Maintenance response timing suggestion device, maintenance response timing method, and maintenance response timing suggestion program

The maintenance response time suggestion device uses machine learning to automate preventive maintenance planning for network devices, enhancing accuracy and reducing response time gaps.

JP7575714B2Active Publication Date: 2024-10-30NIPPON TELEGRAPH & TELEPHONE CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023539555
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-08-06
Publication Date
2024-10-30
Estimated Expiration
2041-08-06

AI Technical Summary

Technical Problem

Existing technologies for allocating human resources for preventive maintenance of network devices require manual estimation and cannot automate the creation of implementation plans.

Method used

A maintenance response time suggestion device that utilizes a machine learning engine to analyze sign detection information and resource usage plans to automatically determine the optimal timing and method for preventive maintenance of network devices.

Benefits of technology

Enables automated formulation of preventive maintenance plans without human intervention, improving accuracy and reducing the time gap between detection and response to device malfunctions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007575714000001
    Figure 0007575714000001
  • Figure 0007575714000002
    Figure 0007575714000002
  • Figure 0007575714000003
    Figure 0007575714000003
Patent Text Reader

Abstract

A maintenance time proposing device 1 for proposing a time to conduct preventive maintenance against device failure, the maintenance time proposing device 1 comprising: a sign reception unit 11 that receives sign detection information representing a sign of device failure detected; a resource reception unit 14 that receives resource use planning information indicating a plan of a use purpose and use time of personnel and material resources associated with a predicted period of occurrence of the device failure; a resource estimation unit 15 that, on the basis of the use purpose and a use period of the personnel and material resources, inputs the use purpose and use time of the personnel and material resources included in the resource use planning information to a machine learning engine that generates transient data of the use amount of the personnel and material resources and performs machine learning, to estimate and calculate transient data of the use amount of the personnel and material resources associated with the predicted period of occurrence of the device failure; and a measure-taking determination unit 17 that determines a time and method to take measures against the device failure, on the basis of the sign detection information and the transient data of the use amount of the personnel and material resources.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a maintenance timing proposal device, a maintenance timing proposal method, and a maintenance timing proposal program. [Background technology]

[0002] Some network devices such as servers, routers, and switches are equipped with a function to acquire and transmit detailed internal device status in real time, based on technologies such as telemetry used for monitoring and managing network infrastructure. By acquiring detailed internal device status using this function, network monitors and managers can grasp signs of failures and other issues, and can carry out preventive maintenance of the devices.

[0003] It is preferable to carry out preventive maintenance of equipment at a convenient time when there are spare human and material resources, rather than dealing with the symptoms of equipment failure immediately. In other words, preventive maintenance of equipment should be carried out at a time when there are fewer plans to use human and material resources. For this reason, a scheduling support technology that efficiently allocates human resources based on given conditions is known (Non-Patent Document 1). [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] Chen, et al., "Proposal of a method to support planning tasks using Gantt charts and RPA," Japan Society for Management Information 2020 National Research Presentation Conference, November 7-8, 2020, pp.148-151, [online], [Retrieved July 15, 2021], Internet<URL : https: / / www.jstage.jst.go.jp / article / jasmin / 202011 / 0 / 202011_148 / _pdf / -char / ja> Summary of the Invention [Problem to be solved by the invention]

[0005] However, Non-Patent Document 1 is merely a technology for allocating human resources, and the prerequisite task of estimating the amount of human resources used must be performed manually. Therefore, it is not possible to completely automate the creation of an implementation plan for preventive maintenance of equipment.

[0006] The present invention has been made in consideration of the above-mentioned circumstances, and an object of the present invention is to provide a technology that can automatically, without human intervention, develop an implementation plan for preventive maintenance of an equipment in response to signs of equipment malfunction, such as a breakdown or failure. [Means for solving the problem]

[0007] A maintenance response timing proposal device according to one embodiment of the present invention is a maintenance response timing proposal device that proposes the timing of preventive maintenance response to equipment malfunctions, and includes: an indication receiving unit that receives indication detection information that detects indications of an equipment malfunction; a resource receiving unit that receives resource usage plan information that indicates plans for the use and timing of use of human and physical resources related to the predicted period during which the equipment malfunction is to occur; a resource estimation unit that estimates and calculates transition data of the usage of human and physical resources related to the predicted period during which the equipment malfunction is to occur by inputting the use and timing of use of the human and physical resources included in the resource usage plan information into a machine learning engine that generates transition data of the usage amount of human and physical resources based on the use and duration of the human and physical resources and performing machine learning on the inputted information; and a countermeasure determination unit that determines the timing and method for dealing with the equipment malfunction based on the indication detection information and the transition data of the usage amount of the human and physical resources.

