Parts Integrated Management Device
The parts integrated management system optimizes nuclear power plant equipment maintenance by predicting component life and cost, addressing unreliable breakdowns and high costs through informed part replacement decisions.
Patent Information
- Application Number
- JP2022012402
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-09-24
- Filing Date
- 2022-01-28
- Publication Date
- 2024-10-17
- Estimated Expiration
- 2042-01-28
AI Technical Summary
Existing maintenance practices for nuclear power plant equipment parts with varying service lives face challenges in setting optimal replacement cycles, leading to unreliable equipment breakdowns and increased costs due to either excessive maintenance or premature part replacement.
A parts integrated management system that predicts the remaining life of components based on life characteristics and cost information, optimizing replacement timing to minimize maintenance costs while ensuring equipment reliability.
The system effectively minimizes maintenance costs and maintains equipment reliability by accurately predicting part replacement times, reducing unnecessary replacements and improving cost management.
Smart Images

Figure 0007569344000001 
Figure 0007569344000002 
Figure 0007569344000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a system for integrated management of replacement parts such as consumables for equipment in nuclear power plants and other nuclear power-related facilities. Place Regarding. [Background technology]
[0002] Generally, for parts with limited life spans (parts whose performance deteriorates over time and which require replacement at regular intervals) used in equipment at facilities such as nuclear power plants, the replacement cycle is described in the instruction manual, etc., and the list of parts to be replaced is determined based on the results of periodic inspections. The replacement cycle for these parts with limited life spans is determined based on estimated values from life tests, empirical values, etc.
[0003] For example, Patent Document 1 discloses that for EQ (Environmental Qualification) equipment, which is required to have environmental resistance performance in nuclear power plants, the lifespan and replacement timing of EQ equipment are determined from the results of environmental measurements, and the equipment is appropriately managed and maintained. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2019-007852 A Summary of the Invention [Problem to be solved by the invention]
[0005] Conventionally, parts with a finite lifespan were inspected and replaced periodically. However, for parts with a wide variation in lifespan, setting a short replacement cycle not only reduces reliability due to excessive maintenance, but is also wasteful, so an average replacement cycle is set based on experience. This results in problems such as failures shortly after replacement, or replacement when parts still have a remaining lifespan. Additionally, at facilities such as nuclear power plants, maintenance work on EQ equipment is carried out during regular inspections, and replacement cycles for EQ equipment parts are set according to these inspections, but there was an issue with the reliability of the maintenance work not being adequately guaranteed and the costs not being evaluated.
[0006] The object of the present invention is to develop an integrated parts management system for nuclear power-related equipment that takes into account the remaining life, part cost, and replacement cost of parts. Place The purpose is to provide. [Means for solving the problem]
[0007] In order to solve the above-mentioned problems, the parts integration management device of the present invention is a parts integration management device for equipment used in nuclear power-related facilities, and includes a parts information storage unit that stores limit test results that indicate the life characteristics of parts that affect the soundness of the equipment, a cost information storage unit that stores cost information on the part replacement work, the part price, and losses due to equipment shutdown, a life prediction unit that predicts the remaining life of the parts from equipment status information by referring to the limit test results in the parts information storage unit, and a parts selection unit that selects replacement parts that minimize the maintenance cost of the equipment based on a maintenance plan, from the remaining life of the parts, the equipment life, and the cost information. Effect of the Invention
[0008] According to the present invention, the maintenance costs for parts of equipment in nuclear power-related facilities can be minimized without compromising the reliability of the equipment. [Brief description of the drawings]
[0009] [Figure 1] 1 is a block diagram showing a configuration of an integrated parts management device according to a first embodiment; [Diagram 2] 11 is a diagram showing a configuration of maintenance plan information of an EQ device stored in a maintenance plan information storage unit. FIG. [Diagram 3] 11 is a diagram showing the configuration of part information indicating the contents of a part to be replaced of an EQ device, which is stored in a part information storage unit. FIG. [Figure 4]11 is a diagram showing the configuration of cost information generated when replacing a part of an EQ device, which is stored in a cost information storage unit. FIG. [Diagram 5] FIG. 11 is a flow chart showing a process in which, when replacing a part of an EQ device in one maintenance job, the integrated parts management device determines whether or not a part can be replaced and selects a part that minimizes the cost of the maintenance job. [Figure 