Power System

The described power system addresses rapid load increases by rotating air conditioning units and managing power distribution across floors, ensuring stable power supply through centralized control and battery management.

JP7578214B2Active Publication Date: 2024-11-06MURATA MFG CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2024539323
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-09-14
Filing Date
2023-08-30
Publication Date
2024-11-06
Estimated Expiration
2043-08-30

AI Technical Summary

Technical Problem

Conventional power systems struggle to supply sufficient power when load consumption increases rapidly, leading to potential power shortages.

Method used

A power system with multiple inverters, bidirectional converters, and storage batteries, controlled by a central device to manage power distribution across different floors of a building, ensuring efficient rotation of air conditioning units and utilization of commercial power grids to prevent power overloads.

Benefits of technology

The system effectively suppresses power increases during high demand by optimizing power distribution and utilizing storage batteries to maintain stable power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007578214000001
    Figure 0007578214000001
  • Figure 0007578214000002
    Figure 0007578214000002
  • Figure 0007578214000003
    Figure 0007578214000003
Patent Text Reader

Abstract

An electric power system (10) comprises: a plurality of inverse converters (31 to 34) and a power receiving point (P500), outputs from the plurality of inverse converters (31 to 34) each being connected to the power receiving point (P500) via a grid interconnection relay; a plurality of loads (L41 to L44) each including one of air conditioners (41 to 44); a current sensor (CT); and a control device (60). The plurality of inverse converters (31 to 34) are each installed on a different floor of the same building. The control device (60) rotates the operation of the air conditioners (41 to 44) provided respectively on each floor such that respective operating times thereof do not overlap, and performs control, on the basis of a measured value from the current sensor (CT), such that electricity is discharged from storage batteries of the plurality of inverse converters (31 to 34) to a heavy load, such that an amount of electric power procured from a power grid per prescribed unit of time does not exceed a prescribed value.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power system including a plurality of power storage units and a plurality of air conditioners. [Background technology]

[0002] A power storage system is described in Patent Document 1. The power storage system of Patent Document 1 includes a plurality of power storage units and a plurality of power conversion units.

[0003] The power conversion units are arranged corresponding to the power storage units, respectively. The power conversion units convert the DC output of the power storage units connected to each of the power conversion units into AC output and supply the AC output to a load. The power conversion units also convert AC power from the power grid into DC power to charge the power storage units connected to each of the power conversion units.

[0004] The power storage system of Patent Document 1 operates in a peak cut priority mode, discharging from a storage battery corresponding to each load to each load, thereby suppressing the peak of power consumption of each load. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2017-85852 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, in the conventional configuration as shown in Patent Document 1, each of the multiple storage batteries can only discharge to a load connected between the storage battery and the grid, and it is not possible to supply power from the multiple storage batteries to one load. Therefore, when the power consumption of the load increases suddenly (the load suddenly changes to a heavy load), the power supply from the storage batteries may not be sufficient, and the power supplied from the power grid may increase.

[0007] Therefore, an object of the present invention is to provide a power system that can suppress an increase in power supply from a power grid even when the power consumption of a load increases suddenly. [Means for solving the problem]

[0008] The power system of the present invention includes a plurality of inverters, a plurality of loads each including an air conditioner, each of which is connected between the plurality of inverters and a grid interconnection relay, a power receiving point, a current sensor, and a control device. The plurality of inverters include at least a bidirectional inverter, a bidirectional DC-DC converter, and a storage battery. The power receiving point is connected to a commercial power grid by collecting the outputs of the plurality of inverters via the grid interconnection relay.

[0009] The current sensor detects the direction and magnitude of the current at the power receiving point. The control device controls the charging and discharging of each of the storage batteries. The multiple inverters are installed on multiple different floors of the same building. The control device rotates the operation of the multiple air conditioners installed on the multiple floors so that their operation times do not overlap, and controls the discharge of the storage batteries of the multiple inverters to a heavy load based on the measurement value of the current sensor so that the amount of power procured from the commercial power system per specified time unit does not exceed a specified value.