[0008] A maintenance response timing proposal method according to one embodiment of the present invention is a maintenance response timing proposal method for proposing the timing of preventive maintenance response to a malfunction of an equipment, the maintenance response timing proposal device performing the following steps: receiving precursor detection information that detects a precursor of a malfunction of the equipment; receiving resource usage plan information that indicates a plan for the use and timing of use of human and physical resources related to a predicted period during which a malfunction of the equipment is to occur; inputting the use and timing of use of the human and physical resources contained in the resource usage plan information into a machine learning engine that generates trend data of the usage amount of human and physical resources based on the use and duration of the human and physical resources, and performing machine learning to estimate and calculate trend data of the usage amount of human and physical resources related to the predicted period during which a malfunction of the equipment is to occur; and determining the timing and method for dealing with the malfunction of the equipment based on the precursor detection information and the trend data of the usage amount of the human and physical resources.

[0009] A maintenance timing proposal program according to one aspect of the present invention causes a computer to function as the maintenance timing proposal device. Effect of the Invention

[0010] According to the present invention, it is possible to provide a technology that can automatically, without human intervention, develop an implementation plan for preventive maintenance of an apparatus in response to a sign of an apparatus malfunction such as a breakdown or failure. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a diagram showing a functional block configuration of a maintenance timing proposing device. [Diagram 2] FIG. 2 is a diagram showing an example of transition data of a risk level and an example of transition data of the amount of human and physical resources used. [Diagram 3] FIG. 3 is a diagram showing a process flow of the maintenance timing proposing device. [Figure 4] FIG. 4 is a diagram illustrating an example of the sign detection information. [Diagram 5] FIG. 5 is a diagram illustrating an example of the sign-related information. [Figure 6]FIG. 6 is a diagram showing an example of transition data of the risk level. [Figure 7] FIG. 7 is a diagram illustrating an example of resource usage plan information. [Figure 8] FIG. 8 is a diagram showing an example of transition data of the utilization amount of human and physical resources. [Figure 9] FIG. 9 is a diagram showing an example of risk level transition data, an example of resource usage plan information, and an example of difference transition data. [Figure 10] FIG. 10 is a diagram showing an example of a recommended action timing and a recommended action method. [Figure 11] FIG. 11 is a diagram showing an example of a transition pattern of resource usage for each keyword. [Figure 12] FIG. 12 is a diagram illustrating a hardware configuration of the maintenance timing proposing device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the description of the drawings, the same parts are given the same reference numerals and the description will be omitted.

[0013] [Maintenance timing suggestion device] 1 is a diagram showing a functional block configuration of a maintenance response timing proposal device 1 according to this embodiment. The maintenance response timing proposal device 1 is a computer that proposes a response timing and a response method for preventive maintenance of a network device (hereinafter, NW device) in response to a symptom of a malfunction of the network device, such as a server, a router, or a switch. A malfunction is, for example, a breakdown or failure of the network device.

[0014] [Operational overview of the maintenance timing suggestion device] In order to propose the timing and method of preventive maintenance of a network device, the maintenance response timing proposal device 1 receives as input symptom detection information that detects symptoms of a network device malfunction and resource usage plan information that indicates the planned usage purpose and timing of use of human and physical resources related to the predicted period during which the network device malfunction will occur.

[0015] Then, as shown in FIG. 2, the maintenance response timing proposal device 1 estimates and calculates transition data R of the risk level due to a malfunction of the NW device based on the above-mentioned precursor detection information, and estimates and calculates transition data U of the usage amount of human and physical resources based on the above-mentioned resource usage plan information.

