Work Machine

The control device in the working machine adjusts the hydraulic excavator's working device posture to prevent interference with dump trucks, improving loading efficiency by accurately calculating and controlling the boom and arm operations.

JP7569351B2Active Publication Date: 2024-10-17HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022060395
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-03-31
Publication Date
2024-10-17
Estimated Expiration
2042-03-31

AI Technical Summary

Technical Problem

Hydraulic excavators face challenges in coordinating the operation of the revolving structure and working device to prevent interference with dump trucks during loading, requiring skilled operator intervention to adjust the working device's posture accurately.

Method used

A working machine equipped with a control device that includes a posture detection system, vessel position acquisition, and an arm operation system to calculate and adjust the working device's posture to prevent interference by determining an interference prevention height and controlling the operation of the boom, arm, and revolving body to ensure the bucket does not collide with the vessel.

Benefits of technology

The system effectively prevents interference between the working device and the vessel, allowing the operator's intended posture adjustments, enhancing loading efficiency and reducing the risk of damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007569351000008
    Figure 0007569351000008
  • Figure 0007569351000009
    Figure 0007569351000009
  • Figure 0007569351000010
    Figure 0007569351000010
Patent Text Reader

Abstract

To provide a work machine capable of adjusting an attitude of a work device while reflecting an operator's intention and preventing interference with a vessel after the work device approaches a side of the vessel.SOLUTION: When a turning operation is performed, a control device of a work machine identifies an operation start position of a tip end of an arm and an interference prevention position between that position and a side of a vessel, and calculates a lower limit value that is larger as a position is closer to the interference prevention position and becomes an interference prevention height at the interference prevention position in a range from the operation start position to the interference prevention position. While a revolving body is in operation, the control device disables the operation of the arm and controls the operation of the boom and the revolving body so that the height of the tip end of the arm does not fall below the lower limit value. The control device enables the operation of the arm when the tip end of the arm exceeds the interference prevention position. The control device controls the operation of at least one of the boom and the arm so that the height of the tip end of the arm that operates in response to the operation of the arm does not fall below the interference prevention height.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a work machine. [Background technology]

[0002] There is known a working machine such as a hydraulic excavator that includes a rotating body rotatably attached to a traveling body and a multi-jointed working device attached to the rotating body. The working device provided on the hydraulic excavator has a boom rotatably attached to the rotating body, an arm rotatably attached to the boom, and a bucket rotatably attached to the arm.

[0003] A hydraulic excavator performs a loading operation of excavated materials by carrying the excavated materials, such as soil and sand, excavated by its working equipment to above the loading platform (vessel) of a loading machine such as a dump truck, and then discharging the excavated materials onto the loading platform of the dump truck.

[0004] When loading, if the bucket is positioned low relative to the dump truck, the bucket may interfere with the dump truck during the transport operation. On the other hand, if the bucket is positioned too high relative to the dump truck during the discharge operation, the dump truck may be damaged by the discharged excavated material. Therefore, when loading, the operator of the hydraulic excavator needs to link the operation of the rotating body and the operation of the working equipment while checking the position of the dump truck, and this work requires skill. In addition, in the preparation operation of moving the working equipment toward the excavation target to perform the excavation operation again after the discharge operation, it is also necessary to avoid interference between the bucket and the dump truck.

[0005] Patent Document 1 discloses a hydraulic excavator equipped with a control device capable of executing control to prevent the bucket from contacting a dump truck due to the rotation of the rotating body. The control device of the hydraulic excavator disclosed in Patent Document 1 specifies a discharge position based on position information and direction information of the dump truck, and specifies an interference avoidance position based on the specified discharge position. The control device disclosed in Patent Document 1 specifies an interference avoidance position that is equal in height to the discharge position (earth unloading position), equal in distance from the center of rotation of the rotating body to the distance from the center of rotation to the discharge position, and where no dump truck is present below the bucket, and generates an operation signal to drive only the rotating body after the bucket reaches the interference avoidance position. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2019-65661 A Summary of the Invention [Problem to be solved by the invention]

[0007] An operator of a hydraulic excavator may adjust the attitude of the working implement when the bucket is located near the bed. For example, in a loading operation, a suitable position for discharging excavated material from the bucket to a dump truck varies depending on the condition of the excavated material discharged to the dump truck. Therefore, in a loading operation, an operator of a hydraulic excavator may adjust the attitude of the working implement after the bucket is located above the dump truck so that the bucket reaches a desired discharge position.

[0008] However, the hydraulic excavator control device described in Patent Document 1 operates only the rotating body when moving the bucket from the interference avoidance position to the release position. With the technology described in Patent Document 1, it is not possible to adjust the release position by operating the work equipment in accordance with the operator's intention after the bucket approaches the bed of the dump truck, which may cause the operator to feel uncomfortable.

[0009] The present invention has an object to provide a work machine that can prevent interference between a work implement and the vessel of a machine being loaded during loading operations etc., and that can adjust the posture of the work implement to reflect the operator's intentions after the work implement approaches the side of the vessel. [Means for solving the problem]

[0010] A working machine according to one aspect of the present invention comprises a running body, a rotating body rotatably arranged relative to the running body, a working implement attached to the rotating body and having a boom, an arm and a bucket, an attitude detection device for detecting the attitude of the working implement, a vessel position acquisition device for acquiring the position of a vessel of a loading machine into which material excavated by the working implement is loaded, an arm operating device for operating the arm, a rotation operating device for operating the rotating body, and a control device for controlling the operation of the working implement and the rotating body, and the excavated material is loaded into the vessel, which has a bottom and multiple sides and an open top.The control device calculates a height of the tip of the arm at which the vessel and the working device do not interfere with each other as an interference prevention height, based on the position of the vessel acquired by the vessel position acquisition device, and determines whether or not an interference prevention control execution condition including a rotation operation of the bucket in a direction approaching the side of the vessel is satisfied. When it is determined that the interference prevention control execution condition is satisfied, the control device specifies an operation start position that is a circumferential position before the rotation operation of the tip of the arm, based on the attitude of the working device detected by the attitude detection device, and specifies an interference prevention position that is an angular position in the rotation direction of the tip of the arm at which the vessel and the working device do not interfere with each other between the operation start position and the side of the vessel. The control device calculates a lower limit value in the height direction of the working device according to the angular position in the rotation direction of the tip of the arm, which is larger the closer to the interference prevention position and which becomes the interference prevention height at the interference prevention position, within a motion range of the rotating body from the specified operation start position to the interference prevention position, and a control unit for controlling the operation of the boom and the rotating body so that the height of the tip of the arm does not fall below the lower limit; a determination unit for determining whether or not an enabling condition for the operation of the arm is satisfied, the enabling condition including that the tip of the arm has reached an angular position in the rotation direction that exceeds the interference prevention position while the tip of the arm has reached a height that exceeds the interference prevention height, and if the enabling condition is satisfied, the operation of the arm by the arm operating device is enabled; a determination unit for determining whether or not the bucket has passed through the side of the vessel in a plan view after rotating beyond the interference prevention position; and if it is determined that the bucket has not passed through the side of the vessel, the control unit for controlling the operation of at least one of the boom and the arm so that the height of the tip of the arm that operates in response to the operation of the arm by the arm operating device does not fall below the interference prevention height; and if it is determined that the bucket has passed through the side of the vessel, the operation of the arm by the arm operating device is permitted to fall below the interference prevention height. Effect of the Invention

[0011] According to the present invention, it is possible to provide a work machine capable of preventing interference between a work implement and the vessel of a machine being loaded during loading operations and the like, and capable of adjusting the posture of the work implement to reflect the operator's intentions after the work implement approaches the side of the vessel. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a side view of a hydraulic excavator according to a first embodiment. [Diagram 2] FIG. 2 is a schematic diagram of a hydraulic drive system of a hydraulic excavator. [Diagram 3] FIG. 3 is a functional block diagram of the control device according to the first embodiment. [Figure 4] FIG. 4 is a diagram showing the shovel reference coordinate system as viewed from the Y-axis direction. [Diagram 5] FIG. 5 is a diagram showing the shovel reference coordinate system as viewed from the Z-axis direction. [Figure 6] FIG. 6 is a diagram showing a correlation map Ma that the control device according to the first embodiment uses during a loading operation. [Figure 7] FIG. 7 is a side view of the hydraulic excavator and the loaded machine, showing the lower limit height for passing, Zamta1. [Figure 8] FIG. 8 is a plan view of the hydraulic excavator and the loaded machine, and shows the control start swing angle θswsa1 and the interference prevention angle θswta1. [Figure 9] FIG. 9 is a plan view of the hydraulic excavator and the loaded machine, showing the in-bed reach angle θswta2. [Figure 10] FIG. 10 is a flowchart showing an example of the processing flow of the loading operation support control executed by the control device according to the first embodiment, and shows the processing of steps S101 to S122. [Figure 11] FIG. 11 is a flowchart showing an example of the processing flow of the loading operation support control executed by the control device according to the first embodiment, and shows the processing of steps S125 to S166. [Figure 12]FIG. 12 is a diagram for explaining the main operations of the hydraulic excavator 1. [Figure 13] FIG. 13 is a diagram showing a correlation map Mb that the control device according to the second embodiment uses during the preparatory operation. [Figure 14] FIG. 14 is a flowchart showing an example of the processing flow of the preparatory movement support control executed by the control device according to the second embodiment, and shows the processing of steps S201 to S222. [Figure 15] FIG. 15 is a flowchart showing an example of the processing flow of the preparatory movement support control executed by the control device according to the second embodiment, and shows the processing of steps S231 to S269. [Figure 16] FIG. 16 is a plan view of the hydraulic excavator and the loaded machine, showing the limit angle θswta3 within the loading platform. [Figure 17] FIG. 17 is a side view of the hydraulic excavator and the loaded machine, showing the lower limit height Zamta2 within the vessel. [Figure 18] FIG. 18 is a diagram showing a correlation map Ma' that the control device according to the third embodiment uses during a loading operation. [Figure 19A] FIG. 19A is a diagram showing an example of an arrangement of the assistance control execution switch. [Figure 19B] FIG. 19B is a diagram showing another example of the arrangement of the assistance control execution switch. [Figure 20] FIG. 20 is a flowchart showing the flow of processing of the loading operation support control executed by the control device according to the modification 1-1. [Figure 21] FIG. 21 is a functional block diagram of a control device according to Modification 1-2. [Figure 22] FIG. 22 is a flowchart showing the flow of processing of the loading operation support control executed by the control device according to the modified example 1-2. [Figure 23] FIG. 23 is a flowchart showing an example of the process flow of the loading operation support control executed by the control device according to the third modification, and shows the processes of steps S125 to S166. [Figure 24]FIG. 24 is a side view of a hydraulic excavator according to the fourth modification. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following, an example will be described in which the work machine is a hydraulic excavator. In the following description, when there are a plurality of identical components, a lowercase alphabetical letter may be added to the end of the reference numeral, but the lowercase alphabetical letter may be omitted to collectively express the plurality of components. For example, when there are two identical traveling hydraulic motors 4a, 4b, these may be collectively expressed as traveling hydraulic motor 4. In the following description, the control executed by the control device to assist the loading operation according to the operation of the operator is referred to as "loading operation assist control". In addition, the control executed by the control device to assist the preparatory operation according to the operation of the operator is referred to as "preparatory operation assist control".

[0014] First Embodiment Fig. 1 is a side view of a hydraulic excavator 1 according to a first embodiment of the present invention. As shown in Fig. 1, the hydraulic excavator 1 according to this embodiment is a backhoe excavator having a bucket 10 attached facing backward to the tip of an arm 9. The hydraulic excavator 1 performs an excavation operation for excavating a surface to be excavated, such as the ground, and a loading operation for loading the excavated material, such as earth and sand, onto a loading platform 201 of a loading machine 200, such as a transport vehicle including a dump truck.

[0015] In loading work, the hydraulic excavator 1 performs a transport operation in which the upper rotating body 7 is rotated to transport the excavated material in the bucket 10 to above the loaded machine 200, and a discharge operation in which the bucket 10 is moved in the dumping direction to discharge the excavated material onto the loading platform 201 of the loaded machine 200. The loading platform 201 is a vessel (tray) with an open top that has a pair of left and right side portions 202l, 202r (see FIG. 8), a front side portion 202f, and a bottom portion 203 (see FIG. 8) to which the side portions 202l, 202r, 202f are connected. The left side portion 202l and the right side portion 202r are disposed opposite each other.

[0016] The hydraulic excavator 1 includes a vehicle body (machine main body) 3 and an articulated working device 2 attached to the vehicle body 3. The vehicle body 3 includes a lower traveling body 5 and an upper rotating body 7 provided so as to be rotatable with respect to the lower traveling body 5. The lower traveling body 5 travels using a right crawler driving traveling hydraulic motor 4a (see FIG. 2) that drives the right crawler, and a left crawler driving traveling hydraulic motor 4b (see FIG. 2) that drives the left crawler. The upper rotating body 7 is attached to the upper part of the lower traveling body 5 via a rotating device, and rotates using a swing hydraulic motor 6 of the swing device. In this embodiment, the right crawler driving traveling hydraulic motor 4a and the left crawler driving traveling hydraulic motor 4b are collectively referred to as traveling hydraulic motors 4.

[0017] The working device 2 has a plurality of driven members (8, 9, 10) that are rotatably connected, and a plurality of hydraulic cylinders (11, 12, 13) that drive the driven members. In this embodiment, a boom 8, an arm 9, and a bucket 10 as three driven members driven by the plurality of hydraulic cylinders (11, 12, 13) are connected in series.

[0018] The boom 8 has a base end portion rotatably connected to the front of the upper rotating body 7 by a boom pin 8a (see FIG. 4). The arm 9 has a base end portion rotatably connected to the tip of the boom 8 by an arm pin 9a. The bucket 10 is rotatably connected to the tip of the arm 9 by a bucket pin 10a. The boom pin 8a, arm pin 9a, and bucket pin 10a are arranged parallel to one another, and the driven members (8, 9, 10) are capable of relative rotation in the same plane.

[0019] The boom 8 rotates up and down by the telescopic movement of the boom cylinder 11. The arm 9 rotates forward and backward (dump direction and cloud direction) by the telescopic movement of the arm cylinder 12. The bucket 10 rotates forward and backward (dump direction and cloud direction) by the telescopic movement of the bucket cylinder 13. One end of the boom cylinder 11 is connected to the boom 8, and the other end is connected to the frame of the upper rotating body 7. One end of the arm cylinder 12 is connected to the arm 9, and the other end is connected to the boom 8. One end of the bucket cylinder 13 is connected to the bucket 10 via a bucket link 16, and the other end is connected to the arm 9.

