System and method for providing an end effector

The 3D printing of end effectors addresses the inefficiencies in manufacturing by enabling rapid production and iterative design refinement, ensuring timely delivery and continuous work operation.

JP7575948B2Active Publication Date: 2024-10-30FUJI CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2020550994
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2018-10-03
Publication Date
2024-10-30
Estimated Expiration
2038-10-03

AI Technical Summary

Technical Problem

The existing systems for providing end effectors face challenges in quickly manufacturing new shapes and remanufacturing due to the need for new molds, which are time-consuming and costly.

Method used

A system that utilizes a 3D printer to generate and print end effectors based on 3D data that meets design criteria, allowing for rapid production and immediate delivery of prototypes, with the option to refine designs based on evaluation results.

Benefits of technology

Significantly shortens the manufacturing time for end effectors, enabling same-day delivery of prototypes and continuous work operation, with the ability to iteratively improve designs based on evaluation feedback.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007575948000001
    Figure 0007575948000001
  • Figure 0007575948000002
    Figure 0007575948000002
  • Figure 0007575948000003
    Figure 0007575948000003
Patent Text Reader

Abstract

The provision system provides an end effector that is replaceably attached to a work device that performs work on a workpiece and that holds the workpiece. The system includes a three-dimensional printing device that performs three-dimensional printing by layering material based on three-dimensional data, and a processing control unit that generates or acquires three-dimensional data that meets the design criteria for the end effector that are set based on information about the workpiece and the work, and controls the three-dimensional printing device to print a product formed by the end effector based on the three-dimensional data.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] Disclosed herein are systems and methods for delivering an end effector. [Background technology]

[0002] Conventionally, a system has been proposed for selecting an appropriate end effector from multiple types of end effectors according to a workpiece to be worked on, for a robot equipped with an end effector (hand) that holds a workpiece. For example, Patent Document 1 describes a system that evaluates the compatibility of a workpiece and an end effector based on information on the workpiece to be worked on and information on the end effector, and automatically selects a more appropriate end effector. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] WO2015 / 178377A1 Summary of the Invention [Problem to be solved by the invention]

[0004] Depending on the results of the evaluation of the suitability of the end effector, it may become necessary to design and manufacture an end effector with a new shape. This requires the manufacture of a new mold, and it is difficult to manufacture a new end effector in a short period of time. In addition, if a defect is found after the end effector is manufactured and used, the end effector will have to be manufactured again, but this will require time and cost to modify or remanufacture the mold.

[0005] A primary objective of the present disclosure is to more quickly provide an appropriate end effector for holding a workpiece. [Means for solving the problem]

[0006] In order to achieve the above-mentioned main object, the present disclosure has adopted the following means.

[0007] The end effector provision system of the present disclosure is a provision system that provides an end effector that is replaceably attached to a work device that performs work on a workpiece and is for holding the workpiece, and is equipped with a 3D printing device that performs 3D modeling by stacking material based on 3D data, and a processing control unit that generates or acquires 3D data that satisfies design criteria for the end effector that are set based on information about the workpiece and the work, and controls the 3D printing device to form a modeled product of the end effector based on the 3D data.

[0008] In the end effector providing system of the present disclosure, three-dimensional data that satisfies the design criteria of the end effector determined based on the information of the workpiece and the task is generated or acquired, and a three-dimensional printing device is controlled to form a molded product of the end effector based on the three-dimensional data. This allows the end effector to be rapidly provided to the user of the task device by significantly shortening the manufacturing period of the end effector compared to the case of manufacturing a molded product of the end effector using a metal mold. In addition, since the three-dimensional data of the end effector satisfies the design criteria of the end effector determined based on the information of the workpiece and the task, an end effector appropriate for a new workpiece or a new task can be provided. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is an explanatory diagram showing an overview of a business operator system 10 and a customer system 40. [Diagram 2] FIG. 1 is a diagram showing an outline of the configuration of a work system 50. [Diagram 3] FIG. 4 is an explanatory diagram showing an example of an end effector E. [Figure 4] FIG. 2 is an explanatory diagram showing an example of a task DB 26 included in the provision management device 20. [Diagram 5] 11 is a flowchart showing an example of a provision response process. [Figure 6]13 is a flowchart showing an example of an end effector forming process. [Figure 7] 11 is a flowchart illustrating an example of an end effector evaluation process. [Figure 8] 11 is a flowchart showing an example of an evaluation handling process. [Figure 9] FIG. 1 is an explanatory diagram showing the process of creating and evaluating a prototype of the end effector E. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Next, an embodiment of the present disclosure will be described with reference to the drawings.