[0016] Thereafter, based on difference transition data (not shown) obtained by subtracting transition data U of human and physical resource usage from transition data R of risk level, the maintenance response timing proposal device 1 proposes a period D2 within a predicted malfunction period D1 from the time T1 when the precursor is detected to the predicted malfunction time T2, as well as the period before and after that, during which there is a margin of human and physical resource usage, as the timing for preventive maintenance of the network equipment.

[0017] In particular, in this embodiment, when estimating and calculating transition data U of the utilization amount of human and physical resources, the maintenance response timing proposal device 1 uses a machine learning engine that generates transition data of the utilization amount of human and physical resources based on the utilization purpose and utilization period of the human and physical resources. The maintenance response timing proposal device 1 inputs the utilization purpose and utilization period of the human and physical resources included in the input resource utilization plan information into the machine learning engine and performs machine learning to estimate and calculate transition data U of the utilization amount of human and physical resources related to the malfunction occurrence predicted period D1.

[0018] Furthermore, in this embodiment, the maintenance response timing proposal device 1 inputs the utilization purposes and utilization times of the human and physical resources included in each of the multiple pieces of resource utilization plan information into the machine learning engine and performs machine learning, thereby updating the fluctuation parameters of the pattern shape of the transition data of the utilization amounts of human and physical resources, so as to reduce the difference between the determined timing for taking action against a malfunction of a network device and the timing for taking action determined by a human.

[0019] In this way, the maintenance response timing proposal device 1 estimates and calculates the transition data U of the utilization amount of human and physical resources using a machine learning engine, and therefore it is possible to provide a technology that can automatically and appropriately develop an implementation plan for preventive maintenance of a network device without human intervention in response to signs of malfunction of the network device, such as a breakdown or failure.

[0020] In addition, the maintenance response timing proposal device 1 repeats machine learning using the machine learning engine so as to reduce the difference between the time determined to be the time to take action for a malfunction of a network equipment and the time determined by a human being, thereby making it possible to provide technology that can appropriately plan implementation plans for preventive maintenance of network equipment.

[0021] Furthermore, since the maintenance response timing proposal device 1 proposes a period D2 in which there is leeway in the utilization of human and material resources as the response timing for preventive maintenance of the network equipment, it is possible to provide a technology that can more appropriately plan the implementation plan for preventive maintenance of the network equipment.

[0022] [Configuration of the maintenance timing suggestion device] In order to execute the above-mentioned outline operation and realize its effects, the maintenance response timing proposal device 1 includes, for example, a sign receiving unit 11, a risk estimating unit 12, a sign related information storage unit 13, a resource receiving unit 14, a resource estimating unit 15, a resource usage plan information storage unit 16, a countermeasure determining unit 17, and a countermeasure output unit 18, as shown in Fig. 1. IF-A is an interface during operation of the maintenance response timing proposal device 1. IF-B is an interface during learning of the machine learning engine.

[0023] The sign receiving unit 11 has a function of receiving sign detection information that detects a sign of a malfunction in a network device. For example, the sign receiving unit 11 acquires from an OpS (Operation System) (not shown) or a sign detection device (not shown) the sign detection information that the OpS or the sign detection device has received from the network device. The sign detection information includes, for example, the name of the network device that has a sign of malfunction, the installation location of the network device, the date and time of the sign detection, the sign name, and the like.

[0024] The risk estimation unit 12 has a function of estimating and calculating transition data of the risk level due to a malfunction of a network device based on the sign detection information and using sign-related information that has been set in advance in the sign-related information storage unit 13 by an operator or the like.

[0025] The symptom-related information storage unit 13 has a function of storing symptom-related information that is set in advance by an operator, etc. The symptom-related information includes, for example, a symptom name, an effective countermeasure for a malfunction of a network device that has a symptom, a grace period from the time when the symptom is detected until the malfunction occurs, etc.

[0026] The resource receiving unit 14 has a function of receiving resource usage plan information indicating the usage purpose and usage timing plan of human and physical resources related to the predicted period of occurrence of a fault in the network device. For example, the resource receiving unit 14 acquires in-house public information stored in an in-house public information management device (not shown) from the in-house public information management device. The in-house public information indicates that a specific event (= the use of human and physical resources) will be held from XX month XX day to XX month △△ day.