[0020] Fig. 2 is a schematic configuration diagram of a hydraulic drive system 50 of the hydraulic excavator 1. As shown in Fig. 2, the hydraulic drive system 50 includes an engine 103 which is a prime mover mounted on the upper rotating body 7, and a main pump 102 and a pilot pump 104 which are hydraulic pumps driven by the engine 103. The main pump 102 and the pilot pump 104 are driven by the engine 103 and discharge hydraulic oil.

[0021] The hydraulic drive system 50 includes a flow control valve 101 that controls the flow rate and flow direction of hydraulic oil discharged from a main pump 102, a plurality of solenoid proportional valves 51 that output an operating pressure as an operating signal to the flow control valve 101, a control device 40 that outputs a control signal to the solenoid proportional valve 51, and operation devices 20, 21 that are operated by an operator and output a signal corresponding to the operation amount and operation direction to the control device 40. The operation devices 20, 21 are installed in an operator's cab 71 (see FIG. 1) provided on the upper rotating body 7.

[0022] The work operation device 20 includes a work operation right lever 22a for operating the boom 8 and the bucket 10, and a work operation left lever 22b for operating the arm 9 and the upper rotating body 7. In other words, the operation device 20 functions as a boom operation device, a bucket operation device, an arm operation device, and a swing operation device. The traveling operation device 21 includes a travel operation right lever 23a for operating the right crawler, and a travel operation left lever 23b for operating the left crawler. In this embodiment, the work operation right lever 22a and the work operation left lever 22b are collectively referred to as the operation lever 22, and the travel operation right lever 23a and the travel operation left lever 23b are collectively referred to as the operation lever 23.

[0023] The operation system according to this embodiment is an electric lever type operation system in which an electrical signal indicating the amount of operation and the direction of operation is input from the operation device 20 to the control device 40, a control signal is output from the control device 40 to the solenoid proportional valve 51, and an operating pressure is output from the solenoid proportional valve 51 to the flow control valve 101.

[0024] The hydraulic excavator 1 has an operation detection device 56 that detects the operation amount and operation direction of the operation levers 22, 23 and outputs a signal indicating the detection result to the control device 40. The operation detection device 56 has an operation amount sensor 52a that detects the arm crowding operation amount and the arm dumping operation amount by the work operation left lever 22b, an operation amount sensor 52b that detects the right turning operation amount and the left turning operation amount by the work operation left lever 22b, an operation amount sensor 52c that detects the boom raising operation amount and the boom lowering operation amount by the work operation right lever 22a, an operation amount sensor 52d that detects the bucket crowding operation amount and the bucket dump operation amount by the work operation right lever 22a, an operation amount sensor 52e that detects the right crawler forward operation amount and the right crawler backward operation amount by the traveling operation right lever 23a, and an operation amount sensor 52f that detects the left crawler forward operation amount and the left crawler backward operation amount by the traveling operation left lever 23b.

[0025] The plurality of operation amount sensors 52 are, for example, rotary encoders or potentiometers capable of detecting the amount and direction of operation of the operating levers 22, 23.

[0026] The control device 40 according to this embodiment controls the rotational movement of the working device 2, the traveling movement of the lower traveling body 5, and the rotating movement of the upper rotating body 7 according to the operation information (amount and direction of operation) of the operating levers 22, 23 by the operator.

[0027] Specifically, the control device 40 outputs a control signal corresponding to the amount and direction of operation of the operating levers 22, 23 by the operator to the solenoid proportional valves 51 (51a to 51l). The solenoid proportional valves 51 are provided in a pilot line 100 to which pressure oil is supplied from a pilot pump 104. The solenoid proportional valves 51 operate when a control signal from the control device 40 is input, and output a secondary pressure generated by reducing the primary pressure of the pilot line 100 as an operating pressure to the flow control valve 101. The flow control valve 101 has a plurality of spool valves provided for each of a plurality of hydraulic actuators (the swing hydraulic motor 6, the arm cylinder 12, the boom cylinder 11, the bucket cylinder 13, the traveling hydraulic motor 4a, and the traveling hydraulic motor 4b). The operating pressure output by the solenoid proportional valves 51 is guided to the pressure receiving chamber of the spool valve, and the spool operates. As a result, the hydraulic oil discharged from the main pump 102 is supplied to the corresponding hydraulic actuator through the spool valve, and the hydraulic actuator is operated.

[0028] The electromagnetic proportional valves 51a and 51b output operation pressure for controlling the pressure oil supplied to the swing hydraulic motor 6 to the pressure receiving chamber of the spool valve of the flow control valve 101 for driving the swing hydraulic motor 6. The electromagnetic proportional valves 51c and 51d output operation pressure for controlling the pressure oil supplied to the arm cylinder 12 to the pressure receiving chamber of the spool valve of the flow control valve 101 for driving the arm cylinder 12. The electromagnetic proportional valves 51e and 51f output operation pressure for controlling the pressure oil supplied to the boom cylinder 11 to the pressure receiving chamber of the spool valve of the flow control valve 101 for driving the boom cylinder 11. The electromagnetic proportional valves 51g and 51h output operation pressure for controlling the pressure oil supplied to the bucket cylinder 13 to the pressure receiving chamber of the spool valve of the flow control valve 101 for driving the bucket cylinder 13. The solenoid proportional valves 51i, 51j output operating pressure for controlling the pressure oil supplied to the traveling hydraulic motor 4a to the pressure receiving chamber of the spool valve of the flow control valve 101 for driving the traveling hydraulic motor 4a. The solenoid proportional valves 51k, 51l output operating pressure for controlling the pressure oil supplied to the traveling hydraulic motor 4b to the pressure receiving chamber of the spool valve of the flow control valve 101 for driving the traveling hydraulic motor 4b.

[0029] The boom cylinder 11, the arm cylinder 12, and the bucket cylinder 13 each extend and retract by the supplied pressure oil, thereby rotating the boom 8, the arm 9, and the bucket 10. This changes the position of the bucket 10 and the attitude of the work implement 2. The swing hydraulic motor 6 rotates by the supplied pressure oil, thereby rotating the upper swing body 7. The traveling hydraulic motor 4a and the traveling hydraulic motor 4b rotate by the supplied pressure oil, thereby traveling the lower traveling body 5. Note that even if the operator does not operate the operation levers 22, 23, the solenoid proportional valves 51a-51l are operated by a control signal from the control device 40, and the flow control valve 101 is operated, thereby enabling the hydraulic actuators (4a, 4b, 6, 11, 12, 13) to be driven.

[0030] The hydraulic excavator 1 is equipped with a posture detection device 53 that detects the posture of the working implement 2 and the vehicle body 3. The posture detection device 53 is configured to include a boom angle sensor 14, an arm angle sensor 15, a bucket angle sensor 17, a tilt angle sensor 18, and a swing angle sensor 19 as a plurality of posture sensors. The boom angle sensor 14 is attached to the boom pin 8a, detects the rotation angle of the boom 8 relative to the upper swing structure 7, and outputs a signal indicating the detection result to the control device 40. The arm angle sensor 15 is attached to the arm pin 9a, detects the rotation angle of the arm 9 relative to the boom 8, and outputs a signal indicating the detection result to the control device 40. The bucket angle sensor 17 is attached to the bucket link 16, detects the rotation angle of the bucket 10 relative to the arm 9, and outputs a signal indicating the detection result to the control device 40. The control device 40 obtains the respective rotation angles of the boom 8, the arm 9, and the bucket 10 by the respective angle sensors 14, 15, and 17.

[0031] The method of acquiring the respective rotation angles of the boom 8, the arm 9, and the bucket 10 is not limited to this. The control device 40 may acquire each rotation angle by detecting each angle of the boom 8, the arm 9, and the bucket 10 with respect to a reference plane such as a horizontal plane using an inertial measurement unit (IMU) and converting it into each rotation angle of the boom 8, the arm 9, and the bucket 10. The control device 40 may also acquire each rotation angle by detecting each stroke of the boom cylinder 11, the arm cylinder 12, and the bucket cylinder 13 using a stroke sensor and converting it into each rotation angle of the boom 8, the arm 9, and the bucket 10.

[0032] The inclination angle sensor 18 is attached to the upper rotating body 7, detects the inclination angle of the upper rotating body 7 (car body 3) with respect to a reference plane such as a horizontal plane, and outputs a signal representing the detection result to the control device 40. The turning angle sensor 19 is attached to a turning device between the lower running body 5 and the upper rotating body 7, detects the turning angle of the upper rotating body 7 with respect to the lower running body 5, and outputs a signal representing the detection result to the control device 40.

[0033] Here, the rotation angles of the boom 8, the arm 9, and the bucket 10 are parameters that represent the attitude of the work implement 2. That is, the boom angle sensor 14, the arm angle sensor 15, and the bucket angle sensor 17 function as attitude sensors that detect the attitude of the work implement 2. Also, the inclination angle of the upper rotating body 7 and the rotation angle of the upper rotating body 7 relative to the lower traveling body 5 are parameters that represent the attitude of the upper rotating body 7 (vehicle body 3). That is, the inclination angle sensor 18 and the rotation angle sensor 19 function as attitude sensors that detect the attitude of the upper rotating body 7 (vehicle body 3).

[0034] The hydraulic excavator 1 is equipped with an object position detection device 54 that detects the type and position of an object present around the hydraulic excavator 1. The object position detection device 54 is, for example, a LiDAR (Light Detection And Ranging) or a stereo camera, and is attached to the upper part of the driver's cab 71 or the like. The object position detection device 54 detects a loading platform (vessel) 201 of the loaded machine 200 onto which the material excavated by the work device 2 is loaded, and detects the relative position of the loading platform 201 of the loaded machine 200 with respect to the object position detection device 54 provided on the upper rotating body 7. Note that a plurality of object position detection devices 54 may be attached to the hydraulic excavator 1.

[0035] The control device 40 is a computer in which processing devices such as a CPU (Central Processing Unit), an MPU (Micro Processing Unit), and a DSP (Digital Signal Processor), internal storage devices such as a RAM (Random Access Memory) and a ROM (Read Only Memory), and an external I / F (Interface) are connected to each other via a bus. An operation detection device 56, an attitude detection device 53, an object position detection device 54, and external storage devices (not shown) such as a hard disk drive and a large-capacity flash memory are connected to the external I / F of the control device 40.

[0036] The ROM stores programs capable of executing various calculations. In other words, the ROM is a storage medium capable of reading programs that realize the functions of this embodiment. The processing device is a calculation device that expands the programs stored in the ROM into the RAM and executes the programs, and performs predetermined calculations on signals received from the external I / F and storage devices (internal storage device and external storage device) in accordance with the programs.

[0037] The input section of the external I / F converts signals input from various devices (such as the operation detection device 56, the attitude detection device 53, and the object position detection device 54) into signals that can be calculated by the processing device. The output section of the external I / F generates an output signal according to the calculation result by the processing device, and outputs the signal to various devices (such as the solenoid proportional valve 51).

[0038] The attitude detection device 53 includes attitude sensors (14, 15, 17) that detect the attitude of the above-mentioned working device 2, and attitude sensors (18, 19) that detect the attitude of the upper rotating body 7 (vehicle body 3).

[0039] Fig. 3 is a functional block diagram of the control device 40. As shown in Fig. 3, the control device 40 executes a program stored in the ROM to function as an attitude calculation unit 41, a loaded machine position calculation unit 42, a speed calculation unit 43, a speed vector calculation unit 44, a condition determination unit 45, a target angle calculation unit 46, an attitude comparison unit 47, a target speed calculation unit 48, a correlation map generation unit 49, and an actuator control unit 39.

[0040] The ROM of the control device 40 stores in advance an excavator reference coordinate system used to specify the position and posture of the components of the hydraulic excavator 1. As shown in Figs. 4 and 5, the excavator reference coordinate system of this embodiment is defined as a right-handed coordinate system with the origin O being the point where the central axis of rotation intersects with the ground G. In the excavator reference coordinate system of this embodiment, the forward movement direction of the lower traveling body 5 is defined as the positive direction of the X-axis. In the excavator reference coordinate system of this embodiment, the direction extending upward from the origin O parallel to the central axis of rotation is defined as the positive direction of the Z-axis. In the excavator reference coordinate system of this embodiment, the excavator reference coordinate system is defined as being perpendicular to each of the X-axis and Z-axis, and the left side of the lower traveling body 5 is defined as the positive direction of the Y-axis. In this way, the excavator reference coordinate system of this embodiment is a coordinate system set based on the lower traveling body 5, and the XY plane is fixed to the ground (traveling surface) G with which the lower traveling body 5 comes into contact.

[0041] In the excavator reference coordinate system of this embodiment, the swing angle θsw of the upper rotating body 7 is 0 degrees when the hydraulic excavator 1 is in the reference posture, i.e., when the working implement 2 is parallel to the X-axis. When the swing angle θsw of the upper rotating body 7 is 0 degrees, the motion plane of the working implement 2 is parallel to the XZ plane, the lifting motion direction of the boom 8 is the positive direction of the Z-axis, and the dumping direction of the arm 9 and bucket 10 is the positive direction of the X-axis.

[0042] The attitude calculation unit 41 calculates the attitude of the components of the hydraulic excavator 1 in the excavator reference coordinate system from the detection signal of the attitude detection device 53. Specifically, the attitude calculation unit 41 calculates a rotation angle (hereinafter also referred to as boom angle) θbm of the boom 8 with respect to the X-axis from a detection signal of the rotation angle of the boom 8 output from the boom angle sensor 14. The attitude calculation unit 41 calculates a rotation angle (hereinafter also referred to as arm angle) θam of the arm 9 with respect to the boom 8 from a detection signal of the rotation angle of the arm 9 output from the arm angle sensor 15. The attitude calculation unit 41 calculates a rotation angle (hereinafter also referred to as bucket angle) θbk of the bucket 10 with respect to the arm 9 from a detection signal of the rotation angle of the bucket 10 output from the bucket angle sensor 17. The attitude calculation unit 41 calculates the swing angle θsw of the upper swing structure 7 with respect to the X-axis (lower running structure 5) from the detection signal of the swing angle of the upper swing structure 7 output from the swing angle sensor 19.

[0043] The posture calculation unit 41 calculates the positions of the boom 8, the arm 9, and the bucket 10 in the shovel reference coordinate system, that is, the planar positions specified by the X-coordinate and the Y-coordinate, and the heights from the ground G specified by the Z-coordinate, based on the calculated rotation angles θbm, θam, θbk of the working device 2 and the revolving angle θsw of the upper revolving body 7, as well as the boom length Lbm, the arm length Lam, and the bucket length Lbk. The boom length Lbm is the length from the boom pin 8a to the arm pin 9a. The arm length Lam is the length from the arm pin 9a to the bucket pin 10a. The bucket length Lbk is the length from the bucket pin 10a to the tip (tip) of the bucket 10. The boom pin 8a is provided at a position offset by Lox in the X-axis direction from the revolving center axis (Z-axis) when the revolving angle is set to 0 degrees.

