Energy usage information system, energy usage information processing method and program
The energy usage information system addresses the need for increased solar power awareness and utilization by linking generation and usage data with vehicle information, enhancing awareness and promoting sustainable practices.
Patent Information
- Application Number
- JP2022136753
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-08-30
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-08-30
AI Technical Summary
There is a need to increase awareness and utilization of natural energy generation, particularly solar power, to combat global warming, and existing systems do not effectively link and promote the use of such energy.
An energy usage information system that collects and links primary information on solar power generation with secondary information on vehicle usage to create natural energy usage information, facilitating matching between providers and acquirers of this information, and presenting driving routes to maximize energy usage awareness and trading opportunities.
The system enhances awareness and utilization of natural energy by linking primary and secondary information, promoting decarbonization and sustainable practices through increased interest in solar power generation and trading of carbon credits.
Smart Images

Figure 0007586154000001 
Figure 0007586154000002 
Figure 0007586154000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an energy usage information system, an energy usage information processing method, and a program. [Background technology]
[0002] 2. Description of the Related Art Vehicles that are equipped with solar power generation panels and use electric power generated by the solar power generation panels as driving force for the vehicle or the like are known (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2021-197847 Summary of the Invention [Problem to be solved by the invention]
[0004] Incidentally, as a measure to prevent the current problem of global warming, it is urgent to expand the use of power generation using natural energy sources, such as power generation using solar panels, and in order to do so, it is necessary to raise people's awareness of power generation using natural energy sources. [Means for solving the problem]
[0005] Therefore, according to the present invention, primary information regarding the generation or use of electric energy generated by a solar power generation device mounted on a vehicle and secondary information regarding the vehicle equipped with the solar power generation device are obtained, and natural energy utilization information is created by linking the secondary information to the primary information. and a matching processing unit that matches the created natural energy utilization information provider with a natural energy utilization information acquirer, in which the acquirer presents a travel route of a vehicle that can acquire the natural energy utilization information that the acquirer wishes to acquire, and the matching processing unit matches the acquirer with an owner of a vehicle that may travel along the travel route presented by the acquirer. An energy usage information system is provided. Further, according to the present invention, The computer Collect primary information on the generation or use of electric energy generated by solar power generation equipment installed in vehicles and secondary information on vehicles equipped with solar power generation equipment, and create natural energy usage information by linking the secondary information to the primary information. and matching the created natural energy utilization information provider with a natural energy utilization information acquirer, the acquirer is made to present a travel route of a vehicle that can acquire the natural energy utilization information that the acquirer desires to acquire, and the acquirer is matched with an owner of a vehicle that may travel along the travel route presented by the acquirer. A method for processing energy usage information is provided. Furthermore, according to the present invention, primary information regarding the generation or use of electric energy generated by a solar power generation device mounted on a vehicle and secondary information regarding the vehicle equipped with the solar power generation device are obtained, and natural energy utilization information is created by linking the secondary information to the primary information. and matching the created natural energy utilization information provider with a natural energy utilization information acquirer, the acquirer is made to present a travel route of a vehicle that can acquire the natural energy utilization information that the acquirer desires to acquire, and the acquirer is matched with an owner of a vehicle that may travel along the travel route presented by the acquirer. A program that causes a computer to function is provided. Effect of the Invention
[0006] By creating information on natural energy usage that links primary information with secondary information, it is possible to raise people's awareness of power generation using natural energy. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is an overall view of the energy usage information system. [Diagram 2] FIG. 2 is a diagram illustrating the management server. [Diagram 3] FIG. 3 is a diagrammatic view of a vehicle. [Figure 4] FIG. 4 is a diagram showing communication devices installed in a company or the like. [Diagram 5] FIG. 5 is a diagram showing a list of natural energy utilization information. [Figure 6] FIG. 6 is a diagram for explaining the procedure of advance registration. [Figure 7] FIG. 7 is a diagram for explaining the procedure of the start process of the vehicle. [Figure 8] FIG. 8 is a flowchart for transmitting basic information. [Figure 9] FIG. 9 is a flowchart for transmitting vehicle position information. [Figure 10] FIG. 10 is a flowchart for calculating the primary information. [Figure 11] FIG. 11 is a flowchart for calculating the secondary information. [Figure 12]FIG. 12 is a flowchart for creating natural energy utilization information. [Figure 13] FIG. 13 is a diagram showing a list of natural energy utilization information. [Figure 14] FIG. 14 is a diagram showing a list of natural energy utilization information. [Figure 15] FIG. 15 is a diagram showing a list of natural energy utilization information. [Figure 16] FIG. 16 is a diagram showing a list of natural energy utilization information desired to be acquired. [Figure 17] FIG. 17 is a flowchart for performing the matching process. [Figure 18] 18A and 18B are diagrams for explaining the travel route. [Figure 19] FIG. 19 is a diagram showing a list of natural energy utilization information desired to be acquired. [Figure 20] FIG. 20 is a diagram for explaining the procedure of the matching process. [Figure 21] FIG. 21 is a diagram for explaining the procedure of the matching process. [Figure 22] 22A and 22B are diagrams for explaining the procedure for registering a planned traveling route and the procedure for the matching process, respectively. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Figure 1 shows an overall view of the energy utilization information system. Referring to Figure 1, 1 indicates a communication network, 2 indicates a base station of the communication network 1, 3 indicates a management server, 4 indicates a company, research institute, or individual (hereinafter referred to as an acquirer) who wishes to obtain natural energy utilization information, 5 indicates a vehicle, and 6 indicates a mobile terminal possessed by the vehicle owner.