[0011] Fig. 1 is an explanatory diagram showing an overview of the business operator system 10 and the customer system 40, and Fig. 2 is a configuration diagram showing an overview of the configuration of the operation system 50. Note that the left-right direction in Fig. 2 is the X-axis direction, the front-rear direction is the Y-axis direction, and the up-down direction is the Z-axis direction. Note that there may be not only one customer system 40, but also multiple customer systems 40.

[0012] The business operator system 10 is a system of a business operator that provides an end effector E to be used in the operation system 50 of the customer system 40. As shown in FIG. 1, the business operator system 10 includes a processing device 12, an injection molding device 14, a supply management device 20, and a 3D printer 30, which are connected to a LAN 19. The processing device 12 is composed of a machining center, a lathe, or the like, and performs die processing by cutting or the like. The injection molding device 14 molds the end effector E to be provided by injection molding of resin or the like using a die.

[0013] The provision management device 20 includes a control unit for controlling the entire device, a storage unit for storing various application programs and various data, a display unit for displaying various information, an input unit such as a keyboard and a mouse for an operator to input various commands, and a communication unit for communicating with an external device such as a 3D printer 30. The storage unit of the provision management device 20 incorporates 3D CAD software and the like. The provision management device 20 also includes a setting processing unit 22, a 3D data generating unit 24, and a work DB 26 as functional units required for designing and providing the end effector E to be provided. The setting processing unit 22 performs processing for setting design standards for the end effector E based on information on the work W and information on the work to be performed on the work W. Information transmitted from the customer system 40 is used as the information on the work W and information on the work to be performed on the work W. The design standards will be described later. The 3D data generating unit 24 generates 3D (three-dimensional) data as modeling data for modeling the three-dimensional shape of the end effector E to be provided. The job DB 26 stores various information about the end effectors E that have been provided to each customer and the jobs that use them, the details of which will be described later.

[0014] The 3D printer 30 includes a modeling stage 32, a head 34 that ejects or extrudes a modeling material such as resin toward the modeling stage 32, a movement mechanism 36 that moves the modeling stage 32 and the head 34 relatively in the XYZ directions, and a control unit 38 that controls the head 34 and the movement mechanism 36. The 3D printer 30 is capable of forming a three-dimensional modeled product such as an end effector E by layering modeling material based on 3D data. The modeling material is appropriately selected from ABS resin, acrylic resin, metal, silicone rubber, and the like according to the rigidity, elasticity, and the like required for the modeled product.

[0015] The customer system 40 on the customer (user) side that uses the end effector E includes a work management device 42 and a work system 50 including a robot 60, which are connected to a LAN 49. The work system 50 includes a work supply device 52 and a tray transport device 54 arranged on a work table 51, the robot 60, and a control unit 58 that controls the entire work system 50. The work supply device 52 includes a conveyor belt 52a that is stretched over a drive roller and a driven roller that are arranged at a distance in the front-rear direction (Y-axis direction), and supplies multiple workpieces W on the conveyor belt 52a from the rear to the front by rotating the drive roller. The tray transport device 54 is composed of a conveyor belt, transports a tray T in a direction (X-axis direction) perpendicular to the supply direction of the workpieces W, and positions and holds the tray T at a central position. The work system 50 performs an operation of picking up the workpieces W supplied by the work supply device 52 using the robot 60, and aligning and placing the workpieces W on the tray T transported by the tray transport device 54. The work system 50 also performs tasks such as using a robot 60 to pick up another work W, such as a washer, from the work W, such as a bolt, aligned on a tray T, and place it so as to insert it into the shank of the bolt.

[0016] The robot 60 includes a vertical articulated robot arm 62 in which multiple links are rotatably connected via joints. The robot arm 62 is provided with a servo motor (not shown) and an encoder for detecting a rotation angle at each joint. An end effector E as a work tool for picking up a workpiece W is detachably attached to the tip of the robot arm 62. A camera 68 is attached to the tip of the robot arm 62. The camera 68 captures an image for recognizing the position and posture of the workpiece W to be picked and the position of the workpiece W to be placed, and transmits the image to the control unit 58.

