Optical path route design device and optical path route design method
The optical path route design device addresses high installation costs by sharing 3R relay devices across multiple optical path routes, optimizing resource use and reducing equipment redundancy, thereby lowering the cost of constructing a third route in optical networks.
Patent Information
- Application Number
- JP2023529168
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-14
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2041-06-14
AI Technical Summary
The installation cost of a third optical path route in optical networks is high due to the need for expensive 3R repeaters, which are used to switch routes remotely and are as costly as transponders, when constructing a third route that detours away from the 0-system and 1-system routes to avoid damage.
An optical path route design device that selects and shares 3R relay devices among multiple optical path routes, using a transmission/reception route selection unit to identify non-overlapping routes, and a 3R installation candidate selection unit to determine existing or new shared 3R functional units with the largest resource capacity, reducing the need for duplicate installations.
This configuration reduces the installation cost of the third optical path route by sharing 3R relay devices across multiple routes, ensuring efficient resource utilization and minimizing the need for redundant equipment.
Smart Images

Figure 0007568097000001 
Figure 0007568097000002 
Figure 0007568097000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an optical path route design device and an optical path route design method for laying a third route of a standby system in addition to a 0-system route of a working system and a 1-system route of a standby system by optical transmission paths using optical fibers, optical amplifiers, etc. [Background technology]
[0002] In optical networks where optical transmission paths (optical path routes) using optical fibers that realize long-distance optical communications are laid, there is a demand for ensuring reliability during disasters, making recovery work more efficient, and shortening recovery times due to the frequent occurrence of disasters such as heavy rains and earthquakes. In developing disaster-resistant optical networks, there is a technology that adds a third route (third optical path route) to the 0-series route (0-series optical path route) and 1-series route (1-series optical path route), making the optical path route into three routes.
[0003] In conjunction with this three-route system, the introduction of a CD (Colorless Directionless) function and a CDC (Colorless Directionless Contentionless) function that allow route switching by remote control is being considered. The CD function and the CDC function are called CD / CDC. A technology of this type is described in Non-Patent Document 1. [Prior art documents] [Non-patent literature]
[0004] [Non-Patent Document 1] Masahiro Nakagawa,et al.,“Numerical Analysis of Adaptive Restoration in Optical Transport Networks”,[online],2019,[Retrieved May 14, 2021],Internet〈URL: https: / / ieeexplore.ieee.org?document Numerical Analysis of Adaptive Restoration in Optical〉 Summary of the Invention [Problem to be solved by the invention]
[0005] The above-mentioned third route is laid (installed) in a detouring location away from the 0-system route and the 1-system route to avoid disasters, so the distance is long. For this reason, multiple 3R repeaters with 3R (Regenerate: signal regeneration, Reshape: waveform shaping, Retiming: timing regeneration) functions that enable route switching by remote control are required along the third route. However, the 3R repeaters are almost as expensive as transponders that are installed at both ends of the optical path route and transmit and receive optical signals. For this reason, there was a problem that the installation costs of the third route using the optical path route to realize the three-route system were high.
[0006] The present invention has been made in consideration of the above circumstances, and has as its object to reduce the cost of installing a third route when realizing a three-route system using three optical path routes in an optical network. [Means for solving the problem]
[0007] In order to solve the above problems, the optical path route design device of the present invention selects a relay station in which two transmitting and receiving end devices that transmit and receive optical signals are located from a plurality of relay stations that are connected to each other by an optical transmission line and relay optical signals, connects the transmitting and receiving end devices, and selects a route pair of a working 0-system route and a backup 1-system route that do not overlap with each other, and a backup third route that bypasses the route pair via the relay station, and selects relay stations scattered on the selected third route as candidates for locating a 3R (Regenerate Reshape Retiming) function unit that relays optical signals of a predetermined number of wavelengths. election the candidate shared 3R functional unit is characterized in that it comprises a candidate selection unit which selects a candidate shared 3R functional unit from among the candidate shared 3R functional units when the existing presence / absence determination unit determines that there is no existing shared 3R functional unit; a new 3R selection unit which selects a new shared 3R functional unit from among the candidate shared 3R functional units when the existing presence / absence determination unit determines that there is an existing shared 3R functional unit; and a maximum resource 3R selection unit which selects one shared 3R functional unit if there is only one existing shared 3R functional unit when the existing presence / absence determination unit determines that there is an existing shared 3R functional unit, and selects the shared 3R functional unit with the largest number of wavelengths as a communication resource when there are multiple existing shared 3R functional units. Effect of the Invention
[0008] According to the present invention, when realizing a triple route configuration using three optical path routes in an optical network, the installation cost of the third route can be reduced. [Brief description of the drawings]
[0009] [Figure 1] 1 is a block diagram showing a configuration of an optical path route design apparatus according to a first embodiment of the present invention. [Diagram 2] FIG. 1 is a configuration diagram showing an example of an optical network. [Diagram 3] 1 is a block diagram showing a specific configuration example of an optical network between transmitting and receiving end points. [Figure 4] FIG. 1 is a configuration diagram showing an example of an optical network. [Diagram 5] FIG. 1 is a configuration diagram showing an example of an optical network. [Figure 6]FIG. 1 is a configuration diagram showing an example of an optical network. [Figure 7] 4 is a flowchart illustrating an optical path route design process performed by the optical path route design apparatus according to the first embodiment. [Figure 8] 11 is a flowchart for explaining an operation of determining an amount of resources required for shared 3R selected in the optical path route design processing according to the first embodiment. [Figure 9] FIG. 11 is a block diagram showing a configuration of an optical path route design apparatus according to a second embodiment of the present invention. [Figure 10] FIG. 1 is a configuration diagram showing an example of an optical network. [Figure 11] 10 is a flowchart illustrating an optical path route design process performed by the optical path route design apparatus according to the second embodiment. [Figure 12] FIG. 11 is a block diagram showing a configuration of an optical path route design apparatus according to a third embodiment of the present invention. [Figure 13] FIG. 1 is a configuration diagram showing an example of an optical network. [Figure 14] FIG. 1 is a configuration diagram showing an example of an optical network. [Figure 15] 11 is a flowchart for explaining an operation of increasing the amount of shared 3R resources in the optical path route design processing by the optical path route design apparatus according to the second embodiment. [Figure 16] FIG. 2 is a hardware configuration diagram showing an example of a computer that realizes the functions of the optical path route design device according to the first to third embodiments. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. However, in all the drawings in this specification, components having corresponding functions are given the same reference numerals, and the description thereof will be omitted as appropriate. <Configuration of the First Embodiment> FIG. 1 is a block diagram showing a configuration of an optical path route design apparatus according to a first embodiment of the present invention.
[0011] An optical path route design device (also called a design device) 20A shown in Fig. 1 designs 3R repeaters (also called 3R) 8a, 8c connected midway along a third route 3a to be shared with another third route 3b when forming an optical path route connecting transponders 4a, 4b located at distant locations in an optical network 10 shown in Fig. 2 into three routes. A transponder performs transmission and reception processing of optical signals and is also called a transmitting and receiving terminal point. The transponder or the transmitting and receiving terminal point constitutes a transmitting and receiving end device as recited in the claims. Also, the 3R repeater or 3R constitutes a 3R function unit as recited in the claims.
[0012] The design device 20A shown in Figure 1 is configured to include a transmission / reception route selection unit 20, a 3R installation candidate selection unit 21, an existing presence / absence determination unit 22, a maximum resource 3R selection unit 23, a new 3R selection unit 24, a required resource amount confirmation unit 25, a resource amount determination unit 26, a resource amount update unit 27, a route remaining confirmation unit 28, and a maximum resource amount determination unit 29.
[0013] In the optical network 10 shown in Fig. 2, the optical path route connecting the transmitting and receiving terminals 4a, 4b by the optical transmission line shown by the line segment is made into three routes by laying a third route 3a in addition to the 0 system route 0a of the working system and the 1 system route 1a of the backup system. In this case, the design device 20A (Fig. 1) designs the 3R repeaters 8a, 8c connected in the middle of the third route 3a to be shared with the other third route 3b. This design makes it possible to suppress the installation cost of the third route when realizing the three routes. The third route 3a may be the second shortest route after the 1 system route 1a, but may be laid (installed) in a detour at a remote location away from the 0 system route 0a and the 1 system route 1a to avoid disasters.
[0014] The transmitting and receiving end points 4a, 4b are connected by optical transmission lines via one or more relay stations 9 that relay optical signals, and the optical transmission lines form a 0-system route 0a, a 1-system route 1a, and a third route 3a. Similarly, the transponders 4a, 4b and other transponders 5a, 5b that are distantly separated from each other are also connected by optical transmission lines via the relay stations 9, and the optical transmission lines form a 0-system route 0b, a 1-system route 1b, and a third route 3b.
[0015] The 0-system route 0a and the 1-system route 1a between the transponders 4a and 4b are also referred to as a route pair 01a. The 0-system route 0b and the 1-system route 1b between the transponders 5a and 5b are also referred to as a route pair 01b.
[0016] A plurality of relay stations 9 are connected at predetermined intervals to each of the third route 3a related to the route pair 01a and the third route 3b related to the route pair 01b. Of the relay stations 9, relay stations 9a, 9b, and 9c are shared by the two third routes 3a and 3b. Of the relay stations 9a, 9b, and 9c, a 3R relay device (3R) 8a is provided at the relay station 9a, and a 3R relay device 8c is provided at the relay station 9c.
[0017] The 3R 8a, 8c have a 3R function that can switch routes remotely, and are communication resources in the optical network 10. The 3R 8a, 8c are equipped with a transmission function for optical signals of different wavelengths as a communication resource for transmitting optical signals. The resource amount of this transmission function as a communication resource is proportional to the number of wavelengths of the optical signal that can be transmitted, and increases as the number of wavelengths increases to 10 wavelengths, 20 wavelengths, and so on. The transmission function for optical signals of multiple wavelengths is also referred to as a transmission function for the number of wavelengths.
