Control system for work machines
The control system prioritizes and executes interrupt tasks after completing current tasks, addressing the challenge of handling sudden work interruptions in work machines, thereby improving responsiveness.
Patent Information
- Application Number
- JP2024510907
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-03-30
- Publication Date
- 2024-10-24
- Estimated Expiration
- 2042-03-30
AI Technical Summary
Existing work machine control systems struggle to handle sudden interrupt tasks effectively, requiring reconfiguration of the site environment and work machine operations.
A control system for work machines that prioritizes and executes interrupt tasks after completing the current task, using a work instruction acquisition unit to identify and manage interrupt tasks separately from non-interrupt tasks.
Enables efficient handling of interrupt tasks by ensuring they are executed after the current task is completed, enhancing the system's responsiveness to sudden work instructions.
Smart Images

Figure 0007573136000001 
Figure 0007573136000002 
Figure 0007573136000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a control system for a work machine. [Background technology]
[0002] Conventionally, there have been proposed control systems for work machines that automatically excavate an object and automatically load the excavated object at a predetermined position. For example, the control system for work machines described in Patent Document 1 includes an excavation target position calculation means for calculating an excavation target position, a loading target position calculation means for calculating a loading target position, an automatic positioning means for automatically positioning the work machine at the calculated excavation target position and loading target position, an automatic excavation control means for automatically excavating an object at the excavation target position, and an automatic loading control means for automatically loading the object at the loading target position. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 10-88625 Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the work machine control system described in Patent Document 1, when a sudden work instruction occurs, such as an interrupt task that must be executed as a priority, the site environment and work machine settings must be redone, making it difficult to respond to the interrupt task.
[0005] The present invention has been made in view of the above-mentioned problems, and has an object to provide a control system for a work machine that can easily handle interrupt tasks. [Means for solving the problem]
[0006] The work machine control system of the present invention is a work machine control system comprising a work instruction acquisition unit that acquires a series of work instructions for a work machine, and an operation control unit that controls the operation of the work machine to execute each task included in the work instructions acquired by the work instruction acquisition unit, and is characterized in that when the work instructions include an interrupt task to be executed with priority and a non-interrupt task excluding the interrupt task, the operation control unit executes the interrupt task after performing the operation of the work machine instructed by the task currently being executed.
[0007] In the work machine control system of the present invention, when a work instruction contains a plurality of tasks including an interrupt task to be executed with priority and a non-interrupt task excluding the interrupt task, the operation control unit executes the interrupt task after performing the operation of the work machine instructed by the task being executed, thereby making it possible to easily deal with the interrupt task. Effect of the Invention
[0008] According to the present invention, interrupt tasks can be easily handled. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a perspective view showing a work machine. [Diagram 2] FIG. 1 is a schematic diagram showing a work machine. [Diagram 3] FIG. 2 is a functional block diagram showing an automatic driving control device for a work machine. [Figure 4] 13 is an example of map data included in a work instruction. [Diagram 5] 13 is an example of task data included in a work instruction. [Figure 6] 13 is an example of an interrupt task included in a work instruction. [Figure 7] FIG. 1 is a functional block diagram showing a control system for a work machine according to a first embodiment. [Figure 8] 13 is a flowchart showing a process performed by a task input processing unit. [Figure 9] 13 is a flowchart showing a process performed by a task update processing unit. [Figure 10] 13 is a flowchart showing a process performed by a task execution processing unit. [Figure 11] 13 is a flowchart showing a loading task process performed by a task execution processing unit. [Figure 12] FIG. 5 is a functional block diagram showing a control system for a work machine according to a second embodiment. [Figure 13] 13 is a flowchart showing processing performed in a task update processing unit of a construction machine control system according to a second embodiment. [Figure 14] 13 is a flowchart showing the processing performed by a load determination unit of a control system for a construction machine according to a second embodiment. [Figure 15] 13 is a flowchart showing processing performed in a task update processing unit of a construction machine control system according to a third embodiment. [Figure 16] 13 is an example of task data included in a work instruction of the control system for a work machine according to the fourth embodiment. [Figure 17] 13 is an example of an interrupt task included in a work instruction of the control system for a work machine according to the fourth embodiment. [Figure 18] 13 is a flowchart showing the processing of a loading task performed by a task execution processing unit of a construction machine control system according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of a construction machine control system according to the present invention will be described with reference to the drawings. In the description of the drawings, the same elements are given the same reference numerals, and duplicated description will be omitted. In the following description, an example will be given in which the construction machine is a wheel loader, but the construction machine of the present invention is not limited to a wheel loader and may be a construction machine such as a hydraulic excavator. Furthermore, in the following description, the directions and positions of up / down, left / right, front / rear are based on the directions as seen from the driver's seat of the construction machine.
[0011] Furthermore, the work machine control system according to the present invention may be provided in the work machine (i.e., mounted on the work machine), or part or all of the control system may be provided in an external server device capable of communicating with the work machine, but here we will explain an example in which the control system is mounted on the work machine.
[0012] [First embodiment] The work machine control system 200 according to this embodiment is a system for controlling the operation of the work machine 1 based on work instructions for the work machine 1, and is mainly equipped with a communication interface 18 and an operation control section 110, which will be described later. The communication interface 18 and the operation control section 110 are each provided in the work machine 1.