[0017] Here, Fig. 3 is an explanatory diagram showing an example of the end effector E. In this embodiment, an end effector E1* shown in Fig. 3A and an end effector E2* shown in Fig. 3B can be used as the end effector E. The end effector E1* is a suction nozzle that holds the workpiece W by suctioning it with negative pressure, and a number of types are used that have different design criteria, such as the nozzle inner diameter φN, height H, and pad diameter φP. The end effector E2* is a mechanical chuck (hereinafter, referred to as a mechanical chuck) that holds the workpiece W by gripping it with a pair of openable and closable clamping jaws, and a number of types are used that have different design criteria, such as the thickness D, width W, height H, opening and closing stroke amount St, and outer dimension Ro at maximum opening, of the clamping jaws.

[0018] The control unit 58 is composed of a CPU, ROM, HDD, RAM, etc., and stores operation programs for the robot 60. The control unit 58 receives detection signals from the encoder of the robot 60, image data from the camera 68, operation signals from the work supply device 52 and the tray transport device 54, etc. The control unit 58 outputs control signals to the servo motor and end effector E of the robot 60, control signals to the camera 68, control signals to the work supply device 52 and the tray transport device 54, etc.

[0019] The work management device 42 includes a control unit, a storage unit, a display unit, an input unit, and a communication unit, similar to the provision management device 20. The work management device 42 is communicably connected to the control unit 58 of the work system 50 via the LAN 49, and exchanges various data related to the work. The work management device 42 can also communicate with the provision management device 20 via a network 18 such as the Internet, and exchanges various data, etc. For example, the work management device 42 outputs a provision request for a required end effector E to the provision management device 20, together with job information including information on the work W and information on the work to be performed on the work W.

[0020] 4 is an explanatory diagram showing an example of the task DB 26 possessed by the provision management device 20. As shown in the figure, the task DB 26 registers various information such as the serial number of the end effector E and information on design standards in association with information on the work W and information on the task. The information on the work W includes information on the shape and dimensions of the work W. The task information includes information on the target shape and target dimensions of the target on which the work W is to be placed, and the content of the task such as whether the work W is to be aligned on the tray T or inserted into the bolt shaft. For example, in the case of the task of inserting a washer into the bolt shaft, the shape of the work W (washer), the inner and outer diameters of the washer, the shaft diameter of the bolt, shaft insertion, etc. are registered. The information on end effector E includes the model number of end effector E (E1* or E2*), as well as design standard information such as the nozzle inner diameter φN, height H, and pad diameter φP if end effector E1* is a suction nozzle, and if end effector E2* is a mechanical chuck, design standard information such as the clamping jaw thickness D, width W, height H, opening / closing stroke amount St, and outer dimension Ro.

[0021] Next, a process related to the provision of the end effector E performed by the business operator system 10 will be described. FIG. 5 is a flowchart showing an example of the provision response process. This process is executed by the provision management device 20 of the business operator system 10. In this process, the provision management device 20 first accepts a provision request for the end effector E from the customer system 40 (S100), and judges whether the provision request is a request for a new end effector E (S110), whether it is a request for immediate delivery (S120), and whether it is a request for remodeling (S130). A new request is a request for the provision of an end effector E that has not been molded with a die, and is made, for example, when work on a new work W or work with new contents is scheduled. A request for immediate delivery is a request for provision with a short delivery time, such as within the same day or several days, and is made, for example, when a sudden defect such as breakage occurs during the use of the end effector E molded with a die, and there is no stock or only a small stock. A request for remodeling is made, for example, when a prototype of a new end effector E is provided to a customer system 40 and used, and as a result, shape correction or the like is required.

[0022] When the provision management device 20 determines that the request is a new request in S110, that the request is for immediate delivery in S120, or that the request is for remodeling in S130, it executes an end effector modeling process by the 3D printer 30 (S140). Details of the process of S140 will be described later. On the other hand, when the provision management device 20 determines that the request is not any of S110 to S130, it arranges for the molding of the requested end effector E (S150). In S150, if the end effector E has no experience of molding with a mold, the provision management device 20 issues an instruction to design the mold or an instruction to process the mold in the processing device 12. In addition, if the preparation of the mold is complete or the end effector E already has a mold, the provision management device 20 issues an instruction to injection mold the end effector E in the injection molding device 14.

