Integrated management device, management method, server, program, and storage medium

The integrated management device optimizes energy and mobile object demands by determining movement schedules that prioritize either energy or mobile object needs, addressing the challenge of simultaneous demand satisfaction.

JP7583947B2Active Publication Date: 2024-11-14HONDA MOTOR CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023542401
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2021-08-20
Filing Date
2022-08-16
Publication Date
2024-11-14
Estimated Expiration
2042-08-16

AI Technical Summary

Technical Problem

Existing systems lack an efficient method to manage and coordinate energy demand and mobile object demands in a way that satisfies both simultaneously, often leading to suboptimal or conflicting outcomes in energy and delivery schedules.

Method used

An integrated management device that determines the location and time for mobile objects to move based on energy and demand requirements, switching between modes to prioritize either energy demand or mobile object demand, and adjusts schedules to optimize satisfaction of both.

Benefits of technology

The system effectively balances energy and mobile object demands, ensuring that either energy demand is satisfied to the extent possible while meeting mobile object demands, or vice versa, thereby optimizing overall system efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007583947000001
    Figure 0007583947000001
  • Figure 0007583947000002
    Figure 0007583947000002
  • Figure 0007583947000003
    Figure 0007583947000003
Patent Text Reader

Abstract

An integrated management device according to the present invention includes: an acquisition unit that acquires (I) a first demand that includes demand amount regarding to energy demand, demand time, and demand position, and that is transmitted from an energy management device that manages energy, (II) a second demand that includes demand amount regarding to demand of a moving body, demand time, and demand position, and that is transmitted from a moving body management device that manages the moving body; a processing unit that performs at least one of processing for deciding position and time of travel of the moving body, on the basis of the first demand and the second demand acquired by the acquisition unit, and processing of determining whether both demands of the first demand and the second demand can be satisfied; and a mode distinguishing unit that switches a plurality of modes including, as modes for managing the energy and the moving body, a first mode that satisfies the first demand within a range that is capable while satisfying the second demand, and a second mode that satisfies the second demand within a range that is capable while satisfying the first demand.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an integrated management device, a management method, a server, a program, and a storage medium. [Background technology]

[0002] Patent Document 1 discloses that "the V2G system comprises a parent aggregator that manages the buying and selling of electricity from multiple power supply sources to the power grid, and a child aggregator that manages multiple pieces of transportation equipment and ensures to the parent aggregator the charging and discharging between at least one of the capacitors installed in each of the multiple pieces of transportation equipment and the power grid." [Prior art document] [Patent documents] [Patent Document 1] JP 2018-124674 A General Disclosure

[0003] In a first aspect, an integrated management device is provided. The integrated management device includes an acquisition unit that acquires (I) a first demand including a demand amount, a demand time, and a demand location related to energy demand, sent from an energy management device that manages energy, and (II) a second demand including a demand amount, a demand time, and a demand location related to a mobile object demand, sent from a mobile object management device that manages a mobile object. The integrated management device includes a processing unit that performs at least one of a process for determining a location and a time at which the mobile object moves based on the first demand and the second demand acquired by the acquisition unit, and a process for determining whether both the first demand and the second demand can be satisfied. The integrated management device includes a mode discrimination unit that switches between a plurality of modes for managing energy and mobile objects, including a first mode that satisfies the first demand to a possible extent while satisfying the second demand, and a second mode that satisfies the second demand to a possible extent while satisfying the first demand.

[0004] The mode determination unit may determine a mode to be executed in the future from among a plurality of modes as a mode for managing energy and moving bodies.

[0005] The mode determination unit may determine a mode to be currently executed from among a plurality of modes as a mode for managing energy and moving bodies, regardless of a mode currently being executed.

[0006] The mode discrimination unit may discriminate which mode should currently be executed from among the multiple modes when a predetermined emergency condition is satisfied after the moving body starts to move based on the position and time at which the moving body will move that have been determined according to the mode discriminated by the mode discrimination unit.

[0007] The first mode may be a mode in which a position and time for the moving body to move are determined so as to satisfy the second demand, and the time for the moving body to move is adjusted so as to satisfy the first demand to the extent possible while satisfying the second demand.

[0008] When the first mode is determined by the mode determination unit, the processing unit determines whether both the first demand and the second demand can be satisfied by moving the mobile body according to a position and time for the mobile body to move determined to satisfy the second demand, and if it is determined that both the first demand and the second demand cannot be satisfied, performs processing to adjust the time for which the mobile body moves so as to satisfy the first demand to the extent possible while satisfying the second demand.

[0009] The second mode may be a mode in which a moving body necessary to satisfy a first demand is selected from among the multiple moving bodies, and moving bodies other than the selected moving body from among the multiple moving bodies so as to satisfy the second demand to the greatest extent possible.

[0010] When the second mode is determined by the mode determination unit, the processing unit may perform processing to select a moving body from the multiple moving bodies that is necessary to satisfy the first demand, and to determine the locations and times at which moving bodies other than the selected moving body from the multiple moving bodies will move, so as to satisfy the second demand as much as possible.

[0011] In a second aspect, a server is provided. The server includes an acquisition unit that acquires (I) a first demand including a demand amount, a demand time, and a demand location related to energy demand, sent from an energy management device that manages energy, and (II) a second demand including a demand amount, a demand time, and a demand location related to a mobile object demand, sent from a mobile object management device that manages a mobile object. The server includes a processing unit that performs at least one of a process for determining a location and a time at which the mobile object moves based on the first demand and the second demand acquired by the acquisition unit, and a process for determining whether both the first demand and the second demand can be satisfied. The server includes a mode discrimination unit that switches between a plurality of modes for managing energy and mobile objects, including a first mode that satisfies the first demand to a possible extent while satisfying the second demand, and a second mode that satisfies the second demand to a possible extent while satisfying the first demand.

[0012] In a third aspect, a management method is provided. The management method includes a step of acquiring a first demand including a demand amount, a demand time, and a demand location related to an energy demand. The management method includes a step of acquiring a second demand including a demand amount, a demand time, and a demand location related to a demand of a mobile body. The management method includes a step of performing at least one of a process for determining a location and a time at which the mobile body moves based on the first demand and the second demand, and a process for determining whether both the first demand and the second demand can be satisfied. The management method includes a step of switching between a plurality of modes for managing energy and the mobile body, including a first mode for satisfying the first demand to a possible extent while satisfying the second demand, and a second mode for satisfying the second demand to a possible extent while satisfying the first demand.

[0013] In a fourth aspect, there is provided a program that causes a computer to function as the above-mentioned integrated management device.

[0014] In a fifth aspect, a storage medium is provided. The storage medium stores the above program. The storage medium may be a non-transitory computer-readable storage medium.

[0015] The above summary of the invention does not list all of the necessary features of the present invention. Also, subcombinations of these features may also be inventions. [Brief description of the drawings]

[0016] [Figure 1] 1 illustrates a control system 100 according to a first embodiment. [Diagram 2] 1 shows a schematic diagram of a delivery route for goods from business establishment 11. [Diagram 3] 1 shows a schematic diagram of a system configuration of an integrated management device 51. [Figure 4] 4 shows execution sequences of the power control device 41, the integrated management device 51, and the vehicle control device 61 in the normal mode. [Diagram 5] 13 shows an example of delivery information input by a user of the vehicle control device 61. [Figure 6] 13 shows a schematic diagram of a process in which the vehicle control device 61 allocates vehicles 181 for delivering goods when a vehicle allocation plan is created. [Figure 7] This information indicates the location of the delivery destination and the delivery route determined by the vehicle control device 61 when creating a vehicle dispatch plan. [Figure 8] The figure shows a schematic representation of the number of goods delivered by each vehicle 181 based on the proposed vehicle dispatch plan. [Figure 9] 2 shows the charging demand and power supply demand in the business establishment 11 determined by the power control device 41 when the power plan was created. [Figure 10] 13 illustrates a process in which the integrated management device 51 adjusts the delivery plan in accordance with the power demand. [Figure 11] 1 illustrates a schematic of mediated electricity demand and delivery demand. [Figure 12] Execution sequences of the power control device 41, the integrated management device 51, and the vehicle control device 61 when the special mode is determined are shown. [Figure 13] 13A and 13B show schematic diagrams of a process in which the vehicle control device 61 reallocates vehicles 181 for delivering goods in response to an adjustment request from the integrated management device 51 in the special mode. [Figure 14] The area covered by vehicle 181 is shown. [Figure 15] 4 shows execution sequences of the power control device 41, the integrated management device 51 and the vehicle control device 61 in the emergency mode. [Figure 16] 13A and 13B show schematic diagrams of a process in which the vehicle control device 61 reallocates vehicles 181 that deliver goods in response to an adjustment request from the integrated management device 51 in emergency mode. [Figure 17] The area covered by vehicle 181 is shown. [Figure 18] 2 shows a schematic diagram of a system configuration of an integrated management device 50. [Figure 19] 1 shows an overview of the overall system execution sequence for the movement of the vehicle 110 in the control system 100. [Figure 20] Execution sequences of processes executed by the integrated management device 50, the power control device 40, the vehicle control device 60, and the vehicle 110 are shown. [Figure 21] 2 shows an example of a data structure of delivery information managed by the processing unit 220. [Figure 22] Schematically shows the change in the speed of a vehicle 110 from departure from a base 10 through business establishments 11 to 14 to return to the base 10. [Figure 23] 1 is a graph showing a schematic representation of predicted values ​​of power consumption, generated power, and changes over time in remaining charge of stationary batteries for the next day at each of bases 10 and offices 11-14. [Figure 24] 13 illustrates a schematic diagram of control of a vehicle 110 based on operation information and power transfer information. [Diagram 25] 21 is a flowchart showing the details of the process from S306 to S310 in FIG. 20. [Figure 26] 13 is a flowchart showing a process executed by the vehicle 110 on the day that the vehicle 110 departs from the base 10. [Figure 27] 10 is a flowchart showing the process executed when the vehicle 110 arrives at the business establishments 11-14. [Figure 28] FIG. 11 is a schematic diagram for explaining the processing of a processing unit 220 in the second embodiment. [Figure 29] FIG. 13 is a schematic diagram for explaining the processing of a processing unit 220 in a control system 1200 according to the third embodiment. [Diagram 30] An example of a computer 2000 is shown. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] The present invention will be described below through embodiments of the invention, but the following embodiments do not limit the scope of the invention according to the claims. Furthermore, not all of the combinations of features described in the embodiments are necessarily essential to the solution of the invention.

[0018] 1 is a schematic diagram of a control system 100 according to a first embodiment. The control system 100 includes a power control device 40, a power control device 41, a power control device 42, a power control device 43, and a power control device 44, a vehicle control device 60, a vehicle control device 61, a vehicle control device 62, a vehicle control device 63, and a vehicle control device 64, an integrated management device 50, an integrated management device 51, an integrated management device 52, an integrated management device 53, and an integrated management device 54, and a power control device 140.

[0019] In this embodiment, the vehicles 110a, 110b, and 110c are vehicles equipped with a driving battery that stores driving power for driving. The vehicles 110a, 110b, and 110c are, for example, electric vehicles. The vehicles 110a, 110b, and 110c are delivery vehicles capable of transporting goods to the business establishments 11, 12, 13, and 14. In this embodiment, the vehicles 110a, 110b, and 110c may be collectively referred to as "vehicles 110". The vehicles 110 are provided so as to be able to communicate with the vehicle control device 60 via a mobile communication network or the like.

[0020] The base 10 is, for example, a business establishment for managing delivery of goods to the business establishments 11, 12, 13, and 14. The base 10 functions as a base for parking the vehicle 110. The base 10 and the business establishments 11 to 14 can exchange power with a driving battery provided in the vehicle 110. That is, the vehicle 110 can be used for energy management at the base 10 and the business establishments 11 to 14. The integrated management device 50 and the vehicle control device 60 are managed, for example, at the base 10. The integrated management device 50 and the vehicle control device 60 are provided so as to be able to communicate with each other via a communication line. The integrated management device 50 and the vehicle control device 60 may be provided outside the base 10. The integrated management device 50 and the vehicle control device 60 may be provided so as to be able to communicate with each other via a communication line such as the Internet. One or both of the integrated management device 50 and the vehicle control device 60 may be realized by a server such as a cloud server.

