Temporary lining deck, installation structure for temporary lining deck, and installation method for temporary lining deck

The temporary lining deck slab simplifies bridge deck replacement by using a rotary support device and other components to align slopes, avoid stud dowel interference, and close gaps, thus reducing construction complexity and traffic disruption.

JP7570947B2Active Publication Date: 2024-10-22OHBAYASHI GUMI LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2021034115
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-04
Publication Date
2024-10-22
Estimated Expiration
2041-03-04

AI Technical Summary

Technical Problem

Existing bridge deck replacement methods require lengthy traffic restrictions, which disrupt traffic flow in urban and mountainous areas, and involve complex installation processes due to the need for slope adjustment and interference with stud dowels, handrails, and protective fences.

Method used

A temporary lining deck slab with a rotary support device, height adjustment plate, axial force introducing member, gap closing member, and protective fence, which simplifies installation by allowing precise slope matching, avoiding stud dowel interference, and reducing the need for separate handrail installation.

Benefits of technology

The solution enables efficient installation and reuse of temporary lining slabs, minimizing traffic disruption by allowing daytime traffic during construction, reducing work time, and improving durability through corner protection and gap closure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007570947000001
    Figure 0007570947000001
  • Figure 0007570947000002
    Figure 0007570947000002
  • Figure 0007570947000003
    Figure 0007570947000003
Patent Text Reader

Abstract

To provide a temporary covering slab, an installing structure of the temporary covering slab, and an installing method of the temporary covering slab which can improve efficiency of installation work on the top of a bridge main girder with a simple configuration.SOLUTION: A temporary covering slab provided on a bridge main girder after removal of existing slabs includes a slab body, and a rotary bearing device which is on the lower surface side of the slab body and provided at a position in contact with the bridge main girder. The rotary bearing device includes a pin bearing having a pin extending in the direction of the bridge axis, and a shoe seat detachably installed on the lower shoe of the pin bearing.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a temporary lining deck used in a deck replacement method for replacing an existing deck of a bridge with a new deck, a mounting structure for the temporary lining deck, and a mounting method for the temporary lining deck. [Background technology]

[0002] Traditionally, when carrying out renovation work on large road bridges that have bridges for inbound and outbound lanes to replace the existing bridge deck with a new deck, one of the bridges for the inbound or outbound lanes is completely closed to traffic while the renovation work is carried out, and two-way traffic is restricted on the other bridge.

[0003] However, in heavy traffic roads in urban areas and mountain areas sandwiched between long tunnels, implementing two-way traffic restrictions for long periods of time could have a negative impact on the traffic environment in the surrounding areas. For this reason, there is a need for a method to restrict lanes only at night while carrying out renewal work, and to open up all traffic during the day.

[0004] In this situation, for example, Patent Document 1 discloses a bridge deck replacement method in which an existing deck is replaced with a new precast deck while alternating between traffic restriction time periods during construction and traffic opening time periods. Specifically, the work required to remove the existing deck installed on the steel main girders and install a new precast concrete deck on the removed main girders is divided into multiple interruptible steps. Then, after one of the steps is performed during traffic restriction time periods during construction, a temporary lining deck is installed on the top surface of the main girders and temporary paving is applied to make the road passable for vehicles, and the traffic opening time arrives. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2021-001536 A Summary of the Invention [Problem to be solved by the invention]

[0006] According to Patent Document 1, by setting construction traffic control periods at night, it is possible to complete work that can be carried out within a limited time, and to ensure traffic-free periods during the day when vehicles can pass through.

[0007] However, when installing a temporary covering deck on top of the main girder, installation work can become complicated, as adjustments must be made to match the slope and road surface height so that the road surface is continuous with the adjacent existing deck and the newly installed deck.

[0008] Additionally, immediately after removing the existing deck, stud dowels and other parts are often still left on the top surface of the main girders. For this reason, the temporary lining deck is required to have a structure that can be installed on the main girders while avoiding interference with the existing stud dowels and suppressing behavior such as rattling when traffic is opened or movement due to vibrations transmitted from the adjacent existing deck.

[0009] Furthermore, depending on the location where the temporary lining deck is to be installed, a parapet or guardrail may be required, and if the lining plate, which is widely used when temporarily closing openings in public roads, is used for the temporary lining deck, this cannot be accommodated. Even if it were possible to prepare separate members that function as parapets or guardrails and install them on the lining plate, not only would this be less economical, but the work would also be cumbersome.

[0010] The present invention has been developed in consideration of such problems, and its main objective is to provide a temporary lining deck, an installation structure for a temporary lining deck, and an installation method for a temporary lining deck that are capable of improving the efficiency of installation work on the upper surface of a bridge's main girder with a simple configuration. [Means for solving the problem]

[0011] In order to achieve this purpose, the temporary lining deck of the present invention is a temporary lining deck that is installed on the main girder of a bridge after the existing deck is removed, and comprises a deck body and a rotary bearing device installed on the underside of the deck body at a position where it abuts the main girder of the bridge, and is characterized in that the rotary bearing device comprises a pin bearing having a pin extending in the bridge axis direction, and a shoe seat that is freely attached and detached to the lower shoe of the pin bearing.

[0012] In addition, the temporary covering deck of the present invention is characterized in that the shoe seat comprises a support plate having a notch formed therein, and a height adjustment plate laminated on the upper surface of the support plate.

[0013] According to the temporary lining deck of the present invention, the rotary bearing device provided on the underside of the deck body at a position where it abuts against the bridge main girder is provided with a pin bearing with a pin extending in the bridge axis direction. This makes it possible to obtain the same gradient as the removed existing deck on the temporary lining deck simply by removing the existing deck that was installed on multiple bridge main girders arranged in parallel with a height difference and placing the temporary lining deck in its place, thereby making it possible to improve the efficiency of the gradient adjustment work.

[0014] In addition, by providing a height adjustment plate on the base, the height of the base can be adjusted in advance so that the road surface height of the temporary lining deck matches that of the existing deck. This streamlines the work related to the positioning of the temporary lining deck, improving construction accuracy and shortening the construction period.

[0015] In addition, if a height-adjustable plate is laminated on the upper surface of the support plate with the cutout to form a shoe seat, the stud dowels left on the upper surface of the main girder after the existing deck is removed can be stored in the cutout of the support plate, and the shoe seat can be placed on the upper surface of the bridge's main girder. Therefore, even if the preparation of the upper surface of the bridge deck has not been completed, interference with the stud dowels can be avoided, and behavior such as rattling or positional movement caused by vibrations transmitted from adjacent existing decks can be suppressed, making it possible to install the temporary lining deck in a stable state.