[0044] Furthermore, although not shown, the attitude calculation unit 41 calculates the inclination angle (pitch angle and roll angle) of the vehicle body 3 (lower traveling body 5) with respect to a reference plane from a detection signal of the inclination angle of the vehicle body 3 output from the inclination angle sensor 18. The reference plane is, for example, a horizontal plane perpendicular to the direction of gravity. The attitude calculation unit 41 calculates a ground angle γ, which is the angle of the bucket 10 with respect to the ground G, from each of the rotation angles θbm, θam, θbk of the working implement 2. The ground angle γ of the bucket 10 is the angle that a straight line passing through the tip of the bucket 10 and the bucket pin 10a forms with the ground G.

[0045] 3 calculates the position of the platform 201 of the loaded machine 200 in the shovel reference coordinate system (the planar position specified by the X coordinate and the Y coordinate, and the height from the ground G specified by the Z coordinate) based on information on the relative position of the platform 201 of the loaded machine 200 with respect to the object position detection device 54 detected by the object position detection device 54, the rotation angle θsw of the upper rotating body 7 calculated by the attitude calculation unit 41, and the mounting position of the object position detection device 54 in the shovel reference coordinate system. In this way, the control device 40 according to this embodiment acquires the relative position of the platform 201 with respect to the hydraulic excavator 1 (the X, Y, Z coordinates in the shovel reference coordinate system) using the object position detection device 54. The position information of the loading platform 201 acquired by the control device 40 includes, for example, the position coordinates of the four corners of the upper surface of the loading platform 201, i.e., the position coordinates of the front and rear ends of the upper edge of the left side 202l of the loading platform 201, and the position coordinates of the front and rear ends of the upper edge of the right side 202r of the loading platform 201.

[0046] The speed calculation unit 43 calculates the operation command speed of each hydraulic actuator 6, 11, 12, 13 based on the detection signal from the operation detection device 56. Specifically, a speed table indicating the correspondence between the operation amount of the operating levers 22, 23 and the operation command speed of the hydraulic actuators 6, 11, 12, 13 is stored in advance in the ROM of the control device 40. The speed calculation unit 43 refers to this speed table and calculates the operation command speed of each hydraulic actuator 6, 11, 12, 13 from the operation amount included in the operation information of the operating levers 22, 23 output from the operation detection device 56.

[0047] The speed calculation unit 43 converts the operation command speed of the swing hydraulic motor 6 into the swing speed ωsw of the upper swing body 7. The speed calculation unit 43 converts the operation command speed of the boom cylinder 11 into the rotation speed of the boom 8. The speed calculation unit 43 converts the operation command speed of the arm cylinder 12 into the rotation speed of the arm 9. The speed calculation unit 43 converts the operation command speed of the bucket cylinder 13 into the rotation speed of the bucket 10.

[0048] The speed calculation unit 43 calculates the actual rotation speed of the working device 2 from the time change in the rotation angles θbm, θam, θbk of the working device 2 calculated by the posture calculation unit 41. The speed calculation unit 43 calculates the actual rotation speed ωswr of the upper rotating body 7 from the time change in the rotation angle θsw of the upper rotating body 7 calculated by the posture calculation unit 41.

[0049] The velocity vector calculation unit 44 calculates a velocity vector generated in the working device 2 based on the calculation results of the attitude calculation unit 41 and the calculation results of the velocity calculation unit 43. Specifically, the velocity vector calculation unit 44 calculates a velocity vector of the tip of the arm 9 based on the rotation angles θbm, θam, θbk of the working device 2 and the swing angle θsw of the upper swing body 7 calculated by the attitude calculation unit 41, and the rotation speeds of the working device 2 and the swing speed of the upper swing body 7 calculated by the velocity calculation unit 43.

[0050] The condition determination unit 45 determines whether or not a loading operation support control execution condition (first interference prevention control execution condition), which is a condition for executing loading operation support control as interference prevention control described later, is satisfied. The loading operation support control execution condition includes the following (Condition 1) and (Condition 2). The loading operation support control execution condition is satisfied when both (Condition 1) and (Condition 2) are satisfied, and is not satisfied when either (Condition 1) or (Condition 2) is not satisfied. (Condition 1) When viewed from above, the bucket 10 is rotated in a direction approaching the side portion 202 of the loading platform 201 from the outside of the loading platform 201. (Condition 2) The posture of the working implement 2 is a transport posture. If both (Condition 1) and (Condition 2) are satisfied, it can be determined that the operator has the intention to perform an operation to transport the excavated material.

[0051] The condition determination unit 45 determines whether or not the operator has performed a swing operation in a direction in which the bucket 10 approaches the side part 202 of the platform 201 from the outside of the platform 201 in a plan view, based on the relative position of the platform 201 with respect to the hydraulic excavator 1 and the movement direction of the work implement 2. For example, the condition determination unit 45 determines whether or not the operator has performed a swing operation in a direction in which the bucket 10 approaches the side part of the platform 201 from the outside of the platform 201 in a plan view, based on the position (planar position and height) of the platform 201 of the loaded machine 200 calculated by the loaded machine position calculation unit 42 and the velocity vector of the tip of the arm 9 (a parameter indicating the movement direction of the bucket 10) calculated by the velocity vector calculation unit 44.

[0052] The method of determining whether or not a rotation operation has been performed in a direction in which bucket 10 approaches the side of platform 201 from the outside of platform 201 in a plan view is not limited to this. For example, condition determination unit 45 may determine whether or not a rotation operation has been performed in a direction in which bucket 10 approaches the side 202 of platform 201 from the outside of platform 201 in a plan view, based on the position of platform 201 calculated by loaded machine position calculation unit 42, the position of the tip of arm 9 calculated by posture calculation unit 41, and the operation direction of the rotation operation detected by operation detection device 56 (left rotation direction or right rotation direction).

[0053] In addition, the condition determination unit 45 may determine that (Condition 1) is satisfied when the distance between the position of the loading platform 201 of the loaded machine 200 and the position of the hydraulic excavator 1 is less than a predetermined value and a turning operation has been performed, and may determine that (Condition 1) is not satisfied when the distance between the position of the loading platform 201 of the loaded machine 200 and the position of the hydraulic excavator 1 is equal to or greater than a predetermined value, or when a turning operation has not been performed.

[0054] The condition determination unit 45 determines whether or not the attitude of the working implement 2 is a transport attitude based on the calculation result of the attitude calculation unit 41. For example, the condition determination unit 45 compares the absolute value of the ground angle γ of the bucket 10 calculated by the attitude calculation unit 41 with a ground angle threshold value γt. The ground angle threshold value γt is a threshold value for determining whether or not the attitude of the working implement 2 is a transport attitude, and is stored in advance in the ROM of the control device 40. For example, a value of about 10 degrees to 20 degrees is adopted as the ground angle threshold value γt.

[0055] If the absolute value of the ground angle γ of the bucket 10 calculated by the attitude calculation unit 41 is equal to or smaller than the ground angle threshold value γt, the condition determination unit 45 determines that the attitude of the work implement 2 is the transport attitude. If the absolute value of the ground angle γ of the bucket 10 calculated by the attitude calculation unit 41 is greater than the ground angle threshold value γt, the condition determination unit 45 determines that the attitude of the work implement 2 is not the transport attitude.

[0056] When the condition determination unit 45 determines that the loading operation assist control execution condition (first interference prevention control execution condition) is satisfied, loading operation assist control, which is interference prevention control during a loading operation, is executed. The interference prevention control is control for preventing the bucket 10 from interfering with the loading platform 201. In this embodiment, when the hydraulic excavator 1 performs a loading operation, loading operation assist control, which is interference prevention control for preventing the bucket 10 from interfering with the loading platform 201, is executed.

[0057] In the loading operation assistance control, when the operator performs a rotation operation to move the bucket 10 to a discharge position (soil dumping position) above the platform 201, the control device 40 generates a correlation map Ma (see Figure 6) to assist the operator's operation so that the bucket 10 moves to the discharge position without interfering with the platform 201 of the loaded machine 200, and stores the map in a storage device.

[0058] FIG. 6 is a diagram showing a correlation map Ma used by the control device 40 during loading operation. As shown in FIG. 6, the correlation map Ma is a map that specifies the lower limit of the arm tip height according to the swing angle. The arm tip height is the height (distance in the Z-axis direction) from the ground G to the tip of the arm 9 (for example, the center of the bucket pin 10a). The vertical axis indicates the lower limit of the arm tip height. As shown in FIG. 7, Zamta1 is the height of the tip of the arm 9 at which the side 202 and the bucket 10 do not interfere with each other when the working device 2 is positioned above the side 202 of the loading platform 201 (interference prevention height), and will hereinafter also be referred to as the passing lower limit height. The passing lower limit height Zamta1 is the height in the excavator reference coordinate system that the tip of the arm 9 should reach in order to pass the bucket 10 above the side 202 of the loading platform 201. Therefore, if the arm tip height is greater than the lower limit height for passing Zamta1, the bucket 10 can be moved from the outside to the inside of the platform 201 by the rotation of the upper rotating body 7 without interfering with the platform 201.

[0059] As shown in FIG. 6, the horizontal axis of the correlation map Ma indicates the swing angle, and the swing angle when the hydraulic excavator 1 is in the reference posture is set to 0 degrees, and the swing angle increases when the hydraulic excavator 1 swings left. As shown in FIG. 8, θswsa1 is the swing angle at the position where the transport operation in the loading operation starts (operation start position), i.e., the position where the loading operation support control starts (control start position), and hereinafter also referred to as the control start swing angle. θswta is the swing angle at the position where the predicted movement trajectory L of the tip of the arm 9 intersects with the outer surface of the side part 202r of the loading platform 201 of the loaded machine 200 in a plan view, i.e., the position where the bucket 10 overlaps with the side part 202r of the loading platform 201 in a plan view (wrap position), and hereinafter also referred to as the wrap swing angle. The predicted movement trajectory L is the movement trajectory of the tip of the arm 9 when the arm tip height is the passing lower limit height Zamta1.

[0060] θswta1 is the swing angle when the working implement 2 is located at the interference prevention position, and is hereinafter also referred to as the interference prevention angle. The interference prevention position is a position near the platform 201 where the bucket 10 does not interfere with the platform 201 even if the arm tip height is lower than the interference prevention height. The interference prevention angle θswta1 can also be said to be a swing angle for identifying the interference prevention position. θswta2 is the swing angle when the bucket 10 moves from the outside of the platform 201 beyond the side portion 202r and the entire bucket 10 is located inside the platform 201, as shown in FIG. 9, and is hereinafter also referred to as the in-platform reach angle.

[0061] The control device 40 refers to the correlation map Ma shown in Fig. 6 and controls the operations of the work implement 2 and the upper rotating body 7 so that the arm tip height does not fall below a lower limit value defined in the correlation map Ma. A method of generating the correlation map Ma and a method of controlling the work implement 2 will be described in detail below.

[0062] When the loading operation assist control execution condition is satisfied, the posture calculation unit 41 shown in Fig. 3 identifies the operation start position, which is the circumferential position before the swing operation of the tip of the arm 9, based on the posture of the working device 2 detected by the posture detection device 53 when the condition is satisfied. Specifically, the posture calculation unit 41 calculates the swing angle θsw of the upper swing body 7 at the start of the loading operation assist control as the control start swing angle θswsa1. The posture calculation unit 41 calculates the height of the tip of the arm 9 at the start of the loading operation assist control as the control start height Zamsa1.

[0063] 7, the target angle calculation unit 46 calculates a passing lower limit height Zamta1 by adding a height Zv, which is the position of the platform 201 in the Z-axis direction in the shovel reference coordinate system calculated by the loaded machine position calculation unit 42, to a predetermined set value Za. The height Zv of the platform 201 is specifically the height from the ground G to the upper edge of the side part 202 of the platform 201 in the shovel reference coordinate system. The set value Za is set by adding the bucket length Lbk and a margin.

[0064] Furthermore, the posture calculation unit 41 calculates the arm angle θam at the start of the loading operation assist control as a control start arm angle θamsa1. When the loading operation assist control execution condition is met, the target angle calculation unit 46 calculates a passing lower limit boom angle θbmta1, which is a boom angle at which the arm tip height becomes the passing lower limit height Zamta1, based on the control start arm angle θamsa1 and the passing lower limit height Zamta1.

[0065] Also, as shown in Figure 8, when the loading operation assistance control execution condition is met, the target angle calculation unit 46 calculates, based on the passing lower limit boom angle θbmta1, an interference prevention angle θswta1 that specifies an interference prevention position, which is an angular position in the rotation direction of the tip of the arm 9 where the platform 201 and the working implement 2 do not interfere with each other between the operation start position specified outside the platform 201 and the side 202 (the right side 202r in the example shown in Figure 8) among the multiple side portions 202 of the platform 201 that the working implement 2 can reach first after the upper rotating body 7 operates.

[0066] A specific method for calculating the passing lower limit boom angle θbmta1 and the interference prevention angle θswta1 will be described. In the following expressions (1) to (4), the description will be given assuming that the dimension in the width direction of the work implement 2 can be ignored. The arm tip height Zam, which is the height from the ground surface G of the tip of the arm 9 in the shovel reference coordinate system, can be obtained by the following expression (1).

[0067]

number

[0068] A passing lower limit boom angle θbmta1, which is the boom angle when the tip of the arm 9 is at the passing lower limit height Zamta1, is calculated by the following formula (2).

[0069]

number

[0070] When the passing lower limit boom angle θbmta1 is determined, the distance Rta1 from the rotation center axis (Z axis) to the tip of the arm 9 in a plan view (hereinafter also referred to as arm tip distance) can be calculated by the following formula (3).

[0071]

number

[0072] If the position in the shovel reference coordinate system of the intersection P between the predicted movement trajectory L of the tip of the arm 9 when it rotates at the arm tip distance Rta1 and the line segment indicating the outer surface of the side 202 of the loading platform 201 of the loaded machine 200 is Xta1, Yta1 (see Figure 8), the wrap rotation angle θswta can be calculated by the following equation (4).

[0073]

number

[0074] The target angle calculation unit 46 adds a predetermined margin θswtam to the wrap swing angle θswta to calculate the interference prevention angle θswta1 (θswta1=θswta+θswtam). Note that the predetermined margin θswtam is a margin that is added so that the working implement 2 is positioned away from the side portion 202 toward the outside of the platform 201. For example, when the wrap swing angle θswta in the left swing direction from the reference posture is expressed as a positive value, the margin θswtam is a negative value. The absolute value of the margin is at least greater than half the width of the bucket 10.