[0021] The base 10 includes a power generation device 20, a stationary battery 30, and a power control device 40. The power generation device 20 is a power generation device that uses renewable energy such as a solar power generation device. The stationary battery 30 is a battery provided at the base 10. The power control device 40 controls charging and discharging of the stationary battery 30 according to the amount of power generated by the power generation device 20 and the power demand so as to meet the power demand at the base 10. The power control device 40 is capable of communicating with an integrated management device 50 via a communication line such as the Internet.

[0022] Each of the business establishments 11 to 14 has a vehicle for transporting goods. For example, the business establishment 11 has a vehicle 181a, a vehicle 181b, a vehicle 181c, and a vehicle 181d. In this embodiment, the vehicles 181a, 181b, 181c, and 181d may be collectively referred to as "vehicle 181". The business establishment 11 is an establishment for delivering goods transported to the business establishment 11 to a house or the like in a specific area 121. The business establishment 12 is an establishment for delivering goods transported to the business establishment 12 to a house or the like in a specific area 122. The business establishment 13 is an establishment for delivering goods transported to the business establishment 13 to a house or the like in a specific area 123. The business establishment 14 is an establishment for delivering goods transported to the business establishment 14 to a house or the like in a specific area 124. The delivery destination of the goods from the establishments 11 to 14 is not limited to a residence, but may be a store such as a convenience store.

[0023] The business establishment 11 includes a power generation device 21, a stationary battery 31, a power control device 41, an integrated management device 51, and a vehicle control device 61. The power generation device 21 is, for example, a power generation device that uses renewable energy such as a solar power generation device. The stationary battery 31 is a battery provided in the business establishment 11. The power control device 41 controls charging and discharging of the stationary battery 31 according to the amount of power generated by the power generation device 21 and the power demand so as to satisfy the power demand in the business establishment 11. The power control device 41 transfers power between the business establishment 11 and a driving battery provided in a vehicle 181 parked in the business establishment 11. The vehicle control device 61 determines the time at which the vehicle 181 provided in the business establishment 11 leaves and returns from the business establishment 11 so as to satisfy the delivery demand. The integrated management device 50 adjusts the time at which the vehicle 181 leaves and returns from the business establishment 11 so as to satisfy the delivery demand indicated by the delivery schedule information of the goods and the power demand information in the business establishment 11.

[0024] The business establishment 12 includes a power generation device 22, a stationary battery 32, a power control device 42, an integrated management device 52, and a vehicle control device 62. The business establishment 13 includes a power generation device 23, a stationary battery 33, a power control device 43, an integrated management device 53, and a vehicle control device 63. The business establishment 14 includes a power generation device 24, a stationary battery 34, a power control device 44, an integrated management device 54, and a vehicle control device 64. The power generation devices 22, 23, and 24 have the same functions as the power generation device 21. The stationary battery 32, 33, and 34 have the same functions as the stationary battery 31. The power control device 42, 43, and 44 have the same functions as the power control device 41. The integrated management devices 52, 53, and 54 have the same functions as the integrated management device 51. Vehicle control device 62, vehicle control device 63, and vehicle control device 64 have the same functions as vehicle control device 61. Therefore, explanations of the power generation devices, stationary batteries, and power control devices in business establishments 12 to 14 will be omitted.

[0025] In this embodiment, it is assumed that the vehicle 110 departs from the base 10, and then returns to the base 10 via the business offices 11, 12, and 13 in that order. The vehicle control device 60 acquires delivery demand indicating the items that each of the business offices desires to deliver the next day from the business offices 11-14, and transmits this as delivery schedule information to the central management device 50. In addition, the power control devices 40-44 predict the power consumption and the power generation amount of the power generation devices 20-24 at each of the bases 10 and the business offices 11-14 for the next day, and transmit this to the central management device 50 as power demand information. The integrated management device 50 determines the arrival and departure times of the vehicle 110 at each of the business offices 11-14 so as to satisfy the delivery demand indicated by the delivery schedule information and the power demand information at each base 10 and the business offices 11-14, and causes power to be transferred between the driving battery of the vehicle 110 and the business offices 11-14 when the vehicle 110 stops at each of the business offices 11-14 to unload goods. Note that the stations 71-74 are charging stations installed outside the business offices 11-14. When the integrated management device 50 determines that the battery of the vehicle 110 needs to be recharged at any of the stations 71-74, it may determine operation information for passing through the station and cause the driving battery to be charged at the station according to the determined operation information.

[0026] The power control device 140 communicates with the power control devices 40-44 and supervises overall power control in the base 10 and the business offices 11-14. For example, the power control device 140 may collect information on power supply and demand from the power control devices 40-44 and cause the power control devices 40-44 to control the power control devices 40-44 so as to minimize the power cost overall for the base 10 and the business offices 11-14 by adjusting the overall power supply and demand including power trading with the grid.

[0027] 2 shows a schematic diagram of a delivery route of an item from the establishment 11. In this embodiment, a case will be described in which delivery destinations 111a, 112a, 113a, 114a, and 115a exist within area A, delivery destinations 111b, 112b, 113b, 114b, and 115b exist within area B, delivery destinations 111c, 112c, 113c, 114c, and 115c exist within area C, and delivery destinations 111d, 112d, 113d, 114d, and 115d exist within area D.

[0028] Vehicles 181a, 181b, 181c, and 181d provided in the business establishment 11 are vehicles equipped with a battery for driving that stores driving power for driving. Vehicles 181a, 181b, 181c, and 181d are, for example, electric vehicles. Vehicles 181a, 181b, 181c, and 181d are delivery vehicles for transporting goods to delivery destinations 111 to 115. Vehicle 181 is provided so as to be able to communicate with vehicle control device 61 via a mobile communication network or the like.

[0029] Based on the delivery information, the vehicle control device 61 determines to deliver the goods to the delivery destinations 111a to 115a in area A by the vehicle 181a, to deliver the goods to the delivery destinations 111b to 115b in area B by the vehicle 181b, to deliver the goods to the delivery destinations 111c to 115c in area C by the vehicle 181c, and to deliver the goods to the delivery destinations 111d to 115d in area D by the vehicle 181d. The vehicle control device 61 acquires delivery demand indicating the goods that each delivery destination desires to deliver on the next day from the business establishment 11, and determines the travel routes of the vehicles 181a to 181d and the departure and return times of the business establishment 11 as delivery schedule information, and transmits them to the integrated management device 51. The power control device 41 also predicts the power consumption and the power generation amount of the power generation device 21 in the business establishment 11 on the next day, and transmits them to the integrated management device 51 as power demand information. The integrated management device 51 determines the departure time from the business establishment 11, the delivery route of the vehicle 181, and the return time to the business establishment 11 so as to satisfy the delivery demand indicated by the delivery schedule information and the electricity demand information at the business establishment 11, and when the vehicle 181 is parked at the business establishment 11, transmits and receives electricity between the vehicle 181's driving battery and the business establishment 11.

[0030] Note that the delivery control and power control of goods at the business establishments 12 to 14 are similar to the delivery control and power control of goods at the business establishment 11. Therefore, in this embodiment, the delivery control and power control of goods at the business establishment 11 will be described, and a description of the delivery control and power control at the business establishments 12 to 14 will be omitted.

[0031] 3 illustrates a system configuration of the central management device 51. The central management device 51 includes a calculation unit 300, a storage unit 380, and a communication unit 390. The calculation unit 300 includes an acquisition unit 310, a processing unit 320, and a mode discrimination unit 330.

[0032] The calculation unit 300 is realized by, for example, a calculation processing device including a processor. The storage unit 380 is realized by including a non-volatile storage medium. The calculation unit 300 performs processing using information stored in the storage unit 380. The communication unit 390 is responsible for communication between the power control device 41, the vehicle control device 61, and the vehicle 181. The calculation unit 300 communicates with the outside through the communication unit 390.

[0033] The acquisition unit 310 acquires (I) a first demand including a demand amount, a demand time, and a demand location related to the energy demand, sent from an energy management device that manages energy, and (II) a second demand including a demand amount, a demand time, and a demand location related to the demand of the mobile body, sent from a mobile body management device that manages the mobile body. The processing unit 320 includes a processing unit that performs at least one of a process for determining a position and a time at which the mobile body moves based on the first demand and the second demand acquired by the acquisition unit 310, and a process for determining whether both the first demand and the second demand can be satisfied. The mode discrimination unit 330 switches between a plurality of modes, including a first mode that satisfies the first demand to a possible extent while satisfying the second demand, and a second mode that satisfies the second demand to a possible extent while satisfying the first demand, as a mode for managing energy and the mobile body. The power control device 41 in this embodiment is an example of an energy management device that manages energy. In this embodiment, the power control device 41 manages and controls power as an example of energy, but the power control device 41 may manage power without controlling the power. The vehicle control device 61 in this embodiment is an example of a mobile object management device. In this embodiment, the vehicle control device 61 manages and controls a vehicle 181 as an example of a mobile object, but the vehicle control device 61 may manage the vehicle 181 without controlling the vehicle 181.

[0034] The "normal mode" described later is an example of the first mode. The "special mode" and "emergency mode" described later are examples of the second mode. The mode discrimination unit 330 may select the "special mode" when it is determined that peak shaving of power is necessary in the power plan drawn up by the power control device 41. The mode discrimination unit 330 may select the "normal mode" when it is determined that peak shaving of power is not necessary in the power plan drawn up by the power control device 41. The mode may be set in the business establishment 11. For example, when the "emergency mode" is selected in the business establishment 11, the mode discrimination unit 330 may always select the "emergency mode".

[0035] The mode discrimination unit 330 may discriminate a mode to be executed in the future from among the multiple modes as a mode for managing energy and a moving body. The mode discrimination unit 330 may discriminate a mode to be executed currently from among the multiple modes as a mode for managing energy and a moving body, regardless of the currently executed mode. The mode discrimination unit 330 may discriminate a mode to be executed currently from among the multiple modes when a predetermined emergency condition is satisfied after the moving body starts moving based on the position and time at which the moving body moves determined according to the mode discriminated by the mode discrimination unit 330.

[0036] The first mode may be a mode in which a position and time for the moving body to move are determined so as to satisfy the second demand, and the time for the moving body to move is adjusted so as to satisfy the first demand to the extent possible while satisfying the second demand.

[0037] When the first mode is determined by the mode determination unit 330, the processing unit 320 determines whether both the first demand and the second demand can be satisfied by moving the mobile body according to the position and time of the mobile body's movement determined to satisfy the second demand, and if it determines that both the first demand and the second demand cannot be satisfied, it may perform processing to adjust the time during which the mobile body moves so as to satisfy the first demand to the extent possible while satisfying the second demand.

[0038] The second mode may be a mode in which a moving body necessary to satisfy a first demand is selected from among the multiple moving bodies, and moving bodies other than the selected moving body from among the multiple moving bodies so as to satisfy the second demand to the greatest extent possible.

[0039] When the second mode is determined by the mode determination unit 330, the processing unit 320 may perform processing to select a moving body from among the multiple moving bodies that is necessary to satisfy the first demand, and to determine the positions and times at which moving bodies other than the selected moving body from among the multiple moving bodies will move, so as to satisfy the second demand as much as possible.

[0040] Fig. 4 shows an execution sequence of the power control device 41, the integrated management device 51, and the vehicle control device 61 in the normal mode. The processing in Fig. 4 shows the processing from creating a power plan and a vehicle allocation plan for the next day on the previous day to executing the plan according to the created plan.

[0041] As the control related to the power control device 41, in S4010, at least one of the user of the power control device 41 and the power control device 140 sets constraint conditions related to the power plan in the business establishment 11 and notifies the power control device 41. The power control device 140 may set constraint conditions in the business establishment 11 so as to minimize the power cost as a whole for the base 10 and the business establishments 11 to 14. The user is a person or a system that inputs information related to power management in the business establishment 11 to the power control device 41. The constraint conditions are conditions that are constraints in formulating a power plan. The constraint conditions may include constraints necessary to satisfy the power demand. The constraint conditions include, for example, information related to the current amount of power generation, the current amount of power consumption, and the power fee. The amount of power generation is, for example, the amount of power generation in the power generation device 21. The amount of power consumption is the amount of power consumption in the business establishment 11. The power fee includes the power purchase price and the power selling price. The power purchase price is, for example, a condition related to the amount of money charged as a consideration for the business establishment 11 receiving power from the grid. The power selling price is a condition regarding the amount of money that the business establishment 11 can receive as compensation for supplying power to the grid, for example.

