Covering plate structure for platform door construction, covering plate for braille blocks, manufacturing method for covering plate for braille blocks, and construction method for platform door
The lining plate structure with internal space forming and coated protrusions addresses the challenge of efficiently installing and removing lining boards and Braille blocks on railway platforms, enhancing work efficiency and reducing construction time.
Patent Information
- Application Number
- JP2020216451
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-25
- Publication Date
- 2024-10-03
- Estimated Expiration
- 2040-12-25
AI Technical Summary
The installation of platform doors on railway platforms requires efficient methods to install and remove lining boards while ensuring the placement of Braille blocks, which are prone to being blown away by wind and require time-consuming restoration, thereby reducing work efficiency and extending construction time.
A lining plate structure with a rectangular shape and internal space forming structure, featuring a combination of lining boards and Braille block lining plates with dome-shaped and half-dome-shaped protrusions, coated with anti-slip paint, to securely fix Braille blocks without tape, allowing for parallel installation and removal of lining boards.
Improves work efficiency by securely fixing Braille blocks, preventing them from being blown away, and allowing for parallel installation and removal of lining boards, thus reducing construction time and maintaining platform usability during construction.
Smart Images

Figure 0007561024000001 
Figure 0007561024000002 
Figure 0007561024000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a covering plate structure for platform door construction used during construction to install platform doors or the like on railway platforms, a covering plate for braille blocks, a manufacturing method for a covering plate for braille blocks, and a construction method for platform doors. [Background technology]
[0002] The installation of platform doors on railway platforms is becoming more common. When installing platform doors on railway platforms, a structure that can withstand the weight of the opening and closing control device for the platform doors and a structure to accommodate the power supply and signal cables to the opening and closing control device are required. Therefore, construction work to install these structures is required on existing platforms.
[0003] The installation of platform doors is carried out late at night when train services are not available. Meanwhile, during hours when train services are available, covering plates are laid over the areas of the platform where construction is taking place. By laying the covering plates, passengers can walk on the platform and use the train in near-normal conditions even during construction.
[0004] The time available for platform door installation work is only about two to three hours, between the last train at midnight and the first train in the morning. Furthermore, if the covering plate is removed at the start of construction and then installed at the end of construction, the time available for actual construction work will be even shorter. Therefore, it is desirable to minimize the man-hours required for installing and removing the covering plate. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2011-6844 A [Patent Document 2] JP 2012-7321 A [Patent Document 3] Patent No. 4604132 [Patent Document 4] Patent No. 4880797 [Patent Document 5] JP 2020-153147 A Summary of the Invention [Problem to be solved by the invention]
[0006] In order to efficiently install and remove the covering plate, a covering plate unit is laid in succession along the length of the platform or track, with multiple thin covering plates, each about 500 mm wide and 2000 to 2500 mm long, lined up across the width of the platform. For the purpose of reducing weight, this covering plate has a structure in which multiple square steel pipes are lined up at intervals and covered with a floor plate on the surface side. A structure in which multiple square steel pipes are lined up forms a space inside the covering plate, making it possible to reduce weight.
[0007] Meanwhile, the Barrier-Free Law requires that platform edge warning blocks called braille blocks (hereafter referred to as warning blocks) be installed at a specified distance from the edge of the platform, even when they are temporary. For this reason, a strip-shaped warning block sheet with multiple consecutive warning blocks is attached with line tape or the like to the surface of, for example, three covering plates aligned across the width of the platform. The reason for attaching the warning blocks with line tape is that it makes it easier to remove and restore them.
[0008] The installation position of warning blocks is stipulated in the Barrier-Free Development Guidelines (hereinafter referred to as the Guidelines) to be at least 800 mm and at most 1000 mm from the end of the platform, so for example, 800 mm from the end of the platform is adopted. For narrow platforms, for example, it is preferable to set the minimum distance of 800 mm within the range of 800 to 1000 mm. Since the width of the platform of warning blocks is stipulated to be at least 400 mm, if the covering plate is 500 mm wide, the warning blocks will be attached across the second and third covering plates from the end of the platform. From the viewpoint of work efficiency, warning block sheets are used, so the warning block sheets are attached across two covering plates.
[0009] However, in strong winds, the wind blowing through the gaps in the lining plate can peel off the line tape, and there is a risk that the warning block sheet will fly away. Furthermore, when laying the warning block sheet during restoration work after rainfall, the lining plate is dried using a gas burner, etc., while the warning block sheet is attached to the lining plate with line tape. This makes restoration work take time, resulting in shorter construction time.
[0010] Furthermore, the covering plates to be removed before construction begins are the first covering plate, as well as the second and third covering plates with warning block sheets straddling them, so all three covering plates must be removed before construction begins and then restored when construction is suspended, resulting in poor work efficiency. Also, flexible construction procedures such as removing the second and third covering plates separately and carrying out construction in each location cannot be adopted, which can result in a prolonged construction period.
[0011] Therefore, an object of the present invention is to provide a covering plate structure for platform door construction, a covering plate for braille blocks, a manufacturing method for a covering plate for braille blocks, and a construction method for platform doors that improve the work efficiency of installing the covering plates during platform door construction. [Means for solving the problem]
[0012] According to a first aspect of the present invention, a track-side covering plate unit is provided that has a rectangular shape having a first width and a first length longer than the first width, and is arranged on the platform tip side with the direction of the first length along the track; A rectangular Braille block covering plate is arranged adjacent to the opposite side of the platform tip of the covering plate unit and has a second width and a second length longer than the second width, The covering plate unit has one covering plate or a plurality of covering plates arranged in parallel along the track, and the first width is a distance from the end of the platform of the braille block prescribed by law, The covering plate and the covering plate for the braille block have an internal space forming structure that forms a space inside and a floor plate that covers the surface of the internal space forming structure, The floor plate of the braille block covering plate has a plurality of braille block floor plates arranged continuously in the second length direction, Each braille block floor plate has a covering plate structure for platform door construction in which braille protrusions are formed on the surface along the long side of the braille block covering plate that contacts the covering plate unit.
[0013] According to a second aspect of the present invention, a step of repeatedly forming M dome-shaped dot protrusions on a floor plate covering a surface of a braille block covering plate by pressing the floor plate using a dome-shaped dot protrusion die for forming M dome-shaped dot protrusions on the surface, the step of repeating this step N times; a step of flattening the tops of the dome-shaped dot-like protrusions by pressing the floor plate on which the dome-shaped dot-like protrusions are formed using a half-dome dot-like protrusion die for flattening the tops of the dome-shaped dot-like protrusions; This method for manufacturing a covering plate for a braille block includes the steps of heating a floorboard having M x N half-dome-shaped dot-like protrusions formed thereon to a high temperature, electrostatically coating the surface of the floorboard by baking paint containing anti-slip particles onto the surface of the floorboard, and further coating the surface with yellow paint to combat color blindness. Effect of the Invention
[0014] According to the present invention, the efficiency of work on the covering plate during platform door construction can be improved. Also, the braille blocks specified by law can be formed on the covering plate. [Brief description of the drawings]
[0015] [Figure 1] This is a cross-sectional view showing an example of the platform structure before construction of platform doors begins. [Diagram 2] FIG. 1 is a cross-sectional view showing an example of a platform structure when conventional platform door construction is suspended. [Diagram 3] This is a side view showing the configuration of the covering plates and covering girders when platform door construction is suspended. [Figure 4] This is a diagram showing an example of the platform structure after completion of platform door construction. [Diagram 5]FIG. 2 is a plan view showing an example of a covering plate structure for platform door construction in this embodiment. [Figure 6] This is a plan view showing the unconnected state of the three covering plates that make up the covering plate structure for platform door construction. [Figure 7] 1 is a plan view and a side view showing an example of the structure of a covering plate of this embodiment. [Figure 8] A diagram showing an example of the platform structure when platform door construction is suspended using the covering plate structure of this embodiment. [Figure 9] 1A to 1C are diagrams showing an example of a manufacturing process for the warning block floor panel of the present embodiment. [Figure 10] This is a plan view showing a covering plate structure that is temporarily installed when conventional platform door construction is suspended. [Figure 11] This is a cross-section of the platform where the first platform doors are installed. [Figure 12] This is a plan view and cross-sectional view of a platform where the first platform doors are installed. [Figure 13] This is a plan view and a cross-sectional view of the platform at step 3. [Figure 14] This is a plan view and a cross-sectional view of the platform at step 4. [Figure 15] This is a cross-section of a platform where the second type of platform doors are installed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Braille blocks include dotted blocks with multiple dot-like projections arranged in a matrix, dotted blocks with inner lines (platform edge warning blocks), and linear blocks with multiple linear projections (guidance blocks). These braille blocks are laid at a specified distance from the end or edge of the platform. In the following explanation, platform edge warning blocks (hereinafter referred to as warning blocks) are used as an example of these braille blocks, but in the present invention, the warning blocks may be replaced with dotted blocks or linear blocks. Accordingly, in the following explanation, the braille block covering plate and braille block floor plate in the claims will be explained using warning block covering plates and warning block floor plates, respectively.