[0013] Fig. 1 is a perspective view showing a work machine, and Fig. 2 is a schematic diagram showing the work machine. As shown in Fig. 1, the work machine 1 is, for example, an electrically driven wheel loader, and is equipped with a bucket (also called a working implement) 2 arranged at the front of the work machine 1, and a pair of left and right lift arms 3 that rotatably support the bucket 2. The lift arms 3 are rotatably supported on the body of the work machine 1. When the lift arms 3 rotate, the bucket 2 moves up and down. The lift arms 3 also rotatably support a bell crank 4. When the bell crank 4 rotates, the bucket 2 also rotates relative to the lift arms 3 via a bucket link 5.
[0014] The work machine 1 is equipped with a front left tire 6FL, a front right tire 6FR, a rear left tire 6RL, and a rear right tire 6RR, and travels by driving these tires. The work machine 1 also has an articulated steering mechanism, and turns by generating an angle difference between the front and rear of the vehicle body with the vertical direction of the vehicle body as an axis.
[0015] As shown in Fig. 2, the work machine 1 is equipped with an engine 7 as a power source. The engine 7 drives a hydraulic pump 8 and a driving force transmission device 9. The driving force transmission device 9 transmits the driving force of the engine 7 to the front left tire 6FL, the front right tire 6FR, the rear left tire 6RL, and the rear right tire 6RR via a center joint 10 and a front differential 11F and a rear differential 11R, respectively, to accelerate the work machine 1.
[0016] Meanwhile, the hydraulic pump 8 supplies hydraulic oil to the control valve 12 by being driven by the engine 7. The hydraulic oil is distributed by the control valve 12 and supplied to the steer cylinder 13, the lift cylinder 14, the bucket cylinder 15, and the brakes 16F, 16R, respectively. The steer cylinder 13, the lift cylinder 14, and the bucket cylinder 15 each extend and retract by the hydraulic oil supplied, thereby changing the angle between the front and rear of the vehicle body, the angle of the lift arm 3 relative to the vehicle body, and the angle of the bucket 2, respectively. In addition, the brakes 16F, 16R close with the hydraulic oil supplied to suppress rotation of the front left tire 6FL, front right tire 6FR, rear left tire 6RL, and rear right tire 6RR, thereby decelerating and stopping the work machine 1.
[0017] Furthermore, the work machine 1 is equipped with a positioning device 17, a communication interface 18, a pressure sensor 19, an engine control device 20, a hydraulic control device 21, a travel control device 22, and an automatic driving control device 100. The positioning device 17 is configured with, for example, two GNSS (Global Navigation Satellite System) receivers (see FIG. 1) that receive signals from positioning satellites to measure the position, and outputs the measured position information of the work machine 1 to the automatic driving control device 100. Note that the positioning device 17 is not limited to a GNSS receiver, and a known SLAM (Simultaneous Localization and Mapping) using a camera or LiDAR may be adopted.
[0018] The communication interface 18 corresponds to the "work instruction acquisition unit" recited in the claims, and acquires a series of work instructions for the work machine 1 from the process control terminal 30, and outputs the acquired work instructions to the automatic driving control device 100. As will be described later, the work instructions include task data and map data related to the work. Note that the work instruction acquisition unit may be anything that can acquire work instructions from the process control terminal 30, and may be a wireless communication device or the like in addition to the communication interface 18.
[0019] The pressure sensor 19 detects load information of an object loaded on the work machine 1 (i.e., an object contained in the bucket 2) based on the hydraulic pressure of the lift cylinder 14 or the stress of the lift cylinder 14, and outputs the detected load information to the automatic driving control device 100.
[0020] The automatic driving control device 100 is configured, for example, by a microcomputer that combines a CPU (Central Processing Unit) that executes calculations, a ROM (Read Only Memory) as a secondary storage device that records programs for the calculations, and a RAM (Random Access Memory) as a temporary storage device that saves the calculation progress and temporary control variables, and performs various calculations, settings, judgments, generation, and other processes related to the automatic driving of the work machine 1 by executing the stored programs.
[0021] For example, the automatic driving control device 100 generates an engine control signal, a hydraulic control signal, and a driving control signal based on work instructions from the process control terminal 30 obtained via the communication interface 18, the position information of the work machine 1 measured by the positioning device 17, and the load information detected by the pressure sensor 19, and outputs the generated engine control signal to the engine control device 20, the hydraulic control signal to the hydraulic control device 21, and the driving control signal to the driving control device 23.
[0022] The engine control device 20 controls the rotation speed of the engine 7 based on an engine control signal from the automatic driving control device 100. The hydraulic control device 21 controls the opening and closing degree of the control valve 12 based on a hydraulic control signal from the automatic driving control device 100. The driving control device 22 controls the gear ratio and rotation direction of the driving force transmission device 9 based on a driving control signal from the automatic driving control device 100.
[0023] The process control terminal 30 is a terminal for transmitting work instructions to each work machine 1 operating at the site, and may be one in which a site manager or the like manually creates and transmits work instructions, or one that automatically acquires information on the progress of work throughout the site using a sensor or the like, and automatically generates and transmits work instructions.