[0009] Fig. 2 shows the management server 3 shown in Fig. 1. Referring to Fig. 2, an electronic control unit 10 is provided within the management server 3. This electronic control unit 10 is made up of a digital computer, and includes a CPU (microprocessor) 12, memory 13 made up of ROM and RAM, and input / output ports 14, which are connected to each other via a bidirectional bus 11. As shown in Fig. 2, various devices 15 are connected to the electronic control unit 10, and the electronic control unit 10 is also connected to a communication network 1.
[0010] FIG. 3 diagrammatically illustrates an example of the vehicle 5 shown in FIG. 1. Referring to FIG. 3, 20 indicates an electric motor for driving the vehicle 5, 21 indicates a drive control device for controlling the drive of the electric motor 20, 22 indicates a battery, 23 indicates a solar power generation device, such as a solar power generation panel, installed on the roof of the vehicle 5, 24 indicates a power distribution control device for distributing and controlling the power generated in the solar power generation device 23 to charge the battery 22 and to drive the electric motor 20, and 25 indicates an electronic control unit. As shown in FIG. 3, the electronic control unit 25 is made up of a digital computer and includes a CPU (microprocessor) 27, a memory 28 consisting of ROM and RAM, and an input / output port 29, which are connected to each other by a bidirectional bus 26. Also, as shown in FIG. 3, the drive control device 21 and the power distribution control device 24 are connected to the electronic control unit 25, and the drive control device 21 and the power distribution control device 24 are controlled based on an output signal from the electronic control unit 25.
[0011] 3, the vehicle 5 is provided with various sensors 30, such as an on-board camera, a lidar, and a radar, for detecting the surroundings of the vehicle 5, a GNSS (Global Navigation Satellite System) receiver 31, a map data storage device 32, a navigation device 33, and a display unit 34 equipped with a display screen. The GNSS receiver 31 can detect the current position of the vehicle 5 (e.g., the latitude and longitude of the vehicle 5) based on information obtained from a plurality of artificial satellites. Therefore, the current position of the vehicle 5 can be identified by the GNSS receiver 31. For example, a GPS receiver is used as the GNSS receiver 31.
[0012] These various sensors 30, the GNSS receiver 31, the map data storage device 32, the navigation device 33, and the display unit 34 are all included in an electronic control unit (ECU). 25 3. The vehicle 5 is also equipped with a communication device 35 for communicating with the management server 3, and the vehicle 5 and the mobile terminal 6 are capable of communicating with the management server 3 via the base station 2 and the communication network 1. In the example shown in FIG. 3, the vehicle drive unit 20, i.e., the electric motor, is driven by the charging power of the battery 22, or is driven by the driving power of the vehicle 5 distributed by the power distribution control device 24, or is driven by both the charging power of the battery 22 and the driving power of the vehicle 5 distributed by the power distribution control device 24.
[0013] On the other hand, in the example shown in FIG. 3, the generated voltage and generated current of the solar power generation device 23 are detected, and the electronic control unit 25 In the example shown in FIG. 3, the terminal voltage and temperature of the battery 22 are detected, and the electronic control unit 24 calculates the power generated by the solar power generation device 23 based on these detected values. In this case, in the embodiment according to the present invention, the power generated by the solar power generation device 23 is referred to as the amount of power generated by the solar power generation device 23. 25In the example shown in FIG. 3, the drive voltage and drive current of the electric motor 20 are detected, and the electronic control unit 24 calculates the amount of charge stored in the battery 22 based on these detected values. In this case, in the embodiment according to the present invention, the amount of charge stored in the battery 22 is referred to as the charge amount of the battery 22. 25 Then, the drive power of the electric motor 20 is calculated based on these detected values. In this case, in the embodiment according to the present invention, the drive power of the electric motor 20 is referred to as the consumption amount of electric energy used to drive the vehicle 5.
[0014] On the other hand, a communication device is installed in the acquisition applicant company 4 shown in FIG. 1, and this communication device is indicated by reference numeral 40 in FIG. 4. Referring to FIG. 4, an electronic control unit 41 is provided in this communication device 40. This electronic control unit 41 is also made of a digital computer, and includes a CPU (microprocessor) 43, a memory 44 made of ROM and RAM, and an input / output port 45, which are connected to each other by a bidirectional bus 42. As shown in FIG. 4, various devices 46 are connected to the electronic control unit 41, and the electronic control unit 41 is also connected to the communication network 1. Therefore, this communication device 40 can also communicate with the management server 3 via the communication network 1.
[0015] Now, as a measure to prevent global warming, which is currently a problem, it is urgent to popularize the use of power generation using natural energy, such as power generation by the solar power generation device 23, and in order to do so, it is necessary to raise people's awareness of power generation using natural energy. In this case, if not only information on the amount of power generation by the solar power generation device 23 mounted on the vehicle 5, but also information on when, who, and where the power generation by the solar power generation device 23 was performed is added to this information, it is considered that people's interest in power generation by the solar power generation device 23 will increase. For example, if a celebrity of interest generates power using the solar power generation device 23, it is considered that people who are interested in the celebrity will become more interested in power generation by the solar power generation device 23, and also, for example, if power generation by the solar power generation device 23 is performed in an area of interest, it is considered that people who are interested in that area will become more interested in power generation by the solar power generation device 23.
