In-building ceiling transport system and method for installing the in-building ceiling transport rail

By installing ceiling conveyance rails directly on building frames without dedicated hanging bases and using movable unit frames, the system addresses the inefficiencies of conventional methods, enabling faster installation, accurate adjustments, and flexible layout changes, thus improving production efficiency and reducing construction time.

JP7564005B2Active Publication Date: 2024-10-08SHIMIZU CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2021018139
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-08
Publication Date
2024-10-08
Estimated Expiration
2041-02-08

AI Technical Summary

Technical Problem

Conventional ceiling conveyance rail installation in building structures, particularly in clean rooms of semiconductor factories, requires completion of ceiling panels and dedicated hanging bases, prolonging construction periods and reducing production efficiency due to the need for precise installation and adjustments, which are time-consuming and difficult to change.

Method used

The system installs ceiling conveyance rails directly on building frames without dedicated hanging bases, allowing for installation before ceiling panels are completed, and enables easy, accurate position adjustments and changes by using unit frames supported by sidebars that can be moved and adjusted in multiple directions.

Benefits of technology

This approach shortens construction periods, enhances production efficiency by allowing early operation of semiconductor devices, facilitates easy layout changes, and reduces the need for additional construction work, while maintaining cleanliness and reducing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007564005000001
    Figure 0007564005000001
  • Figure 0007564005000002
    Figure 0007564005000002
  • Figure 0007564005000003
    Figure 0007564005000003
Patent Text Reader

Abstract

To provide a ceiling carrying system inside a building which dispenses with a suspension base exclusive for a ceiling carrying rail, allows installation of the ceiling carrying rail irrespective of construction of the exclusive suspension base and ceiling panels, reduces a construction period, allows efficient and simple work for orbit correction and highly accurate position adjustment of the ceiling carrying rail, and allows easy change of a device layout.SOLUTION: A ceiling carrying system inside a building comprises a suspended ceiling 10 having ceiling panels 12 supported by a substrate frame 11 suspended to the skeleton top face of a building, multiple side bars 3 supported by the substrate frame 11 and extending in a second direction Y with an interval in a first direction X, and unit frames 4 unitized in a connected state of a ceiling carrying rail 2 from above and extending in the first direction X. The unit frame 4 is positioned on the multiple side bars 3, movably provided in the first direction X, the second direction Y and a vertical direction Z. The ceiling carrying system is supported in a suspended state to the side bars 3 at a positionally adjusted prescribed position.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an in-building ceiling transport system and an installation method for an in-building ceiling transport rail. [Background technology]

[0002] Conventionally, in clean rooms in semiconductor factories, ceiling transport equipment is known that automatically transports wafers using a ceiling transport rail installed on the ceiling surface as a track to store the wafers as they are moved between semiconductor devices.

[0003] Here, suspended ceilings are often used as ceilings for buildings such as clean rooms. Such suspended ceilings are configured with a number of rafters arranged in parallel at a given interval in one horizontal direction, a number of rafter supports arranged in parallel at a given interval in the other horizontal direction perpendicular to the rafters and integrally connected to the plurality of rafters, a number of suspension bolts (suspension members) each having a lower end connected to the rafter support and an upper end fixed to a superstructure (building frame) such as flooring on the upper floor, and a ceiling panel integrally attached to the underside of the rafters by screws or the like to form the ceiling surface of the lower floor (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2013-177801 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, the conventional method of installing ceiling transport equipment in a ceiling structure as shown in Patent Document 1 has the following problems. That is, conventional ceiling conveyor rails are installed on ceiling panels, or a dedicated suspension point for the ceiling conveyor rail is separately installed on the top surface of the ceiling frame, such as the ceiling panel base material. Therefore, the construction of the ceiling conveyor equipment is started after the construction of the ceiling panel and the dedicated suspension point is completed, which causes a problem of a long construction period. For example, as mentioned above, when it is adopted in a clean room in a semiconductor factory, there are cases where the operation time of semiconductor devices is earlier than the completion of the ceiling conveyor equipment. In other words, until the ceiling conveyor equipment is completed, workers have to transport using carts, etc., which reduces production efficiency, and there is room for improvement in this respect.

[0006] In addition, in the conventional construction, high accuracy is required for the installation position of the storage unit relative to the semiconductor device, so high accuracy is also required for the installation of the ceiling transport rail of the ceiling transport equipment. Therefore, the accuracy of the ceiling transport rail is determined by the positional relationship between the ceiling frame and the hanging bolt, which is the suspension base, so it takes a lot of time to adjust the position. Moreover, since the position adjustment work needs to be done at the same time as the construction of the ceiling transport rail, it is difficult to reduce the time required for one work process.