[0024] Next, the automatic driving control device 100 will be described in detail with reference to Fig. 3. Fig. 3 is a functional block diagram showing an automatic driving control device for a work machine. As shown in Fig. 3, the automatic driving control device 100 includes an operation control unit 110, a route planning unit 120, and an operation generation unit 130.
[0025] The operation control unit 110 is configured by a microcomputer that combines a CPU that executes calculations, a ROM as a secondary storage device that records programs for the calculations, and a RAM as a temporary storage device that saves the calculation progress and temporary control variables, and controls the operation of the work machine 1 so as to execute each task included in the work instructions obtained by the communications interface 18.
[0026] For example, the operation control unit 110 sets an operation mode and a target position of the work machine 1 based on work instructions from the process control terminal 30 acquired via the communication interface 18, position information of the work machine 1 measured by the positioning device 17, and load information detected by the pressure sensor 19. Furthermore, the operation control unit 110 outputs the set operation mode to the operation generation unit 130 and the set target position to the path planning unit 120. A detailed description of the operation control unit 110 will be given later.
[0027] Examples of the operation modes include a traveling mode, an excavation mode, and a loading mode. Furthermore, "loading" in this embodiment includes the work machine 1 loading an object onto the bed of a transport vehicle, and transporting the excavated object to a destination and discharging it. Therefore, the "loading operation" in this embodiment includes the operation of the work machine 1 loading an object onto the bed of a transport vehicle, and the operation of transporting the excavated object to a destination and discharging it.
[0028] The route planning unit 120 sets a target route based on work instructions from the process control terminal 30 acquired via the communication interface 18, position information of the work machine 1 measured by the positioning device 17, and the target position set by the operation control unit 110. Specifically, the route planning unit 120 sets a target route from the current position of the work machine 1 to the target position using map data included in the work instructions. In addition, the route planning unit 120 outputs the set target route to the operation generation unit 130.
[0029] The motion generation unit 130 generates motions for controlling the engine control unit 20, the hydraulic control unit 21, and the travel control unit 22, based on the motion mode set by the motion control unit 110, the target route set by the route planning unit 120, and position information of the work machine 1 measured by the positioning device 17. Specifically, the motion generation unit 130 generates travel motions for causing the work machine 1 to travel from the current position of the work machine 1 along the target route, based on the target route set by the route planning unit 120 and the position information of the work machine 1 measured by the positioning device 17. In addition, the motion generation unit 130 generates work motions of the bucket 2, such as digging and loading, based on the motion mode set by the motion control unit 110.
[0030] The motion generator 130 then outputs the generated traveling motion as a traveling control signal to the traveling control device 22, and outputs the generated work motion as a hydraulic control signal to the hydraulic control device 21. The traveling control signal may be, for example, the accelerator and brake pedal operation amounts and a forward / reverse switch switching signal, similar to conventional manual operation. The hydraulic control signal may be, for example, the lever operation amounts of the lift arm 3 and the bucket 2, similar to conventional manual operation. Furthermore, the motion generator 130 calculates the required engine speed based on the generated traveling motion and work motion, and outputs the calculation result to the engine control device 20 as an engine control signal.
[0031] Next, the map data and task data included in the work instructions will be described with reference to Figs. 4 to 6. The work instructions each include map data and task data related to the work. The task data includes interrupt tasks that are executed with priority and non-interrupt tasks excluding the interrupt tasks. An interrupt task is a task that is executed with priority over a non-interrupt task, for example, a task whose processing method is indicated by the number "2" as described below. On the other hand, a non-interrupt task is a normal task without a priority (for example, a task whose processing method is indicated by the numbers "0" and "1" as described below), and is a task that is executed sequentially according to the order listed in the task instruction list.
[0032] Figure 4 is an example of map data included in a work instruction. As shown in Figure 4, the map data is given as a number of coordinate points (p0 to p9) and line segments connecting them. In Figure 4, Q1 and Q2 indicate excavation positions, R1 and R2 indicate loading positions, and O1 indicates an obstacle. These excavation positions, loading positions, and obstacles are given attribute information linked to the coordinates.
[0033] FIG. 5 is an example of task data included in a work instruction. As shown in FIG. 5, the task data is a task instruction list that includes a set of an object, an excavation position, and a loading position. For example, in an M1 loading task, the work machine 1 excavates the object M1 at an excavation position Q1, loads it at a loading position R1, and when loading at the loading position R1 is completed, the M1 loading task is completed and the process moves to the next M2 loading task. In an M2 loading task, the work machine 1 excavates the object M2 at an excavation position Q2, loads it at a loading position R2, and when the M2 loading task is completed, the process moves to the next task in the order listed in the task instruction list. Then, in the last task listed in the task instruction list, the work machine 1 waits at a waiting position.
[0034] As shown in Fig. 5, the task data specifies a processing method for each task. The processing method is indicated by a number such as "0", "1", or "2". In this embodiment, for example, "0" indicates a processing method for discarding an acquired task, and "1" indicates a processing method for executing tasks sequentially according to the order listed in the task instruction list. On the other hand, "2" indicates a processing method with a higher priority than "1", that is, it indicates an interrupt task that is executed with priority over "1".