[0016] That is, natural energy utilization information that combines primary information regarding the generation or use of electric energy generated by the solar power generation device 23 mounted on the vehicle 5 with secondary information regarding when, who, and where the power generation by the solar power generation device 23 was performed, i.e., secondary information regarding the vehicle 5 mounted with the solar power generation device 23, i.e., natural energy utilization information that links the above-mentioned secondary information to the above-mentioned primary information, is thought to increase people's interest in power generation by the solar power generation device 23, etc. Therefore, in an embodiment of the present invention, natural energy utilization information is created that links the above-mentioned secondary information to the above-mentioned primary information. Fig. 5 shows an example of a list of the created natural energy utilization information.
[0017] Referring to FIG. 5, the table of natural energy usage information shown in FIG. 5 lists primary information and secondary information for each vehicle 5 No. 1 to No. n. In the example shown in FIG. 5, the amount of power generated by the solar power generation device 23, the charge amount of the battery 22, and the consumption amount of electric energy used to drive the vehicle 5 are listed as primary information. In addition to the amount of power generated, the charge amount, and the consumption amount, the example shown in FIG. 5 also lists the amount of CO2 emission reduction. In this case, in the embodiment according to the present invention, the amount of CO2 emission reduction is the amount of CO2 emission reduced when the vehicle 5 is driven using the electric motor 20 instead of the internal combustion engine, and this amount of CO2 emission reduction is calculated from the amount of electric energy consumed to drive the vehicle 5. In this case, the owner of the vehicle 5 is granted the right to emit an amount of CO2 equivalent to this amount of CO2 emission reduction as a tradable carbon credit. That is, in the example shown in FIG. 5, information on the amount of CO2 emission reduction to be traded by carbon credit is also listed.
[0018] 5 lists, as secondary information, the driving position of the vehicle 5, the name of the owner of the vehicle 5, the names of the passengers in the vehicle 5, the driving area of the vehicle 5, and the driving time of the vehicle 5. In the example shown in Fig. 5, the driving position of the vehicle 5 refers to the place name where the vehicle 5 is currently driving, the driving area of the vehicle 5 refers to the partitioned area where the vehicle 5 is driving, such as Tokyo, Shizuoka Prefecture, Aichi Prefecture, Mishima City, or Nagoya City, and the driving time of the vehicle 5 refers to, for example, the time that the vehicle 5 has been driving in each driving area.
[0019] Moreover, each value shown in the table of FIG. 5 indicates a value at a certain time every certain time, for example, every 10 minutes, every hour, or every day. Furthermore, when each value shown in the table of FIG. 5 indicates a value at a certain time every day, there are cases where each value indicates a total value for the past one day up to that time, and cases where each value indicates a total value of all past values up to that time. In this case, when each value shown in the table of FIG. 5 indicates a total value for the past one day at a certain time, the power generation amount, the charging amount, the consumption amount, and the CO2 emission reduction amount in FIG. 5 indicate a total value for the past one day at a certain time. Meanwhile, in this case, in FIG. 5, the traveling position indicates the position of the vehicle 5 at this certain time, the traveling area indicates one or more areas where the vehicle 5 has traveled in the past one day at this certain time, and the traveling time indicates the traveling time in each traveling area where the vehicle 5 has traveled in the past one day at this certain time.
[0020] As described above, it is believed that creating natural energy utilization information by linking the primary information shown in Fig. 5 with the secondary information shown in Fig. 5 will increase people's interest in power generation by the solar power generation device 23, etc. In this case, in one embodiment of the present invention, the primary information includes at least one of the amount of power generation by the solar power generation device 23, the charge amount of the battery 22, and the consumption amount of electric energy used to drive the vehicle 5, and the secondary information includes at least one of the traveling position of the vehicle 5, the name of the owner of the vehicle 5, the name of the passenger of the vehicle 5, the traveling area of the vehicle 5, and the traveling time of the vehicle 5.
[0021] The list of natural energy utilization information shown in Fig. 5 can be created in each vehicle 5, or can be created in the management server 3. Next, taking the case where this list of natural energy utilization information is created in the management server 3 as an example, an example of a method for creating this list of natural energy utilization information will be described with reference to Figs. 6 to 12.
[0022] FIG. 6 shows the procedure of advance registration performed on the management server 3 when creating a list of natural energy usage information in the management server 3. Referring to FIG. 6, first, as shown by A1 in FIG. 6, a list creation site of natural energy usage information of the management server 3 is accessed on the display screen of the display unit 34 of the vehicle 5, and information about the vehicle body, such as the vehicle model number, is registered on the list creation site of the management server 3. Next, as shown by A2 in FIG. 6, information about the name of the owner of the vehicle 5, etc. is registered on the display screen of the display unit 34 of the vehicle 5. This registered information is stored in the memory 13 of the electronic control unit 10 of the management server 3. When registration of the information about the name of the owner of the vehicle 5, etc. is completed, As shown in Figure 6, A3, A vehicle ID is assigned to the vehicle 5 in the management server 3 , and the assigned vehicle ID is transmitted to the vehicle 5 and stored in the memory 28 of the electronic control unit 25 of the vehicle 5 .
