Monitoring system, information processing device, monitoring device and program
The monitoring system accurately detects insulation deterioration and ground faults in wiring systems by analyzing ground capacitance and insulation resistance values, improving fault detection and enabling rapid recovery.
Patent Information
- Application Number
- JP2020195568
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-25
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2040-11-25
AI Technical Summary
The increasing ground capacitance in wiring systems due to the use of shielded power cables and bus duct wiring leads to malfunctions in current ground fault detection equipment, and the current values at fault points do not match, necessitating improved methods for accurate detection of insulation deterioration and ground faults.
A monitoring system comprising an information processing device and a monitoring device that acquires and analyzes ground capacitance and insulation resistance values, zero-sequence voltage and current, to identify phases with insulation deterioration or ground faults, and determine the current values and direction of ground faults.
Enables accurate detection of ground fault direction and current values without malfunction, facilitating early identification of insulation deterioration and ground faults, reducing power outages and enabling rapid recovery.
Smart Images

Figure 0007555070000005 
Figure 0007555070000001 
Figure 0007555070000006
Abstract
Description
[Technical field]
[0001] The present invention relates to a monitoring system, an information processing device, a monitoring device, and a program. [Background technology]
[0002] There is a need for early detection of points of insulation deterioration in wiring systems, early maintenance of points of insulation deterioration in distribution cables, etc. before a ground fault accident occurs, and early detection of ground fault points in the event of a ground fault accident and early restoration work.
[0003] For this reason, technology has been proposed that can monitor the state of a wiring system regardless of whether the system is normal, has deteriorated insulation, has a ground fault, or has changed capacitance to the ground. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-173242 A Summary of the Invention [Problem to be solved by the invention]
[0005] Recently, due to the progress of undergrounding of power distribution lines and the construction of large-scale facilities, wiring using shielded power cables (hereinafter referred to as power cables) and bus duct wiring are increasing, and the capacitance to the ground of wiring paths tends to increase. As a result of the increase in the capacitance to the ground of wiring paths, malfunctions in the detection of the direction of ground faults of current ground fault detection devices (directional ground relays: DGRs) in wiring systems are becoming more frequent.
[0006] Also, due to the same factor, the current value at the earth fault current detection point (the installation point of a zero-phase current detector: ZCT (Zero-phase-sequence Current Transformer)) will not match the current value at the accident point where an earth fault actually occurs, and the latter will be several tens of percent to several times larger, so in the future it will become necessary to detect the current at the earth fault accident point.
[0007] In view of the above circumstances, the present invention provides a monitoring system, an information processing device, a monitoring device, and a program capable of monitoring the state of a wiring system without malfunction. [Means for solving the problem]
[0008] According to one aspect of the present invention, there is provided a monitoring system for monitoring a state of a wiring system. The monitoring system includes an information processing device and a monitoring device. The information processing device includes a receiving unit, an updating unit, and a providing unit. The receiving unit is configured to be able to receive configuration information of a wiring system to be monitored. The updating unit is configured to be able to update a wiring system database that manages the earth capacitance value and the earth insulation resistance value of each wire that configures the wiring system based on the configuration information. The providing unit is configured to be able to provide the earth capacitance value and the earth insulation resistance value managed by the wiring system database to the monitoring device. The monitoring device includes an acquiring unit, a monitoring unit, and a specifying unit. The acquiring unit is configured to be able to acquire the earth capacitance value and the earth insulation resistance value of the wires that configure the wiring system to be monitored from the information processing device that manages the information of the wiring system. The monitoring unit is configured to be able to acquire the zero-phase voltage and the zero-phase current of the wiring system. The identification unit is configured to identify a wiring phase in which insulation deterioration or a ground fault is occurring based on the zero-phase voltage and the zero-phase current, and to be able to identify the ground fault current detection point current value and the ground fault fault point current value of the identified wiring phase based on the earth capacitance value and the earth insulation resistance value acquired by the acquisition unit.