[0035] Figure 6 is an example of an interrupt task included in a work instruction. Here, the processing method is specified as the number "2" to specify it as an interrupt task. Note that interrupt tasks are intended to perform temporary (in other words, sudden) interrupt processing, and if you want to give priority to multiple tasks over an acquired task, it is desirable to discard the acquired task before executing the interrupt task. For example, as described above, by setting the processing method to the number "0", the acquired task is discarded before executing the interrupt task with the number "2".
[0036] Fig. 7 is a functional block diagram showing the construction machine control system according to the first embodiment. As shown in Fig. 7, the operation control unit 110 of the construction machine control system 200 includes a map data input processing unit 111, a task input processing unit 112, a task update processing unit 113, a task execution processing unit 114, a map memory 116, a queue 117, an interrupt task buffer 118, and a current task buffer 119.
[0037] As shown in FIG. 7, the communication interface 18 connected to the operation control unit 110 extracts the map data and task data contained in the work instructions obtained from the process control terminal 30, and outputs the extracted map data to the map data input processing unit 111 and the extracted task data to the task input processing unit 112.
[0038] The map data input processing unit 111 stores the map data acquired via the communication interface 18 in the map memory 116 .
[0039] The task input processing unit 112 separates the task data acquired via the communication interface 18 into interrupt tasks and non-interrupt tasks, and stores the interrupt tasks in the interrupt task buffer 118 and the non-interrupt tasks in the queue 117. Specifically, the task input processing unit 112 separates the acquired tasks into interrupt tasks (e.g., tasks whose processing method number is "2") and non-interrupt tasks (e.g., tasks whose processing method number is "1") based on the processing method number included in the task data, and stores the interrupt tasks in the interrupt task buffer 118 and the non-interrupt tasks in the queue 117.
[0040] In the following description, in order to distinguish between the tasks stored in the queue 117, the interrupt task buffer 118, and the current task buffer 119, the tasks stored in the queue 117 may be referred to as "tasks in the queue", the tasks stored in the interrupt task buffer 118 as "interrupt tasks", and the tasks stored in the current task buffer 119 as "current tasks" or "tasks being executed". Furthermore, "tasks in the queue" are only non-interrupt tasks, while the "current task" or "tasks being executed" may be either interrupt tasks or non-interrupt tasks.
[0041] The task execution processing unit 114 sets an operation mode and a target position of the work machine 1 based on the current task (i.e., the task being executed) stored in the current task buffer 119, the map data stored in the map memory 116, the position information of the work machine 1 measured by the positioning device 17, and the load information detected by the pressure sensor 19. The task execution processing unit 114 also outputs the set operation mode to the operation generation unit 130 and the set target position to the path planner 120. Furthermore, when the task execution processing unit 114 determines that the current task (the task being executed) is completed, it outputs a task completion flag to the task update processing unit 113. The task execution processing unit 114 will be described later.
[0042] The task update processing unit 113 updates the tasks in the current task buffer 119 based on the presence or absence of a task completion flag output by the task execution processing unit 114, the tasks stored in the queue 117 (tasks in the queue), and the interrupt tasks stored in the interrupt task buffer 118.
[0043] Next, each process performed by the operation control unit 110 will be described in detail with reference to Fig. 8 to Fig. 11. Note that each process performed by the operation control unit 110 is performed asynchronously and periodically. Below, the task input processing unit 112, task update processing unit 113, and task execution processing unit 114 will be described in that order.
[0044] Fig. 8 is a flowchart showing the processing performed by the task input processor. As shown in Fig. 8, in step S1121, the task input processor 112 determines whether or not a work instruction has been acquired based on the presence or absence of task data from the communication interface 18. If there is task data, it is determined that a work instruction has been acquired, and the processing proceeds to step S1122.
[0045] In step S1122, the task input processing unit 112 determines whether or not there is an interrupt task in the acquired task data. At this time, as described above, the task input processing unit 112 classifies the acquired tasks into interrupt tasks and non-interrupt tasks, and determines the presence or absence of an interrupt task based on the result.
[0046] If it is determined that there is no interrupt task (in other words, if all tasks are non-interrupt tasks), the process proceeds to step S1123. In step S1123, task input processing unit 112 stores the tasks included in the work instructions in queue 117 in order. At this time, task input processing unit 112 stores each task in queue 117 in the order listed in the task instruction list. On the other hand, if it is determined that there is an interrupt task, the process proceeds to step S1124. In step S1124, task input processing unit 112 stores the interrupt task in interrupt task buffer 118.
[0047] Fig. 9 is a flowchart showing the processing performed by the task update processing unit. As shown in Fig. 9, in step S1131, the task update processing unit 113 judges whether or not there is a current task (i.e., a task being executed) in the current task buffer 119. If it is judged that there is a current task, the processing proceeds to step S1132. On the other hand, if it is judged that there is no current task, the processing proceeds to step S1134.