[0023] Fig. 7 shows the procedure of the start process performed in the vehicle 5 when starting to use the vehicle 5. Referring to Fig. 7, first, the start switch is turned on, as shown in B1 of Fig. 7. When the start switch is turned on, a request to input the name of a passenger in the vehicle 5 is displayed on the display screen of the display unit 34 of the vehicle 5, as shown in B2 of Fig. 7. Next, As shown in B3 of Fig. 7, the passenger's name is entered. Once the passenger's name is entered, the passenger's name is stored in the memory 13 of the electronic control unit 10 of the management server 3. Next, as shown in B4 of Fig. 7, a start notification indicating the start of transmission of natural energy usage information, the entered passenger's name, and the vehicle ID are transmitted from the vehicle 5 to the management server 3.
[0024] 8 shows a basic information transmission routine for transmitting basic information for calculating the primary information from the vehicle 5 to the management server 3. This routine is executed in the electronic control unit 25 of the vehicle 5 by an interrupt at regular intervals, for example, every second. Referring to FIG. 8, first, in step 50, the power generation current Ia and the power generation voltage Va of the photovoltaic power generation device 23 are detected. Next, in step 51, the power generation power Pa (kw) of the photovoltaic power generation device 23 is calculated from the detected power generation current Ia and power generation voltage Va. Next, in step 52, the terminal voltage Vb and the temperature Tb of the battery 22 are detected. Next, in step 53, the drive current Ic and the drive voltage Vc of the electric motor 20 are detected. Next, in step 54, the drive power Pc of the electric motor 20 is calculated from the detected drive current Ic and drive voltage Vc. Next, in step 55, each data, i.e., the calculated power generation power Pa of the photovoltaic power generation device 23, the detected terminal voltage Vb and temperature Tb of the battery 22, and the calculated drive power Pc of the electric motor 20 are transmitted to the management server 3 together with the vehicle ID, and the transmitted data are stored in the memory 13 of the electronic control unit 10 of the management server 3.
[0025] 9 shows a vehicle position information transmission routine for transmitting the vehicle 5 position information, which is secondary information, from the vehicle 5 to the management server 3. This routine is executed in the electronic control unit 25 of the vehicle 5 by an interrupt at regular intervals, for example, every second. 9, first, in step 60, the current position of the vehicle 5 (e.g., the latitude and longitude of the vehicle 5) is detected by the GNSS receiver 31. Next, in step 61, data indicating the current position of the vehicle 5 and the vehicle ID are transmitted to the management server 3, and the transmitted data is stored in the memory 13 of the electronic control unit 10 of the management server 3.
[0026] 10 shows a calculation routine for the primary information. This routine is repeatedly executed in the electronic control unit 10 of the management server 3. 10, first, in step 70, it is determined whether or not basic information transmitted from the vehicle 5 has been received. If it is determined that the basic information has been received, the process proceeds to step 71, where the power generation electric power Pa of the solar power generation device 23 is integrated, and the integrated value of the power generation electric power Pa is set to ΣPa. Furthermore, based on this integrated value ΣPa of the power generation electric power Pa, the power generation amount (kWh) of the solar power generation device 23 within a certain time period (e.g., one hour or one day) from the start of the integration is calculated. Next, in step 72, the current charge amount Q of the battery 22 is calculated based on the terminal voltage Vb and temperature Tb of the battery 22.
[0027] Next, in step 73, the driving power Pc of the electric motor 20 is integrated, and the integrated value of the driving power Pc of the electric motor 20 is set as ΣPc. In addition, based on this integrated value ΣPc of the driving power Pc of the electric motor 20, the consumption amount (kwh) of electric energy within a certain time (e.g., one hour or one day) from the start of the integration is calculated. Meanwhile, as described above, in the embodiment according to the present invention, the amount of CO2 emissions reduced when the vehicle 5 is driven using the electric motor 20 instead of the internal combustion engine is set as the CO2 emission reduction amount, and this CO2 emission reduction amount is calculated from the consumption amount of electric energy used to drive the vehicle 5. Therefore, in step 74, based on the integrated value ΣPc of the driving power Pc of the electric motor 20 calculated in step 73, the CO2 emission reduction amount R within a certain time (e.g., one hour or one day) from the start of the integration is calculated.
[0028] 11 shows a calculation routine for the secondary information. This routine is repeatedly executed in the electronic control unit 10 of the management server 3. 11, first, in step 80, it is determined whether data indicating the current position of the vehicle 5 transmitted from the vehicle 5 has been received. If it is determined that data indicating the current position of the vehicle 5 has been received, the process proceeds to step 81, where the traveling position of the vehicle 5, i.e., the name of the place where the vehicle 5 is currently traveling, is identified based on the map information stored in the memory 13 of the electronic control unit 10 of the management server 3. Next, in step 82, the partitioned area where the vehicle 5 is currently traveling is identified. Next, in step 83, an accumulation operation of the transmission interval Δt of the position data of the vehicle 5 from the vehicle 5 to the management server 3 is performed, and the accumulated value of the transmission interval Δt is set to Σt. This accumulated value Σt of the transmission interval Δt represents the elapsed time since the start of transmission of the position data of the vehicle 5, i.e., the traveling time of the vehicle 5.
[0029] 12 shows a routine for creating a list of natural energy utilization information. This routine is executed in the electronic control unit 10 of the management server 3 at regular time intervals, for example, every 10 minutes, every hour, or every 24 hours. figure 12 Referring to FIG. 13, first, in step 90, a list of natural energy utilization information shown in FIG 5 is created based on the information stored in the memory 13 of the electronic control unit 10 of the management server 3, the values calculated by the primary information calculation routine shown in FIG 10, and the values calculated by the secondary information calculation routine shown in FIG 11. Next, in step 91, the natural energy utilization information shown in FIG 5 is processed, and a list of processed natural energy utilization information is created. An example of this list of processed natural energy utilization information is shown in FIG 13.