[0042] In S4012, the power control device 41 creates a power plan for the business establishment 11 for the next day. The power plan includes the amount of power generation, the amount of stored power, and the amount of power consumption for each time period in a day. The power plan determines how much power is generated and consumed in each time period in the business establishment 11, and how much is charged to the stationary battery 31 or how much is discharged from the stationary battery 31. The amount of power generation for each time period on the next day may be predicted from environmental information such as weather information for the next day and past performance data. The power plan may include peak shave information for performing peak shaving. The peak shave information may include information indicating how much power consumption should be suppressed in which time period in the business establishment 11. The peak shave information may include information indicating how much power should be received from the outside in which time period in the business establishment 11.

[0043] The power control device 41 may create an optimal power plan for the business 11. For example, the power control device 41 may create a power plan so that the amount of power received from the grid at the business 11 is minimized. The power control device 41 may create a power plan so that the amount of money charged as compensation for receiving power from the grid at the business 11 is minimized. The power control device 41 may create a power plan so that the amount of money obtained as compensation for supplying power to the grid at the business 11 is maximized. In this way, the power control device 41 creates an optimal power plan as a power plan for the next day at the business 11 based on the constraint conditions. This power plan determines the amount of power that needs to be received from the outside during each time period on the next day. The amount of power that needs to be received from the outside may be supplied from a driving battery provided in a vehicle 181 parked at the business 11. The power control device 41 transmits the created power plan to the integrated management device 51.

[0044] As control related to the vehicle control device 61, in S4210, a user inputs constraint conditions related to the dispatch of the vehicle 181. The user of the vehicle control device 61 is, for example, a person or a system that inputs delivery demand data at the business establishment 11. The constraint conditions for dispatching the vehicle may include constraints required to meet the delivery demand of goods in the area 121. The constraint conditions for dispatching the vehicle are conditions that are constraints when planning a dispatch plan. The constraint conditions for dispatching the vehicle include, for example, the delivery origin and delivery destination, the departure time and return time of the business establishment 11, the type of goods as cargo, the volume of the goods, and the weight of the goods. The delivery origin and delivery destination determine from which location to which the vehicle 181 needs to travel. The departure time is the time when the vehicle 181 departs from the business establishment 11, and the return time is the time when the vehicle 181 returns to the business establishment 11. For the departure time and return time, a time adjustment allowance may be set, which indicates the amount of time by which the departure time and return time of the vehicle 181 can be changed.

[0045] In S4212, the vehicle control device 61 creates a vehicle allocation plan for the next day at the business establishment 11 based on the constraint conditions notified by the user. For example, the vehicle control device 61 determines the number of vehicles 181 to be used for delivery, the vehicles 181 to be used to deliver the goods, the areas to which the vehicles 181 will deliver the goods, the travel routes of the vehicles 181, and the travel speeds of the vehicles 181, so that the delivery demand determined by the constraint conditions is satisfied. The vehicle control device 61 transmits the created vehicle allocation plan to the integrated management device 51.

[0046] In S4110 , the integrated management device 51 receives the power plan transmitted from the power control device 41 and the vehicle allocation plan transmitted from the vehicle control device 61 .

[0047] In S4112, when the mode discrimination unit 330 of the integrated management device 51 determines that the control is to be performed in the normal mode based on the power plan, the processing unit 320 mediates the power plan and the vehicle allocation plan in the normal mode. For example, the processing unit 320 determines whether the power plan in the business establishment 11 is satisfied when the vehicle 181 is operated according to the vehicle allocation plan. For example, the vehicle allocation plan determines a period during which the vehicle 181 is predicted to be present at the business establishment 11. The processing unit 320 determines that the power plan is satisfied when it is predicted that the business establishment 11 can receive the power that needs to be supplied from the outside from the driving battery provided in the vehicle 181 during the period during which the vehicle 181 is present at the business establishment 11 during the required time period. In addition, the processing unit 320 determines that the power plan is satisfied when it is predicted that the business establishment 11 can supply the power that each business establishment 11 needs to discharge to the outside to the driving battery provided in the vehicle 181 during the time period during which the power needs to be discharged.

[0048] When the processing unit 320 determines that the power plan cannot be satisfied when vehicles are dispatched according to the vehicle dispatch plan, it determines how to modify the vehicle dispatch plan to satisfy the power plan. For example, the processing unit 320 determines the amount of adjustment of the departure time and arrival time of the vehicle 181 with respect to the vehicle dispatch plan received from the vehicle control device 61 within the time adjustment allowance in the vehicle dispatch plan.

[0049] In S4112, the integrated management device 51 transmits a time adjustment amount including a correction to the vehicle dispatch plan to the vehicle control device 61. When the vehicle control device 61 receives the time adjustment amount from the integrated management device 51, it reflects the time adjustment amount in the vehicle dispatch plan drawn up in S4212 (S4213). For example, the vehicle control device 61 corrects the departure time and return time in the drawn up vehicle dispatch plan according to the time adjustment amount. The vehicle control device 61 transmits a vehicle dispatch plan indicating the corrected departure time and return time to the integrated management device 51 as a result of reflecting the time adjustment amount.

[0050] In S4114, when the integrated management device 51 receives the revised vehicle allocation plan from the vehicle control device 61, it transmits the arbitration result indicating the revised vehicle allocation plan to the power control device 41. When the power control device 41 receives the arbitration result from the integrated management device 51, it reflects the arbitration result in the power plan based on the arbitration result (S4014), and notifies the user of the power plan finalized by reflecting the arbitration result (S4015). In S4016, the user and the power control device 140 execute control according to the notified power plan. In S4018, the user and the power control device 140 execute performance processing related to the execution of the power plan. For example, the user executes a process of collecting and inputting performance data of power management including performance data of the charge / discharge amount of the stationary battery in each time period, performance data of the generated power, and performance data of the power consumption. In S4020, the power control device 41 manages the performance data input from each of the user and the power control device 140 as history information. The power control device 41 may use the history information managed by the power control device 41 when creating a power plan later.

[0051] Furthermore, the vehicle control device 61 finalizes the vehicle dispatch plan by reflecting the time adjustment amount in S4213 (S4214), and notifies the user of the finalized vehicle dispatch plan. In S4216, the user executes operation control of the vehicles 181 according to the notified vehicle dispatch plan. In S4218, the user performs performance processing related to the execution of the vehicle dispatch plan. For example, the user performs a process of collecting and inputting driving performance data including driving data of each vehicle 181 and remaining capacity of the driving battery. In S4220, the vehicle control device 61 manages the driving performance data input by the user as history information. Note that the vehicle control device 61 may use the history information managed by the vehicle control device 61 when later formulating a vehicle dispatch plan.

[0052] FIG. 5 shows a schematic example of delivery information input by a user of the vehicle control device 61. The delivery information includes a delivery area, a control number, a delivery address, weight, and a designated time period. The delivery area specifies information identifying areas A to D. The control number specifies identification information of the item to be delivered. The delivery address specifies the address of the delivery destination. The information specified for the delivery area is determined from the delivery address. The weight specifies the weight of the item to be delivered. The designated time period specifies the time period during which the item should be delivered.

[0053] 6 is a schematic diagram showing a process in which the vehicle control device 61 assigns vehicles 181 for delivering goods when creating a vehicle dispatch plan. The vehicle control device 61 groups goods according to the delivery destination areas A to D of each goods, based on the delivery destination address of each goods included in the delivery information, and determines which vehicle 181 will deliver which goods. As shown in FIG. 6, the vehicle control device 61 assigns vehicle 181a as a vehicle for delivering goods whose delivery destination is area A, vehicle 181b as a vehicle for delivering goods whose delivery destination is area B, vehicle 181c as a vehicle for delivering goods whose delivery destination is area C, and vehicle 181d as a vehicle for delivering goods whose delivery destination is area D.

[0054] 7 is information showing the location of the delivery destination and the delivery route determined by the vehicle control device 61 when creating a vehicle dispatch plan. The vehicle control device 61 determines the delivery route and delivery time zone based on the delivery address, designated time zone, and weight included in the delivery information. The vehicle control device 61 determines the delivery route and delivery time zone so as to minimize the amount of power consumed by the vehicle 181 to travel. The vehicle control device 61 also calculates the delivery time required from departure from the business establishment 11 to arrival at the business establishment 11 when delivery is made along the determined delivery route. In this way, the vehicle control device 61 determines the departure time and return time of each vehicle 181.

[0055] FIG. 8 shows the number of deliveries of goods by each vehicle 181 based on the proposed vehicle dispatch plan. According to the vehicle dispatch plan shown in FIG. 8, vehicle 181a departs from business office 11 at 8:00 a.m., returns to business office 11 at 9:30 a.m., leaves business office 11 again at 1:00 p.m., and returns to business office 11 at 5:00 p.m. Vehicle 181b departs from business office 11 at 8:00 a.m., returns to business office 11 at 11:00 a.m., leaves business office 11 again at 1:00 p.m., and returns to business office 16 at 4:30 p.m. Vehicle 181c departs from business office 11 at 8:00 a.m., returns to business office 11 at 10:00 a.m., leaves business office 11 again at 1:00 p.m., and returns to business office 16 at 5:00 p.m. Vehicle 181d departs from business office 11 at 8:00 a.m., returns to business office 11 at 11:00 a.m., departs from business office 11 again at 1:00 p.m., and returns to business office 16 at 5:00 p.m.

[0056] 9 shows the charging demand and power supply demand in the business establishment 11 determined by the power control device 41 when the power plan is created. The charging demand indicates that the stationary battery 31 provided in the business establishment 11 needs to be charged, and the power supply demand indicates that power needs to be discharged from the stationary battery 31.

[0057] FIG. 10 is a schematic diagram showing a process in which the integrated management device 51 adjusts the delivery plan in accordance with the power demand. As shown in FIG. 10, the processing unit 320 of the integrated management device 51 advances the morning departure time of the vehicle 181a by 30 minutes so that the vehicle 181a returns to the business office 11 before the start time of the charging demand at the business office 11. The processing unit 320 also advances the afternoon departure time of the vehicle 181b by 30 minutes so that the vehicle 181b returns to the business office 11 before the start time of the power supply demand at the business office 11. As a result, as shown in FIG. 11, by adjusting the vehicle dispatch plan based on the time adjustment amount, the vehicle 181a can return to the business office 11 a predetermined time before the start time of the charging demand, and the stationary battery 31 can be charged with the power from the driving battery of the vehicle 181a. Also, it is possible for the vehicle 181b to return to the business establishment 11 a predetermined time before the start time of the power supply demand, and to charge the driving battery of the vehicle 181b with the power discharged from the stationary battery 31. In this manner, the processing unit 320 determines the time adjustment amount in the vehicle dispatch plan so that any one of the vehicles 181 returns to the business establishment 11 a predetermined time before the start time of the charging demand and the start time of the power supply demand.

[0058] Fig. 12 shows an execution sequence of the power control device 41, the integrated management device 51, and the vehicle control device 61 when the special mode is determined. The process in Fig. 12 shows the process from creating a power plan and a vehicle allocation plan for the next day on the previous day to executing the plan according to the created plan.

[0059] The processes of S4010, S4012, S4110, and S4210 are the same as the processes of S4010, S4012, S4110, and S4210 in FIG. 4, and therefore will not be described here.

[0060] In S5112, when the mode discrimination unit 330 of the integrated management device 51 determines that control is to be performed in the special mode based on the power plan, the processing unit 320 reconciles the power plan and the vehicle dispatch plan in the special mode. The mode discrimination unit 330 may determine that control is to be performed in the special mode when it determines that the amount of power consumption to be suppressed in the business establishment 11 exceeds a predetermined value based on peak shaving information included in the power plan. When it is determined that control is to be performed in the special mode, the processing unit 320 determines the power capacity of the driving battery to be reserved for peak shaving of the business establishment 11 based on the peak shaving information. The processing unit 320 transmits a reservation request including the determined power capacity to the vehicle control device 61.

[0061] When the vehicle control device 61 receives the reservation request from the integrated management device 51, it determines the number of vehicles 181 to be stationed at the business establishment 11 based on the power capacity included in the reservation request, reorganizes the vehicle allocation plan using vehicles 181 other than the determined number of vehicles 181, and transmits the reorganized vehicle allocation plan to the integrated management device 51 (S5213). The reorganized vehicle allocation plan includes information indicating the number of vehicles 181 stationed at the business establishment 11.