[0023] Then, the supply management device 20 ships and delivers the end effector E that has been completed in the end effector formation process in S140 by the 3D printer 30 to the requesting customer system 40 (S160), and ends the supply response process. Note that the end effector E manufactured by injection molding in the injection molding device 14 will also be shipped and delivered to the requesting customer system 40 upon completion (S160). However, it may take a long period of time, from several weeks to several months, from designing the mold to completing the injection molding of the end effector E.

[0024] Here, the end effector modeling process of S140 will be described with reference to the flowchart of Fig. 6. In this process, the provision management device 20 determines whether or not 3D data of the end effector E has been generated (S200), and if it is determined that the data has not been generated, it determines whether or not a design criterion for the end effector E has been set (S210). Note that in the case of a request for immediate delivery or a request for remodeling, it is determined in S200 that the 3D data has been generated. Also, even if the 3D data has not been generated, for example, if a provision request is received from the customer system 40 together with the design criterion, it is determined in S210 that the design criterion has been set.

[0025] When the provision management device 20 determines in S210 that the design criteria have not been set, it acquires information on the workpiece W and information on the work as information on the current job required to set the design criteria for the end effector E (S220). The work management device 42 of the customer system 40 transmits the information on the workpiece W and the work together with the provision request for the end effector E, so the provision management device 20 can acquire these pieces of information from the provision request. Next, the provision management device 20 calculates a correlation value between the acquired information and the information on each job registered in the work DB 26 using a predetermined algorithm (S230). For example, in the predetermined algorithm, for each item such as the shape and dimensions of the workpiece W, the shape and dimensions of the target to be placed, and the work content, each evaluation value is calculated using an evaluation function determined for each item, and the correlation value is calculated by weighting and adding each evaluation value using a weighting coefficient for each item. A specific example of such an algorithm is described in, for example, WO2015 / 178377.

[0026] When the provision management device 20 calculates the correlation value, it sets the design criteria for the end effector E by referring to information on one or more jobs in the job DB 26 for which the correlation value is higher than a predetermined value (S240). For example, if the end effector E1* used in the two jobs with high correlation values ​​is a suction nozzle with nozzle inner diameters φN of φ4 and φ8, the provision management device 20 sets the design criteria by setting the nozzle inner diameter φN to be set to the intermediate value φ6. Alternatively, if φ8 has a higher correlation value, the provision management device 20 may set the nozzle inner diameter φN to φ7. The provision management device 20 sets other design criteria in the same manner. In addition, the provision management device 20 may display information on jobs with high correlation values ​​on the display unit and accept the setting of the design criteria from the worker, or display the automatically set design criteria on the display unit and accept the adjustment of the design criteria from the worker.

[0027] In this way, when the design criteria are set or when it is determined in S210 that the design criteria have been set, 3D data that satisfies the design criteria is generated (S250). In S250, the provision management device 20 generates 3D data by setting each dimension of one or more members that constitute the end effector E so as to satisfy the design criteria. In addition, the provision management device 20 appropriately selects a modeling material for modeling the member according to the rigidity, deflection, etc. required for the member. When the provision management device 20 generates 3D data or when it is determined in S200 that the 3D data has been generated, the provision management device 20 displays a 3D drawing of the end effector E based on the 3D data and modeling materials on the screen, and waits for the worker who has confirmed the displayed contents to input modeling permission (S260). Note that the worker may adjust the 3D data and then input modeling permission. When modeling permission is input in S260, the provision management device 20 outputs the 3D data to the 3D printer 30 and models the end effector E based on the 3D data (S270), and ends this process. The control unit 38 of the 3D printer 30 controls the head 34 and the moving mechanism 36 based on the 3D data to model the end effector E. The modeling of the end effector E is completed in approximately several hours, although the time varies depending on the type, size, shape, material, etc. of the end effector E. When the modeling of the end effector E is completed, the provision management device 20 delivers the modeled product of the end effector E to the customer system 40. In this way, when the business operator system 10 receives a new request, an immediate delivery request, or a remodeling request for the end effector E, it manufactures a modeled product of the end effector E using the 3D printer 30, rather than a molded product, and delivers it to the customer system 40. For this reason, the business operator system 10 can deliver the end effector E within a few days, such as the same day or the next day. Therefore, even if there is a new request for the end effector E, the modeled product of the end effector E can be delivered as a prototype on the same day at the earliest, and can be used in the work system 50. The following describes the process after the end effector E is delivered as a prototype. Note that the 3D printer 30 may create the workpiece W based on the 3D data of the workpiece W and deliver the workpiece W together with the prototype of the end effector E to the customer system 40.

