Ship monitoring device, ship monitoring method, and ship monitoring program

The ship monitoring device enhances route prediction accuracy by using a trained model tailored to each port's characteristics, facilitating safe and efficient construction operations by accurately predicting ship routes and evacuation times.

JP7573479B2Active Publication Date: 2024-10-25FUJITSU LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021074146
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-26
Publication Date
2024-10-25
Estimated Expiration
2041-04-26

AI Technical Summary

Technical Problem

The accuracy of ship route prediction in ports is compromised due to varying topographical characteristics, making it difficult to determine whether a ship will approach a construction area and estimate the time of approach accurately.

Method used

A ship monitoring device and method that utilizes a trained model to predict ship routes based on past positional and type data, specifically tailored for each port's unique features, enhancing accuracy by learning ship movement characteristics.

Benefits of technology

Improves the accuracy of ship route prediction in ports, allowing for timely evacuation of work boats and ensuring safety and efficiency in construction operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007573479000001
    Figure 0007573479000001
  • Figure 0007573479000002
    Figure 0007573479000002
  • Figure 0007573479000003
    Figure 0007573479000003
Patent Text Reader

Abstract

To improve an accuracy of sea-route prediction of a ship in a port.SOLUTION: In a ship monitoring device 10, a processing unit 12 detects, for example, positional information and a ship type of a ship 2 entering a port A where marine construction is being carried out. Using a learned model 11a, the processing unit 12 predicts a sea-route of the ship 2 based on a detection result of the positional information and the ship type of the ship 2. This learned model 11a is generated by inputting the positional information and the ship type of each of a plurality of ships that has entered the port A in the past, and by learning a sea-route for each ship type.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a ship monitoring device, a ship monitoring method, and a ship monitoring program. [Background technology]

[0002] When a ship is navigating, it is possible to navigate safely by understanding the position, speed, and direction of other ships using AIS (Automatic Identification System) data and predicting the route of other ships. It is also being considered to automatically predict and estimate a ship's route. For example, an estimation system has been proposed that learns the motion characteristics of ships for each type of ship and, based on the learning results, estimates the ship's route in sections where track data has been lost.

[0003] On the other hand, in offshore construction work, it is also necessary to be on guard against ships approaching the construction area. When a ship approaches the construction area, measures are taken such as warning the ship or having the construction workboat evacuate. Technology for predicting ship routes is also useful for such purposes. As a related technology, for example, a support system has been proposed that uses AIS data from an entering ship to estimate the time when the ship will navigate around the construction site, and determines whether or not the workboat should evacuate from the construction site based on that time. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-185785 A [Patent Document 2] JP 2019-40329 A Summary of the Invention [Problem to be solved by the invention]

[0005] When construction work is carried out at a port, by predicting the route of a ship navigating the port, it is possible to determine whether the ship will approach the construction area and estimate the time of approach. In this case, it is important to accurately predict the ship's route at the port. However, if the ship's route is predicted taking into account the ship's motion characteristics as described above, there is a problem that the accuracy of the route prediction decreases depending on the port because the characteristics such as topography differ from port to port.

[0006] In one aspect, the present invention aims to provide a ship monitoring device, a ship monitoring method, and a ship monitoring program that can improve the accuracy of predicting ship routes in a port. [Means for solving the problem]

[0007] One proposal provides a ship monitoring device having the following processing unit: In this ship monitoring device, the processing unit detects the position information and ship type of a ship entering a port, and predicts the ship's route based on the detection results of the position information and ship type of the ship, using a trained model that has learned the route for each ship type using the input of the position information and ship type for each of a plurality of ships that have entered the port in the past.

[0008] Also, one proposal provides a vessel monitoring method in which a computer executes the same processing as the vessel monitoring device described above. Furthermore, in one proposal, a ship monitoring program is provided that causes a computer to execute the same processing as the above-mentioned ship monitoring device. Effect of the Invention

[0009] On the one hand, it will improve the accuracy of predicting ship routes in ports. [Brief description of the drawings]

[0010] [Figure 1] 1 is a diagram illustrating an example of a configuration and a processing example of a ship monitoring device according to a first embodiment. [Diagram 2]FIG. 11 is a diagram illustrating an example of the configuration of a vessel monitoring system according to a second embodiment. [Diagram 3] FIG. 2 illustrates an example of a hardware configuration of a monitoring server. [Figure 4] 2 is a diagram showing an example of the configuration of processing functions provided in each device in the ship monitoring system. FIG. [Diagram 5] FIG. 1 is a diagram for explaining the basic processing of a route prediction AI. [Figure 6] FIG. 13 is a diagram for explaining the port-specific route learning process. [Figure 7] FIG. 13 is a diagram for explaining the process of extracting ships to be monitored. [Figure 8] FIG. 13 is a diagram illustrating an example of a display process of a predicted position. [Figure 9] FIG. 13 is a diagram for explaining the processing that is performed when a monitored ship reaches a warning line. [Figure 10] FIG. 13 is a diagram for explaining the processing performed when a vessel to be monitored is predicted to enter a construction area. [Figure 11] FIG. 13 is a diagram showing an example of a process for determining completion of evacuation of a work vessel. [Figure 12] 13 is a flowchart illustrating an example of a monitoring target extraction process. [Figure 13] 13 is a flowchart (part 1) showing an example of a process for monitoring approach of a ship. [Figure 14] 11 is a flowchart (part 2) illustrating an example of a process for monitoring approaching ships. [Figure 15] 13 is a flowchart showing a modified example of the process for monitoring approach of a ship. [Figure 16] FIG. 11 is a diagram illustrating an example of the configuration of a vessel monitoring system according to a third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. First Embodiment Fig. 1 is a diagram showing an example of the configuration and processing of a ship monitoring device according to a first embodiment. The ship monitoring device 10 shown in Fig. 1 has a storage unit 11 and a processing unit 12. The storage unit 11 is realized, for example, as a storage area of ​​a storage device (not shown) included in the ship monitoring device 10. The processing unit 12 is realized, for example, as a processor (not shown) included in the ship monitoring device 10.

[0012] The memory unit 11 stores a trained model 11a for predicting a ship's route. The processing unit 12 predicts the route of a ship entering a specific port (assumed to be port A) using the trained model 11a. This allows the ship monitoring device 10 to predict the ship's route in port A. For example, when offshore construction work is being carried out in port A, the ship monitoring device 10 can predict the route of a ship that may approach the offshore construction site.

[0013] The trained model 11a is generated as follows. As shown in the upper part of Fig. 1, the position information and ship type of each of a plurality of ships that have arrived at the port in the past are input, and a route is trained for each ship type. The position information (absolute coordinates) and ship type of ships that have arrived at the port in the past, which is the same as the target of the route prediction, are used as input data for this training.