[0027] In addition to in-house public information, for example, the resource receiving unit 14 acquires a disaster response contact form from a disaster response transmission tool or the like (not shown). The disaster response contact form describes that a response to the earthquake (=use of human and material resources) will be carried out from month XX to month ◇◇. Other resource usage plan information includes information on the depletion of parts due to EoL (End of Life), information on the depletion of human resources due to holding an event, etc.

[0028] The resource estimation unit 15 has a function of estimating and calculating transition data of the amount of human and physical resource usage related to the predicted period of occurrence of a malfunction in the network equipment by inputting the purpose and period of use of the human and physical resources included in the resource usage plan information into a machine learning engine that generates transition data of the amount of human and physical resource usage based on the purpose and period of use of the human and physical resources, and performing machine learning.

[0029] The resource estimation unit 15 also has a function of updating the fluctuation parameters forming the pattern shape of the transition data of the utilization amount of the human and physical resources by inputting the utilization purpose and utilization time of the human and physical resources included in each of the multiple pieces of resource utilization plan information into a machine learning engine and repeating machine learning. The fluctuation parameters are, for example, the rise period, convergence period, and maximum value of the utilization amount of the human and physical resources.

[0030] Furthermore, the resource estimation unit 15 has a function of more appropriately updating the above-mentioned variable parameters by repeating machine learning of the machine learning engine so as to reduce the difference between the timing for taking action determined by the maintenance response timing proposal device 1 for a malfunction of a network device and the timing for taking action determined by a human being.

[0031] The resource usage plan information storage unit 16 has a function of storing various data used when the machine learning engine estimates and calculates transition data of the usage amount of human and physical resources, performs machine learning, etc. For example, the resource usage plan information storage unit 16 stores the usage purpose and usage time of the human and physical resources included in the resource usage plan information, variable parameters, and the timing of action (teaching data for machine learning: correct answer) determined by a person inputted from an operator terminal (not shown), etc.

[0032] The countermeasure determination unit 17 has a function of determining the timing and method of dealing with a failure of the NW device within a period included in a predicted period of occurrence of the failure of the NW device or within a period including a period before and after the period, based on the precursor detection information and the transition data of the utilization amount of human and physical resources. Specifically, the countermeasure determination unit 17 obtains difference transition data by subtracting the transition data of the utilization amount of human and physical resources from the transition data of the risk degree estimated and calculated based on the precursor detection information, and determines the time when the value of the difference transition data matches a threshold value of a predetermined countermeasure method that is predetermined for an index of the difference as the time to deal with the predetermined countermeasure method.

[0033] The predetermined countermeasures include, for example, remote measures such as a remote reset, local measures such as unplugging and plugging in a cable without replacing parts on-site, local replacement in which parts are replaced on-site, or doing nothing.

[0034] The countermeasure output unit 18 has a function of outputting the determined timing and method of countermeasures for a malfunction of a network device as a recommended countermeasure timing and recommended countermeasure method. For example, the countermeasure output unit 18 displays the determined timing and method of countermeasures on the screen of an operator terminal or the like.

[0035] [Processing operation of the maintenance response time suggestion device] FIG. 3 is a diagram showing a process flow of the maintenance timing proposing device 1.

[0036] Step S1; First, the sign receiving unit 11 receives the sign detection information of Fig. 4, which indicates that a sign of a malfunction of a network device has been detected. The sign detection information includes the name of the network device that has the sign of a malfunction, the installation location of the network device, the date and time of the sign detection, the sign name, etc.

[0037] Step S2; Next, the risk estimation unit 12 obtains an effective countermeasure and grace period corresponding to the symptom name in the symptom detection information from the symptom-related information of Figure 5 stored in the symptom-related information memory unit 13, and estimates and calculates transition data of the risk level due to a failure in the network device based on the symptom detection date and time in the symptom detection information and the effective countermeasure and grace period.

[0038] For example, as shown in FIG. 6, the risk estimation unit 12 sets the date and time of the symptom detection as the symptom detection time T1, sets the time obtained by adding a grace period to the symptom detection time T1 as the predicted time T2 of a failure occurring in the network device, sets the period from T1 to T2 as the predicted period D1 of a failure occurring in the network device, and outputs transition data R having a risk level according to the symptom name.