[0017] [Platform before construction of platform doors begins] Fig. 1 is a cross-sectional view showing an example of the structure of a platform before construction of platform doors begins. The example shown in Fig. 1 is the cross-sectional structure of an embankment-type railway platform. In an embankment-type platform, embankment 11 piled up on ground 10 is protected by a retaining wall 13 consisting of multiple blocks installed on the track side 19. RC (Reinforced Concrete) plates 14 are installed on the track side of the retaining wall 13 and embankment 11, asphalt coating 15 and mortar 16 are installed on steel pipe piles (not shown) installed on the opposite side of the platform from the track side, the RC plates 14, and the embankment 11, and a tip tile 18 is installed on the track side on the mortar 16, and a warning block 17 is installed on the platform side.
[0018] In order to install platform doors on an embankment platform, the door opening and closing control device (the platform door) must be installed on the platform, and the power and control signal cables connecting to the door opening and closing control device must be placed under the platform. Therefore, the embankment platform must be modified to be able to withstand the weight of the door opening and closing control device and to allow for the placement of the cables.
[0019] [Platform when platform door construction is suspended] FIG. 2 is a cross-sectional view showing an example of a platform structure when the conventional platform door construction is suspended. The suspension of the platform door construction refers to the time when the platform door construction is suspended from the first train to the last train. When the platform door construction starts, the asphalt coating 15 and the embankment 11 below it are excavated at the position of the steel pipe pile 21 (see FIG. 4) to be installed from the state before the platform door construction starts shown in FIG. 1, and the steel pipe pile 21 is installed. At the same time, the warning block 17, the end tile 18, the mortar 16, and the RC plate 14 are removed from the end of the platform. Furthermore, the embankment 11 below the RC plate 14 is excavated, and a lining girder 20C is installed on the embankment 11 and the retaining wall 13 as a temporary girder to support the lining plate. A plurality of lining girders 20C are installed at predetermined intervals in the longitudinal direction of the platform (perpendicular to the paper). The steel pipe piles 21 are located between a plurality of lining girders 20C provided at predetermined intervals in the longitudinal direction of the platform, and are not visible in the cross-sectional view of FIG. 2 and are therefore indicated by dashed lines.
[0020] As shown in Figure 2, rectangular covering plates P1, P2, and P3 that are long in the longitudinal direction of the platform are placed in parallel at the end of the platform on the track side, along the tracks, and perpendicular to the longitudinal direction of the platform, via height-adjustable girders 12 on top of covering girders 20C installed at predetermined intervals along the longitudinal direction of the platform.
[0021] FIG. 3 is a side view showing the structure of the lining plates and lining girders when the platform door construction is suspended. FIG. 3 is a side view of the platform as seen from the track side. As described above, three lining plates P1, P2, and P3 are placed in parallel in the direction perpendicular to the page on the retaining wall 13 and multiple lining girders 20C provided on the retaining wall 13. Then, each of the lining plates P1, P2, and P3 is fixed to the lining girders 20C by a clamper (not shown). The lining girders 20C are provided on the retaining wall 13, for example, with the H-shaped steel oriented horizontally. The steel pipe piles 21 described above are not visible in the side view of FIG. 3, and are therefore omitted.
[0022] As shown in Figures 1, 2 and 3, the warning block 17, end tile 18, mortar 16 and RC plate 14 at the end of the platform are removed, new lining girders 20C are installed, and lining plates P1, P2 and P3 are placed between the lining girders 20C. With this structure, during construction of the platform doors, the lining plates P1, P2 and P3 are removed after the last train and the platform structure is remodeled, and then lining plates P1, P2 and P3 are laid on the lining girders 20C before the first train to restore the platform, making the removal and restoration of the lining plates easier.
[0023] [Platform after completion of platform door construction] FIG. 4 is a diagram showing an example of the structure of a platform after the completion of the platform door construction. When the platform door construction is completed, the lining girders 20C are installed as cross beams 20 on top of the steel pipe piles 21 and the retaining wall 13 at predetermined intervals along the length of the platform. The cross beams 20 are installed, for example, by laying H-beams horizontally. A cable passage hole 25 is also provided in the cross beam 20. Then, a precast prestressed concrete plate (PPC plate) 22 is installed so as to span a pair of cross beams 20 installed at predetermined intervals along the length of the platform. The PPC plate is the base on which the platform door is installed.
[0024] A warning block 23 and a leading edge tile 24 are provided on the PPC board 22 and the platform's asphalt coating 15 (see Figures 1 and 2), and a door opening / closing control device 31 is installed on the leading edge tile 24. A pair of doors 32 of the platform doors that open and close move out from within the pair of door opening / closing control devices 31 to a closed state, and also move into the pair of door opening / closing control devices 31 to an open state. The door opening / closing control device 31 constitutes the platform doors, and has the function of a housing that houses the doors, and the function of a control device that controls the opening and closing of the doors. The door opening / closing control device 31, which is the platform doors, is fixed to the PPC board 22, which is the platform door installation base, with anchor bolts.
[0025] The structure of the steel pipe piles 21, cross beam 20, and PPC plate 22 newly installed in the platform door construction makes it possible to install the heavy door opening / closing control device 31 at the end of the platform. Also, by providing a cable passage hole 25 in the cross beam 20, it is possible to accommodate the cable 26 connected to the door opening / closing control device 31, minimizing the amount of embankment to be excavated.
[0026] [Conventional covering plate structure] Fig. 10 is a plan view showing the structure of a covering plate that is temporarily installed when conventional platform door construction is suspended. When construction is carried out on a platform, even with the covering plate temporarily installed, it is necessary to lay a warning block 45 having a dot-like protrusion 42 and one linear protrusion 43 on the covering plate at a position 800 to 1000 mm from the end of the platform in accordance with the Barrier-Free Law. When conventional platform door construction is suspended, as shown in Fig. 2, a warning block sheet 27 consisting of multiple warning blocks 45 connected in the platform length direction is attached and fixed to the covering plate with line tape at a position from a position of length D4 = 800 mm from the end of the platform to the inside of the platform (the track side, the opposite side to the end of the platform).
[0027] 10, the widths D1, D2, and D3 of the three covering plates P1, P2, and P3 are all about 500 mm, the length D5 of the warning block in the direction perpendicular to the platform length is about 400 mm, and the position of the warning block 45 is a distance D4 (800 mm) from the end of the platform. Therefore, the warning block sheet 27 is attached across the covering plates P2 and P3.
[0028] By attaching both sides of the warning block sheet 27 to the covering plate with line tape, the warning block sheet can be easily removed when work begins late at night and restored when work ends early in the morning in a short time.