[0028] First, the processing of the customer system 40 to which the prototype of the end effector E is delivered will be described. FIG. 7 is a flowchart showing an example of the end effector evaluation processing. In this processing, the work management device 42 first instructs the use of the delivered prototype of the end effector E (S300) and waits for the use result to be received (S310). In S300, if the robot 60 is configured to be able to automatically replace the end effector E, the work management device 42 outputs an exchange instruction to the robot 60 to start using it. On the other hand, if the robot 60 is not able to automatically replace the end effector E, the work management device 42 displays an exchange instruction on the display unit, etc., to have the worker replace the end effector E and start using it. In addition, the worker checks the holding state of the workpiece W when the robot 60 works using the prototype of the end effector E and inputs it as the use result. Alternatively, the use result determined by the control unit 58 as to whether or not the robot 60 was able to hold the workpiece W normally may be input to the work management device 42.

[0029] When the use result is received in S310, the work management device 42 judges whether the use result is good or not (S320). When the work management device 42 judges that the use result is not good, the work management device 42 waits for the acceptance of a change in the design criteria (S330). The worker changes the design criteria by modifying the numerical values ​​of each item of the design criteria of the end effector E, for example, via a design change screen displayed on the display unit of the work management device 42. Note that the design criteria are not limited to being accepted based on the operation of the worker, and the work management device 42 may accept only the designation of the item to be changed and automatically correct it. For example, the work management device 42 may accept which item among the items such as height and thickness is excessive or insufficient, and may change the design criteria by increasing or decreasing the accepted item by a predetermined amount. The work management device 42 may also accept a change in 3D data. When the work management device 42 accepts a change in the design criteria, it registers the change to be included in the evaluation result (S340), transmits a request for remodeling the end effector E and the evaluation result to the provision management device 20 (S350), and ends the end effector evaluation process. On the other hand, when the work management device 42 determines in S320 that the usage result is good, it transmits a request for a genuine end effector E and the evaluation result to the provision management device 20 (S360), and ends the end effector evaluation process.

[0030] Next, the process of the provision management device 20 of the business entity system 10 that has received the evaluation result will be described. FIG. 8 is a flowchart showing an example of the evaluation response process. In this process, the provision management device 20 first determines whether the evaluation result is good or not (S400), and if it determines that the evaluation result is not good, it modifies the design criteria of the end effector E based on the changes registered in the evaluation result (S410). Next, the provision management device 20 modifies the 3D data so that the modified design criteria are satisfied (S420), and ends the evaluation response process. In this way, when the provision management device 20 receives an evaluation result indicating that the evaluation result is not good, it modifies the design criteria and the 3D data based on the changes. In addition, since the evaluation result indicating that the evaluation result is not good is transmitted together with a request for re-modeling, the provision management device 20 determines that the request is a request for re-modeling in S130 of the provision response process and models the end effector E. In this case, the end effector E is re-modeled using the modified 3D data that reflects the evaluation result, so that the modified end effector E can be easily re-provided compared to the case where a mold modification or the like is required.

[0031] On the other hand, when the provision management device 20 determines that the evaluation result is good in S400, it confirms the design criteria and 3D data when the delivered end effector E was modeled (S430), updates the work DB 26 by registering the serial number and design criteria of the end effector E in association with the information of the work W and the information of the work (S440), and ends the evaluation response process. In this way, when a good evaluation of the end effector E is obtained, the provision management device 20 registers information required to set the design criteria of the end effector E in the work DB 26, so that the accuracy of automatic setting of the design criteria of the end effector E can be improved. In addition, the evaluation result indicating that the end effector E is good is transmitted together with a request for a genuine product. Therefore, the provision management device 20 determines that none of S110 to S130 of the provision response process applies and arranges for the die molding of the end effector E, so that the manufacture of the die molded product of the end effector E, which is a genuine product, is started. Although the genuine product has higher durability and dimensional accuracy than the prototype, the prototype can also be used continuously, so in the customer system 40, work can be continued using the prototype until the genuine end effector E is delivered. Therefore, in the customer system 40, work can be continued using the molded product (prototype) of end effector E, and it is possible to prevent the customer system 40 from being unable to work until the genuine end effector E is delivered.

