Factor analysis device and factor analysis method

The factor analysis device addresses the challenge of identifying sensors and causes of performance decline by constructing binary trees from collected data, improving the accuracy of performance analysis in power generation plants.

JP7586366B2Active Publication Date: 2024-11-19FUJI ELECTRIC CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2024102724
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-10-09
Filing Date
2024-06-26
Publication Date
2024-11-19
Estimated Expiration
2040-05-18

AI Technical Summary

Technical Problem

Existing technologies struggle to identify which sensors affect the thermal efficiency of power generation plants and accurately analyze the causes of performance decline using analysis trees, leading to potential misidentification of factors.

Method used

A factor analysis device that collects and analyzes measurement data using a collection unit, performance estimator, change detector, and analysis unit to construct classification or regression binary trees, enabling the extraction of factors causing performance changes.

Benefits of technology

The device effectively identifies sensors affecting performance and accurately extracts factors of change by constructing binary trees from labeled or analyzed periods, enhancing the precision of performance analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007586366000003
    Figure 0007586366000003
  • Figure 0007586366000004
    Figure 0007586366000004
  • Figure 0007586366000005
    Figure 0007586366000005
Patent Text Reader

Abstract

To appropriately extract a factor of a performance change.SOLUTION: A factor analysis device according to an embodiment includes: collection means for collecting measurement data obtained by measuring an object by using a plurality of sensors; performance estimation means for estimating a performance value of the object by using the measurement data collected by the collection means; change detection means for setting an analysis period for the performance value estimated by the performance estimation means and detecting measurement data in which the performance value has changed during the analysis period; and analysis means for analyzing a factor of a performance change from the measurement data during the analysis period set by the change detection means.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a factor analysis device and a factor analysis method. [Background technology]

[0002] In recent years, with the development of sensors and the fall in communication costs, it has become easier to collect sensor data, and there are hopes for services that utilize this sensor data to realize efficient operation of various objects (e.g., plants, various facilities, equipment, devices, etc.). In order to realize efficient operation of such objects, technology has been proposed to analyze the factors that change the performance of the objects.

[0003] For example, Patent Document 1 discloses a technology that can remove external factors such as outside air temperature and seawater temperature, and can analyze the thermal efficiency of a power plant based on actual measured values, the performance values ​​of the equipment that constitutes the power plant, and the impact of changes in the performance values ​​on the thermal efficiency of the power plant.In addition, for example, Patent Document 2 discloses a technology for highly accurate efficiency diagnosis and supporting the response without interpolating know-how based on plant-specific knowledge and experience. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 5618322 [Patent Document 2] Patent No. 6472339 Summary of the Invention [Problem to be solved by the invention]

[0005] However, for example, the technology disclosed in Patent Document 1 can identify equipment that affects the thermal efficiency of a power plant, but cannot identify which sensor sensing the equipment affects the thermal efficiency. Also, for example, the technology disclosed in Patent Document 2 analyzes the cause of performance degradation using an analysis tree, but since the determination of performance degradation and the extraction of factors using the analysis tree are different logic, when a performance degradation is determined, the cause may not necessarily be extracted using the analysis tree.

[0006] An embodiment of the present invention has been made in consideration of the above points, and has an object to appropriately extract factors of performance changes. [Means for solving the problem]

[0007] In order to achieve the above-mentioned object, a factor analysis device according to one embodiment is characterized in having a collection means for collecting measurement data obtained by measuring an object using a plurality of sensors, a performance estimation means for estimating a performance value of the object using the measurement data collected by the collection means, a change detection means for setting an analysis period for the performance value estimated by the performance estimation means and detecting measurement data whose performance value has changed during the analysis period, and an analysis means for analyzing factors of the performance change from the measurement data during the analysis period set by the change detection means. Effect of the Invention

[0008] The causes of performance changes can be appropriately extracted. [Brief description of the drawings]

[0009] [Figure 1] 1 is a diagram illustrating an example of an overall configuration of a factor analysis apparatus according to a first embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of a hardware configuration of the factor analysis apparatus according to the first embodiment. [Diagram 3] 11 is a flowchart showing an example of the flow of a factor analysis process according to the first embodiment. [Figure 4]FIG. 11 is a diagram illustrating an example of a detection result of a performance change period. [Diagram 5] FIG. 11 is a diagram illustrating an example of an overall configuration of a factor analysis apparatus according to a second embodiment. [Figure 6] 13 is a flowchart showing an example of the flow of a factor analysis process according to the second embodiment. [Figure 7] FIG. 13 is a diagram illustrating an example of an overall configuration of a factor analysis apparatus according to a third embodiment. [Figure 8] 13 is a flowchart showing an example of the flow of a factor analysis process according to the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Each embodiment of the present invention will be described below. In each embodiment of the present invention, a factor analysis device 10 capable of appropriately extracting the factors of a performance change will be described.

