Electronic Control Unit
The electronic control device uses detection units and controlled injection sequences to diagnose and locate heater failures, ensuring continuous urea water injection and maintaining exhaust gas purification efficiency in systems with multiple injection valves.
Patent Information
- Application Number
- JP2021022763
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-02-16
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2041-02-16
AI Technical Summary
Existing systems with multiple injection valves and heaters in exhaust passages cannot accurately identify the location of energization failures, leading to potential urea water injection stoppages in cold weather.
An electronic control device that includes detection units to monitor current and voltage, and executes specific injection control sequences to diagnose and pinpoint failures in individual heaters by analyzing urea water supply pressure changes.
Enables precise identification of failed heaters, ensuring continuous urea water injection and maintaining exhaust gas purification efficiency by distinguishing between normal and failed heaters.
Smart Images

Figure 0007559597000001 
Figure 0007559597000002 
Figure 0007559597000003
Abstract
Description
[Technical field]
[0001] The disclosure herein relates to electronic control devices. [Background technology]
[0002] Patent Document 1 describes a system including an injection valve that injects urea water into an exhaust passage of an internal combustion engine, a pipe that supplies the urea water to the injection valve, and an electric heater that heats the pipe. The urea water injected into the exhaust passage is converted into ammonia in the exhaust passage. This ammonia is supplied to a purification device as a reducing agent and reduces and purifies NOx in the exhaust gas on a catalyst of the purification device.
[0003] If the urea water freezes in the piping, the urea water is thawed by passing electricity through the electric heater, making it possible to inject the urea water from the injection valve.
[0004] Furthermore, Patent Document 1 describes a diagnostic device for diagnosing a current failure in an electric heater. This diagnostic device diagnoses a current failure when the electric heater is turned on but the food does not defrost after a predetermined time has elapsed. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2017-172377 A Summary of the Invention [Problem to be solved by the invention]
[0006] In recent years, as a measure to deal with the strengthening of regulations on exhaust gas purification, systems have been developed in which multiple purification devices are installed in the exhaust passage and an injection valve is provided for each purification device. In this type of system, the above-mentioned multiple injection valves require that the piping and electric heaters be branched or multiple units be provided for each injection valve, which results in the piping route becoming more complicated and longer.
[0007] In this case, by detecting the current flowing through any of the electric heaters, it is possible to determine whether or not a power failure has occurred within the system. However, it is not possible to determine in which part of the piping the power failure has occurred based on the current flow alone. Therefore, when a power failure occurs, there is a possibility that all urea water injection control will stop in cold weather, and there is room for improvement.
[0008] An object of the disclosure of this specification is to provide an electronic control device that makes it possible to identify a location of a current failure in an electric heater in a urea water supply system equipped with a plurality of injection valves. [Means for solving the problem]
[0009] The disclosed electronic control device for achieving the above object comprises: a first injector (21) and a second injector (22) for injecting urea water into an exhaust passage (10a, 10b) of the internal combustion engine; a first pipe (51) for supplying urea water to the first injector, and a second pipe (52) for supplying urea water to the second injector; An electronic control device is applied to a urea water supply system including a first heater (61) which is an electric heater that generates heat when electricity is applied and which heats urea water present in a first pipe and a second heater (62) which heats urea water present in a second pipe, a detection unit (S14) that detects the presence or absence of a power failure based on a current or a voltage when the first heater and the second heater are powered on; an injection control unit (S21, S24) that, when the detection unit detects that there is an electrical failure, executes a first injection control for closing the second injector and opening the first injector, and a second injection control for closing the first injector and opening the second injector, respectively; When the supply pressure of the urea water does not drop normally when the first injection control is being performed and when the supply pressure of the urea water drops normally when the second injection control is being performed, a diagnosis is made that there is a failure in the power supply to the first heater, a diagnosis unit (S27) for diagnosing a malfunction in energization of the second heater when the supply pressure of the urea water does not drop normally during the second injection control and when the supply pressure of the urea water drops normally during the first injection control; Equipped with.
[0010] Now, if the power supply to the first heater is normal, it is highly likely that the urea water in the first pipe has thawed. Therefore, if the first injection control is executed in this case, the intended amount of urea water should be injected from the first injection valve, and the supply pressure of the urea water should drop normally. On the other hand, if the power supply to the first heater is broken, it is highly likely that the supply pressure will not drop normally even if the first injection control is executed, because the urea water in the first pipe is frozen.