[0029] However, there is a risk that the warning block sheet 27 may fly off onto the platform during strong winds. Furthermore, when it rains, the warning block sheet must be attached with line tape while drying the surface of the covering plate with a gas burner or the like when restoring the warning block sheet after construction is suspended, which lengthens the restoration work time and shortens the actual work time for platform door construction. Furthermore, because the warning block sheet is attached across P2 and P3 out of the covering plates P1, P2, and P3, it is necessary to remove the covering plates P2 and P3 together with the warning block sheet during construction, which makes the platform door construction inefficient.
[0030] Therefore, in an embodiment of the present invention, instead of attaching a warning tile sheet to a covering plate with line tape, the structure of the covering plate is improved to solve the above-mentioned conventional problems.
[0031] [Covering plate structure for platform door construction in this embodiment] Fig. 5 is a plan view showing an example of a covering plate structure for platform door construction in this embodiment. Fig. 6 is a plan view showing the three covering plates constituting the covering plate structure for platform door construction in an unconnected state. The horizontal direction in Fig. 5 is the length direction of the track and platform, and the vertical direction is the width direction of the platform. When the three covering plates P11, P12, and P13 in Fig. 5 are connected in parallel to form a covering plate structure 100, the covering plate structure 100 can be separated into the three covering plates P11, P12, and P13 shown in Fig. 6 when the connections are removed.
[0032] In the example of FIG. 5, the covering plate structure 100 has three covering plates P11, P12, and P13. The covering plate P11 is arranged at the front end of the platform, and the covering plates P12 and P13 are arranged adjacent to the covering plate P11 on the opposite side of the front end of the platform. The track is arranged on the opposite side of the covering plate P11 to the covering plate P12. The covering plates P11, P12, and P13 have, for example, a horizontal length L10 of about 2500 mm or 2000 mm, and vertical widths D11, D12, and D13 of D11=500 mm, D12=300 mm, and D13=500 mm, respectively.
[0033] The covering plate structure 100 in Figure 5 has a track-side covering plate unit (P11+P12) arranged with its length along the track at the end of the platform and having covering plates P11 and P12, and a warning block covering plate P13 arranged on the opposite side of the platform end of the covering plate unit (P11+P12).
[0034] A covering plate unit (P11+P12) having two covering plates P11 and P12 arranged adjacent to each other with their length direction along the track at the end of the platform forms a rectangle having a first width D11+D12 and a first length L10 longer than the first width. As described above, the first width D11+D12 is 800 mm, which is the sum of D11=500 mm and D12=300 mm, and is a length within the range of 800 to 1000 mm from the end of the platform to the warning block as stipulated in the Barrier-Free Law.
[0035] Furthermore, the warning block cover plate P13 is disposed adjacent to the cover plate unit (P11+P12) on the opposite side to the platform tip, and has a second width D13 and a second length L10 longer than the second width. In the example of Fig. 5, the second length L10 is the same as the first length L10, but they do not necessarily have to be the same. For example, the second length and the first length may have a relatively small integer ratio, such as 1:2 or 2:1.
[0036] The lining plates constituting the lining plate units (P11, P12) and the lining plate constituting the warning block lining plate P13 each have an internal space forming structure that forms a space inside, and a plurality of floor plates that cover the surface of the internal space forming structure. The structure of this lining plate will be described in detail in Figure 7.
[0037] As shown in Figures 5 and 6, the multiple floor plates 40 provided on the surface of the warning block lining plate P13 are arranged continuously in the length direction of the warning block lining plate P13. Each floor plate 40 has the same width as the width D13 of the warning block lining plate P13, and the width of the floor plate 40 in the length direction of the lining plate is, for example, 300 to 420 mm. In addition, end connecting members 53 that cover the ends of the internal space forming structure described later are provided on both the left and right ends of the lining plates P11, P12 of the lining plate unit and the lining plate P13 for the warning block. The multiple floor plates and end connecting members 53 of the lining plates P11, P12 are not shown in Figures 5 and 6.
[0038] Each floor plate 40 of the warning block covering plate P13 is a warning block floor plate 41 having a plurality of dot-like protrusions 42 and linear protrusions 43 formed on its surface. In the example of Fig. 5 and Fig. 6, the warning block 45 formed on the surface of the warning block floor plate 41 has a dot-like block 44 in which the dot-like protrusions 42 are formed in a 5 x 5 matrix, and one linear protrusion (inner indication line) 43 arranged on the opposite side of the dot-like block 44 from the platform tip.
[0039] The warning block 45 formed on the warning block floor panel 41 is arranged along the long side E2 of the warning block lining plate P13 that contacts the long side E1 (long side E1 of the lining plate P12) of the lining plate unit (P11+P12) opposite the platform end. By lining the warning block 45 along the long side E2 in this way, the warning block 45 is arranged at a position D11+D12=800 mm from the platform end in the lining plate structure 100. As a result, if the lining plate unit (P11+P12) and the warning block lining plate P13 are arranged in parallel from the platform end, the warning block formed in the length direction of the lining plate structure 100 is automatically arranged at the position (800 to 1000 mm) specified by law from the platform end.
[0040] Five dot-like projections 42 and one linear projection 43 are also formed by press working on the end connection members 53 that cover both ends of the warning block covering plate P13. By forming part of the warning block 45 on the end connection members 53 as well, an uninterrupted belt-like warning block is formed on the multiple warning block covering plates P13 that are connected in the longitudinal direction of the platform.
[0041] The warning block floor plate 41 is a thin plate such as an aluminum plate, and a plurality of dot-like projections 42 and linear projections 43 are formed on the thin plate by die pressing.
[0042] In addition, on the covering plate P11 that constitutes the covering plate unit (P11+P12) located at the end of the platform, a CP line (Color Psychology line) CP is painted along the long side E0 on the end side of the platform. The CP line has the function of informing people with color-blindness of the position of the end of the platform.
[0043] As mentioned above, the total width of the two covering plates P11, P12 that make up the covering plate unit (P11+P12) at the end of the platform is 500+300=800 mm, so when the warning block covering plate P13, which has multiple warning block floor plates 41 on its surface, is placed next to the covering plate P12 on the platform, the warning blocks 45 formed on the surface of the multiple warning block floor plates 41 will be positioned 800 mm from the end of the platform.
[0044] As a result, the lining plate state at the time of interruption of construction can be restored simply by placing and fixing the lining plates P11, P12 constituting the lining plate unit (P11+P12) and the lining plate for warning blocks P13 on the temporary lining girder 20C. In the restoration work of the lining plate, the work of attaching the warning block sheet to the lining plate with line tape as in the past is no longer necessary. In addition, since the multiple dot-like protrusions and one linear protrusion constituting the warning block 45 are formed directly on the multiple warning block floor plates 41 of the lining plate for warning blocks P13, the warning block sheet will not peel off from the lining plate in strong winds as in the past.
[0045] Furthermore, as will be described in detail later, construction can be carried out by removing the covering plates P11 and P12 without removing the warning block covering plate P13, and when restoring the covering plates P11 and P12, the covering plates P11 and P12 can be restored using the warning block covering plate P13, which remains in the correct position, as the reference position. This allows the covering plates P11 and P12 to be restored without conducting a construction gauge survey of the platform to ensure the distance between the vehicle and the covering plate at the end of the platform, which was required when restoring all three covering plates, improving work efficiency.
[0046] In addition, by removing the covering plates P11 and P12 and laying the tip tile, a door opening and closing control device can be installed on the tip tile while leaving the warning block covering plate P13 in place, and by removing the warning block covering plate P13 and laying the warning blocks in parallel, the construction period can be shortened.
[0047] [Covering plate structure] Fig. 7 is a diagram showing an example of the configuration of the lining plate in this embodiment. In Fig. 7, (1) is a plan view of the lining plates P11, P12, and P13, (2) is a right side view of the lining plate, (3) is a cross-sectional view of the lining plate taken along line AA, (4) is a plan view of the end connecting member, (5) is a left side view of the end connecting member, (6) is a front view of the lining plate, and (7) is a cross-sectional view of the lining plate taken along line BB.