[0048] In step S1132, the task update processing unit 113 determines whether the current task is completed based on the presence or absence of a task completion flag output by the task execution processing unit 114. If the task completion flag is present, it is determined that the current task is completed, and the process proceeds to step S1133. In step S1133, the task update processing unit 113 discards the completed current task. On the other hand, if the task completion flag is not present, it is determined that the current task is not completed, and the process becomes "RETURN."
[0049] In step S1134, the task update processing unit 113 determines whether or not there is an interrupt task in the interrupt task buffer 118. If it is determined that there is an interrupt task, the process proceeds to step S1135.
[0050] In step S1135, the task update processing unit 113 updates the task in the current task buffer 119 by transferring the interrupt task stored in the interrupt task buffer 118 to the current task buffer 119. In this way, the interrupt task stored in the interrupt task buffer 118 can be transferred to the current task buffer 119 with priority over the task (i.e., the non-interrupt task) stored in the queue 117, and can be executed with priority over the non-interrupt task.
[0051] On the other hand, if it is determined in step S1134 that there is no interrupt task, the process proceeds to step S1136. In step S1136, the task update processing unit 113 determines whether or not there is a task (i.e., a non-interrupt task) in the queue 117. If it is determined that there is a task in the queue 117, the process proceeds to step S1137.
[0052] In step S1137, the task update processing unit 113 transfers the tasks in the queue to the current task buffer 119. For example, the task update processing unit 113 updates the tasks in the current task buffer 119 by transferring the task that was stored earliest among the multiple tasks stored in the queue 117 (in other words, the task listed at the top of the task instruction list). In this way, the tasks stored in the queue 117 are transferred in sequence to the current task buffer 119 and executed in sequence.
[0053] 10 is a flowchart showing the process performed by the task execution processing unit 114. As shown in FIG 10, in step S1141, the task execution processing unit 114 refers to the current task stored in the current task buffer 119.
[0054] In step S1142 following step S1141, the task execution processing unit 114 determines whether or not the current task stored in the current task buffer 119 has been updated. The determination of whether or not the current task has been updated is made based on, for example, whether or not the contents of the current task have changed. If it is determined that the current task has not been updated, the process proceeds to step S1143. In step S1143, the task execution processing unit 114 continues processing the currently executed task.
[0055] On the other hand, if it is determined that the current task has been updated, the process proceeds to step S1144. In step S1144, the task execution processing unit 114 initializes the task execution process. For example, in the case of processing a loading task shown in Fig. 11 described later, the task execution processing unit 114 starts the process from the beginning (START). Also, if an initial position is specified in the task, the task execution processing unit 114 may perform initialization such as returning the work machine 1 to the initial position.
[0056] FIG. 11 is a flowchart showing the processing of a loading task performed by the task execution processing unit. Here, the M1 loading task shown in FIG. 5 (a task in which the work machine 1 excavates at an excavation position Q1, loads at a loading position R1, and completes the M1 loading task when loading at the loading position R1 is completed) will be taken as an example for explanation. In step S1001, the task execution processing unit 114 sets the excavation position described in the task data (more specifically, the current task) as the target position, and outputs the set target position to the path planning unit 120. Specifically, the task execution processing unit 114 sets the excavation position Q1 as the target position based on the excavation position Q1 described in the current task and the map data stored in the map memory 116. The set target position is, for example, the coordinates of Q1.
[0057] In step S1002 following step S1001, the task execution processing unit 114 sets the operation mode of the work machine 1 to a traveling mode in order to travel from the current position to the excavation position Q1, and outputs the set operation mode to the operation generation unit .
[0058] In step S1003 following step S1002, the task execution processing unit 114 determines whether or not the work machine 1 has reached the excavation position Q1 (i.e., the target position) based on the target position set in step S1001 and the position information of the work machine 1 measured by the positioning device 17. If it is determined that the work machine 1 has not reached the excavation position Q1, the process returns to step S1002. On the other hand, if it is determined that the work machine 1 has reached the excavation position Q1, the process proceeds to step S1004.
[0059] In step S1004, the task execution processing unit 114 sets the operation mode of the work machine 1 to excavation mode in accordance with the order described in the current task, and outputs the set operation mode to the operation generation unit 130.
[0060] In step S1005 following step S1004, the task execution processing unit 114 determines whether or not the excavation operation in the excavation mode has ended based on the load information detected by the pressure sensor 19. If it is determined that the excavation operation has not ended, the process returns to step S1004. On the other hand, if it is determined that the excavation operation has ended, the process proceeds to step S1006. Note that the determination of the end of the excavation operation may be made based on information regarding the height and attitude of the bucket 2 in addition to the load information.
[0061] In step S1006, the task execution processing unit 114 sets the loading position R1 described in the current task as a target position based on the loading position R1 and the map data stored in the map memory 116, and outputs the set target position to the route planning unit 120. The set target position is, for example, the coordinates of R1.
[0062] In step S1007 following step S1006, in order to travel from the current position (here, the digging position Q1) to the loading position R1, the task execution processing unit 114 sets the operation mode of the work machine 1 to a traveling mode and outputs the set operation mode to the operation generation unit 130.