[0014] Here, by learning the route for each type of ship, it is possible to generate a trained model 11a that reflects the characteristics of the movement of each type of ship, for example. However, since the characteristics such as the topography differ depending on the port, the way the route (speed, direction, etc.) is taken by each type of ship and the way in which the port entry time is delayed differs.

[0015] In this embodiment, learning is performed using position information and ship type of past ships that have arrived at the same port A as the target of the route prediction, and a trained model 11a is generated. Then, using this trained model 11a, the route of a ship that will arrive at the same port A is predicted. This enables accurate route prediction according to the characteristics of port A.

[0016] The processing unit 12 of the ship monitoring device 10 performs a route prediction in the following procedure. As an example, it is assumed here that offshore construction work is being carried out at position 1 in port A, as shown in the lower left of Fig. 1. In this state, it is assumed that the processing unit 12 detects a ship 2 entering port A. The processing unit 12 then detects the position information and ship type of the ship 2. The position information and ship type of the ship 2 can be acquired, for example, from AIS data transmitted from the ship 2.

[0017] Next, the processing unit 12 uses the trained model 11a to predict the route of the ship 2 based on the position information and the ship type detection results for the ship 2. As an example of the predicted route, for example, the position 2a of the ship 2 after a predetermined time is predicted. Furthermore, the route prediction process is actually performed using data corresponding to the ship type of the ship 2 from among the data of the trained model 11a.

[0018] The above processing can improve the accuracy of ship route prediction in a port, for example, the accuracy of ship route prediction approaching a construction area in a port. Second Embodiment Next, a vessel monitoring system capable of calculating the time to evacuate a work vessel from a construction area by utilizing the route prediction process in the first embodiment will be described.

[0019] Fig. 2 is a diagram showing an example of the configuration of a ship monitoring system according to a second embodiment. The ship monitoring system shown in Fig. 2 includes a monitoring server 100, an on-site terminal 200, and an evacuation site terminal 300. The monitoring server 100, the on-site terminal 200, and the evacuation site terminal 300 are connected to each other via a network 400.

[0020] The monitoring server 100 is a server device that executes support processing to enable safe construction work when marine construction work such as bank protection work and dredging work is being carried out inside a port. Specifically, the monitoring server 100 monitors ships approaching the construction site, and calculates an appropriate evacuation time for the work ship to leave the construction site based on the monitoring results. The monitoring server 100 has, for example, a Web server function, and transmits display information to notify the on-site terminal 200 of various information such as the evacuation time.

[0021] Marine construction sites near ports are often close to ship routes, and in such cases, the safety of the ship route and construction workers is ensured by having work boats evacuate whenever a ship approaches the construction site. At such construction sites, the time to evacuate the work boat was determined by visually monitoring approaching ships or by referring to a schedule of ships entering and leaving the port. The monitoring server 100 automatically determines the time to evacuate such work boats, thereby improving work efficiency at the construction site while ensuring the safety of ship navigation and construction work.

[0022] The on-site terminal 200 is a terminal device installed on a work boat at a construction site or on a land facility near the construction site. An AIS receiver 201 and a display device 202 are connected to the on-site terminal 200.

[0023] The AIS receiver 201 is a device for receiving AIS data from ships sailing near the port, and includes an antenna for receiving the AIS data, a processing device for processing the signal received by the antenna, etc. The AIS data includes the ship's identification code, ship name, and position information (for example, absolute coordinate information such as latitude and longitude). The AIS receiver 201 transmits the received AIS data to the on-site terminal 200.

[0024] The on-site terminal 200 transmits the contents of the received AIS data to the monitoring server 100 as ship information about the ship detected sailing near the port. The monitoring server 100 predicts the route of the ship approaching the construction site based on the ship information received from the on-site terminal 200, and predicts the time the ship will pass near the construction site based on the prediction result. The monitoring server 100 calculates an appropriate evacuation start time based on the predicted time of the ship, taking into account the time it will take for the workboat to evacuate, and notifies the on-site terminal 200.

[0025] The AIS data is an example of information for acquiring ship information. For small ships that do not have an AIS data transmitter, ship information can be acquired by receiving, for example, Global Positioning System (GPS) information together with the ship's identification information.

[0026] The display device 202 displays the display information received from the monitoring server 100 and the like. The evacuation site terminal 300 is a terminal device installed near an evacuation site to which a workboat will retreat when retreating from a construction site. A camera 301 is connected to the evacuation site terminal 300. The camera 301 captures an image of the workboat entering the evacuation site. The evacuation site terminal 300 analyzes the captured image to determine whether the workboat has completed its movement to the evacuation site, and notifies the monitoring server 100 of the completion of the movement when the movement is completed. Note that the image analysis by the camera 301 is an example of a method for determining the completion of the movement of the workboat, and the completion of the movement of the workboat may be determined based on the GPS information of the workboat, for example.

[0027] Fig. 3 is a diagram showing an example of the hardware configuration of a monitoring server. The monitoring server 100 is realized, for example, as a computer as shown in Fig. 3. The monitoring server 100 shown in Fig. 3 includes a processor 101, a RAM (Random Access Memory) 102, a HDD (Hard Disk Drive) 103, a graphic interface (I / F) 104, an input interface (I / F) 105, a reader 106, and a communication interface (I / F) 107.

[0028] The processor 101 performs overall control of the entire monitoring server 100. The processor 101 is, for example, a central processing unit (CPU), a micro processing unit (MPU), a digital signal processor (DSP), an application specific integrated circuit (ASIC), or a programmable logic device (PLD). The processor 101 may also be a combination of two or more elements of a CPU, an MPU, a DSP, an ASIC, or a PLD.

[0029] The RAM 102 is used as a main storage device of the monitoring server 100. The RAM 102 temporarily stores at least a part of an OS (Operating System) program and application programs to be executed by the processor 101. The RAM 102 also stores various data necessary for processing by the processor 101.

[0030] The HDD 103 is used as an auxiliary storage device for the monitoring server 100. The OS program, application programs, and various data are stored in the HDD 103. Note that other types of non-volatile storage devices such as SSDs (Solid State Drives) can also be used as the auxiliary storage device.

[0031] A display device 104a is connected to the graphic interface 104. The graphic interface 104 displays an image on the display device 104a in accordance with an instruction from the processor 101.

[0032] An input device 105a is connected to the input interface 105. The input interface 105 transmits a signal output from the input device 105a to the processor 101. The input device 105a may be a keyboard or a pointing device. The pointing device may be a mouse, a touch panel, a tablet, a touch pad, a trackball, or the like.

[0033] A portable recording medium 106a is detachably attached to the reading device 106. The reading device 106 reads data recorded on the portable recording medium 106a and transmits it to the processor 101. The portable recording medium 106a may be an optical disk, a magneto-optical disk, a semiconductor memory, or the like.