6] FIG. 11 is a block diagram showing a configuration of a parts integrated management device according to a second embodiment. [Figure 7] FIG. 11 is a diagram showing a configuration of part information according to the second embodiment. [Figure 8] This is a flow diagram showing a process of determining whether or not to replace parts and selecting parts that minimizes the cost of maintenance work while ensuring the reliability of the equipment, based on the life characteristics of consumable parts obtained from limit test results. [Figure 9] This is a flow chart that explains the operation of predicting the remaining life of a consumable part based on the life characteristics of the consumable part from the results of limit tests, predicting the remaining life of the consumable part from the amount of change in the dimensions or physical properties of the consumable part and the equipment operating rate, and determining whether or not to replace a part or selecting a part that minimizes the cost of maintenance work while ensuring the reliability of the equipment. [Figure 10] This is a flow diagram that explains the operation of predicting the remaining life of consumable parts based on the results of limit tests of the consumable parts, correcting the remaining life in accordance with usage condition information, and determining whether or not to replace parts or selecting parts that will minimize the cost of maintenance work while ensuring the reliability of the equipment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. EXAMPLES
[0011] The integrated parts management device 10 of the first embodiment manages life characteristic data based on limit tests of multiple parts (consumable parts) constituting EQ equipment in nuclear power-related facilities such as nuclear power plants, which correspond to the environment in which the EQ equipment is required, and by referring to the life characteristic data, predicts the remaining life of the parts from status information indicating the operating state of the EQ equipment, determines the replacement timing of the parts, and proposes consolidating the parts into the most suitable parts to optimize parts costs.
[0012] In detail, the integrated parts management device 10 of the first embodiment obtains the life characteristic data of the life parts used in the EQ equipment installed in the nuclear power related facilities, the past replacement records, and the operating status of the EQ equipment in use by sampling via the Internet, and calculates the remaining life by comparing with the limit test results performed for each part.Then, the power generation loss cost (equipment downtime loss) due to the extension of the shutdown period for the power plant's regular inspection, the replacement work cost, and the cost of the part itself are compared to determine the replacement timing that can minimize costs while ensuring reliability.
[0013] In addition, the integrated parts management device 10 of the first embodiment replaces currently used parts with parts that are used in a similar environment and have a longer life span while ensuring reliability by comparing the limit tests and usage records of parts used in the EQ device. In other words, the integrated parts management device 10 consolidates and manages the parts of the EQ device.
[0014] Hereinafter, the integrated parts management device according to the first embodiment will be described in detail with reference to the drawings.
[0015] FIG. 1 is a block diagram showing the configuration of an integrated parts management device 10 according to the first embodiment. The integrated parts management device 10 comprises a parts information storage unit 1, a cost information storage unit 2, a life prediction unit 3, a parts selection unit 4, an output unit 5, a parts ordering unit 6, a limit test result input unit 7, a maintenance plan information storage unit 8 and an equipment status acquisition unit 9.
[0016] The part information storage unit 1 is a storage unit that stores, as part information, limit test results that indicate the life characteristics of parts such as consumables that affect the soundness of the EQ device for each usage environment. The details of the part information will be described later with reference to FIG.
[0017] The cost information storage unit 2 is a storage unit that stores cost information such as replacement work for parts (consumable parts), prices of the parts (consumable parts), and losses due to stoppage of the EQ device. Details of the cost information will be described later with reference to FIG.
[0018] The device status acquisition unit 9 acquires, from the EQ device, status information indicating the operating status of the EQ device, which is composed of environmental information such as the temperature, humidity, radiation amount, and atmospheric pressure of the EQ device, and the operating rate of the EQ device.
[0019] The life prediction unit 3 is a processing unit that refers to the limit test results in the part information storage unit 1 and predicts the remaining life of parts that can ensure the reliability of the equipment from the status information acquired by the equipment status acquisition unit 9.
[0020] The part selection unit 4 is a processing unit that selects replacement parts that minimize the maintenance cost of the EQ device in the facility maintenance plan or during regular inspection, based on the remaining life of the parts, the life and reliability of the EQ device, and cost information.
[0021] The maintenance plan information storage unit 8 is a storage unit that stores maintenance plan information for the EQ device. The configuration of the maintenance plan information will be described later with reference to FIG.