[0010] The power system of the present invention includes a plurality of power conditioners, a power receiving point, a plurality of loads each including an air conditioner, which are respectively connected between the plurality of power conditioners and the power receiving point, a current sensor, and a control device. The plurality of power conditioners include at least a bidirectional inverter, a bidirectional DC-DC converter, a storage battery, and a grid-connection relay. The power receiving point collects the outputs of the plurality of power conditioners and is connected to a commercial power grid. The current sensor detects the direction and magnitude of the current at the power receiving point. The control device controls the charging and discharging of each of the storage batteries. The plurality of power conditioners are installed on different floors of the same building. The control device rotates the operation of the air conditioners installed on the plurality of floors so that their operation times do not overlap, and controls the storage batteries of the plurality of power conditioners to discharge to a heavy load based on the measurement value of the current sensor so that the amount of power procured from the commercial power grid in a predetermined time unit does not exceed a predetermined value.

[0011] In these configurations, the operation of multiple air conditioners does not overlap, and power is supplied to heavy loads from storage batteries on multiple floors. Effect of the Invention

[0012] According to the present invention, even when the power consumption of the load increases suddenly, an increase in the power supply from the power grid can be suppressed. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a power system according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing a flow of power in a first state of the power system according to the first embodiment. [Diagram 3] FIG. 3 is a diagram showing a flow of power in the second state of the power system according to the first embodiment. [Figure 4] FIG. 4 is a diagram showing a flow of power in the third state of the power system according to the first embodiment. [Diagram 5]FIG. 5 is a diagram showing a flow of power in the fourth state of the power system according to the first embodiment. [Figure 6] FIG. 6(A) shows an example of the change in power consumption over time, and FIG. 6(B) shows an example of the change in room temperature over time. [Figure 7] FIG. 7 is a diagram showing an example of mode selection for one day. [Figure 8] FIG. 8 is a diagram illustrating an example of the configuration of a power system according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] [First embodiment] A power system according to a first embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a diagram showing an example of the configuration of the power system according to the first embodiment. Note that the number of floors, the number of inverters, and the number of loads shown in this embodiment are merely examples, and are not limited to these examples as long as there are more than one.

[0015] (Schematic configuration of power system 10) As shown in FIG. 1, the power system 10 includes a plurality of inverters 31-34, a plurality of loads L41-L44, a plurality of grid interconnection relays 51-54, a control device 60, a commercial power interconnection line 500, a power receiving point P500, and a current sensor CT.

[0016] The multiple inverters 31-34 include an inverter 31, an inverter 32, an inverter 33, and an inverter 34. The multiple loads L41-L44 include a load L41, a load L42, a load L43, and a load L44. The load L41 includes an air conditioner 41, the load L42 includes an air conditioner 42, the load L43 includes an air conditioner 43, and the load L44 includes an air conditioner 44. The multiple grid interconnection relays 51-54 include a grid interconnection relay 51, a grid interconnection relay 52, a grid interconnection relay 53, and a grid interconnection relay 54.

[0017] The inverters 31-34 are connected to a power receiving point P500, and outputs of the inverters 31-34 are collected at the power receiving point P500 and are connected to the commercial power system via a commercial power interconnection line 500.

[0018] The grid interconnection relay 51 is connected in series between the inverter 31 and the power receiving point P500. The grid interconnection relay 52 is connected in series between the inverter 32 and the power receiving point P500. The grid interconnection relay 53 is connected in series between the inverter 33 and the power receiving point P500. The grid interconnection relay 54 is connected in series between the inverter 34 and the power receiving point P500.

[0019] The air conditioner 41 is connected to a line connecting the inverter 31 and the grid interconnection relay 51. The air conditioner 42 is connected to a line connecting the inverter 32 and the grid interconnection relay 52. ​​The air conditioner 43 is connected to a line connecting the inverter 33 and the grid interconnection relay 53. The air conditioner 44 is connected to a line connecting the inverter 34 and the grid interconnection relay 54.

[0020] The control device 60 receives output (direction and magnitude of current at the power receiving point P500) from a current sensor CT arranged on the commercial power interconnection line 500, and performs charge / discharge control of multiple inverters 31-34, operation control of multiple air conditioners 41-44, and switch control of multiple grid interconnection relays 51-54.