[0034] The communication interface 107 transmits and receives data to and from other devices such as the on-site terminal 200 and the evacuation site terminal 300 via the network 400 . The above hardware configuration can realize the processing functions of the monitoring server 100. The on-site terminal 200 and the evacuation site terminal 300 can also be realized as computers having the configuration shown in FIG.

[0035] FIG. 4 is a diagram showing an example of the configuration of processing functions provided in each device in the ship monitoring system. First, the on-site terminal 200 includes a vessel information transmission unit 211 and an information display processing unit 212. The processing of the vessel information transmission unit 211 and the information display processing unit 212 is realized, for example, by a processor (not shown) included in the on-site terminal 200 executing a predetermined program.

[0036] The ship information transmission unit 211 acquires the AIS data received by the AIS receiver 201, generates ship information based on the AIS data, and transmits it to the monitoring server 100. The ship information includes at least the ship name, ship type (classification of ship), and location information. The ship information may further include the speed and direction of the ship.

[0037] The information display processing unit 212 receives display information from the monitoring server 100 and displays an image based on the display information on the display device 202. For example, the display information may show the position and predicted route of a detected ship. Information received from the monitoring server 100 includes nautical charts of the port area and information showing the evacuation start time of a work ship calculated based on the predicted time of ship passage near a construction site.

[0038] Next, the evacuation site terminal 300 includes an evacuation ship detection unit 311. The processing of the evacuation ship detection unit 311 is realized, for example, by a processor (not shown) included in the evacuation site terminal 300 executing a predetermined program. The evacuation ship detection unit 311 analyzes the image captured by the camera 301 to determine whether the movement of the work ship to the evacuation site has been completed, and notifies the monitoring server 100 of the completion of the movement when the movement has been completed. This determination function is realized, for example, by a ship identification AI that detects the type of ship and the position of the ship captured in the captured image.

[0039] Next, the monitoring server 100 includes a learning model storage unit 111, an entry / departure list storage unit 112, and a monitoring target storage unit 113. The learning model storage unit 111, the entry / departure list storage unit 112, and the monitoring target storage unit 113 are realized as storage areas of a storage device included in the monitoring server 100, such as the RAM 102, the HDD 103, etc.

[0040] The monitoring server 100 further includes a navigation history acquisition unit 121, a route learning unit 122, a ship information receiving unit 123, a monitoring target extraction unit 124, an approach monitoring processing unit 125, an information notification unit 126, and an evacuation monitoring processing unit 127. The processing of the navigation history acquisition unit 121, the route learning unit 122, the ship information receiving unit 123, the monitoring target extraction unit 124, the approach monitoring processing unit 125, the information notification unit 126, and the evacuation monitoring processing unit 127 is realized, for example, by the processor 101 included in the monitoring server 100 executing a predetermined program.

[0041] In the surveillance server 100, route prediction of a vessel that is a subject of surveillance is performed using a route prediction AI (Artificial Intelligence). The navigation history acquisition unit 121, the route learning unit 122, and the learning model storage unit 111 are provided as learning functions for generating a learning model of the route prediction AI. Meanwhile, the approach monitoring processing unit 125, which will be described later, is provided as an inference function for performing route prediction using the generated learning model.

[0042] The navigation history acquisition unit 121 acquires the past navigation history of the ship in the port where the construction work is to be carried out. The navigation history includes at least the type of ship, multiple positions (absolute coordinates) on the ship's wake, and information on the time corresponding to each position. In addition, the navigation history may also include the speed and direction at each position.

[0043] As this navigation history, AIS data transmitted from ships that have sailed in the past can be mainly used. In particular, since large ships are required to transmit AIS data, it is easy to obtain past AIS data as navigation history from, for example, a port manager. On the other hand, for ships that do not have the ability to transmit AIS data, such as small ships, GPS information detected by mobile devices (such as smartphones) held by crew members can be used. Some countries promote the collection and distribution of location information such as GPS information to ensure the safety of small ships, so it is also possible to use such location information as navigation history.

[0044] The route learning unit 122 generates a learning model by learning the ship's route using the acquired navigation history, and registers data (learning model data) indicating the generated learning model in the learning model storage unit 111. In this learning, the navigation history is classified by ship type, and the route is learned for each ship type. Therefore, learning model data is also generated by ship type and registered in the learning model storage unit 111.

[0045] The vessel information receiving unit 123 receives vessel information transmitted from the vessel information transmitting unit 211 of the on-site terminal 200 during the construction of the marine works. As described above, the vessel information includes at least the vessel name, vessel type, and position information. The vessel information may further include the vessel speed and direction.

[0046] The port entry / departure list memory unit 112 stores a port entry / departure list for the port where the construction work is to be carried out. The monitoring target extraction unit 124 compares the ships whose ship information has been received with the port entry / departure list in the port entry / departure list memory unit 112, and extracts from these ships those ships that may approach the construction site as monitoring targets. In this process, from the ships whose ship information has been received, ships that are scheduled to enter port within a specified period including the current time in the port entry / departure list are extracted as monitoring targets. Ship information about the extracted ships is registered in the monitoring target memory unit 113. Ship information about the ships that have been selected as monitoring targets is accumulated in the monitoring target memory unit 113.

[0047] The approach monitoring processing unit 125 monitors the movement of the monitored ship based on the ship information stored in the monitored ship storage unit 113. At this time, the approach monitoring processing unit 125 predicts the route of the monitored ship using the learning model data stored in the learning model storage unit 111. In this route prediction, learning model data corresponding to the type of ship is used. Furthermore, as a result of the route prediction, a predicted position of the ship after a predetermined time is output.

[0048] If the predicted position of the vessel after a predetermined time has approached beyond a predetermined warning line, the approach monitoring processing unit 125 warns the on-site terminal 200 of the approach of the vessel via the information notification unit 126. Furthermore, if the predicted position of the vessel after a predetermined time is included in a construction area that includes the construction site, the approach monitoring processing unit 125 calculates the evacuation start time for evacuation of the work vessel from the construction site based on the predicted arrival time of the vessel at the predicted position.

[0049] The information notification unit 126 transmits various display information to the on-site terminal 200 to display the information in response to requests from the approach monitoring processing unit 125 and the evacuation monitoring processing unit 127. For example, the information notification unit 126 transmits display information indicating the evacuation start time calculated by the approach monitoring processing unit 125 to the on-site terminal 200. In addition, based on the processing result of the approach monitoring processing unit 125, the information notification unit 126 can also transmit to the on-site terminal 200 display information indicating the position of the ship on a nautical chart and display information indicating the predicted position of the monitored ship on the nautical chart.