[0022] The output unit 5 is an output unit that displays a list of replacement parts in the maintenance work selected by the part selection unit 4. Based on the list of replacement parts output from the output unit 5, replacement work of the parts to be maintained of the EQ device is performed.
[0023] The parts ordering unit 6 is a processing unit that manages inventory of parts for the EQ device and orders parts required for maintenance work on the EQ device from the parts supply chain.
[0024] Hereinafter, the integrated parts management device 10 of the first embodiment will be described in detail.
[0025] Incidentally, the integrated parts management device 10 of the first embodiment is realized by a computer having a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM, an HDD (Hard Disk Drive), an input / output I / F (Interface), a communication I / F, and a media I / F.
[0026] The CPU operates based on a program (integrated parts management program) stored in the ROM or HDD, and realizes functions such as the life prediction unit 3 and the part selection unit 4 of the integrated parts management device 10 shown in Fig. 1. The ROM stores a boot program executed by the CPU when the computer starts up, programs related to the computer hardware, and the like.
[0027] The CPU controls input devices such as a mouse and keyboard, and output devices such as a display, via the input / output I / F to obtain data from the input / output I / F input devices and output data generated from the input / output I / F input devices to the output devices. In addition, the CPU obtains data from other devices via the network or communication network through the communication I / F, and transmits data generated by the CPU to other devices via the network or communication network through the communication I / F. The CPU executes a program and realizes the functions of the limit test result input unit 7, the equipment status acquisition unit 9, the output unit 5, and the parts ordering unit 6 through the input / output I / F or the communication I / F.
[0028] The HDD stores the programs executed by the CPU and the data used by the programs. The part information storage unit 1, the cost information storage unit 2, and the maintenance plan information storage unit 8 are realized by a HDD.
[0029] The media I / F reads a program or data stored in the recording medium and outputs it to the CPU via the RAM. The CPU loads a program related to the target processing from the recording medium onto the RAM via the media I / F and executes the loaded program. The recording medium may be an optical recording medium such as a DVD (Digital Versatile Disc) or a PD (Phase change rewritable Disk), a magneto-optical recording medium such as an MO (Magneto Optical disk), a magnetic recording medium, a conductive memory tape medium, or a semiconductor memory.
[0030] FIG. 2 is a diagram showing the configuration of the maintenance plan information of the EQ device stored in the maintenance plan information storage unit 8. As shown in FIG. The maintenance plan information is information that indicates the contents of the maintenance work of the EQ equipment to be performed during periodic inspections, etc. In nuclear power plants and other nuclear-related facilities, the maintenance work of the EQ equipment is determined in advance by a maintenance work plan for the operation period.
[0031] The maintenance plan information consists of, for each planned maintenance work, the name of the maintenance work, the type of maintenance work (such as regular inspection or special work), the schedule for carrying out the maintenance work (date, time, period), the name of the EQ equipment for which the maintenance work will be performed, and the name of the part to be replaced.
[0032] FIG. 2 shows that in maintenance work on target devices A and B, parts with part names A1, A2, A3, etc. are replaced in device A, and parts with part names B1, B2, etc. are replaced in device B.
[0033] FIG. 3 is a diagram showing the structure of part information stored in the part information storage unit 1 and indicating the contents of parts to be replaced as part of the maintenance of the EQ device. The part information corresponds to the target part name in FIG. 2 and is configured for each part to be replaced in the EQ device.
[0034] The part name in the part information is the name of the part to be replaced. The part number is identification information of the part to be replaced. The name of the EQ device used is the name of the EQ device that uses the part. Part specifications are information that indicates dimensions, shape, materials, performance, environmental resistance specifications, etc.
[0035] The part price is the purchase price of the part. The availability period is the period during which the part is available. The replacement time is the time it takes to replace a part in an EQ device. The work procedure is information showing the procedure for replacing parts in the EQ device. It may be a procedure file or a link to a web page showing the procedure.
[0036] The last replacement date is the date and time when the part was last replaced. The date and time elapsed from the last replacement date to the current replacement date is the operating time of the part. The recommended life is the recommended operating time in a specified operating environment. Replace parts so that the operating time does not exceed the recommended time. The remaining life indicates the remaining operating time in the usage environment calculated by the life prediction unit 3. If the remaining life is longer than the period until the next maintenance work date and time, replacement does not need to be performed during the current maintenance work.
