conditions.

[0201] Figure 17 is a flow chart of an AGV scheduling method according to an embodiment of the present application. Taking Figure 17 as an example, the method 400 includes the following steps.

[0202] Step 410: Obtain external disturbance information.

[0203] In the presence of external disturbance, the layout information is updated according to the external disturbance information, and the path information of the AGV is updated according to the updated layout information.

[0204] Step 420: Solve the MILP model.

[0205] For example, AGV path information can be mapped to a Petri net model, and the AGV scheduling strategy can be solved using a mixed-integer linear programming (MILP) model. In the MILP model, AGV path information and AGV process information can be used as constraints, and the objective function can be set according to actual needs.

[0206] Step 430: output the optimal transition sequence.

[0207] Specifically, at each moment, one transition in the optimal transition sequence is output, and the one transition is the transition that is actually triggered.

[0208] Step 440, trigger the transition.

[0209] In the Petri net model, according to the output transition, the triggerable transition is stimulated into the actual triggered transition.

[0210] Step 450, synchronization action.

[0211] The actually triggered transition is fed back into the optimal transition sequence, and the transition at the next moment is calculated based on the actually triggered transition.

[0212] Step 460: Update the Petri net.

[0213] Update the Petri net according to the changes of the trigger. For example, update the state M of the Petri net K .

[0214] Step 470, simulation animation.

[0215] Visualize the triggering of the transition and display the visualized interface on the display interface. For example, convert the triggering of the transition into the movement of the AGV or the production behavior of the production line.

[0216] Step 480, end the simulation.

[0217] As shown in FIG17 , the MILP model can be used to obtain the optimal transition sequence, and then the transitions are stimulated according to the optimal transition sequence, and the Petri net is updated according to the stimulated transitions.

[0218] FIG18 is a schematic diagram of a display interface according to an embodiment of the present application. As shown in FIG18 , the display interface 300 includes a first area 310 , a second area 320 and a third area 330 .

[0219] The first area 310 includes a first operating unit 311 for acquiring site layout information. The first operating unit 311 includes a plurality of operating keys, for example, the first operating unit 311 includes a production line operating key 321, an AGV operating key 322, an AGV running track operating key 323 and a warehouse operating key 324.

[0220] The production line operation keys 321 have various types, such as a test type production line operation key, an assembly type production line operation key, a welding type production line operation key, a binding type production line operation key, and the like.

[0221] The AGV operation key 322 has various types, for example, an AGV type operation key and an OHT type operation key.

[0222] The second area 320 is used to display a layout model. For example, the layout model is created by dragging the first operating unit 311 in the first area 310.

[0223] The third area 330 includes a second operating unit 331 for acquiring production order information, a third operating unit 332 for acquiring a scheduling target, and a fourth operating unit 333 connected to the algorithm optimization module.

[0224] FIG19 is a schematic diagram of an AGV scheduling method implemented in the present application. The AGV scheduling method shown in FIG19 can be applied to the visualization interface shown in FIG17 .

[0225] As shown in FIG19 , the method 200 includes the following steps.

[0226] Step 210 , presenting a display interface 300 including a first area 310 , a second area 320 and a third area 330 .

[0227] The first area 310 includes a first operating unit 311 for acquiring layout information of a site, and the third area 330 includes a second operating unit 331 for acquiring production order information, a third operating unit 332 for acquiring a scheduling target, and a fourth operating unit 333 connected to an algorithm optimization module.

[0228] Step 220 : In response to the first operation, display a layout model corresponding to the site in the second area 320 .

[0229] The first operation is to drag the first operation unit 311 to the second area 320 based on the production order information. The first operation unit 311 is used to form a layout model. The layout model includes parameter information of the AGV and parameter information of the site.

[0230] Step 230 : In response to the second operation on the second operation unit 331 , the production order information is imported.

[0231] Step 240 : In response to the third operation on the third operation unit 332 , a scheduling target is imported into the layout model, where the scheduling target is a target determined based on the production order information.

[0232] Step 250 : Displaying the moving path of the AGV in the layout model displayed in the second area 320 , wherein the scheduling strategy of the moving path of the AGV is generated based on the layout model, the production order information, and the scheduling target.