[0009] According to one aspect of the present invention, it is possible to detect the direction of a ground fault and the current at a ground fault point without malfunction. [Brief description of the drawings]
[0010] [Figure 1] 1 is a diagram illustrating an example of the configuration of a monitoring system 100 according to an embodiment of the present invention. [Diagram 2] 1 is a diagram showing an outline of the configuration of an information processing device 1. FIG. [Diagram 3] 2 is a diagram showing an outline of the configuration of a monitoring device 3. FIG. [Figure 4] 2 is a block diagram showing the functional configuration of an information processing device 1 and a monitoring device 3. FIG. [Diagram 5] 1 is a diagram showing an example of configuration information of a wiring system 4 in a diagrammatic form. [Figure 6] FIG. 2 is an activity diagram showing the flow of operations of the information processing device 1. [Figure 7] 4 is an activity diagram showing the flow of operations of the monitoring device 3. FIG. [Figure 8] FIG. 13 is a diagram showing an example of IRB expressed as a complex number. [Figure 9] In the wiring system shown in FIG. 5, an example of an equivalent circuit is shown, which is composed of a system (1) in which insulation deterioration of resistor RR1 in the R phase or a ground fault has occurred, and a normal system (2). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described with reference to the drawings. Various characteristic features shown in the following embodiments can be combined with each other.
[0012] Incidentally, the program for realizing the software appearing in this embodiment may be provided as a non-temporary computer-readable recording medium, or may be provided so as to be downloadable from an external server, or may be provided so that the program is started on an external computer and its functions are realized on a client terminal (so-called cloud computing).
[0013] In addition, in this embodiment, the term "unit" may include, for example, a combination of hardware resources implemented by a circuit in the broad sense and software information processing that can be specifically realized by these hardware resources. In addition, in this embodiment, various information is handled, and this information is represented, for example, by physical values of signal values representing voltage and current, high and low signal values as a binary bit collection consisting of 0 or 1, or quantum superposition (so-called quantum bits), and communication and calculation can be performed on the circuit in the broad sense.
[0014] In addition, a circuit in the broad sense is a circuit realized by at least appropriately combining a circuit, circuitry, a processor, a memory, etc. In other words, it includes an application specific integrated circuit (ASIC), a programmable logic device (e.g., a simple programmable logic device (SPLD), a complex programmable logic device (CPLD), and a field programmable gate array (FPGA)), etc.
[0015] 1. Configuration of monitoring system 100 1 is a diagram showing an example of the configuration of a monitoring system 100 according to an embodiment of the present invention. As shown in the figure, the monitoring system 100 includes an information processing device 1, a wiring system database 2, and a monitoring device 3, and the information processing device 1 and the monitoring device 3 are communicatively connected via a network 5. This monitoring system 100 monitors the state of a wiring system 4.
[0016] The information processing device 1 manages information about the wiring system 4, and manages the information about the wiring system 4 by using a wiring system database 2. The wiring system database 2 is a database that stores and holds information about the wiring system 4. The monitoring device 3 monitors the state of the wiring system 4. The wiring system 4 is a subject to be monitored.
[0017] 2. Configuration of information processing device 1 Next, a description will be given of the configuration of the information processing device 1. Fig. 2 is a diagram showing an outline of the configuration of the information processing device 1. As shown in the figure, the information processing device 1 has a processing unit 11, a storage unit 12, a temporary storage unit 13, an external device connection unit 14, and a communication unit 15, and these components are electrically connected inside the information processing device 1 via a communication bus 16.
[0018] The processing unit 11 is realized by, for example, a central processing unit (CPU), and operates according to a predetermined program stored in the storage unit 12 to realize various functions.
[0019] The storage unit 12 is a non-volatile storage medium that stores various information. This is realized by a storage device such as a ROM (Read Only Memory) or a Solid State Drive (SSD). Of course, it may also be a Hard Disk Drive (HDD).
[0020] The temporary storage unit 13 is a volatile storage medium. This is realized by a memory such as a random access memory (RAM), and stores information (arguments, arrays, etc.) that is temporarily required when the processing unit 11 operates.
[0021] The external device connection unit 14 is a connection unit that complies with standards such as Universal Serial Bus (USB) and High-Definition Multimedia Interface (HDMI).