[0048] The lining plate shown in Fig. 7 shows the structure of the lining plates P11, P12, and P13 shown in Fig. 5 and Fig. 6. In the case of the lining plates P11 and P12, a floor plate 40 covers the surface of a number of connected square steel pipes, and in the case of the warning block lining plate P13, a warning block floor plate 41 covers the surface of a number of connected square steel pipes. The warning block floor plate 41 has dot-like protrusions and linear protrusions, but these are omitted in Fig. 7. The connected square steel pipes correspond to an internal space forming structure that forms a space inside the lining plate.
[0049] As shown in the plan view of Fig. 7(1), for example, the lining plate has four square steel pipes SP1, SP2, SP3, and SP4 arranged in parallel at a predetermined interval, rectangular connecting members 50 that connect the two square steel pipes SP1 and SP2 on the page and the two square steel pipes SP3 and SP4 below on the front side, and a U-shaped connecting member 52 that connects the two central square steel pipes SP2 and SP3 on the back side. A slit hole 52a is formed in the center of the U-shaped connecting member 52 to insert a crank that fixes the lining plate to the lining girder.
[0050] Furthermore, the lining plate has a pair of rectangular cap-shaped end connection members 53 that cover both ends of the four connected square steel pipes SP1 to SP4. However, the left end connection member 53 is shown in a position where it is not covered by the square steel pipes. The end connection member 53 is fixed to the connected square steel pipes with screws (not shown). In addition, the end connection member 53 has two screw holes 56 for adjusting the height of the lining plate when the lining plate is placed on the lining girder, and a lining plate holding tool hole 57 into which a holding tool is inserted when the lining plate is held. The height adjustment screw hole 56 and the lining plate holding tool hole 57 are also shown in the plan view of the end connection member 53 in Figure 7 (4).
[0051] The covering plate has floor plates 40 or warning block floor plates 41 that cover the surfaces of the four connected square steel pipes SP1 to SP4. The multiple floor plates 40 or warning block floor plates 41 cover the surfaces between the end connection members 53 at both ends of the connected square steel pipes SP1 to SP4. In FIG. 7, one floor plate 40 or warning block floor plate 41 at the left end is shown by a solid line in the plan view (1). The remaining floor plates 40 or warning block floor plates 41 are shown by a dashed line in the B-B cross-sectional view (7). The floor plate 40 or warning block floor plate 41 is fixed to the rectangular connection member 50 with screw holes (not shown) and is fixed to the connected square steel pipes SP1 to SP4.
[0052] The square steel pipes SP1 and SP4 located on the outside of the lining plate are provided with misalignment prevention holes 58. When placed on the lining girder, the difference in rigidity of adjacent lining plates can cause the plates to sag differently, resulting in a difference in the height of the lining plate surface. To prevent this, misalignment prevention pins 59 are inserted into the misalignment prevention holes 58 of the adjacent lining plates.
[0053] The right side view of Fig. 7(2) shows the side of the end connecting member 53 and the side of the square steel pipes SP1-SP4. The left side view of the end connecting member 53 in Fig. 7(5) shows three end connecting member covers 54 formed on the left side of the end connecting member with diagonal lines. In the area of the end connecting member 53 where the end connecting member covers 54 are not formed, end connecting member holes 55 are formed into which connecting members (not shown) for connecting the covering plates in the longitudinal direction are inserted.
[0054] The AA cross-sectional view in Fig. 7 (3) shows cross sections of the four square steel pipes SP1-SP4, the rectangular connecting member 50, the U-shaped connecting member 52, and the floor panel 40 or the warning block floor panel 41. The floor panel 40 or the warning block floor panel 41 has a surface region covering the surfaces of the four square steel pipes SP1-SP4 and a side region partially covering the outer surfaces of the two outer square steel pipes SP1, SP4, and has a shape obtained by flipping the letter C from left to right in the cross-sectional view (3).
[0055] The front view of Fig. 7(6) shows a rectangular parallelepiped end connecting member 53 covering the right end of the square steel pipe SP4, and a floor plate 40 or a warning block floor plate 41 covering the front side of the square steel pipe SP4. The connecting member 50 is also shown by a dashed line. Furthermore, a misalignment prevention hole 58 is shown at the center position of the square steel pipe SP4.
[0056] The B-B cross-sectional view of the covering plate in Fig. 7 (7) shows a cross section of the square steel pipe SP4, end connecting member 53, and floor plate 40 or warning block floor plate 41, and further shows in broken lines the connecting member 50 and the floor plate 40 or warning block floor plate 41, which are not shown in the plan view (1). End connecting member holes 55 formed in the connecting members 53 at both ends are also shown. Furthermore, a misalignment prevention hole 58 is shown in the center position of the square steel pipe SP4.
[0057] [Platform when platform door construction is suspended in this embodiment] Fig. 8 is a cross-sectional view showing an example of the structure of a platform when the construction of the platform door is suspended, using the covering plate structure of this embodiment. The ground 10, embankment 11, height adjustment girder 12, retaining wall 13, asphalt coating 15, steel pipe pile 21, and covering girder 20C in Fig. 8 are the same as those in the conventional example in Fig. 2.
[0058] However, unlike the conventional example of FIG. 2, the covering plate structure placed on the covering girder 20C of FIG. 8 via the height adjustment girder 12 has a covering plate P11 arranged at the end of the platform on the track 19 side, a covering plate P12 arranged adjacent to the covering plate P11, and a warning block covering plate P13 arranged adjacent to the covering plate P12. In the example of FIG. 8, the widths D11 and D13 of the covering plates P11 and P13 are about 500 mm as in FIG. 2, but the width D12 of the covering plate P12 is about 300 mm, unlike FIG. 2. Therefore, the sum D11+D12=D4 of the widths D11 and D12 of the covering plates P11 and P12 arranged on the platform end side is 800 mm, which is within the range of the length from the end of the platform to the warning block set by law.
[0059] 8, the floor plate of the warning block covering plate P13 is a warning block floor plate with dot-like protrusions 42 and linear protrusions 43 formed by die pressing or the like, and the warning block 45 having the dot-like protrusions 42 and linear protrusions 43 is disposed on the long side E2 of the warning block covering plate P13. Since the horizontal length of the warning block 45 is approximately 400 mm, the warning block 45 formed on the warning block floor plate is formed biased toward the long side E2 of the warning block covering plate P13 with a width D13 of 500 mm.
[0060] [Manufacturing process of warning block floor panel of this embodiment] Figure 9 shows an example of a manufacturing process for a warning block floor panel of this embodiment. Figure 9(1) shows, in a clockwise direction, a plan view, a right side view, and a front view of a warning block floor panel 41 before the warning blocks are formed. Figures 9(2) to 9(6) show a plan view, a right side view, and a front view in each process of forming the warning blocks.
[0061] In the process of Fig. 9(1), the warning block floor panel 41 is formed by bending, for example, areas of a predetermined width at the top and bottom ends of a rectangular aluminum plate by 90°. The bent shape in the right side view is the same as the warning block floor panel 41 shown in Fig. 7(3).
[0062] In this embodiment, the warning block floor plate 41 made of the above-mentioned aluminum plate is pressed with a mold to form dot-like protrusions and linear protrusions. As described above, for example, 5 x 5 = 25 dot-like protrusions 42 and one linear protrusion 43 are formed on one warning block floor plate 41 by press working. The covering plate is installed on the platform when construction is suspended, and railway users walk on it, so it is necessary for the surface to be flat.
[0063] Therefore, in this embodiment, first, a dot-like protrusion die (not shown) is used to press five dot-like protrusions adjacent to each other in a straight line, and then a linear protrusion die is used to press one linear protrusion. In this way, by sequentially pressing a dot-like protrusion die less than 25 (five) in multiple steps, deformation of the warning block floor plate due to pressing can be suppressed and a flat shape can be maintained. Specifically, this is as follows.