[0011] In consideration of these points, according to the above-mentioned electronic control device, when a power failure is detected, the first injection control and the second injection control are each executed. Then, when the supply pressure during the first injection control does not drop normally and the supply pressure during the second injection control drops normally, a power failure to the first heater is diagnosed. Also, when the supply pressure during the second injection control does not drop normally and the supply pressure during the first injection control drops normally, a power failure to the second heater is diagnosed.
[0012] As described above, according to the electronic control device, when a power failure to the heater is detected, it is possible to identify whether the power failure occurs in the first heater or the second heater.
[0013] The reference numbers in parentheses merely indicate an example of a corresponding relationship with a specific configuration in an embodiment described later, and do not limit the technical scope in any way. [Brief description of the drawings]
[0014] [Figure 1] 1 is a diagram illustrating an outline of a urea water supply system to which an electronic control device according to a first embodiment is applied; [Diagram 2]2 is a flowchart showing a procedure of defrosting control executed by the control device shown in FIG. 1; [Diagram 3] 3 is a flowchart showing a procedure for identifying an abnormality location described in FIG. 2; [Figure 4] 10 is a flowchart showing a procedure for identifying an abnormality, which is executed by an electronic control device according to a second embodiment. [Diagram 5] 10 is a flowchart showing a procedure for identifying an abnormality, which is executed by an electronic control device according to a third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, multiple embodiments of the present disclosure will be described with reference to the drawings. Note that in each embodiment, corresponding components are denoted by the same reference numerals, and duplicated descriptions may be omitted. In each embodiment, when only a part of the configuration is described, the configuration of the other embodiment described above can be applied to the other parts of the configuration.
[0016] (First embodiment) First, the configuration of a urea water supply system to which the electronic control device according to this embodiment is applied will be described with reference to FIG.
[0017] The urea water supply system is mounted on a vehicle equipped with an internal combustion engine 5. A plurality of purifiers each having a selective catalytic reduction (SCR) catalyst are attached to an exhaust pipe 10 of the internal combustion engine 5. The SCR catalyst selectively reduces and purifies nitrogen oxides (NOx) from among the oxides in the exhaust gas. In the example of FIG. 1, two purifiers are attached, and the purifier located downstream of the exhaust pipe 10 is referred to as a first purifier 11, and the purifier located upstream is referred to as a second purifier 12.
[0018] The urea water supply system injects urea water into exhaust passages 10a, 10b inside the exhaust pipe 10. The injected urea water is heated and hydrolyzed in the exhaust passages 10a, 10b. Ammonia is produced as a reducing agent by this hydrolysis, and is supplied to each of the first purifier 11 and the second purifier 12.
[0019] The urea water supply system includes a first injector 21, a second injector 22, a tank 30, an electric pump 40, various pipes, an electric heater, and a control device 70 (electronic control device).
[0020] The first injection valve 21 is attached to a portion of the exhaust pipe 10 on the upstream side of the exhaust flow with respect to the first purifier 11 and on the downstream side with respect to the second purifier 12. The first injection valve 21 injects urea water stored in a tank 30 into the exhaust passage 10a to supply the reducing agent to the first purifier 11.
[0021] The second injection valve 22 is attached to a portion of the exhaust pipe 10 upstream of the exhaust flow with respect to the second purifier 12. The second injection valve 22 injects urea water stored in a tank 30 into the exhaust passage 10b to supply the reducing agent to the second purifier 12.
[0022] The various pipes described above include a discharge pipe, a suction pipe 54, and a return pipe 55, which will be described below. The discharge pipe includes a first pipe 51, a second pipe 52, and an upstream pipe 53, which will be described below.
[0023] The discharge pipe connects the inlet of the first injector 21 and the inlet of the second injector 22 to the discharge port of the electric pump 40. The urea water discharged from the electric pump 40 is supplied to the first injector 21 and the second injector 22 through the discharge pipe. In detail, the urea water discharged from the electric pump 40 is distributed from the upstream pipe 53 to the first pipe 51 and the second pipe 52. The distributed urea water is supplied from the first pipe 51 to the first injector 21, and from the second pipe 52 to the second injector 22.
[0024] More specifically, the downstream end of the first pipe 51 is connected to the inlet of the first injection valve 21, and the downstream end of the second pipe 52 is connected to the inlet of the second injection valve 22. The upstream end of the first pipe 51 and the upstream end of the second pipe 52 are connected to the downstream end of the upstream pipe 53. The upstream end of the upstream pipe 53 is connected to the discharge port of the electric pump 40. In short, the first pipe 51 and the second pipe 52 are connected to the upstream pipe 53 so as to branch off from the downstream end of the upstream pipe 53.