[0037] The limit test result is information for referring to the limit test result of the life characteristics of the part for each usage environment. It may be link information of the test result file. The compatible part name is information indicating the name of a replaceable part. When the compatible part name is set, the part selection unit 4 performs cost evaluation including the compatible part, and selects the part with the lowest cost while ensuring the reliability of the equipment.
[0038] FIG. 4 is a diagram showing the structure of cost information stored in the cost information storage unit 2, which is generated when replacing a part of an EQ device. The cost information consists of the purchase costs of each part A1, A2, A3, B1, B2, ..., the replacement costs incurred when replacing each part A1, A2, A3, B1, B2, ..., and the loss costs incurred when stopping EQ equipment A, B, ....
[0039] In FIG. 4, the replacement cost of each part is shown as the labor cost, but there may be cases where multiple parts can be replaced in one replacement operation. In such cases, the replacement cost may be shown pro rata for a combination of parts such as part names A1+A2. Moreover, the equipment stoppage loss in FIG. 4 may be shown as an equipment stoppage loss when the periodic inspection period is exceeded.
[0040] Next, the operation of the integrated parts management device 10 of the first embodiment will be described with reference to the flow chart of FIG. FIG. 5 shows a process in which, when replacing a part of an EQ device in one maintenance job, the integrated parts management device 10 determines whether or not a part can be replaced and selects a part that minimizes the cost of the maintenance job.
[0041] In step S51, the integrated parts management device 10 causes the limit test result input unit 7 to register the limit test results for each use environment of the parts of the EQ device in the limit test results in the part information storage unit 1. In step S51, the general industrial parts may be subjected to a limit test, and the integrated parts management device 10 may store the limit test results of the life characteristics of the parts for the EQ device for each use environment. This allows the general industrial parts to be used as parts for the EQ device.
[0042] In step S52, the integrated parts management device 10 refers to the maintenance plan information in the maintenance plan information storage unit 8, and repeats the processes from step S53 to S56 for the target parts registered in the maintenance work.
[0043] In step S53, the parts integrated management device 10 determines the EQ equipment using the target part by referring to the maintenance plan information (maintenance plan information storage unit 8), and acquires status information of the EQ equipment using the target part by the equipment status acquisition unit 9. The acquired status information is environmental information such as the temperature, humidity, radiation amount, and atmospheric pressure of the EQ equipment, and the operating rate of the EQ equipment.
[0044] In step S54, the integrated parts management device 10 predicts the remaining lifespan of the parts using the lifespan prediction unit 3. The integrated parts management device 10 registers the predicted remaining lifespan of the parts in the remaining lifespan of the parts information (parts information storage unit 1). In detail, the lifespan prediction unit 3 refers to the limit test results (parts information storage unit 1) and predicts the remaining lifespan of the parts from the status information of the EQ equipment acquired in step S53.
[0045] In step S55, the integrated parts management device 10 causes the parts selection unit 4 to evaluate the cost involved in replacing the target parts and select the parts that minimize the maintenance cost.
[0046] In detail, the part selection unit 4 refers to the maintenance plan information (maintenance plan information storage unit 8) to obtain the next maintenance work schedule for the target part, and calculates the time until the next maintenance work. Then, it is determined whether the remaining life of the target part predicted in step S54 is longer than the time until the next maintenance work. If the remaining life is longer than the time until the next maintenance work, the part replacement in this maintenance work is stopped. The maintenance cost of the target part is set to 0. If the availability rate of the EQ device in the status information acquired in step S53 is lower than a predetermined value, the part selection unit 4 performs part replacement since there is a possibility that the remaining life span may be shortened.
[0047] Next, the part selection unit 4, assuming that the target part is to be replaced, refers to the cost information (cost information storage unit 2), acquires the part cost, operation cost, and equipment downtime loss of the target part, and adds them up to determine the maintenance cost of the target part. If there is a part to be replaced at the same time, the operation cost is pro rataly calculated to calculate the maintenance cost of the target part.
[0048] If the name of a compatible part for the target part is registered in the part information (part information storage unit 1), the part selection unit 4 replaces the target part with the compatible part, refers to the part information (part information storage unit 1) of the compatible part, determines the part cost and labor cost from the part price and replacement time, adds up the equipment downtime loss, and determines the maintenance cost of the target part.