[0064] In FIG. 9(2), a dome-shaped dot-like protrusion die (not shown) for pressing five dome-shaped dot-like protrusions arranged vertically is used to press the warning block floor plate 41 to form five dome-shaped dot-like protrusions 42d. In the press process, the dome-shaped dot-like protrusion dies (male and female sides) are pressed from the right and left sides of the warning block floor plate 41 shown in the right side view. The dome-shaped dot-like protrusions are semicircular protrusions. As shown in the right side view, the dome-shaped dot-like protrusions 42d are protrusions that are convex on the front side of the warning block floor plate 41 and concave on the back side.
[0065] FIG. 9(3) shows the state where the press working using the five-piece dome-shaped dot-like projection die is repeated four more times, resulting in a total of 25 dome-shaped dot-like projections 42d being formed on the warning block floor panel.
[0066] Next, in FIG. 9(4), a half-dome-shaped dot-like projection die (not shown) that flattens the top of the dome-shaped dot-like projection is used to press the warning block floor panel 41 to form the half-dome-shaped dot-like projection 42 as specified by law. This press processing may be performed five times using a half-dome-shaped dot-like projection die for 5 pieces, or it may be performed once using a half-dome-shaped dot-like projection die for 25 pieces. In this press processing, it is necessary to make the corners between the round flat part at the center of the half-dome-shaped dot-like projection and the inclined part around the flat part round to within 2 mm as specified by law. Since the shape of the dome-shaped dot-like projection makes it easy for pedestrians to slip, it is specified that the half-dome-shaped dot-like projection should be used.
[0067] Furthermore, as shown in the upper right of Figure 9 (4), it is desirable to form a 1 to 2 mm unevenness on the round flat part at the center of the half-dome-shaped dot-like protrusion 42. The half-dome-shaped dot-like protrusion 42 formed on the metal floor plate becomes slippery over time even after powder coating, which will be described later, so forming the unevenness makes it less slippery. Then, yellow paint is applied on top of the powder coating to make it easier for people with weak eyesight to distinguish it, but if the unevenness is painted yellow, even if the yellow paint on the top of the protrusion peels off due to wear by pedestrians, the yellow paint in the recessed part remains, so that the distinguishing ability can be maintained for a long time.
[0068] In FIG. 9(5), a linear protrusion die for press-forming linear protrusion 43 is used to press warning block floor plate 41 to form one linear protrusion 43. According to the law, linear protrusion 43 has a larger width in plan view than dot-like protrusion 42 and the same height as dot-like protrusion 42. Linear protrusion 43 is also a protrusion with a convex surface side and a concave back side of warning block floor plate 41. In the case of linear protrusion 43, as shown in the upper right of FIG. 9(5), it is desirable to form a 1 to 2 mm unevenness in the elongated flat part in the center of linear protrusion 43. The advantage is the same as that of half-dome dome dot-like protrusion 42.
[0069] 9(6), first, the entire surface of the warning block floor panel 41 in plan view is coated with powdered resin for anti-slip purposes. After that, the area of the warning block 45 on the surface of the warning block floor panel 41, where 25 dot-like protrusions 42 and one linear protrusion 43 are formed, is painted yellow for the visually impaired.
[0070] The powder resin coating agent is, for example, saturated polyester resin paint mixed with alumina powder for slip resistance. The specific painting work is electrostatic painting in which the warning block floor board 41 made of aluminum plate, which is the base material, is heated to, for example, about 340°C, and the alumina powder mixed resin paint is sprayed onto the floor board surface. The yellow paint is applied by solvent painting. The painting work is controlled so that the width of the upper plane of the dot-like protrusions and linear protrusions, the overall width, height, and the measurement points of the roundness between the upper plane and the slope based on the law are satisfied, while adjusting and managing the painting time of the alumina mixed resin paint.
[0071] As explained in Fig. 5, in addition to the multiple warning block floor plates 41 on the surface of the warning block covering plate P13, the end connecting members 53 also have dot-like protrusions 42 and linear protrusions 43 formed thereon. The warning block floor plates 41 are, for example, aluminum plates, while the end connecting members 53 are made of iron. The warning block floor plates 41 and the end connecting members 53 are made of different materials, and the plate thicknesses differ accordingly.
[0072] Because the materials and plate thicknesses are different, a different dome-shaped dotted protrusion die, half-dome-shaped dotted protrusion die, and linear protrusion die are used for pressing the warning block floor panel 41 and the end connecting member 53, respectively.
[0073] In the process of press forming five dot-like protrusions and one linear protrusion on end connection member 53, first, five dome-shaped dot-like protrusions are formed by press forming using a five-point dome-shaped dot-like protrusion die, as in Fig. 9. Then, the tops of the five dome-shaped dot-like protrusions are flattened by press forming using a half-dome dot-like protrusion die. Then, one linear protrusion is formed by press forming using a linear protrusion die.
[0074] [Variation 1] In the conventional lining plate structure shown in Figure 10, three lining plates P1, P2, and P3 with a width of 500 mm are arranged in parallel. Using lining plates of the same width and length improves workability and reduces costs.
[0075] In contrast, in the lining plate structure of this embodiment shown in Figures 5 and 6, a lining plate P11 with a width of 500 mm, a lining plate P12 with a width of 300 mm, and a lining plate P13 for warning blocks with a width of 500 mm are arranged in parallel. The lining plates P11 and P13 with a width of 500 mm are structured by connecting four square steel pipes SP1 to SP4 as an internal space forming structure as shown in Figure 7, while the lining plate P12 with a width of 300 mm is structured by connecting, for example, three square steel pipes. Therefore, if the same square steel pipes are used, the rigidity of the narrower covering plate P12 will be lower than the rigidity of the wider covering plates P11 and P13, and when the three covering plates P11, P12, and P13 are placed between the covering girders 20C, the weight of railway passengers will cause the narrower covering plate P12 to deflect more than the wider covering plates P11 and P13.
[0076] To solve this variation in the amount of deflection, in this embodiment, it is preferable to make the plate thickness of the square steel pipe of the narrow lining plate P12 thicker than the plate thickness of the square steel pipe of the wide lining plates P11 and P13. The difference in thickness is preferably selected so that the amount of deflection when placed on the lining girder 20C is approximately the same. It is preferable to make the plate thickness of the square steel pipe of the narrow lining plate thicker than the square steel pipe of the wide lining plate to make the rigidity of both lining plates equal and to make the amount of deflection equal.
[0077] [Variation 2] In the above embodiment, the track-side covering plate unit P11+P12 is configured by connecting a 500 mm-wide covering plate P11 and a 300 mm-wide covering plate P12 in parallel. However, the track-side covering plate unit P11+P12 may be configured by connecting two 400 mm-wide covering plates in parallel. Alternatively, the track-side covering plate unit P11+P12 may be configured by one 800 mm-wide covering plate. In either case, the warning block 45 provided on the warning block covering plate P13 is 800 mm from the leading edge of the platform, which satisfies the legally stipulated position of the warning block from the leading edge of the platform, which is 800 to 1000 mm.
[0078] [Variation 3] In the above embodiment, as shown in Fig. 7, the internal space forming structures of the lining plates P11, P12 and the lining plate P13 for warning blocks are formed by connecting a plurality of square pipes. The internal space forming structure may have the following structure in addition to the structure of connecting a plurality of square pipes.
[0079] For example, as shown in Figures 4, 9, and 10 of Japanese Patent No. 4880797, the internal space forming structure may be a corrugated steel plate in which the cross section in the width direction of the covering plate is repeatedly bent alternately between the bottom surface and the top surface of the covering plate. That is, the corrugated steel plate has a bottom surface portion located on the bottom surface of the covering plate, a top surface portion located on the top surface, and an oblique vertical portion located between the bottom surface and the top surface portion, from the bottom surface to the top surface or from the top surface to the bottom surface. Alternatively, the structure may be a structure in which a plurality of channel steels are connected.