[0025] The suction pipe 54 connects the suction port of the electric pump 40 and the tank 30. The urea water stored in the tank 30 is sucked into the electric pump 40 through the suction pipe 54. The return pipe 55 connects the discharge port or discharge pipe of the electric pump 40 to the tank 30. The urea water discharged from the electric pump 40 is returned to the tank 30 through the return pipe 55 when the first injector 21 and the second injector 22 are closed.
[0026] The electric heaters mentioned above include a first heater 61, a second heater 62, and an upstream heater 63, which will be described below. The upstream heater 63 is attached to the upstream pipe 53 and heats the urea water located in the upstream pipe 53. The first heater 61 is attached to the first pipe 51 and heats the urea water located in the first pipe 51. The second heater 62 is attached to the second pipe 52 and heats the urea water located in the second pipe 52.
[0027] In this embodiment, no electric heater is attached to the first injector 21 or the second injector 22, but an electric heater may be attached to these as well for heating. However, since the first injector 21 and the second injector 22 are heated by the exhaust gas flowing through the exhaust passages 10a, 10b, they are less likely to become below the freezing point than the tank 30 and various pipes, and therefore there is less need for heating by an electric heater.
[0028] 1, one electric heater is attached to each portion, but multiple electric heaters may be attached to each portion. For example, multiple first heaters 61 may be attached to the first pipe 51. Multiple second heaters 62 may be attached to the second pipe 52. A tank heater 64 for heating the urea water stored in the tank 30 is attached to the tank 30.
[0029] The control device 70 has at least one arithmetic processing device (processor 71) and at least one storage device (memory 72) as a storage medium for storing programs executed by the processor 71 and data.
[0030] The processor 71 and the memory 72 may be provided by a microcomputer. The storage medium is a non-transient tangible storage medium that non-transiently stores a program readable by the processor 71. The storage medium may be provided by a semiconductor memory or a magnetic disk, etc. The control device 70 may be provided by one computer, or a set of computer resources linked by a data communication device. The programs, when executed by the processor 71, cause the control device 70 to function as the device described in this specification and to function to execute the method described in this specification.
[0031] The control device 70 further has a heater drive circuit, an injection valve drive circuit, and a pump drive circuit, which are not shown. These drive circuits have switching elements that switch between energizing and cutting off the vehicle battery, and are controlled by a microcomputer. The microcomputer has an injection control unit, a pump control unit, and a heater control unit for controlling the above drive circuits. These control units are realized by the control device 70 when the processor 71 executes a program stored in the memory 72. Detection signals detected by various sensors, which will be described later, are input to the control device 70. Based on these detection signals, the above-mentioned control units execute various controls.
[0032] The injection control unit controls the injection amount and injection timing of the urea water by controlling the valve opening operation of the valve body by controlling the energization state of the electromagnetic coils of the first injection valve 21 and the second injection valve 22. For example, the injection control unit controls the valve opening time of the valve body by controlling the energization time of the electromagnetic coil, thereby controlling the injection amount of the urea water injected per unit time.
[0033] The control device 70 requests injection of urea water from the first injector 21 and the second injector 22 when exhaust purification is required due to the operation of the internal combustion engine 5 and when conditions such as the SCR catalyst being at or above its activation temperature are met. Furthermore, the control device 70 calculates a target injection amount of urea water based on the amount of NOx emitted from the internal combustion engine 5. When injection of urea water is required, the injection control unit controls the operation of the first injector 21 and the second injector 22 so as to open the valve body for a valve opening time corresponding to the target injection amount.
[0034] The pump control unit controls the rotation speed of the impeller by controlling the power supply state to the motor of the electric pump 40, thereby controlling the discharge pressure and discharge timing of the urea water. For example, the pump control unit controls the power supply to the motor by controlling the power supply period, power supply phase, and current peak value of the drive current flowing through the coil of the motor, thereby controlling the discharge pressure.
[0035] The heater control unit controls the temperature of the urea water in the various pipes and the tank 30 by controlling the energization state of the first heater 61, the second heater 62, the upstream heater 63, and the tank heater 64. For example, the heater control unit controls the amount of power supplied by duty-controlling the drive current flowing through the various electric heaters.