[0049] In this case, by consolidating the parts by changing the target parts to compatible parts, the number of parts increases, but this is expected to reduce the cost of parts. Moreover, the decision as to whether or not to change to a compatible part may be made based on the ratio of the part price and the recommended lifespan in the part information, that is, by comparing performance. Moreover, the decision as to whether or not to change to a compatible part may be made by comparing the length of time that the part information is available.
[0050] The part selection unit 4 calculates the maintenance costs of all the target parts, changes the combinations, and finds a combination that minimizes the total maintenance work cost, thereby selecting the part (target part).
[0051] In step S56, the integrated parts management device 10 repeats the processes from steps S53 to S55 for the target parts, and then proceeds to step S57.
[0052] In step S57, the integrated parts management device 10 causes the output unit 5 to output a list of parts to be replaced in the maintenance work.
[0053] In step S58, the integrated parts management device 10 notifies the vendor of the parts supply according to the stock of the parts through the parts ordering unit 6, and orders the replacement parts. In this way, the integrated parts management device 10 of the first embodiment constitutes a part of the supply chain of the EQ device parts.
[0054] According to the integrated parts management device 10 of the first embodiment, it is possible to minimize the maintenance cost of parts for the EQ devices without compromising the reliability of the EQ devices. Furthermore, by consolidating parts, not only can the administrative work such as purchasing parts and inventory management be reduced, but also a supply chain for parts can be maintained and built by making a long-term purchasing plan. EXAMPLES
[0055] Next, we will explain an integrated parts management device 10 that relates to consumable parts, which are resin products (packings, sealing materials, oils, coating materials, sheets, etc.) or metal products (bearings, etc.) in general equipment used in nuclear power-related facilities, predicts the remaining life of consumable parts from equipment status information by referring to limit test results that show the life characteristics of the consumable parts under the environmental conditions under which the equipment is used, predicts the remaining life of consumable parts based on actual equipment data obtained by measuring the consumable parts and / or the usage conditions of the consumable parts, determines the replacement timing of the parts, and optimizes parts costs by consolidating them into the most suitable parts.
[0056] Here, nuclear power-related facilities include nuclear reactor facilities undergoing decommissioning work, nuclear fuel cycle plants, fuel processing plants, and radioactive waste disposal sites.
[0057] Specifically, the integrated parts management device 10 of the second embodiment obtains limit test results indicating life characteristics related to operating time from the dimensions (initial dimensions), shape or physical properties of the consumable parts before use and dimensional changes, shape changes or physical property deterioration such as compression set at the end of use, and then predicts the remaining life of the consumable parts from the state of the equipment based on the limit test results.
[0058] Furthermore, the integrated parts management device 10 measures the dimensions of the consumable parts as actual machine data, for example, and evaluates the remaining lifespan based on the amount of change from the initial dimensions. At this time, it is desirable for the integrated parts management device 10 to take into consideration the dimensional variation of the consumable parts and to evaluate the remaining life of parts with large dimensional variation as being short.
[0059] The integrated parts management device 10 of the second embodiment evaluates the remaining lifespan of the consumable parts by taking into account the influence of deterioration depending on the usage conditions of the consumable parts. The usage conditions that may affect deterioration include the characteristics of the fluid that comes into contact with the consumable parts (gas, water vapor, water, pH) or the use of chemical substances that accelerate the corrosion of the parts (alkali metals, lanthanides, actinides, transition metals, halogens, chalcogen elements).
[0060] The integrated parts management device 10 of the first embodiment predicts the remaining life of consumable parts based on life characteristic data based on limit test results corresponding to the environmental conditions of the EQ equipment, thereby optimizing the maintenance costs of the consumable parts while ensuring reliability, whereas the integrated parts management device 10 of the second embodiment predicts the remaining life of consumable parts while ensuring reliability based on life characteristic data based on limit test results corresponding to the environmental conditions under which the consumable parts are used. Further, the integrated parts management device 10 of the second embodiment is different in that it performs one or both of the following: evaluating the remaining life from the usage record and evaluating the remaining life taking into account the deterioration of the consumable parts according to the usage conditions of the consumable parts.
[0061] Similar to the parts integrated management device 10 of the first embodiment, the parts integrated management device 10 of the second embodiment determines the timing of part replacement based on the predicted remaining life of consumable parts, and consolidates the parts into the most suitable parts to optimize part costs.