[0007] In addition, in the case of overhead transport equipment in semiconductor factories, the layout of the semiconductor device is often changed, and the rail tracks must be corrected and precisely adjusted to match the layout change. In other words, to change the position of the overhead transport rail, it is necessary to loosen the fixing bolts of the raceway attached to the ceiling frame, adjust the position, and then retighten all the bolts to fix them in place. Furthermore, if major changes were to be made to the layout, the system would need to be removed from the raceway itself, necessitating larger-scale construction work, including adjustment work.

[0008] The present invention has been made in consideration of the above-mentioned problems, and aims to provide an in-building ceiling conveying system and an in-building ceiling conveying rail construction method that eliminate the need for a dedicated hanging point for the ceiling conveying rail, and that allows the ceiling conveying rail to be installed without the need for a dedicated hanging point or the construction of a ceiling panel, thereby shortening the construction period. Another object of the present invention is to provide an in-building ceiling conveying system and an installation method for an in-building ceiling conveying rail that can efficiently and simply correct the trajectory of the ceiling conveying rail and adjust its position with high precision. It is still another object of the present invention to provide an in-building ceiling transport system and an in-building ceiling transport rail installation method that allow easy changes to the equipment layout. [Means for solving the problem]

[0009] In order to achieve the above-mentioned object, the indoor ceiling transport system of the present invention is an indoor ceiling transport system equipped with a ceiling transport rail for transporting items to the top surface of a building's structure, comprising a plurality of side bars supported on the top surface of the structure, extending in a second direction perpendicular to a first direction in which the ceiling transport rail extends, and spaced apart in the first direction, and a unit frame in which the ceiling transport rails are unitized by connecting them from above and extending in the first direction, wherein the unit frame is arranged to be movable in the first direction, the second direction, and the up and down directions relative to the plurality of side bars, and is supported in a suspended state relative to the side bars at a predetermined position that has been adjusted in position.

[0010] In addition, the construction method for an indoor ceiling transport rail of the present invention is a construction method for an indoor ceiling transport rail, which installs a ceiling transport rail for transporting goods on the top surface of a building's structure, and is characterized by having the steps of: providing a plurality of side bars supported on the top surface of the structure, extending in a second direction perpendicular to the first direction of the ceiling transport rail, and spaced apart in the first direction; providing a unitized transport rail unit connected from above to the ceiling transport rail by a unit frame extending in the first direction; and placing the unit frame equipped with the ceiling transport rail above the plurality of side bars and moving it in the first direction, the second direction, and up and down directions to adjust its position, and supporting it in a suspended state relative to the side bars at a predetermined position.

[0011] In the present invention, the side bar that supports the unit frame that unitizes the ceiling conveyor rail in a suspended state is supported on the top surface of the structure, so that when the construction of the top surface of the structure is completed, the side bar can be attached to the top surface of the structure and the ceiling conveyor rail can be constructed together with the unit frame. Therefore, a dedicated suspension point for the ceiling conveyor rail is not required, and the ceiling conveyor rail can be installed regardless of the construction of the dedicated suspension point or ceiling panel. In other words, the ceiling conveyor rail can be constructed before the completion of the dedicated suspension point or ceiling panel, shortening the construction period.

[0012] In addition, in the present invention, the unit frame is arranged in a state where it can be guided to the multiple side bars, so that the unit frame can be easily moved in the first and second directions relative to the side bars, and can also be moved up and down. In this way, the position of the unit frame can be adjusted efficiently and easily with high accuracy, and the construction period can be shortened.

[0013] In addition, in the present invention, in the case of minor changes to the device layout, the unit frame can be released from its fixed position relative to the side bar to adjust the position of the unit frame in the first direction, the second direction, and the up-down direction. Even in the case of major layout changes that exceed the range of movement of the unit frame relative to the side bar, the construction period required for changing the device layout can be extended by advancing the construction of the ceiling transport rail. In this way, the present invention can provide high adaptability to changes in the device layout.

[0014] Furthermore, in the present invention, the side bars are attached to the ceiling of the building frame or the ceiling space, which is the top surface of the building frame, so compared to the conventional case where the ceiling transport rail is attached to a ceiling panel or a dedicated hanging point, the side bars can be installed at any height in the vertical direction. Therefore, for example, if there is dead space in the ceiling, it is possible to place the side bars and ceiling transport rail in this dead space, making effective use of the space.