[0022] The communication unit 15 is a communication means conforming to, for example, a local area network (LAN) standard, and realizes communication between the information processing device 1 and a network 5 such as the local area network or the Internet via the local area network. Note that the communication unit 15 is not necessarily a necessary component, and when communication is required, a desired communication device can be connected to the external device connection unit 14 in place of the communication unit 15. The communication unit 15 is also connected to the wiring system database 2 so as to be able to communicate with it.
[0023] The information processing device 1 may be configured as a dedicated device, or a general-purpose computer or the like may be used.
[0024] 3. Configuration of monitoring device 3 Next, a description will be given of the configuration of the monitoring device 3. Fig. 3 is a diagram showing an outline of the configuration of the monitoring device 3. As shown in the figure, the monitoring device 3 has a processing unit 31, a storage unit 32, a temporary storage unit 33, an external device connection unit 34, and a communication unit 35, and these components are electrically connected inside the monitoring device 3 via a communication bus 36.
[0025] The processing unit 31 is realized by, for example, a CPU, and operates according to a predetermined program stored in the storage unit 32 to realize various functions.
[0026] The storage unit 32 is a non-volatile storage medium that stores various information. This is realized by a storage device such as a ROM or SSD. Of course, it may also be an HDD.
[0027] The temporary storage unit 33 is a volatile storage medium, which is realized by a memory such as a RAM, and stores information temporarily required when the processing unit 31 operates.
[0028] The external device connection unit 34 is a connection unit conforming to standards such as USB or HDMI, and allows a measuring instrument for measuring the voltage and current of the wiring system 4, a monitor, and the like to be connected.
[0029] The communication unit 35 is, for example, a communication means conforming to the LAN standard, and realizes communication between the monitoring device 3 and the network 5. Note that the communication unit 35 is not necessarily a required component, and when communication is required, a desired communication device can be connected to the external device connection unit 34 in place of the communication unit 35.
[0030] The monitoring device 3 may be configured as a dedicated device, or a general-purpose computer, etc. Also, a computer may be incorporated in a relay or measuring instrument such as a DGR, or a ground fault circuit interrupter installed in a bus duct wiring or a shielded cable wiring, and these devices may be operated as the monitoring device 3.
[0031] 4. Functions of the information processing device 1 and the monitoring device 3 Next, the functions of the information processing device 1 and the monitoring device 3 will be described. The information processing device 1 operates according to a program to realize each of the functional units described below. This program is a program that causes a computer to operate or function as an information processing device. The monitoring device 3 operates according to a program to realize each of the functional units described below. This program is a program that causes a computer to operate or function as a monitoring device. The computer may be a server or a personal computer, or may be a computer that can be incorporated into a relay or measuring instrument such as a DGR, or an earth leakage circuit breaker installed in a bus duct wiring or a shielded cable wiring.
[0032] 4 is a block diagram showing functional configurations of the information processing device 1 and the monitoring device 3. As shown in the figure, the information processing device 1 includes a receiving unit 101, an updating unit 102, and a providing unit 103. The receiving unit 101 is configured to be able to receive configuration information of the wiring system 4 to be monitored. The configuration information of the wiring system 4 received by the receiving unit 101 includes, for example, the configuration of the wiring system, the wiring cable type, the size and length settings, the settings of EVTs (Earthed Voltage Transformers), ZPDs (Zero-phase-sequence Potential Devices), ZCTs, and DGRs.
[0033] FIG. 5 is a diagram showing an example of the configuration information of the wiring system 4. As shown in the figure, the configuration information of the wiring system 4 includes a power source E, a transformer T, a load equipment L1, a load equipment L2, a load equipment L3, a cable SC1, a cable SC2, a cable SC3, a cable SC4, a cable SC5, a DGR41, an EVT / ZPD42, a DGR43, a DGR44, an EVT / ZPD45, a DGR46, and a DGR47. EVT / ZPD42 and EVT / ZPD45 indicate that they are either EVT or ZPD. The configuration information of the wiring system 4 includes detailed information about each of these parts. The detailed information is, for example, information that the power source E is a three-phase 50 Hz, 66 kV power source, and the transformer T is a three-phase, three-wire, primary side 66 kV, and secondary side 6.6 kV.