[0021] In general terms, the control device 60 rotates the operation of the multiple air conditioners 41-44 so that their operating times do not overlap, and controls the discharge of the storage batteries 315, 325, 335, 345 of the multiple inverters 31-34 to heavy loads so that the amount of power procured from the commercial power system per specified time unit does not exceed a specified value based on the measurement value of the current sensor CT.

[0022] The inverters 31-34, the air conditioners 41-44, the grid-connected relays 51-54, and the control device 60 are arranged in a building having, for example, multiple floors (four floors in the illustrated example). In the illustrated example, the inverter 31, the air conditioners 41, and the grid-connected relay 51 are arranged on the third floor, and the inverter 32, the air conditioners 42, and the grid-connected relay 52 are arranged on the second floor. The inverter 33, the air conditioners 43, and the grid-connected relay 53 are arranged on the first floor, and the inverter 34, the air conditioners 44, and the grid-connected relay 54 are arranged on the first basement floor. That is, the inverters, the air conditioners, and the grid-connected relays are arranged in sets on different floors (floors) of the same building. The control device 60 may be arranged on any floor.

[0023] In the above case, air conditioner 41 is air conditioner installed on the third floor, air conditioner 42 is air conditioner installed on the second floor, air conditioner 43 is air conditioner installed on the first floor, and air conditioner 44 is air conditioner installed on the first basement floor.

[0024] The battery capacity of the storage batteries 315, 325, 335, and 345 is preferably 4800 Ah or less, which simplifies fire and explosion-proof equipment and makes installation easier.

[0025] (Configuration of multiple inverters 31-34) The inverter 31 has a bidirectional inverter 313, a bidirectional DCDC converter 314, and a storage battery 315. The bidirectional inverter 313 is connected to the bidirectional DCDC converter 314. The bidirectional DCDC converter 314 is connected to the storage battery 315. The end (AC end) of the bidirectional inverter 313 opposite to the connection end (DC end) to the bidirectional DCDC converter 314 is the output end of the inverter 31 described above.

[0026] The inverter 32 has a bidirectional inverter 323, a bidirectional DCDC converter 324, and a storage battery 325. The bidirectional inverter 323 is connected to the bidirectional DCDC converter 324. The bidirectional DCDC converter 324 is connected to the storage battery 325. The end (AC end) of the bidirectional inverter 323 opposite to the connection end (DC end) to the bidirectional DCDC converter 324 is the output end of the inverter 32 described above.

[0027] The inverter 33 has a bidirectional inverter 333, a bidirectional DCDC converter 334, and a storage battery 335. The bidirectional inverter 333 is connected to the bidirectional DCDC converter 334. The bidirectional DCDC converter 334 is connected to the storage battery 335. The end (AC end) of the bidirectional inverter 333 opposite to the connection end (DC end) to the bidirectional DCDC converter 334 is the output end of the inverter 33 described above.

[0028] The inverter 34 has a bidirectional inverter 343, a bidirectional DCDC converter 344, and a storage battery 345. The bidirectional inverter 343 is connected to the bidirectional DCDC converter 344. The bidirectional DCDC converter 344 is connected to the storage battery 345. The end (AC end) of the bidirectional inverter 343 opposite to the connection end (DC end) to the bidirectional DCDC converter 344 is the output end of the inverter 34 described above.

[0029] (An example of control) FIG. 2 is a diagram showing the flow of power in a first state of the power system according to the first embodiment. FIG. 3 is a diagram showing the flow of power in a second state of the power system according to the first embodiment. FIG. 4 is a diagram showing the flow of power in a third state of the power system according to the first embodiment. FIG. 5 is a diagram showing the flow of power in a fourth state of the power system according to the first embodiment. Note that FIGS. 2, 3, 4, and 5 only show air conditioners, and do not show them as loads. FIG. 6(A) shows an example of the change over time in power consumption, and FIG. 6(B) shows an example of the change over time in room temperature. Note that FIGS. 6(A) and 6(B) show the case where cooling is performed by air conditioners.