[0015] In addition, the indoor ceiling transport system of the present invention may be characterized in that a suspended ceiling having ceiling panels supported by a suspended base frame is provided on the top surface of the structure, and the side bars are supported by the base frame.

[0016] In this case, since the side bars are supported by the base frame, which is the top surface of the structure, the side bars can be attached to the base frame once construction of the base frame is complete. Therefore, the ceiling transport rails can be installed on the side bars via the unit frames, and the ceiling transport rails can be installed before the ceiling panels installed on the base frame are completed, shortening the construction period.

[0017] In addition, the indoor ceiling transport system of the present invention may be characterized in that the side bar is provided with a height adjustment member for adjusting the vertical height relative to the ceiling surface of the structure.

[0018] In this case, when the unit frame is suspended from and supported by the side bar, the vertical position of the unit frame can be easily adjusted by using the height adjustment member.

[0019] In addition, the indoor ceiling transport system of the present invention may be characterized in that the unit frame is formed in a frame shape within a horizontal plane.

[0020] In this case, the frame-shaped unit frame is placed in a stable position relative to the multiple side bars, so that the unit frame can be moved with high precision by being guided by the side bars when adjusting its position.

[0021] In addition, the intra-building ceiling transport system of the present invention may be characterized in that the side bars are arranged in multiple tiers in the vertical direction, the lower tier side bar is suspended from the upper tier side bar directly above or from the top surface of the structure by a guide hanging material, and the ceiling transport rail is provided on the lower tier side bar.

[0022] In this case, it is possible to provide multiple layers of ceiling transport rails in the vertical direction. Furthermore, as mentioned above, when the side bars and ceiling conveying rails are arranged in the dead space in the ceiling pocket to make the ceiling conveying rails multi-layered, there is no need to raise the ceiling panel to the position of the upper ceiling conveying rail as in the past, and then install the ceiling panel, thereby preventing an increase in floor height.

[0023] In addition, the construction method for an in-factory ceiling transport system of the present invention includes a step of suspending a base frame from the top surface of the building's structural body and providing a suspended ceiling with ceiling panels supported by the base frame, and the multiple side bars may be provided on the base frame.

[0024] In addition, the construction method of the in-factory ceiling transport system of the present invention may be characterized in that a transport cart capable of mounting the transport rail unit and running on the floor is provided, and the transport rail unit is transported below the side bar at the installation position by the transport cart.

[0025] In this case, when installing the conveying rail unit in a designated position on the ceiling, the conveying rail unit can be loaded onto a transport cart and transported, and can be easily transported below the side bar at the installation position, thereby improving construction efficiency. Effect of the Invention

[0026] According to the in-building ceiling conveying system and in-building ceiling conveying rail construction method of the present invention, a dedicated suspension point for the ceiling conveying rail is not required, and the ceiling conveying rail can be installed without the need for a dedicated suspension point or the construction of a ceiling panel, thereby shortening the construction period. Furthermore, according to the present invention, trajectory correction and highly accurate position adjustment of the ceiling transport rail can be performed efficiently and with simple operations. Furthermore, according to the present invention, the layout of the device can be easily changed. [Brief description of the drawings]

[0027] [Figure 1] 1 is a side view showing the configuration of an intra-building ceiling transportation system according to a first embodiment of the present invention; [Diagram 2] FIG. 13 is a perspective view showing a construction state in which the transport rail unit is assembled to the side bar. [Diagram 3] 11 is a perspective view showing a state in which the transport rail unit is being transported using a transport cart. FIG. [Figure 4] FIG. 2 is a perspective view showing a configuration of a transport cart. [Diagram 5] FIG. 11 is an oblique view showing a method for adjusting the position of a conveying rail unit, where (a) is a diagram before movement, (b) is a diagram showing the state after it has been moved in the second direction Y, and (c) is a diagram showing the state after it has been moved in the first direction X. [Figure 6]13 is a side view showing the configuration of an intra-building ceiling transportation system according to a second embodiment. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] Hereinafter, an embodiment of the in-building ceiling transport system and an installation method for an in-building ceiling transport rail according to the present invention will be described with reference to the drawings.

[0029] (First embodiment) The in-building ceiling transport system 1 according to this embodiment is an automatic transport equipment that is used in the ceiling of a semiconductor factory (building) such as a clean room, as shown in Figure 1, and is equipped with ceiling transport rails 2 for transporting a storage section 2A containing items (here, wafers) to the ceiling of the building.