[0050] The evacuation monitoring processing unit 127 monitors whether evacuation to an evacuation location has been completed for a ship that has passed the calculated evacuation start time based on information from the evacuation site terminal 300, and if evacuation has been completed, causes the information notification unit 126 to send display information indicating the completion of evacuation.

[0051] However, it takes a certain amount of time to move a workboat from a construction site to a shelter. Therefore, when a ship approaches a construction site, it is desirable to determine the evacuation time taking into account the time it will take for the workboat to evacuate. In order to accurately determine such an evacuation time, it is important to be able to accurately predict the time when the ship will enter the construction area where the workboat needs to evacuate.

[0052] One possible method for predicting the ship's entry time is to refer to a port entry / departure list that lists the ship's entry / departure schedule. However, the actual entry / departure time of a ship often differs due to various reasons, such as the waiting status for a berth and weather, and the amount of the difference can be large. For example, there may be a wait for a berth that lasts for several hours. Therefore, it is difficult to accurately predict the time when a ship will enter a construction area using this method.

[0053] For this reason, in practice, a method is often used in which ships approaching the construction site are visually monitored to predict the time when the ship will enter the construction area. However, even with this method, it is difficult to accurately predict the time when the ship will enter. For this reason, for safety reasons, it is often the case that work ships are evacuated early to allow for extra time, but there is a problem in that evacuating early shortens the time available for construction work.

[0054] Therefore, in this embodiment, the route prediction AI is used to predict the route of a ship approaching a construction site. As described above, the route prediction AI predicts the route of the ship according to the movement status of the ship while navigating, using a learning model that has been trained in advance based on the past navigation history of the port where the construction work is being carried out. The route prediction AI will be described below with reference to Figures 5 and 6.

[0055] FIG. 5 is a diagram for explaining the basic processing of the route prediction AI. First, the learning process by the route learning unit 122 will be described. The route learning unit 122 generates a learning model by learning the ship's wake using the data of the navigation history (navigation history data) acquired by the navigation history acquisition unit 121. As described above, the navigation history data includes at least the type of ship, multiple positions (absolute coordinates) on the ship's wake, and information on the time corresponding to each position. However, it is assumed that at least n or more (n≧2) combinations of positions and times are registered in the navigation history data. This is because a predictor is trained that outputs a predicted position a predetermined time later for the input of the previous n pieces of position information.

[0056] The route learning unit 122 classifies the acquired navigation history data by the type of ship recorded (step S11). In the example of Fig. 5, it is assumed that the navigation history data is classified into three types of ship types. The route learning unit 122 uses each of the classified navigation history data to learn the track of each ship type individually (steps S12a to S12c).

[0057] In learning the ship wake, a learning model of the time series data is constructed, for example, using LSTM (Long-Short Term Memory), based on time series data including multiple (n or more) combinations of positions and times as described above. Through such learning, learning model data is generated that indicates a predictor that outputs a predicted position a predetermined time later in response to input information including the previous n combinations of positions and times. In this embodiment, as an example, learning model data is generated for a predictor that outputs a predicted position m1 seconds later and a predicted position m2 seconds later (where m2>m1). Such learning model data is generated for each ship type and registered in the learning model storage unit 111.

[0058] Next, route prediction (inference) using the generated learning model data will be described. A management table including a ship information record generated for each ship extracted as a monitoring target is registered in the monitoring target memory unit 113. The ship information record collectively registers the contents of the ship information transmitted from the on-site terminal 200 for each ship. Therefore, the ship information record registers at least one combination of position (absolute coordinates) and time in association with the ship name and ship type.

[0059] In this embodiment, when a ship to be monitored is extracted, the approach monitoring processing unit 125 starts predicting the ship's route. As shown in Fig. 5, when predicting the route of a ship, the approach monitoring processing unit 125 refers to the ship information record 113a corresponding to the ship. The approach monitoring processing unit 125 determines the ship type based on the ship information record 113a (step S21).

[0060] Next, the approach monitoring processing unit 125 selects and reads out the learning model data corresponding to the determined ship type from the learning model storage unit 111. At the same time, the approach monitoring processing unit 125 reads out the most recent n combinations of position and time from the ship information record 113a, and inputs the read out data into a predictor constructed using the selected learning model data to perform route prediction (inference) (step S22). This route prediction outputs a predicted position of the ship a predetermined time after the current time. In this embodiment, a predicted position m1 seconds after the current time and a predicted position m2 seconds after the current time are output.

[0061] In this way, by learning the ship's trajectory for each type of ship using navigation history data, it is possible to generate a highly accurate route predictor. As described above, the predictor only needs to receive information on the most recent n positions. These n positions do not need to be detected at equal time intervals. This is because AIS data is not transmitted at equal time intervals. However, for example, if the ship information includes speed or speed and direction in addition to position and time, position information detected at regular time intervals may be generated pseudo-wise by an interpolation calculation based on this information. In this case, the navigation history data also includes speed or speed and direction in addition to position and time, and position information detected at regular time intervals is generated pseudo-wise by an interpolation calculation based on this information, and learning is performed using the generated position information.

[0062] Furthermore, when learning and route prediction are performed, at least one of speed and direction may be included as input data in addition to position and time, and learning and route prediction may be performed using this information as well. This can improve the accuracy of route prediction compared to when only position and time are used.

[0063] For example, when both speed and direction are used, n or more combinations of position, time, speed, and direction are recorded in the navigation history data input to the route learning unit 122, and learning is performed using such navigation history data. In addition, the approach monitoring processing unit 125 extracts the most recent n combinations of position, time, speed, and direction from the input ship information record, and performs route prediction.

[0064] FIG. 6 is a diagram for explaining the route learning process for each port. As described above, the learning model predicts the ship's route by learning past tracks. Therefore, the prediction result depends on the track, which is the teaching data, and this track depends heavily on the shape and topography of the port and the destination. Therefore, in this embodiment, a learning model for route prediction in each port is individually generated using navigation history data for each port.

[0065] FIG. 6 illustrates an example in which learning is performed separately for each of ports H1 and H2. The route learning unit 122 learns the track for each ship type using navigation history data for ships that have navigated near port H1. This generates learning model data for each ship type for port H1. The route learning unit 122 also learns the track for each ship type using navigation history data for ships that have navigated near port H2. This generates learning model data for each ship type for port H2.

[0066] For the navigation history data corresponding to port H1, it is possible to obtain data collected by, for example, the administrator of port H1. Similarly, for the navigation history data corresponding to port H2, it is possible to obtain data collected by, for example, the administrator of port H2.