[0036] In this embodiment, one common heater drive circuit controls the energization state of the first heater 61, the second heater 62, and the upstream heater 63. Therefore, it is not possible to turn on some heaters while turning off others, and all heaters are commonly controlled to be turned on or off. Note that the energization of the tank heater 64 is controlled by a drive circuit separate from the heater drive circuit.
[0037] In this embodiment, the first heater 61, the second heater 62, and the upstream heater 63 are connected in parallel with each other. Therefore, the voltage applied to each heater is the same value, while the current flowing through each heater is different depending on the load. The various sensors described above include an outside air temperature sensor 70T and a pressure sensor 70P. The outside air temperature sensor 70T is disposed outside the various pipes and the tank 30. The outside air temperature sensor 70T outputs a detection signal corresponding to the ambient temperature (outside air temperature) of the various pipes.
[0038] The pressure sensor 70P is attached to the upstream pipe 53 and outputs a detection signal corresponding to the pressure of the urea water located in the upstream pipe 53. The pressure sensor 70P may be attached to the discharge port of the electric pump 40 and outputs a detection signal corresponding to the discharge pressure of the urea water. The pressure sensor 70P may be attached to the supply path from the electric pump 40 to the first injector 21 and the second injector 22. However, it is preferable that the pressure sensor 70P is attached upstream of the first pipe 51 and the second pipe 52. In other words, it is preferable that the pressure sensor 70P is attached to the discharge port of the electric pump 40 or the upstream pipe 53.
[0039] Next, a procedure for controlling the power supply state to the electric heater based on the various physical quantities acquired by these various sensors will be described with reference to Figures 2 and 3. The process of Figure 2 is triggered by the vehicle driver turning on the ignition switch, and is executed while the internal combustion engine is in an operable state or is being operated. The flowcharts shown in Figures 2 and 3 are repeatedly executed by the processor 71 at a predetermined calculation period.
[0040] 2, it is determined whether the outside air temperature Ta detected by the outside air temperature sensor 70T is lower than a preset threshold temperature Tth. The threshold temperature Tth is set to a preset freezing temperature (e.g., −11° C.) of an ideal urea water concentration (e.g., 32.5%). Alternatively, it is set to a value higher than the freezing temperature by a margin temperature.
[0041] If it is determined that the outside air temperature Ta is lower than the threshold temperature Tth, it is assumed that the urea water in the various pipes and the tank 30 is frozen, and heater control is executed in the following step S12. In the heater control, for example, when duty controlling the drive current flowing through the electric heater, the drive current is controlled to a larger value as the outside air temperature Ta is lower.
[0042] In the next step S13, the heater current or heater terminal voltage is monitored. As described above, the first heater 61, the second heater 62, the upstream heater 63, and the tank heater 64 are connected in parallel. The heater current is the sum of the currents flowing through these heaters. The heater terminal voltage is the value of the voltage applied to these heaters. The heater current or heater terminal voltage is obtained by monitoring the current or voltage flowing through the heater drive circuit described above.
[0043] In the next step S14, it is determined whether the monitored heater current I1 is a normal value within a predetermined range. For example, if the heater current I1 is equal to or greater than an upper limit Ith1, it is determined that a short circuit has occurred in one of the electrical paths, causing an electrical failure. For example, if the heater current I1 is equal to or less than a lower limit Ith2, it is determined that a disconnection has occurred in one of the electrical paths, causing an electrical failure. When performing the process of step S14, the control device 70 corresponds to a "detection unit" that detects the presence or absence of an electrical failure based on the heater current I1.
[0044] The control device 70 has a judgment circuit 73 (judgment unit) that judges whether the cause of the current flow failure is a break or a short circuit. In FIG. 1, the judgment circuit 73 is written as DL (Detection Logic). For example, the judgment circuit 73 has a shunt resistor and an operational amplifier. The shunt resistor generates a potential difference according to the current flowing through the heater drive circuit and outputs a signal of a potential according to the heater current I1. The operational amplifier includes a comparator that compares the detected heater current I1 with an upper limit value Ith1 and a comparator that compares the detected heater current I1 with a lower limit value Ith2. Based on the comparison results output by these comparators, it is judged whether the heater current I1 is a normal value or not, that is, whether an abnormality has occurred in the current flow path of the electric heater.
[0045] If it is determined that the temperature is normal in step S14, it is determined in the following step S15 whether or not the thawing by heating with the electric heater is completed. For example, it is determined that the thawing is completed when a predetermined time has elapsed since the heater control was started in step S12. Alternatively, it is determined that the thawing is completed when the urea water temperature is detected by a temperature sensor and the detected temperature is sufficiently higher than the freezing temperature.