[0030] That is, as described above, if power generation is performed by the photovoltaic power generation device 23 in an area of interest, it is considered that people who are interested in that area will become more interested in power generation by the photovoltaic power generation device 23. In the example shown in Fig. 13, assuming such a case, natural energy use information is listed for each travel area of the vehicle 5, for example, Tokyo (H1), Shizuoka Prefecture (H2), and Aichi Prefecture (H3). In this case, in the example shown in Fig. 13, vehicles 5 that are traveling or have traveled in the same travel area, for example, vehicles 5 that are traveling or have traveled in Tokyo (H1), are numbered in order from No. 1, and for each vehicle 5, the amount of power generation, amount of charge, amount of consumption, and amount of CO2 emission reduction are presented as the primary information, and the owner's name and travel time are presented as the secondary information.
[0031] Returning to Figure 12 again, step 92 In this example, one or both of a list of natural energy utilization information as shown in Fig. 5 and a list of natural energy utilization information as shown in Fig. 13 are presented on a site presenting a list of natural energy utilization information of the management server 3. A person who wishes to obtain natural energy utilization information can obtain the natural energy utilization information by accessing the site presenting a list of natural energy utilization information of the management server 3.
[0032] In this manner, in an embodiment according to the present invention, primary information regarding the power generation or use of electric energy generated by the solar power generation device 23 mounted on the vehicle 5 and secondary information regarding the vehicle 5 mounted with the solar power generation device 23 are obtained, and natural energy utilization information is created by linking this secondary information to this primary information. Furthermore, in an embodiment of the present invention, an energy utilization information processing method is provided that acquires primary information regarding the power generation or use of electric energy generated by a solar power generation device 23 mounted on a vehicle 5 and secondary information regarding the vehicle 5 mounted with the solar power generation device 23, and creates natural energy utilization information by linking the secondary information to the primary information. In addition, in an embodiment of the present invention, a program is provided that causes a computer to acquire primary information regarding the power generation or use of electric energy generated by a solar power generation device 23 mounted on a vehicle 5 and secondary information regarding the vehicle 5 mounted with the solar power generation device 23, and to create natural energy utilization information that links this secondary information to this primary information.
[0033] Moreover, in the embodiment according to the present invention, the primary information includes information related to the amount of power energy generated by the solar power generation device 23. Furthermore, in the embodiment according to the present invention, the primary information includes at least one of information related to the charge amount of the battery 22 mounted on the vehicle 5 and information related to the consumption amount of power energy used to drive the vehicle 5, in addition to information related to the amount of power energy generated.
[0034] Moreover, in an embodiment according to the present invention, the secondary information includes information relating to the traveling position of the vehicle 5. Furthermore, in an embodiment according to the present invention, the secondary information includes, in addition to the information relating to the traveling position of the vehicle 5, at least one of information relating to the owner of the vehicle 5, the passengers of the vehicle 5, the traveling area of the vehicle 5, and the traveling time of the vehicle 5. Furthermore, in an embodiment according to the present invention, the primary information includes information relating to the amount of power generated by the solar power generation device 23, the secondary information includes information relating to the traveling position of the vehicle 5, and the natural energy utilization information includes information indicating the relationship between the amount of power generated and the traveling position of the vehicle 5.
[0035] Natural energy usage information that links this secondary information to primary information not only has the effect of raising people's interest in the use of natural energy, but also plays a major role in understanding the status of natural energy usage. Furthermore, information on the charge amount of the battery 22 plays a particularly important role when the charging power of the battery 22 is the subject of electricity trading, and information on the amount of CO2 emissions reduction plays a particularly important role when trading carbon credits. Therefore, it can be said that the present invention contributes to decarbonization, carbon neutrality, and a sustainable society (SDGs) by promoting the use of natural energy including solar power.
[0036] Next, an embodiment in which a provider of created natural energy utilization information is matched with a provider of natural energy utilization information is described with reference to Figures 14 to 22B. When a provider of natural energy utilization information is matched with a provider of natural energy utilization information, a list of natural energy utilization information shown in Figure 14 in which desired provision conditions are added to the list of natural energy utilization information shown in Figure 5 is used, and a list of natural energy utilization information shown in Figure 15 in which desired provision conditions are added to the list of natural energy utilization information shown in Figure 13 is used.
[0037] In the natural energy usage information list shown in Fig. 14 and the natural energy usage information list shown in Fig. 15, the desired provision conditions include monetary requests, points, and other acquisition requests in return for providing the natural energy usage information. Note that in this case, there may be cases where no return is requested.
[0038] In this case, when matching between the person wanting to provide and the person wanting to acquire, in an embodiment of the present invention, the person wanting to acquire is presented with the desired natural energy utilization information, and matching between the person wanting to provide and the person wanting to acquire is performed based on the presented desired natural energy utilization information and the natural energy utilization information provided by the person wanting to provide. In this case, in an embodiment of the present invention, the person wanting to acquire the natural energy utilization information accesses a registration site for the desired natural energy utilization information of the management server 3, and the person wanting to acquire registers the desired natural energy utilization information.