[0034] The types, sizes, and lengths of cables SC1, SC2, SC3, SC4, and SC5 are monitored by DGR41, DGR43, DGR44, DGR46, and DGR47, respectively. Note that the receiving unit 101 may receive a capacitance to earth value and an insulation resistance to earth value instead of the type, size, and length of the cables.
[0035] The update unit 102 updates the wiring system database 2, which manages the capacitance to earth and the insulation resistance to earth of each wire constituting the wiring system 4, based on the configuration information received by the reception unit 101. At this time, the update unit 102 calculates the capacitance to earth and the insulation resistance to earth based on the type, size, and length of each wire constituting the wiring system 4. If the wiring system 4 is configured by at least one of a shielded power cable and a bus duct wiring, the update unit 102 uses the calculated values before use published by the manufacturer or the factory measured values as the electrical characteristics such as the minimum insulation resistance and the capacitance. The insulation resistance to earth and the capacitance to earth of the R phase, S phase, and T phase of each cable of the wiring system 4 are the same value for each of the R phase, S phase, and T phase because the cables of each phase are single-core cables or three-core cables having the same structure. Therefore, the earth insulation resistance value per phase in the zero-phase current detection range of each ZCT in the wiring system 4 can be obtained by parallel calculation of the earth insulation resistance value corresponding to the length of the distribution cable in the zero-phase current detection range, and the earth capacitance value per phase can be obtained as the sum of the earth capacitance values corresponding to the length of the distribution cable.
[0036] The providing unit 103 is configured to be able to provide the monitoring device 3 with the earth capacitance value and the earth insulation resistance value managed by the wiring system database 2. For example, the providing unit 103 notifies the monitoring device 3 that the wiring system database 2 has been updated, and when the monitoring device 3 requests the provision of the earth capacitance value, etc. managed by the wiring system database 2 in response to this notification, the providing unit 103 provides the requested information. Note that the providing unit 103 may be configured to directly transmit the earth capacitance value, the earth insulation resistance value, etc. to the monitoring device 3 when the earth capacitance value, etc. managed by the wiring system database 2 is updated without issuing a notification.
[0037] The wiring system database 2 is always updated when the wiring system 4 is expanded or removed. The contents of the wiring system database 2 are automatically provided to all DGRs installed in the wiring system 4, or to the monitoring devices and monitoring systems that monitor and manage the DGRs, and all DGRs, monitoring devices 3 and monitoring systems that receive this information update the information each time.
[0038] The monitoring device 3 also includes an acquisition unit 301 , a storage unit 302 , a monitoring unit 303 , an identification unit 304 , and an output unit 305 .
[0039] The acquiring unit 301 is configured to be able to acquire the capacitance to ground value and the insulation resistance to ground value of the wiring constituting the wiring system 4 to be monitored from the information processing device 1 that manages the information of the wiring system 4. The capacitance value and the like may be acquired in a form of receiving a push transmission from the information processing device 1, or may be acquired in a form of downloading after receiving a notification from the information processing device 1.
[0040] The holding unit 302 stores and holds the ground capacitance value and the ground insulation resistance value acquired by the acquisition unit 301.
[0041] The monitoring unit 303 is configured to be able to acquire the zero-phase-sequence voltage and the zero-phase-sequence current of the wiring system 4. Specifically, the monitoring unit 303 acquires the zero-phase-sequence voltage from an EVT or ZPD installed in the wiring system 4, and acquires the zero-phase-sequence current from a ZCT installed in the wiring system 4. The zero-phase-sequence voltage value may be a product of an equivalent internal resistance value of the zero-phase-sequence voltage detector (EVT or ZPD) and the zero-phase-sequence current (acquired from the ZCT).