[0075] The target angle calculation unit 46 adds a predetermined margin θswtam2 to the wrap swing angle θswta to calculate the bed interior arrival angle θswta2 (θswta2=θswta+θswtam2). Note that the predetermined margin θswtam2 is a margin that is added so that the working implement 2 is positioned in a position that is farther from the side portion 202 toward the inside of the bed 201. For example, when the wrap swing angle θswta in the left swing direction from the reference posture is expressed as a positive value, the margin θswtam2 will be a positive value. The absolute value of the margin is at least greater than half the width of the bucket 10.

[0076] The correlation map generator 49 shown in Fig. 3 generates a correlation map Ma for loading operation assistance as shown in Fig. 6 based on the calculation result of the target angle calculator 46. The correlation map Ma is generated so that, from the control start swing angle θswsa1 to the interference prevention angle θswta1, the lower limit of the arm tip height monotonically increases from the control start height Zamsa1 as the swing angle increases, and the lower limit of the arm tip height becomes the passing lower limit height Zamta1 at the interference prevention angle θswta1. The correlation map Ma is also generated so that, from the swing angle ranging from the interference prevention angle θswta1 to the bed arrival angle θswta2, the lower limit of the arm tip height becomes the passing lower limit height Zamta1.

[0077] In this way, the control device 40 calculates a lower limit value in the height direction of the working device 2 according to the angular position in the rotation direction of the tip of the arm 9, within the operating range of the upper rotating body 7 from the operating start position specified by the control start rotation angle θswsa1 to the interference prevention position specified by the interference prevention angle θswta1, which is larger the closer to the interference prevention position it is and which becomes the lower limit height for passing (interference prevention height) Zamta1 at the interference prevention position.

[0078] As described later, when the swing angle is equal to or greater than the interference prevention angle θswta1, the operation of the arm 9 becomes effective. For this reason, when the swing angle is equal to or greater than the interference prevention angle θswta1, the arm angle θam may change due to the operation of the operator. When the arm angle θam changes, the reach (arm tip distance) of the working device 2 changes when viewed from above, and therefore the in-platform arrival angle θswta2, which is the swing angle at a position where the entire bucket fits within the platform 201, changes dynamically. In other words, when the arm angle θam changes, the target angle calculation unit 46 recalculates the in-platform arrival angle θswta2. The correlation map generation unit 49 updates the correlation map Ma based on the recalculated in-platform arrival angle θswta2.

[0079] The posture comparison unit 47 shown in FIG. 3 compares the rotation angle θsw calculated by the posture calculation unit 41 with the interference prevention angle θswta1 calculated by the target angle calculation unit 46, and determines whether or not the enabling condition for the operation of the arm 9 is satisfied based on the comparison result. The enabling condition for the operation of the arm 9 includes the state in which the tip of the arm 9 reaches an angle position in the rotation direction that exceeds the interference prevention position while reaching a height that exceeds the interference prevention height. When the rotation angle θsw is less than the interference prevention angle θswta1, the posture comparison unit 47 determines that the tip of the arm 9 does not exceed the interference prevention position. In other words, the posture comparison unit 47 determines that the enabling condition is not satisfied. When the rotation angle θsw is equal to or greater than the interference prevention angle θswta1, the posture comparison unit 47 determines that the tip of the arm 9 exceeds the interference prevention position. The lower limit value in the height direction of the working device 2 at the interference prevention position is the lower limit height for passing (interference prevention height) Zamta1. Therefore, when the turning angle θsw is equal to or larger than the interference prevention angle θswta1, the attitude comparison unit 47 determines that the enabling condition is met.

[0080] Further, the posture comparison unit 47 compares the arm tip height Zam calculated by the posture calculation unit 41 with the passing lower limit height Zamta1 calculated by the target angle calculation unit 46.

[0081] The posture comparison unit 47 determines whether or not the conditions for executing control to automatically perform boom raising operation (hereinafter also referred to as the automatic boom raising control execution conditions) are met based on the comparison result between the arm tip height Zam and the lower limit height for passing Zamta1.

[0082] The automatic boom raising control execution condition includes at least the following (Condition 3). The automatic boom raising control execution condition is met when the following (Condition 3) is satisfied while the interference prevention control is being executed, and is not met when (Condition 3) is not satisfied. (Condition 3) The arm tip height Zam must be less than the lower limit height Zamta1 for passing.

[0083] Moreover, the posture comparison unit 47 compares the swing angle θsw calculated by the posture calculation unit 41 with the inside-of-bed arrival angle θswta2 calculated by the target angle calculation unit 46, and determines whether or not the bucket 10 has passed the side 202 of the bed 201 in a plan view (only the side 202r that can be reached first among the sides 202r and 202l) after swinging beyond the interference prevention position, that is, whether or not the entire bucket 10 has passed the side 202r in a plan view and reached the inside of the bed 201, which is a position in the swing direction just before the side 202l. When the swing angle θsw is less than the inside-bed arrival angle θswta2, the posture comparison unit 47 determines that the entire bucket 10 has not reached the inside of the bed 201. When the swing angle θsw is equal to or greater than the inside-bed arrival angle θswta2, the posture comparison unit 47 determines that the entire bucket 10 has reached the inside of the bed 201.

[0084] The target speed calculation unit 48 calculates the target speed of the hydraulic actuators that drive the boom 8, arm 9, bucket 10, upper rotating body 7, etc., based on the operation command speed calculated by the speed calculation unit 43. The actuator control unit 39 outputs a control signal to the electromagnetic proportional valve 51 so that each hydraulic actuator (the boom cylinder 11, arm cylinder 12, bucket cylinder 13, swing hydraulic motor 6, etc.) operates at the target speed calculated by the target speed calculation unit 48.

[0085] Furthermore, when the loading operation assist control execution condition is met, the target speed calculation unit 48 calculates the target speeds of the hydraulic actuators based on the posture of the hydraulic excavator 1 calculated by the posture calculation unit 41 and the correlation map Ma.

[0086] The details of the method of calculating the target speed of each hydraulic actuator by the target speed calculation unit 48 in the loading operation assist control are as follows.

[0087] When the loading operation support control execution condition is satisfied, the target speed calculation unit 48 executes a disabling process for disabling the arm operation by the operator until the swing angle θsw calculated by the posture calculation unit 41 reaches the interference prevention angle θswta1, that is, while the posture comparison unit 47 determines that the enabling condition for the operation of the arm 9 is not satisfied. In the disabling process, the target speed calculation unit 48 sets the target speed of the arm cylinder 12 to 0 (zero) even if the operation command speed of the arm cylinder 12 calculated by the speed calculation unit 43 is not 0 (zero). In this way, the control device 40 according to this embodiment disables the operation of the arm 9 by the operation device 20 during the operation of the upper rotating body 7 until the enabling condition is satisfied in the loading operation support control. In other words, the control device 40 disables the operation of the arm 9 by the arm operation device (operation device 20) during the operation of the upper rotating body 7 from the operation start position to the interference prevention position.

[0088] The target speed calculation unit 48 does not execute the disabling process when the posture comparison unit 47 determines that the enabling condition for the operation of the arm 9 is satisfied. That is, the target speed calculation unit 48 sets the operation command speed of the arm cylinder 12 calculated by the speed calculation unit 43 as the target speed of the arm cylinder 12. In this way, in the loading operation support control, the control device 40 according to this embodiment enables the operation of the arm 9 by the operating device 20 when the enabling condition is satisfied.

[0089] When the attitude comparing unit 47 determines that the automatic boom raising control execution condition is satisfied, the target speed calculating unit 48 sets a predetermined automatic boom raising speed as the target speed of the boom cylinder 11, regardless of the boom operation by the operator. The automatic boom raising speed is stored in advance in the ROM of the control device 40. Note that when the attitude comparing unit 47 determines that the automatic boom raising control execution condition is not satisfied, the target speed calculating unit 48 does not perform the process of setting the target speed of the boom cylinder 11 to the automatic boom raising speed.

[0090] The target speed calculation unit 48 compares the arm tip height Zam calculated by the posture calculation unit 41 with the correlation map Ma generated by the correlation map generation unit 49, and sets a target rotation speed so that the arm tip height Zam does not fall below the lower limit value defined by the correlation map Ma due to the rotation operation.

[0091] Specifically, the target speed calculation unit 48 calculates the limit rotation speed ωswt that satisfies the gradient α of the correlation map Ma from the rotation speed (angular speed) ωbm of the boom 8 calculated by the speed calculation unit 43.

[0092] The target speed calculation unit 48 compares the swing speed ωsw calculated by the speed calculation unit 43 in response to the operator's swing operation with the limit swing speed ωswt, and determines, based on the comparison result, whether or not the operator's swing operation causes the arm tip height Zam to fall below a lower limit value defined by the correlation map Ma.

[0093] When the swing speed ωsw is equal to or less than the limit swing speed ωswt, the target speed calculation unit 48 determines that the swing operation by the operator will not cause the arm tip height Zam to fall below the lower limit value defined by the correlation map Ma. When the swing speed ωsw is greater than the limit swing speed ωswt, the target speed calculation unit 48 determines that the swing operation by the operator will cause the arm tip height Zam to fall below the lower limit value defined by the correlation map Ma.

[0094] When it is not determined that the arm tip height Zam falls below the lower limit value defined by the correlation map Ma due to the operator's rotation operation, the target speed calculation unit 48 sets the operation command speed of the rotation hydraulic motor 6 calculated by the speed calculation unit 43 as the target speed of the rotation hydraulic motor 6. As a result, the upper rotating body 7 operates at a rotation speed ωsw corresponding to the operator's rotation operation. When it is determined that the arm tip height Zam falls below the lower limit value defined by the correlation map Ma due to the operator's rotation operation, the target speed calculation unit 48 sets the target speed of the rotation hydraulic motor 6 to a speed corresponding to the limited rotation speed ωswt. As a result, the upper rotating body 7 operates at the limited rotation speed ωswt lower than the rotation speed corresponding to the operator's rotation operation. That is, the rotation operation of the upper rotating body 7 is decelerated.

[0095] In this way, the control device 40 according to this embodiment controls the automatic raising operation of the boom 8 and controls the operation restriction of the upper rotating body 7 so that the arm tip height Zam does not fall below the lower limit value defined by the correlation map Ma.

[0096] Furthermore, when the slewing angle θsw is equal to or larger than the interference prevention angle θswta1 and smaller than the loading platform reach angle θswta2, the target speed calculation unit 48 judges whether the arm operation by the operator causes the arm tip height Zam to fall below the lower limit value (passing lower limit height Zamta1) defined by the correlation map Ma. When the velocity vector of the arm tip calculated by the velocity vector calculation unit 44 does not contain a downward component, the target speed calculation unit 48 judges that the arm operation by the operator does not cause the arm tip height Zam to fall below the lower limit value (passing lower limit height Zamta1) defined by the correlation map Ma. When the velocity vector of the arm tip calculated by the velocity vector calculation unit 44 contains a downward component, the target speed calculation unit 48 judges that the arm operation by the operator causes the arm tip height Zam to fall below the lower limit value (passing lower limit height Zamta1) defined by the correlation map Ma.

[0097] When it is determined that the arm tip height Zam does not fall below the lower limit value (passing lower limit height Zamta1) defined by the correlation map Ma due to the arm operation by the operator, the target speed calculation unit 48 sets the target speed of the boom cylinder 11 to 0 (zero). In addition, the target speed calculation unit 48 sets the operation command speed of the arm cylinder 12 calculated by the speed calculation unit 43 as the target speed of the arm cylinder 12.

[0098] When it is determined that the arm tip height Zam falls below a lower limit value (passing lower limit height Zamta1) defined by the correlation map Ma due to the arm operation by the operator, the target speed calculation unit 48 calculates a target speed in the extension direction of the boom cylinder 11 (raising direction of the boom 8) so that the arm tip height Zam does not fall below the lower limit value defined by the correlation map Ma. Note that instead of calculating the target speed in the extension direction of the boom cylinder 11, or in addition to calculating the target speed in the extension direction of the boom cylinder 11, the target speed calculation unit 48 may set the target speed of the arm cylinder 12 to 0 (zero).

[0099] In this way, when it is not determined that the bucket 10 has passed through the side 202 of the loading platform 201 in a planar view, the control device 40 of this embodiment controls the operation of at least one of the boom 8 and the arm 9 so that the height of the tip of the arm 9, which moves in response to operation of the arm 9 by the operating device 20, does not fall below the lower limit height for passing (interference prevention height) Zamta1.

[0100] The control device 40 according to this embodiment ends the loading operation support control when the swing angle θsw becomes equal to or larger than the bed reach angle θswta2. In other words, when the swing angle θsw becomes equal to or larger than the bed reach angle θswta2, the target speed calculation unit 48 sets the operation command speed of the arm cylinder 12 calculated by the speed calculation unit 43 as the target speed of the arm cylinder 12.

[0101] In other words, when the control device 40 according to this embodiment determines that the bucket 10 has passed through the side 202 of the loading platform 201 in a planar view, it allows the tip of the arm 9 to move to a position lower than the lower limit height for passing (interference prevention height) Zamta1.

[0102] An example of the flow of processing of loading operation support control executed by the control device 40 will be described with reference to Figures 10 and 11. The processing shown in the flowcharts of Figures 10 and 11 is started when an ignition switch (not shown) is turned on, and is repeatedly executed at a predetermined control period.

[0103] As shown in FIG. 10, in step S101, the loaded machine position calculation unit 42 calculates the relative position of the platform 201 of the loaded machine 200 with respect to the hydraulic excavator 1 based on the detection result of the object position detection device 54.

[0104] In the next step S104, the condition determination unit 45 determines, based on the position of the platform 201 calculated in step S101 and the velocity vector of the arm tip calculated by the velocity vector calculation unit 44, whether or not the operator has performed a rotation operation in a direction in which the bucket 10 approaches the side 202 of the platform 201 from the outside of the platform 201 in a planar view.

[0105] If it is determined in step S104 that the operator has performed a swing operation in a direction in which the bucket 10 approaches the side part 202 of the loading platform 201 from the outside of the loading platform 201 in a plan view, the process proceeds to step S107. If it is determined in step S104 that the operator has not performed a swing operation in a direction in which the bucket 10 approaches the side part 202 of the loading platform 201 from the outside of the loading platform 201 in a plan view, the process shown in the flowcharts of Figures 10 and 11 ends.

[0106] In step S107, condition determination unit 45 determines whether or not the posture of the working implement 2 is the transport posture, based on the ground angle γ of the bucket 10 calculated by posture calculation unit 41. If it is determined in step S107 that the posture of the working implement 2 is the transport posture, the process proceeds to step S110. If it is determined in step S107 that the posture of the working implement 2 is not the transport posture, the process shown in the flowcharts of Figures 10 and 11 ends.