[0030] In Fig. 6(A), the solid line and power consumption Pc41 indicate the power consumption of air conditioner 41, the dashed line and power consumption Pc42 indicate the power consumption of air conditioner 42, the one-dot chain line and power consumption Pc43 indicate the power consumption of air conditioner 43, and the two-dot chain line and power consumption Pc44 indicate the power consumption of air conditioner 44. In Fig. 6(B), the solid line indicates the room temperature of the floor on which air conditioner 41 is located, the dashed line indicates the room temperature of the floor on which air conditioner 42 is located, the one-dot chain line indicates the room temperature of the floor on which air conditioner 43 is located, and the two-dot chain line indicates the room temperature of the floor on which air conditioner 44 is located. Note that Fig. 6(B) shows a case in which the cooling upper limit temperature THmx and the cooling lower limit temperature THmn are the same on all floors, but they may be different.

[0031] The control device 60 rotates the operation of the air conditioners 41-44 installed on each floor so that their operation times do not overlap (see FIG. 6(A)). At this time, the control device 60 controls the inverters 31-34 so that the storage batteries 315, 325, 335, 345 of the inverters 31-34 are discharged to heavy loads (in operation) based on the measurement value of the current sensor CT so that the amount of power procured from the commercial power system in a predetermined time period (30 minutes, for example) does not exceed a predetermined value.

[0032] For example, as shown in FIG. 6(A), the control device 60 controls the air conditioners 41, 42, 43, and 44 to operate in rotation in this order.

[0033] At this time, when each of the air conditioners 41-44 is operating, the control device 60 assists the power consumption of the load by discharging from the multiple storage batteries 315, 325, 335, and 345 as shown in FIGS.

[0034] 2, when the air conditioner 41 is operated (when the load L41 is a heavy load), the control device 60 stops the air conditioners 42, 43, and 44 (when the loads L42, L43, and L44 are a light load). In addition, the control device 60 controls the inverters 31-34 to discharge (supply power) from the multiple storage batteries 315, 325, 335, and 345 to the load L41.

[0035] The control device 60 starts the operation of the air conditioner 41 when the room temperature of the floor on which the air conditioner 41 is installed reaches the upper limit temperature for cooling. On the other hand, the control device 60 stops the operation of the air conditioner 41 when the room temperature of the floor on which the air conditioner 41 is installed reaches the lower limit temperature for cooling. The upper limit temperature for cooling is set to the cooling set temperature +α1°C, and the lower limit temperature for cooling is set to the cooling set temperature -β1°C. α1 and β1 may be the same or different. In addition, α1 and β1 are set based on the range that the user can tolerate for changes in the cooling temperature.

[0036] When the air conditioner 41 performs heating, the control device 60 starts operation when the room temperature of the floor on which the air conditioner 41 is installed reaches a lower limit temperature for heating, and stops operation when the room temperature of the floor on which the air conditioner 41 is installed reaches an upper limit temperature for heating. The upper limit temperature for heating is set to the heating set temperature +α2°C, and the lower limit temperature for heating is set to the heating set temperature -β2°C. α2 and β2 may be the same or different. Also, α2 and β2 are set based on the range of changes in heating temperature that the user can tolerate.

[0037] At this time, the control device 60 performs discharge control on the load L41 so that the power supply from the commercial power system does not exceed a predetermined value in a predetermined time unit. Note that the predetermined time unit and the predetermined value are set based on, for example, an electricity rate contract of the building in which the power system 10 is installed.

[0038] At this time, the control device 60 controls the storage battery 315 on the same floor as the air conditioner 41 to mainly discharge. Specifically, for example, the control device 60 covers the power consumption of the load L41 mainly with the discharged power of the storage battery 315 and the power supplied from the commercial power system, and supplies the discharged power from the other storage batteries 325, 335, 345 to the load L41 so that the power supplied from the commercial power system does not exceed the above-mentioned predetermined value.

[0039] 3, when the air conditioner 42 is operated (when the load L42 is a heavy load), the control device 60 stops the air conditioners 41, 43, and 44 (when the loads L41, L43, and L44 are a light load). In addition, the control device 60 controls the inverters 31-34 to discharge (supply power) from the multiple storage batteries 315, 325, 335, and 345 to the load L42.