[0042] The identifying unit 304 is configured to identify a wiring phase in which insulation deterioration or a ground fault occurs based on the zero-phase voltage and the zero-phase current, and to identify a ground fault current detection point current value and a ground fault fault point current value of the identified wiring phase based on the ground capacitance value and the ground insulation resistance value acquired by the acquiring unit. The identifying unit 304 also identifies an impedance of a wiring phase in which insulation deterioration or a ground fault occurs based on the insulation deterioration current value or the ground fault fault current value and the voltage of the insulation deterioration point or the ground fault point, and identifies an earth insulation resistance value and an earth capacitance value of the insulation deterioration point or the ground fault point from the identified impedance. The earth capacitance value of the insulation deterioration point or the ground fault point is a distributed constant. Then, the current value of the insulation deterioration point or the ground fault point is identified based on the earth insulation resistance value and the earth capacitance value.
[0043] The identifying unit 304 identifies whether the direction of the ground fault is the power supply side or the load side based on the logical product of the first determination result and the second determination result. The first determination result is a determination result based on the magnitude of the ground fault point current in the ground fault phase, and the second determination result is a determination result based on the magnitude of the current in the ground fault phase and another normal phase.
[0044] The output unit 305 outputs the value, the determination result, etc., identified by the identification unit 304 to a specified output destination. If the output destination is a location system capable of identifying the location of a ground fault point, it is possible to identify insulation deterioration points and ground fault points early, and to prevent power outages caused by ground faults and to implement early restoration work in the event of a ground fault.
[0045] 5. Operation of the information processing device 1 Next, a description will be given of the operation of the information processing device 1. Fig. 6 is an activity diagram showing the flow of the operation of the information processing device 1.
[0046] When the information processing device 1 is requested to input configuration information of the wiring system 4, the reception unit 101 receives the input (A101). Next, the update unit 102 updates the wiring system database 2 based on the input configuration information, and if a calculation process is required at this time, the calculation process is performed (A102), and the wiring system database 2 is updated based on the calculation result (A103). A case where calculation is required is when the reception unit 101 receives the type, size, and length of the cable. Also, if a calculation process is not required, the update unit 102 updates the wiring system database 2 as is (A103). A case where calculation is not required is when the reception unit 101 receives the capacitance value of the wiring, etc.
[0047] When the updating unit 102 updates the wiring system database 2, the providing unit 103 notifies the monitoring device 3 that an update has been made (A104), and the process ends.
[0048] Furthermore, when the information processing device 1 is requested by the monitoring device 3 to provide the updated data of the wiring system database 2, the providing unit 103 provides the updated data to the monitoring device 3 (A105), and the process ends.
[0049] 6. Operation of monitoring device 3 Next, a description will be given of the operation of the monitoring device 3. Fig. 7 is an activity diagram showing the flow of the operation of the monitoring device 3.
[0050] When the monitoring device 3 is notified by the information processing device 1 of an update to the wiring system database 2, the acquisition unit 301 acquires the update data from the information processing device 1 (A301) and stores the acquired update data in the storage unit 302 (A302).
[0051] Furthermore, when there is no notification of an update of the wiring system database 2 from the information processing device 1, the monitoring unit 303 of the monitoring device 3 acquires measured values such as the zero-phase voltage and the zero-phase current (A303). If there is no abnormality in the measured values acquired by the monitoring unit 303, for example, if the zero-phase current value is less than a predetermined value, the monitoring device 3 repeats the same process. Note that, instead of the measured value, the zero-phase voltage may be a value obtained by multiplying the sum of the high-voltage side converted value of the zero-phase voltage detection resistor of the zero-phase voltage detector and the ground resistance value by the value of the zero-phase current.
[0052] If there is an abnormality in the measured value acquired by the monitoring unit 303, for example, if the zero-phase current value is equal to or greater than a predetermined value, the identifying unit 304 first identifies the wiring phase with deteriorated insulation or the wiring phase with a ground fault (A304). For example, in the example of an ungrounded wiring system as shown in Fig. 5, the secondary terminal of the transformer T is not grounded, so the power circuit is an ungrounded system, but the neutral point is equivalently grounded with high impedance by the transformer (EVT or ZPD) that detects the zero-phase voltage of the secondary system, so it can be calculated as an impedance-grounded star-connected circuit.