[0039] The risk estimation unit 12 stores in advance different risk levels over time depending on the sign name. For example, for sign A, a risk level that rises sharply in a short period of time is stored, and for sign B, a risk level that rises gradually in a long period of time is stored.

[0040] Step S3; Next, the resource receiving unit 14 receives a plurality of pieces of resource usage plan information indicating the usage purpose and usage time plan of the human and material resources related to the predicted failure occurrence period D1 of the network device. For example, the resource receiving unit 14 receives the public information of FIG. 7(a) and the disaster response contact form of FIG. 7(b).

[0041] Step S4; Next, the resource estimation unit 15 creates a utilization plan for the human and physical resources related to the predicted period D1 of failure of the NW device based on the utilization purpose and utilization time of the human and physical resources included in the plurality of pieces of resource utilization plan information. Specifically, the resource estimation unit 15 inputs the utilization purpose and utilization time of the human and physical resources included in the plurality of pieces of resource utilization plan information into a machine learning engine and performs machine learning to estimate and calculate transition data of utilization amounts of the human and physical resources related to the predicted period D1 of failure of the NW device.

[0042] As an idea of ​​the estimated calculation, as shown in Figure 8, trend data U is created by adding together trend data U1 of the amount of human and material resources required for the use of the public information in Figure 7(a) and trend data U2 of the amount of human and material resources required for the use of the disaster response contact form in Figure 7(b).

[0043] Step S5; Next, the countermeasure determination unit 17 obtains differential transition data W by subtracting the transition data U of the utilization amount of human and physical resources obtained in step S4 from the transition data R of the risk level obtained in step S2, as shown in Fig. 9. Thereafter, when the difference exceeds the threshold value TH of the effective countermeasure obtained in step S2 (a threshold value previously determined for the index of the difference), the countermeasure determination unit 17 determines that the countermeasure should be implemented at that time.

[0044] At this time, the countermeasure determination unit 17 selects only the countermeasure timing included in the predicted failure occurrence period D1 of the NW device. However, the predicted failure occurrence period T2, which is the final period of the predicted failure occurrence period D1, is merely a predicted period estimated by the maintenance response timing proposal device 1 itself, and since there is a possibility that a failure will not occur even after T2 has passed, the countermeasure determination unit 17 may also select a countermeasure timing included in the period after T2.

[0045] Step S6; Finally, the countermeasure output unit 18 outputs the determined countermeasure timing and method for the fault in the network device as a recommended countermeasure timing and recommended countermeasure method. For example, the countermeasure output unit 18 outputs the recommended countermeasure timing and recommended countermeasure method in FIG.

[0046] [Machine learning engine machine learning] When using the machine learning engine in step S4, the resource estimation unit 15 inputs the utilization purpose and utilization timing of the human and physical resources included in each of the multiple pieces of resource utilization plan information into the machine learning engine and repeats machine learning, thereby repeatedly updating the variable parameters that form the pattern shape of the transition data of the utilization amount of the human and physical resources.

[0047] However, even if highly flexible resource information such as in-house announcements and disaster response contact forms are input into the maintenance response timing proposal device 1 and the internal parameters of the middle layer that are updated by machine learning are haphazardly set, the accuracy of determining the timing of response may not improve.

[0048] Therefore, in this embodiment, the accuracy of machine learning is improved by feeding back the result of a human's judgment of the timing of action. Specifically, when the machine learning engine is learning, the timing of action that a human actually judges to be necessary is taken in as teacher data (correct answer), and the machine learning engine is improved so as to output a timing close to that timing. This makes it possible to output a highly accurate timing of action.

[0049] Specifically, the resource estimation unit 15 generates a pattern of transition data of the resource usage of the human and physical resources for each use of the human and physical resources (keywords included in the in-house notice document) as shown in Fig. 11. The resource estimation unit 15 sets the variable parameters required for estimating and calculating the transition data U of the human and physical resource usage for each keyword as the internal parameters of the machine learning, that is, sets the rise period a1 to a5 of the usage of the human and physical resources of the usage resource transition pattern (=U) corresponding to each keyword, the convergence period b1 to b5, and the maximum value c1 to c5 of the human and physical resources to be secured as the internal parameters, and tunes each value of the internal parameters so that the target function "sum of |time to deal with correct answer-time to deal with judgment result|" becomes small.