[0063] In step S1008 following step S1007, the task execution processing unit 114 determines whether or not the work machine 1 has reached the loading position R1 (i.e., the target position) based on the target position set in step S1006 and the position information of the work machine 1 measured by the positioning device 17. If it is determined that the work machine 1 has not reached the loading position R1, the process returns to step S1007. On the other hand, if it is determined that the work machine 1 has reached the loading position R1, the process proceeds to step S1009.
[0064] In step S1009, the task execution processing unit 114 sets the operation mode of the work machine 1 to the loading mode in accordance with the order described in the current task, and outputs the set operation mode to the operation generation unit 130.
[0065] In step S1010 following step S1009, the task execution processing unit 114 determines whether or not the loading operation in the loading mode has ended based on the load information detected by the pressure sensor 19. If it is determined that the loading operation has not ended, the process returns to step S1009. On the other hand, if it is determined that the loading operation has ended, the process proceeds to step S1011. The determination of the end of the loading operation may be made based on information regarding the height and attitude of the bucket 2 in addition to the load information.
[0066] In step S1011, the task execution processing unit 114 determines that the M1 loading task described in the current task has been completed, and outputs a task completion flag to the task update processing unit 113.
[0067] In the work machine control system 200 according to this embodiment, when an interrupt task and a non-interrupt task are included among a plurality of tasks included in a work instruction from the process control terminal 30, the task input processing unit 112 of the operation control unit 110 stores the interrupt task in the interrupt task buffer 118, and the task update processing unit 113 transfers the interrupt task stored in the interrupt task buffer 118 to the current task buffer 119. This makes it possible to execute the interrupt task with priority over the non-interrupt task after the operation of the work machine 1 instructed in the task being executed (e.g., a loading operation), and therefore makes it possible to easily deal with the interrupt task. In particular, since the work machine 1 is in an unloaded state after the loading operation of the work machine 1 instructed in the task being executed is performed, the interrupt task can be executed more easily.
[0068] [Second embodiment] Next, a second embodiment of a construction machine control system will be described with reference to Figures 12 to 14. A construction machine control system 200A according to this embodiment differs from the first embodiment in that an operation control unit 110A further includes a loading determination unit 115, and in the processing content of a task update processing unit 113A. Only these differences will be described below.
[0069] Fig. 12 is a functional block diagram showing a construction machine control system according to the second embodiment. As shown in Fig. 12, the operation control unit 110A of the construction machine control system 200A further includes a loading determination unit 115. The loading determination unit 115 determines whether or not the construction machine 1 is loaded with an object (in other words, loaded or unloaded) based on the load information detected by the pressure sensor 19 and the operation mode set by the task execution processing unit 114, and outputs the determination result to the task update processing unit 113A. The processing performed by the loading determination unit 115 will be described later.
[0070] On the other hand, the task update processing unit 113A updates the task in the current task buffer 119 based on the presence or absence of a task completion flag output by the task execution processing unit 114, the task stored in the queue 117, the interrupt task stored in the interrupt task buffer 118, and the result determined by the loading determination unit 115.
[0071] Fig. 13 is a flowchart showing the processing performed by the task update processing unit of the work machine control system according to the second embodiment. The processing shown in Fig. 13 is obtained by further adding steps S1138 and S1139 to the processing performed by the task update processing unit of the first embodiment (see Fig. 9). Only the added steps S1138 and S1139 will be explained here.
[0072] Specifically, if it is determined in step S1132 that the current task is not completed, the process proceeds to step S1138. In step S1138, the task update processing unit 113A determines whether or not the work machine 1 has "an interrupt task and is not loaded", based on the presence or absence of an interrupt task stored in the interrupt task buffer 118 and the determination result of the loading determination unit 115.
[0073] For example, if there is both an interrupt task and a load, if there is neither an interrupt task nor a load, or if there is no interrupt task but a load, it is determined that there is not an "interrupt task and no load" and the process goes to "RETURN." On the other hand, if it is determined that there is an "interrupt task and no load," the process proceeds to step S1139.
[0074] In step S1139, the task update processing unit 113A updates the task in the current task buffer 119 by transferring the interrupt task stored in the interrupt task buffer 118 to the current task buffer 119. In this way, even if the current task is not completed, if there is no load, the interrupt task stored in the interrupt task buffer 118 can be transferred to the current task buffer 119 and the interrupt task can be immediately executed as the current task. Conversely, by not executing the interrupt task when there is a load, it is possible to prevent an operation already in progress from being interrupted.
[0075] Fig. 14 is a flowchart showing the processing performed by the loading determination unit of the work machine control system according to the second embodiment. As shown in Fig. 14, in step S1151, the loading determination unit 115 determines whether the operation mode set by the task execution processing unit 114 is the excavation mode. If it is determined that it is the excavation mode, the processing proceeds to step S1155. On the other hand, if it is determined that it is not the excavation mode, the processing proceeds to step S1152.
[0076] In step S1152, the loading determination unit 115 determines whether or not the operation mode set by the task execution processing unit 114 is the loading mode. If it is determined that it is the loading mode, the process proceeds to step S1155. On the other hand, if it is determined that it is not the loading mode, the process proceeds to step S1153.
[0077] In step S1153, the loading determination unit 115 determines whether the load is equal to or greater than a preset predetermined value based on the load information detected by the pressure sensor 19. If it is determined that the load is equal to or greater than the predetermined value, the process proceeds to step S1155. On the other hand, if it is determined that the load is not equal to or greater than the predetermined value, the process proceeds to step S1154.