[0030] The intra-building ceiling transport system 1 comprises a suspended ceiling 10 having a ceiling panel 12 supported by a base frame 11 suspended from a ceiling (top surface of the building structure) not shown, a plurality of side bars 3 supported by the base frame 11 and extending in a second direction Y perpendicular to the first direction X which is the extension direction of the ceiling transport rail 2 and spaced apart in the first direction X, and a unit frame 4 which extends in the first direction X by connecting the ceiling transport rails 2 from above as a unit.

[0031] Here, the ceiling conveying rail 2 of this embodiment is installed in an appropriate position depending on the layout of the semiconductor device, and the first direction X (as well as the second direction Y) indicating the extension direction of the ceiling conveying rail 2 is not limited to a specific direction. Moreover, the ceiling conveying rail 2 is provided so as to be changeable in accordance with changes in the layout of the semiconductor device. In addition, the top surface of the structure refers to the area including the ceiling of the structure, the ceiling space, and the base materials installed in the ceiling space.

[0032] The suspended ceiling 10 has a plurality of hanging members 13 suspended from the top surface of the structural body, a base frame 11 consisting of joist supports and joists supported via the hanging members 13, and a ceiling panel 12 attached below the base frame 11.

[0033] The hanging members 13 are long members extending in the vertical direction, such as L-shaped steel members, with their upper ends fixed to and hanging down from the top surface of the structure and their lower ends connected to the base frame 11 using a connecting jig or the like. The hanging members 13 are arranged at predetermined intervals in the horizontal direction.

[0034] The base frames 11 are arranged in parallel at a predetermined interval in both the vertical and horizontal directions in a horizontal plane. A ceiling panel 12 is suspended from the underside of the base frame 11 using a connecting jig 14 and a hanging bolt 15.

[0035] As described above, the ceiling panel 12 forms a ceiling surface by connecting to a plurality of base frames 11 via connecting jigs 14 and hanging bolts 15. In the present embodiment, the ceiling panel 12 is formed with a recessed portion 12A so that the ceiling surface is elevated in the area where the ceiling conveying rail 2 is disposed. Here, the recessed portion 12A has a top surface portion 121 and inner side surface portions 122 opposed to each other.

[0036] 1 to 3, the ceiling transport rail 2 extends in one direction (first direction X) with a concave cross section that opens downward, and guides the storage section 2A that can store and hold articles. The ceiling transport rail 2 is formed of a top wall 21 and both side walls 22, as shown in FIG. Protrusions 23 that protrude outward in the second direction are provided at the upper part of the outer surfaces of both side walls 22 at predetermined intervals in the length direction of the ceiling conveying rail 2. The multiple protrusions 23 are arranged at the same height on the ceiling conveying rail 2. The lower ends of the vertical lifting members 43, which will be described later, are fixed to the upper surfaces 23a of the protrusions 23. The ceiling conveying rail 2 is unitized and provided integrally with the unit frame 4 as described above.

[0037] As shown in Fig. 1, the side bar 3 is made of a long steel material such as a raceway, an H-shaped steel, an L-shaped steel, or a channel steel, and is arranged with its flat surface (sliding surface 3a) facing upward. The side bar 3 is arranged so as to extend in the second direction Y within the recessed portion 12A of the ceiling panel 12, and is suspended from the base frame 11 by a suspension bolt 15 (see Fig. 2). The side bar 3 is arranged at a height close to the top surface portion 121 of the recessed portion 12A using a height adjustment member (not shown), and the height is determined so that the lower end 2a of the ceiling transport rail 2 suspended from the side bar 3 is located above the lower surface 12a of the ceiling panel 12. A plurality of side bars 3 extending in the second direction Y are provided at intervals in the first direction X for one ceiling transport rail 2 (unit frame 4).

[0038] 2, the unit frame 4 is placed on the sliding surfaces 3a, which are the upper surfaces of the side bars 3, and is provided so as to be movable in the first direction X, the second direction Y, and the up-down direction Z, and is supported in a state of being suspended from the side bars 3 at a predetermined position after adjusting its position. As shown in FIG. 3, the unit frame 4 is made of long steel material such as a raceway, H-shaped steel, L-shaped steel, or channel steel, and is formed into a frame shape in a horizontal plane.