[0011] [First embodiment] Hereinafter, a first embodiment of the present invention will be described. In the first embodiment, a classification binary tree is constructed as a decision tree for detecting a change in performance and extracting the cause of the change by using measurement data obtained by sensing an object for which performance efficiency is to be improved (for example, a plant, various facilities, equipment, devices, etc.), and the cause of the performance change is extracted by analyzing the classification binary tree.

[0012] In the following, the target for which the performance is to be made more efficient is also referred to as the "efficiency target." As described above, examples of the efficiency target include plants, various facilities, equipment, and devices. In addition, it is assumed that the state, operation, etc. of each efficiency target are sensed by one or more sensors.

[0013] <Overall composition> First, the overall configuration of a factor analysis device 10 according to the present embodiment will be described with reference to Fig. 1. Fig. 1 is a diagram showing an example of the overall configuration of the factor analysis device 10 according to the first embodiment.

[0014] As shown in FIG. 1, a factor analysis device 10 according to this embodiment includes a collection unit 101, a performance estimation unit 102, a change detection unit 103, a factor analysis unit 104, and a storage unit 105.

[0015] The collection unit 101 collects measurement data obtained by sensing the efficiency improvement target, and stores it in the storage unit 105. Here, the measurement data includes, for example, identification information for identifying the efficiency improvement target (for example, a plant ID, a facility ID, an equipment ID, an apparatus ID, etc.), the date and time when the state or operation of the efficiency improvement target was sensed (measured), identification information of the sensor that performed these measurements (for example, a sensor ID, etc.), and the measurement value (sensor value) of the sensor. Note that, for example, if the state or operation of the efficiency improvement target is measured by N sensors, the measurement data includes the sensor IDs of these N sensors and the sensor values ​​of these N sensors.

[0016] The collecting unit 101 may collect the measurement data by any method. For example, the collecting unit 101 may collect the measurement data by receiving the measurement data from a measuring device or a sensor via a communication network such as a LAN (Local Area Network), or may collect the measurement data by inputting the measurement data through an input device such as a keyboard.

[0017] Furthermore, the collection unit 101 may collect, for example, operation data of the efficiency improvement target other than the measurement data. The operation data includes, for example, information indicating normal and abnormal ranges of the measurement values ​​of the efficiency improvement target, and various events of the efficiency improvement target (for example, operation days, equipment inspection days, etc.). When the operation data is collected, the operation data is also stored in the storage unit 105.

[0018] The performance estimation unit 102 estimates a performance value of the efficiency improvement target by using the measurement data stored in the storage unit 105. In this way, a performance value is estimated for each of the measurement data.

[0019] Performance values ​​are estimated from the input / output relationship of the target for efficiency improvement using a physically defined quantitative performance conversion formula. For example, when the performance value is efficiency, it is generally estimated using a conversion formula that divides the output value by the input value for each plant or facility.

[0020] Specifically, for example, when the target for efficiency improvement is a gas turbine power plant, the performance value can be estimated by the following formula (1).

[0021]

number

[0022] However, the above formula (1) is just an example, and the conversion formula for the performance value differs depending on the type of efficiency improvement target, etc. For example, if the efficiency improvement target is a turbine room, its performance value (turbine room efficiency) can be estimated by dividing the turbine room output by the turbine room input. The turbine room output and turbine room input are measurement values ​​included in the measurement data. Note that this embodiment is not limited to a specific type of performance value, and can be applied to any type of performance value.

[0023] The change detection unit 103 divides the performance values ​​estimated by the performance estimation unit 102 into multiple periods for each efficiency improvement target, calculates a predetermined statistical amount for each period, and labels each period with this statistical amount, thereby detecting the period before and after a change in performance (e.g., a decrease in performance) as a performance change period.

[0024] For example, period P1 to period P n In the case where the performance value is divided into n periods, and each period is labeled with either a first label indicating a high performance value or a second label indicating a low performance value, the motion detection unit 103 detects the period P to which the first label is assigned. m and the second labeled period P m+1When these periods P m and P m+1 This is detected as a period of performance change.

[0025] The factor analysis unit 104 extracts factors of the performance change from the measurement data during the performance change period detected by the change detection unit 103. At this time, the factor analysis unit 104 constructs a classification binary tree from the measurement data during the performance change period, and extracts the factors of the performance change by analyzing this classification binary tree.