[0016] The temporary covering deck of the present invention is characterized in that it is equipped with an axial force introduction member that introduces axial force in the bridge axis direction to the deck main body, and the axial force introduction member is provided at the side end part of the deck main body.

[0017] According to the temporary lining deck of the present invention, after the deck body is installed on the upper surface of the bridge's main girder, axial force can be introduced by abutting the axial force introduction member against other temporary lining decks, existing decks, or new decks adjacent in the bridge axis direction, making it possible to achieve continuity in the bridge axis direction with a simple configuration.

[0018] The temporary covering deck of the present invention is characterized in that it comprises a preliminary temporary paving portion which is provided on the upper surface of the deck body leaving an outer peripheral edge portion, and a gap sealing member which is freely attached and detached to the outer peripheral edge portion and is positioned across an adjacent existing deck or a newly constructed deck.

[0019] In addition, the temporary covering deck of the present invention is characterized in that the corners of the advance temporary paving portion are protected via corner chipping prevention members.

[0020] According to the temporary lining deck of the present invention, because the preliminary temporary pavement is laid in advance, the area of ​​the temporary pavement that is laid so as to be continuous with the adjacent deck after the temporary lining deck is installed on the main girder of the bridge can be made small. This allows the work time required for laying the temporary pavement to be significantly reduced.

[0021] In addition, since the corners of the preliminary temporary paving section are protected by corner-chip prevention materials, durability is improved, making it possible to reuse the temporary covering deck repeatedly.

[0022] In addition, because it is equipped with gap filling members that are placed across adjacent existing or new decks, it is possible to omit the process of filling the gap between the temporary lining deck and the adjacent deck, which is generally required before laying temporary pavement. This further shortens the work time required for temporary pavement and also makes it possible to quickly remove the temporary lining deck.

[0023] Furthermore, the gap sealing members can be attached to the temporary lining deck in advance, which makes it possible to significantly shorten the work time after the temporary lining deck is installed on the main girder of the bridge.

[0024] The temporary covering deck of the present invention is characterized in that it comprises a ground cover which is installed on the upper surface of one of the ends of the deck body in a direction perpendicular to the bridge axis and whose position can be adjusted, and a protective fence which is installed in a manner that allows it to be attached and detached freely from the ground cover.

[0025] According to the temporary lining deck of the present invention, since a guard fence is provided, the guard fence can be connected to the adjacent existing deck or new deck balustrade simply by installing the temporary lining deck on the bridge main girder, and no openings are created in the balustrade. In addition, since the position of the guard fence on which the guard fence is installed can be adjusted, it is possible to easily carry out the work of aligning the balustrade of the adjacent existing deck or new deck.

[0026] The mounting structure of the temporary lining deck of the present invention is characterized in that the rotary bearing device is placed on the main girder of the bridge, and the shoe seat of the rotary bearing device and the main girder of the bridge are fixed in a detachable manner via fixing brackets.

[0027] In addition, the installation method of the temporary lining deck of the present invention is characterized in that the rotary bearing device is placed on the main girder of the bridge, and then the shoe seat of the rotary bearing device and the main girder of the bridge are detachably fixed via fixing brackets.

[0028] According to the temporary lining deck installation structure and temporary lining deck installation method of the present invention, the temporary lining deck can be detachably installed on the bridge main girder using a rotary bearing device, which not only improves the work efficiency related to the installation of the temporary lining deck, but also makes it possible to improve the efficiency of the work during removal. Furthermore, since the temporary lining deck after removal does not suffer significant damage from the installation and removal work, it can be reused and is economical. Effect of the Invention

[0029] According to the present invention, a simple configuration in which a rotary support device is provided on the underside of the deck body at a position where it abuts the main bridge girder makes it possible to improve the efficiency of the work of attaching a temporary lining deck to the upper surface of the main bridge girder. [Brief description of the drawings]

[0030] [Figure 1] FIG. 2 is a diagram illustrating a half-section deck replacement construction method according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing the general installation procedure of a temporary lining deck in an embodiment of the present invention. [Diagram 3] FIG. 2 is a diagram showing the plan view of a temporary lining deck in an embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing a plan view of a deck body in an embodiment of the present invention. [Diagram 5] A diagram showing a cross section of a deck body in an embodiment of the present invention. [Figure 6] FIG. 2 is a diagram showing details of a steel guardrail and a guardrail in an embodiment of the present invention. [Figure 7] FIG. 2 is a diagram showing the side and cross section of a temporary lining deck in an embodiment of the present invention. [Figure 8] FIG. 2 is a diagram showing the underside of a temporary lining deck in an embodiment of the present invention. [Figure 9] 3A and 3B are diagrams showing details of a rotation bearing device according to an embodiment of the present invention. [Figure 10] FIG. 1 is a diagram showing an assembly stand according to an embodiment of the present invention. [Figure 11] 4 is a diagram showing details of an axial force introducing member in the embodiment of the present invention (part c of FIG. 3). FIG. [Figure 12] 4 is a diagram showing details of an axial force introducing member in the embodiment of the present invention (part d in FIG. 3). FIG. [Figure 13] A figure showing a temporary covering deck with a gap closing member and a trailing gap closing member attached in an embodiment of the present invention. [Figure 14]1 is a diagram showing how a temporary lining deck having a gap sealing member attached thereto is hung by a deck slab hanger in an embodiment of the present invention. FIG. [Figure 15] 5A to 5C are diagrams illustrating details of a gap blockage member according to an embodiment of the present invention. [Figure 16] FIG. 2 is a diagram showing the procedure for installing a temporary lining deck in an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0031] The temporary covering deck of the present invention is intended to be temporarily installed on the main girder of a bridge after the existing deck is removed during bridge renovation work in which the existing deck is replaced with a new deck made of precast concrete, thereby making it possible to ensure hours during which traffic is free to pass through during the construction period.

[0032] There are two main methods for carrying out bridge renovation work while ensuring traffic-free periods: one is to use full-section construction, which involves closing the road during the renovation work and alternating between periods of road closure and traffic-free periods, and the other is to use a half-section deck replacement method, which involves restricting lanes during the renovation work and alternating between periods of lane restriction and traffic-free periods.

[0033] The temporary lining deck can be used in either method, but in this embodiment, the case where it is used in the half-section deck replacement method is taken as an example, and the details are explained with reference to Figures 1 to 16.