[0039] FIG. 16 shows an example of a list of desired natural energy use information created in the management server 3 based on the desired natural energy use information registered by the desired acquirer. As shown in FIG. 16, the list of desired natural energy use information lists the acquirer, the desired primary information, the desired secondary information, and the desired acquisition conditions. Note that At1, At2, Ct3, Bt4, and Dt5 in parentheses written in the desired primary information column represent the desired acquisition amount, and H1 and H2 in parentheses written in the desired secondary information column represent, for example, Tokyo and Shizuoka prefecture. Also, the desired acquisition conditions include monetary compensation, points, or other compensation for acquiring natural energy use information. Note that in this case, there may be no compensation.
[0040] FIG. 16 shows, as an example, a case where an applicant Z1 wishes to acquire natural energy utilization information where the driving area is Tokyo (H1) and the power generation amount is At1 (kwh), natural energy utilization information where the driving area is Shizuoka prefecture (H2) and the power generation amount is At2 (kwh), and natural energy utilization information where the driving area is Shizuoka prefecture (H2) and the power energy consumption amount is Ct3 (kwh), and a case where an applicant Z2 wishes to acquire natural energy utilization information where the driving area is Shizuoka prefecture (H2) and the charge amount Q of battery 22 is Dt5 (Wh), and natural energy utilization information where the driving area is Tokyo (H1) and the CO2 emission reduction amount is Dt5 (kg).
[0041] Fig. 17 shows a matching process routine for matching a provider and an acquirer. This routine is executed at regular time intervals, for example, every 10 minutes, every hour, or every 24 hours, in the electronic control unit 10 of the management server 3. Note that the matching process routine will be described below by taking as an example a case where a provider and an acquirer are matched based on the list of natural energy usage information shown in Fig. 15 and the list of desired acquirement natural energy usage information shown in Fig. 16.
[0042] Referring to Fig. 17, first, in step 100, the desired natural energy utilization information No. 1 in the list of desired natural energy utilization information shown in Fig. 16 is read. Next, in step 101, information that satisfies the primary information and secondary information in the read No. 1 desired natural energy utilization information is extracted from the list of available natural energy utilization information shown in Fig. 15, and the number of the extracted available natural energy utilization information is stored. Next, in step 102, the available natural energy utilization information with the first extracted number from the extracted available natural energy utilization information is read.
[0043] Next, in step 103, it is determined whether the desired provision conditions of the available natural energy utilization information extracted first with the number match the desired acquisition conditions of the No. 1 desired acquisition information. If it is determined that the desired provision conditions match the desired acquisition conditions, the process proceeds to step 104, where both the acquirer and the donor, or at least one of them, are notified that the transaction has been concluded. On the other hand, if it is determined that the desired provision conditions do not match the desired acquisition conditions, the process proceeds to step 105, where it is determined whether the determination of whether the desired provision conditions match the desired acquisition conditions for all extracted available natural energy utilization information with the number numbers has been completed.
[0044] If it is determined that the condition match determination between the desired provision conditions and the desired acquisition conditions has not been completed for all of the extracted available natural energy utilization information of the numbered number, the process proceeds to step 106, where the extracted available natural energy utilization information of the next numbered number is read. Next, the process proceeds to step 103, where it is determined whether the desired provision conditions of the extracted available natural energy utilization information of the next numbered number match the desired acquisition conditions of the No. 1 desired acquisition information. If it is determined in step 105 that the condition match determination between the desired provision conditions and the desired acquisition conditions has been completed for all of the extracted available natural energy utilization information of the numbered number, the process proceeds to step 107.
[0045] In step 107, it is determined whether or not such condition matching determination has been completed for all of the desired natural energy utilization information numbers listed in the list of desired natural energy utilization information shown in Fig. 16. If it is determined that such condition matching determination has not been completed for all of the desired natural energy utilization information numbers, the process proceeds to step 108, where the desired natural energy utilization information with the next number in the list of desired natural energy utilization information shown in Fig. 16 is read. Then, the process proceeds to step 101. In this way, it is determined whether or not the desired provision conditions and the desired acquisition conditions match for all of the desired natural energy utilization information in the list of desired natural energy utilization information shown in Fig. 16.
[0046] In the example shown in Figure 17, only the case where the desired provision conditions and the desired acquisition conditions match is described, but it is of course possible to construct a matching system that allows the acquirer and the donor to negotiate when the desired provision conditions and the desired acquisition conditions do not match.
[0047] In this manner, in the embodiment of the present invention, a matching processing unit is provided that matches the person who wishes to provide the created natural energy utilization information with the person who wishes to obtain the natural energy utilization information. In this case, in the embodiment of the present invention, the electronic control unit 10 of the management server 3 constitutes this matching processing unit.
[0048] In an embodiment according to the present invention, the desired natural energy use information that the acquirer wishes to acquire is presented, and the matching processing unit determines whether or not the natural energy use information provided by the desired provider contains information that satisfies the desired natural energy use information of the acquirer, and matches the acquirer with the desired provider when it is determined that the natural energy use information provided by the desired provider contains information that satisfies the desired natural energy use information of the acquirer. In this case, when the matching processing unit matches the acquirer with the desired provider, it notifies at least one of the acquirer and the desired provider that a transaction has been established.
[0049] Next, an embodiment in which an applicant presents a vehicle travel route so that the applicant can obtain the natural energy utilization information that the applicant desires to obtain will be described. First, an outline of this embodiment will be described with reference to Figs. 18A and 18B which illustrate examples of vehicle travel routes. Fig. 18A shows a case in which three different travel routes are possible between regions P1 and Q1 that are separated from each other, for example, between Nagoya City and Kyoto City, and R1(1), R1(2), and R1(3) show stopovers on each travel route. Meanwhile, Fig. 18B shows a case in which two different travel routes are possible between regions P2 and Q2 that are separated from each other, and R2(1) and R2(2) show stopovers on each travel route.