[0062] The integrated parts management device according to the second embodiment will be described in detail below with reference to the drawings.
[0063] FIG. 6 is a block diagram showing the configuration of an integrated parts management device 10 according to the second embodiment. The integrated parts management device 10 comprises a parts information storage unit 1a, a cost information storage unit 2, a life prediction unit 3a, a parts selection unit 4, an output unit 5, a parts ordering unit 6, a limit test plan / result input unit 7a, a maintenance plan information storage unit 8, and an equipment status acquisition unit 9a.
[0064] The cost information storage unit 2, the parts selection unit 4, the output unit 5, the parts ordering unit 6, and the maintenance plan information storage unit 8 have the same functions as the integrated parts management device 10 of the first embodiment, and therefore the description thereof will be omitted here.
[0065] The part information storage unit 1a is a storage unit that stores part information indicating the details of the consumable parts that are the object of the maintenance work. The part information storage unit 1a stores the limit test results notified by the limit test plan and result input unit 7a as part information, and also stores the remaining life of the consumable parts as part information, which is referred to by the life prediction unit 3a.
[0066] As shown in FIG. 7, the part information is configured by adding information indicating "part dimensions before use," "part physical properties before use," and "storage period since manufacture" to the part information described in FIG. 3.
[0067] In detail, the part information "part dimensions before use" and "part physical properties before use" are referenced by the life prediction unit 3a, and compared with the acquired dimensions or physical properties of the consumable part (actual equipment data), the remaining life of the consumable part is predicted from the amount of change in the dimensions or physical properties and the equipment operating rate.
[0068] Furthermore, the "storage period from manufacture" of the part information is referenced by a deterioration influence assessment unit 31 of the life prediction unit 3a, which will be described later, and a reduction in the remaining life of the consumable part due to storage deterioration is predicted.
[0069] The equipment status acquisition unit 9a acquires from the equipment environmental information such as temperature, humidity, and air pressure of the equipment that uses consumable parts, status information indicating the operating status of the equipment consisting of the equipment's operating rate, and status information (actual equipment data) on the dimensions and physical properties of the consumable parts, and notifies the life prediction unit 3a.
[0070] The life prediction unit 3a is a processing unit that refers to the limit test results in the part information storage unit 1a and predicts the remaining life of the consumable parts from the equipment status information acquired by the equipment status acquisition unit 9a. In addition, the life prediction unit 3a refers to the "part dimensions before use" and "part physical properties before use" in the part information storage unit 1a, and predicts the remaining life of the consumable part based on the equipment operating rate acquired by the equipment status acquisition unit 9a and the status information (actual equipment data) of the dimensions or physical properties of the consumable part.
[0071] The degradation influence assessment unit 31 is provided in the life prediction unit 3a, and corrects the remaining life in accordance with information on the use conditions of the consumable parts (the characteristics of the fluid that comes into contact with the consumable parts, the use of chemicals that accelerate the corrosion of the parts). In addition, the deterioration impact assessment unit 31 refers to the “storage period from manufacture” in the part information memory unit 1a as usage condition information for the consumable part, predicts the reduction in the remaining life of the consumable part due to storage deterioration, and corrects the calculated remaining life to be shorter.
[0072] Furthermore, the degradation influence assessment unit 31 may take the possibility that the equipment will become in an SA environment (severe accident environment) as usage condition information, and may correct the calculated remaining life of consumable parts of equipment that may become in an SA environment (severe accident environment) to be shorter.
[0073] The life predicting unit 3a notifies the part information storage unit 1a of the predicted remaining life of the consumable part.
[0074] The limit test plan and result input unit 7a selects consumable parts to be subjected to limit tests and plans the test conditions according to the deterioration state of the consumable parts replaced during maintenance work, and stores the limit test results of the consumable parts in the part information storage unit 1a.
[0075] Next, the operation of the integrated parts management device 10 of the second embodiment will be described with reference to the flow chart of FIG. FIG. 8 shows a process in which, when replacing consumable parts of equipment in a maintenance job, the integrated parts management device 10 determines whether or not to replace parts and selects parts that will minimize the cost of the maintenance job, based on the life characteristics of the consumable parts obtained from limit tests.