[0018] For example, when the 3Rs 8a and 8c are equipped with a transmission function for 20 different wavelengths, they perform a process of relaying and transmitting optical signals of 20 wavelengths. In this case, optical signals of 10 wavelengths can be transmitted through one third route 3a, and optical signals of 10 wavelengths can be transmitted through the other third route 3b.
[0019] In this manner, in this embodiment, at least one 3R (3R repeater) is shared by two or more independent third routes 3a, 3b. This shared 3R is also called a shared 3R. The shared 3R is equipped with a transmission function for the minimum number of wavelengths required when two or more third routes 3a, 3b sharing the 3R transmit optical signals.
[0020] The 3Rs 8a and 8c shared by two or more third routes 3a and 3b are not used simultaneously by two or more third routes 3a and 3b in the event of a failure of a single link (single optical transmission path) constituting the route pair 01a or route pair 01b, so by using the shared 3Rs 8a and 8c, resource efficiency can be improved.
[0021] Here, an example of a fault location in a single link will be described with reference to an optical network 10K shown in Fig. 3. In the optical network 10K, parts corresponding to those in the optical network 10 (Fig. 2) are given the same reference numerals.
[0022] In the optical network 10K shown in FIG. 3, a transponder 4a is connected to one end of an optical fiber 0a corresponding to the 0-system route 0a (FIG. 2) via a CD / CDC-compatible MUX / DEMUX (Multiplexer / Demultiplexer) 51a, and a transponder 4b is connected to the other end via a MUX / DEMUX 51b.
[0023] Between the MUX / DEMUXs 51a and 51b, a repeater station 9B configured as a route section having a WSS (Wavelength Selective Switch) 52 and an optical amplifier 53, and a repeater station 9C configured as an in-line amplifier section having an optical amplifier 53 are connected by an optical fiber 0a. The repeater station 9A and the repeater station 9B are connected by an optical fiber 0a1, the repeater station 9B and the repeater station 9C are connected by an optical fiber 0a2, and the repeater station 9C and the repeater station 9D are connected by an optical fiber 0a3.
[0024] The transponders 4c and 4d are connected to the WSS 52 of the relay station 9B via a MUX / DEMUX 51c.
[0025] In the optical network 10K configured as above, the first single link fault range is between the route sections of the repeater stations 9A and 9B connected by the optical fiber 0a1, surrounded by the dashed frame a5. The second single link fault range is between the repeater stations 9B and 9D connected by the optical fibers 0a2 and 0a3 with the repeater station 9C sandwiched therebetween, surrounded by the dashed frame a6. The above correspondence is similar in the 1-system route 1a, although not shown. The 0-system route 0a and the 1-system route 1a are configured by connecting multiple such first and second single links, and in this single link fault range a5, a6, the above-mentioned route pair 01a or route pair 01b fault occurs.
[0026] Next, a process for selecting and setting a shared 3R when multiple types of route pairs exist will be described. However, it is assumed that there are three types of route pairs, as shown in Fig. 4 (first route pair 01a), Fig. 5 (second route pair 01b), and Fig. 6 (third route pair 01c).
[0027] The optical network 10A shown in Fig. 4 is formed by connecting a plurality of relay stations 9, which are widely distributed in all directions, with optical transmission paths shown by line segments. In this optical network 10A, transponders (transmitting and receiving terminals) 4a and 4b are provided in two relay stations 9.
[0028] The transmitting and receiving end points 4a, 4b are connected by a 0-system route 0a with the shortest distance via a relay station 9, and a 1-system route 1a that does not overlap with the 0-system route 0a, and are further connected by a third route 3a that bypasses the route pair (first route pair) 01a. A plurality of distant relay stations 9 are interposed and connected to the third route 3a, and one relay station 9 is a candidate for one 3R8b to be deployed, another relay station 9 is a candidate for 3R8c to be deployed, and the other relay station 9 is a candidate for 3R8d to be deployed.
[0029] In the optical network 10B shown in FIG. 5, similar to the optical network 10A, a plurality of repeater stations 9 are connected by optical transmission lines, and transponders (transmitting and receiving terminal points) 5a and 5b are provided in two repeater stations 9 different from those in the optical network 10A.
[0030] The transmitting and receiving end points 5a, 5b are connected by the 0-system route 0b and the 1-system route 1b, and are connected by a third route 3b that bypasses the route pair (second route pair) 01b. The third route 3b is connected via a plurality of distant relay stations 9, one relay station 9 is a candidate for 3R8a, another relay station 9 is a candidate for 3R8b, and the remaining relay station 9 is a candidate for 3R8e. Furthermore, three other relay stations 9 connected to the third route 3b are candidates for 3R8f, 8g, and 8h.
[0031] In the optical network 10C shown in FIG. 6, similar to the optical network 10A, a plurality of repeater stations 9 are connected by optical transmission lines, and transponders (transmitting and receiving terminals) 6a and 6b are provided in two repeater stations 9 different from those in the optical networks 10A and 10B.
[0032] The transmitting and receiving end points 6a, 6b are connected by the 0-system route 0c and the 1-system route 1c, and are connected by the third route 3c, which is a detour around the route pair (third route pair) 01c. The third route 3c is connected via a plurality of distant relay stations 9, one relay station 9 is a candidate for 3R8a, another relay station 9 is a candidate for 3R8b, and the remaining relay station 9 is a candidate for 3R8e. Furthermore, three other relay stations 9 connected to the third route 3c are candidates for 3R8f, 8i, and 8j.
[0033] In the optical path route design apparatus 20A shown in FIG. 1, the transmitting / receiving route selector 20 selects transmitting / receiving end points, a 0-system route, a 1-system route, and a third route in the optical networks 10A to 10C shown in FIGS.
[0034] That is, the transmission and reception route selection unit 20 (selection unit 20) selects a relay station 9 in which two transmission and reception end points 4a, 4b for communication shown in Fig. 4 are located, in response to a communication request (or communication demand) from a user. Next, the selection unit 20 selects the shortest route connecting the transmission and reception end points 4a, 4b located in the selected relay station 9 as the 0-system route 0a. At this time, the 0-system route 0a may be the one that connects the transmission and reception end points 4a, 4b so as to minimize the number of relay stations 9 having optical amplifiers.
[0035] The selection unit 20 selects a route that does not overlap with the 0-system route 0a and is the second shortest route after the 0-system route 0a as the 1-system route 1a. Furthermore, the selection unit 20 selects a third route 3a that does not overlap with the first route pair 01a.
[0036] Next, the 3R installation candidate selection unit (also called the candidate selection unit) 21 shown in Fig. 1 selects relay stations 9 scattered on the third route 3a as candidates for placing 3Rs 8b, 8c, and 8d. At this time, since the transmission distance changes depending on the communication modulation method, it is possible to perform a transmission design that selects relay stations 9 as 3R installation candidates by selecting a modulation method based on the communication demand volume and the total distance of the route, etc.
[0037] Examples of modulation methods include 16QAM (Quadrature Amplitude Modulation) at 32 Gbaud and 200 Gbps / λ, QPSK (Quadra Phase Shift Keying) at 32 Gbaud and 100 Gbps / λ, and 16QAM at 64 Gbaud and 400 Gbps / λ.
[0038] A relay station 9 as a 3R installation station is selected based on a transmission design from the modulation method and information on the relay amplifiers installed in the relay station 9 on the route. To be precise, the transmission design is performed based on detailed information such as the distance / loss and fiber type of each span (between each relay station 9), but a span model is used to get a rough idea first, and then the transmission design is finally used to confirm. In the example of optical networks 10A to 10C in Figures 4 to 6, one 3R is required for approximately every three spans, and the route design is performed using a span model as an example, with the relay stations 9 before and after this 3R being 3R installation candidates.
[0039] Next, the existing presence / absence determination unit 22 determines whether the selected candidates 3R 8b, 8c, and 8d exist as selected existing 3R. Here, since the candidates 3R 8b, 8c, and 8d are the ones selected initially, the existing presence / absence determination unit 22 determines that they do not exist.
[0040] If it is determined that no shared 3R exists, the new 3R selection unit 24 newly selects, for example, 3R 8b from among the candidate 3Rs 8b, 8c, and 8d as a shared 3R.
[0041] Here, the route remaining confirmation unit 28 checks whether or not a transmission / reception route selection for another route pair based on the above communication request remains. If a transmission / reception route selection unit 20 remains, the transmission / reception route selection unit 20 performs the same selection as above in response to the next communication request.
[0042] After that, the candidate selection unit 21 selects the shared 3R candidate 3R8b, and then selects the shared 3R candidates in the two third routes 3b and 3c related to the remaining second and third route pairs 01b and 01c (FIGS. 5 and 6). This selection is performed in the order of communication requests from users. Here, the candidate 3R8b shown in FIG. 5 and FIG. 6 is selected in the order of communication requests.
[0043] Next, the existing presence / absence determination unit 22 determines whether the selected candidates 3R8a, 8b, 8e exist as already selected existing 3R. Here, since the first selected candidate 3R8b exists, it is determined that an existing 3R exists in the candidate 3R8b.
[0044] After this determination, if the existing presence / absence determination unit 22 determines that an existing 3R exists, the maximum resource 3R selection unit 23 selects the existing 3R if there is one, and selects the 3R with the largest number of wavelengths in resource capacity if there are multiple existing 3Rs. In this example, since there is only one existing 3R 8b, the maximum resource 3R selection unit 23 selects the existing 3R 8b as the shared 3R.
[0045] <Determination of resource amount for shared 3R> Here, a process for determining the transmission function (resource amount) of the number of wavelengths required for the selected shared 3R will be described.
[0046] The required resource confirmation unit 25 (also referred to as the confirmation unit 25) shown in Figure 1 selects one of each single link that constitutes the 0-series route 0a, etc. of each route pair 01a, 01b, 01c (Figures 4 to 6), and confirms the amount of resources required in the shared 3R on the third route in the event of a failure of this selected single link.