[0062] In S5114, when the integrated management device 51 receives the rearranged vehicle allocation plan from the vehicle control device 61, it transmits the rearranged vehicle allocation plan as the arbitration result to the power control device 41. When the power control device 41 receives the arbitration result from the integrated management device 51, it reflects the arbitration result in the power plan based on the arbitration result (S5014), and notifies the user of the power plan finalized by reflecting the arbitration result (S5015). The subsequent processes of S4016, S4018, and S4020 are the same as the processes of S4016, S4018, and S4020 in Fig. 4, and therefore description thereof will be omitted here.

[0063] In addition, the vehicle control device 61 confirms the vehicle dispatch plan rearranged in S5213 (S5214) and notifies the user of the confirmed vehicle dispatch plan. The subsequent processes of S4216, S4218, and S4220 are the same as those of S4216, S4218, and S4220 in FIG. 4, and therefore will not be described here.

[0064] 13 is a schematic diagram showing a process in which the vehicle control device 61 reallocates vehicles 181 for delivering goods in response to an adjustment request from the integrated management device 51 in the special mode. The vehicle control device 61 selects vehicles 181a to be stationed at the business establishment 11 as backup power sources. At this time, the vehicle control device 61 determines the number of vehicles 181 to be stationed at the business establishment 11 as backup power sources based on the remaining capacity of the driving battery of the vehicle 181 and the reservation request notified from the integrated management device 51, and selects the determined number of vehicles 181 as vehicles 181 to be stationed at the business establishment 11 as backup power sources.

[0065] When the vehicle 181a is selected as the vehicle to be stationed at the business establishment 11, the vehicle control device 61 assigns the items to be delivered to the delivery destination in area A to the vehicles 181b, 181c, and 181d other than the vehicle 181a based on the address of the delivery destination. For example, as shown in FIG. 13, the vehicle control device 61 assigns two of the five items whose delivery destination is area A and the item whose delivery destination is area B to the vehicle 181b. Also, the vehicle control device 61 assigns two of the five items whose delivery destination is area A and the item whose delivery destination is area C to the vehicle 181c. Also, the vehicle control device 61 assigns one of the five items whose delivery destination is area A and the item whose delivery destination is area D to the vehicle 181d. As a result, the areas shared by the vehicles 181b, 181c, and 181d are determined as shown in FIG. 14. The vehicle control device 61 rearranges the dispatch plan based on the delivery destinations of the goods assigned to the vehicles 181b, 181c, and 181d, and determines the driving routes, departure times, and return times of the vehicles 181b, 181c, and 181d. This allows the power control device 41 to control the charging and discharging of the driving battery of the vehicle 181a stationed at the business establishment 11, thereby making it possible to meet at least a part of the power demand of the business establishment 11.

[0066] Fig. 15 shows an execution sequence of the power control device 41, the integrated management device 51, and the vehicle control device 61 in the emergency mode. The processing in Fig. 15 is started when a predetermined event occurs while the vehicle 181 is being operated and controlled by the power control device 41 according to the power plan and the vehicle dispatch plan created in the normal mode or the special mode. The predetermined event may be, for example, a disaster event such as a power outage or an earthquake.

[0067] As control related to the power control device 41, in S6010, at least one of the user of the power control device 41 and the power control device 140 sets constraint conditions related to the power plan in the business establishment 11 and notifies the power control device 41. The constraint conditions include the power outage situation, the current state of the power generation amount, and the current state of the power consumption amount. The power generation amount is, for example, the power generation amount in the power generation device 21. The power consumption amount is the power consumption amount in the business establishment 11.

[0068] In S6012, the power control device 41 creates a power plan for the business establishment 11 from the current day onwards. The power plan includes the amount of power generation, the amount of stored power and the amount of power consumption for each time period in a day. The power control device 41 transmits the amount of power capacity that needs to be secured at the business establishment 11 to the central management device 51 based on the power plan. The power control device 41 may determine the amount that needs to be secured so that at least the power consumed at night in the business establishment 11 can be secured.

[0069] As control related to the vehicle control device 61, in S6210, the user inputs constraint conditions related to the dispatch of the vehicle 181. The constraint conditions may include information indicating undelivered goods, information on the safety of the delivery destination, receipt availability information indicating whether the delivery destination can receive the goods, and road conditions including whether the road is passable.

[0070] In S6212, the vehicle control device 61 creates a vehicle allocation plan for the business establishment 11 from the current day onward, based on the constraints notified by the user. For example, the vehicle control device 61 determines the number of vehicles 181 to be used for delivery, the vehicles 181 to be used for delivery of the goods, the areas to which the vehicles 181 will deliver the goods, the travel routes of the vehicles 181, and the travel speeds of the vehicles 181, so that the delivery demand for undelivered goods is met. The vehicle control device 61 creates a delivery plan only for goods that can be delivered, based on road conditions and receipt availability information. The vehicle control device 61 transmits the created vehicle allocation plan to the integrated management device 51.

[0071] In S6110, the integrated management device 51 receives the required amount of power to be secured transmitted from the power control device 41 and the vehicle allocation plan transmitted from the vehicle control device 61.

[0072] In S6112, when the mode discrimination unit 330 of the integrated management device 51 determines that control should be performed in emergency mode due to the occurrence of a predetermined event, the processing unit 320 arbitrates the power plan and the vehicle dispatch plan in emergency mode. For example, the processing unit 320 determines the power capacity of the driving battery to be secured at the business establishment 11 based on the required amount of power to be secured received from the power control device 41. The integrated management device 51 transmits a securing request including the determined power capacity to the vehicle control device 61.

[0073] When the vehicle control device 61 receives the reservation request from the integrated management device 51, it determines the number of vehicles 181 to be stationed at the business establishment 11 based on the power capacity included in the reservation request, reorganizes the vehicle allocation plan to dispatch undelivered goods using vehicles 181 other than the determined number of vehicles 181, and transmits the reorganized vehicle allocation plan to the integrated management device 51 (S6213). The reorganized vehicle allocation plan includes information indicating the number of vehicles 181 stationed at the business establishment 11.

[0074] In this embodiment, the vehicles 181 that are in the middle of delivery and have not returned to the business establishment 11 at the time when a predetermined event occurs are assumed to return to the business establishment 11 once, and the driving batteries of all the vehicles 181 are charged to full capacity by the power generation device 20. In addition, the user of the vehicle control device 61 collects road conditions in response to the occurrence of a predetermined event, and collects information on the safety of the delivery destination and whether the goods can be received. In addition, after charging of the driving batteries of the vehicles 181 is completed, the vehicle control device 61 selects the vehicles 181 to be stationed at the business establishment 11 based on the reservation request, and selects vehicles 181 other than the selected vehicle 181 as vehicles 181 for delivering the goods. The vehicle control device 61 may rearrange the vehicle allocation plan for the day and thereafter so as to meet the delivery demand to the extent possible.

[0075] In S6114, when the integrated management device 51 receives the rearranged vehicle allocation plan from the vehicle control device 61, it transmits the rearranged vehicle allocation plan as the arbitration result to the power control device 41. When the power control device 41 receives the arbitration result from the integrated management device 51, it reflects the arbitration result in the power plan based on the arbitration result (S6014), and notifies the user of the power plan finalized by reflecting the arbitration result (S6015). The subsequent processes of S4016, S4018, and S4020 are the same as the processes of S4016, S4018, and S4020 in Fig. 4, and therefore description thereof will be omitted here.

[0076] In addition, the vehicle control device 61 confirms the dispatch plan rearranged in S6213 (S6214) and notifies the user of the confirmed dispatch plan. The subsequent processes of S4216, S4218, and S4220 are the same as those of S4216, S4218, and S4220 in FIG. 4, and therefore will not be described here.

[0077] 16 is a schematic diagram showing a process in which the vehicle control device 61 reallocates vehicles 181 for delivering goods in response to an adjustment request from the integrated management device 51 in the emergency mode. The vehicle control device 61 selects vehicles 181a and 181b as vehicles 181 to be stationed at the business establishment 11 as backup power sources. At this time, the vehicle control device 61 determines the number of vehicles 181 to be stationed at the business establishment 11 as backup power sources based on the remaining capacity of the driving batteries of the vehicles 181 and the reservation request notified from the integrated management device 51, and selects the determined number of vehicles 181 as vehicles 181 to be stationed at the business establishment 11 as backup power sources.

[0078] When the vehicle 181a and the vehicle 181b are selected as vehicles to be stationed at the business establishment 11, the vehicle control device 61 assigns the items to be delivered to the delivery destination in area A to the vehicles 181c and 181d other than the vehicles 181a and 181b based on the address of the delivery destination. For example, as shown in FIG. 16, the vehicle control device 61 assigns four items out of five items whose delivery destination is area A, one item out of five items whose delivery destination is area B, and an item whose delivery destination is area C to the vehicle 181c. In addition, the vehicle control device 61 assigns one item out of five items whose delivery destination is area A, four items out of five items whose delivery destination is area B, and an item whose delivery destination is area D to the vehicle 181d. As a result, the areas shared by the vehicles 181c and 181d are determined as shown in FIG. 17. The vehicle control device 61 rearranges the vehicle dispatch plan for the day and thereafter based on the delivery destinations of the goods assigned to the vehicles 181c and 181d, and determines the driving routes, departure times, and return times of the vehicles 181c and 181d. This allows the power control device 41 to control the charging and discharging of the driving batteries of the vehicles 181a and 181b stationed at the business establishment 11, thereby making it possible to meet at least a part of the power demand of the business establishment 11.

[0079] Next, with reference to Figs. 18 to 30, a form of control to satisfy the power demand and delivery demand in the business establishment 11 by the movement of the vehicle 110 will be described.

[0080] 18 illustrates a system configuration of the central managing device 50. The central managing device 50 includes a calculation unit 200, a storage unit 280, and a communication unit 290. The calculation unit 200 includes an acquisition unit 210 and a processing unit 220.

[0081] The calculation unit 200 is realized by, for example, a calculation processing device including a processor. The storage unit 280 is realized by including a non-volatile storage medium. The calculation unit 200 performs processing using information stored in the storage unit 280. The communication unit 290 is responsible for communication between the power control devices 40 to 44, the vehicle control device 60, and the vehicle 110. The calculation unit 200 communicates with the outside through the communication unit 290.

[0082] The acquisition unit 210 acquires (I) a first demand including a demand amount, a demand time, and a demand location related to energy demand, sent from an energy management device that manages energy, and (II) a second demand including a demand amount, a demand time, and a demand location related to the demand of a mobile object, sent from a mobile object management device that manages a mobile object. The processing unit 220 performs at least one of a process of determining a position and a time at which the mobile object moves, and a process of determining whether both the first demand and the second demand can be satisfied, based on the first demand and the second demand acquired by the acquisition unit 210. The power control device 40 and the power control devices 42 to 44 are an example of an energy management device. The power control device 40 and the power control devices 42 to 44 manage and control power as an example of energy, but the power control device 40 and the power control devices 42 to 44 may manage power without controlling power. The vehicle control device 60 is an example of a mobile object management device. The vehicle control device 60 manages and controls the vehicle 110 as an example of a moving body, but the vehicle control device 60 may manage the vehicle 110 without controlling the vehicle 110.

[0083] The processing unit 220 may manage first supply information indicating that the mobile body can further supply more than the demand amount included in the first demand, and second supply information indicating that the mobile body can further supply more than the demand amount indicated by the second demand, and may re-determine the location and time for the mobile body to move based on the first demand and second demand newly acquired by the acquisition unit 210.

[0084] When the processing unit 220 determines that both the first demand and the second demand cannot be satisfied, it may determine the location and time for the moving body to move by prioritizing one of the first demand and the second demand over the other.

[0085] When the processing unit 220 determines that both the first demand and the second demand cannot be satisfied, it may determine the location and time for the mobile body to move so as to satisfy at least the second demand and to satisfy at least the demand amount and demand time at a predetermined portion of the multiple demand locations included in the first demand.

[0086] The processing unit 220 may determine a position and a time for the moving object to move based on the first demand, and may determine whether the second demand is satisfied based on the position and the time for the moving object to move determined based on the first demand.

[0087] The processing unit 220 may redetermine the position and time at which the moving body will move each time a predetermined condition is satisfied after the moving body starts moving based on the position and time at which the moving body will move determined based on the first demand and the second demand.

[0088] The processing unit 220 may re-determine the position and time for the mobile object to move every time the mobile object arrives at the demand position. The processing unit 220 may re-determine the position and time for the mobile object to move every time the mobile object departs from the demand position.