[0067] Furthermore, the navigation history acquisition unit 121 may extract navigation history data corresponding to ports H1 and H2, respectively, from navigation history data collected from all over the country, based on the position information (absolute coordinates) described in the navigation history data. For example, the range of an area including port H1 (hereinafter referred to as the "first range") and the range of an area including port H2 (hereinafter referred to as the "second range") are set in advance. The navigation history acquisition unit 121 extracts only data whose position indicated by the position information falls within the first range from the collected navigation history data, and uses the extracted data to learn about port H1. Similarly, the navigation history acquisition unit 121 extracts only data whose position indicated by the position information falls within the second range from the collected navigation history data, and uses the extracted data to learn about port H2.

[0068] In this way, by learning individually for each port using the navigation history data of ships that have sailed near each port, a learning model can be generated that is capable of predicting routes that match the shape and topography of the port, and this learning model can be used to perform highly accurate route predictions.

[0069] Next, a process for calculating the evacuation time of a workboat using the above-mentioned route prediction AI will be described with reference to Figs. Fig. 7 is a diagram for explaining the extraction process of a vessel to be monitored. The nautical chart 130 shown in Fig. 7 shows the vicinity of a certain port. The construction zone Z1 shown by a dashed circle is an area that includes a construction site, and indicates an area where work boats need to evacuate if a vessel enters. For example, the construction zone Z1 is defined as a circle with a specified radius centered on the construction site.

[0070] 7 is an area for extracting candidate ships to be monitored, and is set to include at least the area near the entrance to the harbor through which ships sailing from the open sea to the vicinity of the construction area Z1 pass. The setting position of the setting area Z2 may be changed depending on the position of the construction area Z1.

[0071] The monitoring target extraction unit 124 extracts ship information whose location indicated by the location information is included in the set area Z2 from among the ship information received by the ship information receiving unit 123 within a certain period of time. The monitoring target extraction unit 124 compares the ship name described in each extracted ship information with the ship name of a ship (arriving ship) scheduled to enter port listed in the port entry / departure list 112a in the port entry / departure list storage unit 112. At this time, among the entering ships listed in the port entry / departure list 112a, the entering ships whose scheduled port entry time falls within a certain period including the current time are the objects of comparison. As this certain period, for example, a period starting from several days before the current time is used, taking into account delays in the port entry time. The monitoring target extraction unit 124 extracts the ship name that matches the ship name of the entering ship to be compared from among the ship names described in each extracted ship information. In this way, the ships to be monitored are extracted.

[0072] In the example of Figure 7, ships 131 to 135 located within the set area Z2 are extracted based on the received ship information. Furthermore, it is assumed that ships 131 and 132 are newly extracted as monitoring targets by checking against the port entry / departure list 112a. In this case, ship information records corresponding to the ships 131 and 132 respectively are registered in the management table stored in the monitoring target storage unit 113. The ship information records register the ship name, ship type, position and time based on the ship information of the corresponding ship.

[0073] By registering such a ship information record, the corresponding ship is set as a monitoring target (a target for tracking), and prediction of the ship's position after a certain time period begins. In practice, each time ship information for the same ship is received after the ship information record is registered, the position and time contained in the ship information are additionally registered in the ship information record. Then, when a predetermined number or more combinations (n ​​or more sets) of positions and times have been registered, position prediction begins.

[0074] 8 is a diagram showing an example of the display process of the predicted position. As described above, the approach monitoring processing unit 125 calculates each predicted position m1 seconds and m2 seconds after the current time. At this time, display information showing each predicted position of the monitored ship m1 seconds and m2 seconds after is generated on the nautical chart 130 and transmitted to the on-site terminal 200. Based on the received display information, the on-site terminal 200 causes the display device 202 to display an image of the nautical chart 130 showing each predicted position. This allows the predicted course to be displayed in an easy-to-understand format.

[0075] In this embodiment, in addition to the predicted position, a "forecast circle" indicating a certain range centered on the predicted position is displayed as an example. In Fig. 8, as an example, the predicted positions and forecast circles for each of the ships 131 and 132 are shown. For example, for the ship 132, a predicted position 132a after m1 seconds and a predicted position 132b after m2 seconds are shown. Furthermore, a forecast circle 132a1 centered on the predicted position 132a and a forecast circle 132b1 centered on the predicted position 132b are shown.

[0076] The forecast circle indicates the range of the position predicted with a certain probability or higher in m1 seconds and m2 seconds. For example, the forecast circle corresponding to the predicted position in m1 seconds indicates the range in which the actual ship's position in m1 seconds will be included with a probability of approximately 95% or higher. Also, the forecast circle corresponding to the predicted position in m2 seconds indicates the range in which the actual ship's position in m2 seconds will be included with a probability of approximately 90% or higher.

[0077] Here, the size of the forecast circle corresponding to the predicted position m1 seconds later and m2 seconds later may be different depending on the type of ship, for example. This is because the accuracy of the predicted position differs due to different characteristics during movement depending on the type of ship. For example, tankers often sail on a predetermined route, but tugboats frequently change their course depending on the content of the work, so their route is more difficult to predict than that of tankers. Therefore, the size of the forecast circle for a tugboat after a predetermined time is displayed larger than that of a tanker. For example, the radius of the forecast circle corresponding to the predicted position m1 seconds later is set to 25 m for tankers and 50 m for tugboats. Also, the radius of the forecast circle corresponding to the predicted position m2 seconds later is set to 60 m for tankers and 120 m for tugboats.

[0078] In the above example, when route prediction for a vessel to be monitored is started, the predicted positions m1 seconds and m2 seconds later are displayed on the nautical chart along with the forecast circles corresponding to each predicted position. The following methods may be adopted for displaying such predicted positions and forecast circles. For example, when the predicted position of a vessel (e.g., predicted position m2 seconds later) exceeds a warning line described below, the display of the forecast circle may be started in addition to the predicted position. Furthermore, for a vessel to be monitored whose predicted position exceeds the warning line, the predicted position and forecast circle may be displayed more emphatically than for other vessels. Furthermore, the display method of the predicted position and forecast circle, or whether or not to display them, may be changed depending on the type of vessel and the characteristics of the vessel's movement. As an example, the forecast circle may be displayed only for vessels with a relatively high risk, such as vessels whose speed is above a threshold or vessels whose size is above a certain level.

[0079] Fig. 9 is a diagram for explaining the processing when a monitored ship reaches a warning line. The approach monitoring processing unit 125 monitors whether the predicted position of the ship after a predetermined time has crossed a warning line set in advance on a nautical chart. As illustrated in Fig. 9, the warning line L1 is a line for identifying a ship approaching the construction zone Z1, and is set so as to cross the route taken by a ship sailing from the open sea toward the construction zone Z1. "Crossing the warning line L1" means that the predicted position of the ship crosses the warning line L1 and moves in a direction closer to the construction zone Z1.