[0034] <<Half-section deck replacement method>> The half-section deck replacement method, as shown in Figure 1(a), is a method in which, for example, in a road bridge B equipped with a bridge B1 for two lanes in the upward direction and a bridge B2 for two lanes in the downward direction, bridge B1 is restricted to traffic lanes and the existing deck slab 1 of one of the half-sections, either on the driving lane side or the passing lane side, is replaced with a new deck slab, and around the same time, the existing deck slab 1 of the other half-section is also replaced with a new deck slab.

[0035] The procedure for replacing half of the existing deck 1 with a new deck is as follows: first, a work area D is set up on the travel lane side as shown in Figure 1(b), and cutting lines 2 perpendicular to the bridge axis are provided on the existing deck 1 in this work area D to form multiple existing deck pieces 3. Note that this embodiment shows an example in which six existing deck pieces 3 are formed, and all of these are formed to a size that allows transportation by vehicle after removal.

[0036] Next, as shown in Fig. 2(a), for example, two of the six existing deck pieces 3 are cut off and removed from the existing deck 1. Then, a part of the bridge main girder 4 made of I-beam is exposed where the existing deck pieces 3 were removed, so the top surface of the exposed upper flange of the bridge main girder 4 is preparatory treated and new stud dowels (not shown) are installed.

[0037] This series of work, from preparing the top surface of the upper flange to installing new stud dowels, is complicated and often requires a lot of work time. For this reason, these tasks are divided into multiple processes that can be interrupted during construction. Then, the processes that can be performed during the construction traffic control hours are performed consecutively, or only one process is performed.

[0038] After that, as shown in Fig. 2(b), when any process is completed and before the traffic release time comes, a temporary lining deck 100 is installed on the bridge's main girders 4 and temporary pavement 5 is laid on necessary areas, so that vehicles can pass through as shown in Fig. 2(c). As a result, when the traffic release time comes, traffic can be released using the temporary lining deck 100 even if construction is suspended.

[0039] Then, after the process of installing the new stud dowels is completed, the new deck is installed. The same process is carried out for the remaining four existing deck pieces 3, and all of the existing deck pieces 3 in the work section D are removed and replaced with the new deck.

[0040] In this way, by adopting the half-section deck replacement method, traffic control hours for construction work can be set at night, making it possible to open up traffic during the day. Therefore, even if the bridge where the existing deck replacement work is to be carried out is located on a heavy traffic road in an urban area or in a mountainous area sandwiched between long tunnels, it is possible to proceed with the work while minimizing the impact on the traffic environment in the surrounding area.

[0041] <<Temporary lining deck>> As described above, the temporary lining deck 100 is installed on the bridge main girder 4 after the existing deck piece 3 is removed, and temporarily enables vehicle passage.

[0042] In terms of its structure, as shown in Fig. 3, a preliminary temporary paving section 14 is provided in advance on the upper surface of the deck body 10, and a protective fence 64 is detachably installed. In addition, a number of rotary bearing devices 20 are provided on the inside of the lower surface of the deck body 10, as shown in Fig. 7(b) and Fig. 8.

[0043] Furthermore, an axial force introduction member 30 as shown in Figures 11 and 12 is provided at the side end portion in the bridge axis direction, and a gap closing member 40 and a trailing gap closing member 50 as shown in Figures 13 and 14 are provided at the outer peripheral edge portion of the upper surface of the deck body 10.

[0044] <Deck body> As shown in Figures 4(a) and (b), the deck body 10 comprises multiple deck main girders 11, inserted girders 12, and floor plates 13. The deck main girders 11 extend in a direction perpendicular to the bridge axis, and multiple ones are arranged in parallel with gaps between them. The inserted girders 12 extend in the bridge axis direction, and multiple ones are arranged with gaps between them so as to connect adjacent deck main girders 11. The floor plates 13 are installed on the upper surface of the inserted girders 12 so as to cover the openings formed between adjacent deck main girders 11.

[0045] As long as both the deck main girder 11 and the plug girder 12 are long steel materials, any material may be used, and in this embodiment, an example is given in which an H-shaped steel is used. Also, a steel plate or a checkered steel plate is used for the floor plate 13. As shown in Fig. 5, the stiffener 111 provided on the deck main girder 11 and the web of the plug girder 12 are connected via a gusset plate 16, and the floor plate 13 is connected to the upper flange of the plug girder 12.

[0046] <Preliminary temporary pavement> A preliminary temporary pavement 14 is laid at a predetermined thickness on the upper surface of the deck body 10 thus formed. As shown in Fig. 3, the preliminary temporary pavement 14 is laid inside the deck body 10 while leaving its outer peripheral edge, and is surrounded by corner chipping prevention members 15. As shown in Fig. 5, the corner chipping prevention members 15 are made of, for example, angle bars fixed to the upper surface of the deck body 10 by fixing means such as welding.

[0047] In this way, by protecting the corners of the preceding temporary pavement 14 with the corner chipping prevention members 15, corner chipping is less likely to occur, and it becomes possible to repeatedly use the temporary lining deck 100. Furthermore, if the preceding temporary pavement 14 is laid in advance, after the temporary lining deck 100 is installed on the bridge main girder 4 as shown in Figure 2(b), the area of ​​the temporary pavement 5 that is laid later can be made smaller as shown in Figure 2(c), and the work time for the temporary pavement 5 can be significantly shortened.

[0048] ≪Protective fence≫ 4(b) and 6, the guard fence 64 is detachably installed via a steel ground guard 60 on one side of the deck body 10 in the direction perpendicular to the bridge axis. As shown in Fig. 6, the steel ground guard 60 comprises a ground guard main body 61 on which the guard fence 64 is installed, a fixing member 62 for installing the ground guard main body 61 on the deck body 10, and an adjustment fitting 63 used to adjust the position of the guard fence 64 to be vertical.

[0049] The ground covering body 61 extends in the bridge axis direction with a flange 611 erected, and is installed on the upper surface of the deck body 10 by fastening it to a fixing member 62 that abuts against the flange 611 with a fastening bolt F1. The fixing members 62 are made of angle bars, and extend in pairs parallel to the ground covering body 61, sandwiching it therebetween, and are fastened to multiple deck main girders 11 with fastening bolts F1.

[0050] At this time, as shown in Fig. 4(a), the bolt hole 621 of the fixing member 62 is formed as an elongated hole extending in the bridge axis direction, and the bolt hole 116 of the deck main girder 11 is formed as an elongated hole extending in the direction perpendicular to the bridge axis. Therefore, as shown in Fig. 6, when fastening with the fastening bolt F1, the fastening position of the fixing member 62 with respect to the deck main body 10 can be adjusted in either the bridge axis direction or the direction perpendicular to the bridge axis. This allows the position of the steel ground cover 60 fixed via the fixing member 62 to be adjusted.