[0039] Specifically, as shown in Fig. 3, the unit frame 4 has a pair of vertical members 41 arranged in parallel with a gap between them, and three horizontal members 42 connecting the vertical members 41 to each other. The unit frame 4 is unitized with the ceiling conveying rail 2 via a vertical lifting member 43 (described later) with the vertical members 41 parallel to the longitudinal direction (first direction X) of the ceiling conveying rail 2. Here, the unitized state in which the ceiling conveying rail 2 is connected from above by the unit frame 4 extending in the first direction X is referred to as a conveying rail unit 40.

[0040] As shown in Fig. 3, the unit frame 4 is fixed to vertical lifting members 43 protruding upward from both the left and right sides of the ceiling conveyor rail 2. The vertical lifting members 43 are provided between the ceiling conveyor rail 2 and the unit frame 4 so that their length in the vertical direction Z can be adjusted and fixed thereto. The vertical lifting members 43 are bolt materials, and can be configured to be fixed to the unit frame 4 by fastening nuts (not shown) using bolt holes (not shown) formed in the unit frame 4. Then, by adjusting the position of the nuts relative to the vertical lifting members 43, the distance between the ceiling conveyor rail 2 and the unit frame 4, i.e., the heights of both, can be adjusted.

[0041] As shown in Figs. 3 and 4, when assembling the transport rail unit 40 to the side bar 3, a transport cart 5 capable of mounting the transport rail unit 40 and running on the floor is used. The transport cart 5 includes a running platform 52 having wheels 51, a pair of support columns 53 erected upward from the left and right sides of the running platform 52, and a horizontal mounting member 54 connecting the upper ends of the support columns 53 and extending in the second direction Y. The support columns 53 are supported by the running platform 52 through a pair of diagonal support members 55. The unit frame 4 is placed on the horizontal mounting member 54. As shown in Fig. 3, a plurality of (here, three) transport carts 5 are arranged in the first direction X, and used to transport a long transport rail unit 40.

[0042] Next, a construction method for installing the ceiling conveying rails 2 of the above-mentioned in-building ceiling conveying system 1 will be specifically described with reference to the drawings. First, as shown in Fig. 1, a suspended ceiling 10 is provided that includes a ceiling panel 12 supported by a base frame 11 suspended from the top surface of the building's framework. In this embodiment, once the installation of the base frame 11 is complete, the work of providing the side bars 3 on the base frame 11 begins.

[0043] 2, a plurality of hanging bolts 15 are provided on the base frame 11, and a plurality of side bars 3 are provided to extend horizontally at a predetermined height using these hanging bolts 15. At this time, the side bars 3 extend in a second direction Y perpendicular to the first direction X of the ceiling transport rail 2, and are arranged at intervals in the first direction X. Note that the hanging bolts 15 are used to suspend and support the ceiling panel 12, but the hanging bolts 15 in the portion where the side bars 3 are to be installed may be installed first.

[0044] Next, in parallel with the above work, as shown in Fig. 3, a conveying rail unit 40 is formed as a unit connected from above to the ceiling conveying rail 2 by a unit frame 4 extending in the first direction X. The conveying rail unit 40 is integrally assembled by attaching a plurality of protrusions 23 to the side walls 22 on both the left and right sides of the ceiling conveying rail 2 at intervals in the first direction X, and fixing the unit frame 4 to the upper surfaces of the protrusions 23 via a vertical lifting member 43. The integrated transport rail unit 40 is then loaded onto a plurality of transport carts 5 and transported along the floor to a position below the side bar 3 where the transport rail unit 40 is to be installed.

[0045] Then, as shown in Figure 3, the conveying rail unit 40 is removed from the multiple transport carts 5, and the conveying rail unit 40 is raised using an aerial work vehicle 6 so that the unit frame 4 is above the multiple side bars 3, and the unit frame 4 is placed on the upper surfaces (sliding surfaces 3a) of these side bars 3. In addition, the transport rail unit 40 may be placed on the side bar 3 while still attached to the transport cart 5.

[0046] Next, the position of the transport rail unit 40 is adjusted as shown in Figures 5(a), (b), and (c). Specifically, the position adjustment in the first direction X as shown in Figure 5(c) and in the second direction Y as shown in Figure 5(b) is performed by sliding the unit frame 4 on the sliding surface 3a of the side bar 3. Then, the position adjustment in the vertical direction Z as shown in Figure 5(a) is performed by adjusting the position of a nut (not shown) of the vertical lift member 43. The transport rail unit 40 is fixed to the side bar 3 at a predetermined position by a predetermined fixing means and supported in a suspended state. This completes the installation of the ceiling conveyor rail 2. Since the ceiling conveyor rail 2 is set to a predetermined length, it is installed by connecting the first direction X in an appropriate direction.