[0047] For example, assume that a failure 11 occurs in the 1-system route 1a that uses 10 wavelengths in the first route pair 01a shown in Fig. 4. In this case, since there is no 0-system route or 1-system route that includes the single link of the failure 11 in the other second route pair 01b (Fig. 5) and third route pair 01c (Fig. 6), 10 wavelengths are required only in the third route 3a of the first route pair 01a. Therefore, the confirmation unit 25 confirms that the shared 3R8b of the third route 3a requires a resource amount that is a transmission function of optical signals of 10 wavelengths.
[0048] The resource amount determination unit 26 determines whether or not the confirmed resource amount exceeds the designed maximum required resource amount set in the shared 3R8b.
[0049] When the resource amount determination unit 26 determines that the maximum required resource amount will be exceeded, the resource amount update unit 27 updates the maximum required resource amount to be set in the shared 3R8b to the resource amount confirmed by the confirmation unit 25. The resource amount update unit 27 constitutes an update unit recited in the claims.
[0050] When the resource amount determination unit 26 determines that the resource amount is less than the maximum required resource amount, or when the resource amount update unit 27 performs an update, the route remaining confirmation unit 28 confirms whether or not a single link of a route pair remains that requires confirmation of the resource amount in the event of a failure by the confirmation unit 25.
[0051] For example, the route remaining confirmation unit 28 confirms that a single link constituting the 0-system routes 0b, 0c of the second and third route pairs 01b, 01c, which requires confirmation of the resource amount related to the fault 12 shown in Figures 5 and 6, remains. If a single link remains, the necessary resource amount confirmation unit 25 and the resource amount determination unit 26 perform the same process as described above.
[0052] For example, at failure 12, which is a failure of a single link constituting the 0-series routes 0b and 0c, which require 10 wavelengths each for the second and third route pairs 01b and 01c, the number of wavelengths required for shared 3R8b is 20 wavelengths, which is the sum of the 10 wavelengths each required for transmission for the third routes 3b and 3c (10+10).
[0053] Therefore, the confirmation unit 25 confirms that the shared 3R 8b requires a resource amount, which is a transmission function of optical signals of 20 wavelengths. After this confirmation, the resource amount determination unit 26 updates the maximum required resource amount to be set in the shared 3R 8b from 10 wavelengths to 20 wavelengths, and furthermore, the route remaining confirmation unit 28 confirms that no single link remains.
[0054] In this case, the maximum resource amount determining unit 29 determines the maximum required resource amount (for example, 20 wavelengths) as the predetermined resource amount of the shared 3R8b. The maximum resource amount determining unit 29 constitutes a determining unit recited in the claims.
[0055] In this embodiment, the 3R that can be shared and used by the third routes 3a, 3b, and 3c related to each of the first to third route pairs 01a, 01b, and 01c (FIGS. 4 to 6) is 3R8b. This shared 3R8b only needs to have a resource amount that is a transmission function of up to 20 wavelengths. In other words, the shared 3R8b of the three third routes 3a, 3b, and 3c requires 10 wavelengths at the time of failure 11 (FIG. 4) and 20 wavelengths at the time of failure 12 (FIGS. 5 and 6), so it only needs the resource amount of the minimum number of wavelengths (20 wavelengths). In the conventional technology, the number of wavelengths required for transmission by the three third routes 3a, 3b, and 3c was simply added up to 30 wavelengths.
[0056] <Operation of the First Embodiment> Next, a selection operation of a shared 3R on the third route in the optical path route design processing by the optical path route design apparatus 20A according to the first embodiment will be described with reference to a flowchart in FIG.
[0057] In step S1 shown in FIG. 7, the transmission / reception route selection unit 20 of the design device 20A shown in FIG. 1 selects transmission / reception terminal points, a 0-system route, a 1-system route, and a third route (referred to as transmission / reception route selection) in the optical network 10A shown in FIG. 4 in response to a predetermined communication request.
[0058] That is, the selection unit 20 selects a relay station 9 in which two transmitting and receiving end points 4a, 4b for communication are located, for example, in response to a communication request from a user, as shown in Fig. 4. Next, the selection unit 20 selects a 0-system route 0a that connects the transmitting and receiving end points 4a, 4b located in the selected relay station 9, and selects a 1-system route 1a that does not overlap with the 0-system route 0a.
[0059] Next, in step S2, the 3R installation candidate selection unit 21 selects relay stations 9 scattered on the third route 3a selected by the selection unit 20 as candidates for placing 3Rs 8b, 8c, and 8d. In this example, 3R 8c is set as a candidate target, and the three candidates are 3Rs 8b and 8d on both sides of 3R 8c.
[0060] Next, in step S3, the existing presence / absence determination unit 22 determines whether the selected candidate 3R 8b, 8c, 8d exists as a selected existing 3R. Here, since the candidates 3R 8b, 8c, 8d are the first selected candidates, it is determined that they do not exist (No).
[0061] If it is determined that there is no existing 3R, in step S4, the new 3R selection unit 24 newly selects, for example, 3R 8b as a shared 3R from among the candidate 3Rs 8b, 8c, and 8d.
[0062] Next, in step S5, the route remaining confirmation unit 28 checks whether or not there are any transmission / reception route selections remaining for other route pairs due to the communication request. If it is determined that there are no remaining route selections (No), this selection process ends.
[0063] On the other hand, if it is determined that the request remains (Yes), the process returns to step S1, and the transmission / reception route selection unit 20 selects the transmission / reception terminal points, the 0-system route, the 1-system route, and the third route in the optical network 10B shown in FIG. 5 in response to the next communication request.
[0064] That is, the selection unit 20 selects a relay station 9 in which the two transmitting and receiving end points 5a, 5b shown in Figure 5 are located, then selects a 0-system route 0b connecting the transmitting and receiving end points 5a, 5b, then selects a 1-system route 1b, and then selects a third route 3b.
[0065] Next, in step S2, the 3R installation candidate selection unit 21 selects the relay stations 9 scattered on the third route 3b selected by the selection unit 20 as candidates for placing the 3Rs 8a, 8b, and 8e. election do.
[0066] In step S3, the existing presence / absence determination unit 22 determines whether the selected candidate 3Rs 8a, 8b, and 8e are existing as selected existing 3Rs. Here, since 3R 8b is an existing 3R, it is determined that it exists (Yes).
[0067] In the case of this existing determination, in step S6, the maximum resource 3R selection unit 23 selects the 3R with the greatest amount of resources from among the existing 3Rs as the shared 3R. Here, since there is one existing 3R 8b, 3R 8b is selected as the shared 3R.
[0068] Next, in step S5, the route remaining confirmation unit 28 checks whether or not there is a transmission / reception route selection remaining for another route pair due to the communication request. Here, it is assumed that it is determined that there is still a transmission / reception route selection remaining (Yes).
[0069] If the determination is that the request remains (Yes), the process returns to step S1, and the transmission / reception route selection unit 20 selects the transmission / reception terminal points, the 0-system route, the 1-system route, and the third route in the optical network 10C shown in FIG. 6 in response to the next communication request.
[0070] That is, the selection unit 20 selects a relay station 9 in which the two transmitting and receiving end points 6a, 6b shown in FIG. 6 are located, then selects a 0-system route 0c connecting the transmitting and receiving end points 6a, 6b, then selects a 1-system route 1c, and then selects a third route 3c.
[0071] Next, in step S2, the 3R installation candidate selection unit 21 selects relay stations 9 scattered on the third route 3c selected by the selection unit 20 as candidates for placing the 3Rs 8a, 8b, and 8e.
[0072] In step S3, the existing presence / absence determination unit 22 determines that 3R 8b exists (Yes) from the selected candidate 3Rs 8a, 8b, and 8e. In step S6, the maximum resource 3R selection unit 23 selects one existing 3R 8b as the shared 3R with the largest amount of resources.
[0073] Next, in step S5, the route remaining confirmation unit 28 judges whether or not there are any transmission and reception route selections remaining for other route pairs due to the communication request. Here, it is assumed that there are no transmission and reception route selections remaining (No). This ends the selection process of the shared 3R on the third route.
[0074] <Determination of the amount of resources required for shared 3R> Next, an operation for determining the amount of resources (transmission function of the number of wavelengths) required for the shared 3R 8b selected in the above selection process will be described with reference to the flowchart of FIG.
[0075] In step S11 shown in FIG. 8, the required resource confirmation unit 25 shown in FIG. 1 selects one of each single route constituting the 1-system route 1a or the 0-system routes 0b, 0c, etc. of the first to third route pairs 01a, 01b, 01c shown in FIG. 4 to FIG. 6, and confirms the amount of resources required in the shared 3R on the third route when each single link failure occurs, such as failures 11 and 12, of the selected single link.
[0076] For example, suppose that a failure 11 occurs in the 1-system route 1a that uses 10 wavelengths in the first route pair 01a (FIG. 4). In this case, since there is no 0-system route or 1-system route that includes the single link of the failure 11 in the other second and third route pairs 01b, 01c (FIGS. 5 and 6), 10 wavelengths are required only in the third route 3a of the first route pair 01a. From this confirmation process, the confirmation unit 25 confirms that when the failure 11 occurs in the 1-system route 1a, the shared 3R8b of the third route 3a requires a resource amount that is a transmission function of optical signals of 10 wavelengths.
[0077] Next, in step S12, the resource amount determining unit 26 determines whether or not the resource amount confirmed in step S11 exceeds the designed maximum required resource amount set in the shared 3R8b.
[0078] If the result of this determination is No, in step S13, the route remaining confirmation unit 28 confirms (determines) whether or not a single link of the route pair that requires resource amount confirmation in the event of a failure in step S11 remains. It is assumed that this determination confirms that a single link constituting the 0-series routes 0b, 0c of the second and third route pairs 01b, 01c that requires resource amount confirmation related to the failure 12 shown in Figures 5 and 6 remains.
[0079] In this case, returning to step S11, the confirmation unit 25 selects a single link corresponding to the failure 12 constituting the 0-series routes 0b, 0c of the second and third route pairs 01b, 01c, and confirms that when a failure 12 occurs in each of the 0-series route 0b and the 0-series route 0c, a resource amount of 10 wavelengths + 10 wavelengths = 20 wavelengths is required for the shared 3R8b of the third route 3b, 3c.