[0051] 6, the protective fence 64 includes a post 641 having a base plate 6411 at its lower end, a bracket 642 attached to the post 641, and a beam 643 attached to the tip of the bracket 642. The post 641 is erected on the steel ground cover 60 by fastening the base plate 6411 to the web 612 of the ground cover main body 61 with fastening bolts F1.

[0052] The bracket 642 is fastened to the side surface of the support 641 near the upper end thereof by using two fastening bolts F1, one of the two bolt holes provided in the support 641 being formed in an arc hole 644. This allows the attachment angle to be appropriately adjusted when fastening the bracket 642 to the support 641, and therefore makes it possible to change the position of the beam 643 not only to a position parallel to the support 641, but also to a position facing upward or downward.

[0053] Therefore, when the guard fence 64 is installed on the steel guardrail 60, even if the support pillar 641 is erected at an angle to the vertical axis, the beam 643 can be adjusted to a position parallel to the vertical axis. Such adjustment of the position of the beam 643 can also be performed by adjusting the position of the support pillar 641 using the adjustment metal fittings 63.

[0054] 6, the adjustment fitting 63 is used by being interposed between the deck body 10 and the fixing member 62, or between the web 612 of the ground covering body 61 and the base plate 6411 of the support 641. The shape of the fitting may be any shape as long as it can make the web 612 of the ground covering body 61 horizontal when the steel ground covering 60 is installed on the deck body 10.

[0055] By using such an adjustable metal fitting 63, the support pillar 641 can be erected vertically as shown in Figures 7(a) and (b) simply by installing the protective fence 64 on the web 612 of the ground covering body 61. Therefore, the beam 643 can be arranged in a position parallel to the vertical axis without adjusting the angle of the bracket 642. The adjustable metal fitting 63 may be manufactured appropriately on-site, or may be manufactured in advance based on the gradient when the temporary lining deck 100 is installed on the bridge main girder 4.

[0056] In this way, the guard fence 64 can be adjusted in its installation position in the bridge axis direction and in the direction perpendicular to the bridge axis on the upper surface of the deck body 10 via the steel ground covering 60, and the attitude of the beam 643 can be adjusted. Therefore, when the temporary lining deck 100 is installed on the bridge main girder 4, it can be easily aligned with the parapet of the adjacent existing deck 1 and the previously installed new deck 200, as shown in Fig. 13, for example.

[0057] <Rotary bearing device> The rotary bearing device 20 is installed on the underside of the deck body 10 at a position facing the bridge main girder 4 of the deck main girder 11 located on the inside, as shown in Fig. 8. Its structure includes a shoe seat 22 placed on the upper surface of the bridge main girder 4 and a pin bearing 21 installed on the upper surface of the shoe seat 22, as shown in Fig. 7(b) and Fig. 9.

[0058] 9, the pin bearing 21 includes a pin 212 arranged parallel to the bridge main girder 4 (in the bridge axis direction), and an upper shoe 211 and a lower shoe 213 provided above and below the pin 212. The shoe seat 22 includes a support plate 221 formed into a comb shape by providing a cutout, and a height adjustment plate 222 stacked on the support plate 221.

[0059] The comb-shaped support plate 221 is formed in a shape that allows the existing stud dowels 4a on the upper surface of the bridge main girder 4 to be stored in the cutout portion. In this way, even if the existing stud dowels 4a have not been completely removed, the rotary bearing device 20 can be installed on the upper surface of the bridge main girder 4 while suppressing interference with them, and it becomes possible to install it in a stable state without causing rattling or the like.

[0060] There are no restrictions on the number or shape of the cutouts, and they may be formed into an appropriate shape depending on the arrangement of the existing stud dowels 4a. Furthermore, the support plate 221 is not limited to a comb shape, and may be a plate material with long holes or the like, as long as it can accommodate the existing stud dowels 4a.

[0061] The above-mentioned shoe seat 22 is integrally formed with the lower shoe 213 of the pin bearing 21 by fastening with a countersunk bolt F2, the upper surface of which is flat and the seat surface is formed in a cone shape. In addition, the lower surface side of the support plate 221 constituting the shoe seat 22, where the seat surface of the countersunk bolt F2 abuts, is countersunk (counterbore) so that the head of the countersunk bolt F2 can be accommodated. This allows the shoe seat 22 to be stably placed on the upper surface of the bridge main girder 4 without the head of the countersunk bolt F2 interfering with it. In addition, by fastening the upper shoe 211 and the deck main girder 11 with the fastening bolt F1, the rotary bearing device 20 can be installed in advance at a required location on the lower surface of the deck body 10, as shown in FIG. 8.

[0062] Therefore, the existing deck 1, which was installed on multiple bridge girders 4 arranged in parallel with a height difference to provide a gradient, is removed, and the temporary lining deck 100 with the rotary bearing device 20 installed beforehand is placed on the exposed top surface of the bridge main girders 4. The pin bearings 21 then rotate, and the temporary lining deck 100 is installed on the top surface of the bridge main girders 4 with the same gradient as the removed existing deck 1, which eliminates the need to adjust the gradient and makes it possible to improve the efficiency of the installation work.

[0063] In addition, the road surface height of the temporary lining deck 100 can be adjusted by appropriately changing the number of height adjustment plates 222 constituting the shoe seat 22, as shown in Fig. 9. This makes it possible to easily match the upper surface of the preliminary temporary pavement portion 14 of the temporary lining deck 100 with the pavement surfaces of the existing deck 1 and the new deck 200 when they are adjacent to each other in the bridge axis direction, as shown in Fig. 13.

[0064] The rotary bearing device 20 placed on the bridge main girder 4 can be detachably fixed by clamping the support plate 221 and the upper flange of the bridge main girder 4 with clamping metal fittings 23 as shown in Fig. 7(b). This makes it possible to easily perform not only the installation work of the temporary lining deck 100 but also the removal work.

[0065] <Axial force introduction member> As shown in Figures 11(a) and 11(b), the axial force introduction member 30 is provided at the side end of the deck body 10 in the bridge axis direction, directly above the bridge main girder 4. Its structure includes an expansion device 31 such as a uniblock, and an axial force adjustment plate 32. The axial force adjustment plate 32 is made of a block made of steel plate or steel material, and is provided so that a plurality of plates are overlapped in the expansion and contraction direction of the expansion device 31. In addition, as shown in Figure 8, axial force transmission plates 17 are installed on the underside of the deck body 10 on both sides of the mounting position of the axial force introduction member 30 so as to connect the deck main girders 11 to each other.