[0107] If the determinations in steps S104 and S107 are affirmative, the loading operation support control execution condition is met, and the loading operation support control is started. In the loading operation support control, first, in step S110, the posture calculation unit 41 calculates the control start swing angle θswsa1, the control start arm angle θamsa1, and the control start height Zamsa1.

[0108] In the next step S113, the target angle calculation unit 46 calculates a passing lower limit height Zamta1. In the next step S116, the target angle calculation unit 46 calculates a passing lower limit boom angle θbmta1 and a wrap swing angle θswta. In the next step S119, the target angle calculation unit 46 calculates an interference prevention angle θswta1 and an in-bed arrival angle θswta2.

[0109] In the next step S122, correlation map generating unit 49 generates a correlation map Ma (see FIG. 6) based on the calculation results in steps S110, S113, and S119.

[0110] In the next step S125, the attitude comparator 47 determines whether or not the current swing angle θsw calculated by the attitude calculation unit 41 is less than the interference prevention angle θswta1 calculated in step S119. If it is determined in step S125 that the current swing angle θsw is less than the interference prevention angle θswta1, the process proceeds to step S128. If it is determined in step S125 that the current swing angle θsw is equal to or greater than the interference prevention angle θswta1, the enabling condition for the operation of the arm 9 is met, and the process proceeds to step S145.

[0111] In step S128, the posture comparison unit 47 determines whether the current arm tip height Zam calculated by the posture calculation unit 41 is equal to or less than the passing lower limit height Zamta1 calculated in step S113. If it is determined in step S128 that the current arm tip height Zam is equal to or less than the passing lower limit height Zamta1, the process proceeds to step S131. If it is determined in step S128 that the current arm tip height Zam is greater than the passing lower limit height Zamta1, the process proceeds to step S134.

[0112] If the determination in step S128 is affirmative, the automatic boom raising control execution condition is established. As a result, in step S131, target speed calculation unit 48 sets the target speed of boom cylinder 11 to a predetermined automatic boom raising speed. When the process in step S131 ends, the process proceeds to step S134.

[0113] In step S134, the target speed calculation unit 48 determines whether or not the arm tip height Zam falls below the lower limit value defined by the correlation map Ma due to the operator's turning operation, based on the turning speed ωsw according to the operator's turning operation and the limit turning speed ωswt. If it is determined in step S134 that the arm tip height Zam falls below the lower limit value defined by the correlation map Ma due to the operator's turning operation, the process proceeds to step S137. If it is determined in step S134 that the arm tip height Zam does not fall below the lower limit value defined by the correlation map Ma due to the operator's turning operation, the process proceeds to step S140.

[0114] In step S137, the target speed calculation unit 48 sets the target speed of the swing hydraulic motor 6 to a speed corresponding to the limited swing speed ωswt. By performing the processes of steps S131 and S137, the swing operation and the boom raising operation are performed in combination so that the arm tip height does not fall below the lower limit value defined by the correlation map Ma. Although not shown, if a negative determination is made in step S134, an operation command speed corresponding to the amount of swing operation by the operator is set as the target speed of the swing hydraulic motor 6. When the process of step S137 ends, the process proceeds to step S140.

[0115] In step S140, the target speed calculation unit 48 determines whether or not the operator is performing arm operation based on the operation command speed of the arm cylinder 12 calculated by the speed calculation unit 43. If the operation command speed of the arm cylinder 12 is not 0 (zero), the target speed calculation unit 48 determines that the operator is performing arm operation, and if the operation command speed of the arm cylinder 12 is 0 (zero), the target speed calculation unit 48 determines that the operator is not performing arm operation. If it is determined in step S140 that the operator is performing arm operation, the process proceeds to step S143. If it is determined in step S140 that the operator is not performing arm operation, the process proceeds to step S160.

[0116] In step S143, the target speed calculation unit 48 sets the target arm speed to 0 (zero). That is, the process of step S143 can be said to be a nullification process for nullifying the arm operation by the operator. When the process of step S143 ends, the process proceeds to step S160.

[0117] In step S145, the target angle calculation unit 46 performs the same process as in step S140. If it is determined in step S145 that the arm has been operated by the operator, the process proceeds to step S147. If it is determined in step S145 that the arm has not been operated by the operator, the process proceeds to step S150.

[0118] In step S147, the target angle calculation unit 46 recalculates the inside-bed arrival angle θswta2, and the correlation map generation unit 49 updates the correlation map Ma. When the process of step S147 ends, the process proceeds to step S150.

[0119] In step S150, posture comparison unit 47 determines whether or not the entire bucket 10 has reached the inside of the platform 201 in a planar view, based on the current swing angle θsw calculated by posture calculation unit 41 and the in-platform arrival angle θswta2. If it is determined in step S150 that the entire bucket 10 has not reached the inside of the platform 201 in a planar view, the process proceeds to step S153. If it is determined in step S150 that the entire bucket 10 has reached the inside of the platform 201 in a planar view, the process shown in the flowcharts of Figures 10 and 11 ends.

[0120] In step S153, the target speed calculation unit 48 determines whether or not the arm tip height Zam falls below the lower limit value (passing lower limit height Zamta1) defined by the correlation map Ma due to the arm operation by the operator, based on the arm tip speed vector calculated by the speed vector calculation unit 44. If it is determined in step S153 that the arm tip height Zam falls below the lower limit value defined by the correlation map Ma due to the arm operation by the operator, the process proceeds to step S156. If it is determined in step S153 that the arm tip height Zam does not fall below the lower limit value defined by the correlation map Ma due to the arm operation by the operator, the process proceeds to step S160.

[0121] In step S156, the target speed calculation unit 48 calculates a target speed of the boom cylinder 11 for raising the boom 8 so that the arm tip height Zam does not fall below a lower limit value defined by the correlation map Ma. As a result, the arm operation and the boom raising operation are performed in combination so that the arm tip height does not fall below the passing lower limit height Zamta1. When the processing of step S156 ends, the processing proceeds to step S160.

[0122] In step S160, the actuator control unit 39 outputs a control signal corresponding to the target speed calculated by the target speed calculation unit 48 to the solenoid proportional valve 51. In the next step S163, the condition determination unit 45 determines, based on the calculation result of the speed vector calculation unit 44 or the calculation result of the speed calculation unit 43, whether or not the operator is continuing a turning operation.

[0123] For example, if the velocity vector of the tip of the arm 9 calculated by the velocity vector calculation unit 44 contains a component in the rotation direction, the condition determination unit 45 determines that the operator is continuing the rotation operation, and if the velocity vector of the tip of the arm 9 does not contain a component in the rotation direction, it determines that the operator is not continuing the rotation operation.

[0124] In addition, the condition determination unit 45 may determine that the operator is continuing the rotation operation if the operation command speed of the rotation hydraulic motor 6 calculated by the speed calculation unit 43 is not 0 (zero), and may determine that the operator is not continuing the rotation operation if the operation command speed of the rotation hydraulic motor 6 calculated by the speed calculation unit 43 is 0 (zero).

[0125] If it is determined in step S163 that the turning operation by the operator is continuing, the process returns to step S125. If it is determined in step S163 that the turning operation by the operator is not continuing, the process proceeds to step S166.

[0126] In step S166, the condition determination unit 45 determines whether the actual swing speed ωswr calculated by the speed calculation unit 43 is equal to or greater than the speed threshold value ωswr0. The process of step S166 corresponds to a process of determining whether the upper swing body 7 is moving due to inertia. If it is determined in step S166 that the actual swing speed ωswr is equal to or greater than the speed threshold value ωswr0, the process returns to step S125. If it is determined in step S166 that the actual swing speed ωswr is less than the speed threshold value ωswr0, the process shown in the flowcharts of FIGS. 10 and 11 ends.

[0127] With reference to Fig. 12, the main operations of the hydraulic excavator 1 according to this embodiment will be described. As shown in Fig. 12, when the operator starts a left rotation operation to transport excavated material to the loading machine 200, the upper rotating body 7 starts a left rotation operation. When the arm tip height Zam is less than the passing lower limit height Zamta1, the left rotation operation of the upper rotating body 7 and the raising operation of the boom 8 are performed in combination. Note that, when the rotation speed according to the left rotation operation of the operator causes the arm tip height Zam to fall below the lower limit value defined by the correlation map Ma, the rotation speed is automatically decelerated.

[0128] At least when the working device 2 reaches the interference prevention position, the arm tip height Zam is disposed at a position higher than the lower limit height for passing Zamta1. As a result, the bucket 10 passes above the side portion 202 of the loading platform 201 without interfering with the side portion 202. When the entire bucket 10 is contained inside the loading platform 201, the operation of the arm 9 is valid. As a result, as shown by the two-dot chain line in FIG. 12, the arm 9 is subjected to a dumping operation to move the tip portion of the arm 9 in a direction away from the operator's cab 71, thereby making it possible to adjust the discharge position of the excavated material. As a result, the efficiency of the loading operation by the hydraulic excavator 1 can be improved.

[0129] According to the first embodiment, the following advantageous effects are achieved.

[0130] (1) The control device 40 calculates the height of the tip of the arm 9 at which the platform 201 and the working device 2 do not interfere with each other as a passing lower limit height (interference prevention height) Zamta1 based on the position of the platform (vessel) 201 acquired by the object position detection device (vessel position acquisition device) 54. The control device 40 judges whether or not a loading operation support control execution condition (interference prevention control execution condition) including a swing operation of the bucket 10 in a direction approaching the side part 202 of the platform 201 is satisfied. When it is judged that the loading operation support control execution condition (interference prevention control execution condition) is satisfied, the control device 40 specifies an operation start position, which is a circumferential position of the tip of the arm 9 before the swing operation, based on the attitude of the working device 2 detected by the attitude detection device 53, and specifies an interference prevention position, which is an angular position in the swing direction of the tip of the arm 9 at which the platform 201 and the working device 2 do not interfere with each other between the operation start position and the side part 202 of the platform 201.

[0131] The control device 40 calculates a lower limit value in the height direction of the working device 2 according to the angular position in the rotation direction of the tip of the arm 9, which is larger the closer to the interference prevention position it is and which becomes the lower limit height for passing (interference prevention height) Zamta1 at the interference prevention position, within the operating range of the upper rotating body 7 from the specified operation start position to the interference prevention position (operating range from control start rotation angle θswsa1 to interference prevention angle θswta1). During operation of the upper rotating body 7 from the operation start position to the interference prevention position, the control device 40 disables operation of the arm 9 by the operating device (arm operating device) 20, and controls the operation of the boom 8 and upper rotating body 7 so that the height of the tip of the arm 9 does not fall below the lower limit value.

[0132] The control device 40 determines whether or not a validation condition for the operation of the arm 9 is satisfied, including the tip of the arm 9 reaching an angular position in the rotation direction that exceeds the interference prevention position while reaching a height that exceeds the interference prevention position. When the validation condition is satisfied, the control device 40 validates the operation of the arm 9 by the operation device (arm operation device) 20.

[0133] The control device 40 determines whether or not the bucket 10 has passed the side 202 of the loading platform 201 in a planar view after rotating beyond the interference prevention position. When the control device 40 has not determined that the bucket 10 has passed the side 202 of the loading platform 201 in a planar view, the control device 40 controls the operation of at least one of the boom 8 and the arm 9 so that the height of the tip of the arm 9, which moves in response to operation of the arm 9 by the operation device (arm operation device) 20, does not fall below the passing lower limit height (interference prevention height) Zamta1. When the control device 40 determines that the bucket 10 has passed the side 202 of the loading platform 201 in a planar view, the control device 40 allows the tip of the arm 9 to move to a position lower than the passing lower limit height (interference prevention height) Zamta1.

[0134] According to this configuration, it is possible to provide a hydraulic excavator 1 capable of preventing interference between the working implement 2 and a vessel such as the bed 201 of the loaded machine 200 during loading operations, and capable of adjusting the posture of the working implement 2 to reflect the operator's intentions after the working implement 2 approaches the side 202 of the bed 201.

[0135] (2) The loading operation assistance control execution condition (interference prevention control execution condition) includes the posture of the working device 2 being a transport posture. Based on the detection result of the posture detection device 53, the control device 40 determines whether the posture of the working device 2 is a transport posture.

[0136] If the loading operation assist control execution conditions do not include the posture of the working implement 2 being in a transport posture, there is a possibility that the loading operation assist control will be executed against the operator's intention during excavation work, for example, when the toe of the bucket 10 is pointing downward. Therefore, according to this embodiment, the loading operation assist control can be executed while better reflecting the operator's intention.

[0137] <Second embodiment> A hydraulic excavator 1 according to a second embodiment of the present invention will be described with reference to FIG. 3 and FIGS. 13 to 15. The same reference numerals are used for configurations that are the same as or equivalent to those described in the first embodiment, and differences will be mainly described. In the first embodiment, the loading operation support control as interference prevention control when performing a loading operation is described, but the present invention is not limited thereto. The interference prevention control may be executed when performing a preparatory operation to move the working device 2 again toward an excavation site where an excavation target (such as natural ground) exists after the loading operation on the loaded machine 200. In the second embodiment, when the interference prevention control execution condition is satisfied, a preparatory operation support control is executed as an interference prevention control for preventing the bucket 10 from interfering with the loading platform 201 when the hydraulic excavator 1 performs a preparatory operation.

[0138] The preparatory operation is started from a situation in which the dump operation of the bucket 10 has been performed with the entire bucket 10 contained inside the loading platform 201 of the loaded machine 200 in a plan view. In the second embodiment, the condition determination unit 45 shown in Fig. 3 determines whether or not a preparatory operation assistance control execution condition (second interference prevention control execution condition), which is a condition for executing the preparatory operation assistance control, is satisfied. The preparatory operation assistance control execution condition includes at least the following (Condition 1B). (Condition 1B) When viewed from above, the bucket 10 is rotated in a direction approaching the side portion 202 of the loading platform 201 from the inside of the loading platform 201.

[0139] The condition determination unit 45 determines whether or not the operator has performed a rotation operation in a direction in which the bucket 10 approaches the side 202 of the platform 201 of the loaded machine 200 from the inside of the platform 201 in a planar view, based on the position of the platform 201 of the loaded machine 200 calculated by the loaded machine position calculation unit 42 and the velocity vector of the tip of the arm 9 (a parameter indicating the movement direction of the bucket 10) calculated by the velocity vector calculation unit 44.

[0140] Therefore, when the operator performs a turning operation toward the excavation site after the excavated material has been discharged onto the loading platform 201, the condition determining unit 45 determines that the preparatory operation assistance control execution condition is met.

[0141] The method of determining whether or not a swing operation has been performed in a direction in which the bucket 10 approaches the side part 202 of the bed 201 from the inside of the bed 201 in a plan view is not limited to this. For example, the condition determination unit 45 may determine whether or not a swing operation has been performed by the operator in a direction in which the bucket 10 approaches the side part 202 of the bed 201 of the loaded machine 200 from the inside of the bed 201 in a plan view, based on the position of the bed 201 of the loaded machine 200 calculated by the loaded machine position calculation unit 42, the position of the tip of the arm 9 calculated by the attitude calculation unit 41, and the operation direction of the swing operation detected by the operation detection device 56.