[0047] Next, the operation of the above-mentioned indoor ceiling transport system 1 and the method of installing the indoor ceiling transport rail will be described in detail with reference to the drawings. In this embodiment, as shown in Figure 4, the side bar 3 that supports the unit frame 4 in which the ceiling transport rail 2 is unitized in a suspended state is supported by the base frame 11 of the suspended ceiling 10.Therefore, once the construction of the base frame 11 is completed, the side bar 3 can be attached to the base frame 11, and the ceiling transport rail 2 can be constructed together with the unit frame 4. Therefore, a dedicated suspension point for the ceiling transport rail is not required, and the ceiling transport rail 2 can be installed regardless of the construction of the dedicated suspension point or ceiling panel. In other words, the ceiling transport rail 2 can be installed before the dedicated suspension point and ceiling panel are completed, shortening the construction period.

[0048] In this embodiment, the unit frame 4 is arranged in a state where it can be guided relative to the multiple side bars 3, so that the unit frame 4 can be easily moved in the first direction X shown in Fig. 5(c) and the second direction Y shown in Fig. 5(b) by guiding it along the sliding surface 3a on the upper surface of the side bar 3, and can also be moved in the vertical direction Z shown in Fig. 5(c). In this way, the position of the unit frame 4 can be adjusted efficiently and with high accuracy by simple work, and the construction period can be shortened.

[0049] In addition, in this embodiment, in the case of minor changes to the device layout, the position of the unit frame 4 in the first direction X, the second direction Y, and the up-down direction Z can be adjusted by releasing the unit frame 4 from its fixed position relative to the side bar 3. Furthermore, even when making a major layout change that exceeds the range of movement of the unit frame 4 relative to the side bar 3, it is possible to secure a longer construction period for changing the equipment layout by advancing the construction of the ceiling conveyor rails 2. In this way, this embodiment can provide high adaptability to changes in the equipment layout.

[0050] Furthermore, in this embodiment, the side bar 3 is configured to be attached to the ceiling of the framework or the top surface of the framework, which is the ceiling space, so compared to the conventional case where the ceiling transport rail is attached to a ceiling panel or a dedicated hanging point, the side bar 3 can be installed at any height in the vertical direction Z. Therefore, for example, when there is dead space in the ceiling as in this embodiment, it is possible to place the side bar 3 and the ceiling transport rail 2 in this dead space, making effective use of the space.

[0051] In addition, in this embodiment, when the unit frame 4 is suspended and supported from the side bar 3, the position of the unit frame 4 in the vertical direction Z can be easily adjusted using a height adjustment member (not shown) provided on the side bar 3.

[0052] Furthermore, in this embodiment, the unit frame 4 is formed in a frame shape in a horizontal plane, and the frame-shaped unit frame 4 is placed in a stable posture relative to the multiple side bars 3. Therefore, when adjusting the position of the unit frame 4, it can be moved with high precision by being guided by the sliding surface 3a on the upper surface of the side bar 3.

[0053] In addition, in this embodiment, when installing the conveying rail unit 40 at a predetermined position on the ceiling, the conveying rail unit 40 can be loaded onto the transport cart 5 and transported, and can be easily transported below the side bar 3 at the installation position, thereby improving construction efficiency.

[0054] As described above, the construction of the ceiling conveyor rail 2 can be started before the construction of the ceiling panel 12, so that the use of the ceiling conveyor rail 2 can be started almost at the same time as the operation of the semiconductor manufacturing equipment, as in the case of a semiconductor manufacturing factory such as the present embodiment, and production efficiency can be improved. In other words, the construction of the ceiling conveyor rail 2 can be completed when the semiconductor manufacturing equipment is in operation, so that cleanliness control for construction, which is not required when the semiconductor manufacturing equipment is installed and operated at the same time as the construction of the ceiling conveyor rail 2, is not required, and the contamination countermeasures for the clean room can be reduced, and construction efficiency can be improved. For example, since the construction of the ceiling conveyor rail 2 is not performed at the same time as the installation of the semiconductor manufacturing equipment and semiconductor manufacturing, workers can work in normal work clothes, improving the work environment, and since dust prevention measures are not required, equipment that emphasizes work efficiency can be used. Furthermore, only one layer of protective material is required for the ceiling conveyor rail 2, and the effort and cost required for unpacking can be reduced.