[0066] When the axial force introduction member 30 is located between adjacent temporary lining deck slabs 100, as shown in Fig. 11(b), a pressing force can be applied to the web 113 of the deck main girder 11 provided on each of them. Note that the axial force introduction member 30 may be any configuration capable of applying a pressing force to adjacent temporary lining deck slabs 100, and may be only an expansion device 31.

[0067] On the other hand, when the axial force introduction member 30 is located between the new deck 200 and the temporary lining deck 100, the connecting rebar 202 is protected by using the axial force adjustment plate 32, as shown in Figures 12(a) and 12(b). Specifically, the new deck 200 made of precast concrete generally has a shape in which the connecting rebar 202 protrudes in the bridge axis direction and in the direction perpendicular to the bridge axis from the side of the new deck body 201. For this reason, the axial force adjustment plate 32 is provided with a connecting rebar penetration part 321, through which the connecting rebar 202 is inserted.

[0068] This avoids interference between the joint rebar 202 and the axial force introduction member 30, and suppresses deformation of the joint rebar 202 due to the axial force introduction work. In addition, the pressing force generated by extending the expansion device 31 is applied to the side of the newly constructed deck main body 201 via the axial force adjustment plate 32, allowing efficient introduction of the axial force. Any shape may be adopted for the joint rebar penetration part 321, and as shown in Fig. 12(b), it may be formed by providing a notch in the axial force adjustment plate 32, or a through hole through which the joint rebar 202 can pass may be provided.

[0069] The axial force introduction member 30 having such a configuration is configured to be attached after the deck body 10 is installed on the bridge main girder 4. For this reason, a notch 114 is provided in the upper flange 112 of the deck main girder 11 to ensure a working space.

[0070] As shown in Figures 11(a) and 12(a), the cutout portion 114 is provided in the upper flange 112 of the deck main girder 11 at a position eccentric to the axis of the bridge main girder 4. However, if there is a gap between the temporary lining deck 100 and another adjacent deck that is large enough to allow the installation work of the axial force introduction member 30, it is not necessarily necessary to provide the cutout portion 114. Furthermore, even if the cutout portion 114 is provided, its installation position is not limited to the upper flange 112 of the deck main girder 11.

[0071] For example, the cutout portion 114 may be provided in the lower flange 115 of the deck main girder 11. In this way, the installation work of the axial force introduction member 30 can be performed from the lower side of the deck main body 10. As a result, when it is desired to perform other work on the deck main body 10, these works can be carried out in parallel with the installation work of the axial force introduction member 30, which makes it possible to improve work efficiency.

[0072] <Gap-blocking materials> The gap closing member 40 is installed at a position that avoids at least the portion where the cutout portion 114 is provided in the deck main girder 11 and the corner portion of the temporary lining deck 100, as shown in Fig. 14. The structure is composed of a closing plate body 41, a deck support member 42, and a placement member 43, as shown in Fig. 15.

[0073] The following provides an example of a gap sealing member 40 that seals the gap between a temporary lining deck 100 and a newly constructed deck 200 adjacent to it in the bridge axis direction, and explains the details thereof as follows.

[0074] As shown in Fig. 15, the closing plate body 41 is made of a plate material such as a steel plate, and is engaged with a locking bolt 117 provided on the upper flange 112 of the deck main girder 11, and protrudes from the upper flange 112 in a direction parallel to the upper flange. The locking bolt 117 penetrates a notched locked portion 411 provided on the closing plate body 41 and extending in the bridge axis direction. Therefore, by loosening the fastening by the nut provided on the locking bolt 117, the closing plate body 41 can adjust its protrusion amount. A mounting member 43 is provided on the protruding end of the closing plate body 41 to abut against the new deck body 201 of the new deck 200.

[0075] The mounting member 43 is composed of an adjustment bolt 431 provided to penetrate the closing plate main body 41, and an abutment plate 432 provided at the lower end of the adjustment bolt 431. The abutment plate 432 is arranged in a position parallel to the closing plate main body 41, and its height position is adjusted via the adjustment bolt 431 to abut against the upper surface of the new deck slab main body 201. This results in the closing plate main body 41 being supported at its overhanging end by the new deck slab main body 201 via the mounting member 43.

[0076] The deck support member 42 is composed of a tightening bolt 421 that penetrates the closing plate body 41, and a deck abutment fitting 422 that is provided at the lower end of the tightening bolt 421. As shown in Figure 13, the tightening bolt 421 penetrates a bolt hole 412 formed in an elongated hole that is provided in the closing plate body 41 and extends in a direction perpendicular to the bridge axis.

[0077] Also, as shown in Figure 15, the deck abutment fitting 422 is positioned so as to extend further toward the new deck 200 than the protruding end of the blocking plate main body 41, and by adjusting its height position via the tightening bolt 421, it can abut against the underside of the new deck main body 201.

[0078] As a result, even if vertical vibrations occur in the closing plate body 41 via the temporary lining deck 100 when traffic is opened, the closing plate body 41 is restrained by the deck support members 42 and the mounting members 43, suppressing the rattling behavior of the closing plate body 41. Therefore, the gap between the erection lining deck and another adjacent deck can be closed reliably in a stable state using the gap closing member 40 in a manner that is easy to attach and detach.

[0079] Furthermore, as shown in Figures 2(b) and (c), after the deck body 10 has been installed on the bridge main girder 4, the filling process can be omitted and temporary pavement 5 can be provided on the upper surface of the blocking plate body 41, thereby improving workability.

[0080] In the above-mentioned gap closing member 40 that closes the gap between adjacent newly constructed deck slabs 200 in the bridge axis direction, the locked portion 411 through which the locking bolt 117 passes is formed as a notch extending in the bridge axis direction, as shown in Fig. 13. This is to accommodate cases where the position of the temporary lining deck 100 needs to be finely adjusted in the bridge axis direction. Therefore, when using the gap closing member 40 to close the gap between adjacent decks in the direction perpendicular to the bridge axis, the locked portion 411 may be a circular hole.

[0081] The gap closing member 40 having such a configuration is installed in advance on the deck body 10, as shown in Fig. 14. In this way, it becomes possible to close the gap between the temporary lining deck 100 and the adjacent deck while suspending it from the main bridge girder 4 and installing it, and it becomes possible to reduce the work to be performed on the main bridge girder 4.