[0078] In step S1154, loading determination unit 115 determines that there is no loading, and outputs the determination result to task update processing unit 113A. In step S1155, loading determination unit 115 determines that there is loading, and outputs the determination result to task update processing unit 113A. In this manner, for example, by determining that there is loading during excavation work or loading work, it is possible to prevent task update processing unit 113A from updating the task while the loading state is changing.
[0079] [Third embodiment] Next, a third embodiment of a construction machine control system will be described with reference to Fig. 15. The construction machine control system according to this embodiment differs from the second embodiment in the processing contents of the task update processing unit 113A. Only the differences will be described below.
[0080] Fig. 15 is a flowchart showing the processing performed by the task update processing unit of the work machine control system according to the third embodiment. The processing shown in Fig. 15 replaces step S1139 of the processing of the task update processing unit 113A according to the second embodiment (see Fig. 13) with step S1139'.
[0081] Specifically, if it is determined in step S1138 that there is an interrupt task and no loading, the process proceeds to step S1139'. In step S1139', the task update processing unit swaps the interrupt task stored in the interrupt task buffer 118 with the current task stored in the current task buffer 119. That is, the interrupt task stored in the interrupt task buffer 118 is transferred to the current task buffer 119, and the task being executed is transferred from the current task buffer 119 to the interrupt task buffer 118.
[0082] In this way, even if the currently executed current task is not completed, if there is no load, the interrupt task stored in the interrupt task buffer 118 can be immediately executed as the current task. Also, by transferring the task that was being executed to the interrupt task buffer 118, after the interrupt task is completed, the task can be transferred to the current task buffer 119 and resumed.
[0083] [Fourth embodiment] Next, a fourth embodiment of a construction machine control system will be described with reference to Figures 16 to 18. The construction machine control system according to this embodiment differs from the first embodiment in that an instruction regarding the number of tasks is added to the task data, and in the processing content of the task execution processing unit 114. Only these differences will be described below.
[0084] Fig. 16 is an example of task data included in a work instruction of the work machine control system according to the fourth embodiment, and Fig. 17 is an example of an interrupt task included in a work instruction of the work machine control system according to the fourth embodiment. As shown in Fig. 16, the task data included in the work instruction of this embodiment has an additional item called "number of tasks" compared to the task data included in the work instruction of the first embodiment (see Fig. 5). Also, as shown in Fig. 17, the interrupt task data of this embodiment also has an additional item called "number of tasks" compared to the interrupt task of the first embodiment (see Fig. 6). The "number of tasks" indicates, for example, the number of loadings.
[0085] As a result, in a work instruction for an M1 loading task, the work machine 1 excavates the object M1 at the excavation position Q1, loads it at the loading position R1, and when the number of loadings reaches N1, the M1 loading task is completed and the process moves to the next M2 loading task. The same applies to interrupt tasks. When the number of loadings is specified in this way, the task is executed until the specified number of loadings is reached. Note that instead of the "number of tasks," a "work amount" (e.g., loading amount) may be specified.
[0086] Fig. 18 is a flowchart showing the processing of a loading task performed by a task execution processing unit of a work machine control system according to Embodiment 4. As shown in Fig. 18, the processing of the loading task performed by the task execution processing unit 114 of this embodiment is obtained by further adding steps S1010-1 and S1010-2 to the processing of the loading task in the first embodiment (see Fig. 11).
[0087] Steps S1010-1 and S1010-2 are added between steps S1010 and S1011. Specifically, if it is determined in step S1010 that the loading operation has ended, the process proceeds to step S1010-1. In step S1010-1, the task execution processing unit 114 subtracts the number of loading operations of the task being executed. At this time, the task execution processing unit 114 subtracts the number of loading operations of the completed loading operation from the number of operations (here, the number of loading operations) included in the task data (more specifically, the current task).
[0088] In step S1010-2 following step S1010-1, task execution processing unit 114 determines whether the difference obtained by the subtraction is greater than 0 (zero). If it is determined that the difference is greater than 0, the process returns to step S1001. On the other hand, if it is determined that the difference is equal to or less than 0, the process proceeds to step S1011. In step S1011, task execution processing unit 114 outputs a task completion flag.
[0089] In the control system for the work machine according to this embodiment, the task execution processing unit 114 subtracts the number of loading operations of the completed loading operation from the number of operations (loading number) included in the task data, so that when an interrupt task is executed in the middle of the task being executed and then the original task is resumed, the number of loading operations that reflects the number of loading operations that have already been completed can be set for the original task. For example, when an interrupt task is executed preferentially in the middle of the M1 loading task (e.g., the number of loading operations N1=5) (e.g., when the number of loading operations of the completed loading operation is 3), and the original M1 loading task is resumed after the interrupt task is executed, the task execution processing unit 114 controls the work machine 1 to perform the remaining two loading operations (N1-3=5-3=2) for the resumed M1 loading task. Note that, when the loading amount is used instead of the number of loading operations, the amount of the object is measured after the end of the excavation operation and before the start of the loading operation, and the loading amount is subtracted in the same manner as the number of loading operations.