[0055] Furthermore, by providing an air vent in the recessed portion 12A on the ceiling surface, the shape and the pressure difference between the clean room and the ceiling space (inside the ceiling chamber) can be utilized to efficiently draw dust into the ceiling space when the vehicle passes over the ceiling transport rail 2, preventing contamination of the clean room.

[0056] As described above, the building interior ceiling conveying system 1 and the construction method for the building interior ceiling conveying rail according to this embodiment eliminate the need for a dedicated hanging point for the ceiling conveying rail, and the ceiling conveying rail 2 can be installed without the need for a dedicated hanging point or the construction of a ceiling panel, thereby shortening the construction period. Furthermore, in this embodiment, trajectory correction and highly accurate position adjustment of the ceiling transport rail 2 can be performed efficiently and simply. Furthermore, in this embodiment, the layout of the device can be easily changed.

[0057] Second embodiment 6, the in-building ceiling transport system 1A in the second embodiment is configured with transport rail units 40 arranged in two layers, one above the other. Note that the above-mentioned first embodiment is an example in which one layer of ceiling transport rails 2 is installed at a position (recessed portion 12A) above the ceiling panel 12.

[0058] In the interior ceiling transport system 1A in the second embodiment, the side bars 3 are provided in two stages in the vertical direction Z. The lower side bar 3B is suspended by a guide suspension member 31 from the upper side bar 3A directly above it.

[0059] The upper side bar 3A is provided with a transport rail unit 40 in which the ceiling transport rail 2 is unitized with a unit frame 4. The lower side bar 3B is disposed at a position lower than the storage section 2A (articles) transported by the transport rail unit 40 provided on the upper side bar 3A. The ceiling transport rail 2 is fixed to the lower side bar 3B. The lower ceiling transport rail 2 is suspended from the lower side bar 3B via fixtures 24 without being provided with a unit frame 4.

[0060] In the case of the second embodiment, it is possible to make the ceiling conveying rail 2 multi-layered in the vertical direction Z. Also, when the ceiling conveying rail 2 is multi-layered by arranging the upper side bar 3A and the ceiling conveying rail 2 in the dead space of the ceiling pocket as in this embodiment, it is no longer necessary to raise the ceiling panel to the position of the upper ceiling conveying rail and install the ceiling panel as in the conventional case, so that an increase in floor height can be suppressed.

[0061] Moreover, in the second embodiment, an air conditioner 71 that blows air into the clean room is provided on the ceiling panel 12, and an exhaust port 72 is provided in the center of the left and right of the top surface 121 of the recessed portion 12A. The exhaust port 72 is located above the upper ceiling transport rail 2. As a result, air E blown out from the air conditioner 71 flows toward the exhaust port 72, so that dust F generated when the accommodation section 2A travels on the ceiling transport rail 2 is attracted into the ceiling chamber 16, preventing contamination of the clean room and maintaining the cleanliness of the clean room. In this embodiment, the exhaust port 72 is attached to the upper part of the ceiling transport rail 2, but is not limited to this position and can be disposed, for example, on the side surface of the recessed portion 12A.

[0062] The above describes an embodiment of the indoor ceiling conveying system and the installation method for the indoor ceiling conveying rail according to the present invention, but the present invention is not limited to the above embodiment and can be modified as appropriate within the scope of the spirit thereof.

[0063] For example, in this embodiment, the suspended ceiling 10 is provided on the top surface of the building frame, and the side bar 3 is supported by the base frame 11 of the suspended ceiling 10, but the present invention is not limited to the configuration in which the suspended ceiling 10 is provided. For example, the side bar 3 may be provided directly on the top surface of the building frame.

[0064] In addition, in this embodiment, the unit frame 4 is placed on the upper side of the multiple side bars 3 and is movable in the first direction X, the second direction Y, and the up-down direction Z, but the present invention is not limited to providing the unit frame 4 on the upper side of the side bars 3. For example, the unit frame 4 may be provided on the lower side of the side bars 3 and guided along the lower surface of the side bars 3 to be movable in the first direction X and the second direction.

[0065] In addition, in this embodiment, the height of the unit frame 4 (transport rail unit 40) in the up-down direction Z is adjusted by using the up-down lifting member 43 provided between the unit frame 4 and the ceiling transport rail 2, but the height adjustment method is not limited to this type of up-down lifting member 43. For example, the height of the side bar 3 itself may be adjusted by adjusting the bolt fixing positions of the hanging bolts 15 that suspend the side bar 3 from the base frame 11.