[0080] When the predicted position of the vessel crosses the warning line L1, the approach monitoring processing unit 125 issues a warning to the on-site terminal 200 via the information notification unit 126. This makes it possible to notify the user of the on-site terminal 200 that the vessel is approaching the construction zone Z1. As a method of warning, for example, as shown in Fig. 9, a warning display image 141 warning that the vessel is approaching the construction site is superimposed on the nautical chart 130 displaying the vessel's predicted position and forecast circle. The warning display image 141 may include information such as the vessel name and line type of the approaching vessel.

[0081] Whether or not the warning line L1 has been crossed may be determined, for example, using the predicted position m2 seconds later. In the example of Fig. 9, a predicted position 132a of the ship 132 in m1 seconds and a predicted position 132b in m2 seconds are displayed, and the case where the predicted position 132b has crossed the warning line L1 is shown.

[0082] 10 is a diagram for explaining the process when the vessel to be monitored is predicted to enter the construction zone. When the predicted position of the vessel after a predetermined time is included in the construction zone Z1, the approach monitoring processing unit 125 calculates the evacuation start time for the work vessel to evacuate from the construction site based on the predicted arrival time of the vessel at the predicted position.

[0083] As the predicted position for determining whether or not the vessel 132 is included in the construction zone Z1, for example, the predicted position m2 seconds later may be used. In the example of Fig. 10, a predicted position 132a of the vessel 132 in m1 seconds and a predicted position 132b of the vessel 132 in m2 seconds are displayed, and the case where the predicted position 132b is included in the construction zone Z1 is shown.

[0084] Here, the time it takes for the work vessel to complete evacuation to the designated evacuation location from when it starts evacuation is t. Also, the time when the predicted position is included in the work zone Z1 is T1. In this case, the evacuation start time T2 is calculated according to the following formula (1). T2 = T1 - t (1) The approach monitoring processing unit 125 calculates the evacuation start time T2 according to formula (1) and notifies and displays it on the on-site terminal 200 via the information notification unit 126. This makes it possible to notify the user of the on-site terminal 200 of the time to evacuate the workboat. As a method for displaying the evacuation start time T2, for example, as shown in Fig. 10, a method can be adopted in which a time display image 142 showing the evacuation start time T2 is superimposed on the screen of a nautical chart 130 showing the predicted position, etc.

[0085] Furthermore, assuming that the current time is T0, when the condition of the following formula (2) is satisfied, the current time reaches the evacuation start time T2, and immediate evacuation of the workboat is required. Therefore, when the condition of formula (2) is satisfied, the approach monitoring processing unit 125 instructs the on-site terminal 200 to start evacuation of the workboat via the information notification unit 126. Although not shown, this instruction is given, for example, by displaying an instruction image showing the wording instructing to start evacuation. T0+t≦T2 (2) By the above procedure, an appropriate evacuation start time that takes into account the time it takes for the workboat to evacuate can be calculated and notified to the user of the on-site terminal 200. To calculate such an evacuation start time, as described above, a highly accurate route prediction is performed using a learning model that is generated by learning using the navigation history in the port where the construction site is located and that is learned for each ship type. This makes it possible to improve the accuracy of the calculation of the evacuation start time.

[0086] In the above examples of Figures 7 to 10, when a vessel to be monitored is extracted, a process for predicting the vessel's position after a predetermined time is started. However, as another example, the process for predicting the vessel's position may not be started when the vessel to be monitored is extracted. In this case, for example, the process for predicting the vessel's position may be started when the actual vessel to be monitored crosses the warning line L1.

[0087] 11 is a diagram showing an example of a process for determining whether evacuation of a workboat is complete. The evacuation monitoring processing unit 127 monitors whether evacuation to an evacuation site has been completed for a ship that has passed the calculated evacuation start time, based on information from the evacuation site terminal 300. The evacuation ship detection unit 311 of the evacuation site terminal 300 determines whether evacuation of the ship to the evacuation site has been completed, based on an image captured by the camera 301, for example.

[0088] The camera image 150 shown in Fig. 11 is an example of an image obtained by capturing an image of an area including an evacuation location with the camera 301. The evacuation ship detection unit 311 detects an area in which a ship is captured from the camera image 150, for example, by image recognition processing, and determines the type of ship. When the evacuation ship detection unit 311 detects a work ship as a ship, it identifies the area in the camera image 150 in which the work ship is captured (ship area). The example in Fig. 11 shows a case in which a work ship 151 captured in the camera image 150 is detected, and the ship area 152 for the work ship 151 is represented by a rectangle.

[0089] Meanwhile, a set area 153 indicating the evacuation location is set in advance in the camera image 150. In the example of Fig. 11, the set area 153 is set as a rectangular area. The evacuation ship detection unit 311 determines that the evacuation of the work ship 151 to the evacuation location is completed, for example, when at least a part of the detected ship area 152 is included in the set area 153. For example, when the ratio of the area of ​​the ship area 152 that overlaps with the set area 153 is equal to or greater than a predetermined ratio, the evacuation of the work ship 151 is determined to be completed.

[0090] When the evacuation vessel detection unit 311 determines that the evacuation of the work vessels is complete, it notifies the monitoring server 100 of that effect. Upon receiving this notification, the evacuation monitoring processing unit 127 of the monitoring server 100 causes the information notification unit 126 to transmit display information indicating the completion of evacuation to the on-site terminal 200. This allows the user of the on-site terminal 200 to reliably recognize that the evacuation of the work vessel that was instructed to evacuate has subsequently been completed, improving work efficiency.

[0091] The image recognition described above is an example for determining whether the evacuation of the work boat is complete, and is not limited thereto. For example, the evacuation completion may be determined based on GPS information of the work boat.

[0092] Next, the processing of the monitoring server 100 will be described with reference to a flowchart. FIG. 12 is a flowchart illustrating an example of the monitoring target extraction process. [Step S31] The monitoring target extraction unit 124 acquires ship information received by the ship information receiving unit 123 within a recent fixed period of time.

[0093] [Step S32] The monitoring target extraction unit 124 extracts, from the acquired ship information, ship information in which the position of the ship indicated by the position information is included in a predetermined area (the above-mentioned set area Z2). [Step S33] The monitoring target extraction unit 124 refers to the port entry / departure list 112a and extracts, from the ship information extracted in step S32, the ship information of arriving ships whose scheduled port entry times fall within a certain period including the current time.

[0094] [Step S34] The monitoring target extraction unit 124 generates new ship information records for the ship information of ships extracted in step S33 whose ship information records are not registered in the management table of the monitoring target storage unit 113, and registers them in the management table. The monitoring target extraction unit 124 registers the contents described in the ship information in this management table. As a result, the ship information records of the ships extracted as new monitoring targets are registered in the management table of the monitoring target storage unit 113.