[0089] Fig. 19 shows an overview of the overall execution sequence of the system related to the movement of the vehicle 110 in the control system 100. The flow of processing of each part will be described with reference to Fig. 19. The processing in Fig. 19 shows the processing from drawing up a power plan and vehicle allocation plan for the next day on the previous day to executing the plan according to the drawn up plan.

[0090] As a process related to the power control device 40, in S3010, at least one of the user of the power control device 40 and the power control device 140 sets constraint conditions related to the power plan in the base 10 and the business offices 11 to 14, and notifies the power control device 41. The "user" is a user or a system that manages the power control device 40. In S3010, the user sets constraint conditions related to the power plan, and notifies the power control device 40. The constraint conditions are conditions that are constraints in formulating the power plan. The constraint conditions may include constraints required to satisfy the power demand. The constraint conditions include, for example, information on the current amount of power generation, the current amount of power consumption, and the power fee. The amount of power generation is, for example, the amount of power generation in the power generation devices 20 to 24. The amount of power consumption is the amount of power consumption in each of the base 10 and the business offices 11 to 14. The power fee includes the power purchase price and the power selling price. The power purchase price is, for example, a condition regarding the amount of money charged to each of the base 10 and the business offices 11 to 14 as compensation for receiving power from the grid. The power sale price is, for example, a condition regarding the amount of money that each of the base 10 and the business offices 11 to 14 can receive as compensation for supplying power to the grid.

[0091] In S3012, the power control device 40 creates a power plan for the next day. For example, the power control device 40 creates a power plan for each of the base 10 and the business offices 11 to 14. The power control device 40 may acquire the power plans created by the power control devices 41 to 44. The power plan includes the amount of power generation, the amount of stored power, and the amount of power consumption for each time period in a day. The power plan is, for example, a power plan for the next day. The power plan determines how much power is generated and consumed in each time period in each of the base 10 and the business offices 11 to 14, and how much power is charged to the stationary battery or how much is discharged from the stationary battery. The amount of power generation for each time period in the next day may be predicted from environmental information such as the weather information for the next day and past performance data. The power plan may indicate in which time period power consumption suppression (peak cut) is executed in each of the base 10 and the business offices 11 to 14. The power plan may indicate how much power the base 10 and each of the business establishments 11 to 14 will receive from the outside during what time period.

[0092] The power control device 40 may create an optimal power plan for each of the base 10 and the business offices 11 to 14. For example, the power control device 40 may create a power plan so that the amount of power received from the grid at each of the base 10 and the business offices 11 to 14 is minimized. The power control device 40 may create a power plan so that the amount of money charged as a compensation for receiving power from the grid at each of the base 10 and the business offices 11 to 14 is minimized. The power control device 40 may create a power plan so that the amount of money obtained as a compensation for supplying power to the grid at each of the base 10 and the business offices 11 to 14 is maximized. In this way, the power control device 40 creates an optimal power plan as the power plan for the next day based on the constraint conditions. The amount of power that needs to be received from the outside during each time period on the next day is determined by the power plan. As described later, the amount of power that needs to be received from the outside can be supplied from a driving battery provided in the vehicle 110. The power control device 40 transmits the power plan to the central management device 50 .

[0093] As a control related to the vehicle control device 60, the user of the vehicle control device 60 inputs constraint conditions for vehicle dispatch in S3210. The user of the vehicle control device 60 is a person or a system that inputs delivery demand data at a delivery company. The constraint conditions for vehicle dispatch may include constraints required to meet delivery demand. The constraint conditions for vehicle dispatch are conditions that are constraints when planning a vehicle dispatch plan. The constraint conditions for vehicle dispatch include, for example, the delivery origin and delivery destination, the departure time and the return time, the type of goods as the load, the volume of the goods, and the weight of the goods. The delivery origin and the delivery destination determine from which location to which location the vehicle needs to operate. The departure time and the return time determine from which location and at what time the vehicle needs to depart and to which location and at what time the vehicle needs to return. The departure time may be the time of departure from the base 10, and the return time may be the time of return to the base 10. A time range that allows for change may be set for the departure time and the return time. The type, volume, and weight of the items dictate which vehicles they can be delivered by.

[0094] In S3212, the vehicle control device 60 creates a delivery plan for the next day based on the constraint conditions notified by the user. For example, the vehicle control device 60 determines the number of vehicles 110 to be used for delivery, the vehicles 110 to be used for delivery, the departure and arrival times of the base 10 and the business offices 11-14, the travel route of the vehicles 110, the travel speed of the vehicles 110, and the station at which supplementary charging should be performed among the stations 71-74, so that the delivery demand determined by the vehicle allocation constraint conditions is satisfied. The vehicle control device 60 transmits the vehicle allocation plan to the integrated management device 50.

[0095] In S3110, the integrated management device 50 receives the power plan transmitted from the power control device 41 and the vehicle allocation plan transmitted from the vehicle control device 60.

[0096] In S3112, the integrated management device 50 reconciles the power plan and the vehicle allocation plan. For example, the integrated management device 50 judges whether the power plan is satisfied when the vehicle is allocated according to the vehicle allocation plan. For example, the vehicle allocation plan determines a period during which the vehicle 110 is predicted to be present at the base 10 and the business offices 11-14. The integrated management device 50 judges that the power plan is satisfied when the business offices 11-14 can receive the power that needs to be supplied from the outside from the driving battery provided in the vehicle 110 during the period during which the vehicle 110 is present at the base 10 and the business offices 11-14 during the required time period. The integrated management device 50 also judges that the power plan is satisfied when the business offices 11-14, which are the destinations of the vehicle 110, can supply the power that each of the business offices 11-14 needs to discharge to the outside to the driving battery provided in the vehicle 110 during the time period during which the power needs to be discharged.

[0097] When the integrated management device 50 determines that the power plan cannot be satisfied when vehicles are dispatched according to the vehicle dispatch plan, it determines how to modify the power plan so that the vehicle dispatch plan can be satisfied. For example, the integrated management device 50 determines how much the power consumption in each time period should be changed in relation to the power plan at each of the base 10 and the business offices 11-14. The integrated management device 50 also determines how much the amount of power received from the grid in each time period should be changed at each of the base 10 and the business offices 11-14. The integrated management device 50 determines how much the amount of power released to the grid in each time period should be changed at each of the base 10 and the business offices 11-14.

[0098] In addition, when the integrated management device 50 determines that the power plan cannot be satisfied when vehicles are dispatched according to the vehicle dispatch plan, it determines how to modify the vehicle dispatch plan to satisfy the power plan. For example, the integrated management device 50 determines how much the departure time and return time should be changed for the vehicle dispatch plan received from the vehicle control device 60 at each of the base 10 and the business offices 11 to 14. In addition, the integrated management device 50 determines how the driving route of the vehicle 110 should be modified for the vehicle dispatch plan. In addition, the integrated management device 50 determines how much the number of vehicles 110 used for delivery should be modified for the vehicle dispatch plan. In addition, the integrated management device 50 determines at which station among the stations 71 to 74 the base 10 should be supplementarily charged and at what time for the vehicle dispatch plan. In addition, the integrated management device 50 determines how much the driving speed of the vehicle 110 should be modified for the vehicle dispatch plan.

[0099] Furthermore, when the integrated management device 50 determines that the power plan cannot be satisfied when vehicles are dispatched according to the vehicle dispatch plan, it determines how to modify both the power plan and the vehicle dispatch plan so that the revised vehicle dispatch plan and power plan can be satisfied. As described above, the integrated management device 50 determines how to modify the power consumption in each time period at each of the base 10 and the business offices 11 to 14, the amount of power received from the grid in each time period, and the amount of power discharged to the grid in each time period, and how to modify the departure time, return time, driving route, driving speed, number of vehicles 110 used for delivery, and charging stations.

[0100] In S3112, the integrated management device 50 transmits an arbitration proposal including corrections to the power plan and the vehicle dispatch plan to the power control device 40 and the integrated management device 50. When the power control device 40 receives the arbitration proposal from the integrated management device 50, in S3014, the power control device 40 reflects the arbitration proposal received from the integrated management device 50 in the power plan drawn up in S3012. For example, the power control device 40 modifies the power consumption in each time period at each of the base 10 and the business offices 11 to 14, the amount of power received from the grid in each time period, and the amount of power discharged to the grid in each time period, etc., in accordance with the arbitration proposal. When the power control device 40 determines that energy management in the base 10 and the business offices 11 to 14 can be realized in accordance with the arbitration proposal, it transmits the power plan reflecting the arbitration proposal to the integrated management device 50 as a reflection result.

[0101] Similarly, when the vehicle control device 60 receives the arbitration proposal from the integrated management device 50, in S3214, it reflects the arbitration proposal received from the integrated management device 50 in the vehicle dispatch plan drawn up in S3212. For example, the vehicle control device 60 modifies the departure time, return time, travel route, travel speed, number of vehicles 110 used for delivery, charging stations, etc., in accordance with the arbitration proposal for the vehicle dispatch plan. When the vehicle control device 60 determines that the delivery demand will be satisfied in accordance with the arbitration proposal, it transmits the vehicle dispatch plan reflecting the arbitration proposal to the integrated management device 50 as a reflection result.

[0102] In S3114, when the integrated management device 50 receives the reflection result of the arbitration proposal from the power control device 40 and the vehicle control device 60, it confirms that the delivery demand and the power demand are satisfied by the power plan and the vehicle dispatch plan in which the arbitration proposal is reflected. When it is confirmed that the dispatch demand and the power demand are satisfied, the integrated management device 50 transmits to the power control device 40 and the vehicle control device 60, as an arbitration result, a message indicating that the plan will be executed according to the reflection result of the arbitration proposal. Note that, if the delivery demand and the power demand are not satisfied by the power plan and the vehicle dispatch plan in which the arbitration proposal is reflected, the integrated management device 50 may further modify the power plan and the vehicle dispatch plan and transmit them as the arbitration result. The power control device 41, the vehicle control device 60, and the vehicle control device 60 may repeat the processes of S3112, S3014, S3214, and S3114 until the delivery demand and the power demand are satisfied.

[0103] When the power control device 40 receives the arbitration result from the integrated management device 50, in S3014, the power control device 40 finalizes the power plan and notifies the user of the finalized power plan. In S3016, the user executes energy management according to the notified power plan. In S3018, the user performs performance processing related to the execution of the power plan. For example, the user performs processing to collect and input performance data of energy management including performance data of the charge / discharge amount of the stationary battery in each time period, performance data of the generated power, and performance data of the consumed power. In S3020, the power control device 40 manages the performance data input by each user as history information. Note that the power control device 40 may use the history information managed by the power control device 40 when formulating a power plan later.

[0104] Furthermore, when the vehicle control device 60 receives the arbitration result from the integrated management device 50, in S3214, it finalizes the vehicle allocation plan and notifies the user of the finalized vehicle allocation plan. In S3216, the user executes the plan according to the notified vehicle allocation plan. In S3218, the user performs performance processing related to the execution of the vehicle allocation plan. For example, the user performs a process of collecting and inputting driving performance data including driving data of each vehicle 110 and the remaining capacity of the driving battery. In S3020, the vehicle control device 60 manages the driving performance data input by the user as history information. Note that the vehicle control device 60 may use the history information managed by the vehicle control device 60 when later formulating a vehicle allocation plan.

[0105] FIG. 20 shows an execution sequence of the process executed by the integrated management device 50, the power control device 40, the vehicle control device 60, and the vehicle 110. In S302, the power control device 40 transmits power demand information to the integrated management device 50. For example, the power control device 40 predicts the power generated by the power generation device 20 on the next day and the power consumption at the base 10 on the next day. As an example, the power control device 40 stores history information in which the power generated by the power generation device 20 in the past and the power consumption at the base 10 in the past are associated with weather information. The power control device 40 predicts the power generated by the power generation device 20 on the next day and the power consumption on the next day based on the weather forecast information for the next day and the history information. For example, the power control device 40 predicts the power generated by the power generation device 20 on the next day and the power consumption on the next day by acquiring information associated with weather information that matches the weather information indicated by the weather forecast information for the next day from the history information. Similarly, the power control devices 41 to 45 predict the power generated and power consumption on the next day at each of the business locations. The power control device 40 receives power demand information including information indicating the generated power and consumed power for the next day predicted by each of the power control devices 41-45, and transmits the power demand information of the power control devices 40-45 to the integrated management device 50.