[0090] In the above-mentioned embodiment, an example has been described in which the work machine control system 200, 200A is mounted on the work machine 1, but for example the communications interface 18 and operation control sections 110, 110A may be provided in an external server device etc. configured to be able to communicate with the process control terminal 30 and the work machine 1, respectively, or only the operation control sections 110, 110A may be provided in an external server device etc. By having such variations, the installation of the work machine control system 200, 200A can be changed depending on the situation, thereby enhancing the versatility of the work machine control system 200, 200A.
[0091] Although the embodiment of the present invention has been described above in detail, the present invention is not limited to the above-described embodiment, and various design modifications can be made without departing from the spirit of the present invention described in the claims. Furthermore, the above-described embodiment has been described in detail to easily explain the present invention, and the present invention is not necessarily limited to having all of the configurations described. [Explanation of symbols]
[0092] 1: Work machine, 2: Bucket, 3: Lift arm, 4: Bell crank, 5: Bucket link, 7: Engine, 8: Hydraulic pump, 9: Driving force transmission device, 10: Center joint, 12: Control valve, 13: Steer cylinder, 14: Lift cylinder, 15: Bucket cylinder, 17: Positioning device, 18: Communication interface, 19: Pressure sensor, 20: Engine control device, 21: Hydraulic control device, 22: Travel control device, 30: Process management terminal, 100: Automatic driving control device, 110, 110A: Operation control device, 111: Map data input processing device, 112: Task input processing device, 113: Task update processing device, 114: Task execution processing device, 115: Loading determination device, 116: Map memory, 117: Queue, 118: Interrupt task buffer, 119: Current task buffer, 120: Path planning device, 130: Operation generation device, 200, 200A: Work machine control system
Claims
1. a work instruction acquisition unit that acquires a series of work instructions for the work machine; an operation control unit that controls an operation of the work machine so as to execute each task included in the work instruction acquired by the work instruction acquisition unit; A control system for a work machine comprising: a loading determination unit that determines whether or not the work machine is loaded with an object, The operation control unit, when the work instruction includes an interrupt task to be executed with priority and a non-interrupt task other than the interrupt task, among a plurality of tasks included in the work instruction, When the loading determination unit determines that the work machine is loaded with the object, the interrupt task is executed after performing an operation of the work machine instructed by the task being executed, A work machine control system characterized in that, when the loading determination unit determines that the work machine is not loaded with the object, the interrupt task is executed before the operation of the work machine instructed by the task in progress is completed.
2. The operation control unit is a task input processing unit that divides a plurality of tasks included in the work instructions acquired by the work instruction acquisition unit into the interrupt tasks and the non-interrupt tasks; an interrupt task buffer for storing the interrupt task; a queue for storing the non-interrupt tasks in the order specified by the work instructions; A current task buffer that stores the currently running task; a task execution processing unit that sets an operation mode and a target position of the work machine based on the task being executed stored in the current task buffer, map data included in the work instruction, position information of the work machine, and load information of an object to be loaded on the work machine, and that outputs a task completion flag when the task being executed is completed; a task updating processing unit that updates a task in the current task buffer based on the presence or absence of a task completion flag output by the task execution processing unit, the non-interrupt task stored in the queue, and the interrupt task stored in the interrupt task buffer; Equipped with 2. The work machine control system according to claim 1, wherein the task update processing unit updates the task in the current task buffer by transferring to the current task buffer the interrupt task stored in the interrupt task buffer with priority over the non-interrupt task stored in the queue.
3. The loading determination unit is determining whether or not the work machine is carrying an object based on load information of an object loaded on the work machine and an operation mode set by the task execution processing unit, and outputting the determination result to the task update processing unit; 3. The work machine control system according to claim 2, wherein when it is determined that the work machine is not loaded with an object and the interrupt task is stored in the interrupt task buffer, the task update processing unit transfers the interrupt task stored in the interrupt task buffer to the current task buffer.
4. 4. The control system for a work machine according to claim 3, wherein the task update processing unit transfers the interrupt task stored in the interrupt task buffer to the current task buffer, and transfers a task being executed from the current task buffer to the interrupt task buffer.
5. The work instructions include instructions on the amount of work or the number of times of work, The construction machine control system according to any one of claims 2 to 4, wherein when the task execution processing unit executes the interrupt task in the middle of a task being executed and then resumes the original task, it sets a remaining amount of work or number of tasks for the original task that reflects the amount of work or number of tasks that have already been completed.
6. the operation of the work machine includes a loading operation; 6. A work machine control system according to claim 1, wherein the operation control section executes the interrupt task after carrying out a loading operation of the work machine instructed by a task being executed.
7. A construction machine control system according to any one of claims 1 to 6, wherein the work instruction acquisition unit and the operation control unit are provided in the construction machine, or in an external server device capable of communicating with the construction machine.
Citation Information
Patent Citations
Automatic excavation machine and method, and automatic loading method
JP1998088625A
Automatic operating shovel
JP1999158934A
Service providing system and movement instruction program
JP2018039192A
Work machine
JP2021051650A
Method of controlling machines at a worksite
US20170314232A1