[0076] In step S81, the integrated parts management device 10 registers the limit test results for each use environment of the consumable parts in the limit test results in the part information storage unit 1 via the limit test plan and result input unit 7a.
[0077] In step S82, the integrated parts management device 10 refers to the maintenance plan information in the maintenance plan information storage unit 8, and repeats the processes from step S83 to S86 for the target consumable parts registered in the maintenance work.
[0078] In step S83, the integrated parts management device 10 determines the equipment using the consumable parts to be maintained by referring to the maintenance plan information (maintenance plan information storage unit 8), and acquires the status information of the equipment using the consumable parts by the equipment status acquisition unit 9a. The acquired status information includes environmental information such as the temperature, humidity, and air pressure of the equipment, and the operating rate of the equipment.
[0079] In step S84, the integrated parts management device 10 uses the life prediction unit 3a to predict the remaining life of the consumable part, and registers the predicted remaining life of the consumable part in the remaining life of the part information (part information storage unit 1). In detail, the life prediction unit 3 refers to the limit test result (part information storage unit 1) and predicts the remaining life of the consumable part from the equipment status information acquired in step S83.
[0080] In step S85, the integrated parts management device 10 causes the parts selection unit 4 to evaluate the cost associated with replacing the target consumable parts and select the consumable parts that minimize the maintenance cost. The details of step S85 are the same as the process of step S55 in FIG. 5, and therefore will not be described.
[0081] In step S86, the integrated parts management device 10 repeats the processes from steps S83 to S85 for the target consumable parts, and then proceeds to step S87.
[0082] In step S87, the integrated parts management device 10 causes the output unit 5 to output a list of parts to be replaced in the maintenance work.
[0083] In step S88, the integrated parts management device 10 notifies the vendor that supplies the consumable parts of order information according to the inventory of the consumable parts through the parts ordering unit 6, and orders replacement parts. In this way, the integrated parts management device 10 of the second embodiment constitutes a part of the supply chain of consumable parts.
[0084] In step S89, the parts integrated management device 10 changes the test conditions of the limit test according to the deterioration state of the replaced consumable part through the limit test plan / result input unit 7a, and updates the limit test results of the consumable part.
[0085] Next, referring to Figure 9, the operation of the integrated parts management device 10 of the second embodiment will be described in the case where, in addition to the process of predicting the remaining life of a consumable part based on the life characteristics of the consumable part based on the limit test results described in Figure 8, the integrated parts management device 10 predicts the remaining life of a consumable part based on the amount of change in the dimensions or physical properties of the consumable part and the equipment operating rate, and determines whether or not to replace a part or selects a part that minimizes the cost of maintenance work while ensuring reliability.
[0086] In step S91, the integrated parts management device 10 stores the "part dimensions before use" and "part properties before use" of the consumable part in the part information storage unit 1a as initial values of the change in the dimensions or properties of the consumable part.
[0087] In step S92, the integrated parts management device 10 acquires state information (actual machine data) on the dimensions or physical properties of the consumable parts by the machine state acquisition unit 9a.
[0088] In step S93, the integrated parts management device 10, by using the life prediction unit 3, predicts the remaining life of the consumable parts from the equipment status information acquired in step S83 with reference to the limit test results (parts information storage unit 1), and also predicts the remaining life of the consumable parts from the equipment operation rate and the status information (actual equipment data) of the dimensions or physical properties of the consumable parts acquired in step S92. Then, the predicted remaining life of the consumable parts is registered in the remaining life of the part information (parts information storage unit 1).
[0089] The processes in steps S81 to S83 and steps S85 to S89 in FIG. 9 are the same as those in FIG. 8, and therefore the description thereof will be omitted.
[0090] Next, referring to FIG. 10, the operation of the integrated parts management device 10 of the second embodiment will be described in the case where, in addition to the process of predicting the remaining life of consumable parts based on the limit test results of the consumable parts as described in FIG. 8, the deterioration influence assessment unit 31 corrects the remaining life in accordance with the use conditions that affect the deterioration of the consumable parts, and determines whether or not to replace parts that will minimize the cost of maintenance work, or selects parts.
[0091] In step S101, if the usage condition information for the consumable part is the characteristics of the fluid that comes into contact with the consumable part (gas, water vapor, water, pH) or the use of a chemical substance that accelerates corrosion of the part (alkali metal, lanthanide, actinide, transition metal, halogen, chalcogen element), the integrated parts management device 10 refers to the limit test results in step S84, shortens the remaining life of the consumable part predicted from the equipment status information, and registers the remaining life in the part information (part information storage unit 1).