[0046] If it is determined that thawing is complete, then in step S16, power to the electric heater is turned off and heater control is terminated. If it is not determined that thawing is complete, the process returns to step S12, where heater control is continued and fault diagnosis is continued by monitoring the heater current I1. The steps indicated by the dashed dotted line (1) in FIG. 2 can be said to be performing heater fault diagnosis. The control device 70 during the processing of steps S12 and S16 corresponds to the "heater control unit."
[0047] If a failure is detected by the heater failure diagnosis, that is, if an abnormality is determined in step S14, the process of identifying the abnormality is executed in step S20. After that, regardless of whether thawing is completed or not, the heater control is terminated in step S16. In step S20, the subroutine process shown in FIG. 3 is executed.
[0048] First, in step S21 of Fig. 3, the first injection control is executed to open the first injection valve 21 and inject urea water from the first injection valve 21. In this injection, the valve is not opened intermittently multiple times, but is continuously kept open for a predetermined period of time. In addition, since this is an injection for identifying an abnormality location, the valve opening time is set regardless of the amount of NOx emitted from the internal combustion engine 5. This corresponds to a "detection unit" that detects the presence or absence of an electrical failure based on the heater current I1.
[0049] In the following step S22, the supply pressure P of the urea water to the first injector 21 and the second injector 22, detected by the pressure sensor 70P, is acquired. Then, it is determined whether the acquired supply pressure P is less than the threshold pressure Pth.
[0050] At the time of the determination in step S22, the heater control in step S12 is being executed. Therefore, if the thawing of the urea water by the heater control is proceeding normally, the urea water should be injected from the first injection valve 21 in step S21. In that case, the supply pressure P should decrease with the injection. Therefore, if the supply pressure P is not less than the threshold pressure Pth in step S22, there is a high probability that the first injection valve 21 is not injecting normally. In this way, if the supply pressure P does not become less than the threshold pressure Pth despite the first injection valve 21 being commanded to open, the first abnormality flag is set to ON in step S23.
[0051] In the next step S24, the second injection valve 22 is opened to execute a second injection control in which the second injection valve 22 injects urea water. In this injection, the valve is not opened intermittently multiple times, but is continuously maintained in an open state for a predetermined period of time. Also, similar to step S21, the valve opening time is set regardless of the amount of NOx discharged from the internal combustion engine 5. The valve opening time in this step S24 is set to the same length as the valve opening time in step S21. The control device 70 when executing the processes of steps S21 and S24 corresponds to an "injection control unit" that executes the first injection control and the second injection control, respectively.
[0052] In the next step S25, the supply pressure P detected by the pressure sensor 70P is obtained, and it is determined whether or not the supply pressure P is less than the threshold pressure Pth. The threshold pressure Pth used in this determination is the same value as the threshold pressure Pth used in the determination in step S22.
[0053] At the time of the judgment of step S25, the heater control in step S12 is being executed. Therefore, if the thawing of the urea water by the heater control is proceeding normally, the urea water should be injected from the second injection valve 22 in step S24. In that case, the supply pressure P should decrease with the injection. Therefore, if the supply pressure P is not less than the threshold pressure Pth in step S25, there is a high probability that the injection from the second injection valve 22 is not being performed normally. In this way, if the supply pressure P does not become less than the threshold pressure Pth despite the second injection valve 22 being commanded to open, the second abnormality flag is set to ON in step S26.
[0054] In the next step S27, a location of abnormality in the power supply to the electric heater is identified based on the states of the first abnormality flag and the second abnormality flag. Specific diagnosis contents in step S27 will be described below.
[0055] If both the first abnormality flag and the second abnormality flag are off, the system is diagnosed as "normal." "Normal" here does not mean that the result of step S14, in which the heater current I1 was diagnosed as abnormal, is overturned. If an abnormality exists in any of the current paths of the electric heater, but the urea water has thawed to the extent that it can be injected, the system is diagnosed as "normal."
[0056] For example, even if an abnormality occurs in the current path to the second heater 62, the current paths to the first heater 61 and the upstream heater 63 may be normal. In this case, the upstream pipe 53 and the first pipe 51 are heated by the electric heaters and the temperature increases, and the heat is transferred to the urea water in the second pipe 52 through the second pipe 52. As a result, there may be a situation in which the urea water in the second pipe 52 is thawed without being heated by the second heater 62 and is normally injected from the second injector 22.