[0082] <Back-up gap blocking parts> As shown in Fig. 13, the trailing gap closing member 50 includes a connecting plate 51 made of a plate material such as a steel plate, and a connecting metal fitting 52 that connects the closing plate bodies 41 of adjacent gap closing members 40. These are installed at the corners of the deck body 10 and at the portions of the deck main girder 11 where the cutout portions 114 are provided, as shown in Figs. 13 and 14.

[0083] <<How to install the temporary lining deck>> The procedure for attaching the temporary lining deck 100 having the above-mentioned configuration to the bridge main girder 4 will be described with reference to the flow shown in Fig. 16. Note that, as shown in Fig. 13, the case where a new deck 200 has been installed in advance, and two temporary lining decks 100 are to be installed between the new deck 200 and the existing deck 1 will be described as an example.

[0084] <Installation of preliminary temporary pavement, protective fences and gap sealing materials> As shown in Fig. 14, a preliminary temporary pavement 14 is provided on the deck body 10, and a steel ground guard 60, a guard fence 64, and a gap closing member 40 are attached. In addition, a hanging jig 301 is attached to the deck main girder 11 constituting the deck body 10, and connected so as to be able to be hung by a deck hanging tool 300.

[0085] The hanging jig 301 may be attached to the deck body 10 by any means. For example, it is advisable to provide a tap on the upper flange 112 of the deck main girder 11 and provide the hanging jig 301 so that it can be attached and detached.

[0086] <Installation of the rotating support device> The rotary bearing device 20 is installed on the underside of the deck body 10. Any installation method may be used, but for example, the installation work can be easily performed by using an assembly stand as shown in Figures 10(a) and (b). Note that the work of installing the advance temporary pavement section 14, steel ground guard 60, guard fence 64, and gap closing member 40 on the deck body 10 and the work of installing the rotary bearing device 20 may be performed in any order.

[0087] <Assembly stand> 10(a), the assembly stand 400 includes a stand base 401 that is installed at a work site, an assembly factory, or the like, a deck support stand 402, and a knee brace 403. The deck support stand 402 stands up or lies down by rotating in the vertical direction on the stand base 401 with a pivot pin 4021 as a fulcrum. The pivot pin 4021 is disposed at one end in the short direction of the substantially rectangular deck support stand 402, and a locking jig 4022 capable of locking a traction material 500 such as a wire is disposed at the other end.

[0088] In addition, the frame base 401 is provided with a stopper 4012 that abuts against the deck support base 402 when it reaches an arbitrary angle, thereby stopping the rotation. As a result, when the towing material 500 engaged with the engaging jig 4022 is towed, the deck support base 402 in the lying position on the frame base 401 can be easily raised within a range of angles until it abuts against the stopper 4012, as shown in FIG.

[0089] The knee brace 403 maintains the position of the deck support base 402 standing upright relative to the frame base 401, with one end rotatably connected to the deck support base 402 and the other end provided with a fastening pin 404 that can be fastened to the frame base 401. The fastening pin 404 is fastened to a fixing hole 4011 made of a circular hole provided in the frame base 401. This makes it possible to raise the deck support base 402 at a predetermined inclination angle while preventing the possibility of an accident caused by the fastening pin 404 coming loose.

[0090] The fixing hole 4011 may be formed in one place, or may be formed in multiple places at intervals in a direction perpendicular to the pivot pin 4021, as shown in Fig. 10(a). In this way, the inclination angle of the deck slab support base 402 can be adjusted by selecting any one of the multiple fixing holes 4011 and fastening the fastening pin 404. Also, Fig. 10(a) shows an example in which three fixing holes 4011 are provided, but the number is not limited in any way. The fixing hole 4011 may be formed in an elongated hole extending in a direction perpendicular to the pivot pin 4021.

[0091] The above-mentioned assembly stand 400 is manufactured by using a weight balance that can maintain an upright position with the deck body 10 installed on the deck support base 402, and the stand base 401 and deck support base 402 are manufactured. If a hanging bracket 4013 is provided on the stand base 401, it becomes possible to suspend not only the assembly stand 400 but also the temporary lining deck 100 after the rotary bearing device 20 is attached to the deck body 10.

[0092] <<Method of mounting the rotary bearing device 20 to the deck body 10>> First, the deck body 10 is suspended via the deck slab suspension tool 300 onto the upper surface of the deck slab support base 402, which is in a lying position, as shown in FIG. 4, and the two are clamped together with the clamping fixture 405, as shown in FIG. 10(b).

[0093] Next, the deck support base 402 is pulled by the traction material 500, and the deck body 10 is raised to a desired angle together with the deck support base 402, as shown in Fig. 10(a). After that, the fastening pins 404 are fastened to fix the diagonal braces 403 to the frame base 401, and the deck support base 402 is held in an upright position at a desired angle.

[0094] After that, as shown in Fig. 8, the rotary bearing device 20 is attached to a predetermined position on the underside of the deck body 10. It is advisable to adjust the number of height adjustment plates 222 of the rotary bearing device 20 in advance, taking into consideration the road surface height required when the temporary lining deck 100 is installed on the bridge main girder 4. This makes it possible to install the rotary bearing device 20 on the underside without the trouble of turning the deck body 10 over.

[0095] <Hanging down onto the top of the bridge girder> When the installation work of the rotary support device 20 is carried out near the planned installation location of the temporary lining deck 100, the temporary lining deck 100 with the rotary support device 20 attached is suspended using the deck hoisting device 300 and lowered from the assembly stand 400 to the top surface of the bridge main girder 4.

[0096] On the other hand, when the installation work of the rotary bearing device 20 using the assembly stand 400 is carried out at a location other than the site of the deck replacement work, the temporary lining deck 100 may be transported to the site together with the assembly stand 400. After this, the temporary lining deck 100 is suspended using the deck hoisting tool 300, and is lowered from the assembly stand 400 to the upper surface of the bridge main girder 4.

[0097] When the temporary lining deck 100 is placed on the upper surface of the bridge main girder 4, as shown in Fig. 7(b), the temporary lining deck 100 assumes a posture with the desired road surface height and gradient via the rotary bearing device 20. In this state, the support plate 221 constituting the shoe seat 22 of the rotary bearing device 20 and the upper flange of the bridge main girder 4 are clamped with clamping metal fittings 23, thereby detachably fixing the temporary lining deck 100.