[0050] As a result, each resource usage trend pattern is updated through machine learning, so that keywords and resource usage trend patterns gradually become linked 1:1, making it possible to output a highly accurate response time that is close to a human's judgment of when to take action.

[0051] In this way, by using the resource usage rise period a, convergence period b, and maximum value c as internal parameters, meaningful machine learning based on logic is performed, and the accuracy of the machine learning can be improved. Also, since the initial values ​​of the internal parameters can be input manually, the accuracy of the machine learning can be improved early. Furthermore, since a usage resource transition pattern consisting of the resource usage rise period a, convergence period b, and maximum value c is used, it is possible to propose the timing and method of preventive maintenance even if detailed resource usage plan information is not given.

[0052] [effect] According to the present embodiment, the maintenance response timing proposal device 1 includes an indication receiving unit 11 that receives indication detection information that detects an indication of a malfunction of a network device, a resource receiving unit 14 that receives resource usage plan information that indicates a plan for the use and timing of use of human and physical resources related to a predicted period during which a malfunction of the network device will occur, a resource estimation unit 15 that estimates and calculates transition data of the usage amount of human and physical resources related to a predicted period during which a malfunction of the network device will occur by inputting the use and timing of use of the human and physical resources included in the resource usage plan information into a machine learning engine that generates transition data of the usage amount of human and physical resources based on the use and duration of the human and physical resources and performing machine learning, and a countermeasure determination unit 17 that determines the timing and method of taking measures against the malfunction of the network device based on the indication detection information and the transition data of the usage amount of the human and physical resources. Thus, a technology can be provided that can automatically formulate an implementation plan for preventive maintenance of a device in response to an indication of a malfunction of the device, such as a breakdown or failure, without human intervention.

[0053] Furthermore, according to this embodiment, the resource estimation unit 15 inputs the utilization purposes and utilization times of the human and physical resources included in each of a plurality of pieces of resource utilization plan information into the machine learning engine and performs machine learning so as to reduce the difference between the determined timing for taking action against a malfunction of the NW equipment and the timing for taking action determined by a human being, thereby updating the fluctuation parameters of the pattern shape of the transition data of the utilization amounts of the human and physical resources. This makes it possible to improve the accuracy of the timing for taking action against a malfunction of the NW equipment, and provides a technology that can appropriately plan an implementation plan for preventive maintenance of the NW equipment.

[0054] Furthermore, according to the present embodiment, the countermeasure determination unit 17 determines the timing for dealing with the malfunction of the network device, which is included in the predicted period for the malfunction of the network device, and therefore the accuracy of the timing for dealing with the malfunction of the network device can be improved, and a technology can be provided that can more appropriately plan the implementation plan for preventive maintenance of the network device.

[0055] As a result of the above, in this embodiment, since it is possible to supplement the information required for calculating the timing of preventive maintenance taking into account the resource status, it is expected that highly accurate results can be obtained, and since it is easier to manually input initial values, it is expected that the learning accuracy will improve early. As a result, for network devices equipped with means for detecting signs by analyzing telemetry based on ambiguous information, it becomes possible to prevent failures before they occur, reducing emergency responses, limiting responses at night and on holidays, and suppressing adverse effects on customers (such as deterioration of communication quality).

[0056] [others] The present invention is not limited to the above-described embodiment, and various modifications are possible within the scope of the present invention.

[0057] The above-described maintenance response timing proposal device 1 of the present embodiment can be realized, for example, as shown in Fig. 12, by using a general-purpose computer system including a CPU 901, a memory 902, a storage 903, a communication device 904, an input device 905, and an output device 906. The memory 902 and the storage 903 are storage devices. In the computer system, the CPU 901 executes a predetermined program loaded on the memory 902, thereby realizing each function of the maintenance response timing proposal device 1.

