Hoist installation guide device and hoist installation method

The hoist installation guide device with a lower bracket and guide member addresses instability issues in machine room-less elevators by facilitating stable lifting of the hoisting machine unit along the guide rail, enhancing installation efficiency and safety.

JP7583224B2Active Publication Date: 2024-11-13HITACHI BUILDING SYST CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2024507386
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-03-18
Publication Date
2024-11-13
Estimated Expiration
2042-03-18

AI Technical Summary

Technical Problem

Existing hoist installation methods in machine room-less elevators face challenges when the guide rail does not extend to the top of the hoistway, causing instability and inefficiency during hoist lifting, as the guide member can come off the guide rail, complicating the installation process.

Method used

A hoist installation guide device with a lower bracket and guide member slidably engaged with the guide rail is used to support the hoisting machine unit, allowing it to be lifted along the guide rail, ensuring stability and efficiency during installation.

Benefits of technology

The solution improves work efficiency by enabling stable lifting of the hoisting machine unit to the top of the hoistway, reducing high-place work and enhancing safety by allowing assembly at lower levels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583224000001
    Figure 0007583224000001
  • Figure 0007583224000002
    Figure 0007583224000002
  • Figure 0007583224000003
    Figure 0007583224000003
Patent Text Reader

Abstract

This guide device for the installation of a hoisting machine may be used when installing a hoisting machine unit on guide rails erected in a hoistway. The guide device for the installation of a hoisting machine comprises: a lower bracket attached to the lower part, in the vertical direction, of a hoisting machine unit; and a guide members which are provided to the lower bracket and which slidably engage with guide rails.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a hoist installation guide device and a hoist installation method. [Background technology]

[0002] One example of an elevator is a machine-room-less elevator, which does not have a machine room at the top of the elevator shaft. In recent years, in machine-room-less elevators, a hoist is sometimes installed on a guide rail that guides the elevator car and counterweight upward and downward.

[0003] A technique for installing such a hoist is described, for example, in Patent Document 1. Patent Document 1 includes an erecting step of erecting a guide rail in a hoistway, and an installation step of attaching a guide member that holds the mounting frame slidably relative to the guide rail to the mounting frame. After the installation step, the method includes a lifting step of lifting the hoist while sliding the mounting frame in the longitudinal direction of the guide rail, a fixing step of fixing a support base and a beam that support the vertical load of the hoist and the mounting frame to the guide rail, and an installation step of installing the mounting frame and the hoist on the beam. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] International Publication No. 2002-79076 Summary of the Invention [Problem to be solved by the invention]

[0005] However, there are elevators in which the guide rail does not extend to the top of the hoistway. In addition, in the technology described in Patent Document 1, the guide member is installed on the side of the hoist. Therefore, in the technology described in Patent Document 1, when the hoist is lifted to the top of the hoistway, the guide member comes off the guide rail, and the hoist cannot be lifted to the top in a stable state, which reduces the efficiency of the installation work of the hoist.

[0006] In consideration of the above problems, an object of the present invention is to provide a hoist installation guide device and a hoist installation method that can improve the work efficiency when installing a hoist. [Means for solving the problem]

[0007] In order to solve the above problems and achieve the object, a hoist installation guide device is used when installing a hoist unit on a guide rail erected in a hoistway. The hoist installation guide device includes a lower bracket attached to the lower part of the hoist unit in the vertical direction, and a guide member provided on the lower bracket and slidably engaged with the guide rail.

[0008] In addition, the method for installing the hoist includes the steps (1) to (3) shown below. (1) The process of installing guide rails in the elevator. (2) A process of attaching a lower bracket to the vertical lower part of the hoist unit and slidably engaging a guide member provided on the lower bracket with a guide rail. (3) A process of sliding the guide member along the guide rail to lift the hoist unit. Effect of the Invention

[0009] According to the hoist installation guide device and the hoist installation method having the above-mentioned configuration, it is possible to improve the work efficiency when installing the hoist. [Brief description of the drawings]

[0010] [Figure 1] FIG. 2 is a side view of a hoistway showing the installation position of a hoist in an elevator according to an embodiment. [Diagram 2] FIG. [Diagram 3] 1 is a front view showing a state in the middle of lifting a hoist using a hoist installation guide device according to an embodiment. FIG. [Figure 4]4 is a flowchart showing a method for installing a hoist according to an embodiment. [Diagram 5] FIG. 4 is a front view showing the state in which the hoist has been lifted to a predetermined position. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, a hoist installation guide device and a hoist installation method according to an embodiment will be described with reference to Fig. 1 to Fig. 5. In addition, the same reference numerals are used to designate common members in each drawing.