[0080] After checking these 20 wavelengths, in step S12, the resource amount determining unit 26 determines that the amount of required resources exceeds the maximum required resource amount (10 wavelengths) already set for the shared 3R8b (Yes).
[0081] In this case, in step S14, the resource amount update unit 27 updates the maximum required resource amount set for the shared 3R 8b from 10 wavelengths to 20 wavelengths.
[0082] Next, in step S13, it is assumed that the route remaining confirmation unit 28 has confirmed that there remains no single link that requires confirmation of the resource amount in the event of a failure in step S11.
[0083] In this case, in step S15, the maximum resource amount determining unit 29 determines that the maximum required resource amount of 20 wavelengths updated in step S14 is to be the resource amount of the shared 3R8b.
[0084] <Advantages of the First Embodiment> The effects of the optical path route design apparatus 20A according to the first embodiment of the present invention will be described.
[0085] (1a) An optical path route design device 20A shown in FIG. 1 includes a transmission / reception route selector 20, a candidate selector 21, an existing presence / absence determiner 22, a new 3R selector 24, and a maximum resource 3R selector 23.
[0086] As shown in Figures 4 to 6, the transmission / reception route selection unit 20 selects a relay station 9 that has two transmission / reception end points for transmitting and receiving an optical signal from a plurality of relay stations 9 that are connected to each other by an optical transmission path and relay optical signals, and selects a route pair 01a of a working 0 system route 0a and a backup 1 system route 1a that connect the transmission / reception end points and do not overlap with each other, and a backup third route 3a that bypasses the route pair 01a via the relay station 9.
[0087] The candidate selection unit 21 selects relay stations 9 scattered on the selected third route 3a as candidates for arranging 3R function units (3R8b, 8c, 8d and 3R8a, 8b, 8e) that relay optical signals of a predetermined number of wavelengths.
[0088] The existing / non-existent determining unit 22 determines whether or not the selected candidate shared 3R function unit already exists.
[0089] The new 3R selection unit 24 selects a new shared 3R functional unit from among the candidate shared 3R functional units when the existing presence / absence determination unit 22 determines that there is no existing unit.
[0090] The maximum resource 3R selection unit 23 is configured so that when the existing presence / absence determination unit 22 determines whether or not there is an existing shared 3R functional unit, if there is one existing shared 3R functional unit, it selects one shared 3R functional unit, and if there are multiple existing shared 3R functional units, it selects the shared 3R functional unit with the largest number of wavelengths as a communication resource.
[0091] According to this configuration, when laying a route pair 01a of a working 0-system route 0a and a backup 1-system route 1a, and a backup third route 3a that bypasses the route pair 01a to realize a third route, a shared 3R function unit shared by each of the third routes 3a and 3b related to a different route pair 01b can be selected from new or existing shared 3R function units. In other words, it is possible to easily provide a shared 3R function unit shared by each of the third routes 3a and 3b without providing a 3R function unit individually for each of the third routes 3a and 3b. Therefore, the installation cost of the third routes 3a and 3b can be kept low.
[0092] (2a) The transmission / reception route selection unit 20A further includes the required resource amount confirmation unit 25, the resource amount update unit 27, and the maximum resource amount determination unit 29 shown in FIG.
[0093] The required resource amount confirmation unit 25 confirms the amount of resources required for the shared 3R functional unit on the third route related to each route pair when a single link constituting the 0-system route or 1-system route of the route pair fails. If the confirmed resource amount exceeds the maximum required resource amount set for the shared 3R functional unit, the resource amount update unit 27 updates the resource amount of the shared 3R functional unit to the confirmed resource amount. If the update is not performed, the maximum resource amount determination unit 29 determines the confirmed resource amount as the maximum required resource amount for the shared 3R functional unit, and if the update is performed, determines the updated resource amount as the maximum required resource amount for the shared 3R functional unit.
[0094] The amount of resources required for the shared 3R function unit is the number of wavelengths of the optical signal transmitted to the failed single link, and when the same failed single link exists in multiple different route pairs, the number of wavelengths is the sum of the number of wavelengths of the optical signal transmitted for each failed single link.
[0095] This configuration provides the following advantageous effects. Suppose a first fault occurs only in the 1-system route of the first route pair 01a as a single link using, for example, 10 wavelengths. In this case, the specific shared 3R function unit on the third route 3a associated with the first route pair 01a requires a resource of 10 wavelengths. Meanwhile, suppose a second fault occurs in the same 0-system route of the second and third route pairs 01b and 01c as a single link using 10 wavelengths each.
[0096] In this case, the specific shared 3R function unit on each of the third routes 3b, 3c relating to the second and third route pairs 01b, 01c requires a resource amount of 20 wavelengths, which is the sum (10+10) of the 10 wavelengths required for transmission for each of the third routes 01b, 01c at the time of the second failure. In this way, the specific shared 3R function unit shared by the three third routes 01a, 01b, 01c requires 10 wavelengths at the time of the first failure and 20 wavelengths at the time of the second failure, but it is possible to get by with the minimum required resource amount of 20 wavelengths, rather than 10+20=30 wavelengths. This makes it possible to keep the installation costs for the third routes 01a, 01b, 01c low.
[0097] <Configuration of the second embodiment> FIG. 9 is a block diagram showing a configuration of an optical path route design apparatus according to the second embodiment of the present invention.
[0098] The optical path route design device 20B of the second embodiment shown in Figure 9 selects the 3R with the smallest resource amount from among the 3R (3R repeater) 8a, 8c shared by multiple third routes 3a and third routes 3b as shown in Figure 2.
[0099] The design device 20B of the second embodiment shown in Figure 9 is equipped with a total transmission / reception route selection unit 31, a total 3R installation candidate selection unit 32, a minimum resource 3R selection unit 33, a minimum resource amount determination unit 34, a minimum resource amount update unit 35, and a route remaining confirmation unit 36 to be confirmed, and is also configured with a required resource amount confirmation unit 25, a resource amount determination unit 26, a resource amount update unit 27, a route remaining confirmation unit 28, and a maximum resource amount determination unit 29 similar to the design device 20A of the first embodiment (Figure 1).
[0100] The total transmission / reception route selection unit 31 selects transmission / reception end points, 0-system routes, 1-system routes and a third route in all of the optical networks 10B, 10C and 10D shown in, for example, FIG. 5, FIG. 6 and FIG. 10 where transmission / reception demand is currently confirmed.
[0101] However, in the optical network 10D shown in Fig. 10, it is assumed that the request occurs after the transmission and reception requests of the optical networks 10A and 10B. In the optical network 10D, similar to the optical network 10A (Fig. 4), a plurality of relay stations 9 are connected by optical transmission lines, and transponders (transmission and reception terminal points) 7a and 7b are provided in two relay stations 9 different from those in the optical networks 10A and 10B (Fig. 5).
[0102] The transmitting and receiving end points 7a, 7b are connected by the 0-system route 0d and the 1-system route 1d, and are connected to the third route 3d, which is a long-distance detour from the route pair (fourth route pair) 01d. The third route 3d is connected via three distant relay stations 9, and the three relay stations 9 are candidates for placement of 3R8a, 8f, and 8g.
[0103] Here, assume that 3Rs 8a, 8b, and 8e on the third route 3b related to the second route pair 01b (FIG. 5) are selected by the design device 20A of the first embodiment shown in FIG. 1, and then 3Rs 8a, 8b, and 8e on the third route 3c related to the third route pair 01c (FIG. 6) are selected. Since 3Rs 8a, 8b, and 8e on both the second and third route pairs 01b and 01c are candidates for the shared 3R, assume that 3R 8b, for example, is selected as the shared 3R.
[0104] However, suppose that 3Rs 8a, 8f, and 8g on the third route 3d related to the fourth route pair 01d are selected in response to a new transmission / reception request. In this case, the 3Rs 8a, 8f, and 8g do not have either of the 3Rs 8b already selected, so they do not become shared 3Rs for the three route pairs 01b, 01c, and 01d.
[0105] Therefore, the design device 20B of the second embodiment selects the shared 3Rs of all three route pairs 01b, 01c, and 01d as follows: That is, the all-transmitting / receiving route selection unit 31 (selection unit 31) selects transmitting / receiving end points, 0-system routes, 1-system routes, and third routes in all optical networks 10B, 10C, and 10D.
[0106] That is, the selection unit 31 selects a relay station 9 that places two transmitting and receiving end points 5a and 5b shown in Fig. 5, selects a 0-system route 0b and a 1-system route 1b that do not overlap with each other and connect the transmitting and receiving end points 5a and 5b, and selects a third route 3b that does not overlap with these route pair 01b. Furthermore, the selection unit 31 selects relay stations 9 scattered on the third route 3b as candidates for placing 3R8a, 8b, and 8e.
[0107] 6, selects a 0-system route 0c and a 1-system route 1c that do not overlap with each other and connect the transmitting and receiving end points 6a and 6b, and selects a third route 3c that does not overlap with these route pairs 01c. Furthermore, the selection unit 31 selects relay stations 9 scattered on the third route 3c as candidates for placing 3R8a, 8b, and 8e.
[0108] 10, selects a 0-system route 0d and a 1-system route 1d that do not overlap with each other and connect the transmitting and receiving end points 7a and 7b, and selects a third route 3d that does not overlap with these route pair 01d. Furthermore, the selection unit 31 selects relay stations 9 scattered on the third route 3d as candidates for placing 3R8a, 8f, and 8g.
[0109] The all-3R installation candidate selection unit 32 shown in Figure 9 (also referred to as the all-candidate selection unit 32) selects a shared 3R (for example, 3R8a) that can be shared on all of the third routes 3b, 3c, and 3d from among all the candidates selected by the selection unit 31, namely 3R8a, 8b, and 8e on the third route 3b (Figure 5), 3R8a, 8b, and 8e on the third route 3c (Figure 6), and 3R8a, 8f, and 8g on the third route 3d (Figure 10).