[0095] In addition, at least the ship name, ship type, position, and time information are registered in the ship information record. In the following explanation, information including position and time among these information is referred to as "measured position information." For example, if direction and speed are used in addition to position and time during learning, the direction and speed information extracted from the ship information is also registered in the measured position information of the ship information record. In this case, in addition to the position and time information, the direction and speed information are also additionally registered in the measured position information in the processing of Figures 13 and 14 below.

[0096] 13 and 14 are flowcharts showing an example of a process for monitoring approaching ships. The processes in Fig. 13 and 14 are executed for a ship that is newly extracted as a monitoring target when the ship information record for that ship is registered in the management table of the monitoring target storage unit 113.

[0097] [Step S41] The approach monitoring processing unit 125 waits to receive the next ship information about the ship to be monitored. If the next ship information is received within a certain period of time, the process proceeds to step S42. On the other hand, if the next ship information is not received within the certain period of time, the corresponding ship is excluded from the monitoring targets, and the approach monitoring process ends.

[0098] [Step S42] The approach monitoring processing unit 125 extracts the measured position information from the received next ship information, and adds it to the ship information record of the ship to be monitored. As described above, the measured position information includes at least the position and time information.

[0099] [Step S43] The process of step S43 is executed when n or more sets of measured position information are registered in the ship information record. When there are fewer than n sets of measured position information registered in the ship information record, the process proceeds to step S41, and the process waits for reception of the next ship information.

[0100] In step S43, the approach monitoring processing unit 125 acquires learning model data corresponding to the ship type registered in the ship information record from the learning model data registered in the learning model storage unit 111. The approach monitoring processing unit 125 also extracts the most recent n sets of measured position information from the ship information record, and executes a route prediction process using the acquired learning model data with the extracted measured position information as input. This outputs the predicted positions (absolute coordinates) of the ship m1 seconds and m2 seconds later.

[0101] [Step S44] A process is executed to display the output predicted position on the on-site terminal 200. For example, the approach monitoring processing unit 125 generates display information of an image showing the predicted position and forecast circle m1 seconds and m2 seconds later on a nautical chart, and passes it to the information notification unit 126 to request transmission to the on-site terminal 200. The information notification unit 126 transmits the display information to the on-site terminal 200 in response to the request. The information display processing unit 212 of the on-site terminal 200 causes the display device 202 to display an image based on the received display information.

[0102] [Step S45] The approach monitoring processing unit 125 determines whether the predicted position after a predetermined time (here, after m2 seconds) has crossed the warning line (see FIG. 9). If the predicted position has crossed the warning line, the process proceeds to step S46. On the other hand, if the predicted position has not crossed the warning line, the process proceeds to step S41, and the process waits for reception of the next ship information.

[0103] [Step S46] A warning process is executed for the on-site terminal 200. For example, the approach monitoring processing unit 125 superimposes a warning display image indicating that a vessel is approaching on the image displayed in step S44. Display information of the image on which such a warning display image is superimposed is transmitted from the information notifying unit 126 to the on-site terminal 200, and an image based on the display information is displayed on the display device 202.

[0104] [Step S47] The approach monitoring processing unit 125 determines whether the predicted position after a predetermined time (here, m2 seconds) is within the construction zone (the above-mentioned construction zone V1). If the predicted position is within the construction zone, the process proceeds to step S48. On the other hand, if the predicted position is not within the construction zone, the process proceeds to step S41, and the process waits for reception of the next ship information.

[0105] [Step S48] The approach monitoring processor 125 calculates the evacuation start time T2 of the work vessel using the above-mentioned formula (1) based on the time t required for evacuation completion and the time T1 m2 seconds after the current time.

[0106] [Step S49] The approach monitoring processing unit 125 determines whether the current time T0 has reached the calculated evacuation start time T2. If the condition of the above-mentioned formula (2) is satisfied, it is determined that the current time T0 has reached the evacuation start time T2. If the evacuation start time has been reached, the process proceeds to step S51. If the evacuation start time has not been reached, the process proceeds to step S50.

[0107] [Step S50] A process is executed to notify the on-site terminal 200 of the evacuation start time T2. For example, the approach monitoring processing unit 125 superimposes a time display image indicating the calculated evacuation start time T2 on the image displayed in step S44. Display information of the image on which such a time display image is superimposed is transmitted from the information notification unit 126 to the on-site terminal 200, and an image based on the display information is displayed on the display device 202. In this case, the warning display image of step S46 does not need to be displayed. When the above process of step S50 is completed, the process proceeds to step S41 and the process waits for reception of the next ship information.

[0108] [Step S51] A process is executed to instruct the on-site terminal 200 to start evacuation of the workboats. For example, the approach monitoring processing unit 125 superimposes an instruction image instructing the workboats to start evacuation on the image displayed in step S44. Display information of the image on which such an instruction image is superimposed is transmitted from the information notification unit 126 to the on-site terminal 200, and an image based on the display information is displayed on the display device 202. In this case, the warning display image of step S46 does not need to be displayed.

[0109] [Step S52] When the processing of step S51 is completed, the monitoring processing by the evacuation monitoring processing unit 127 is started. In this monitoring processing, the evacuation completion information transmitted from the evacuation site terminal 300 is monitored. When the evacuation ship detection unit 311 of the evacuation site terminal 300 detects that the evacuation of the workboat to the evacuation site is completed, the evacuation completion information is transmitted to the monitoring server 100. When the evacuation completion information is received by the evacuation monitoring processing unit 127, the processing proceeds to step S53.

[0110] [Step S53] The evacuation monitoring processing unit 127 generates display information for an image indicating that the evacuation of the workboat has been completed, and transmits this to the on-site terminal 200 via the information notifying unit 126. This notifies the on-site terminal 200 of the completion of the evacuation. The information display processing unit 212 of the on-site terminal 200 causes the display device 202 to display an image based on the received display information.

[0111] Incidentally, a part of the process in Fig. 13 can be modified as shown in Fig. 15. Fig. 15 differs from Fig. 13 in that the ship's course prediction starts when the current position of the ship crosses the warning line.

[0112] Fig. 15 is a flowchart showing a modified example of the process for monitoring approaching ships. In Fig. 15, the same reference numerals are used to denote process steps having the same process contents as those in Fig. 13. In the modified example shown in Fig. 15, the following process of steps S61 to S63 is executed instead of steps S43 to S46 shown in Fig. 13.

[0113] [Step S61] The approach monitoring processing unit 125 determines whether the current position of the monitored ship has crossed the warning line. If the current position of the monitored ship has crossed the warning line, the process proceeds to step S62. On the other hand, if the current position of the monitored ship has not crossed the warning line, the process proceeds to step S41, where the process waits for reception of the next ship information.