[0050] In this case, in the example shown in FIG. 18A, one of the driving routes passing through the route R1(1), the driving route passing through the route R1(2), and the driving route passing through the route R1(3) is selected, and the selected driving route is presented by the person who wishes to acquire the vehicle. On the other hand, in the example shown in FIG. 18B, one of the driving routes passing through the route R2(1) and the driving route passing through the route R2(2) is selected, and the selected driving route is presented by the person who wishes to acquire the vehicle. The selection of the driving route depends on the subject of the interest of the person who wishes to acquire the vehicle. For example, if the person who wishes to acquire the vehicle is interested in the driving area, it is considered that the driving route passing through the driving area of interest will be selected, and if the person who wishes to acquire the vehicle is interested in the amount of power generation, it is considered that the driving route that is predicted to have a lot of sunshine based on the weather forecast will be selected, for example.
[0051] FIG. 19 shows an example of a list of desired natural energy use information created in the management server 3 based on the desired natural energy use information registered by the desired acquirer. As shown in FIG. 19, the list of desired natural energy use information lists the acquirer, the desired primary information, the desired secondary information, the proposed travel route proposed by the acquirer, and the desired acquisition conditions. Note that At1, At2, Ct3, Dt1, and Dt2 in parentheses written in the column of desired primary information represent the desired acquisition amount, and H1 and H2 in parentheses written in the column of desired secondary information represent, for example, Tokyo and Shizuoka prefecture, and the proposed travel route represents the travel route selected by the acquirer described with reference to FIG. 18A and FIG. 18B. In addition, the desired acquisition conditions include a monetary compensation, points, or other compensation for acquiring natural energy use information. Note that in this case, there may be no compensation.
[0052] Fig. 20 shows an example of a procedure for performing matching processing between a provider applicant and an acquirer applicant. Referring to Fig. 20, in this example, first, at C1 in Fig. 20, the acquirer applicant accesses a list creation site of the management server 3 for natural energy use information using a communication device 40 (Fig. 4) installed in the acquirer applicant company 4, and registers the acquirer applicant, the desired primary information to be acquired, the desired secondary information to be acquired, the proposed travel route presented by the acquirer, and the desired acquisition conditions on the list creation site of the management server 3. Once registration of this data is completed, at C2 in Fig. 20, this data is presented in a list of desired natural energy use information to be acquired in the management server 3 as shown in Fig. 19.
[0053] When these data are presented in the list of natural energy utilization information desired to be acquired, in C3 of FIG. 20, a provider who can drive the proposed driving route presented by the acquirer can display the desired information on the display screen of the display unit 34 of the vehicle 5 or on the mobile terminal 6 owned by the owner of the vehicle 5. offer The management server 3 transmits a statement that the presented travel route is possible together with the conditions, i.e., an offer to provide, to the management server 3. When the management server 3 receives the offer to provide, in C4 of Fig. 20, the management server 3 performs a matching process between the provider and the acquirer using a matching process routine as shown in Fig. 17.
[0054] Fig. 21 shows another example of a procedure for matching a provider and an acquirer. Referring to Fig. 21, in this example, first, at D1 in Fig. 21, the acquirer accesses a list creation site of natural energy use information of the management server 3 by using a communication device 40 (Fig. 4) installed in the acquirer company 4, and registers the acquirer, the desired primary information, the desired secondary information, the proposed travel route presented by the acquirer, and the desired acquisition conditions on the list creation site of the management server 3. When the registration of these data is completed, at D2 in Fig. 21, these data are transmitted from the management server 3 to the vehicle 5 or the mobile terminal 6 owned by the owner of the vehicle 5, and these data are displayed on the display screen of the display unit 34 of the vehicle 5 or on the mobile terminal 6.
[0055] When these data are displayed on the display screen of the display unit 34 of the vehicle 5 or on the mobile terminal 6 owned by the owner of the vehicle 5, in D3 of FIG. 21, a provider desirer who can travel the proposed travel route presented by the acquisition desirer can input the desired travel route from the display unit 34 of the vehicle 5 or the mobile terminal 6 owned by the owner of the vehicle 5. offer The management server 3 transmits a statement that the presented travel route is possible together with the conditions, i.e., an offer to provide, to the management server 3. When the management server 3 receives the offer to provide, at D4 in Fig. 21, the management server 3 performs a matching process between the provider and the acquirer using a matching process routine as shown in Fig. 17.
[0056] 22A and 22B show yet another example of the procedure for matching a provider and a purchaser. This example shows a case where the provider's planned driving route is registered in advance in a natural energy usage information list creation site in the management server 3. First, referring to Fig. 22A, in this example, at E1 in Fig. 22A, information on the planned driving route and the like is transmitted from the owner of each vehicle 5 to the management server 3. At this time, the management server 3 registers the owner of the vehicle 5, the planned driving route, and the like on a site for creating a list of natural energy utilization information.