[0110] Here, the design device 20B confirms the resource amount (e.g., 20 wavelengths) of the shared 3R selected by the all-candidate selection unit 32 using the required resource amount confirmation unit 25, resource amount determination unit 26, resource amount update unit 27, route remaining confirmation unit 28, and maximum resource amount determination unit 29 described in the first embodiment. However, the required resource amount confirmation unit 25, resource amount determination unit 26, resource amount update unit 27, route remaining confirmation unit 28, and maximum resource amount determination unit 29 are collectively referred to as a shared 3R resource amount confirmation unit.
[0111] The minimum resource amount determination unit 34 (determination unit 34) determines whether or not the confirmed resource amount is less than the designed minimum required resource amount set in the shared 3R.
[0112] When the determining unit 34 determines that the amount is less than the minimum amount of resources, the minimum resource amount update unit 35 updates the minimum resource amount to be set for the shared 3R to the confirmed amount of resources (for example, 20 wavelengths).
[0113] The confirmation-required route remaining confirmation unit 36 (remaining confirmation unit 36) confirms whether or not any shared 3R arrangement patterns that require confirmation of the resource amount by the shared 3R resource amount confirmation unit remain when the determination unit 34 determines that the resource amount is equal to or greater than the minimum required resource amount, or when an update is performed by the update unit 35. As a result, if any remain, the resource amount is confirmed by the shared 3R resource amount confirmation unit.
[0114] The minimum resource 3R selection unit 33 selects the shared 3R with the minimum amount of resources from among the shared 3Rs.
[0115] <Operation of the second embodiment> Next, a selection operation of a shared 3R on a third route in the optical path route design processing by the optical path route design apparatus 20B according to the second embodiment will be described with reference to a flowchart in FIG.
[0116] In step S21 shown in FIG. 11, the all transmission / reception route selection unit 31 shown in FIG. 9 selects transmission / reception routes for all optical networks for which transmission / reception demands are confirmed.
[0117] For example, the selection unit 31 selects the transmitting and receiving end points 5a, 5b, the 0-system route 0b and the 1-system route 1b, and the third route 3b shown in Figure 5, and selects 3R8a, 8b, and 8e, which are placed at the relay station 9 on the third route 3b, as candidates.
[0118] In addition, the selection unit 31 selects the transmitting and receiving end points 6a, 6b, the 0-system route 0c and the 1-system route 1c, and the third route 3c shown in Figure 6, and selects 3R8a, 8b, and 8e, which are placed at the relay station 9 on the third route 3c, as candidates.
[0119] Furthermore, the selection unit 31 selects the transmitting and receiving end points 7a, 7b, the 0-system route 0d and the 1-system route 1d, and the third route 3d shown in Figure 10, and selects 3R8a, 8f, and 8g, which are placed at the relay station 9 on the third route 3d, as candidates.
[0120] Next, in step S22, the all-candidate selection unit 32 selects all patterns of 3R to be placed for each route pair from among all the selected candidates, 3R8a, 8b, 8e (FIG. 5) on the third route 3b, 3R8a, 8b, 8e (FIG. 6) on the third route 3c, and 3R8a, 8f, 8g (FIG. 10) on the third route 3d. For example, one pattern is one in which all the third routes 3b, 3c, 3d are placed in 3R8a. Another pattern is one in which the third route 3b is placed in 3R8a, the third route 3c is placed in 3R8b, and the third route 3d is placed in 3R8f.
[0121] In step S23, the shared 3R resource amount confirmation unit (required resource amount confirmation unit 25, resource amount judgment unit 26, resource amount update unit 27, route remaining confirmation unit 28, and maximum resource amount determination unit 29) confirms the resource amount (for example, 20 wavelengths of the pattern in which all the third routes 3b, 3c, and 3d are placed in 3R8a) of the 3R allocation pattern selected in step S22. This confirmation is performed as in the processing of steps S11 to S15 (FIG. 8) described above.
[0122] However, in step S15, the resource amount in one shared 3R determined by the maximum resource amount determination unit 29 is confirmed. In this example, the resource amount is confirmed for each arrangement pattern of the shared 3R, so the resource amount of each shared 3R arrangement pattern is confirmed by a loop returning from step S26 to step S23 described later until confirmation of all arrangement patterns is completed.
[0123] In step S24, the minimum resource amount determination unit 34 determines whether the confirmed resource amount (20 wavelengths) is less than the minimum required resource amount (20 wavelengths) of the designed total resource set in the candidate shared 3R of the candidate shared 3R pattern. Here, it is determined that it is equal to or more (No), and the process proceeds to step S26.
[0124] On the other hand, if the determination unit 34 determines in step S24 that the amount of required resources is less than the designed minimum amount of resources (Yes), the update unit 35 updates the minimum amount of resources to be set for the shared 3R to the confirmed amount of resources in step S25. Then, the process proceeds to step S26.
[0125] In step S26, if the determination unit 34 in step S24 determines that the above is true (No), or if the update unit 35 in step S25 performs an update, the remaining confirmation unit 36 determines whether or not any shared 3R arrangement patterns remain that require confirmation of the resource amount by the shared 3R resource amount confirmation unit. If any remain (Yes), the process returns to step S23, and the shared 3R resource amount confirmation unit confirms the resource amount.
[0126] If there are no remaining (No), in step S27, the minimum resource 3R selection unit 33 selects the shared 3R placement pattern with the minimum resource amount and the resource amount of each 3R from the shared 3Rs as a design candidate. In this example, the pattern in which all third routes 3b, 3c, and 3d select shared 3R 8a has the smallest total resource amount (20 wavelengths) of the candidate 3Rs, so a resource amount placement of 20 wavelengths to shared 3R 8a is selected as the design candidate.
[0127] <Effects of the second embodiment> The effects of the optical path route design apparatus 20B according to the second embodiment of the present invention will be described.
[0128] The optical path route design device 20B shown in Figure 9 is configured to include a total transmission / reception route selection unit 31, a total candidate selection unit 32, a shared 3R resource amount confirmation unit (required resource amount confirmation unit 25, resource amount determination unit 26, resource amount update unit 27, route remaining confirmation unit 28 and maximum resource amount determination unit 29), a minimum resource amount update unit (update unit) 35, and a minimum resource 3R selection unit 33.
[0129] As shown in FIG. 5, the total transmission / reception route selection unit 31 selects a relay station 9 in which two transmission / reception end devices (transmission / reception end points) that transmit and receive optical signals are located from a plurality of relay stations 9 that are connected to each other by optical transmission paths and relay optical signals, selects a route pair 01b of a working 0-system route 0b and a backup 1-system route 1b that connect the transmission / reception end devices and do not overlap with each other, and a backup third route 3b that bypasses the route pair 01b via the relay station 9, and selects relay stations 9 scattered on the selected third route 3b as candidates for locating 3R function units (3R8a, 8b, 8e) that relay optical signals of a predetermined number of wavelengths, in a plurality of optical networks 10B, 10C, and 10D (FIGS. 5, 6, and 10).
[0130] The all-candidate selection unit 32 selects all candidate placement patterns of shared 3R functional units that can be selected by all third routes 3b, 3c, 3d from the candidate 3R functional units on all third routes 3b, 3c, 3d selected in the multiple optical networks 10B, 10C, 10D.
[0131] The shared 3R resource amount confirmation unit confirms the resource amount for each arrangement candidate pattern of the shared 3R functional units selected by the all-candidate selection unit 32 .
[0132] When the resource amount confirmed by the shared 3R resource amount confirmation unit 35 is less than the minimum required resource amount of the total designed resource amounts of all 3R functional units selected as candidate shared 3R placement patterns, the minimum resource amount update unit 35 updates the minimum resource amount to be set in the shared 3R functional unit to the confirmed resource amount.
[0133] The minimum resource 3R selection unit 33 is configured to select, as a design candidate, the layout pattern of shared 3R functional units with the minimum resource amount and the required resource amount for each 3R functional unit from the total amount of 3R resources required for each layout pattern of shared 3R functional units whose resource amount has been confirmed by the shared 3R resource amount confirmation unit, using the minimum resource amount update unit 35.
[0134] According to this configuration, when laying a route pair 01b of a working 0-system route 0b and a backup 1-system route 1b, and a backup third route 3b that bypasses the route pair 01b to realize a third route, it is possible to select a shared 3R function unit (3R8a) with the minimum amount of resources among the shared 3R function units shared by each of the third routes 3b, 3c, and 3d related to the different route pairs 01b, 01c, and 01d. In other words, since the shared 3R function unit (3R8a) with the minimum amount of resources can be selected as a design candidate, it is possible to suppress the installation costs of the third routes 3b, 3c, and 3d to low costs.
[0135] <Configuration of the third embodiment> FIG. 12 is a block diagram showing a configuration of an optical path route design apparatus according to the third embodiment of the present invention.
[0136] The optical path route design device 20C of the third embodiment shown in Figure 12 performs a process of increasing the resource amount of the shared 3R when the number of wavelengths (resource amount) is added to the route pair after the design of selecting the shared 3R on the third route related to the route pair is completed by the above-mentioned optical path route design device 20A (Figure 1) and optical path route design device 20B (Figure 9).
[0137] 12 includes a wavelength addition confirmation unit 41, a route confirmation unit 42, a route inclusion determination unit 43, a wavelength summing unit 44, an existing maximum resource amount excess determination unit 45, and a resource amount update unit 46. This design device 20C may be added to the above-mentioned design device 20A or 20B, or may be provided independently.
[0138] Here, in the optical network 10E shown in Fig. 13, multiple relay stations 9 are connected by optical transmission lines, similar to the optical network 10A (Fig. 4), and transponders (transmitting / receiving terminal points) 8a1, 8b1 are installed in two relay stations 9. The transmitting / receiving terminal points 8a1, 8b1 are connected by a 0-system route 0e and a 1-system route 1e, and are connected to a third route 3e that is a long-distance detour from the route pair (fifth route pair) 01e. The third route 3e is connected via four distant relay stations 9, and 3R8a, 8b, 8c, 8d of each relay station 9 are candidates for installation.