[0057] When one of the two abnormality flags is on and the other is off, it is diagnosed that one of the current paths of the first heater 61 and the second heater 62 is abnormal and the other current path is normal. As described above, the first heater 61 and the second heater 62 are connected in parallel. That is, the electrical wiring branches from a common current path to each heater. Therefore, the current path diagnosed as abnormal as described above is the current path at the branch destination (branch path), and is different from the common current path (common path).
[0058] Specifically, when the first abnormality flag is on and the second abnormality flag is off, the current path branching to the first heater 61 is identified as the current abnormality location. When the second abnormality flag is on and the first abnormality flag is off, the current path branching to the second heater 62 is identified as the current abnormality location.
[0059] If both of the two abnormality flags are on, the abnormal location of the current path cannot be identified, so it is diagnosed that the branch paths of both the first heater 61 and the second heater 62 are abnormal, or that the common path is abnormal.
[0060] The steps shown by the dashed line (2) in Fig. 3 described above can be said to execute the fault location diagnosis. The steps shown by the dashed line (3) can be said to execute the injector control described below. The control device 70 when executing the process of step S27 corresponds to the "diagnosis unit."
[0061] If both abnormality flags are OFF in step S27, that is, if the diagnosis is "normal," normal injection control is started in the following step S31. In this normal injection control, urea water is injected from both the first injector 21 and the second injector 22. The injection amount is set according to the amount of NOx discharged from the internal combustion engine 5.
[0062] If one of the abnormality flags is on in step S27, that is, if a diagnosis of "one-sided abnormality" is made, fail-safe control is started in the following step S32. In this fail-safe control, injection is prohibited from the injector diagnosed as abnormal, and injection is permitted from the injector diagnosed as normal. The injection amount of urea water from the permitted side is controlled according to the amount of NOx discharged from the internal combustion engine 5. Therefore, in the fail-safe control, the injection amount from one injector is larger than in normal injection control in which injection is made from both injectors.
[0063] If both abnormality flags are on in step S27, that is, if it is diagnosed that "both are abnormal," then in the following step S33, injection from both injectors is prohibited.
[0064] When the processing of steps S32 and S32 has been executed, in the following step S35, it is determined whether or not the diagnosis time T has passed a predetermined waiting time Tb. If it is determined that the diagnosis time T has not passed, the process returns to the processing of step S21, and the fault location diagnosis in the step group (2) is executed again.
[0065] During such a waiting time Tb, the diagnosis result of the fault location diagnosis may change from one-sided abnormality to normal.
[0066] For example, even if the current supply path to the second heater 62 is diagnosed as abnormal (one-sided abnormality), the first pipe 51 is heated by the first heater 62 and the temperature rises. The heat is transferred to the urea water in the second pipe 52 through the second pipe 52. As a result, the urea water in the second pipe 52 is defrosted during the standby time Tb without heating by the second heater 62, and the situation may change to one in which the urea water is normally injected from the second injector 22.
[0067] During the above-mentioned waiting time Tb, the diagnosis result of the failure location diagnosis may change from "both abnormalities" to "one abnormality."
[0068] For example, even if the current supply paths to the first heater 61 and the second heater 62 are diagnosed as abnormal (both are abnormal), the upstream pipe 53 is heated by the upstream heater 63 and the temperature rises. The heat is transferred to the urea water in the second pipe 52 through the second pipe 52, or transferred to the urea water in the first pipe 51 through the first pipe 51. As a result, the urea water in the second pipe 52 is thawed during the standby time Tb without heating by the second heater 62, or the urea water in the first pipe 51 is thawed during the standby time Tb without heating by the first heater 61. Then, the situation may change to one of the injection valves being normally injected.
[0069] Returning to the explanation of FIG. 2, when the subroutine process of identifying the abnormality part in FIG. 3 described above is completed, the process proceeds to step S17 in FIG. 2 described below. In step S17, if "one side abnormality" or "both abnormalities" is diagnosed in step S27 of the above subroutine, it is determined that a malfunction has been confirmed. In this case, in step S16 in FIG. 2, the power supply to the electric heater is turned off and the heater control is terminated. On the other hand, if "normal" is diagnosed in step S27, it is determined in step S17 that a malfunction has not been confirmed. In this case, the process proceeds to step S15, and on the condition that completion of thawing is confirmed, the heater control is terminated in step S16.
[0070] The effects of the electronic control device having the above-mentioned configuration will be described below.