[0233] In some embodiments, the first operation unit 311 includes a production line operation key 321, an AGV operation key 322, an AGV running track operation key 323 and a warehouse operation key 324; step 220 includes: in response to the first operation, adding at least one of the production line, AGV, running track, and warehouse to the layout model, the first operation is to drag at least one of the production line operation key 321, the AGV operation key 322, the AGV running track operation key 323 and the warehouse operation key 324 to the second area 320 based on the production order information, and the parameter information of the site in the layout model includes at least one of the parameter information of the production line, the parameter information of the running track and the parameter information of the warehouse.

[0234] In some embodiments, method 200 also includes: displaying an updated layout model in the second area 320 in response to a fifth operation, the fifth operation being an update operation of the layout model based on the production order information; displaying the moving path of the AGV in the updated layout model displayed in the second area, and the scheduling strategy of the moving path of the AGV is generated based on the updated layout model, production order information and scheduling targets.

[0235] In this embodiment, the layout model may be modified in the second area 320 of the display interface 300 to update the layout model, and then the updated movement path of the AGV may be displayed in the second area 320 .

[0236] The above describes an embodiment of the AGV scheduling method of the present application embodiment. The following describes an embodiment of the AGV scheduling system of the present application embodiment. It should be understood that similar descriptions of the corresponding parts of the system embodiment and the method embodiment can be referred to the method embodiment, and will not be repeated here.

[0237] FIG20 is a schematic diagram of an AGV scheduling system according to an embodiment of the present application. As shown in FIG20 , the AGV scheduling system 500 includes a model library module 510 , an order management module 520 , an algorithm optimization module 530 , and a display module 540 .

[0238] The model library module 510 is used to import and create a path model corresponding to the layout information of the site and the path information of the AGV.

[0239] The path model corresponding to the site layout information and the AGV path information can be a pre-established model. When the path model is needed, the model library module 510 can import the path model. The path model corresponding to the site layout information and the AGV path information can also be a newly created model based on actual needs. The model library module 510 can also be used to create a new path model.

[0240] The order management module 520 is used to manage production order information and status information of production orders.

[0241] The status information of the production order may include completion status information of the production order, for example, whether the production order has been completed.

[0242] The algorithm optimization module 530 is used to obtain the path model from the model library module 510 and the production order information from the order management module 520, and determine the path information of the AGV corresponding to the site based on the layout information and the path model; and determine the scheduling strategy of the AGV based on the AGV's path information and production order information.

[0243] The display module 540 is used to obtain the AGV target path information determined according to the AGV scheduling strategy from the algorithm optimization module 530 and display the AGV target path information.

[0244] Optionally, the algorithm optimization module 530 is further configured to execute the AGV scheduling method in any of the aforementioned embodiments.

[0245] In some embodiments, the AGV scheduling system 500 also includes a data storage module 550, which is used to store the path model of the model library module 510, the production order information and status information of the production order of the order management module 520, and the AGV scheduling strategy of the algorithm optimization module 530.

[0246] In some embodiments, the algorithm optimization module 530 is also used to obtain data information and process information of the AGV and the site according to the scheduling strategy of the AGV; the AGV scheduling system 500 also includes a visualization module 560, which is used to obtain data information and process information of the AGV and the site from the algorithm optimization module 530, visualize the data information and process information of the AGV and the site, and send the visualized information to the display module 540.

[0247] The data information of the AGV may include the power information of the AGV. The process information of the AGV may include the movement path information of the AGV.

[0248] The data information of the site may include the quantity information of the finished products produced by the production line, the quantity information of the goods stored in the warehouse, the quantity information of the raw materials required for the production line, etc. The process information of the site may include the production process information of the production line, etc.

[0249] Through the visualization module 560, the data information and process information of the AGV and the site can be visualized, so that the movement path of the AGV, the production behavior of the production line, the power of the AGV, the number of products produced, etc. can be displayed on the display interface.