[0032] Here, FIG. 9 is an explanatory diagram showing the flow of forming and evaluating a prototype of the end effector E. First, a request for providing a prototype including information on the workpiece W and information on the work is made from the work management device 42 (FIG. 9(1)). The provision management device 20 that has accepted the provision request sets design standards (FIG. 9(2)), generates 3D data, and outputs it to the 3D printer 30 (FIG. 9(3)). The 3D printer 30 forms a prototype of the end effector E based on the 3D data (FIG. 9(4)), and the prototype is provided to the customer system 40 (FIG. 9(5)). The work system 50 of the customer system 40 uses the end effector E as a prototype (FIG. 9(6)), and the work management device 42 transmits its evaluation to the provision management device 20 (FIG. 9(7)). The provision management device 20 acquires the evaluation and reflects it in correcting or finalizing the design standards (FIG. 9(8)). The provision management device 20 corrects the 3D data if necessary and outputs it to the 3D printer 30 (FIG. 9(9)), and the 3D printer 30 remodels the prototype (FIG. 9(10)). The customer system 40 to which the remodeled prototype is delivered uses the prototype again and transmits an evaluation.

[0033] Here, the correspondence between the components of this embodiment and the components of the present disclosure will be clarified. The robot 60 of this embodiment corresponds to a working device, the end effector E corresponds to an end effector, the business operator system 10 corresponds to a provision system, the 3D printer 30 corresponds to a three-dimensional modeling device, and the provision management device 20 that executes the end effector modeling process in Fig. 6 and the control unit 38 of the 3D printer 30 correspond to a processing control unit. In addition, the provision management device 20 corresponds to an evaluation acquisition unit.

[0034] The business operator system 10 described above generates 3D data that satisfies the design criteria for the end effector E that are determined based on the information on the workpiece W and the task, and models the end effector E using the 3D printer 30 based on the 3D data. This makes it possible to significantly shorten the manufacturing time for the end effector E and provide it to the user quickly, compared to manufacturing a molded product of the end effector E using a metal mold. In addition, since the 3D data satisfies the design criteria that are determined based on the information on the workpiece W and the task, it is possible to provide an end effector E that is appropriate for a new workpiece W or a new task.

[0035] In addition, in the business operator system 10, when a new end effector E is requested, the end effector E is modeled by the 3D printer 30, so that the modeled product of the end effector E can be provided as a prototype in a short period of time, such as on the same day, and used for work. In addition, an evaluation of the holding of the workpiece W by the modeled product of the end effector E is obtained, so that the evaluation of the modeled product (prototype) of the end effector E can be reflected in the design of a mold, and a more appropriate end effector E can be provided. In addition, if the evaluation is not good, the 3D data is modified to reflect the evaluation result, and the modeled product of the end effector E is modeled again by the 3D printer 30, so that a more appropriate end effector E can be provided again based on the evaluation result.

[0036] It goes without saying that the present invention is not limited to the above-described embodiment, and can be embodied in various forms within the technical scope of the present invention.

[0037] For example, in the above-described embodiment, the provision management device 20 includes the setting processing unit 22, the 3D data generating unit 24, and the work DB 26 of the end effector E, and sets the design criteria of the end effector E and generates 3D data, but this is not limited thereto. For example, the work management device 42 may include a setting processing unit and a work DB to set the design criteria. Then, the provision management device 20 may generate 3D data that satisfies the design criteria acquired from the work management device 42. Alternatively, the work management device 42 may include a setting processing unit, a 3D data generating unit, and a work DB to set the design criteria and generate 3D data. Then, the provision management device 20 may cause the 3D printer 30 to model the end effector E based on the 3D data acquired from the work management device 42. Alternatively, a dedicated processing device including a setting processing unit, a 3D data generating unit, and a work DB may be provided separately from the business operator system 10 and the customer system 40 and connected to the network 18. The processing device may be a device that, upon receiving information on the workpiece W and information on the work from the work management device 42, sets design standards and transmits them to the provision management device 20, or generates 3D data and transmits it to the provision management device 20. Note that the setting of the design standards and the generation of the 3D data are not limited to being performed automatically, and may be performed by a worker, for example.