[0012] 1. Example of embodiment 1-1. Location of the hoist First, the installation position of a hoist installed by a hoist installation guide device according to an embodiment (hereinafter referred to as "this example") will be described with reference to Figs. 1 to 3. FIG. 1 is a side view of the hoistway, FIG. 2 is a plan view of the hoistway, and FIG. 3 is a front view showing the hoisting machine in the middle of lifting.

[0013] As shown in Fig. 1, the elevator of this example is a so-called machine room-less elevator, which does not have a machine room at the top of a hoistway 50 formed in a building structure. As shown in Fig. 1 and Fig. 2, a pair of car side guide rails 40, 41 for guiding a car and a pair of weight side guide rails 42, 43 for guiding a counterweight (not shown) are erected in the hoistway 50.

[0014] 2, a plurality of rail brackets 30, 31, 32 are installed in the hoistway 50. The first rail bracket 30 and the second rail bracket 31 are installed on a first inner wall 51 of the hoistway 50, and the third rail bracket 32 ​​is installed on a second inner wall 52 of the hoistway 50. The first inner wall 51 and the second inner wall 52 face each other in the left-right direction when the hoistway 50 is viewed from the hall side where people and baggage enter and exit.

[0015] Furthermore, when the hoist unit 1 is to be installed, a work scaffold or a temporary work floor is set up in the space 10 in the hoistway 50 where the car is to be installed. Various tasks are performed on the work scaffold or the temporary work floor. For this reason, it is extremely difficult to lift the hoist unit 1 to the top of the hoistway using the space 10. The space 10 is disposed between a first inner wall 51 and a second inner wall 52.

[0016] The first rail bracket 30 and the second rail bracket 31 are disposed on the first inner wall 51 with a gap therebetween in the front-rear direction perpendicular to the elevator direction and the left-right direction of the car. A first weight-side guide rail 42 is fixed to the first rail bracket 30. A second weight-side guide rail 43 and a first car-side guide rail 40 are fixed to the second rail bracket 31. A second car-side guide rail 41 is fixed to the third rail bracket 32. The hoist unit 1 passes between the first weight-side guide rail 42 and the second weight-side guide rail 43 and is lifted to the top of the hoistway 50.

[0017] Furthermore, by fixing two guide rails, the second weight side guide rail 43 and the first car side guide rail 40, to the second rail bracket 31, the space occupied by the rail brackets in the elevator shaft 50 can be reduced, making the elevator shaft 50 more compact.

[0018] 1, the pair of car-side guide rails 40, 41 and the first weight-side guide rail 42 extend to the top of the hoistway 50. In contrast, the second weight-side guide rail 43 has its upper end cut off in order to provide a predetermined gap between it and the ceiling 80 (see FIG. 5) of the hoistway 50, and does not extend to near the top of the hoistway 50. Therefore, the second weight-side guide rail 43 is set shorter than the other guide rails 40, 41, 42.

[0019] The hoist unit 1 is lifted to the top of the hoistway 50 by passing between the first weight-side guide rail 42 and the second weight-side guide rail 43 by a hoist installation guide device 60 described later. As shown in FIG. 3, the hoist unit 1 includes a hoist body 2, a machine beam 3, and a vibration-isolating member 4.