[0080] Alternatively, as described in JP 2020-143147 A, etc., a structure having a box-shaped bottom plate without a lid that forms a space between the bottom and top surfaces of the covering plate, a plurality of vertical ribs extending from the bottom to the top in the length direction of the covering plate within the space, and a plurality of horizontal ribs extending from the bottom to the top in the width direction of the covering plate within the space can also be used as an internal space forming structure.
[0081] [Installation of platform doors using lining plates] Next, we will explain how to use the covering plate structure of this embodiment in platform door installation work, and explain the advantages of the covering plate structure.
[0082] FIG. 11 is a cross-sectional view of a platform on which the first type of platform doors are installed. It is a cross-sectional view at the position of the cross beam 20 shown in FIG. 4. Also, FIG. 12 is a plan view and a cross-sectional view of a platform on which the first type of platform doors are installed. (1) of FIG. 12 is a plan view, and (2) and (3) are cross-sectional views at positions B and A on the plan view. FIG. 12(3) is a cross-sectional view at the same position as FIG. 11, but the door opening and closing control device has been omitted. In the first type of platform doors, both sides of the housing for the door opening and closing control device have a wall structure.
[0083] The main steps in the construction of platform door installation are as follows. The following steps are carried out, for example, in units of 5000 mm in length of the PPC board 22. In this case, each construction team is in charge of the construction in units of 5000 mm in length of the PPC board. In each cross-sectional view, the left side of the retaining wall 13 is the track side 19, and the right side of the retaining wall 13 is filled with embankment 11.
[0084] (Step 1) As described in FIG. 4, steel pipe piles 21 are driven at predetermined intervals (for example, 5 m) along the length of the platform, and cross beams 20 (or lining girders) are laid so that they are cantilevered by the steel pipe piles. For example, the steel pipe piles 21 and cross beam 20 are installed at position A in FIG. 12(1). During construction, this cross beam 20 supports the lining plate together with an intermediate support (not shown) laid at the middle position of the cross beam 20. Specifically, a height-adjusting girder is laid on the cross beam 20, and the lining plate is placed on the height-adjusting girder. The length of the lining plate is, for example, 2500 mm, which is half the 5000 mm interval between the steel pipe piles 21.
[0085] (Step 2) Then, a cable cabinet 29 that houses the cables is anchored to the retaining wall 13 on the track side 19.
[0086] (Step 3) After that, the PPC panels 22 are laid between the cross beams 20. As a result, the cable cabinet 29 is disposed between the retaining wall 13 and the PPC panels 22. The PPC panels 22 are platform panels that support the weight of the platform doors and stress due to wind, etc.
[0087] In steps 2 and 3 above, the covering plates at the work sites are removed and each work is carried out, and when work is suspended, the removed covering plates are replaced in their original positions and restored.
[0088] (Step 4) After the PPC plate 22 is laid on the cross beam 20, the covering plate is removed, and the leading edge tile 24 is laid at the leading edge of the platform, and the warning block 23 is laid at the center of the platform. At the position of the BB cross section in FIG. 12(2), the leading edge tile 24B of 500 mm in the width direction of the platform and the warning blocks 23A and 23B of 300 mm and 400 mm are laid. At the position of the AA cross section in FIG. 12(3), the leading edge tile 24A of 800 mm and the warning block 23B of 400 mm are laid. The 300 mm warning block 23A has a dotted block 44, and the 400 mm warning block 23B is a warning block 45 (FIG. 6) having a dotted block 44 and a linear protrusion (inner indication line) 43. The leading edge tile and warning block 23 are on the same plane as the surface 28 of the platform.
[0089] (Step 5) Once the leading edge tile and warning block have been laid, as shown in Figure 11, the door opening / closing control device 31, which is the platform door, is installed on top of the 800 mm leading edge tile 24A at the AA cross section. Specifically, the door opening / closing control device 31 is fixed to the PPC plate 22 with anchor bolts or the like. In addition, power and signal cables are laid inside the cable cabinet 29. Once the leading edge tile and warning block have been laid, the covering plate will not be restored.
[0090] As shown in Fig. 11, the door opening / closing control device 31 is installed on the platform side of the vehicle construction gauge position 62. This is because it is prohibited to construct buildings in the space on the track side of the vehicle construction gauge position 62 in order to eliminate any impact on vehicles running along the platform. By observing the vehicle construction gauge position, the door opening / closing control device 31 is installed at a position, for example, 390 mm from the edge of the platform, so the width of the PPC board 22 that supports its weight, wind stress, etc. is set to, for example, 700 mm.
[0091] FIG. 13 shows a plan view and a cross-sectional view of the platform in step 3. As in FIG. 12, FIG. 13(1) is a plan view, and (2) and (3) are cross-sectional views at positions B and A in the plan view. In step 1, lining plates P11, P12, and P13 are laid on the cross beam 20 from the track 19 side via a height-adjusting beam (not shown). In addition, at position A in the plan view, an additional lining plate P14 is also laid to lay the steel pipe pile 21. As described above, the steel pipe pile 21 and the cross beam 20 are laid at intervals of, for example, 5000 mm, while the lining plates P11, P12, and P13 are, for example, 2500 mm long and are laid between the cross beams 20 spaced at intervals of 5000 mm and the intermediate supports at the midpoints between the cross beams.
[0092] After the covering plates are laid, in step 2, the covering plates P11 and P12 are temporarily removed, and the cable cabinet 29 is laid on the retaining wall 13. Since the cable cabinet 29 is about 500 mm wide, if the covering plates P11 and P12 (total width 800 mm) are temporarily removed, the cable cabinet 29 can be laid without removing the covering plate P13 and leaving it in place. After the cable cabinet 29 is laid, the covering plates P12 and P11 are restored adjacent to the covering plate P13 that has not been removed. By not removing the covering plate P13, the covering plates P12 and P11 can be restored based on the position of the covering plate P13, and the work of measuring the platform construction limit distance and determining the positions of the covering plates P12 and P11 can be eliminated. The platform construction limit distance is the distance at which the end of the platform can be constructed from the side of the train. In the past, when a warning block sheet was attached across the covering plates P2 and P3, if the warning block sheet was peeled off and the covering plates P2 and P3 were removed together with P1, it was necessary to measure the platform construction limit distance and determine the position of the covering plate at the end of the platform when the covering plate was restored. When the warning block sheet was peeled off, the positions of the covering plates P2 and P3 could shift, so both covering plates P2 and P3 were removed.
[0093] Similarly, in step 3, the covering plates P11, P12 (total width 800 mm) are temporarily removed, and for example, a 700 mm wide PPC plate 22 is laid on top of the cross beams 20 spaced 5000 mm apart. In this case, too, if the covering plates P11, P12 (total width 800 mm) are temporarily removed with respect to the 700 mm width of the PPC plate 22, the 700 mm wide PPC plate 22 can be laid while leaving the covering plate P13 in place, and work efficiency can be improved as in step 2.
[0094] Figure 14 is a plan view and a cross-sectional view of the platform in step 4. Figure 14 (1) is a plan view, and (2) and (3) are cross-sectional views at positions B and A on the plan view. In step 4, the covering plates P11 and P12 are removed, and a leading edge tile 24A is laid in the fixed fence area RG_A at position A on the plan view, and a leading edge tile 24B and a warning block 23A are laid in the boarding / alighting area RG_B at position B. After that, the covering plates P11 and P12 are not restored.
[0095] At this time, the covering plate P13 may not be removed, and the installation of the warning block 23B at the position of the covering plate P13 may be postponed. Then, when the leading edge tile 24A is laid in at least the fixed fence area RG_A at position A, the door opening / closing control device 31 can be installed on the leading edge tile 24A. Therefore, the installation work for the door opening / closing control device can be carried out in parallel with the work of removing the covering plate P13 and laying the warning block 23B, which increases the flexibility of the work. Alternatively, the installation work for the door opening / closing control device 31 may be carried out first, and the installation work for the warning block 23B may be carried out later. Such flexibility in the work can shorten the construction period.