[0040] The control device 60 starts the operation of the air conditioner 42 when the room temperature of the floor on which the air conditioner 42 is installed reaches an upper limit temperature for cooling. On the other hand, the control device 60 stops the operation of the air conditioner 42 when the room temperature of the floor on which the air conditioner 42 is installed reaches a lower limit temperature for cooling. When the air conditioner 42 performs heating, the control device 60 starts the operation when the room temperature of the floor on which the air conditioner 42 is installed reaches a lower limit temperature for heating, and stops the operation when the room temperature of the floor on which the air conditioner 42 is installed reaches an upper limit temperature for heating.

[0041] At this time, the control device 60 performs discharge control on the load L42 so that the power supplied from the commercial power system does not exceed a predetermined value within a predetermined time unit.

[0042] At this time, the control device 60 controls the storage battery 325 on the same floor as the load L42 so as to mainly discharge the battery. Specifically, for example, the control device 60 covers the power consumption of the load L42 mainly with the discharged power of the storage battery 325 and the power supplied from the commercial power system, and supplies the discharged power from the other storage batteries 315, 335, 345 to the load L42 so that the power supplied from the commercial power system does not exceed the above-mentioned predetermined value.

[0043] 4, when the air conditioner 43 is operated (when the load L43 is a heavy load), the control device 60 stops the air conditioners 41, 42, and 44 (when the loads L41, L42, and L44 are a light load). In addition, the control device 60 controls the inverters 31-34 to discharge (supply power) from the multiple storage batteries 315, 325, 335, and 345 to the load L43.

[0044] The control device 60 starts the operation of the air conditioner 43 when the room temperature of the floor on which the air conditioner 43 is installed reaches an upper limit temperature for cooling. On the other hand, the control device 60 stops the operation of the air conditioner 43 when the room temperature of the floor on which the air conditioner 43 is installed reaches a lower limit temperature for cooling. When the air conditioner 43 performs heating, the control device 60 starts the operation when the room temperature of the floor on which the air conditioner 43 is installed reaches a lower limit temperature for heating, and stops the operation when the room temperature of the floor on which the air conditioner 43 is installed reaches an upper limit temperature for heating.

[0045] At this time, the control device 60 performs discharge control on the load L43 so that the power supplied from the commercial power system does not exceed a predetermined value within a predetermined time unit.

[0046] At this time, the control device 60 controls the storage battery 335 on the same floor as the load L43 so as to mainly discharge the battery. Specifically, for example, the control device 60 supplies the load L43 with discharged power from the other storage batteries 315, 325, 345 so that the power consumption of the load L43 is mainly covered by the discharged power of the storage battery 335 and the power supplied from the commercial power system, and the power supplied from the commercial power system does not exceed the above-mentioned predetermined value.

[0047] 5, when the air conditioner 44 is operated (when the load L44 is a heavy load), the control device 60 stops the air conditioners 41, 42, and 43 (when the loads L41, L42, and L43 are a light load). In addition, the control device 60 controls the inverters 31-34 to discharge (supply power) from the multiple storage batteries 315, 325, 335, and 345 to the load L44.

[0048] The control device 60 starts the operation of the air conditioner 44 when the room temperature of the floor on which the air conditioner 44 is installed reaches an upper limit temperature for cooling. On the other hand, the control device 60 stops the operation of the air conditioner 44 when the room temperature of the floor on which the air conditioner 44 is installed reaches a lower limit temperature for cooling. When the air conditioner 44 performs heating, the control device 60 starts the operation when the room temperature of the floor on which the air conditioner 44 is installed reaches a lower limit temperature for heating, and stops the operation when the room temperature of the floor on which the air conditioner 44 is installed reaches an upper limit temperature for heating.

[0049] At this time, the control device 60 performs discharge control on the load L44 so that the power supplied from the commercial power system does not exceed a predetermined value within a predetermined time unit.