[0106] In S304, the vehicle control device 60 transmits to the integrated management device 50 information on the delivery schedule of the goods to the business establishments 11-14 on the next day. For example, the vehicle control device 60 acquires delivery information based on the delivery request of the goods for the next day acquired from each of the business establishments 11-14. Specifically, the vehicle control device 60 acquires, as the delivery request, information on the goods to be delivered on the next day and information identifying the business establishment of the delivery destination. The goods information includes the quantity of the goods to be delivered to each business establishment, information on the weight of each item, delivery time information indicating the time when the business establishment desires delivery, and the like. In addition, the vehicle control device 60 manages vehicle information including the number of vehicles 110 and the current remaining capacity of the driving battery equipped with the vehicle 110. The vehicle control device 60 transmits delivery information including the delivery schedule information for the next day and the vehicle information to the integrated management device 50.

[0107] In S306, the processing unit 220 performs processing related to the operation control of the vehicle 110 and the control of the power control devices 41-44 based on the delivery information and the power demand information. For example, the processing unit 220 generates operation information including the position and time when the vehicle 110 moves between the business establishments 11-14 and the travel route of the vehicle 110. The processing unit 220 also generates information on the transfer of power between the driving battery of the vehicle 110 and the business establishments 11-14 at the base 10 and the business establishments 11-14. The information on the transfer of power includes, for example, the time when the power is transferred and the amount of power transferred. The processing of S306 will be described later. In S308, the processing unit 220 transmits the information on the transfer of power to the power control devices 40-44. In addition, the processing unit 220 transmits approval information indicating approval of the control based on the power demand information generated by each of the power control devices 40-44 to the power control devices 40-44 of the base 10 and the business offices 11-14 that have decided not to transfer power. In S310, the processing unit 220 transmits the operation information to the vehicle control device 60.

[0108] In S312, the power control devices 40-44 start power control at each of the bases 10 and the business establishments 11-14. In S314, the vehicle control device 60 starts operation control of the vehicle 110 according to the operation information. For example, the vehicle control device 60 instructs the driver of the vehicle 110 at the base 10 to depart from the base 10 according to the operation information.

[0109] When the vehicle 110 arrives at the business establishment 11 in S320, the processing unit 220 determines that the vehicle 110 has arrived at the business establishment 11 from the position information based on the GPS signal transmitted from the vehicle 110. In S322, the processing unit 220 communicates with the vehicle 110 to receive the remaining charge of the driving battery of the vehicle 110. In S330, the processing unit 220 corrects the operation information of the vehicle 110 and the power transfer information at the base 10 and the business establishments 11-14 based on the currently predicted weather forecast information and the remaining battery charge information of the vehicle 110. The specific processing of S330 will be described later. In S332, the processing unit 220 transmits the corrected power transfer information to the power control devices 40-44. In S334, the processing unit 220 transmits the operation information to the vehicle control device 60. Note that the vehicle 110 repeats the same processing as the processing from S320 to S334 every time it arrives at the business establishments 11-14. This makes it possible to update the power transfer information and operation information based on the latest information.

[0110] FIG. 21 shows an example of the data structure of the delivery information managed by the processing unit 220. The delivery information is generated based on delivery schedule information transmitted from each of the business establishments 11-14. The delivery information includes a location, a business establishment name, an item, and a time. "Location" is information indicating the geographic location of each of the business establishments. "Location" may include, for example, address, latitude, and longitude information. "Business establishment name" is information indicating the name of the business establishment. "Item" is item information indicating the item to be delivered to each of the business establishments. The item information includes information indicating the number of each item to be delivered to the business establishments 11-14. "Time" is information indicating the time at which each of the business establishments 11-14 desires the item to be delivered. The processing unit 220 determines the operation information of the vehicle 110 so that the item can be delivered by the time desired by each of the business establishments 11-14.

[0111] Fig. 22 shows a schematic diagram of the change in the speed of vehicle 110 from departing base 10 to returning to base 10 via business offices 11-14. The graph in Fig. 22 shows the vehicle speed from departing base 10 at midnight, arriving at business office 11 at 1am, departing from business office 11 at 2am and arriving at business office 12 at 2:30pm, departing from business office 12 at 4am and arriving at business office 13 at 4:30pm, departing from business office 13 at 6am and arriving at business office 14 at 6:30pm, departing from business office 14 at 8am and returning to base 10 at 10am.

[0112] When the processing unit 220 determines the operation information, the processing unit 220 refers to the delivery information and determines the driving route and vehicle speed for the vehicle 110 to travel between each base 10 and the business offices 11-14 so as to satisfy the delivery schedule information and minimize the power consumption required for the vehicle 110 to travel on the next day. As an example, the processing unit 220 may determine the driving route and the vehicle speed during the driving route based on the traffic congestion information, road gradient information, traffic light information, etc., predicted for the next day, so as to minimize the power consumption required for the vehicle 110 to travel. When the processing unit 220 transmits the operation information including the driving route and the vehicle speed information to the vehicle control device 60, the vehicle control device 60 instructs the driver of the vehicle 110 through a navigation device provided in the vehicle 110 so that the vehicle 110 travels according to the driving route and the vehicle speed information.

[0113] Fig. 23 is a graph showing a schematic representation of predicted values ​​of the power consumption, generated power, and remaining charge of stationary batteries for the next day at each of the bases 10 and the business establishments 11-14 over time. The horizontal axis of each graph in Fig. 23 represents the time of day. A line 610 in Fig. 23 shows an example of the predicted change in power consumption over time at the bases 10 and the business establishments 11-14. A line 620 in Fig. 23 shows an example of the predicted change in power generation by the power generation devices 20-24 over time. The power control devices 40-44 may predict the power consumption and generated power for the next day based on, for example, the correlation between past weather and power consumption, and weather forecast information for the next day.

[0114] As part of power management, the power control devices 40-44 each charge the stationary batteries 30-34 with surplus power when the generated power exceeds the consumed power, and cover at least a portion of the consumed power by discharging the stationary batteries 30-34 when the consumed power exceeds the generated power. In this way, the power control devices 40-44 perform control to shift the peak of the consumed power.

[0115] A threshold value is set in advance for the stationary batteries 30-34 as a lower limit of the remaining battery capacity. The power control devices 40-44 limit the discharge of the stationary batteries 30-34 so that the remaining battery capacity does not fall below the preset threshold value. A line 630 in FIG. 23 shows a change in the remaining battery capacity when it is assumed that the stationary batteries 30-34 are discharged according to the power consumption when the power consumption exceeds the power generation. As shown in the line 630 in FIG. 23, the remaining battery capacity reaches the threshold value at 7:00 and reaches the minimum value at 9:45. Therefore, when the power consumption, power generation, and remaining battery capacity shown in FIG. 23 are predicted, if the stationary battery can be supplied with an amount of power corresponding to the minimum remaining battery capacity or more by 7:00, for example, it is possible to cover the power consumption by discharging the stationary battery and generating power. Therefore, when the power consumption, power generation, and remaining battery capacity shown in FIG. 23 are predicted, the processing unit 220 determines the operation information so that the vehicle 110 can supply power to the stationary battery by 7:00.

[0116] 24 is a schematic diagram showing the control of the vehicle 110 based on operation information and power transfer information. The processing unit 220 generates operation information including the departure time from the base 10, the arrival and departure times from the business offices 11-14, the arrival time at the base 10, and the vehicle speed of the vehicle 110 between the base 10 and the business offices 11-14. When the traveling battery is to be recharged at the stations 71-74, operation information including the arrival and departure times from the stations where recharging is performed is generated. The processing unit 220 also generates power transfer information including the time and amount of power to be transferred between the base 10 and each of the business offices 11-14.

[0117] For example, when the power consumption, generated power, and remaining battery charge are predicted for the business establishment 11 as shown in Fig. 23, operation information is determined so that the vehicle 110 can supply the required amount of power to the business establishment 11 by 7:00. After the vehicle 110 departs from the base 10 at 5:00 and arrives at the business establishment 11 at 6:00, while the goods to be delivered to the business establishment 11 are being unloaded from the vehicle 110, the processing unit 220 determines the operation information so that the required amount of power can be supplied to the business establishment 11 by 7:00 by discharging the driving battery provided in the vehicle 110.

[0118] Also, when it is predicted that the stationary battery 33 will have a shortage of electric power at the business establishment 13, the processing unit 220 determines operation information so that the driving battery of the vehicle 110 is recharged at the gas station 72 on the way from the business establishment 12 to the business establishment 13, and after arriving at the business establishment 13, while the goods to be delivered to the business establishment 13 are being unloaded from the vehicle 110, the processing unit 220 discharges the driving battery provided in the vehicle 110 and supplies it to the business establishment 13. Also, when it is predicted that there will be a surplus of electric power at the business establishment 14, the processing unit 220 recharges the driving battery with electric power supplied from the power generation device 24 or the stationary battery 34 of the business establishment 14, while the goods to be delivered to the business establishment 14 are being unloaded from the vehicle 110 after arriving at the business establishment 14.

[0119] Fig. 25 is a flowchart showing details of the processing from S306 to S310 in Fig. 20. The processing of the flowchart in Fig. 25 is executed on the day before the vehicle 110 departs from the base 10. For example, the processing of the flowchart in Fig. 25 may be executed between 11pm and midnight on the day before the vehicle 110 departs from the base 10.

[0120] The processing unit 220 refers to the delivery information and determines operation information including the travel route and vehicle speed of the vehicle 110, the departure time from the base 10, the arrival time at each of the business offices 11 to 14, the departure time from each of the business offices 11 to 14, and the arrival time at the base 10, so as to meet the time required for delivery of goods by each of the business offices 11 to 14 and minimize the amount of electricity required for the travel of the vehicle 110. At this time, the processing unit 220 determines the operation information based on infrastructure information including traffic congestion forecast information so as to minimize the amount of electricity required for the travel of the vehicle 110.

[0121] In S820, the processing unit 220 determines the station and business that will perform supplementary charging of the driving battery and the amount of supplementary power, and the business that will perform discharge of the driving battery and the amount of discharged power, based on the amount of power required for the vehicle 110 to travel according to the operation information and the power demand information. For example, the operation information determines the time when the vehicle 110 is predicted to stop at each of the business offices 11 to 14. Also, the power demand information determines whether there will be a surplus of power or a shortage of power during the time when the vehicle 110 is predicted to stop at each of the business offices 11 to 14. Therefore, if there is a surplus of power while the vehicle 110 is stopped at each of the business offices 11 to 14 during the time when the vehicle 110 is predicted to stop at each of the business offices 11 to 14, the processing unit 220 determines that supplementary charging is possible while the vehicle is stopped at the business office 11 to 14. Furthermore, based on the travel route of the vehicle 110 and the locations at which the stations 71-74 are installed, the processing unit 220 determines that supplemental charging is possible at the stations 71-74 if the stations 71-74 are installed within a predetermined distance from the travel route. Furthermore, if there is a power shortage at each of the business establishments 11-14, the processing unit 220 determines that the driving battery can be discharged while the vehicle 110 is parked at that business establishment 11-14.

[0122] In S830, the stations 71-74 and the offices 11-14 where supplementary charging is performed, and the offices 11-14 where discharging is performed are reflected in the operation information. In S840, it is confirmed that the operation of the vehicle 110 is possible, taking into consideration the stations 71-74 and the offices 11-14 where supplementary charging is performed, and the offices 11-14 where discharging is performed. In S850, the processing unit 220 predicts the remaining charge of the driving battery of the vehicle 110 when the vehicle 110 returns to the base 10 according to the operation information. In S860, the processing unit 220 notifies the power control device 40 of the base 10 of the remaining battery charge predicted in S850. In S870, the processing unit 220 transmits information on the transfer of power between the driving battery of the vehicle 110 and the power control device 41-44 of each of the offices 11-14 via the power control device 40. In S880, the processing unit 220 transmits the operation information to the vehicle control device 60.

[0123] 26 is a flowchart showing the processing executed on the day when the vehicle 110 departs from the base 10. The processing unit 220 corrects the operation information including the travel route and vehicle speed of the vehicle 110 and the amount of power required to travel the vehicle 110, based on the latest weather forecast information and infrastructure information, at a timing a predetermined time before the time when the vehicle 110 departs from the base 10. In S920, the processing unit 220 corrects the stations and establishments that perform recharging of the driving battery and the amount of rechargeable power, and the establishments that discharge the driving battery and the amount of discharged power, based on the information corrected in S910.