[0250] Figure 21 is a schematic block diagram of an electronic device according to an embodiment of the present application. As shown in Figure 21, the device 1000 includes a memory 1010 and a processor 1020. The memory 1010 stores computer instructions, and the processor 1020 invokes the computer instructions to enable the electronic device 1000 to implement any of the above-mentioned methods.

[0251] An embodiment of the present application also provides a computer-readable storage medium for storing a computer program. When the computer program is executed by a computing device, the computing device implements the method in any of the above implementation modes.

[0252] An embodiment of the present application also provides a computer program product including computer-readable code, or a non-volatile computer-readable storage medium carrying computer-readable code. When the computer-readable code runs in an electronic device, the processor in the electronic device executes the method in any of the above implementations.

[0253] Although the present application has been described with reference to preferred embodiments, various modifications may be made thereto and components may be substituted with equivalents without departing from the scope of the present application. In particular, the various technical features described in the various embodiments may be combined in any manner as long as there are no structural conflicts. The present application is not limited to the specific embodiments disclosed herein, but encompasses all technical solutions within the scope of the claims.

Claims

1. An AGV scheduling method, characterized in that: include: Obtain site layout information and production order information; Determine, according to the layout information, path information of the AGV corresponding to the site; A scheduling strategy for the AGV is determined based on the path information of the AGV and the production order information.

2. The scheduling method according to claim 1, characterized in that: The determining, according to the layout information, the path information of the AGV corresponding to the site includes: Determine, according to the layout information, a layout model corresponding to the site, wherein the layout model includes parameter information of the AGV and parameter information of the site; According to the layout model, path information of the AGV is determined.

3. The scheduling method according to claim 2, characterized in that: Determining the path information of the AGV according to the layout model includes: According to the layout model, a quadruple corresponding to the layout model is determined; wherein the quadruple includes a first set, a second set, a third set and a fourth set, the first set represents a set of places corresponding to the site, the second set represents a set of transitions between the places, the third set represents a set of flow relations between the places and the transitions, and the fourth set represents weights of the flow relations; According to the four-tuple, the path information of the AGV is determined.

4. The scheduling method according to claim 3, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: Traversing the first sites, mapping each of the first sites to a library, wherein the first sites are sites corresponding to the running track of the AGV; The directed arcs between the first sites are traversed, and each directed arc is mapped to a transition.

5. The scheduling method according to claim 4, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: Determine the resource storage place and the first newly added node storage place according to the number of the next storage place of the current storage place; A first newly added transition associated with the resource repository and / or the first newly added node repository is determined.

6. The scheduling method according to claim 5, characterized in that: The determining of the resource place and the first newly added node place according to the number of the next place of the current place includes: When the number of the next library place of the current library place is greater than or equal to 2, adding the resource library place; When the number of the next library place of the current library place is greater than or equal to 2 and the number of the previous library place of the current library place is greater than or equal to 2, the first newly added node library place is added, and the number of the first newly added node library place is the product of the number of the next library place and the number of the previous library place.

7. The scheduling method according to any one of claims 3 to 6, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: Traversing the second sites, mapping each of the second sites to a production line warehouse, where the second site is a site of the corresponding production line; According to the production line library, a first production line transition and a second production line transition are determined, wherein the first production line transition indicates that the production line starts processing, and the second production line transition indicates that the production line ends processing.

8. The scheduling method according to any one of claims 3 to 7, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: Determine an action location and a second newly added node location according to the function of the site; A second newly added transition associated with the action repository and / or the second newly added node repository is determined.

9. The scheduling method according to claim 8, characterized in that: The determining, according to the function of the site, the action library and the second newly added node library comprises: In case that there is an unloading or loading operation at the site, adding the action library; The second newly added node library is increased according to the number of operable types of the AGV at the site.

10. The scheduling method according to any one of claims 3 to 9, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: When there is an unloading operation at the site and there is a loading point on the corresponding production line, a first loading transition and a second loading transition are added. The first loading transition indicates that the production line starts loading, and the second loading transition indicates that the production line ends loading. When there is a loading operation at the site and there is a material unloading point on the corresponding production line, a first material unloading transition and a second material unloading transition are added. The first material unloading transition indicates that the production line starts unloading, and the second material unloading transition indicates that the production line ends unloading.