[0071] If the power supply to the first heater 61 is normal, it is highly likely that the urea water in the first pipe 51 has thawed. Therefore, if the first injection control is executed in this case, the intended amount of urea water should be injected from the first injector 21, and the supply pressure P should drop normally. On the other hand, if the power supply to the first heater 61 has a power failure, it is highly likely that the urea water in the first pipe 51 will be frozen, and therefore the supply pressure P will not drop normally even if the first injection control is executed.
[0072] In consideration of these points, in the electronic control device according to this embodiment, when a power failure is detected, the first injection control and the second injection control are each executed. Then, when the supply pressure P during the first injection control does not drop normally and the supply pressure P during the second injection control drops normally, a power failure to the first heater 61 is diagnosed. Also, when the supply pressure P during the second injection control does not drop normally and the supply pressure P during the first injection control drops normally, a power failure to the second heater 62 is diagnosed. Therefore, when a power failure to the heater is detected, it is possible to identify which of the first heater 61 and the second heater 62 has a power failure.
[0073] Furthermore, the electronic control device according to this embodiment includes a heater control unit (steps S12, S16) that controls the on / off of the power supply to the first heater 61 and the second heater 62. When either the first heater 61 or the second heater 62 is diagnosed as having a power supply failure, the heater control unit keeps the power on until the diagnosis result is overturned to normal within the waiting time Tb. Furthermore, the heater control unit switches the power supply off after the waiting time Tb has elapsed without the diagnosis result being overturned.
[0074] For example, when the power supply to the first heater 61 is normal and the power supply to the second heater 62 is abnormal, the heater control unit causes the first heater 61 to continue to generate heat during the standby time Tb. Therefore, it is expected that the heat of the first heater 61 will be transmitted to the second pipe 52 and the urea water frozen in the second pipe 52 will be thawed. However, if the thawing does not occur contrary to expectations and the diagnosis result cannot be overturned, the power supply is switched off when the standby time Tb has elapsed.
[0075] Furthermore, in this embodiment, when the detection unit detects that there is a power supply failure, the first injection control and the second injection control are alternately executed multiple times. The diagnosis unit in step S27 repeats the diagnosis every time the first injection control and the second injection control are executed once. Therefore, it is possible to suppress erroneous diagnosis compared to a one-time diagnosis.
[0076] Furthermore, in this embodiment, when a failure in energizing the first heater 61 is diagnosed in step S32 of Fig. 5, the valve opening operation of the first injector 21 is prohibited. Also, when a failure in energizing the second heater 62 is diagnosed, the valve opening operation of the second injector 22 is prohibited. This makes it possible to avoid a situation in which injection is not actually performed due to freezing even though injection control has been performed, that is, a situation in which an injection amount is unintentionally small. This makes it possible to suppress a decrease in purification rate caused by a shortage of urea water.
[0077] Second embodiment In the present embodiment shown in Fig. 4, step S34 is added to the process in Fig. 3. In step S34, the standby time Tb is variably set depending on the determination result of the determination circuit 73. As described above, the determination circuit 73 determines whether the cause of the current flow failure is a break or a short circuit. In step S34, if the determination circuit 73 determines that the cause is a short circuit, the standby time Tb is set shorter than when the determination result is a break.
[0078] In the case of a short circuit, there is a greater concern that an excessive current will flow through the heater, causing abnormal heat generation, compared to a break in the wire. Therefore, according to this embodiment, which shortens the waiting time Tb in the event of a short circuit, the time during which an excessive current flows through the heater can be shortened, and the risk of thermal damage can be reduced.
[0079] Third embodiment In the first embodiment, in step S35 in Fig. 3, it is determined whether the diagnosis time T has passed the waiting time Tb. In contrast to this, in this embodiment, the process of step S35 is replaced with step S36 in Fig. 5. In this step S36, it is determined whether the number of times the diagnosis in step S27 has been performed (diagnosis count N) has reached a predetermined number Nb. In other words, the time required for one diagnosis corresponds to the waiting time Tb used in the determination in step S35 in the first embodiment.
[0080] (Other embodiments) In the first embodiment, in steps S22 and S25, it is determined whether or not the supply pressure P is less than the threshold pressure Pth. That is, the presence or absence of an electrical failure is determined based on the absolute value of the supply pressure P. In contrast, it may be determined whether or not a change of a predetermined amount or more has occurred in the supply pressure P as a result of the execution of the first injection control or the second injection control. That is, it may be determined that an electrical failure has occurred when the amount of change in the supply pressure P is less than the predetermined amount.