[0096] Fig. 15 is a cross-sectional view of a platform on which a second type of platform door different from the above is installed. The second type of platform door in Fig. 15 (door opening / closing control device 31_2) differs from the first type of platform door in Fig. 11 (door opening / closing control device 31) in that the walls of the housing that houses the doors are made skeletonized, making it lighter. Due to the lighter weight, the structure for fixing the door opening / closing control device 31_2 differs from that in Fig. 11.
[0097] That is, the door opening / closing control device 31 in FIG. 11 adopts a structure of a cross beam 20 attached to a steel pipe pile 21 and a high-strength PPC plate 20 to support its weight and wind stress on the wall of the housing. In contrast, the door opening / closing control device 31_2 in FIG. 15 adopts a structure of a terra cell 61 with a width of 1000 mm laid on the embankment 11 and an RC plate (reinforced concrete plate) 60 with a width of 1400 to 1700 mm, for the reason of being lightweight and reducing wind stress due to the skeleton wall of the housing. As a result, the door opening / closing control device 31_2 is supported by the weight of the wide RC plate 60. And, for example, the covering plate structure adopts four plates with widths of 500 mm, 300 mm, 500 mm, 300 mm (total 1600 mm) or 500 mm, 300 mm, 500 mm, 500 mm (total 1800 mm) from the end of the platform. For this reason, in the laying work of the terracell 61, the second to fourth covering plates from the end of the platform will be removed, and in the laying work of the RC plate 60, all four covering plates will be removed.
[0098] However, in the construction of the cable cabinet 29, as in FIG. 13, only the lining plates P11 and P12 at the end of the platform can be removed, and the remaining lining plates P13 and P14 can be left in place. Similarly, the construction of the end tile 24A in the fixed fence area on the RC plate 60 and the construction of the end tile 24B and the warning block 23A in the entrance / exit area can be performed by removing the lining plates P11 and P12. Then, the construction of installing the door opening / closing control device 31_2 on the end tile 24A and the construction of installing the warning block 23B by removing the lining plate P13 can be performed in parallel or in any order. Therefore, even in the construction of installing platform doors using the door opening / closing control device of FIG. 15, the lining plate structure of this embodiment can be used to improve the efficiency of the removal of the lining plates and the restoration work, and to shorten the construction period.
[0099] The above-mentioned construction can be carried out by removing the covering plates P11 and P12 without removing P13, even if the covering plates P11 and P12 are the same 400 mm.
[0100] [summary] (1) In the covering plate structure of this embodiment, the arrangement of the covering plates is changed so that the covering plate P11 at the end of the platform is 500 mm wide and the second covering plate P12 is 300 mm wide. The width of the covering plate unit (P11+P12) having these two covering plates is 800 mm, which complies with the provision of the Barrier-Free Law that the warning block position is 800 mm or more, and at most 1000 mm, from the end (or edge) of the platform. The third covering plate P13 is a warning block covering plate covered with a plurality of continuous warning block floor plates in which a plurality of dot-like protrusions and one linear protrusion are directly formed by die pressing on the floor plate. As a result, the warning block is laid in the position specified by the Barrier-Free Law simply by installing the third covering plate P13 in parallel with the covering plate unit (P11+P12). This eliminates the need to lay a warning block sheet as in the past, and improves the work efficiency of restoration and removal of the covering plate during construction interruption and re-opening. In addition, the warning block sheets will not fly away due to strong winds.
[0101] In the covering plate structure of this embodiment, the rectangular covering plate unit (P11+P12) and the warning block covering plate P13 are arranged along the length of the railway line. Then, a plurality of dot-like protrusions and one linear protrusion (or a plurality of dot-like protrusions, or a plurality of linear protrusions) are formed by die pressing on each of the plurality of warning block floor plates that are continuously covered in the length direction of the warning block covering plate P13. This allows the flatness of each warning block floor plate to be maintained, and the overall flatness of the warning block covering plate P13 covered by the plurality of warning block floor plates can be obtained.
[0102] In contrast, when the warning block covering plate P13 is composed of a single steel plate, if the surface shape of the warning block sheet having multiple dot-like protrusions and one linear protrusion is formed on the surface of a single very long steel plate by mold press processing, it becomes extremely difficult to maintain the flatness of the long steel plate.
[0103] For the above reasons, the structure in which a rectangular covering plate arranged along the length of the track is covered with multiple floor plates that are continuous along the length of the track can, firstly, flatten the surface of the entire covering plate, firstly, form the surface shape of the warning block sheet on each of the multiple floor plates by die pressing, so that each floor plate can be flattened, and secondly, the surface of the entire warning block covering plate covered by the multiple floor plates can also be flattened. Therefore, the covering plate structure of this embodiment is suitable for forming the surface shape of a long warning block sheet arranged along the track.
[0104] (2) The covering plates P11, P12 and the warning block covering plate P13 of this embodiment are constructed by covering an internal space forming structure made of multiple connected square steel pipes with multiple floor plates 40 or warning block floor plates 41, so that an internal space is formed and the weight is reduced. Therefore, even though the covering plate is a rectangular plate that is long in the length direction of the platform, it is lightweight, so that the work of restoring and removing the covering plate when construction is suspended and resumed can be made more efficient.
[0105] (3) Also, in relation to the description of (1), the warning block covering plate P13 of this embodiment is configured by covering an internal space forming structure with a plurality of warning block floor plates 41. The warning block floor plates 41 are each formed by die pressing a plurality of dot-like protrusions and one linear protrusion on the surface of each floor plate. When the dot-like protrusions 42 and linear protrusions 43 are die pressed, the processed plate is likely to warp or bend. However, if a relatively small-sized floor plate is formed by dividing a single warning block covering plate P13 in the length direction, the warping or bending caused by die pressing can be suppressed to an acceptable level.
[0106] Furthermore, the warning block floor panels need to be coated with powder resin paint to prevent slipping, and with yellow paint for color-blind people. For the coating, the base material, the warning block floor panels, is heated to a high temperature and then sprayed with powder resin paint. In this case, the floor panels are relatively small in size, so the distortion and bending of the floor panels that occurs during the heating process can be suppressed to an acceptable level.
[0107] Therefore, the covering plate covered with the small-sized floor plate in this embodiment has a structure suitable for directly processing the multiple dot-like projections 42 and one linear projection required for the warning block into the floor plate. In other words, in this embodiment, by using a small-sized floor plate that covers the internal space forming structure as the warning block floor plate, it is possible to form the warning block by die pressing, electrostatic painting, etc.
[0108] In addition, by forming fine irregularities on the top surface of the half-dome-shaped dot-like protrusions, the warning blocks can be made less slippery when combined with powder coating, even if the floor plate is made of steel. In addition, by painting the fine irregularities yellow, even if there is wear from pedestrians, the yellow paint will only peel off on the convex surfaces of the irregularities, and the yellow paint on the concave surfaces will not peel off, so the lifespan of the yellow paint for weak eyesight can be extended.
[0109] (4) In this embodiment, the lining plate unit is composed of two lining plates P11 and P12 of different widths, and the number of square steel pipes, which are the internal space forming structures of the second lining plate P12, which is narrower, is made smaller than the number of square steel pipes of the first lining plate P11, which is wider. Accordingly, the plate thickness of the square steel pipes of the second lining plate P12 is made thicker than the plate thickness of the square steel pipes of the first lining plate P11. This allows the hardness of the first and second lining plates to be approximately the same, and the amount of deflection when placed side by side on the lining girder 20C can be made approximately the same.
[0110] (5) In the process of forming the warning block by die pressing of the floorboard, the floorboard is pressed with a dome-shaped die to form dome-shaped dots, and then pressed with a half-dome-shaped die to form half-dome-shaped dots. Furthermore, 5 x 5 = 25 dots are processed by repeatedly pressing with a die for fewer than 25 dots, for example, 5 dots. Therefore, it is easier to process the warning block than pressing with a die for 25 dots.