11. The scheduling method according to any one of claims 3 to 9, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: There is no unloading or loading operation at the site and the library corresponding to the site is not connected to a resource library. In this case, add the resource repository.

12. The scheduling method according to any one of claims 3 to 11, characterized in that: The step of determining, according to the layout model, a quadruple corresponding to the layout model comprises: The quaternary group is initialized according to the initial position of the AGV to obtain the initial identification of the quaternary group and the association matrix corresponding to the flow relationship.

13. The scheduling method according to any one of claims 2 to 12, characterized in that: Determining the path information of the AGV according to the layout model includes: According to the quaternary group, determine an electric quantity model graph corresponding to the path information of the AGV, wherein the electric quantity model graph is used to represent the electric quantity information of the AGV, the electric quantity information of the AGV corresponds to the number of tokens in the electric quantity model graph, and the position of the AGV corresponds to the position of the token in the electric quantity model graph and the position of the token in the path information of the AGV; The number of tokens in the power model diagram is updated according to the movement, unloading, loading, waiting or charging operation of the AGV, wherein when the number of tokens is 0, the AGV stops moving.

14. The scheduling method according to claim 13, characterized in that: The power information of the AGV is used to schedule the AGV to obtain the location of a charging pile and charge at the charging pile when the power of the AGV is lower than a preset threshold.

15. The scheduling method according to any one of claims 2 to 14, characterized in that: Determining the path information of the AGV according to the layout model includes: In the case where a charging pile is provided at the site, the power information in the parameter information of the AGV is updated to a fully charged state.

16. The scheduling method according to any one of claims 2 to 15, characterized in that: Determining the path information of the AGV according to the layout model includes: In the case of including multiple raw materials or multiple finished products, the transportation information corresponding to the multiple raw materials or finished products is established in the parameter information of the AGV.

17. The scheduling method according to any one of claims 1 to 16, characterized in that: The step of determining the scheduling strategy of the AGV according to the path information of the AGV and the production order information includes: Determining process information of the AGV according to the production order information; A scheduling strategy for the AGV is determined according to the process information of the AGV and the path information of the AGV.

18. The scheduling method according to claim 17, characterized in that: Determining the scheduling strategy of the AGV according to the process information of the AGV and the path information of the AGV includes: Obtaining process information of the AGV; Determine, according to the process information of the AGV and the path information of the AGV, a plurality of triggerable transition sequences of the AGV between a plurality of sites at a plurality of time moments; An optimal transition sequence is determined among the plurality of triggerable transition sequences.

19. The scheduling method according to claim 18, characterized in that: The determining, according to the process information of the AGV and the path information of the AGV, a plurality of triggerable transition sequences of the AGV between a plurality of sites at a plurality of time periods comprises: Obtain external disturbance information; The plurality of triggerable transition sequences are updated according to the external disturbance information.

20. The scheduling method according to claim 18 or 19, characterized in that: The step of determining an optimal transition sequence among the plurality of triggerable transition sequences comprises: Acquire an objective function, and determine required times of the plurality of triggerable transition sequences based on the objective function and the plurality of triggerable transition sequences; The optimal transition sequence is determined according to the minimum required time of the plurality of triggerable transition sequences.

21. The scheduling method according to any one of claims 1 to 20, characterized in that: The method further comprises: Get updated layout information; Updating the path information of the AGV according to the updated layout information; Determining process information of the AGV according to the production order information; The scheduling strategy of the AGV is updated according to the updated path information of the AGV and the process information of the AGV.

22. An AGV scheduling method, characterized in that: include: Presenting a display interface including a first area, a second area, and a third area, wherein the first area includes a first operating unit for acquiring layout information of a site, the third area includes a second operating unit for acquiring production order information, a third operating unit for acquiring a scheduling target, and a fourth operating unit connected to an algorithm optimization module; In response to a first operation, a layout model corresponding to the site is displayed in the second area, wherein the first operation is an operation of dragging the first operation unit to the second area based on the production order information, and the first operation unit is used to form the layout model, and the layout model includes the parameter information of the AGV and the site Parameter information; In response to a second operation on the second operation unit, importing the production order information; In response to a third operation on the third operation unit, importing the scheduling target into the layout model, the scheduling target being a target determined based on the production order information; The moving path of the AGV is displayed in the layout model displayed in the second area, wherein the scheduling strategy of the moving path of the AGV is generated according to the layout model, the production order information and the scheduling target.