[0142] The control device 40 may also set the position of the excavation site in response to an operation by the operator, and determine that the preparatory operation assistance control execution condition is established when it is detected that the bucket 10 is moving toward the side 202 between the bucket 10 and the excavation site. The operator can input the position of the excavation site to the control device 40 by operating an input device (not shown) having a plurality of switches.

[0143] The excavation site is not limited to being set manually by the operator. For example, the control device 40 may specify and store the position of the excavation site based on the change in the attitude of the work implement 2 and the pressure of the hydraulic actuator when the attitude of the work implement 2 changes. The pressure of the hydraulic actuator is detected by a pressure sensor (not shown) and input to the control device 40.

[0144] When the preparatory movement assist control execution condition is satisfied, the posture calculation unit 41 shown in Fig. 3 calculates the rotation angle θsw of the upper rotating body 7 at the start of the preparatory movement assist control as a control start rotation angle θswsb1 that specifies the movement start position. In addition, the posture calculation unit 41 calculates the height of the tip of the arm 9 at the start of the preparatory movement assist control as a control start height Zamsb1.

[0145] When the preparatory operation assistance control execution condition is met, the target angle calculation unit 46 calculates the passing lower limit height Zamtb1 based on the position (X, Y, Z coordinates) of the platform 201 of the loaded machine 200 in the shovel reference coordinate system calculated by the loaded machine position calculation unit 42. The passing lower limit height Zamtb1 is calculated by adding the height Zv of the platform 201 in the shovel reference coordinate system to a predetermined set value Za. If there is no change in the positions of the hydraulic excavator 1 and the loaded machine 200 during loading work, the passing lower limit height Zamtb1 may be set as the passing lower limit height Zmata1 described in the first embodiment.

[0146] Furthermore, the posture calculation unit 41 calculates the arm angle θam at the start of the preparatory movement assist control as a control start arm angle θamsb1. When the preparatory movement assist control execution condition is met, the target angle calculation unit 46 calculates a passing lower limit boom angle θbmtb1, which is the boom angle at which the arm tip height becomes the passing lower limit height Zamtb1, based on the control start arm angle θamsb1 and the passing lower limit height Zamtb1.

[0147] Similar to the first embodiment, the target angle calculation unit 46 calculates the wrap swing angle θswtb based on the passing lower limit boom angle θbmtb1 and calculates the interference prevention angle θswtb1 that specifies an interference prevention position between the operation start position specified inside the platform 201 and the side part 202 of the platform 201 by adding a predetermined margin to the wrap swing angle θswtb. Note that the wrap swing angle θswtb is the swing angle at the position where the predicted movement trajectory L of the tip of the arm 9 intersects with the inner surface of the side part 202 of the platform 201 of the loaded machine 200 in a plan view, that is, the position where the bucket 10 overlaps with the side part 202 of the platform 201 in a plan view (wrap position).

[0148] In addition, the target angle calculation unit 46 calculates the outside platform reach angle θswtb2, which is the rotation angle when the bucket 10 moves from the inside of the platform 201 over the side 202 and the entire bucket 10 is positioned outside the platform 201, by adding a predetermined margin to the wrap rotation angle θswtb.

[0149] The correlation map generating unit 49 generates a correlation map Mb at the time of preparatory movement assistance as shown in Fig. 13 based on the calculation result of the target angle calculating unit 46, and stores it in the storage device. The horizontal axis of the correlation map Mb shown in Fig. 13 indicates the turning angle. The correlation map Mb is a map in which the turning angle at the reference posture is set to 0 degrees, and the turning angle increases when turning left, that is, the turning angle decreases when returning to the reference posture after turning left.

[0150] The correlation map Mb is generated so that, from the control start swing angle θswsb1 to the interference prevention angle θswtb1, as the swing angle decreases, the lower limit of the arm tip height monotonically increases from the control start height Zamsb1, and the lower limit of the arm tip height becomes the passing lower limit height Zamtb1 at the interference prevention angle θswtb1. Also, the correlation map Mb is generated so that, from the swing angle ranging from the interference prevention angle θswtb1 to the outside-of-bed reach angle θswtb2, the lower limit of the arm tip height becomes the passing lower limit height Zamtb1.

[0151] 3 compares the arm tip height Zam calculated by the posture calculation unit 41 with the passing lower limit height Zamtb1 calculated by the target angle calculation unit 46, and determines whether or not the enabling condition for the operation of the arm 9 is satisfied based on the comparison result. In the second embodiment, the enabling condition for the operation of the arm 9 is satisfied when the tip of the arm 9 exceeds the passing lower limit height (interference prevention height) Zamtb1.

[0152] When the arm tip height Zam is equal to or less than the lower limit height for passing (interference prevention height) Zamtb1, the posture comparator 47 determines that the tip of the arm 9 does not exceed the lower limit height for passing (interference prevention height). In other words, the posture comparator 47 determines that the enabling condition is not satisfied.

[0153] When the arm tip height Zam is greater than the lower limit height for passing (interference prevention height) Zamtb1, the posture comparator 47 determines that the tip of the arm 9 exceeds the lower limit height for passing (interference prevention height) Zamtb1. In other words, the posture comparator 47 determines that the enabling condition is satisfied.

[0154] An example of the processing flow of the preparatory movement support control executed by the control device 40 will be described with reference to Figures 14 and 15. Figures 14 and 15 are similar to Figures 10 and 11, and are flowcharts showing an example of the processing flow of the preparatory movement support control executed by the control device 40. In the processing shown in the flowcharts of Figures 14 and 15, the description of the same processing as that shown in the flowcharts of Figures 10 and 11 will be omitted as appropriate. The processing shown in the flowcharts of Figures 14 and 15 is started when an ignition switch (not shown) is turned on, and is repeatedly executed at a predetermined control period.

[0155] As shown in FIG. 14, in step S201, the loaded machine position calculation unit calculates the relative position of the platform 201 of the loaded machine 200 with respect to the hydraulic excavator 1 based on the detection result of the object position detection device .

[0156] In the next step S204, the condition determination unit 45 determines, based on the position of the platform 201 calculated in step S201 and the velocity vector of the arm tip calculated by the velocity vector calculation unit 44, whether or not the operator has performed a rotation operation in a direction in which the bucket 10 approaches the side 202 of the platform 201 from the inside of the platform 201 in a planar view.

[0157] If it is determined in step S204 that the operator has performed a swing operation in a direction in which the bucket 10 approaches the side part 202 of the loading platform 201 from the inside of the loading platform 201 in a plan view, the process proceeds to step S210. If it is determined in step S204 that the operator has not performed a swing operation in a direction in which the bucket 10 approaches the side part 202 of the loading platform 201 from the inside of the loading platform 201 in a plan view, the process shown in the flowcharts of Figures 14 and 15 ends.

[0158] If the determination in step S204 is affirmative, the preparatory movement support control execution condition is met, and the preparatory movement support control is started. In the preparatory movement support control, first, in step S210, the posture calculation unit 41 calculates the control start swing angle θswsb1, the control start arm angle θamsb1, and the control start height Zamsb1.

[0159] In the next step S213, the target angle calculation unit 46 calculates the passing lower limit height Zamtb1. In the next step S215, the posture comparison unit 47 determines whether the current arm tip height Zam calculated by the posture calculation unit 41 is equal to or less than the passing lower limit height Zamtb1 calculated in step S213. If it is determined in step S215 that the current arm tip height Zam is equal to or less than the passing lower limit height Zamtb1, the process proceeds to step S216. If it is determined in step S215 that the current arm tip height Zam is greater than the passing lower limit height Zamtb1, the enabling condition for the operation of the arm 9 is established, and the process proceeds to step S245.

[0160] In step S216, the target angle calculation unit 46 calculates a passing lower limit boom angle θbmtb1 and a wrap swing angle θswtb. In the next step S219, the target angle calculation unit 46 calculates an interference prevention angle θswtb1 and an outside-bed reach angle θswtb2.

[0161] In the next step S222, correlation map generating section 49 generates a correlation map Mb (see FIG. 13) based on the calculation results in steps S210, S213, and S219.

[0162] If the determination process of step S215 is affirmative, the automatic boom raising control execution condition is established. As a result, in step S231, as shown in Fig. 15, target speed calculation unit 48 sets the target speed of boom cylinder 11 to a predetermined automatic boom raising speed. When the process of step S231 ends, the process proceeds to step S234.

[0163] In step S234, the target speed calculation unit 48 determines whether or not the arm tip height Zam falls below the lower limit value defined by the correlation map Mb due to the operator's turning operation, based on the turning speed ωsw according to the operator's turning operation and the limit turning speed ωswt. If it is determined in step S234 that the arm tip height Zam falls below the lower limit value defined by the correlation map Mb due to the operator's turning operation, the process proceeds to step S237. If it is determined in step S234 that the arm tip height Zam does not fall below the lower limit value defined by the correlation map Mb due to the operator's turning operation, the process proceeds to step S240.

[0164] In step S237, the target speed calculation unit 48 sets the target speed of the swing hydraulic motor 6 to a speed corresponding to the limited swing speed ωswt. By performing the processes of steps S231 and S237, the swing operation and the boom raising operation are performed in combination so that the arm tip height does not fall below the lower limit value defined by the correlation map Mb. Although not shown, if a negative determination is made in step S234, an operation command speed corresponding to the amount of swing operation by the operator is set as the target speed of the swing hydraulic motor 6. When the process of step S237 ends, the process proceeds to step S240.

[0165] The processes in steps S240 and S243 are similar to those in steps S140 and S143 shown in FIG. 11, respectively, and therefore will not be described.

[0166] 15, in step S245, the target angle calculation unit 46 performs the same process as in step S240. If it is determined in step S245 that the arm has been operated by the operator, the process proceeds to step S247. If it is determined in step S245 that the arm has not been operated by the operator, the process proceeds to step S250.

[0167] In step S247, the target angle calculation unit 46 recalculates the outside-of-bed reach angle θswtb2, and the correlation map generation unit 49 updates the correlation map Mb. When the process of step S247 ends, the process proceeds to step S250.

[0168] In step S250, posture comparison unit 47 determines whether or not the entire bucket 10 has reached the outside of the platform 201 in a planar view, based on the current swing angle θsw calculated by posture calculation unit 41 and the outside-platform reach angle θswtb2. If it is determined in step S250 that the entire bucket 10 has not reached the outside of the platform 201 in a planar view, the process proceeds to step S253. If it is determined in step S250 that the entire bucket 10 has reached the outside of the platform 201 in a planar view, the process shown in the flowcharts of Figures 14 and 15 ends.

[0169] In step S253, the target velocity calculation unit 48 determines whether or not the arm tip height Zam falls below the lower limit (passing lower limit height Zamtb1) defined by the correlation map Mb due to the arm operation by the operator, based on the velocity vector of the arm tip calculated by the velocity vector calculation unit 44. If it is determined in step S253 that the arm tip height Zam falls below the lower limit defined by the correlation map Mb due to the arm operation by the operator, the process proceeds to step S256. If it is determined in step S253 that the arm tip height Zam does not fall below the lower limit defined by the correlation map Mb due to the arm operation by the operator, the process proceeds to step S260.

[0170] In step S256, the target speed calculation unit 48 calculates a target speed of the boom cylinder 11 for raising the boom 8 so that the arm tip height Zam does not fall below a lower limit value defined by the correlation map Mb. As a result, the arm operation and the boom raising operation are performed in combination so that the arm tip height does not fall below the passing lower limit height Zamtb1. When the processing of step S256 ends, the process proceeds to step S260.

[0171] The processes of steps S260, S263, and S266 are similar to those of steps S160, S163, and S166 in Fig. 11. As shown in Fig. 15, if an affirmative decision is made in step S263, the process proceeds to step S269. Also, if an affirmative decision is made in step S266, the process proceeds to step S269.

[0172] In step S269, the posture comparison unit 47 performs the same process as in step S215. If it is determined in step S269 that the current arm tip height Zam is equal to or less than the passing lower limit height Zamtb1, the process returns to step S231. If it is determined in step S269 that the current arm tip height Zam is greater than the passing lower limit height Zamtb1, the enabling condition for the operation of the arm 9 is met, and the process proceeds to step S245.

[0173] In this way, in the second embodiment, the control device 40 assists the preparatory operation, so that when the preparatory operation is performed in a state in which the bucket 10 is at a position lower than the upper edge of the side part 202 of the loading platform 201 after the operation of discharging the target object onto the loading platform 201 is completed, interference between the bucket 10 and the side part 202 of the loading platform 201 can be prevented. Note that, when the bucket 10 is at a position higher than the upper edge of the side part 202 of the loading platform 201 at the start of the preparatory operation assistance control, assistance by the control device 40 can be provided only for the operation of the operator that may cause interference. Also, when the bucket 10 exceeds the side part 202 of the loading platform 201 and is positioned outside the loading platform 201, the operation of the tip part of the arm 9 to a position lower than the interference prevention height Zamtb1 is permitted, so that the bucket 10 can be quickly brought close to the excavation target object and the excavation operation can be started.

[0174] In the preparatory operation, the arm tip height often exceeds the interference prevention height when the operation starts, or exceeds the interference prevention height immediately after the operation starts. In the second embodiment, the enabling condition includes the tip of the arm 9 exceeding the interference prevention height, so that the operation of the arm 9 can be enabled immediately after the start of the preparatory operation. This allows the preparatory operation for excavation work to be performed in a manner that better reflects the operator's intentions.

[0175] <Third embodiment> A hydraulic excavator 1 according to a third embodiment of the present invention will be described with reference to Fig. 3 and Figs. 16 to 18. The same reference numerals are used for configurations that are the same as or equivalent to those described in the first embodiment, and differences will be mainly described. In the first embodiment, an example was described in which, when the entire bucket 10 reaches the inside of the loading platform 201 in a plan view, the loading operation assist control ends and the operator is allowed to freely operate the arm 9. In contrast, in the third embodiment, the loading operation assist control continues even after the entire bucket 10 reaches the inside of the loading platform 201 in a plan view. The control contents by the control device 40 of the hydraulic excavator 1 according to the third embodiment will be described in detail below.

[0176] The control device 40 of the third embodiment sets a lower limit height (lower limit value) Zamta2 (see Figure 17) within the vessel, which is the height position of the tip of the arm 9 at which the bottom 203 of the loading platform 201 and the bucket 10 do not come into contact when a bucket 10 is present within the loading platform 201 of the loaded machine 200.