[0020] The hoisting machine main body 2 is installed on the upper part of the machine beam 3 via vibration-proof members 4. The machine beam 3 is arranged between a first weight-side guide rail 42 and a second weight-side guide rail 43. By storing the machine beam 3 within the two weight guide rails 42, 43 in this way, it becomes possible to install the hoisting machine main body 2 on the machine beam 3 in advance at the bottom of the hoistway 50. This makes it unnecessary to perform work to integrate the hoisting machine main body 2 and the machine beam 3 at the top of the hoistway 50, thereby reducing work at high altitudes and improving safety.

[0021] 1-2. Example of the configuration of the hoist installation guide device Next, the configuration of the hoist installation guide device (hereinafter simply referred to as the guide device) 60 will be described. As shown in Fig. 3, the guide device 60 has an upper bracket 61, a spacer bracket 62, and a lower bracket 63. The upper bracket 61 is attached to the upper part of the hoisting machine main body 2. As shown in Fig. 2, the upper bracket 61 is disposed on the rear side of the hoisting machine main body 2, which faces the first inner wall 51. The upper bracket 61 extends in the front-rear direction. Therefore, the upper bracket 61 is disposed between the first weight-side guide rail 42 and the second weight-side guide rail 43.

[0022] Further, guide members 61a, 61b are attached to both ends of the upper bracket 61, respectively. The two guide members 61a, 61b protrude from both ends of the upper bracket 61 toward the hoisting machine main body 2. Therefore, the upper bracket 61 and the two guide members 61a, 61b are formed into a substantially U-shape when viewed from above. As a result, the upper side of the hoisting machine main body 2 is open. The first guide member 61a is slidably supported by the second weight-side guide rail 43, and the second guide member 61b is slidably supported by the first weight-side guide rail 42.

[0023] The spacer bracket 62 is attached to the lower part in the up-down direction of the machine beam 3. The spacer bracket 62 protrudes downward in the up-down direction from the lower part of the machine beam 3. The lower bracket 63 is fixed to the lower end part in the up-down direction of the spacer bracket 62, i.e., the end part opposite the machine beam 3. Therefore, a space 70 is formed by the spacer bracket 62 between the lower bracket 63 and the underside of the machine beam 3.

[0024] The lower bracket 63, like the upper bracket 61, extends along the front-rear direction and is disposed between the first weight-side guide rail 42 and the second weight-side guide rail 43. Furthermore, guide members 64a, 64b are attached to both ends of the lower bracket 63. The first guide member 64a is slidably supported by the second weight-side guide rail 43, and the second guide member 64b is slidably supported by the first weight-side guide rail 42.

[0025] 2.How to install the hoist Next, a method for installing the hoist unit 1 using the above-mentioned guide device will be described with reference to Figs. FIG. 4 is a flow chart showing a method for installing the hoist, and FIG. 5 is a front view showing the state in which the hoist has been lifted up to a predetermined position.

[0026] As shown in Fig. 4, first, a worker carries products such as the hoisting machine main body 2, the machine beam 3, and the guide rails 40, 41, 42, 43 into the lower part of the hoistway 50 (step S11). Next, the worker attaches the guide rails 40, 41, 42, 43 to the rail brackets 30, 31, 32, and stands the guide rails 40, 41, 42, 43 in the hoistway 50 (step S12). Then, the worker positions the guide rails 40, 41, 42, 43 (step S13).

[0027] Next, the worker assembles the hoisting machine main body 2 and the machine beam 3 at the bottom of the hoistway 50 (step S14). That is, the hoisting machine main body 2 is installed on the top of the machine beam 3 via the vibration-proof member 4. This makes it possible to assemble the hoisting machine unit 1 as shown in Fig. 3. Also, by assembling the hoisting machine main body 2 and the machine beam 3 in advance at the bottom of the hoistway 50, it is possible to reduce work at high altitudes and improve safety.

[0028] Next, the guide device 60 is attached to the hoist unit 1 (step S15). That is, the upper bracket 61 is attached to the upper part of the hoist main body 2, and the lower bracket 63 is attached to the lower part of the machine beam 3 via the spacer bracket 62. The installation work of this guide device 60 is also performed at the lower part of the hoistway 50, thereby reducing the amount of work at high altitudes and improving safety. Then, two guide members 61a, 61b provided on the upper bracket 61 slidably engage with the weight-side guide rails 42, 43, and similarly, two guide members 64a, 64b provided on the lower bracket 63 slidably engage with the weight-side guide rails 42, 43.