23. The scheduling method according to claim 22, characterized in that: The first operating unit includes a production line operating key, an AGV operating key, an AGV running track operating key and a warehouse operating key; In response to the first operation, displaying a layout model corresponding to the site in the second area includes: In response to the first operation, at least one of a production line, an AGV, an operating track, and a warehouse is added to the layout model, the first operation being an operation of dragging at least one of the production line operation key, the AGV operation key, the AGV operating track operation key, and the warehouse operation key to the second area based on the production order information, and the parameter information of the site in the layout model includes at least one of parameter information of the production line, parameter information of the operating track, and parameter information of the warehouse.

24. The scheduling method according to claim 22 or 23, characterized in that: The method further comprises: In response to a fifth operation, displaying an updated layout model in the second area, wherein the fifth operation is an update operation of the layout model based on the production order information; The moving path of the AGV is displayed in the updated layout model displayed in the second area, and the scheduling strategy of the moving path of the AGV is generated according to the updated layout model, the production order information and the scheduling target.

25. An AGV dispatching system, characterized in that: include: Model library module, used to import and create new path models corresponding to the site layout information and the AGV path information; An order management module, used to manage production order information and status information of the production order; An algorithm optimization module, configured to obtain the path model from the model library module, obtain the production order information from the order management module, determine the path information of the AGV corresponding to the site according to the layout information and the path model; and determine the scheduling strategy of the AGV according to the path information of the AGV and the production order information; A display module is used to obtain the AGV determined according to the scheduling strategy of the AGV from the algorithm optimization module. Target path information, showing the AGV target path information.

26. The AGV dispatching system according to claim 25, characterized in that: It also includes a data storage module for storing the path model of the model library module, the production order information and the status information of the production order of the order management module, and the scheduling strategy of the AGV of the algorithm optimization module.

27. The AGV dispatching system according to claim 25 or 26, characterized in that: The algorithm optimization module is also used to obtain data information and process information of the AGV and the site according to the scheduling strategy of the AGV; The AGV scheduling system also includes a visualization module, which is used to obtain the data information and process information of the AGV and the site from the algorithm optimization module, visualize the data information and process information of the AGV and the site, and send the visualized information to the display module.

28. An electronic device, characterized in that: The electronic device comprises a memory and a processor, wherein the memory is used to store computer instructions, and the processor is used to call the computer instructions to enable the electronic device to implement the method as described in any one of claims 1-21 or 22-24.

29. A computer-readable storage medium, characterized in that: Used to store a computer program, when the computer program is executed by a computer device, the computer device implements the method according to any one of claims 1-21 or 22-24.

30. A computer program product, characterized in that The invention comprises a computer-readable code, or a non-volatile computer-readable storage medium carrying the computer-readable code. When the computer-readable code is executed in an electronic device, a processor in the electronic device executes the method as described in any one of claims 1-21 or 22-24.

Citation Information

Patent Citations

  • Storage and distribution integration system and method based on insert-type AGV

    CN104555222A

  • Method And System Using With Automated Guided Vehicle

    CN107203825A

  • Automatic guided vehicle scheduling method and device, electronic equipment and storage medium

    CN111338343A

  • Order processing method and device in warehouse, medium, electronic equipment and system

    CN111652408A

  • Warehouse logistics simulation method, device and equipment and storage medium

    CN114219276A

Cited By

  • Optimal scheduling search method for multi-robot coordination system

    CN119417202A

  • Simulation-based scheduling optimization method and device, logistics equipment and medium

    CN119717713A

  • Intelligent guided vehicle charging control method and system based on fuzzy algorithm and medium thereof

    CN119821228A

  • Full-automatic AGV (Automatic Guided Vehicle) charging collaborative optimization system

    CN120257074A

  • AGV robot scheduling method and system of intelligent factory and storage medium

    CN120871773A