[0177] The target angle calculation unit 46 shown in Fig. 3 calculates the arm tip distance Rta1 based on the calculation result in the posture calculation unit 41. As shown in Fig. 16, the target angle calculation unit 46 calculates the position in the excavator reference coordinate system of an intersection point P' between a predicted movement trajectory L' of the tip of the arm 9 when the arm 9 performs a swing operation at the arm tip distance Rta1 and a line segment indicating the inner surface of the side portion 202l of the loading platform 201. The target angle calculation unit 46 calculates a wrap swing angle θswta' based on the position of point P'.

[0178] As shown in Fig. 8, the wrap swing angle θswta is the swing angle when the working device 2 is located at a position (point P) where one of the pair of left and right side portions 202 (e.g., the right side portion 202r) overlaps with the predicted movement trajectory L of the tip of the arm 9. In contrast, as shown in Fig. 16, the wrap swing angle θswta' is the swing angle when the working device 2 is located at a position (point P') where the other of the pair of left and right side portions 202 (e.g., the left side portion 202l) overlaps with the predicted movement trajectory L' of the tip of the arm 9.

[0179] The target angle calculation unit 46 adds a predetermined margin θswtam' to the wrap swing angle θswta' to calculate the in-bed limit angle θswta3 (θswta3 = θswta' + θswtam'). Note that the predetermined margin θswtam' is a margin that is added so that the working implement 2 is positioned inwardly of the bed 201 and away from the side portion 202l, and the entire bucket 10 fits inside the bed 201 in a plan view. For example, when the wrap swing angle θswta' in the left swing direction from the reference posture is expressed as a positive value, the margin θswtam' will be a negative value. The absolute value of the margin is at least greater than half the width of the bucket 10.

[0180] The in-bed reach angle θswta2 and the in-bed limit angle θswta3 are rotation angles that indicate the range in which the entire bucket 10 can be positioned within the bed 201 in a plan view.

[0181] As shown in FIG. 17, the target angle calculation unit 46 calculates the bottom plate height Zvb by subtracting the height hb from the height Zv of the loading platform 201 in the excavator reference coordinate system calculated by the loaded machine position calculation unit 42. The height hb is the height from the bottom 203 to the upper edge of the loading platform 201. The target angle calculation unit 46 calculates the vessel inner lower limit height Zamta2 by adding a predetermined set value Zb to the bottom plate height Zvb. Note that, when the bottom 203 is inclined with respect to the horizontal, the height hb is set to the minimum value hbmin of the height from the bottom 203 to the upper edge of the loading platform 201. Also, the height hb is not limited to being a constant value. In this case, the target angle calculation unit 46 calculates the height hb based on the positional relationship between the bucket 10 and the loading platform 201. The set value Zb is set by adding the bucket length Lbk and a margin.

[0182] The correlation map generating unit 49 generates a correlation map Ma' at the time of loading operation assistance as shown in Fig. 18 based on the calculation result of the target angle calculating unit 46, and stores it in the storage device. As shown in Fig. 18, the correlation map Ma' is the same as the correlation map Ma (see Fig. 6) described in the first embodiment from the control start swing angle θswsa1 to the loading platform reach angle θswta2. The correlation map Ma' differs from the correlation map Ma (see Fig. 6) described in the first embodiment in that a lower limit value of the arm tip height is set in the range from the loading platform reach angle θswta2 to the loading platform limit angle θswta3. The correlation map Ma' is generated so that the lower limit value of the arm tip height becomes the vessel lower limit height Zamta2 from the loading platform reach angle θswta2 to the loading platform limit angle θswta3.

[0183] When the swing angle θsw is within the range from the in-bed reach angle θswta2 to the in-bed limit angle θswta3, that is, when the bucket 10 passes through the right side (first side) 202r and moves between the right side (first side) 202r and the left side (second side) 202l in the bed 201, the target speed calculation unit 48 calculates a target speed in the extension direction of the boom cylinder 11 (the direction in which the boom 8 is raised) so that the arm tip height Zam does not fall below the in-vessel lower limit height Zamta2 by the operation of the arm 9 by the operator. Note that the target speed calculation unit 48 may calculate the target speed in the extension direction of the boom cylinder 11 instead of calculating the target speed in the extension direction of the boom cylinder 11, or may calculate the target speed in the extension direction of the boom cylinder 11 and set the target speed of the arm cylinder 12 to 0 (zero). As a result, even after the bucket 10 reaches the loading platform 201 of the loaded machine 200 , interference between the bucket 10 and the loading platform 201 of the loaded machine 200 can be prevented.

[0184] In this way, when the control device 40 of the hydraulic excavator 1 according to the third embodiment determines that the bucket 10 continues to swing after overlapping with the right side portion (first side portion) 202r during loading operation and has moved to a position where they do not overlap (the entire bucket 10 has passed over the side portion 202r), the control device 40 allows the movement of the tip of the arm 9 to a position lower than the interference prevention height Zamta1. In addition, the control device 40 sets an in-vessel lower limit height (in-vessel lower limit value) Zamta2, which is the height position of the tip of the arm 9 where the bottom 203 and the bucket 10 do not come into contact, between the right side portion (first side portion) 202r and the left side portion (second side portion) 202l. Then, when the bucket 10 passes through the right side (first side) 202r and moves between the right side (first side) 202r and the left side (second side) 202l within the loading platform 201, the control device 40 controls the operation of at least one of the boom 8 and the arm 9 so that the height of the tip of the arm 9 (arm tip height) Zam does not fall below the lower limit height Zamta2 within the vessel.

[0185] According to this configuration, after the entire bucket 10 is positioned inside the loading platform 201 during the loading operation, interference between the bucket 10 and the bottom 203 of the loading platform 201 can be appropriately prevented.

[0186] The following modified examples are also within the scope of the present invention, and it is possible to combine the configurations shown in the modified examples with the configurations described in the above-mentioned embodiments, to combine the configurations described in the different embodiments above, or to combine the configurations described in the different modified examples below.

[0187] <Variation 1> In the first embodiment, an example has been described in which the loading operation assist control execution conditions include (condition 1) that a swing operation has been performed in a direction in which the bucket 10 approaches the side part 202 of the loading platform 201 from the outside of the loading platform 201 in a plan view, and (condition 2) that the posture of the working implement 2 is a transport posture, but the present invention is not limited to this. It is sufficient that the loading operation assist control execution conditions include at least "that a swing operation has been performed in a direction in which the bucket 10 approaches the side part 202 of the loading platform 201." Further, further conditions may be added to the loading operation assist control execution conditions.

[0188] <Modification 1-1> 19A, 19B, and 20, a modified example 1-1 in which the following (Condition A) is added to the loading operation assist control execution conditions described in the first embodiment will be described.

[0189] In this variant example 1-1, the loading operation assistance control execution condition is met when all of (Condition 1), (Condition 2), and (Condition A) are satisfied, and is not met when any of (Condition 1), (Condition 2), and (Condition A) are not satisfied. (Condition A) The assistance control execution switch 90 is turned on.

[0190] Fig. 19A is a diagram showing an example of the arrangement of the assistance control execution switch 90, and Fig. 19B is a diagram showing another example of the arrangement of the assistance control execution switch 90. As shown in Fig. 19A and Fig. 19B, the assistance control execution switch 90 is provided on, for example, the operating lever 22.

[0191] 19A, the assist control execution switch 90 is provided on the front side of the operation lever 22. With this configuration, the operator can easily operate the assist control execution switch 90 with his / her index finger or the like while holding and operating the operation lever 22.

[0192] 19B, the assist control execution switch 90 is provided on the rear side of the operation lever 22. With this configuration, the operator can easily operate the assist control execution switch 90 with his / her thumb or the like while gripping and operating the operation lever 22.

[0193] The assist control execution switch 90 is switched to the ON position by being pressed from the OFF position. The operation method of the assist control execution switch 90 may be a momentary operation method or an alternate operation method. The assist control execution switch 90 outputs an OFF signal to the control device 40 when in the OFF position, and outputs an ON signal to the control device 40 when in the ON position.

[0194] In this modified example 1-1, the loading operation support control shown in Fig. 20 and Fig. 11 is executed. Fig. 20 is a flowchart in which the process of step S103A is added between steps S101 and S104 in the flowchart of Fig. 10.

[0195] In this modified example 1-1, when the process of step S101 ends, the process proceeds to step S103A. In step S103A, the condition determination unit 45 determines whether or not the assistance control execution switch 90 has been turned on. If it is determined in step S103A that the assistance control execution switch 90 has been turned on (pushed in), the process proceeds to step S104. If it is determined in step S103A that the assistance control execution switch 90 has not been turned on, the process shown in the flowcharts of FIG. 20 and FIG. 11 ends.

[0196] According to this modification 1-1, since the loading operation support control execution conditions include (Condition A), the operator can execute or cancel the loading operation support control at any timing. Since the loading operation support control is executed while better reflecting the operator's intention, the efficiency of the loading work can be further improved.

[0197] In the present modified example 1-1, an example in which the loading operation support control execution condition includes (Condition A) has been described, but the preparatory operation support control execution condition described in the second embodiment may include (Condition A). The loading operation support control execution condition described in the third embodiment may include (Condition A).

[0198] <Variation 1-2> Next, with reference to Figs. 21 and 22, a modified example 1-2 in which the following (Condition B) is added to the loading operation assist control execution conditions described in the first embodiment will be described.

[0199] In this variant example 1-2, the loading operation assistance control execution condition is met when all of (Condition 1), (Condition 2), and (Condition B) are satisfied, and is not met when any of (Condition 1), (Condition 2), and (Condition B) are not satisfied. (Condition B) An object to be transported (excavated material) is present in the bucket 10.

[0200] 21, the hydraulic excavator 1 according to Modification 1-2 includes an object information acquisition device 55 that acquires information about an object being transported in the bucket 10. The object information acquisition device 55 is, for example, a device that acquires the load of the object (cargo) in the bucket 10. The object information acquisition device 55 is, for example, a weight detection device that is configured with a pressure sensor that detects the pressure of the boom cylinder 11 and a controller that calculates the weight of the object in the bucket 10 based on the detection result of the pressure sensor.

[0201] The condition determination unit 45 compares the weight W of the object in the bucket 10 acquired by the object information acquisition device 55 with a weight threshold W0. The weight threshold W0 is determined in advance by an experiment or the like, and is stored in the storage device of the control device 40. The weight threshold W0 corresponds to a weight of the object to be transported that is sufficient to perform the transport operation.

[0202] In this modified example 1-2, the loading operation support control shown in Fig. 22 and Fig. 11 is executed. Fig. 22 is a flowchart in which the process of step S109B is added between step S107 and step S110 in the flowchart of Fig. 10.

[0203] In this modified example 1-2, if a positive determination is made in step S107, the process proceeds to step S109B. In step S109B, the condition determination unit 45 determines whether or not a transported object is present in the bucket 10 based on the weight W acquired by the object information acquisition device 55. In step S109B, if the weight W acquired by the object information acquisition device 55 is greater than the weight threshold value W0, the condition determination unit 45 determines that a transported object is present in the bucket 10, and proceeds to step S110. In step S109B, if the weight W acquired by the object information acquisition device 55 is equal to or less than the weight threshold value W0, the condition determination unit 45 determines that a transported object is not present in the bucket 10, and ends the process shown in the flowcharts of FIG. 22 and FIG. 11.

[0204] Thus, in this modified example 1-2, the interference prevention control execution conditions include "the presence of an object to be transported in the bucket 10." The control device 40 determines whether or not an object to be transported is present in the bucket 10 based on the information (weight) acquired by the object information acquisition device 55. According to this modified example 1-2, it is possible to more accurately determine whether or not the operator intends to perform a transport operation. Since the operator's intention can be grasped more accurately, the loading operation can be assisted without giving the operator a sense of discomfort. As a result, the efficiency of the loading operation can be further improved.

[0205] Note that object information acquisition device 55 is not limited to being a weight detection device that detects the weight of an object in bucket 10. Object information acquisition device 55 may be composed of an imaging device such as a camera that images bucket 10, and an image recognition controller that recognizes the object from the image captured by the imaging device. Control device 40 determines whether or not a transport object is present in bucket 10 based on information (image) of the transport object in bucket 10 acquired by the object information acquisition device.

[0206] <Variation 2> In the first embodiment, an example has been described in which the wrap swing angle θswta at which the working device 2 overlaps with the side portion 202 of the platform 201 in a plan view is calculated, and a margin θswtam that takes into account the width of the bucket 10 is added to the wrap swing angle θswta to calculate the interference prevention angle θswta1. However, the method of calculating the interference prevention angle θswta1 is not limited to this method. For example, the reference prevention angle θswta0 that can theoretically prevent interference between the platform 201 and the bucket 10 may be calculated by the following equation (5), and the interference prevention angle θswta1 may be calculated by adding a predetermined margin to the reference prevention angle θswta0 calculated by equation (5).

[0207]

number

[0208] Note that, instead of the arm tip distance Rta1 described in the above embodiment, various calculations may be performed using the distance Rta1a from the rotation center axis (Z axis) to the tip of the bucket 10 in a plan view (hereinafter also referred to as the bucket tip distance). The bucket tip distance Rta1a is calculated by the following formula (6).

[0209]

number

[0210] The reference prevention angle θswta0 is calculated by the following formula (7) using the bucket tip distance Rta1a.

[0211]

number

[0212] By employing the calculation method of the present modified example 2, the interference prevention angles θswta1, θswtb1, inside-bed reach angle θswta2, outside-bed reach angle θswtb2, and inside-bed limit angle θswta3 can be calculated with greater accuracy than in the above embodiment.

[0213] <Modification 3> In the first embodiment, an example has been described in which the enabling condition for the operation of the arm 9 is satisfied only when the tip of the arm 9 passes over the interference prevention position in the rotation direction, i.e., when the rotation angle θsw becomes equal to or larger than the interference prevention angle θswta1, but the present invention is not limited to this. In the first embodiment, the enabling condition for the operation of the arm 9 may be satisfied not only when the tip of the arm 9 passes over the interference prevention position in the rotation direction, but also when the tip of the arm 9 passes over the interference prevention height (lower limit height for passing).

[0214] Hereinafter, an example of the flow of the process of the loading operation support control executed by the control device 40 according to the present modified example 3 will be described with reference to FIG. 23. The present modified example 3 is a modified example of the first embodiment, and the differences from the first embodiment will be described. FIG. 23 is a flowchart showing an example of the flow of the process of the loading operation support control executed by the control device 40 according to the present modified example 3, similar to FIG. 11, and shows the process of steps S125 to S166. The process executed when a negative determination is made in step S128 is different between the flowchart of FIG. 11 and the flowchart of FIG. 23. In the flowchart of FIG. 11, when a negative determination is made in step S128, the process proceeds to step S134. In contrast, in the flowchart of FIG. 23, when it is determined in step S128 that the current arm tip height Zam is greater than the passing lower limit height Zamta1, the process proceeds to step S145.