[0050] At this time, the control device 60 controls the storage battery 335 on the same floor as the load L44 so as to mainly discharge the battery. Specifically, for example, the control device 60 covers the power consumption of the load L44 mainly with the discharged power of the storage battery 345 and the power supplied from the commercial power system, and supplies the discharged power from the other storage batteries 315, 325, 335 to the load L44 so that the power supplied from the commercial power system does not exceed the above-mentioned predetermined value.

[0051] By performing the above-described control, the power system 10 can suppress an increase in the power supply from the commercial power grid in a system having multiple air conditioners, even if the power consumption of the load increases sharply.

[0052] Furthermore, the power system 10 controls the operation of multiple air conditioners in rotation, switching between a state in which each air conditioner operates under a heavy load with high energy efficiency and a state in which the operation is stopped. This allows the power system 10 to achieve more efficient operation than, for example, a control that follows a set temperature with high accuracy.

[0053] (Charging status of storage battery) In the above-described power system 10, when the load is light, a storage battery on the same floor as the light load is charged within a range in which the amount of power procured from the commercial power grid in a predetermined time unit does not exceed a predetermined value. Specifically, for example, the control device 60 controls so that a storage battery installed on the same floor as the air conditioner that has started operating is charged during a period after an air conditioner on another floor that was operating before the air conditioner started operating stops operating.

[0054] As an example, in the case of FIG. 6(A), the storage battery 325 on the same floor as the air conditioner 42 is charged during the period after the air conditioner 41 stops operating and before the load L42 starts operating.

[0055] In this way, by charging the battery when the load is light, the battery can be efficiently charged within a range where the amount of power procured from the commercial power grid does not exceed a predetermined value. Furthermore, by charging the battery on the same floor as the air conditioner just before it starts operating, it is possible to more reliably prevent a shortage of power supply from the battery to the air conditioner when it starts operating.

[0056] Furthermore, a battery charging mode and a rotation operation mode may be set as shown in Fig. 7. Fig. 7 is a diagram showing an example of mode selection in one day. In Fig. 7, tst is the start time of work, and ted is the end time of work.

[0057] As shown in Fig. 7, the power system 10 sets the rotation operation mode during the day based on the work start time tst and the work end time ted. In the rotation operation mode, the power system 10 performs the above-mentioned control. In addition, the power system 10 sets the storage battery charging mode after the work end time ted. In the storage battery charging mode, the power system 10 charges the multiple storage batteries 315, 325, 335, 345 within a range in which the amount of power procured from the commercial power system does not exceed a predetermined value.

[0058] By performing such control, the power system 10 can more reliably charge the multiple storage batteries 315, 325, 335, 345, and can effectively utilize the charged power in the rotation operation mode.

[0059] [Second embodiment] A power system according to a second embodiment of the present invention will be described with reference to Fig. 8. Fig. 8 is a diagram showing an example of the configuration of the power system according to the second embodiment.

[0060] 8, the power system 10A according to the second embodiment differs from the power system 10 according to the first embodiment in that the multiple inverters 31-34 are replaced with multiple power conditioners 31A-34A. The other configuration of the power system 10A is similar to that of the power system 10, and a description of similar parts will be omitted.

[0061] The power system 10A includes a power conditioner 31A, a power conditioner 32A, a power conditioner 33A, and a power conditioner 34A.

[0062] The multiple power conditioners 31A-34A are connected to a power receiving point P500, and outputs of the multiple power conditioners 31A-34A are collected at the power receiving point P500 and are connected to the commercial power system via a commercial power interconnection line 500.

[0063] Load L41 is connected to the line connecting the receiving point P500 and power conditioner 31A, load L42 is connected to the line connecting the receiving point P500 and power conditioner 32A, load L43 is connected to the line connecting the receiving point P500 and power conditioner 33A, and load L44 is connected to the line connecting the receiving point P500 and power conditioner 34A.

[0064] The power conditioner 31A has a bidirectional inverter 313, a bidirectional DCDC converter 314, a storage battery 315, and a grid interconnection relay 316. The bidirectional inverter 313 is connected to the bidirectional DCDC converter 314. The bidirectional DCDC converter 314 is connected to the storage battery 315. An end (AC end) of the bidirectional inverter 313 opposite to a connection end (DC end) to the bidirectional DCDC converter 314 is connected to one terminal of the grid interconnection relay 316, and the other terminal of the grid interconnection relay 316 becomes the above-mentioned output end of the power conditioner 31A.