[0057] Meanwhile, referring to Fig. 22B showing the procedure of matching processing between the provider and the acquirer, in F1 of Fig. 22B, the acquirer accesses the natural energy utilization information list creation site of the management server 3 using the communication device 40 (Fig. 4) installed in the acquirer company 4, and registers the acquirer, the desired primary information, the desired secondary information, the proposed travel route presented by the acquirer, and the desired acquisition conditions on the list creation site of the management server 3. When the registration of this data is completed, in F2 of Fig. 22B, the management server 3 uses a matching processing routine as shown in Fig. 17 to search for planned travel routes, etc. that match the proposed travel routes, etc. registered by the acquirer from among the planned travel routes, etc. registered by the owners of each vehicle 5, and performs matching processing between the provider and the acquirer.
[0058] 18A to 22B also have a matching processing section that matches the created natural energy utilization information provider with the natural energy utilization information acquirer. In this case, the matching processing section is also configured by the electronic control unit 10 of the management server 3 in this embodiment. Also in this embodiment, the acquirer presents a driving route of a vehicle that can acquire the desired natural energy utilization information that the acquirer wishes to acquire, and the matching processing section matches the acquirer with an owner of a vehicle that may travel along the driving route presented by the acquirer.
[0059] In this embodiment, the matching processing unit displays the driving route presented by the applicant on the display screen of each vehicle or on the mobile terminal of the owner of each vehicle, and matches the applicant with owners of vehicles who may drive along the driving route presented by the applicant. Furthermore, in this embodiment, the matching processing unit matches the applicant with vehicle owners who plan to drive along the driving route presented by the applicant. [Explanation of symbols]
[0060] 1. Communication Network 3 Management Server 5. Vehicles 23 Photovoltaic power generation equipment
Claims
1. An energy utilization information system comprising a matching processing unit that acquires primary information regarding the generation or use of electric energy generated by a solar power generation device mounted on a vehicle and secondary information regarding the vehicle mounted on the solar power generation device, creates natural energy utilization information by linking the secondary information to the primary information, and matches a person wishing to provide the created natural energy utilization information with a person wishing to acquire the natural energy utilization information, wherein the person wishing to acquire the natural energy utilization information presents a vehicle driving route that can obtain the natural energy utilization information that the person wishing to acquire presents, and the matching processing unit matches the person wishing to acquire the natural energy utilization information with owners of vehicles that are likely to drive along the driving route presented by the person wishing to acquire the natural energy utilization information.
2. 2. The energy utilization information system according to claim 1, wherein the primary information includes information regarding an amount of electric power generated by a photovoltaic power generation device.
3. 3. The energy utilization information system of claim 2, wherein the primary information includes, in addition to information regarding the amount of power generated by the electric power energy, at least one of information regarding the charge level of a battery installed in the vehicle and information regarding the amount of power energy consumed to drive the vehicle.
4. 2. The energy utilization information system of claim 1, wherein the secondary information includes information regarding a traveling position of the vehicle.
5. 5. The energy utilization information system according to claim 4, wherein the secondary information includes at least one of information related to the vehicle owner, the vehicle occupants, the vehicle travel area, and the vehicle travel time in addition to information related to the vehicle's travel location.
6. The energy utilization information system of claim 1, wherein the primary information includes information regarding the amount of power generated by a solar power generation device, the secondary information includes information regarding the vehicle's traveling position, and the natural energy utilization information includes information indicating the relationship between the amount of power generated by the solar power generation device and the vehicle's traveling position.
7. An energy utilization information system as described in claim 1, wherein the matching processing unit displays the driving route presented by the applicant on the display screen of each vehicle or on the mobile terminal of the owner of each vehicle.
8. The matching processing unit drives along a driving route presented by the acquisition applicant.
2. The energy utilization information system according to claim 1, which matches prospective vehicle owners with those who wish to acquire the vehicle.
9. The energy utilization information system as described in claim 1, wherein the primary information includes information regarding the amount of CO2 emission reduction that is the subject of trading using carbon credits, and a person who wishes to obtain the natural energy utilization information can purchase the carbon credits.
10. An energy utilization information processing method in which a computer acquires primary information regarding the generation or use of electric energy generated by a solar power generation device mounted on a vehicle and secondary information regarding the vehicle mounted on the solar power generation device, creates natural energy utilization information by linking the secondary information to the primary information, and matches a person wishing to provide the created natural energy utilization information with a person wishing to obtain the natural energy utilization information, wherein the method has the person wishing to obtain the information present a driving route of a vehicle that can obtain the natural energy utilization information that the person wishing to obtain wishes to obtain, and matches the person wishing to obtain the information with owners of vehicles that are likely to drive along the driving route presented by the person wishing to obtain the information.
11. A program that acquires primary information regarding the generation or usage of electric energy generated by a solar power generation device mounted on a vehicle and secondary information regarding the vehicle mounted on the solar power generation device, creates natural energy utilization information by linking the secondary information to the primary information, and matches a person wishing to provide the created natural energy utilization information with a person wishing to obtain the natural energy utilization information, the program causing a computer to function in such a way that the person wishing to obtain the natural energy utilization information presents a driving route of a vehicle that can obtain the natural energy utilization information that the person wishing to obtain presents, and matches the person wishing to obtain the natural energy utilization information with owners of vehicles that may be driving along the driving route presented by the person wishing to obtain.
Citation Information
Patent Citations
On-vehicle device
JP2013102673A
Device for outputting power generation amount, and photovoltaic power generation system
JP2014213843A
Transaction management system, transaction management method and program
JP2018049399A
Information processing system, calculation method of reduction amount of carbon dioxide and program
JP2020091771A
Management server, power receiving terminal, power supplying terminal, and charging system
JP2020170419A