[0053] Here, the phase angle of the NR terminal voltage of the transformer is set to 0° as a reference, the phase angle of the NS terminal voltage is set to -120°, and the phase angle of the NT terminal voltage is set to 120°. The zero-phase current detected by the ZCT is set to IRB in complex number representation, and the argument is set to θ. This IRB is rotated 0° to match the R phase, then 120° to match the S phase, and 240° to match the T phase. If the argument angle resulting from the coordinate rotation is set to θ', the phase with -30°<θ'<90° can be easily identified as the earth fault phase generating the IRB. FIG. 8 is a diagram showing an example of IRB expressed in complex numbers. If the state shown in the figure is the result of a coordinate rotation of 0°, the wiring phase with deteriorated insulation or the wiring phase with a ground fault is the R phase. The details of the coordinate rotation are described in Patent Document 1.
[0054] Next, the identifying unit 304 identifies the current value of the wiring phase with deteriorated insulation or the wiring phase with a ground fault (A305). Taking the ungrounded 6.6 kV high voltage wiring system shown in Fig. 5 as an example, as described above, although the system is an ungrounded system, it is equivalent to a neutral point resistance grounding by an instrument transformer that detects the zero-phase voltage.
[0055] Figure 9 shows an example of an equivalent circuit of a circuit consisting of a system (1) in which insulation deterioration of resistor RR1 or a ground fault has occurred in the R phase, and a normal system (2) in the wiring system shown in Figure 5. In the figure, ER represents the R phase voltage, ES represents the S phase voltage, and ET represents the T phase voltage. Also in the figure, IR1 represents the R phase current of system (1), IS1 represents the S phase current of system (1), IT1 represents the T phase current of system (1), RR1 represents the R phase earth fault point resistance of system (1), IRR1 represents the R phase earth fault point current of system (1), IR2 represents the R phase current of system (2), IS2 represents the S phase current of system (2), and IT2 represents the T phase current of system (2). Furthermore, in the figure, ZCT1 represents the ZCT of system (1), ZCT2 represents the ZCT of system (2), IRB1 represents the detected current of ZCT1, IRB2 represents the detected current of ZCT2, CR1 represents the R-phase-to-earth capacitance of system (1), CS1 represents the S-phase-to-earth capacitance of system (1), CT1 represents the T-phase-to-earth capacitance of system (1), CR2 represents the R-phase-to-earth capacitance of system (2), CS2 represents the S-phase-to-earth capacitance of system (2), CT2 represents the T-phase-to-earth capacitance of system (2), RA represents a class A earth resistance, RL represents the neutral-to-earth equivalent limiting resistance, and VN represents the zero-phase voltage (voltage between (RA+RL)).
[0056] In this example, the earth-fault phase is R-phase, and S-phase and T-phase are normal, so that the impedance of S-phase can be determined as ZS1=1 / jωCS1 and the impedance of T-phase as ZT1=1 / jωCT1 using the capacitance to earth value obtained from the wiring system database DB2. Then, the normal S-phase current value IS1 can be determined as IS1=(ES-VN) / ZS1 and the T-phase current value IT1 can be determined as IT1=(ET-VN) / ZT1 from the terminal voltage of the transformer T and the zero-phase voltage value VN detected by the EVT or ZPD. From these, the current value of the earth-fault phase R-phase can be determined as IR1=IRB1-(IS1+IT1). The zero-phase voltage value VN may be determined by using the product of the equivalent internal resistance value of the zero-phase voltage detector and the ZCT current.
[0057] Next, the identifying unit 304 identifies the earth insulation resistance value of the insulation deterioration point or the earth fault point (A306), and identifies the earth capacitance value (A307). From the current value IR1 of the earth fault phase identified in A305 and the voltage (ER-VN) of the earth fault point, the impedance ZR1 of the earth fault phase is identified as ZR1=(ER-VN) / IR1, the reciprocal (admittance) of ZR1 is identified as 1 / ZR1=1 / RR1+jωCR1, the resistance RR1 value of the insulation deterioration point or the earth fault point is identified as RR1=1 / real part of admittance, and the earth capacitance value CR1 is identified as CR1=imaginary part of admittance / ω. Of course, the distributed constant CR1 and the earth capacitance value in the wiring system database 2 match within a small error range.