[0038] In the above embodiment, the business operator system 10 is provided with the processing device 12 and the injection molding device 14 to provide a molded product of the end effector E, but the present invention is not limited to this, and the business operator system 10 may not be provided with the processing device 12 and the injection molding device 14. That is, the business operator system 10 may be a system that does not provide a molded product of the end effector E, but provides a molded product of the end effector E by the 3D printer 30. In addition, the business operator system 10 is provided with the 3D printer 30, but the present invention is not limited to this, and the 3D printer may be provided separately from the business operator system 10 and connected to the network 18. In this case, the provision management device 20 may transmit 3D data to the 3D printer to form the end effector E. Alternatively, the customer system 40 may be provided with a 3D printer. In this case, the work management device 42 may set design standards for the end effector E and generate 3D data to cause the 3D printer to form the end effector E. That is, the provision system of the end effector E may be present in the customer system.

[0039] In the above-described embodiment, one type of end effector E is molded in response to a new request, but the present invention is not limited to this, and multiple types of end effectors E with different design standards or 3D data may be molded. In this way, it is possible to manufacture an optimal die-molded product of the end effector E based on the evaluation results of the multiple types of end effectors E.

[0040] In the above-described embodiment, the vertical articulated robot 60 is exemplified, but the present invention is not limited to this and may be an orthogonal robot, a horizontal articulated robot, a parallel link robot, etc. Furthermore, the robot 60 is not limited to one that picks up the workpiece W and places it on the tray T, but may be one that mounts electronic components, etc. on a board.

[0041] In the above-described embodiment, the end effector E is formed using the 3D printer 30 in response to a new request for an end effector E or a request for immediate delivery, but this is not limited to this, and the end effector E may be formed using the 3D printer 30 regardless of the reason for the request.

[0042] In the above-described embodiment, when 3D data satisfying the design criteria is generated, the end effector E is modeled based on the 3D data, but this is not limited to the above. For example, when 3D data satisfying the design criteria is generated, a simulation based on the 3D data may be performed to confirm that there are no problems with the 3D data, and then the end effector E may be modeled based on the 3D data. Alternatively, the end effector E may be evaluated in the business operator system 10 before being delivered to the customer system 40.

[0043] In the above-described embodiment, when the evaluation of the end effector E indicates that the end effector E is not good, the design criteria and 3D data are modified and the end effector E is remodeled, but the present invention is not limited to this. For example, when the evaluation of the end effector E indicates that the end effector E is not good but can be dealt with by minor modification, the modification may be reflected in the die design and a die molded product of the end effector E may be arranged without remodeling the end effector E.

[0044] In the above embodiment, the work information in the work DB 26 includes dimensions and the like in addition to the shape of the work W, but it is sufficient that it includes at least the shape of the work W. Also, the work information includes the shape and dimensions of the target on which the work W is to be placed, but it is sufficient that it includes at least the work content of what kind of work is to be performed.

[0045] Here, the end effector providing system of the present disclosure may be configured as follows. For example, in the end effector providing system of the present disclosure, when a request is made for the provision of a new end effector, the process control unit may control the 3D printing device to print a molded product of the end effector as a prototype prior to the manufacture of a die-molded product of the end effector. In this way, the molded product of the end effector can be provided to the user as a prototype in a short period of time, such as on the same day, and the user can attach it to a working device and perform work. Note that the user may use the molded product of the end effector as a prototype until a die-molded product of the end effector as a genuine product is provided.

[0046] The end effector providing system of the present disclosure may further include an evaluation acquisition unit that acquires an evaluation of the holding of the workpiece by the product molded by the end effector. In this way, the evaluation of the product molded by the end effector can be reflected in the design of a mold, etc., so that a more appropriate end effector can be provided.

[0047] In the end effector providing system according to the present disclosure, when the evaluation is poor, the processing control unit may generate or obtain the three-dimensional data corrected to reflect the result of the evaluation, and control the three-dimensional printing device to re-print the molded product of the end effector based on the corrected three-dimensional data. In this way, a more appropriate molded product of the end effector can be provided again based on the result of the evaluation.