[0124] In S930, the processing unit 220 reflects the stations 71-74 and the offices 11-14 where recharging is performed, and the offices 11-14 where discharging is performed, in the operation information based on the information corrected in S920. In S940, the processing unit 220 confirms that the operation of the vehicle 110 is possible, taking into consideration the stations 71-74 and the offices 11-14 where recharging is performed, and the offices 11-14 where discharging is performed, based on the information corrected in S920. In S950, the processing unit 220 predicts the remaining charge of the driving battery of the vehicle 110 when the vehicle 110 returns to the base 10 according to the corrected operation information. In S960, the processing unit 220 notifies the power control device 40 of the base 10 of the remaining battery charge predicted in S950. In S970, the processing unit 220 transmits information on the transfer of power between the driving battery of the vehicle 110 and the power control devices 41-44 of the respective offices 11-14. In S980, the processing unit 220 transmits the operation information to the vehicle control device 60.

[0125] By the process described in relation to FIG. 26, the operation information and the power transfer information of the vehicle 110 can be updated based on the latest information before the vehicle 110 departs from the base 10.

[0126] FIG. 27 is a flowchart showing the process executed when the vehicle 110 arrives at the business establishment 11-14. The process of the flowchart of FIG. 27 can be applied to the process from S330 to S334 of FIG. 20. Here, the case where the vehicle 110 arrives at the business establishment 11 will be described. When the processing unit 220 determines that the vehicle 110 has arrived at the business establishment 11 based on the current position information of the vehicle 110 received from the vehicle 110, in S1010, the processing unit 220 recalculates the operation information including the travel route and vehicle speed of the vehicle 110 after departing from the business establishment 11 and the amount of power required for the vehicle 110 to travel, based on the latest weather forecast information, infrastructure information, and the remaining power of the traveling battery of the vehicle 110. In S1020, the processing unit 220 re-determines the station and business establishment that will perform supplementary charging of the traveling battery and the supplementary power amount, and the business establishment that will discharge the traveling battery and the discharged power amount, based on the information recalculated in S1010.

[0127] In S1030, the processing unit 220 reflects the stations 71-74 and the offices 12-14 where recharging is performed, and the offices 12-14 where discharging is performed, in the operation information based on the information determined in S1020. In S1040, the processing unit 220 confirms that the operation of the vehicle 110 is possible, taking into consideration the stations 71-74 and the offices 12-14 where recharging is performed, and the offices 12-14 where discharging is performed, based on the information determined in S1020. In S1050, the processing unit 220 re-predicts the remaining charge of the driving battery of the vehicle 110 when the vehicle 110 returns to the base 10 according to the determined operation information. In S1060, the processing unit 220 notifies the power control device 40 of the base 10 of the remaining battery charge predicted in S1050. In S1070, the processing unit 220 transmits information on the transfer of power between the power control devices 42-44 of the business establishments 12-14 and the driving battery of the vehicle 110. In S1080, the processing unit 220 transmits operation information to the vehicle control device 60.

[0128] 27 is executed each time the vehicle 110 arrives at the business establishment 12, the business establishment 13, and the business establishment 14. This makes it possible to update the operation information and the power transfer information of the vehicle 110 based on the latest information.

[0129] The processing when the vehicle 110 arrives at the establishments 11-14 has been described with reference to S330 in Fig. 20 and Fig. 27. The processing unit 220 may execute processing similar to the processing described with reference to S303 in Fig. 20 and Fig. 27 when the vehicle 110 departs from the establishments 11-14. For example, the processing unit 220 may execute processing similar to the processing described with reference to S303 in Fig. 20 and Fig. 27 when the ignition switch of the vehicle 110 is turned on after the vehicle 110 arrives at the establishment 11.

[0130] 28 is a schematic diagram for explaining the processing of the processor 220 in the second embodiment. As described above, the first embodiment is an embodiment in which it is specified that one vehicle 110 operates in the order of business establishment 11, business establishment 12, business establishment 13, and business establishment 14. In contrast, the second embodiment is an embodiment in which it is specified that the vehicle 110 operates in the order of business establishment 11, business establishment 12, business establishment 13, and business establishment 14, and two vehicles 110 are permitted to operate simultaneously.

[0131] In the second embodiment, the processing unit 220 determines operation information and power transfer information for vehicle 110a to return to base 10 after leaving base 10 via business offices 11 and 12, based on the delivery information and power demand information. Furthermore, the processing unit 220 determines operation information and power transfer information for vehicle 110b to return to base 10 after leaving base 10 via business offices 13 and 14, based on the delivery information and power demand information, during the period from when vehicle 110a leaves base 10 to when vehicle 110a returns to base 10. In the second embodiment, instead of the first embodiment where the order of operation is base 10, business office 11, business office 12, business office 13, business office 14, and base 10, the processing unit 220 assumes that the order of operation is base 10, business office 11, business office 12, and base 10, and that the order of operation is base 10, business office 13, business office 14, and base 10, and performs processing to determine operation information and power transfer information independently for each order.

[0132] In addition, in the second embodiment, the processing unit 220 may generate operation information and power transfer information in which the vehicle 110a departs from the base 10, arrives at the business office 11, departs from the business office 11, returns to the base 10 without passing through the other business offices 12-14, departs from the base 10, arrives at the business office 12, and departs from the business office 12, returns to the base 10 without passing through the other business offices 13-14.

[0133] The second embodiment may be an embodiment applied when the delivery information and operation information and power transfer information that satisfy the power demand cannot be determined by the process described in relation to the first embodiment. According to the second embodiment, it becomes possible to flexibly respond to delivery requests and power requests to each of the business establishments 11 to 14.

[0134] In the first and second embodiments, the processing unit 220 may adopt a form in which the operation information and the power transfer information are determined by prioritizing the power demand at each of the business offices 11-14 over the delivery demand at each of the business offices 11-14. For example, the processing unit 220 may determine the operation information and the power transfer information for minimizing the amount of power required for the vehicle 110 to travel and the amount of power each of the business offices 11-14 receives from the grid at each of the business offices 11-14, and may confirm the operation information and the power transfer information when the delivery information can be satisfied by the operation information. Note that, when the delivery information cannot be satisfied by the operation information and the power transfer information, the processing unit 220 may determine the operation information and the power transfer information for minimizing the amount of power required for the vehicle 110 to travel and the amount of power each of the business offices 11-14 receives from the grid at each of the business offices 11-14, within a range that at least satisfies the delivery information. When both the delivery information and the power demand cannot be satisfied, the processing unit 220 may determine the operation information and the power transfer information so as to satisfy the delivery information of the business establishments 11 to 14 and to satisfy the power demand of a predetermined part of the business establishments 11 to 14. When both the delivery information and the power demand cannot be satisfied, the processing unit 220 may determine the operation information and the power transfer information so as to satisfy the delivery information of the predetermined part of the business establishments 11 to 14 within a range that at least satisfies the power demand of the business establishments 11 to 14. When both the delivery information and the power demand cannot be satisfied, the processing unit 220 may determine the operation information and the power transfer information so as to at least satisfy the delivery demand and the power demand of the predetermined part of the business establishments 11 to 14. Note that the predetermined part of the business establishments 11 to 14 may be business establishments that are predetermined to be maintained in an emergency such as a power outage or an earthquake.

[0135] Fig. 29 is a schematic diagram for explaining the processing of the processor 220 in the control system 1200 in the third embodiment. As described above, the first embodiment is an embodiment in which it is determined that one vehicle 110 operates in the order of business establishment 11, business establishment 12, business establishment 13, and business establishment 14. In contrast, the third embodiment is an embodiment in which the order of passing through the business establishments is not determined. The control system 1200 will be described as including business establishments 1211, 1212, 1213, and 1214, as well as stands 1271, 1272, 1273, and 1274, in addition to the configuration of the first embodiment.

[0136] In the third embodiment, the processing unit 220 determines operation information and power transfer information for vehicle 110a to return to base 10 via business offices 11, 12, 13, and 14 after departing from base 10, based on delivery information and power demand information. The processing unit 220 also determines operation information and power transfer information for vehicle 110b to return to base 10 via business offices 1214, 1213, 1212, and 1211 after departing from base 10.

[0137] In this case, after the vehicle 110a leaves the base 10, if the processing unit 220 determines that at least one of the delivery information and the power demand information for the business office 14 cannot be satisfied by the time the vehicle 110 arrives at the business office 14 based on the latest infrastructure information and the driving battery information of the vehicle 110a, the processing unit 220 generates new operation information and power transfer information for returning to the base 10 via the business office 14 after the vehicle 110b leaves the business office 1211. The processing unit 220 may periodically acquire the remaining capacity of the driving battery of the vehicle 110b, and generate new operation information and power transfer information for returning to the base 10 via the business office 14 when power can be supplied in excess of the power demand of the business offices 1214, 1213, 1212, and 1211, and the base 10. This increases the possibility that the delivery information and the power demand information for the business office 14 can be satisfied.

[0138] As described above, the control systems 100 and 1200 according to the above-mentioned embodiments can use the driving battery provided in the vehicle 110 to perform energy management at the base 10 and the business offices 11-14 while satisfying delivery demand at the business offices 11-14 outside the base 10. This makes it possible to perform optimal energy management at the base 10 and the business offices 11-14 as a whole.

[0139] Vehicle 110 and vehicle 181 are vehicles as an example of transportation equipment. A vehicle includes at least a battery. A vehicle may include an internal combustion engine that generates driving force for traveling. A vehicle may include an internal combustion engine that generates power for charging the battery. A vehicle may be an automobile such as an electric vehicle or a fuel cell vehicle (FCV). Automobiles include buses, trucks, two-wheeled vehicles, etc. A vehicle may be a saddle-type vehicle or the like, or may be a motorcycle. Transportation equipment includes, in addition to vehicles, aircraft including unmanned aerial vehicles, ships, and other equipment. Transportation equipment may be any equipment that transports people or goods. Transportation equipment is an example of a moving body. A moving body is not limited to transportation equipment, and may be any equipment that can be moved.

[0140] In the above-described embodiment, the destination to which the vehicle 110 delivers the goods is the business establishments 11 to 14 for performing the delivery. However, the destination to which the vehicle 110 delivers the goods is not limited to the business establishment. The destination to which the vehicle 110 delivers the goods may be a store such as a convenience store. Furthermore, when the destination to which the goods are delivered from the business establishment 11 is a store or the like that can receive and transmit power from the vehicle 181, the power control device 41, the integrated management device 51, and the vehicle control device 61 may perform control so as to satisfy the power demand and delivery demand of the destination to which the goods are delivered, similar to the control of the power control device 40, the integrated management device 50, and the vehicle control device 60 described in relation to Figs. 18 to 29 and the like.

[0141] 30 shows an example of a computer 2000 in which multiple embodiments of the present invention may be embodied in whole or in part. A program installed in the computer 2000 may cause the computer 2000 to function as a control system or each part of a control system or an apparatus such as a control device or each part of the apparatus according to an embodiment, to execute operations associated with the system or each part of the system or the apparatus or each part of the apparatus, and / or to execute a process or steps of the process according to an embodiment. Such a program may be executed by the CPU 2012 to cause the computer 2000 to execute specific operations associated with some or all of the blocks of the process steps and block diagrams described herein.

[0142] The computer 2000 according to this embodiment includes a CPU 2012 and a RAM 2014, which are connected to each other by a host controller 2010. The computer 2000 also includes a ROM 2026, a flash memory 2024, a communication interface 2022, and an input / output chip 2040. The ROM 2026, the flash memory 2024, the communication interface 2022, and the input / output chip 2040 are connected to the host controller 2010 via the input / output controller 2020.

[0143] The CPU 2012 operates according to the programs stored in the ROM 2026 and RAM 2014, thereby controlling each unit.

[0144] The communication interface 2022 communicates with other electronic devices via a network. The flash memory 2024 stores programs and data used by the CPU 2012 in the computer 2000. The ROM 2026 stores a boot program and the like executed by the computer 2000 upon activation, and / or a program that depends on the hardware of the computer 2000. The input / output chip 2040 may also connect various input / output units, such as a keyboard, mouse, and monitor, to the input / output controller 2020 via input / output ports, such as a serial port, a parallel port, a keyboard port, a mouse port, a monitor port, a USB port, an HDMI port, and the like.