[0066] In addition, in this embodiment, the unit frame 4 is configured to be frame-shaped within a horizontal plane, but the size, shape, and other configurations of the unit frame 4 are not particularly limited and can be set appropriately in accordance with the shape, etc. of the ceiling conveying rail 2.

[0067] Furthermore, in this embodiment, when installing the transport rail unit 40 on the side bar 3, the transport rail unit 40 is loaded onto the transport cart 5, which travels on the floor and is placed below the side bar 3, and then the unit frame 4 of the transport rail unit 40 is placed on the side bar 3 by the aerial work vehicle 6, but this is not limited to using the transport cart 5. Also, instead of the aerial work vehicle 6, scaffolding may be installed for construction.

[0068] Furthermore, the length of the ceiling transport rail 2, the number, shape, and spacing of the side bars 3, etc. can be changed as appropriate.

[0069] In addition, the components in the above-described embodiments can be replaced with well-known components as appropriate without departing from the spirit of the present invention. [Explanation of symbols]

[0070] 1. 1A In-building ceiling transport system 2 Ceiling transport rails 2A Storage section 2a Bottom edge 3. Sidebar 3a Sliding surface 4 Unit Frame 5 Transport trolley 10 Suspended ceiling 11 Base frame 12 Ceiling Panel 12a Bottom side 12A concave part 13 Suspension members 23 Convex 40 Transport rail unit X 1st direction Y Second direction Z vertical direction

Claims

1. A building ceiling transport system having a ceiling transport rail for transporting an article to a ceiling surface of a building frame, A plurality of side bars supported on the top surface of the building body, extending in a second direction perpendicular to the first direction in which the ceiling transport rail extends, and spaced apart in the first direction; a unit frame that is unitized by connecting the ceiling transport rails from above and extends in the first direction; Equipped with An indoor ceiling transport system characterized in that the unit frame is movable in the first direction, the second direction, and the up and down directions relative to the multiple side bars, and is supported in a suspended state relative to the side bars at a predetermined position that has been adjusted.

2. A suspended ceiling having ceiling panels supported by a suspended base frame is provided on the top surface of the structure, 2. The intra-building ceiling transport system according to claim 1, wherein the side bars are supported by the base frame.

3. 3. The intra-building ceiling transport system according to claim 1, wherein the side bars are provided with height adjustment members for adjusting the vertical height relative to the ceiling surface of the building structure.

4. 4. The in-building ceiling transport system according to claim 1, wherein the unit frame is formed in a frame shape within a horizontal plane.

5. The side bars are provided in a plurality of stages in the vertical direction, The lower side bar is suspended from the upper side bar directly above it or from the top surface of the structure by a guide suspension material, 5. The in-building ceiling transport system according to claim 1, wherein the ceiling transport rail is provided on the lower side bar.

6. A method for installing a ceiling conveyor rail for conveying goods on the ceiling surface of a building, comprising: a step of providing a plurality of side bars supported on the top surface of the frame, extending in a second direction perpendicular to the first direction in which the ceiling transport rail extends, and spaced apart in the first direction; providing a unitized transport rail unit in a state where the transport rail unit is connected from above to the ceiling transport rail by a unit frame extending in the first direction; a step of adjusting a position of the unit frame including the ceiling transport rail by moving the unit frame in the first direction, the second direction, and the up-down direction relative to the plurality of side bars, and supporting the unit frame in a suspended state relative to the side bars at a predetermined position; A method for installing an in-building ceiling transport rail, comprising:

7. A step of suspending a base frame from the top surface of the building frame and providing a suspended ceiling with ceiling panels supported by the base frame, 7. The method for installing an in-building ceiling transport rail according to claim 6, wherein the plurality of side bars are provided on the base frame.

8. a transport cart capable of mounting the transport rail unit and running on a floor is provided; 8. The method for installing an in-building ceiling transport rail according to claim 6 or 7, wherein the transport rail unit is transported to an installation position below the side bar by the transport cart.

Citation Information

Patent Citations

  • Overhead traveling crane

    JP1995076489A

  • Telpher crane

    JP1999322258A

  • Ceiling material with joist, and ceiling structure using the same

    JP2007154589A

  • Suspended ceiling structure and method for seismically retrofitting suspended ceiling

    JP2013177801A

  • Movable multipurpose port

    JP2016220993A