[0139] In the optical network 10F shown in Fig. 14, multiple relay stations 9 are connected by optical transmission lines in the same manner as above, and transponders (transmitting and receiving terminals) 9a1, 9b1 are installed in two relay stations 9. The transmitting and receiving terminals 9a1, 9b1 are connected by a 0-system route 0f and a 1-system route 1f, and are connected to these route pairs (sixth route pair) 01f by a third route 3f that is a long-distance detour. Four relay stations 9 are connected to the third route 3f, and 3R8a, 8b, 8e, and 8g of each relay station 9 are candidates for installation.
[0140] Here, it is assumed that a shared 3R8a is selected to be placed in the relay station 9 on the third route 3e related to the fifth route pair 01e shown in Fig. 13. It is assumed that this shared 3R8a is equipped with 10 wavelengths as a resource to be transmitted when a failure 11 occurs in the 1-system route 1e of the fifth route pair 01e.
[0141] The wavelength addition confirmation unit 41 (FIG. 12) confirms that wavelengths have been added to the fifth route pair 01e. For example, it confirms that 15 wavelengths have been added to the 1st route 1e. Since 10+15=25 wavelengths are transmitted to the 1st route 1a after the wavelength addition, when a single link failure 11 occurs in the 1st route 1e, the 3rd route 3e needs to transmit 25 wavelengths. Therefore, the shared 3R8a on the 3rd route 3e is equipped with a resource capacity of 25 wavelengths.
[0142] The route confirmation unit 42 confirms the maximum resource amount (25 wavelengths) of the shared 3R8a of the third route 3e in the wavelength addition route pair 01e confirmed by the wavelength addition confirmation unit 41, and a failure 12 of a single link constituting the 0-system route 0f in which the shared 3R8a has the maximum resource amount (20 wavelengths) in sharing with the third route 3f that requires 20 wavelength transmission of another route pair 01f before the wavelength addition. At the time of the failure 12 before the wavelength addition, 20 wavelengths are transmitted to the third route 3f, so the shared 3R8a has a resource amount of 20 wavelengths as the maximum resource amount.
[0143] The route inclusion determination unit 43 determines whether or not a single link of a single link failure 12 of a 0-series route 0f (Figure 14) of a route pair 01f, which requires the maximum amount of resources (20 wavelengths) confirmed by the route confirmation unit 42, is included in a 1-series route 1e (Figure 13) of a route pair 01e to which wavelengths have been added (+15 wavelengths).
[0144] When the route content determination unit 43 determines that the wavelength is included, the wavelength addition unit 44 adds 15 additional wavelengths (20+15=35 wavelengths) to the 0-series route 0f that requires the maximum resource of 20 wavelengths (20 wavelengths) as is (20 wavelengths). This total of 35 wavelengths becomes the resource amount of the shared 3R8a shared by the third routes 3e and 3f of the two route pairs 01e and 01f.
[0145] If the route inclusion determination unit 43 determines that the route pair 01e does not contain the existing maximum resource amount, the existing maximum resource amount excess determination unit (also referred to as the excess determination unit) 45 determines whether or not a single link failure (for example, single link failure 11) of the 0-system route and the 1-system route of the route pair 01e to which wavelengths have been added (+15 wavelengths) exceeds the existing maximum resource amount (20 wavelengths). The 1-system route 1e transmits the maximum resource amount of 10+15=25 wavelengths by adding wavelengths (+15 wavelengths).
[0146] If the excess determining unit 45 determines that there is no excess case, the maximum resource amount (20 wavelengths) confirmed by the route confirming unit 42 is set as the resource amount of the shared 3R8a.
[0147] When the excess determination unit 45 determines that there is an excess case, the resource amount update unit 46 updates the resource amount of the shared 3R8a of the third route 3e related to the 1-system route 1e at the time of failure 11, which requires the maximum resource amount (25 wavelengths), to 25 wavelengths.
[0148] <Operation of the third embodiment> Next, an operation of increasing the resource amount of the shared 3R performed after completing the design of the shared 3R selection in the optical path route design processing by the optical path route design apparatus 20C according to the third embodiment will be described with reference to the flowchart of FIG.
[0149] However, after the completion of design to select the shared 3R on the third route related to the route pair by the optical path route design device 20A (FIG. 1) and the optical path route design device 20B (FIG. 9) described above, it is assumed that the shared 3R 8a to be placed in the relay station 9 on the third route 3e related to the fifth route pair 01e shown in FIG. 13 is selected. It is assumed that this shared 3R 8a is equipped with 10 wavelengths as a resource amount to be transmitted when the 1-system route 1e of the fifth route pair 01e fails 11. It is also assumed that the maximum resource amount transmitted to the 0-system route 0f shown in FIG. 14 is 20 wavelengths.
[0150] In step S31 shown in Fig. 15, the wavelength addition confirmation unit 41 (Fig. 12) confirms that wavelengths have been added to the fifth route pair 01e. For example, it confirms that 15 wavelengths have been added to the 1-system route 1e. Since 10+15=25 wavelengths are transmitted to the 1-system route 1a after the wavelength addition, when a single link failure 11 occurs in the 1-system route 1e, the third route 3e needs to transmit 25 wavelengths. Therefore, the shared 3R8a on the third route 3e is equipped with a resource capacity of 25 wavelengths.
[0151] In step S32, the route confirmation unit 42 confirms the maximum resource amount (25 wavelengths) of the shared 3R8a of the third route 3e in the wavelength addition route pair 01e (FIG. 13) confirmed in the above step S31. Furthermore, the route confirmation unit 42 confirms a single link failure that causes the shared 3R8a to have the maximum resource amount (20 wavelengths) in sharing with the third route 3f that requires 20 wavelength transmission of another route pair 01f (FIG. 14) before the wavelength addition.
[0152] In step S33, the route inclusion determination unit 43 determines whether or not the single link of the single link failure requiring the maximum amount of resources (20 wavelengths) confirmed in step S32 above is included in the 1-system route 1e of the route pair 01e to which wavelengths have been added (+15 wavelengths).
[0153] If the result of this determination is that the resource is included (Yes), in step S34, the wavelength summing unit 44 adds 15 additional wavelengths as the required resource amount to the single link failure that requires the maximum resource amount (20 wavelengths) (20 wavelengths) (20 + 15 = 35 wavelengths). This sum of 35 wavelengths becomes the resource amount of the shared 3R8a shared by the third routes 3e and 3f of the two route pairs 01e and 01f. This ends the expansion process.
[0154] On the other hand, if it is determined in step S33 that the wavelength is not included, in step S35, the excess determination unit 45 determines whether or not there is a case in which the existing maximum resource amount (20 wavelengths) is exceeded in each single link failure (for example, 11 cases of single link failure) of the 0-system or 1-system route of the route pair 01e to which wavelengths have been added (+15 wavelengths). However, the 1-system route 1e transmits the maximum resource amount of 10+15=25 wavelengths by adding wavelengths (15 wavelengths).
[0155] If it is determined that there is no excess case (No), the maximum resource amount (20 wavelengths) confirmed by the route confirmation unit 42 in step S32 is set as the resource amount of the shared 3R8a, and this expansion process ends.
[0156] On the other hand, if it is determined that there is an excess case (Yes) as a result of the determination, in step S36, the resource amount update unit 46 updates the resource amount of the shared 3R8a of the third route 3e related to the 1-system route 1e at the time of the failure 11 of the single link failure, which requires the maximum resource amount (25 wavelengths), to 25 wavelengths. This ends the expansion process.
[0157] <Effects of the third embodiment> The effects of the optical path route design apparatus 20C according to the third embodiment of the present invention will be described.
[0158] The optical path route design device 20C shown in FIG. 12 includes a wavelength addition confirmation unit 41, a route confirmation unit 42, a route inclusion determination unit 43, a wavelength summing unit 44, an excess determination unit (existing maximum resource amount excess determination unit) 45, and a resource amount update unit 46.
[0159] The wavelength addition confirmation unit 41 confirms the addition of wavelengths (+15 wavelengths) to one route pair 01e shown in FIG. The route confirmation unit 42 confirms the maximum resource amount (25 wavelengths) of the shared 3R function unit (e.g., 3R8a) on the third route 3e in the confirmed wavelength addition route pair 01e. In addition, the route confirmation unit 42 confirms a single link failure case in which the shared 3R8a has the maximum resource amount (20 wavelengths) in sharing with the third route 3f that requires 20 wavelength transmission of another route pair 01f (FIG. 14) before the wavelength addition.
[0160] The route inclusion determining unit 43 determines whether or not the single link in the single fault case requiring the maximum resource amount (20 wavelengths) confirmed by the route confirming unit 42 is included in the wavelength addition route pair 01e. When the route content determining unit 43 determines that the route is contained, the wavelength adding unit 44 adds the resource amount of the additional wavelengths (+15 wavelengths) to the maximum resource amount (20 wavelengths) that is required (35 wavelengths).
[0161] When the route inclusion determination unit 43 determines that there is no inclusion, the excess determination unit 45 determines whether or not the existing maximum resource amount (20 wavelengths) will be exceeded when the wavelength addition route pair 01e fails. When determining that there is no excess, the maximum resource amount (20 wavelengths) before the wavelength addition confirmed by the route confirmation unit 42 is set as the resource amount of the shared 3R function unit (3R8a).
[0162] The resource amount update unit 46 is configured to update the resource amount of the shared 3R function unit (3R8a) to the maximum resource amount (25 wavelengths) confirmed by the route confirmation unit 42 when the excess determination unit 45 determines that an excess exists.
[0163] According to this configuration, after the optical path route design devices 20A, 20B complete the design to select a shared 3R functional unit on the third route 3e related to the route pair 01e, the resource amount of the shared 3R functional unit can be appropriately increased when the number of wavelengths (resource amount) is added to the route pair 01e.