[0098] <Installation of load transmission components and adjustment of road surface height> Simultaneously with, or before or after, the fixing work of the rotary support device 20, as shown in Figure 7(a), a load transfer member 70 is interposed between the deck main girder 11 located on the outside of the deck body 10 in the temporary covering deck 100 and the bridge main girder 4.

[0099] <Load transmission member> The temporary lining deck 100 with the rotary bearing devices 20 attached thereto is placed on the bridge main girder 4 at the desired height and gradient simply by placing it on the bridge main girder 4. For this reason, as shown in Figures 3 and 7(a), it is sufficient to install a load transmission member 70 capable of supporting the load of the temporary lining deck 100 in cooperation with the rotary bearing devices 20 between the bridge main girder 4 and the deck main girder 11 located on the outside of the deck body 10.

[0100] The load transmission member 70 may be any structure capable of transmitting the vertical load of the temporary lining deck 100 to the bridge main girder 4. In this embodiment, it is composed of an expansion device 71 such as a uniblock, and a support plate 72 that supports the expansion device 71. As shown in Fig. 7(a), the support plate 72 is clamped to the upper flange of the bridge main girder 4 by clamping metal fittings 23, and then the expansion device 71 is extended on the support plate 72.

[0101] The expansion device 71 is extended until it abuts against the underside of the deck main girder 11, and the vertical load of the temporary lining deck 100 is shared and supported together with the rotary bearing device 20. Note that the support plate 72 does not necessarily have to be provided, but if there are existing stud dowels on the upper surface of the bridge main girder 4, the vertical load of the temporary lining deck 100 can be efficiently transmitted to the bridge main girder 4 by adopting a support plate similar to the support plate 221 used in the rotary bearing device 20.

[0102] <Road surface height adjustment> Check whether the road surface height matches between the temporary covering deck 100 and other adjacent decks (the existing deck 1 and the previously installed new deck 200), and if fine adjustments are required, make appropriate adjustments, for example, by changing the number of height adjustment plates 222 provided on the rotary bearing device 20.

[0103] <Installation of axial force introduction members and introduction of axial force> The above work is repeated to removably fix the two temporary lining decks 100 to the bridge main girder 4, and then, as shown in Fig. 11, an axial force introduction member 30 is attached between adjacent temporary lining decks 100. Similarly, as shown in Fig. 12, an axial force introduction member 30 is also attached between the temporary lining deck 100 and the other decks (the existing deck 1 and the new deck 200) adjacent in the bridge axis direction.

[0104] Once the axial force introduction members 30 have been installed, the expansion devices 31 are extended to introduce axial force, and the two temporary lining decks 100 are connected to the other decks adjacent in the bridge axis direction. When the cutouts 114 provided for the installation of the axial force introduction members 30 are provided in the upper flanges 112 of the deck main girders 11, the work of introducing axial force can be carried out from above the temporary lining deck 100, and when the cutouts 114 are provided in the lower flanges 115, the work of introducing axial force can be carried out from below the temporary lining deck 100.

[0105] <Fixing of gap closing member and installation of trailing gap closing member> After confirming that the gap between the temporary lining deck 100 and another deck adjacent to it in the bridge axis direction is sealed with the sealing plate body 41 of the gap sealing member 40, the deck support member 42 and the placement member 43 are abutted against the other deck adjacent to the temporary lining deck 100 to restrain the sealing plate body 41.

[0106] If the gap is not sufficiently blocked by the blocking plate body 41, as shown in Fig. 15, the fastening of the nuts of the locking bolts 117 locked to the blocking plate body 41 may be loosened and the overhang amount of the blocking plate body 41 may be appropriately adjusted. After this, a connecting plate 51 constituting the trailing gap blocking member 50 is placed in a corner of the temporary lining deck 100 where no gap blocking member 40 is provided and in a portion where there is a notch 114 of the deck main girder 11. Then, this connecting plate 51 is connected to the blocking plate body 41 of the adjacent gap blocking member 40 via a connecting metal fitting 52.

[0107] <Laying temporary pavement> As shown in Figure 13, once the gap between the temporary lining deck 100 and the adjacent decks (the existing deck 1 and the new deck 200) has been filled by the gap filling member 40 and the trailing gap filling member 50, a temporary pavement 5 is laid on the upper surfaces thereof, as shown in Figure 2(c). Also, between adjacent temporary lining decks 100, the cutout portions 114 of the deck main girders 11 are filled with steel plates or the like, and then the temporary pavement 5 is laid in a similar manner. In this way, the entire upper surface of the temporary lining deck 100 is paved with the preceding temporary pavement 14 and the temporary pavement 5 surrounding it.

[0108] <Adjusting the position of protective fences> After the temporary lining deck 100 has been attached to the bridge main girder 4 using the above procedure, during or in parallel with the work of laying the temporary pavement 5, the installation position of the protective fence 64 on the temporary lining deck 100 is adjusted to align the passage so that the protective fence 64 and the parapet of the existing deck 1 are continuous and no openings are created between the two.

[0109] The steel ground cover 60 can be adjusted by adjusting the position of the fixing members 62 relative to the deck body 10, as shown in Figures 4(a)(b) and 6. The posture of the posts 641 of the guard fence 64 can be corrected vertically by interposing adjustment fittings 63 between the ground cover body 61 and the posts 641, or between the fixing members 62 and the deck body 10. Furthermore, the orientation of the beam 643 can be adjusted by the attachment angle of the brackets 642 relative to the posts 641.

[0110] According to the above-mentioned temporary lining deck 100, the temporary lining deck 100, which has at least the deck body 10, the preceding temporary pavement 14, the guard fence 64, the rotary bearing device 20, and the gap closing member 40 installed in advance, can be installed on the bridge main girder 4. This makes it possible to omit the work of adjusting the gradient and road surface height and the work of filling the gaps between adjacent decks, which are carried out after the temporary lining deck 100 is hung down onto the top surface of the bridge main girder 4, and also shortens the work time associated with the reduction of the casting area of ​​the temporary pavement 5 and the simplification of the alignment of the guard fence 64.

[0111] This makes it possible to significantly reduce the amount of work carried out on the bridge's main girders 4, and even in cases where work hours are limited to nighttime traffic control hours for construction, it becomes possible to efficiently progress the deck replacement work while ensuring daytime traffic opening hours. Note that the steel ground coverings 60, protective fences 64, and gap closing members 40 do not necessarily all have to be attached to the deck body 10 in advance; one may select any one of them, or none may be installed.