[0065] The power conditioner 32A has a bidirectional inverter 323, a bidirectional DCDC converter 324, a storage battery 325, and a grid interconnection relay 326. The bidirectional inverter 323 is connected to the bidirectional DCDC converter 324. The bidirectional DCDC converter 324 is connected to the storage battery 325. An end (AC end) of the bidirectional inverter 323 opposite to a connection end (DC end) to the bidirectional DCDC converter 324 is connected to one terminal of the grid interconnection relay 326, and the other terminal of the grid interconnection relay 326 becomes the above-mentioned output end of the power conditioner 32A.

[0066] The power conditioner 33A has a bidirectional inverter 333, a bidirectional DCDC converter 334, a storage battery 335, and a grid interconnection relay 336. The bidirectional inverter 333 is connected to the bidirectional DCDC converter 334. The bidirectional DCDC converter 334 is connected to the storage battery 335. An end (AC end) of the bidirectional inverter 333 opposite to a connection end (DC end) to the bidirectional DCDC converter 334 is connected to one terminal of the grid interconnection relay 336, and the other terminal of the grid interconnection relay 336 becomes the above-mentioned output end of the power conditioner 33A.

[0067] The power conditioner 34A has a bidirectional inverter 343, a bidirectional DCDC converter 344, a storage battery 345, and a grid interconnection relay 346. The bidirectional inverter 343 is connected to the bidirectional DCDC converter 344. The bidirectional DCDC converter 344 is connected to the storage battery 345. An end (AC end) of the bidirectional inverter 343 opposite to a connection end (DC end) to the bidirectional DCDC converter 344 is connected to one terminal of the grid interconnection relay 346, and the other terminal of the grid interconnection relay 346 becomes the above-mentioned output end of the power conditioner 34A.

[0068] Power conditioner 31A is placed on the same floor as air conditioner 41, power conditioner 32A is placed on the same floor as air conditioner 42, power conditioner 33A is placed on the same floor as air conditioner 43, and power conditioner 34A is placed on the same floor as air conditioner 44.

[0069] In this way, power system 10A using multiple power conditioners 31A-34A can also perform the same control as power system 10, and can achieve the same effects.

[0070] <1> A plurality of inverters including at least a bidirectional inverter, a bidirectional DC-DC converter, and a storage battery; a power receiving point where the outputs of the plurality of inverters are collected via a grid interconnection relay and connected to a commercial power grid; A plurality of loads each including an air conditioner, each of which is connected between the plurality of inverters and the grid interconnection relay; A current sensor for detecting a direction and a magnitude of a current at the power receiving point; A control device for controlling charging and discharging of each of the storage batteries; A power system comprising: The plurality of inverters are installed on different floors of a same building, The control device includes: The air conditioners installed on each floor are operated in rotation so that their operating times do not overlap, a power system that controls discharging from the storage batteries of the multiple inverters to the heavy load based on the measurement value of the current sensor so that the amount of power procured from the commercial power grid per specified time unit does not exceed a specified value.

[0071] <2> A plurality of power conditioners each having at least a bidirectional inverter, a bidirectional DC-DC converter, a storage battery, and a grid interconnection relay; a power receiving point at which outputs of the plurality of power conditioners are collected and connected to a commercial power system; A plurality of loads each including an air conditioner, the loads being connected between the plurality of power conditioners and the power receiving point, respectively; A current sensor for detecting a direction and a magnitude of a current at the power receiving point; A control device for controlling charging and discharging of each of the storage batteries; A power system comprising: The plurality of power conditioners are installed on different floors of the same building, The control device includes: The air conditioners installed on each floor are operated in rotation so that their operating times do not overlap, A power system that controls discharging from the storage batteries of the multiple power conditioners to the heavy load based on the measurement value of the current sensor so that the amount of power procured from the commercial power grid per specified time unit does not exceed a specified value.