[0145] The programs are provided via a computer-readable storage medium such as a CD-ROM, a DVD-ROM, or a memory card, or a network. The RAM 2014, the ROM 2026, or the flash memory 2024 are examples of computer-readable storage media. The programs are installed in the flash memory 2024, the RAM 2014, or the ROM 2026, and executed by the CPU 2012. Information processing described in these programs is read by the computer 2000, and brings about cooperation between the programs and the various types of hardware resources described above. An apparatus or method may be constructed by implementing an operation or processing of information according to the use of the computer 2000.

[0146] For example, when communication is performed between the computer 2000 and an external device, the CPU 2012 may execute a communication program loaded in the RAM 2014 and instruct the communication interface 2022 to perform communication processing based on the processing described in the communication program. Under the control of the CPU 2012, the communication interface 2022 reads transmission data stored in a transmission buffer processing area provided in a recording medium such as the RAM 2014 and the flash memory 2024, transmits the read transmission data to a network, and writes reception data received from the network to a reception buffer processing area or the like provided on the recording medium.

[0147] Furthermore, the CPU 2012 may cause all or a necessary portion of a file or database stored on a recording medium such as the flash memory 2024 to be read into the RAM 2014, and perform various types of processing on the data on the RAM 2014. The CPU 2012 then writes back the processed data to the recording medium.

[0148] Various types of information, such as various types of programs, data, tables, and databases, may be stored in the recording medium and subjected to information processing. The CPU 2012 may execute various types of processing, including various types of operations, information processing, conditional judgment, conditional branching, unconditional branching, information search / replacement, etc., described herein and specified by the instruction sequence of the program, on the data read from the RAM 2014, and write back the results to the RAM 2014. The CPU 2012 may also search for information in a file, database, etc. in the recording medium. For example, when a plurality of entries each having an attribute value of a first attribute associated with an attribute value of a second attribute are stored in the recording medium, the CPU 2012 may search for an entry that matches a condition in which an attribute value of the first attribute is specified from among the plurality of entries, read the attribute value of the second attribute stored in the entry, and thereby obtain the attribute value of the second attribute associated with the first attribute that satisfies a predetermined condition.

[0149] The above-described programs or software modules may be stored in a computer-readable storage medium on the computer 2000 or in the vicinity of the computer 2000. A recording medium such as a hard disk or a RAM provided in a server system connected to a dedicated communication network or the Internet can be used as the computer-readable storage medium. The programs stored in the computer-readable storage medium may be provided to the computer 2000 via a network.

[0150] A program installed in the computer 2000 and causing the computer 2000 to function as the integrated managing device 50 may act on the CPU 2012, etc., to cause the computer 2000 to function as each part of the integrated managing device 50. When the information processing described in these programs is read into the computer 2000, the computer 2000 functions as each part of the integrated managing device 50, which is a specific means in which the software and the various hardware resources described above work together. These specific means then realize calculation or processing of information according to the intended use of the computer 2000 in this embodiment, thereby constructing a specific integrated managing device 50 according to the intended use.

[0151] A program installed in the computer 2000 and causing the computer 2000 to function as the integrated managing device 51 may act on the CPU 2012 and the like to cause the computer 2000 to function as each part of the integrated managing device 51. When the information processing described in these programs is read into the computer 2000, the computer 2000 functions as each part of the integrated managing device 51, which is a specific means in which the software and the various hardware resources described above work together. Then, by implementing calculation or processing of information according to the intended use of the computer 2000 in this embodiment by these specific means, a specific integrated managing device 51 according to the intended use is constructed.

[0152] Various embodiments have been described with reference to block diagrams or the like. In the block diagrams, each block may represent (1) a stage of a process where an operation is performed or (2) a portion of an apparatus responsible for performing an operation. Particular stages and portions may be implemented by dedicated circuitry, programmable circuitry provided with computer-readable instructions stored on a computer-readable storage medium, and / or a processor provided with computer-readable instructions stored on a computer-readable storage medium. The dedicated circuitry may include digital and / or analog hardware circuitry and may include integrated circuits (ICs) and / or discrete circuits. The programmable circuitry may include reconfigurable hardware circuitry including logical AND, logical OR, logical XOR, logical NAND, logical NOR, and other logical operations, memory elements such as flip-flops, registers, field programmable gate arrays (FPGAs), programmable logic arrays (PLAs), and the like.

[0153] A computer-readable storage medium may include any tangible device capable of storing instructions that are executed by a suitable device, such that a computer-readable storage medium having instructions stored thereon constitutes at least a portion of a product that includes instructions that can be executed to provide a means for performing the operations specified in a process or block diagram. Examples of computer-readable storage media may include electronic storage media, magnetic storage media, optical storage media, electromagnetic storage media, semiconductor storage media, etc. More specific examples of computer-readable storage media may include floppy disks, diskettes, hard disks, random access memories (RAMs), read-only memories (ROMs), erasable programmable read-only memories (EPROMs or flash memories), electrically erasable programmable read-only memories (EEPROMs), static random access memories (SRAMs), compact disk read-only memories (CD-ROMs), digital versatile disks (DVDs), Blu-ray (RTM) disks, memory sticks, integrated circuit cards, etc.

[0154] The computer readable instructions may include either assembler instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state setting data, or source or object code written in any combination of one or more programming languages, including object-oriented programming languages ​​such as Smalltalk®, JAVA®, C++, etc., and conventional procedural programming languages ​​such as the “C” programming language or similar programming languages.

[0155] The computer readable instructions may be provided to a processor or programmable circuitry of a general purpose computer, special purpose computer, or other programmable data processing apparatus, either locally or over a wide area network (WAN) such as a local area network (LAN), the Internet, etc., to cause the computer readable instructions to execute means for performing operations specified in the process steps or block diagrams described. Examples of processors include computer processors, processing units, microprocessors, digital signal processors, controllers, microcontrollers, etc.

[0156] Although the present invention has been described above using the embodiments, the technical scope of the present invention is not limited to the scope described in the above embodiments. It is clear to those skilled in the art that various modifications and improvements can be made to the above embodiments. It is clear from the claims that such modifications and improvements can also be included in the technical scope of the present invention.

[0157] It should be noted that the order of execution of each process, such as operations, procedures, steps, and stages, in the devices, systems, programs, and methods shown in the claims, specifications, and drawings is not specifically stated as "before," "prior to," etc., and may be realized in any order unless the output of a previous process is used in a later process. Even if the operational flow in the claims, specifications, and drawings is explained using "first," "next," etc. for convenience, it does not mean that it is essential to perform the process in this order. [Explanation of symbols]

[0158] 10 locations 11 Offices 12 offices 13 Offices 14 Offices 20 Power generation equipment 21 Power generation equipment 22 Power generation equipment 23 Power generation equipment 24 Power generation equipment 30 Stationary Battery 31 Stationary Battery 32 Stationary Battery 33 Stationary Battery 34 Stationary Battery 40 Power control device 41 Power control device 42 Power Control Device 43 Power Control Device 44 Power Control Device 50 Integrated management device 51 Integrated management device 52 Integrated management device 53 Integrated management device 54 Integrated management device 61 Vehicle control device 62 Vehicle control device 63 Vehicle control device 64 Vehicle control device 60 Vehicle control device 71 Stand 72 Stand 74 Stand 100 Control System 110 vehicles 111 Delivery Destination 112 Delivery Destination 113 Delivery Destination 114 Delivery Destination 115 Delivery Destination 121 Area 122 Area 123 Area 124 Area 140 Power Control Device 181 vehicles 200 Arithmetic section 210 Acquisition Department 220 Processing section 280 Storage section 290 Communications Department 300 Arithmetic section 310 Acquisition Department 320 Processing section 330 Mode discrimination unit 380 Storage section 390 Communications Department 1200 Control System 1211 Offices 1212 Offices 1213 Offices 1214 Offices 1271 Stand 1272 Stand 1273 Stand 1274 Stand 2000 Computer 2010 Host Controller 2012 CPU 2014 RAM 2020 Input / Output Controller 2022 Communication Interface 2024 Flash Memory 2026 ROM 2040 Input / Output Chip

Claims

1. An acquisition unit that acquires (I) a first demand including a demand amount and a demand time related to energy demand, which is sent from an energy management device that manages energy, and (II) a second demand including a demand amount, a demand time, and a demand location related to the demand of a mobile object, which is sent from a mobile object management device that manages a mobile object; a processing unit that performs at least one of a process for determining a position and a time for the moving object to move based on the first demand and the second demand acquired by the acquisition unit, and a process for determining whether both the first demand and the second demand can be satisfied; a mode discrimination unit that switches between a plurality of modes for managing the energy and the moving body, the mode including a first mode in which the first demand is satisfied to a possible extent while satisfying the second demand, and a second mode in which the second demand is satisfied to a possible extent while satisfying the first demand; An integrated management device comprising:

2. The mode discrimination unit discriminates a mode to be executed in the future from among the plurality of modes as a mode for managing the energy and the moving body. The integrated management device according to claim 1 .

3. The mode determination unit determines a mode to be currently executed among the plurality of modes as a mode for managing the energy and the moving body, regardless of a mode currently being executed. The integrated management device according to claim 1 or 2.

4. The mode discrimination unit discriminates a mode to be currently executed from among the plurality of modes when a predetermined emergency condition is satisfied after the moving body starts moving based on a position and a time at which the moving body moves, which are determined according to a mode discriminated by the mode discrimination unit. The integrated management device according to claim 3.

5. The first mode is a mode in which a position and a time for the moving body to move are determined so as to satisfy the second demand, and the time for the moving body to move is adjusted so as to satisfy the first demand as much as possible while satisfying the second demand. The integrated management device according to claim 1 or 2.

6. When the first mode is determined by the mode determination unit, the processing unit determines whether both the first demand and the second demand can be satisfied by the moving body moving according to a position and time of the moving body determined to satisfy the second demand, and when it is determined that both the first demand and the second demand cannot be satisfied, performs a process of adjusting the time of the moving body moving so as to satisfy the first demand to the extent possible while satisfying the second demand. The integrated management device according to claim 5 .

7. The second mode is a mode in which a moving body necessary for satisfying the first demand is selected from among a plurality of moving bodies, and moving bodies other than the selected moving body from among the plurality of moving bodies so as to satisfy the second demand as much as possible. The integrated management device according to claim 1 or 2.

8. When the second mode is determined by the mode determination unit, the processing unit: A process is performed to select a moving body necessary for satisfying the first demand from among a plurality of moving bodies, and to determine positions and times at which moving bodies other than the selected moving body from among the plurality of moving bodies will move so as to satisfy the second demand as much as possible. The integrated management device according to claim 7.

9. The first demand further includes a demand location regarding the energy demand transmitted from the energy management device. The integrated management device according to claim 1 or 2.

10. An acquisition unit that acquires (I) a first demand including a demand amount and a demand time related to energy demand, which is sent from an energy management device that manages energy, and (II) a second demand including a demand amount, a demand time, and a demand location related to the demand of a mobile object, which is sent from a mobile object management device that manages a mobile object; a processing unit that performs at least one of a process for determining a position and a time for the moving object to move based on the first demand and the second demand acquired by the acquisition unit, and a process for determining whether both the first demand and the second demand can be satisfied; a mode discrimination unit that switches between a plurality of modes for managing the energy and the moving body, the mode including a first mode in which the first demand is satisfied to a possible extent while satisfying the second demand, and a second mode in which the second demand is satisfied to a possible extent while satisfying the first demand; A server comprising:

11. An acquisition unit provided in an integrated management device acquires a first demand including a demand amount and a demand time related to energy demand; The acquisition unit acquires a second demand including a demand amount, a demand time, and a demand position related to a demand of a mobile body; a processing unit included in the integrated management device performing at least one of a process for determining a position and a time for the moving object to move based on the first demand and the second demand, and a process for determining whether both the first demand and the second demand can be satisfied; A mode discrimination unit of the integrated management device switches between a plurality of modes for managing the energy and the moving body, the modes including a first mode for satisfying the first demand to a possible extent while satisfying the second demand, and a second mode for satisfying the second demand to a possible extent while satisfying the first demand; A management method comprising:

12. A program for causing a computer to function as the integrated management device according to claim 1 or 2.

13. A storage medium storing the program according to claim 12.

Citation Information

Patent Citations

  • Operation plan generation device and operation plan generation method

    JP2015060570A

  • Operation planning support apparatus

    JP2015138501A

  • V2g system, server apparatus and transport machine

    JP2018124674A