[0114] [Step S62] The approach monitoring processing unit 125 acquires learning model data corresponding to the ship type registered in the ship information record from the learning model data registered in the learning model storage unit 111. The approach monitoring processing unit 125 also extracts the most recent n sets of measured position information from the ship information record, and executes a route prediction process using the acquired learning model data with the extracted measured position information as input. This outputs the predicted positions (absolute coordinates) of the ship m1 seconds and m2 seconds later.

[0115] [Step S63] A process is executed to display the output predicted position on the on-site terminal 200. For example, the approach monitoring processing unit 125 generates display information of an image showing the predicted position and forecast circle m1 seconds and m2 seconds later on a nautical chart, and passes it to the information notification unit 126 to request transmission to the on-site terminal 200. The information notification unit 126 transmits the display information to the on-site terminal 200 in response to the request. The information display processing unit 212 of the on-site terminal 200 causes the display device 202 to display an image based on the received display information.

[0116] Third embodiment In the above second embodiment, the learning function and the inference function for the route prediction AI are provided in the same device, the monitoring server 100, but they may be provided in different devices. For example, as shown in the following Figure 16, the inference function may be provided in an on-site terminal.

[0117] Fig. 16 is a diagram showing an example of the configuration of a ship monitoring system according to a third embodiment. In Fig. 16, the same components as those in Fig. 4 are denoted by the same reference numerals, and their explanation will be omitted. As shown in Fig. 16, the ship monitoring system according to the third embodiment includes a learning server 500, an on-site terminal 200a, and an evacuation site terminal 300.

[0118] The learning server 500 is a server device that has only the learning function of the route prediction AI among the processing functions of the monitoring server 100 in Fig. 4. That is, the learning server 500 has a learning model storage unit 111, a navigation history acquisition unit 121, and a route learning unit 122.

[0119] The on-site terminal 200a is a terminal device that further provides the functions of monitoring ships, calculating the evacuation start time of work ships, and monitoring the evacuation of work ships, in addition to the on-site terminal 200 in Fig. 4. Therefore, the on-site terminal 200a also has an inference function of a route prediction AI. As shown in Fig. 16, the on-site terminal 200a includes a learning model storage unit 111a, a port entry / departure list storage unit 112, a monitoring target storage unit 113, a monitoring target extraction unit 124, an approach monitoring processing unit 125, an evacuation monitoring processing unit 127, a ship information acquisition unit 211a, and an information display processing unit 212a.

[0120] The learning model data generated by learning in the learning server 500 and registered in the learning model storage unit 111 is copied from the learning model storage unit 111 and registered in the learning model storage unit 111a. Therefore, the route prediction process by the approach monitoring processing unit 125 is executed using the learning model data registered in the learning model storage unit 111a.

[0121] The ship information acquisition unit 211a acquires AIS data received by the AIS receiver 201, generates ship information based on the AIS data, and passes it to the monitoring target extraction unit 124. The information display processing unit 212a receives display information from the approach monitoring processing unit 125 and the evacuation monitoring processing unit 127, and causes the display device 202 to display an image based on the display information.

[0122] The processing functions of the devices shown in each of the above embodiments (for example, the ship monitoring device 10, the monitoring server 100, the on-site terminals 200, 200a, the evacuation site terminal 300, and the learning server 500) can be realized by a computer. In this case, a program describing the processing contents of the functions that each device should have is provided, and the above processing functions are realized on the computer by executing the program on a computer. The program describing the processing contents can be recorded on a computer-readable recording medium. Examples of computer-readable recording media include magnetic storage devices, optical disks, and semiconductor memories. Examples of magnetic storage devices include hard disk drives (HDDs) and magnetic tapes. Examples of optical disks include CDs (Compact Discs), DVDs (Digital Versatile Discs), and Blu-ray Discs (BD, registered trademark).

[0123] When distributing a program, for example, the program is recorded on a portable recording medium such as a DVD or CD and then sold. The program can also be stored in a storage device of a server computer and transferred from the server computer to other computers via a network.

[0124] A computer that executes a program stores, for example, a program recorded on a portable recording medium or a program transferred from a server computer in its own storage device. The computer then reads the program from its own storage device and executes processing according to the program. The computer can also read the program directly from a portable recording medium and execute processing according to the program. The computer can also execute processing according to the received program each time a program is transferred from a server computer connected via a network. [Explanation of symbols]

[0125] 1,2a position 2 ships 10 Ship monitoring equipment 11 Storage section 11a Pre-trained model 12 Processing section A port

Claims

1. Detecting the location and type of ships entering the port, a processing unit that predicts a ship's route based on the detection results of the position information and ship type of the ship using a trained model that has learned a route for each ship type using input of position information and ship type of each of a plurality of ships that have entered the port in the past; A ship monitoring device having the same.

2. The trained model is generated by learning using a predetermined number or more of position information for each of the plurality of entering ships as input, The processing unit predicts a course of the ship based on the predetermined number of pieces of position information about the ship.

2. A vessel monitoring device according to claim 1.

3. The processing unit outputs a predicted position of the ship at each of a plurality of times after a current time in predicting the ship's course.

3. A vessel monitoring device according to claim 1 or 2.

4. The processing unit further outputs display information of an image showing the predicted position at each of the plurality of times on a nautical chart.

4. A vessel monitoring device according to claim 3.

5. The processing unit, in predicting the ship's course, predicts the position of the ship a predetermined time from the current time, and outputs display information of an image showing a forecast circle indicating a range of the ship's position predicted with a predetermined probability or higher on a nautical chart.

3. A vessel monitoring device according to claim 1 or 2.

6. The position information and ship type for each of the plurality of incoming ships are obtained from AIS (Automatic Identification System) data transmitted from the plurality of incoming ships in the vicinity of the port; A vessel monitoring device according to any one of claims 1 to 5.

7. The processing unit further calculates an arrival time when the ship will arrive at a predetermined area of ​​the port based on a prediction result of the ship's route, and calculates a time to evacuate the ship from the predetermined area based on the arrival time. A vessel monitoring device according to any one of claims 1 to 6.

8. The computer Detecting the location and type of ships entering the port, predicting the ship's route based on the detection results of the position information and ship type of the ship using a trained model that has learned a route for each ship type using input of position information and ship type of each of a plurality of ships that have entered the port in the past; Ship monitoring method.

9. On the computer, Detecting the location and type of ships entering the port, predicting the ship's route based on the detection results of the position information and ship type of the ship using a trained model that has learned a route for each ship type using input of position information and ship type of each of a plurality of ships that have entered the port in the past; A ship monitoring program that causes the processing to be performed.

Citation Information

Patent Citations

  • Collision prevention method and device

    JP1998288663A

  • Traffic control support system

    JP2018036958A

  • Work ship support system and patrol ship support system

    JP2019040329A

  • Lost track data estimation system of marine vessel using machine learning

    JP2019185785A

  • Construction ship operation management system

    JP2019204396A