[0029] The assembly work of the hoisting machine unit 1 and the installation work of the guide device 60 may be carried out in advance before being carried into the hoistway 50.

[0030] Next, the hoist unit 1 with the guide device 60 attached thereto is lifted using the lifting machine 56 shown in FIG. 3 (step S16). That is, as shown in FIG. 3, the lifting machine 56 is attached to a hoisting hook 55 installed at the top of the hoistway 50. Then, the lifting rope of the lifting machine 56 is connected to a hoisting device (not shown) provided at the top of the hoisting machine main body 2. Here, the upper bracket 61 of the guide device 60 is disposed on the rear side of the hoisting machine main body 2, and the top of the hoisting machine main body 2 is open. This makes it possible to prevent interference between the lifting rope of the lifting machine 56 and the upper bracket 61, and the work of connecting the lifting rope to the hoisting device of the hoisting machine main body 2 can be easily performed.

[0031] Then, the lifting machine 56 is driven to lift the hoisting machine unit 1. At this time, the multiple guide members 61a, 61b, 64a, 64b of the guide device 60 slide on the weight-side guide rails 42, 43. In this manner, the hoisting machine unit 1 is supported and lifted by the guide members 61a, 61b, 64a, 64b provided at the upper and lower parts. This allows the hoisting machine unit 1 to be lifted while being held by the guide device 60, so that the hoisting machine unit 1 can be prevented from swinging during the lifting operation and coming into contact with the inner wall of the hoistway 50 or other equipment.

[0032] 5, when the hoist unit 1 is lifted to the top of the hoistway 50, i.e., near the ceiling 80, the first guide member 61a of the upper bracket 61 comes off the second weight-side guide rail 43. However, according to the guide device 60 of this example, the lower bracket 63 is provided on the lower part of the machine beam 3 via the spacer bracket 62. Therefore, even if the hoist unit 1 is lifted to the top of the hoistway 50, the guide members 64a, 64b provided on the lower bracket 63 will not come off the weight-side guide rails 42, 43.

[0033] As a result, the hoist unit 1 can be lifted to the top of the hoistway 50 while being held by the guide device 60. In this way, the hoist unit 1 can be lifted in a stable state all the way to the end, improving the work efficiency when installing the hoist unit 1.

[0034] Next, the machine beam 3 is installed on the weight-side guide rails 42, 43 (step S17). Then, when the installation work of the machine beam 3 is completed, the guide device 60 is removed from the hoisting machine unit 1, and the hoisting machine unit 1 is installed at the top of the hoistway 50, i.e., on the weight-side guide rails 42, 43 (step S18). This completes the installation work of the hoisting machine unit 1.

[0035] In the process of step S17, as shown in Fig. 5, machine beam receivers 5a, 5b are attached to the lower part of the machine beam 3, and the machine beam 3 is fixed to the weight-side guide rails 42, 43 via the machine beam receivers 5a, 5b. Here, a space 70 is formed by the spacer bracket 62 between the lower bracket 63 that holds the hoisting machine unit 1 and the machine beam 3. Therefore, the installation work of the machine beam 3 can be performed without removing the guide device 60 from the hoisting machine unit 1. As a result, the installation work of the machine beam 3 can be performed with the hoisting machine unit 1 in a stable state due to the guide device 60, thereby improving the work efficiency.

[0036] As described above, the guide device 60 is detachably attached to the hoist unit 1. Therefore, the guide device 60 can be repeatedly used as a temporary material, and therefore the guide device 60 of this example can be used not only in the installation work of a new elevator, but also in the renewal work of an existing elevator.

[0037] The present invention is not limited to the embodiment described above and shown in the drawings, and various modifications can be made without departing from the spirit of the invention as defined in the claims.

[0038] In the above-described embodiment, the upper bracket 61 is provided on the upper part of the hoist body 2, but the present invention is not limited to this. For example, the upper bracket 61 may be provided on the side of the hoist body 2, i.e., the guide members 61a and 61b may be provided on the side of the hoist body 2. good.