[0215] According to this configuration, when the amount of rotation operation by the operator is small and the arm tip height Zam becomes larger than the passing lower limit height Zamta1 due to automatic boom raising before the rotation angle θsw reaches the interference prevention angle θswta1, the operation of the arm 9 becomes effective. According to this modified example, the same effect as in the first embodiment can be obtained. Furthermore, when the upper rotating body 7 is operated slowly, if the arm tip height Zam exceeds the passing lower limit height Zamta1 even before the rotation angle θsw reaches the interference prevention angle θswta1, the operation of the arm 9 is permitted, so that the loading operation can be performed in a manner that better reflects the intention of the operator.

[0216] In addition, when it is determined in step S128 that the current arm tip height Zam is greater than the passing lower limit height Zamta1, the control device 40 may generate a correlation map Ma in which the lower limit value of the arm tip height is set to the passing lower limit height Zamta1 even when the arm tip height is less than the interference prevention angle θswta1. In this configuration, when the arm tip height Zam exceeds the passing lower limit height Zamta1 before the swing angle θsw reaches the interference prevention angle θswta1, the boom raising operation is performed thereafter so that the arm tip height does not fall below the passing lower limit height Zamta1 even before the swing angle θsw reaches the interference prevention angle θswta1. This prevents the arm tip height from falling below the passing lower limit height Zamta1 even when the arm operation becomes effective before the swing angle θsw reaches the interference prevention angle θswta1. Therefore, interference between the loading platform 201 and the bucket 10 can be more appropriately prevented during the loading operation.

[0217] <Modification 4> In the above embodiment, a backhoe shovel with the bucket 10 attached to the tip of the arm 9 facing backward has been described as an example of a work machine, but the present invention is not limited to this. As shown in Fig. 24, the work machine may be a loading shovel with the bucket 10 attached to the tip of the arm 9 facing forward.

[0218] <Variation 5> In the above embodiment, an example has been described in which the vessel position acquisition device that acquires the relative position of the loading platform (vessel) 201 of the loaded machine 200 with respect to the hydraulic excavator 1 is the object position detection device 54, but the present invention is not limited to this.

[0219] The vessel position acquisition device may be configured to acquire, via a communication device, position information of the platform 201 of the loaded machine 200 acquired by a server of a management office or the like at the work site. The control device 40 acquires the position coordinates (Xg, Yg, Zg) of the platform 201 of the loaded machine 200 in a global coordinate system via the communication device. The control device 40 acquires the position coordinates (Xg, Yg, Zg) and the direction of the hydraulic excavator 1 in the global coordinate system from a positioning device including a GNSS (Global Navigation Satellite System) antenna attached to the hydraulic excavator 1. The control device 40 may convert the position coordinates of the platform 201 and the hydraulic excavator 1 in the global coordinate system into position coordinates (X, Y, Z) of the hydraulic excavator 1 in a shovel-based coordinate system. Note that, in this modified example, an example has been described in which the object position acquisition device acquires position coordinates based on the global coordinate system, but position coordinates based on a site-based coordinate system (local coordinate system) may also be acquired.

[0220] <Variation 6> In the above embodiment, an example has been described in which the operation system is an electric lever type operation system, but the present invention is not limited to this. Although not shown, the operation system may be a hydraulic pilot type operation system in which the operation devices 20, 21 have pressure reducing valves that generate operation pressure according to the amount and direction of operation of the operation levers 22, 23.

[0221] <Variation 7> As an example of a combination of the configurations described in the different embodiments above, a hydraulic excavator 1 capable of executing the loading operation support control described in the first or third embodiment and the preparatory operation support control described in the second embodiment can be considered.

[0222] The control device 40 of the hydraulic excavator 1 according to this modification determines whether or not a first interference prevention control execution condition, including a swing operation of the bucket 10 in a direction approaching the right side portion (first side portion) 202r from the outside of the loading platform 201 in a plan view, is satisfied based on the relative position of the loading platform 201 with respect to the hydraulic excavator 1 acquired by the object position detection device (vessel position acquisition device) 54. When the enabling condition is satisfied, the control device 40 enables the operation of the arm 9 by the operation device (arm operation device) 20. The control device 40 determines whether or not the bucket 10 has passed the right side portion (first side portion) 202r in a plan view after swinging beyond the interference prevention position. When it is not determined that the bucket 10 has passed the right side portion (first side portion) 202r, the control device 40 controls the operation of at least one of the boom 8 and the arm 9 so that the height of the tip of the arm 9 that operates in response to the operation of the arm 9 by the operation device (arm operation device) 20 does not fall below the interference prevention height Zamta1. When it is determined that the bucket 10 has passed through the right side portion (first side portion) 202r, the control device 40 allows the movement of the tip portion of the arm 9 to a position lower than the interference prevention height Zamta1.

[0223] Furthermore, the control device 40 of the hydraulic excavator 1 according to this modification determines whether or not a second interference prevention control execution condition, including a swing operation of the bucket 10 in a direction approaching the right side portion (first side portion) 202r from the inside of the platform 201 in a plan view, is satisfied based on the relative position of the platform 201 with respect to the hydraulic excavator 1 acquired by the object position detection device (vessel position acquisition device) 54. When the enabling condition is satisfied, the control device 40 enables the operation of the arm 9 by the operation device (arm operation device) 20. The control device 40 determines whether or not the bucket 10 has passed the right side portion (first side portion) 202r in a plan view. When it is not determined that the bucket 10 has passed the right side portion (first side portion) 202r, the control device 40 controls the operation of at least one of the boom 8 and the arm 9 so that the height of the tip of the arm 9, which operates in response to the operation of the arm 9 by the operation device (arm operation device) 20, does not fall below the interference prevention height Zamtb1. When it is determined that the bucket 10 has passed through the right side portion (first side portion) 202r, the control device 40 allows the movement of the tip portion of the arm 9 to a position lower than the interference prevention height Zamtb1.

[0224] According to this configuration, when a series of operations including an excavation operation, a loading operation, and a preparation operation are repeatedly performed, the operation of the hydraulic excavator 1 is supported so that the operation is in line with the operator's intention while preventing interference between the platform 201 and the bucket 10. As a result, the efficiency of work performed by the hydraulic excavator 1 can be improved.

[0225] <Variation 8> In the above embodiment, an example has been described in which the vessel into which the excavated material excavated by the working device 2 is loaded is the bed 201 of a dump truck, but the present invention is not limited to this. The present invention may also be applied to a case in which the excavated material is loaded onto the bed (vessel) of an off-road vehicle equipped with a crawler-type traveling body. The present invention may also be applied to a case in which the excavated material is loaded onto a vessel placed on a belt conveyor.

[0226] Although the embodiments of the present invention have been described above, the above embodiments merely show some of the application examples of the present invention, and the technical scope of the present invention is not limited to the specific configurations of the above embodiments. Note that the control lines and information lines shown in the figures are those considered necessary for the explanation, and do not necessarily show all the control lines and information lines necessary on the product. In reality, it can be considered that almost all the configurations are connected to each other. [Explanation of symbols]

[0227] Reference Signs List 1...hydraulic excavator, 2...working equipment, 3...vehicle body, 4...traveling hydraulic motor (hydraulic actuator), 5...lower traveling body (traveling body), 6...swinging hydraulic motor (hydraulic actuator), 7...upper rotating body (swinging body), 8...boom, 8a...boom pin, 9...arm, 9a...arm pin, 10...bucket, 10a...bucket pin, 11...boom cylinder, 12...arm cylinder, 13...bucket cylinder, 14...boom angle sensor (posture sensor), 15...arm angle sensor (posture sensor), 17...bucket angle sensor (posture sensor), 18...tilt angle sensor (posture sensor), momentum sensor), 19...rotation angle sensor (attitude sensor), 20...operation device (arm operation device, rotation operation device), 39...actuator control unit, 40...control device, 41...attitude calculation unit, 42...loaded machine position calculation unit, 43...speed calculation unit, 44...speed vector calculation unit, 45...condition determination unit, 46...target angle calculation unit, 47...attitude comparison unit, 48...target speed calculation unit, 49...correlation map generation unit, 50...hydraulic drive system, 51...electromagnetic proportional valve, 52...operation amount sensor, 53...attitude detection device, 54...object position detection device (vessel position acquisition device), 55...object information acquisition device, 56...operation detection device, 90...assistance control execution switch, 100...pilot line, 101...flow control valve, 102...main pump (hydraulic pump), 103...engine, 104...pilot pump (hydraulic pump), 200...loaded machine, 201...cargo platform (vessel), 202...side (first side, second side), 203...bottom, Rta1...arm tip distance, Rta1a...bucket tip distance, W...weight, W0...weight threshold, Zamata1, Zamtb1...lower limit height for passing (height to prevent interference), Zamta2...lower limit height within vessel (lower limit value within vessel) ), γ...ground angle, γt...ground angle threshold, θam...arm angle, θamsa1, θamsb1...control start arm angle, θbk...bucket angle, θbm...boom angle, θbmta1, θbmtb1...lower limit boom angle for passing, θsw...swing angle, θswsa1, θswsb1...control start swing angle, θswta...wrap swing angle, θswta0...reference prevention angle, θswta1...interference prevention angle, θswta2...inside loading platform angle, θswta3...inside loading platform limit angle, θswtb...wrap swing angle, θswtb1...interference prevention angle, θswtb2...outside loading platform angle

Claims

1. A running body, A rotating body that is rotatably provided with respect to the traveling body; A working device attached to the rotating body and having a boom, an arm, and a bucket; a posture detection device for detecting a posture of the working device; a vessel position acquisition device that acquires the position of a vessel of a loading machine onto which the excavated material excavated by the working device is loaded; an arm operating device for operating the arm; A rotation operation device for operating the rotating body; A control device for controlling the operation of the working device and the rotating body, A work machine for loading excavated objects into the vessel having a bottom and a plurality of sides and an open top, The control device includes: calculating a height of the tip of the arm at which the vessel and the working device do not interfere with each other as an interference prevention height based on the position of the vessel acquired by the vessel position acquisition device; determining whether or not an interference prevention control execution condition is satisfied, the condition including a rotation operation of the bucket in a direction approaching the side portion of the vessel being performed; when it is determined that the interference prevention control execution condition is satisfied, an operation start position is identified, which is a circumferential position before the pivoting operation of the tip of the arm, based on the attitude of the working device detected by the attitude detection device, and an interference prevention position is identified, which is an angular position in the pivoting direction of the tip of the arm at which the vessel and the working device do not interfere with each other between the operation start position and the side of the vessel, calculate a lower limit value in the height direction of the working device according to an angular position in the rotation direction of the tip of the arm, the lower limit value being larger the closer to the interference prevention position, and being the interference prevention height at the interference prevention position, within the specified operation range of the rotating body from the operation start position to the interference prevention position; During the operation of the rotating body from the operation start position to the interference prevention position, the operation of the arm by the arm operating device is disabled, and the operation of the boom and the rotating body is controlled so that the height of the tip of the arm does not fall below the lower limit value; determining whether or not a validating condition for operation of the arm is established, the validating condition including a state in which the tip end of the arm has reached a height exceeding the interference prevention height and has reached an angular position in a rotation direction exceeding the interference prevention position; When the enabling condition is satisfied, the operation of the arm by the arm operating device is enabled; determining whether or not the bucket has passed through the side portion of the vessel in a plan view after rotating beyond the interference prevention position; when it is not determined that the bucket has passed through the side portion of the vessel, controlling the operation of at least one of the boom and the arm so that the height of the tip of the arm that moves in response to the operation of the arm by the arm operating device does not fall below the interference prevention height; When it is determined that the bucket has passed the side of the vessel, the movement of the tip of the arm to a position lower than the interference prevention height is permitted. A working machine characterized by:

2. 2. The work machine according to claim 1, the interference prevention control execution condition includes a posture of the working device being a transportation posture, The control device determines whether the posture of the working device is a carrying posture based on a detection result of the posture detection device. A working machine characterized by:

3. 2. The work machine according to claim 1, An object information acquisition device for acquiring information on an object to be transported in the bucket, the interference prevention control execution condition includes the presence of an object to be transported in the bucket, The control device determines whether or not an object to be transported is present in the bucket based on information about the object to be transported in the bucket acquired by the object information acquisition device. A working machine characterized by:

4. 2. The work machine according to claim 1, The vessel has a pair of side portions, a first side portion and a second side portion, which are arranged opposite to each other, the vessel position acquisition device acquires a relative position of the vessel with respect to the work machine, The control device includes: determining whether or not the interference prevention control execution condition is satisfied, the determination including a fact that a swing operation has been performed in a direction in which the bucket approaches the first side portion from the outside of the vessel in a plan view, based on a relative position of the vessel with respect to the work machine acquired by the vessel position acquisition device; When the enabling condition is satisfied, the operation of the arm by the arm operating device is enabled; determining whether or not the bucket has passed through the first side portion in a plan view after rotating beyond the interference prevention position; when it is not determined that the bucket has passed through the first side portion, controlling the operation of at least one of the boom and the arm so that the height of the tip of the arm that operates in response to the operation of the arm by the arm operating device does not fall below the interference prevention height; when it is determined that the bucket has passed through the first side portion, allowing the tip of the arm to move to a position lower than the interference prevention height; a lower limit value within the vessel is set between the first side portion and the second side portion, the lower limit value being a height position of a tip end of the arm at which the bottom and the bucket do not come into contact with each other; When the bucket passes through the first side and moves between the first side and the second side in the vessel, the operation of at least one of the boom and the arm is controlled so that the height of the tip of the arm does not fall below the lower limit value in the vessel. A working machine characterized by:

5. 5. The working machine according to claim 4, determining whether or not the interference prevention control execution condition is satisfied, the determination including a fact that a swing operation has been performed in a direction in which the bucket approaches the first side portion from inside the vessel in a plan view, based on a relative position of the vessel with respect to the work machine acquired by the vessel position acquisition device; When the enabling condition is satisfied, the operation of the arm by the arm operating device is enabled; determining whether the bucket has passed the first side portion in a plan view; when it is not determined that the bucket has passed through the first side portion, controlling the operation of at least one of the boom and the arm so that the height of the tip of the arm that operates in response to the operation of the arm by the arm operating device does not fall below the interference prevention height; When it is determined that the bucket has passed the first side portion, the movement of the tip of the arm to a position lower than the interference prevention height is permitted. A working machine characterized by:

Citation Information

Patent Citations

  • Working machine

    JP1999034719A

  • Rotation support device for work machine

    JP2016089389A

  • Loading machine control device and control method

    JP2019065661A

  • Control device, loading machine and control method

    JP2020033825A

  • Work machine

    JP2021050474A