[0081] In the first embodiment, when controlling the energization state of the first heater 61, the second heater 62, and the upstream heater 63, the energization on and off of all the heaters is controlled simultaneously in common. However, the heaters may be divided into a plurality of groups, and the energization on and off of each group may be controlled. However, it is preferable that the first heater 61 and the second heater 62 are set in the same group and controlled in common.
[0082] The detection unit according to the first embodiment detects the presence or absence of a power failure based on the heater current I1. However, in view of the fact that the voltage applied to the heater becomes an abnormal value when a short circuit or disconnection occurs, the detection unit may detect the presence or absence of a power failure based on the voltage applied to the heater.
[0083] In each of the above embodiments, if one or both are diagnosed as abnormal in step S27, the power supply to the heater is kept on until the standby time Tb has elapsed. In contrast, even if one or both are diagnosed as abnormal, the power supply to the heater may be quickly turned off without waiting.
[0084] In each of the above embodiments, when one or both are diagnosed as abnormal, the first injection control and the second injection control are alternately executed multiple times to repeat the diagnosis in step S27. In contrast, even when one or both are diagnosed as abnormal, the diagnosis in step S27 may not be repeated and the subroutine in step S20 may be ended after one diagnosis.
[0085] Although the present disclosure has been described based on the embodiment, it is understood that the present disclosure is not limited to the embodiment or structure. The present disclosure also includes various modifications and modifications within the equivalent range. In addition, although various combinations and forms are shown in the present disclosure, other combinations and forms including only one element, more than one element, or less than one element are also included in the present disclosure. [Explanation of symbols]
[0086] 10a, 10b exhaust passage, 21 first injector, 22 second injector, 51 first piping, 52 second piping, 61 first heater, 62 second heater, 73 determination unit, S12, S16 heater control unit, S14 detection unit, S21, S24 injection control unit, S27 diagnosis unit.
Claims
1. a first injection valve (21) and a second injection valve (22) for injecting urea water into an exhaust passage (10a, 10b) of an internal combustion engine; a first pipe (51) for supplying urea water to the first injection valve, and a second pipe (52) for supplying urea water to the second injection valve; An electronic control device applied to a urea water supply system including a first heater (61) which heats the urea water present in the first pipe, and a second heater (62) which heats the urea water present in the second pipe, the first heater being an electric heater that generates heat when current is applied thereto, a detection unit (S14) that detects the presence or absence of a current failure based on a current or a voltage when the first heater and the second heater are energized; an injection control unit (S21, S24) that, when the detection unit detects that there is an electrical failure, executes a first injection control for closing the second injector and opening the first injector, and a second injection control for closing the first injector and opening the second injector, respectively; when the supply pressure of the urea water does not drop normally when the first injection control is being performed and when the supply pressure of the urea water drops normally when the second injection control is being performed, a diagnosis is made that there is a failure in energization of the first heater, a diagnosis unit (S27) for diagnosing a malfunction in energization of the second heater when the supply pressure of the urea water during the second injection control does not drop normally and when the supply pressure of the urea water during the first injection control drops normally; An electronic control device comprising:
2. a heater control unit (S12, S16) that controls the power supply to the first heater and the second heater to be turned on and off; The heater control unit is 2. The electronic control device according to claim 1, wherein when either one of the first heater or the second heater is diagnosed as having a power failure, the power is continued to be on until the diagnosis result is changed to normal within a predetermined waiting time, and the power is switched to off after the waiting time has elapsed without the diagnosis result being changed to normal.
3. A determination unit (73) for determining whether the cause of the electrical failure is a disconnection or a short circuit, The electronic control device according to claim 2 , wherein when the determination unit determines that the short circuit has occurred, the standby time is set to be shorter than when the determination unit determines that the disconnection has occurred.
4. The injection control unit alternately executes the first injection control and the second injection control multiple times when the detection unit detects that there is an electrical conduction failure, The electronic control device according to claim 2 or 3, wherein the diagnosing unit repeats the diagnosis every time the first injection control and the second injection control are executed once.
5. The electronic control device according to any one of claims 1 to 4, wherein the injection control unit prohibits the first injection valve from opening when a current supply failure to the first heater is diagnosed, and prohibits the second injection valve from opening when a current supply failure to the second heater is diagnosed.
Citation Information
Patent Citations
Urea water injection device
JP2009114978A
Failure determination device of exhaust emission control device of internal combustion engine
JP2016079916A
Electronic control device
JP2017172377A
Addition control device
JP2019143611A
Exhaust gas purification control device
JP2020133501A