[0058] Next, the identifying unit 304 identifies the earth fault point current value (A308). The earth fault point current value can be identified by dividing the earth fault phase current from the earth insulation resistance value of the earth fault point and the earth capacitance value of the distributed constant, so that the current IRR1 at the earth fault point is IRR1=IR1 / (jωCR1*RR1+1).
[0059] Next, the identifying unit 304 identifies the direction of the earth fault point (A309). The direction of the earth fault point is identified by the logical product of the determination result by the first method and the determination result by the second method. The first method identifies the earth fault phase in the wiring system and determines whether the direction of the earth fault is the power supply side or the load side based on whether the magnitude of the earth fault point current is an earth fault value of several mA or more or a normal value of several tens of μA or less. The second method determines the direction of the earth fault based on whether the earth fault point currents of the R phase, S phase, and T phase in the wiring system are all normal values of several tens of μA or less. Note that the direction of the insulation deterioration point can be identified by changing the normal value of several tens of μA or less in the first and second methods to several hundreds of μA.
[0060] Then, the output unit 305 outputs each value identified by the identifying unit 304 to the specified output destination, and the monitoring device 3 ends the process.
[0061] 7.Other The present invention contributes to improving the accuracy of earth fault protection systems in low voltage, high voltage, extra high voltage, and other electric power distribution facilities, as well as in large airports, high speed trains, large factories, etc. In addition, as described above, by combining with an earth fault fault point locating system, it becomes possible to easily determine insulation deterioration points and earth fault points in a short time, which is useful for reducing the maintenance and management work of the insulation performance of wiring facilities and for recovery and power restoration work of power distribution facilities in the unlikely event of a major natural disaster.
[0062] The present invention may be provided in the following aspects. An information processing device that manages information about a wiring system, comprising a receiving unit, an updating unit, and a providing unit, wherein the receiving unit is configured to be able to receive configuration information of a wiring system to be monitored, the updating unit is configured to be able to update a wiring system database that manages earth capacitance values and earth insulation resistance values of each wire that constitutes the wiring system based on the configuration information, and the providing unit is configured to be able to provide the earth capacitance values and earth insulation resistance values managed by the wiring system database to a monitoring device. In the information processing device, the providing unit notifies the monitoring device that the wiring system database has been updated. In the information processing device, the wiring system is configured with at least one of wiring using a shielded power cable and bus duct wiring. In the information processing device, the update unit calculates the ground capacitance value and the ground insulation resistance value based on the length of each wire that constitutes the wiring system. A monitoring device that monitors the condition of a wiring system, comprising an acquisition unit, a monitoring unit, and an identification unit, wherein the acquisition unit is configured to be capable of acquiring earth capacitance values and earth insulation resistance values of wiring that constitute a wiring system to be monitored from an information processing device that manages information about the wiring system, the monitoring unit is configured to acquire zero-phase voltage and zero-phase current of the wiring system, and the identification unit is configured to identify a wiring phase in which insulation deterioration or an earth fault has occurred based on the zero-phase voltage and the zero-phase current, and to identify an earth fault current detection point current value and an earth fault accident point current value of the identified wiring phase based on the earth capacitance value and earth insulation resistance value acquired by the acquisition unit. In the monitoring device, the identification unit identifies the impedance of the wiring phase in which insulation deterioration or ground fault is occurring based on the insulation deterioration current value or the ground fault fault current value and the voltage of the insulation deterioration point or the ground fault point, and identifies the earth insulation resistance value and earth capacitance value of the insulation deterioration point or the ground fault point from the identified impedance, wherein the earth capacitance value of the insulation deterioration point or the ground fault point is a distributed constant. In the monitoring device, the identification unit identifies a current value at the insulation deterioration point or the ground fault point based on the ground insulation resistance value and the ground capacitance value. In the monitoring device, the identification unit identifies whether the direction of the ground fault is on the power supply side or the load side based on the logical product of a first judgment result and a second judgment result, where the first judgment result is a judgment result based on the magnitude of the ground fault point current in the ground fault phase, and the second judgment result is a judgment result based on the magnitude of the current in the ground fault phase and other normal phases. A program that causes a computer to operate as an information processing device, the program causing the computer to function as the information processing device. A program for causing a computer to operate as a monitoring device, the program causing the computer to function as the monitoring device. Of course, this is not the case. [Explanation of symbols]