[0164] <Hardware configuration> Any one of the optical path route design devices 20A, 20B, 20C according to the above-mentioned first to third embodiments is realized by a computer 100 having a configuration as shown in Fig. 16. The computer 100 has a CPU (Central Processing Unit) 101, a ROM (Read Only Memory) 102, a RAM (Random Access Memory) 103, an HDD (Hard Disk Drive) 104, an input / output I / F (Interface) 105, a communication I / F 106, and a media I / F 107.
[0165] The CPU 101 operates based on a program stored in the ROM 102 or the HDD 104, and controls each functional unit. The ROM 102 stores a boot program executed by the CPU 101 when the computer 100 is started up, programs related to the hardware of the computer 100, and the like.
[0166] The CPU 101 controls an output device 111 such as a printer or a display, and an input device 110 such as a mouse or a keyboard, via the input / output I / F 105. The CPU 101 obtains data from the input device 110 via the input / output I / F 105, or outputs generated data to the output device 111.
[0167] The HDD 104 stores programs executed by the CPU 101 and data used by the programs, etc. The communication I / F 106 receives data from other devices (not shown) via a communication network 112 and outputs the data to the CPU 101, and also transmits data generated by the CPU 101 to other devices via the communication network 112.
[0168] The media I / F 107 reads a program or data stored in the recording medium 113 and outputs it to the CPU 101 via the RAM 103. The CPU 101 loads a program related to a target process from the recording medium 113 onto the RAM 103 via the media I / F 107, and executes the loaded program. The recording medium 113 is an optical recording medium such as a DVD (Digital Versatile Disc) or a PD (Phase change rewritable Disc), a magneto-optical recording medium such as an MO (Magneto Optical disk), a magnetic recording medium, a conductive memory tape medium, a semiconductor memory, or the like.
[0169] For example, when the computer 100 functions as any one of the optical path route design devices 20A, 20B, 20C according to the embodiments, the CPU 101 of the computer 100 executes a program loaded onto the RAM 103 to realize the function of any one of the optical path route design devices 20A, 20B, 20C. Furthermore, the HDD 104 stores data in the RAM 103. The CPU 101 reads and executes a program relating to a target process from the recording medium 113. Additionally, the CPU 101 may read a program relating to a target process from another device via the communication network 112.
[0170] <Effects> (1) A transmission / reception route selection unit selects a relay station in which two transmitting / receiving end devices for transmitting / receiving optical signals are located from among a plurality of relay stations that are connected to each other by an optical transmission line and relay optical signals, connects the transmitting / receiving end devices, and selects a route pair of a working 0-system route and a backup 1-system route that do not overlap with each other, and a backup third route that bypasses the route pair via the relay station, and selects relay stations scattered on the selected third route as a 3R (Regenerate Reshape) relay station that relays optical signals of a predetermined number of wavelengths. an existing / absent determination unit that determines whether the selected candidate has an existing shared 3R functional unit; a new 3R selection unit that, when the existing / absent determination unit determines that there is no existing shared 3R functional unit, selects a new shared 3R functional unit from among the candidate shared 3R functional units; and a maximum resource 3R selection unit that, when the existing / absent determination unit determines that there is an existing shared 3R functional unit, selects one shared 3R functional unit if there is only one existing shared 3R functional unit, and selects the shared 3R functional unit with the largest number of wavelengths as a communication resource if there are multiple existing shared 3R functional units.
[0171] According to this configuration, when laying a route pair of an active 0-system route and a backup 1-system route, and a backup third route that bypasses the route pair to realize a third route, a shared 3R function unit shared by each third route related to different route pairs can be selected from new or existing shared 3R function units. In other words, it is possible to easily provide a shared 3R function unit shared by each third route without providing a 3R function unit individually for each third route. This makes it possible to keep the installation costs of the third routes low.
[0172] (2) The optical path route design device according to (1) above, further comprising: a required resource confirmation unit that confirms the amount of resources required for a shared 3R functional unit on the third route related to the route pair when a single link constituting a 0-system route or 1-system route of the route pair fails; an update unit that updates the resource amount of the shared 3R functional unit to the confirmed resource amount when the confirmed resource amount exceeds a maximum required resource amount set in the shared 3R functional unit; and a determination unit that determines the confirmed resource amount as the maximum required resource amount of the shared 3R functional unit when the update is not performed, and determines the updated resource amount as the maximum required resource amount of the shared 3R functional unit when the update is performed, wherein the resource amount required for the shared 3R functional unit is the number of wavelengths of an optical signal transmitted to the failed single link, and when there is an identical failed single link in different route pairs, the number of wavelengths is the sum of the number of wavelengths of an optical signal transmitted for each failed single link.
[0173] According to this configuration, the following effects can be obtained. Suppose a first failure occurs only in a single link constituting a 1-system route using, for example, 10 wavelengths in the first route pair. In this case, the specific shared 3R function unit on the third route related to the first route pair requires a resource amount of 10 wavelengths. On the other hand, suppose a second failure occurs in a single link constituting the same 0-system route using 10 wavelengths in each of the second and third route pairs. In this case, the specific shared 3R function unit on each third route related to the second and third route pairs requires a resource amount of 20 wavelengths, which is the sum of the 10 wavelengths required for transmission for each third route at the time of the second failure (10+10). In this way, the specific shared 3R function unit shared by the three third routes requires 10 wavelengths at the time of the first failure and 20 wavelengths at the time of the second failure, but it is possible to get by with the minimum required resource amount of 20 wavelengths, rather than 10+20=30 wavelengths. This allows the installation cost for the third route to be kept low.
[0174] (3) a total transmission / reception route selection unit that performs processing in an optical network in a plurality of optical networks to select a relay station in which two transmitting and receiving end devices that transmit and receive optical signals are to be located from a plurality of relay stations that are connected to each other by an optical transmission path and relay optical signals, to connect the transmitting and receiving end devices and select a route pair of a working 0-system route and a backup 1-system route that do not overlap with each other, and a backup third route that bypasses the route pair via a relay station, and to select relay stations scattered on the selected third route as candidates for locating a 3R functional unit that relays optical signals of a predetermined number of wavelengths, and a total transmission / reception route selection unit that performs processing in an optical network in a plurality of optical networks to select a total transmission / reception route selection unit that performs processing in an optical network in a plurality of optical networks to select a total transmission / reception route selection unit that performs processing in an optical network to select a total transmission / reception route selection unit that performs processing in an optical network the arrangement pattern of shared 3R functional units whose resource amounts have been confirmed by the shared 3R resource amount confirmation unit and the arrangement pattern of shared 3R functional units whose resource amounts have been updated by the minimum resource amount update unit; and a minimum resource 3R selection unit that selects the arrangement pattern of shared 3R functional units with the minimum resource amount and the resource amount of each shared 3R functional unit as a design candidate from among the arrangement patterns of shared 3R functional units whose resource amounts have been confirmed by the shared 3R resource amount confirmation unit and the arrangement patterns of shared 3R functional units whose resource amounts have been updated by the minimum resource amount update unit.
[0175] According to this configuration, when laying a route pair of a working 0-system route and a backup 1-system route, and a backup third route that bypasses the route pair to realize a third route, it is possible to select a shared 3R function unit with the minimum amount of resources among the shared 3R function units shared by each third route related to different route pairs. In other words, since the shared 3R function unit with the minimum amount of resources can be selected as a design candidate, it is possible to suppress the installation cost of the third route to a low cost.
[0176] (4) a wavelength addition confirmation unit that confirms the addition of a wavelength to one route pair; a route confirmation unit that confirms the maximum resource amount of a shared 3R functional unit on a third route in the wavelength addition route pair confirmed by the wavelength addition confirmation unit and that confirms a single link failure in which the shared 3R functional unit has the maximum resource amount when shared with the third route of another route pair before the wavelength addition; a route inclusion determination unit that determines whether or not a single link of the single link failure requiring the maximum resource amount confirmed by the route confirmation unit is included in the wavelength addition route pair; and The optical path route design device according to any one of (1) to (3) above, further comprising: a wavelength summing unit which sums the resource amount of an added wavelength to the source amount; an excess determination unit which determines whether or not the existing maximum resource amount is exceeded when the route inclusion determination unit determines that there is no inclusion and when a single link constituting a wavelength addition route pair fails; and a resource amount updating unit which updates the resource amount of the shared 3R functional unit to the maximum resource amount confirmed by the route confirmation unit when the excess determination unit determines that there is an excess; and wherein when the excess determination unit determines that there is no excess, the maximum resource amount before the wavelength is added confirmed by the route confirmation unit is taken as the resource amount of the shared 3R functional unit.
[0177] According to this configuration, after the optical path route design device completes the design to select a shared 3R functional unit on the third route related to the route pair, the resource amount of the shared 3R functional unit can be appropriately increased when the number of wavelengths (resource amount) is added to the route pair.