[0048] The present disclosure provides an end effector providing method for an end effector that is replaceably attached to a working device that performs a task on a workpiece and that holds the workpiece, and includes the steps of generating or acquiring three-dimensional data that satisfies a design criterion for the end effector that is set based on information on the workpiece and the task, and forming a molded product of the end effector based on the three-dimensional data using a three-dimensional printing device. In this end effector providing method, as in the above-mentioned end effector providing system, the manufacturing period of the end effector can be significantly shortened and the end effector can be quickly provided to a user of the working device. In addition, an end effector appropriate for a new workpiece or a new task can be provided. In this end effector providing method, a step that realizes each function of the end effector providing system may be added. [Industrial Applicability]

[0049] The present invention can be used in the end effector manufacturing industry and the like. [Explanation of symbols]

[0050] 10 operator system, 18 network, 19, 49 LAN, 20 provision management device, 22 setting processing unit, 24 3D data generation unit, 26 work DB, 30 3D printer, 32 modeling stage, 34 head, 36 moving mechanism, 38, 58 control unit, 40 customer system, 42 work management device, 50 work system, 51 work table, 52 work supply device, 52a conveyor belt, 54 tray transport device, 60 robot, 62 robot arm, 68 camera, E, E1*, E2* end effector, T tray, W work.

Claims

1. A system for providing an end effector that is replaceably attached to a working device that performs a work on a work and that holds the work, comprising: a 3D modeling device that performs 3D modeling by stacking materials based on 3D data; a processing control unit that generates or acquires three-dimensional data that satisfies a design criterion of the end effector, which is set based on information on the workpiece and the task, and controls the three-dimensional printing device to print a modeled product of the end effector based on the three-dimensional data; an evaluation acquisition unit that acquires an evaluation regarding holding of the workpiece by the molded product of the end effector; Equipped with the process control unit, when a request for provision of the end effector is made, if the request is either a new request, a request for immediate delivery, or a request for remodeling, controls the three-dimensional printing device to print a modeled product of the end effector, and if the request for provision is neither a new request, a request for immediate delivery, nor a request for remodeling but a request for a regular product, performs an arrangement process for molding a die for the end effector; the evaluation acquisition unit acquires, as an evaluation result of the end effector, an evaluation result indicating that the end effector is not good that is transmitted together with a request for remodeling the end effector, and acquires an evaluation result indicating that the end effector is good that is transmitted together with a request for a genuine version of the end effector; Furthermore, when an evaluation result indicating that the end effector is not satisfactory is obtained, the process control unit generates or obtains the three-dimensional data corrected to reflect the evaluation result, and controls the three-dimensional printing device to re-print the product of the end effector based on the corrected three-dimensional data; when an evaluation result indicating that the end effector is satisfactory is obtained, the process control unit confirms the design criteria and the three-dimensional data, and allows the continuation of the work using the product of the end effector until a genuine product of the end effector is delivered. End effector delivery system.

2. A method for providing an end effector that is replaceably attached to a working device that performs an operation on a workpiece and that holds the workpiece, comprising the steps of: (a) generating or acquiring three-dimensional data that satisfies a design criterion for the end effector that is set based on information about the workpiece and the task; (b) controlling a 3D printing device to print a model of the end effector by layering material based on the 3D data; and (c) obtaining an assessment of the holding of the workpiece by the end effector build; and Including, In the step (b), when a request for provision of the end effector is made, if the request is a new request, a request for immediate delivery, or a request for remodeling, the 3D printing device is controlled to print a modeled product of the end effector; (d) if the supply request is not a new request, a request for immediate delivery, or a request for remodeling, but is a request for a regular product, performing an arrangement process for molding a die for the end effector; In the step (c), as the evaluation result of the end effector, an evaluation result indicating that the end effector is not good is obtained together with a request for remodeling the end effector, and an evaluation result indicating that the end effector is good is obtained together with a request for authenticity of the end effector; Furthermore, in the step (b), when an evaluation result indicating that the evaluation result is not good is obtained, the three-dimensional data is generated or obtained so as to be corrected so as to reflect the evaluation result, and the three-dimensional printing device is controlled so as to re-print the modeled product of the end effector based on the corrected three-dimensional data. (e) when an evaluation result indicating that the design criteria and the three-dimensional data are satisfactory is obtained, the step of confirming the design criteria and the three-dimensional data and allowing the continuation of the work using the molded product of the end effector until a genuine product of the end effector is delivered, How the end effector is provided.

Citation Information

Patent Citations

  • Manufacturing method for knuckle steering

    JP2002312420A

  • Method for manufacturing mold for mass production of resin molded article, molding method, resin mold, and method for manufacturing resin mold

    JP2016028876A

  • Assembly instruction device and method

    WO2015178377A1