[0111] In this embodiment, a CP line is painted along the long side of the first covering plate at the end of the platform, making it easy for people with color-blindness to identify the end of the platform.
[0112] (6) The aforementioned Patent Document 1 (JP Patent Publication 2011-6844A) states that "it is also possible to make the panel body itself uneven to serve as a warning display section." However, the platform component panel 1 described in Patent Document 1 is a rectangular covering plate that is long in the width direction of the platform and is arranged in the length direction of the platform, and is not a rectangular covering plate that is long in the length direction of the platform and is arranged in parallel in the length direction of the platform, as in the covering plate of the covering plate structure of this embodiment, so that the workability of removing and restoring the covering plate is extremely low. In addition, since the platform component panel 1 is a single steel plate, it is difficult to obtain flatness if multiple dot-like protrusions are directly formed by die pressing. In this embodiment, in a covering plate structure in which multiple rectangular covering plates that are long in the length direction of the platform are arranged in parallel in the width direction of the platform, a warning block can be installed at a position from the end of the platform as specified by law by simply arranging the covering plate unit (P11+P12) and the warning block covering plate P13 at the end of the platform, and problems such as scattering of warning block sheets are solved.
[0113] (7) The covering plate structure of this embodiment has a covering plate unit (P11+P12) with a total width of, for example, 800 mm and a warning block covering plate P13, so that in platform door construction, the two covering plates P11, P12 of the covering plate unit can be removed and the warning block covering plate P13 can be left in place without being removed, allowing cable cabinets and PPC plates to be installed, improving construction efficiency. Also, after removing the covering plate unit (P11+P12) and laying the tip tiles, the door opening / closing control device installation work and the warning block 23B installation work can be carried out in parallel, or in any order, thereby shortening the construction period. [Explanation of symbols]
[0114] 10: Ground 11: Embankment 13: Retaining wall 13a: Emergency exit 14: RC plate 15: Asphalt coating 16: Mortar 17: Warning block 18: Tip tile 19: Track side 12: Height adjustment beam 20: Cross beam 20C: Covering girder (temporary girder) 21: Steel pipe pile 22: PPC board 23: Warning block 24: Tip tile 25: Cable hole 26: Cable 27: Warning block sheet 28: Home surface 29: Cable cabinet 30: Platform door 31: Door opening / closing control device (platform door housing) 31_2: Door opening / closing control device 32: Door P1, P2, P3: Covering plate 100: Lining plate structure P11,P12,P13: Lining plate P11 and P12: Covering plate unit P13: Covering plate for warning block P13: Covering plate for warning block D11, D12, D13: Width 40: Floorboard 41: Warning block floorboard 42: Point-like protrusion 42d: Dome-shaped point-like protrusion 43: Linear projection 44: Point block 45: Warning block E0, E1, E2: Long sides SP1, SP2, SP3, SP4: Square steel pipes 50, 52: Connecting member 52a: Hole for fixing the cover plate 53: End connection member 54: End connection member cover 55: End connection member hole 56: Height adjustment screw hole 57: Lining plate holding tool hole 58: Misalignment prevention hole 59: Misalignment prevention pin 60: RC board 61: Terracel 62: Vehicle construction clearance position
Claims
1. A track-side covering plate unit that is rectangular and has a first width and a first length that is longer than the first width, and is disposed on the platform tip side with the direction of the first length aligned along the track; A rectangular Braille block covering plate is disposed adjacent to the opposite side of the platform tip of the covering plate unit and has a second width and a second length longer than the second width, The covering plate unit has one covering plate or a plurality of covering plates arranged in parallel along the track, and the first width is a distance from the end of the platform of the braille block prescribed by law, The covering plate and the covering plate for the braille block have an internal space forming structure that forms a space inside and a floor plate that covers the surface of the internal space forming structure, The floor plate of the braille block covering plate has a plurality of braille block floor plates arranged continuously in the second length direction, Each braille block floor plate has a covering plate structure for platform door construction in which braille protrusions are formed on the surface along the long side of the braille block covering plate that contacts the covering plate unit.
2. The covering plate structure for platform door construction according to claim 1, wherein each of the plurality of braille block floor panels is a metal plate having a predetermined thickness, and the braille protrusions are formed by die pressing into the metal plate.
3. 3. A covering plate structure for platform door construction as described in claim 2, wherein the Braille protrusions of the metal plate have unevenness formed on the surface of the protrusion top, and a first coating of paint containing anti-slip particles and a yellow coating on the first coating are applied to the surface of the area in which the Braille protrusions are formed.
4. The internal space forming structure has the length of the long side of each of the covering plate and the covering plate for the braille block, and has a plurality of square tubes arranged at predetermined intervals in the width direction of each of the covering plate and the covering plate for the braille block, and a connecting member that connects the plurality of square tubes, The covering plate structure for platform door construction according to claim 1, wherein the surfaces of the plurality of rectangular tubes are covered with the floor plate.
5. The covering plate unit has the plurality of covering plates, The plurality of lining plates include a first lining plate having M of the plurality of rectangular tubes, and a second lining plate having N of the plurality of rectangular tubes, the N being less than M, and having a width narrower than that of the first lining plate; The covering plate structure for platform door construction according to claim 4, wherein the plate thickness of the plurality of square tubes of the second covering plate is thicker than the plate thickness of the plurality of square tubes of the first covering plate.
6. A rectangular braille block covering plate having a first width and a first length longer than the first width, the first length of which is arranged along the track on the platform end side of a track side covering plate unit, the track side covering plate unit being arranged adjacent to the opposite side of the platform end, and having a second width and a second length longer than the second width, The covering plate unit has one covering plate or a plurality of covering plates arranged in parallel along the track, and the first width is a distance from the end of the platform of the braille block prescribed by law, The braille block covering plate has an internal space forming structure that forms a space inside, and a floor plate that covers the surface of the internal space forming structure, The floor plate of the braille block covering plate has a plurality of braille block floor plates arranged continuously in the second length direction, Each braille block floor plate is a covering plate for platform door construction, in which braille protrusions are formed on the surface along the long side of the covering plate for braille blocks that contacts the covering plate unit.
7. A method for manufacturing a covering plate structure for platform door construction according to claim 1, A process of repeatedly performing N times a press process using a dome-shaped dot protrusion die for forming M dome-shaped dot protrusions on a floor plate covering a surface of the braille block covering plate to form the M dome-shaped dot protrusions on the surface; a step of flattening the tops of the dome-shaped dot-like protrusions by pressing the floor plate on which the dome-shaped dot-like protrusions are formed using a half-dome dot-like protrusion die for flattening the tops of the dome-shaped dot-like protrusions; This method for manufacturing a covering plate structure for platform door construction includes the steps of: heating a floor panel having M x N half-dome-shaped dot-like protrusions formed thereon to a high temperature; electrostatically coating the surface of the floor panel by baking paint containing anti-slip particles; and further coating the surface with yellow paint to combat color blindness.
8. A first step of covering the surface of the front end of the platform with the platform door construction covering plate structure according to claim 1; A second step of temporarily removing the covering plate unit while covering the Braille block covering plate, laying a cable cabinet or a platform door installation board inside the platform under the area covered by the covering plate unit, and covering the covering plate unit in its original position; A third step of removing the covering plate unit while covering the braille block covering plate, and laying a tip tile on the platform surface in the area covered by the covering plate unit; A fourth step of installing the platform door on the tip tile; and a fifth step of removing the braille block covering plate and laying warning tiles on the platform surface in the area where the braille block covering plate was covered. A construction method for platform doors, wherein the fourth and fifth steps are carried out at any time after the third step.
Citation Information
Patent Citations
JP1973080797A
Lightweight lining board
JP1995229105A
Pedestrian guide block and its manufacturing
JP1997250114A
Lining board and execution therefor
JP1999200309A
Guide sign
JP2007016439A