[0039] Also, an example has been described in which the space 70 is formed between the machine beam 3 and the lower bracket 63 by the spacer bracket 62, but this is not limiting, and the lower bracket 63 may be directly attached to the lower part of the machine beam 3. In consideration of the ease of installation of the machine beam 3, it is preferable to form the space 70 using the spacer bracket 62.

[0040] In this specification, the words "parallel" and "orthogonal" are used, but these do not mean only "parallel" and "orthogonal" in the strict sense, but may also mean a "substantially parallel" or "substantially orthogonal" state that includes "parallel" and "orthogonal" and is within a range in which the respective functions can be exerted. [Explanation of symbols]

[0041] 1...hoisting machine unit, 2...hoisting machine main body, 3...machine beam, 4...vibration-proof member, 5a, 5b...machine beam support, 30, 31, 32...rail bracket, 40...first cage side guide rail, 41...second cage side guide rail, 42...first weight side guide rail, 43...second weight side guide rail, 50...hoistway, 51...first inner wall, 52...second inner wall, 55...suspension hook, 56...hoisting machine, 60...hoisting machine installation guide device (guide device), 61...upper bracket, 61a...first guide member, 61b...second guide member, 62...spacer bracket, 63...lower bracket, 64a...first guide member, 64b...second guide member, 70...space, 80...ceiling

Claims

1. A hoist installation guide device used when installing a hoist unit on a guide rail erected in a hoistway, The hoist unit includes a hoist body and a machine beam arranged under the hoist body and on which the hoist body is installed, A lower bracket attached to a lower portion of the hoist unit in the up-down direction; a guide member provided on the lower bracket and slidably engaged with the guide rail; An upper bracket attached to an upper portion of the hoist body in the vertical direction; Two guide members provided on the upper bracket and slidably engaged with the guide rail; Equipped with The upper bracket is disposed on the rear side of the hoist body, The upper part of the hoist body in the vertical direction is open, When the hoist unit is lifted to the top of the hoistway, at least one of the two guide members of the upper bracket is disengaged from the guide rail, and the guide member of the lower bracket is engaged with the guide rail. Hoisting machine installation guide device.

2. The machine beam is fixed to the guide rail via a machine beam support, The lower bracket is fixed to the lower part of the machine beam via a spacer bracket, The spacer bracket is fixed to the lower part of the machine beam and protrudes downward in the vertical direction to form a space between the lower bracket and the machine beam. The hoist installation guide device according to claim 1.

3. The lower bracket, the spacer bracket and the upper bracket are detachably attached to the hoist unit. The hoist installation guide device according to claim 2.

4. The front guide rails are a pair of weight-side guide rails that guide the counterweight, The machine beam is disposed between the pair of weight-side guide rails. The hoist installation guide device according to claim 2.

5. A hoist unit having a hoist body and a machine beam arranged under the hoist body and on which the hoist body is installed, A step of erecting a guide rail in the elevator; a step of attaching a lower bracket to a lower portion of the hoist unit in a vertical direction and slidably engaging a guide member provided on the lower bracket with the guide rail; a step of attaching an upper bracket to the top of the winding machine body in the vertical direction and slidably engaging two guide members provided on the upper bracket with the guide rails; Sliding the guide member along the guide rail to lift the hoist unit; Including, The upper bracket is disposed on the rear side of the hoist body, The upper part of the hoist body in the vertical direction is open, When the hoist unit is lifted to the top of the hoistway, at least one of the two guide members of the upper bracket is disengaged from the guide rail, and the guide member of the lower bracket is engaged with the guide rail. How to install a hoist.

Citation Information

Patent Citations

  • Installation method of elevator

    JP2000169059A

  • Method of installing hoisting machine of elevator

    JP2011132012A

  • Machine bed and lifting device

    JP2012201497A

  • Method for installation of hoist, and elevator

    JP2018008805A

  • Method of installing a machine in an elevator system

    US20150083525A1