[0178] In addition, the specific configuration can be modified as appropriate without departing from the spirit of the present invention. [Explanation of symbols]
[0179] 0a, 0b, 0c, 0d, 0e, 0f 0 series route 1a, 1b, 1c, 1d, 1e, 1f 1 series route 01a,01b,01c,01d,01e,01f root pairs 3a,3b,3c,3d,3e,3f 3rd route 8a, 8b, 8d, 8e, 8f, 8g, 8h, 8i, 8j, 8e, 8f 3R Relay Device (3R Functional Unit, Shared 3R Functional Unit) 4a, 4b, 5a, 5b, 6a, 6b, 7a, 7b, 8a1, 8b1, 9a1, 9b1 Transponder, Transmission / Reception Endpoint (Transmission / Reception End Device) 10A, 10B, 10C, 10D, 10E, 10F Optical Network 20A, 20B, 20C Optical Path Route Design Device 20 Transmission / Reception Route Selection Unit 21 3R Installation Candidate Selection Unit (Candidate Selection Unit) 22 Existing Presence Judgment Unit 23 Maximum Resource 3R Selection Unit 24 New 3R Selection Unit 25 Required Resource Quantity Confirmation Unit 26 Resource Quantity Judgment Unit 27 Resource Quantity Update Unit (Update Unit) 28 Route Remaining Confirmation Unit 29 Maximum Resource Quantity Determination Unit (Determination Unit) 31 All Transmission / Reception Route Selection Unit 32 All 3R Installation Candidate Selection Unit 33 Minimum Resource 3R Selection Unit 34 Minimum Resource Quantity Judgment Unit 35 Minimum Resource Quantity Update Unit 36 Confirmation Required Route Remaining Confirmation Unit 41 Wavelength Addition Confirmation Unit 42 Route Confirmation Unit 43 Route Inclusion Judgment Unit 44 Wavelength Summation Unit 45 Existing Maximum Resource Quantity Exceedance Judgment Unit (Exceedance Judgment Unit) 46 Resource Quantity Update Unit
Claims
1. a transmission / reception route selection unit that selects a relay station in which to place two transmitting / receiving end devices that transmit and receive optical signals from a plurality of relay stations that are connected to each other by an optical transmission path and relay optical signals, and that connects the transmitting / receiving end devices and selects a route pair of a working 0 system route and a backup 1 system route that do not overlap with each other, and a backup third route that bypasses the route pair via the relay station; and a candidate selection unit that selects relay stations scattered on the selected third route as candidates for placing a 3R (Regenerate Reshape Retiming) function unit that relays optical signals of a predetermined number of wavelengths. an existing / non-existent determination unit that determines whether the selected candidate shared 3R function unit exists; a new 3R selection unit that selects a new shared 3R functional unit from among the candidate shared 3R functional units when the existing presence / absence determination unit determines that there is no existing functional unit; a maximum resource 3R selection unit that, when the existing presence / absence determination unit determines whether or not there is an existing shared 3R functional unit, selects one shared 3R functional unit if there is only one existing shared 3R functional unit, and selects the shared 3R functional unit having the largest number of wavelengths as a communication resource if there are multiple existing shared 3R functional units; An optical path route design device comprising:
2. a required resource confirmation unit that confirms, when a single link constituting a 0-system route or a 1-system route of the route pair fails, an amount of resources required for a shared 3R function unit on the third route related to the route pair; an update unit that updates a resource amount of the shared 3R functional unit to the confirmed resource amount when the confirmed resource amount exceeds a maximum required resource amount set in the shared 3R functional unit; a determination unit that determines the confirmed resource amount as the maximum resource amount required by the shared 3R functional unit when the update is not performed, and determines the updated resource amount as the maximum resource amount required by the shared 3R functional unit when the update is performed; Equipped with The amount of resources required for the shared 3R function unit is the number of wavelengths of the optical signal transmitted to the failed single link, and when the same failed single link exists in different route pairs, the number of wavelengths is the sum of the number of wavelengths of the optical signal transmitted for each failed single link.
2. The optical path route design device according to claim 1 .
3. an all-transmission route selection unit that executes the following process in a plurality of optical networks: selecting a relay station in which to place two transmitting and receiving end devices that transmit and receive optical signals from a plurality of relay stations that are connected to each other by an optical transmission path and relay optical signals, connecting the transmitting and receiving end devices, selecting a route pair of a working 0-system route and a backup 1-system route that do not overlap with each other, and a backup third route that bypasses the route pair via a relay station, and selecting relay stations scattered on the selected third route as candidates for placing a 3R function unit that relays optical signals of a predetermined number of wavelengths; an all-candidate selection unit that selects all arrangement pattern candidates of shared 3R functional units indicating the 3R functional units to be used in all third routes from among the candidate 3R functional units on all third routes selected in the plurality of optical networks; a shared 3R resource amount confirmation unit that confirms the total amount of resources of the shared 3R resource unit for each arrangement pattern of the shared 3R function unit selected by the all candidate selection unit; a minimum resource amount update unit that updates a minimum resource amount to be set in the shared 3R functional unit to the confirmed resource amount when the confirmed resource amount is less than a minimum required resource amount of a designed arrangement pattern set in the shared 3R functional unit; a minimum resource 3R selection unit that selects the arrangement pattern of the shared 3R functional units with the minimum resource amount and the resource amount of each shared 3R functional unit as a design candidate from the arrangement pattern of the shared 3R functional units whose resource amount has been confirmed by the shared 3R resource amount confirmation unit and the arrangement pattern of the shared 3R functional units whose resource amount has been updated by the minimum resource amount update unit; An optical path route design device comprising:
4. a wavelength addition confirmation unit for confirming addition of a wavelength to one route pair; a route confirmation unit that confirms a maximum resource amount of a shared 3R function unit on a third route in the wavelength addition route pair confirmed by the wavelength addition confirmation unit, and confirms a single link failure that causes the shared 3R function unit to have the maximum resource amount in sharing with the third route of another route pair before the wavelength addition; a route inclusion determination unit that determines whether or not a single link of a single link failure requiring the maximum resource amount confirmed by the route confirmation unit is included in a wavelength addition route pair; a wavelength summing unit that sums a resource amount of an additional wavelength to a maximum resource amount of a single link failure requiring the maximum resource amount when the route inclusion determining unit determines that the resource amount is included; an excess determination unit that determines whether or not an existing maximum resource amount is exceeded when the route inclusion determination unit determines that no resource is included and when a failure occurs in a single link that constitutes a wavelength addition route pair; a resource amount update unit that updates the resource amount of the shared 3R function unit to the maximum resource amount confirmed by the route confirmation unit when the excess determination unit determines that an excess exists; When the excess determination unit determines that there is no excess, the maximum resource amount before the wavelength is added that is confirmed by the route confirmation unit is set as the resource amount of the shared 3R function unit.
4. The optical path route design device according to claim 1, wherein:
5. An optical path route design method by an optical path route design device, comprising: The optical path route design apparatus includes: selecting a relay station in which to place two transmitting and receiving end devices that transmit and receive optical signals from among a plurality of relay stations that are connected to each other by an optical transmission path and relay optical signals, connecting the transmitting and receiving end devices, selecting a route pair of a working 0-system route and a backup 1-system route that do not overlap with each other, and a backup third route that bypasses the route pair via the relay station, and selecting relay stations scattered on the selected third route as candidates for placing a 3R (Regenerate Reshape Retiming) function unit that relays optical signals of a predetermined number of wavelengths; A step of determining whether the selected candidate shared 3R function unit exists; selecting a new shared 3R functional unit from among the candidate shared 3R functional units when it is determined that there is no existing shared 3R functional unit; a step of selecting one shared 3R functional unit if there is one existing shared 3R functional unit when determining whether there is an existing shared 3R functional unit, and selecting the shared 3R functional unit having the largest number of wavelengths as a communication resource if there are multiple existing shared 3R functional units; 2. An optical path route design method comprising:
6. When a single link constituting a 0-system route or a 1-system route of the route pair fails, a step of confirming an amount of resources required for a shared 3R function unit on the third route related to the route pair is provided; When the confirmed resource amount exceeds a maximum required resource amount set in the shared 3R function unit, updating the resource amount of the shared 3R function unit to the confirmed resource amount; determining the confirmed resource amount as the maximum resource amount required by the shared 3R functional unit when the update is not performed, and determining the updated resource amount as the maximum resource amount required by the shared 3R functional unit when the update is performed; Run The amount of resources required for the shared 3R function unit is the number of wavelengths of the optical signal transmitted to the failed single link, and when the same failed single link exists in different route pairs, the number of wavelengths is the sum of the number of wavelengths of the optical signal transmitted for each failed single link.
6. The optical path route design method according to claim 5.
7. An optical path route design method by an optical path route design device, comprising: The optical path route design apparatus includes: a step of executing, in a plurality of optical networks, a process in an optical network of selecting a relay station in which to place two transmitting and receiving end devices that transmit and receive optical signals from a plurality of relay stations that are connected to each other by an optical transmission path and relay optical signals, connecting the transmitting and receiving end devices, selecting a route pair of a working 0-system route and a backup 1-system route that do not overlap with each other, and a backup third route that bypasses the route pair via the relay station, and selecting relay stations scattered on the selected third route as candidates for placing a 3R function unit that relays optical signals of a predetermined number of wavelengths; selecting all arrangement pattern candidates of shared 3R functional units indicating the 3R functional units used in all third routes from among the candidate 3R functional units on all third routes selected in the plurality of optical networks; A step of confirming a total amount of resources of the shared 3R resource unit for each arrangement pattern of the selected shared 3R function unit; When the confirmed resource amount is less than a minimum required resource amount of a designed arrangement pattern set in the shared 3R functional unit, updating the minimum resource amount to be set in the shared 3R functional unit to the confirmed resource amount; selecting, as a design candidate, the arrangement pattern of the shared 3R functional units with the minimum resource amount and the resource amount of each shared 3R resource unit from the arrangement pattern of the shared 3R functional units with the confirmed resource amount and the arrangement pattern of the shared 3R functional units with the updated resource amount; 2. An optical path route design method comprising:
8. performing a first confirmation of adding a wavelength to a route pair; a step of confirming a maximum resource amount of a shared 3R function unit on a third route in the first confirmed wavelength addition route pair, and performing a second confirmation to confirm a single link failure that causes the shared 3R function unit to have the maximum resource amount in sharing with the third route of another route pair before the wavelength addition; determining whether the single link of the single link failure requiring the second confirmed maximum resource amount is included in the wavelength addition route pair; When determining that the maximum resource amount is included, adding the resource amount of the additional wavelength to the maximum resource amount of a single link failure that requires the maximum resource amount; determining whether or not the amount of existing maximum resources is exceeded when a single link constituting the wavelength addition route pair fails when the inclusion is determined; updating the resource amount of the shared 3R function unit to the second confirmed maximum resource amount when it is determined that the resource amount is exceeded; when it is determined that there is no excess, the second confirmed maximum resource amount before the wavelength is added is set as the resource amount of the shared 3R function unit; 8. The optical path route design method according to claim 5, further comprising the steps of:
Citation Information
Patent Citations
Signal switching device and transmission system using same
JP2005027144A
Method for provisioning optical connections within an optical network
JP2017511656A
Optical network control device and optical path setting method
WO2017179534A1
Optical network control device and optical path setting method
WO2018066582A1