[0072] <3> the control device charges a storage battery on the same floor as the air conditioner with a light load within a range in which the amount of power procured from the commercial power grid per predetermined time unit does not exceed a predetermined value; <1> or <2> power system.

[0073] <4> The control device starts operation when the room temperature of the floor on which the air conditioner is installed reaches an upper limit temperature for cooling during cooling, or a lower limit temperature for heating during heating. <1> ~ <3> Any of the power systems.

[0074] <5> the control device controls the storage battery installed on the same floor as the air conditioner that has started operating to be charged during a period after the air conditioner on another floor that has been operating before the start of operation has stopped operating. <4> power system.

[0075] <6> The battery capacity of the storage battery is 4800Ah or less. <1> ~ <5> Any of the power systems. [Explanation of symbols]

[0076] 10, 10A: Power system 31, 32, 33, 34: Inverter 31A, 32A, 33A, 34A: Power conditioner 41, 42, 43, 44: Air conditioning equipment L41, L42, L43, L44: Load 51, 52, 53, 54, 346, 316, 326, 336: Grid-connected relays 60: Control device 313, 323, 333, 343: Bidirectional inverter 314, 324, 334, 344: Bidirectional DC-DC converter 315, 325, 335, 345: Storage battery 500: Commercial power grid connection line CT: Current sensor P500: Power receiving point

Claims

1. A plurality of inverters including at least a bidirectional inverter, a bidirectional DC-DC converter, and a storage battery; a power receiving point where the outputs of the plurality of inverters are collected via a grid interconnection relay and connected to a commercial power grid; a plurality of loads each including an air conditioner, the loads being connected between the plurality of inverters and the grid interconnection relay; A current sensor for detecting a direction and a magnitude of a current at the power receiving point; A control device for controlling charging and discharging of each of the storage batteries; A power system comprising: The plurality of inverters are installed on different floors of a same building, The control device includes: The air conditioners installed on each floor are operated in rotation so that their operating times do not overlap, based on the measured value of the current sensor, control is performed so that the amount of power procured from the commercial power system per predetermined time unit does not exceed a predetermined value, so that the storage batteries of the plurality of inverters are discharged to the load which is a heavy load. Power system.

2. A plurality of power conditioners each having at least a bidirectional inverter, a bidirectional DC-DC converter, a storage battery, and a grid interconnection relay; a power receiving point at which outputs of the plurality of power conditioners are collected and connected to a commercial power system; A plurality of loads each including an air conditioner, the loads being connected between the plurality of power conditioners and the power receiving point, respectively; A current sensor for detecting a direction and a magnitude of a current at the power receiving point; A control device for controlling charging and discharging of each of the storage batteries; A power system comprising: The plurality of power conditioners are installed on different floors of the same building, The control device includes: The air conditioners installed on each floor are operated in rotation so that their operating times do not overlap, Based on the measurement value of the current sensor, control is performed so that the amount of power procured from the commercial power grid per predetermined time unit does not exceed a predetermined value, so that the storage batteries of the plurality of power conditioners are discharged to the load that is a heavy load. Power system.

3. the control device charges a storage battery on the same floor as the air conditioner with a light load within a range in which the amount of power procured from the commercial power grid per predetermined time unit does not exceed a predetermined value; The power system according to claim 1 or 2.

4. The control device includes: When the room temperature of the floor on which the air conditioner is installed reaches the upper limit temperature for cooling during cooling, or the lower limit temperature for heating during heating, the air conditioner starts operating. The power system according to claim 1 or 2.

5. The control device includes: performing control so that the storage battery installed on the same floor as the air conditioner that has started operating is charged during a period after the air conditioner on another floor that has been operating before the start of operation has stopped operating; The power system of claim 4.

6. The battery capacity of the storage battery is 4800 Ah or less. The power system according to claim 1 or 2.

Citation Information

Patent Citations

  • Storage battery type air conditioner

    JP1994137651A

  • Storage battery type air conditioning system

    JP1999325545A

  • Storage type air conditioning system, and operation method and control program for storage type air conditioning system

    JP2008128604A

  • Power storage system

    JP2017085852A

  • Thermal load with improved responsiveness

    JP2018533711A