[0092] The processing in steps S81 to S89 in FIG. 10 is the same as that in FIG. 8, and therefore the description thereof will be omitted.
[0093] In addition, the deterioration impact assessment unit 31 also processes in step S101 when it refers to the "storage period from manufacture" in the part information storage unit 1a to predict the reduction in the remaining life of a consumable part due to storage deterioration and corrects the calculated remaining life to be shorter.
[0094] Furthermore, in the case where the degradation influence assessment unit 31 corrects the calculated remaining lifespan of consumable parts of equipment that may be in an SA environment (severe accident environment) to be shorter, processing may be performed in step S101.
[0095] In addition, when the integrated parts management device 10 of the second embodiment predicts the remaining life of consumable parts based on the limit test results of the consumable parts described in FIG. 8, predicts the remaining life of the consumable parts based on the amount of change in the dimensions or physical properties of the consumable parts and the equipment operating rate, and further corrects the remaining life in accordance with the usage conditions that affect the deterioration of the consumable parts by the deterioration impact evaluation unit 31, and determines whether or not to replace parts or select parts that will minimize the cost of maintenance work, step S101 in FIG. 10 is added after step S93 in the processing flow described in FIG. 9.
[0096] The integrated parts management device 10 described in the first and second embodiments records and accumulates in chronological order the process contents or results of each step in the flow charts of Figures 5, 8, 9, and 10. This makes it possible to add consumable parts from ordering the consumable parts to their consumption after use, thereby improving the traceability of the integrated parts management device 10.
[0097] The present invention is not limited to the above-described embodiment, and includes various modified examples. The above-described embodiment has been described in detail to easily explain the present invention, and the present invention is not necessarily limited to the embodiment having all of the described configurations. [Explanation of symbols]
[0098] 1, 1a Part information storage section 2. Cost information storage unit 3, 3a Life Prediction Section 31 Deterioration Impact Assessment Division 4 Parts selection section 5 Output section 6 Parts Ordering Department 7 Limit test result input section 7a Limit test plan and result input section 8 Maintenance plan information storage unit 9, 9a Device status acquisition section 10. Integrated parts management device
Claims
1. A parts integrated management device for equipment used in nuclear power-related facilities, a part information storage unit that stores limit test results indicating life characteristics of parts that affect the soundness of the equipment; a cost information storage unit that stores cost information regarding part replacement work, part prices, and losses due to equipment stoppage; a life prediction unit that predicts the remaining life of a part from the state information of the device by referring to the limit test results in the part information storage unit; a part selection unit that selects a replacement part that minimizes maintenance costs while ensuring reliability of the equipment based on a maintenance plan, based on the remaining life of the part, the equipment life, and the cost information; A parts integrated management device comprising:
2. 2. The parts integrated management device according to claim 1, The part is a part that determines the soundness of the EQ device, The limit test result corresponds to the environment in which the EQ device is required. A parts integrated management device comprising:
3. 2. The parts integrated management device according to claim 1, The life prediction unit predicts the remaining life of the part based on the limit test result corresponding to the device status information, and on either or both of the actual device data of the part and the use condition information of the part. A parts integrated management device comprising:
4. In the parts integrated management device according to any one of claims 1 to 3, a parts ordering section for ordering the parts selected by the parts selection section according to the stock of the parts; A parts integrated management device comprising:
5. In the parts integrated management device according to any one of claims 1 to 3, the part information storage unit stores a compatible part name indicating a compatible part that can be substituted for the part; The part selection unit selects the compatible part as a replacement part that minimizes maintenance costs while ensuring reliability of the device, by referring to cost information such as the remaining life of the compatible part name, part replacement work, and part price. A parts integrated management device comprising:
6. In the parts integrated management device according to any one of claims 1 to 3, The parts integration management device notifies ordering information to a vendor that supplies parts, and constitutes a part of the supply chain of the parts of the device. A parts integrated management device comprising:
Citation Information
Patent Citations
Optimal maintenance plan decision method
JP2003099119A
Repair work schedule preparation method and repair work schedule preparation system for plant equipment
JP2010073121A
Management device, method for management, and management program
JP2019007852A