[0112] The temporary lining deck, the mounting structure for the temporary lining deck, and the mounting method for the temporary lining deck of the present invention are not limited to the above-described embodiments, and various modifications are possible without departing from the spirit of the present invention.

[0113] In this embodiment, as shown in Figures 1 and 2, the cross section of the bridge B1 is divided into a driving lane side and an overtaking lane side, and the half cross section of the driving lane side is temporarily covered. For this reason, a protective fence 64 is provided on the temporary lining deck 100, but the present invention is not necessarily limited to this.

[0114] For example, when using the half-section deck replacement method to replace the deck of a bridge with three up-bound lanes, the existing deck may be divided for each lane (divided into three in the direction perpendicular to the bridge axis) before construction can begin. In such cases, it is advisable to prepare a deck body 10 that does not have a place for mounting the guardrail 64, and to also use a temporary lining deck 100 with only the preliminary temporary pavement 14 provided on the upper surface.

[0115] In addition, in this embodiment, an example has been given of the case where the temporary covering deck 100 is formed into a rectangular shape when viewed in plan, but the shape is not limited to this, and it is preferable to form it into the optimal shape as appropriate depending on the opening formed in the area where the existing deck 1 is removed.

[0116] Furthermore, although the length of the temporary covering deck 100 in the bridge axis direction is formed to be approximately the same as that of the existing deck piece 3, this is not necessarily limited to this, and as shown in Figure 1, it is also possible to prepare one that is smaller than the length L1 in the bridge axis direction of the existing deck piece 3, for example, 1 / 2 and 1 / 4.

[0117] In this way, the length L1 in the bridge axis direction of the existing deck slab piece 3 may need to be changed due to an unforeseen situation, such as when the planned cutting position of the existing deck slab piece 3 overlaps with a splice plate installed on the upper surface of the upper flange of the bridge main girder 4. Even if it becomes necessary to change the length L1 in the bridge axis direction of the existing deck slab piece 3 during construction, it is possible to respond appropriately by combining temporary lining decks 100 with different lengths in the bridge axis direction. [Explanation of symbols]

[0118] 1 Existing deck 2 cutting line 3 Existing floor slab pieces 4 Bridge girder 4a stud dowel 5 Temporary paving 100 Temporary lining deck 10 Deck body 11 Floor slab main girder 111 Stiffener 112 Upper flange 113 Web 114 Cutout 115 Bottom flange 116 Bolt hole 117 Locking bolt 12 Insert digits 13 Bottom plate 14 Preliminary pavement 15 Corner chipping prevention material 16 Gusset plate 17 Axial force transmission plate 20 Rotary bearing device 21 Pin bearing 211 Kamikutsu 212 pin 213 Shimotsutsu 22 Kutsuza 221 Support plate 222 Height adjustment plate 23 Clamping bracket (fixing bracket) 30 Axial force introduction member 31 Telescopic device 32 Axial force adjustment plate 321 Joint rebar penetration 40 Gap sealing material 41 Closing plate body 411 Locked part 412 Bolt hole 42 Deck support member 421 Fastening bolt 422 Deck abutment fittings 43 Mounting member 431 Adjustment bolt 432 Contact plate 50 Rear gap blocking member 51 Connecting plate 52 Connecting fittings 60 Steel ground cover 61 Ground cover body 62 Fixing member 621 Bolt hole 63 Adjustment fittings 64 Protective fence 641 Post 6411 Base plate 642 Bracket 643 Beam 644 Arc hole 70 Load transmission member 71 Telescopic device 72 Support plate 200 New deck 201 New deck body 202 Jointed Reinforcement Bars 300 Floor slab suspension device 301 Hanging jig 400 Assembly stand 401 Mounting base 4011 Fixed hole 4012 Stopper 4013 Hanging hardware 402 Floor slab support 4021 Pivot pin 4022 Locking jig 403 Cane 404 Fastening pin 405 Clamping metal fittings 500 Traction material B Road bridge B1 Bridge (Uphill 2 lanes) B2 Bridge (2 lanes downbound) D Work Area F1 Fastening bolt F2 countersunk bolt

Claims

1. A temporary lining deck installed on the bridge girder after removing the existing deck, A deck body and a rotary bearing device provided on the underside of the deck body at a position where the rotary bearing device abuts against the bridge main girder, The rotary bearing device is A pin bearing having a pin extending in the bridge axis direction; a shoe seat detachably installed on the lower shoe of the pin support; A temporary covering deck characterized by comprising:

2. In the temporary lining deck according to claim 1, The said Kutsuza is A support plate having a notch formed therein; A height adjustment plate laminated on an upper surface of the support plate; A temporary covering deck characterized by comprising:

3. In the temporary lining deck according to claim 1 or 2, An axial force introduction member is provided to introduce an axial force in the bridge axis direction to the deck body, The temporary covering deck is characterized in that the axial force introduction member is provided above the main girder of the bridge and at the side end of the deck body.

4. In the temporary covering deck according to any one of claims 1 to 3, A preliminary temporary paving portion provided on the upper surface of the deck body, leaving an outer peripheral edge portion; A gap closing member that is detachably provided to the outer peripheral edge portion and arranged across an adjacent existing deck or a new deck; A temporary covering deck characterized by comprising:

5. The temporary lining deck according to claim 4, A temporary covering deck slab, characterized in that the corners of the advance temporary paving portion are protected by corner chipping prevention members.

6. In the temporary covering deck according to any one of claims 1 to 5, A ground cover is provided on the upper surface of one end of the deck body in the direction perpendicular to the bridge axis so that its position can be adjusted; A protective fence that is detachably attached to the ground cover; A temporary covering deck characterized by comprising:

7. The mounting structure for a temporary covering deck according to any one of claims 1 to 6, The rotary bearing device is placed on the bridge main girder, A mounting structure for a temporary lining deck, characterized in that the shoe seat of the rotary bearing device and the main girder of the bridge are detachably fixed via fixing fittings.

8. A method for installing a temporary lining deck according to any one of claims 1 to 6, After placing the rotary bearing device on the bridge main girder, A method for installing a temporary lining deck, characterized in that the shoe seat of the rotary bearing device and the main girder of the bridge are detachably fixed via fixing brackets.

Citation Information

Patent Citations

  • Method for arranging / removing a joint and device for covering said joint

    EP2000592A1

  • JP1971027566Y1

  • Impact replacement of synthetic beam floor plate in road bridge

    JP1983150604A

  • Inclined support for temporary posts

    JP1993077309U

  • Jointless multiple span floor slab bridge

    JP1994313305A