[0063] 1: Information processing equipment 2: Wiring system database 3: Monitoring device 4: Wiring system 5: Network 11: Processing section 12: Storage section 13:Temporary storage 14: External device connection 15: Communications Department 16: Communication bus 31: Processing section 32: Storage section 33:Temporary storage 34: External device connection 35: Communications Department 36: Communication bus 100: Surveillance system 101: Reception 102:Update section 103:Providing Department 301: Acquisition Department 302: Holding part 303: Monitoring Department 304: Specific part 305: Output section
Claims
1. A monitoring system for monitoring a state of a wiring system, comprising: An information processing device and a monitoring device are provided, The information processing device includes a receiving unit, an updating unit, and a providing unit; The reception unit is configured to be able to receive configuration information of a wiring system to be monitored, the update unit is configured to be able to update a wiring system database that manages a capacitance to ground value and an insulation resistance to ground value of each wire constituting the wiring system based on the configuration information; The capacitance to earth value and the insulation resistance to earth value are nominal values, the providing unit is configured to be able to provide the earth capacitance value and the earth insulation resistance value managed by the wiring system database to the monitoring device, The monitoring device includes an acquisition unit, a monitoring unit, and an identification unit. the acquisition unit is configured to be able to acquire the ground capacitance value and the ground insulation resistance value from the information processing device, The monitoring unit is configured to acquire a zero-phase voltage of the wiring system and a zero-phase current of the wiring system, the identifying unit is configured to be able to identify an earth-fault phase in which insulation deterioration or an earth fault has occurred, a current value of the earth-fault phase, and a ground-fault fault point current value based on a system voltage of the wiring system, the capacitance to earth value, the insulation resistance to earth value, the zero-phase voltage, and the zero-phase current; In identifying the earth fault phase, the zero-phase current expressed as a complex number is coordinate-rotated in accordance with a phase angle of each phase of the wiring system, and a phase corresponding to a phase angle in which the deflection angle of the coordinate-rotated zero-phase current falls within a predetermined range is identified as the earth fault phase; In identifying the current value of the earth fault phase, an impedance of each phase other than the earth fault phase of the wiring system is identified from the capacitance to earth value and the insulation resistance to earth value of the phase, a current value of each phase other than the earth fault phase is identified based on the identified impedance, the system voltage, and the zero-phase voltage, and a sum of the current values of the identified phases is subtracted from the value of the zero-phase current to identify the current value of the earth fault phase; In identifying the earth fault point current value, the impedance of the earth fault phase is identified based on the current value of the earth fault phase, the system voltage, and the zero-phase voltage, and a value obtained by dividing the current value of the earth fault phase from a distribution constant of the earth insulation resistance value of the impedance of the earth fault phase and the earth capacitance value of the impedance of the earth fault phase is identified as the earth fault point current value. Surveillance system.
2. 2. The monitoring system according to claim 1, The providing unit notifies the monitoring device that the wiring system database has been updated. Surveillance system.
3. 3. The monitoring system according to claim 1, The wiring system is configured by at least one of shielded power cable wiring and bus duct wiring. Surveillance system.
4. 4. The monitoring system according to claim 3, The update unit calculates the ground capacitance value and the ground insulation resistance value based on the length of each wire constituting the wiring system. Surveillance system.
5. 2. The monitoring system according to claim 1, The determination unit determines whether the direction of the ground fault is the power supply side or the load side based on a logical product of the first determination result and the second determination result, Here, the first determination result is a determination result based on the magnitude of the ground fault point current value, The second determination result is a determination result based on the magnitude of the current of the earth fault phase and each phase other than the earth fault phase. Surveillance system.
Citation Information
Patent Citations
Ground-fault detecting and protecting device
JP1991011921A
Ground fault protective relay system for distribution system
JP2008067434A
Ground fault detector
JP2018004596A
Device and program
JP2020173242A
Insulation monitoring device for simultaneously monitoring network sections of an ungrounded power supply system
US20150204937A1