[0058] The maintenance response timing proposal device 1 may be implemented in one computer. The maintenance response timing proposal device 1 may be implemented in multiple computers. The maintenance response timing proposal device 1 may be a virtual machine implemented in a computer. The program for the maintenance response timing proposal device 1 may be stored in a computer-readable recording medium such as an HDD, SSD, USB memory, CD, or DVD. The program for the maintenance response timing proposal device 1 may also be distributed via a communication network. [Explanation of symbols]

[0059] 1: Maintenance timing suggestion device 11: Predictive Reception Unit 12: Risk Estimation Section 13: Predictive information storage unit 14: Resource receiver 15: Resource estimation unit 16: Resource usage plan information storage unit 17: Action determination section 18: Response output section 901:CPU 902: Memory 903: Storage 904: Communication equipment 905: Input device 906: Output device

Claims

1. A maintenance response timing suggestion device that suggests the timing of preventive maintenance for equipment malfunctions, an indication receiving unit that receives indication detection information that indicates an indication of a malfunction of the device; a resource receiving unit for receiving resource utilization plan information indicating a utilization purpose and a utilization time plan of human and material resources related to a predicted period of occurrence of a malfunction of the device; a resource estimation unit that estimates and calculates transition data of the amount of human and physical resource usage related to a predicted period of occurrence of a malfunction of the device by inputting the use purpose and use time of the human and physical resources included in the resource usage plan information into a machine learning engine that generates transition data of the amount of human and physical resource usage based on the use purpose and use period of the human and physical resources and performing machine learning; a countermeasure determination unit that determines a timing and a method for dealing with the malfunction of the device based on the sign detection information and the transition data of the utilization amount of the human and physical resources; A maintenance response timing suggestion device equipped with the above.

2. A risk estimation unit that estimates and calculates transition data of a risk level due to a malfunction of the device based on the sign detection information, The treatment determination unit is 2. The maintenance response timing proposal device according to claim 1, wherein difference transition data is obtained by subtracting the transition data of the utilization amount of the human and material resources from the transition data of the risk level, and a time when the value of the difference transition data matches a threshold value of a predetermined response method that is predetermined for an index of the difference is determined as the response time for the predetermined response method.

3. The resource estimation unit, 3. A maintenance response timing proposal device as described in claim 1 or 2, which updates the variation parameters of the pattern shape of the trend data of the usage amount of human and physical resources by inputting the usage purposes and usage times of human and physical resources contained in multiple resource usage plan information into the machine learning engine and performing machine learning so as to reduce the difference between the timing to take action determined for a malfunction of the equipment and the timing to take action determined by a human.

4. The variable parameters are:

4. The maintenance timing proposing device according to claim 3, wherein the utilization amount of the human and physical resources is a rise period, a convergence period, and a maximum value.

5. The machine learning engine includes:

5. The maintenance timing proposing device according to claim 3, further comprising: a pattern of transition data of resource usage of human and material resources for each use of the human and material resources.

6. The treatment determination unit is 6. The maintenance response timing suggestion device according to claim 1, which judges a time when the malfunction of the device should be dealt with, the time being included in a predicted period during which the malfunction of the device should occur.

7. A method for proposing a timing for preventive maintenance for a malfunction of an apparatus, comprising: The maintenance timing suggestion device receiving symptom detection information indicating that a symptom of a malfunction of the device has been detected; receiving resource usage plan information indicating a usage purpose and a usage time plan of human and material resources related to a predicted period of occurrence of a malfunction of the device; a step of estimating and calculating transition data of the amount of human and physical resources used related to a predicted period during which a malfunction of the device is to occur by inputting the use purpose and use time of the human and physical resources included in the resource use plan information into a machine learning engine that generates transition data of the amount of human and physical resources used based on the use purpose and use period of the human and physical resources and performing machine learning; determining a timing and a method for dealing with the malfunction of the device based on the symptom detection information and the transition data of the utilization amount of the human and physical resources; A method for proposing the timing of maintenance actions.

8. A maintenance timing suggestion program that causes a computer to function as the maintenance timing suggestion device according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Elevator system

    JP2019018979A

  • Operation device and operation method

    JP2019140496A

  • Recovery support system

    WO2018122928A1