[0026] The storage unit 105 stores the measurement data collected by the collection unit 101. For example, the measurement data is stored as time-series data for each efficiency improvement target in the storage unit 105. Note that, for example, the operation data may be stored in the storage unit 105 for each efficiency improvement target. In addition to the above, the storage unit 105 may store various data (for example, a decision tree for extracting factors of performance changes, intermediate calculation results when the factors of performance changes are extracted by analyzing this decision tree, etc.).

[0027] 1 is merely an example, and other configurations may be used. For example, the factor analysis device 10 may be configured with a plurality of devices, and each unit (collection unit 101, performance estimation unit 102, change detection unit 103, factor analysis unit 104, and storage unit 105) may be distributed among the plurality of devices.

[0028] <Hardware configuration> Next, a hardware configuration of the factor analysis device 10 according to the first embodiment will be described with reference to Fig. 2. Fig. 2 is a diagram showing an example of a hardware configuration of the factor analysis device 10 according to the first embodiment.

[0029] 2, the factor analysis device 10 according to the first embodiment includes an input device 201, a display device 202, an external I / F 203, a communication I / F 204, a processor 205, and a memory device 206. These hardware components are connected to each other via a bus 207 so as to be able to communicate with each other.

[0030] The input device 201 is, for example, various buttons, a touch panel, a keyboard, a mouse, etc., and is used by a user to input various operations to the factor analysis device 10. The display device 202 is, for example, a display, etc., and displays the processing results, etc., of the factor analysis device 10. It is noted that the factor analysis device 10 does not necessarily have to have at least one of the input device 201 and the display device 202.

[0031] The external I / F 203 is an interface with an external device. The external device includes a recording medium 203a, etc. The factor analysis device 10 can read and write data from and to the recording medium 203a via the external I / F 203. One or more programs that realize each functional unit (e.g., the collection unit 101, the performance estimation unit 102, the change detection unit 103, the factor analysis unit 104, etc.) of the factor analysis device 10 may be recorded in the recording medium 203a.

[0032] The recording medium 203a may be, for example, an SD memory card, a USB memory, a CD (Compact Disk), a DVD (Digital Versatile Disk), or the like.

[0033] The communication I / F 204 is an interface for the factor analysis device 10 to perform data communication with other devices, equipment, etc. One or more programs for realizing each functional unit of the factor analysis device 10 may be acquired (downloaded) from a predetermined server device, etc. via the communication I / F 204.

[0034] The processor 205 is, for example, a CPU (Central Processing Unit) or the like, and is an arithmetic device that reads out programs and data from the memory device 206 or the like and executes various processes. Each functional unit of the factor analysis device 10 is realized by a process that the processor 205 executes according to one or more programs stored in the memory device 206 or the like.

[0035] The memory device 206 is, for example, a hard disk drive (HDD), a solid state drive (SSD), a random access memory (RAM), a read only memory (ROM), etc., and is a storage device that stores programs and data. The storage unit 105 of the factor analysis device 10 can be realized using, for example, the memory device 206, etc. However, the storage unit 105 may also be realized using, for example, a storage device connected to the factor analysis device 10 via a communication network, etc.

[0036] The factor analysis device 10 according to the first embodiment has the hardware configuration shown in Fig. 2, and can thereby realize the factor analysis process described below. Note that the hardware configuration shown in Fig. 2 is an example, and the factor analysis device 10 may have other hardware configurations. For example, the factor analysis device 10 may have a plurality of processors 205, or a plurality of memory devices 206.

[0037] <Flow of cause analysis process> Next, a flow of a factor analysis process for extracting factors of performance changes by the factor analysis device 10 according to the present embodiment will be described with reference to Fig. 3. Fig. 3 is a flowchart showing an example of the flow of the factor analysis process according to the first embodiment. It is assumed that the measurement data collected by the collection unit 101 is stored in the storage unit 105 for each efficiency improvement target.

[0038] In the following, a case will be described where the causes of a change in performance of a certain efficiency improvement target are extracted. The efficiency improvement target to be analyzed may be specified by a user or the like, or all efficiency improvement targets may be analyzed.

[0039] First, the performance estimation unit 102 estimates a performance value of the efficiency improvement target by using the measurement data stored in the storage unit 105 (step S101). As a result, a performance value is estimated for each of the measurement data.

[0040] Note that multiple types of performance values ​​may be estimated for one measurement data, but hereinafter, a description will be given assuming that one type of performance value is estimated for one measurement data. When multiple types of performance values ​​are estimated for one measurement data, the following steps S102 to S103 can be repeatedly executed for each type of performance value.

[0041] Next, the change detection unit 103 detects a performance change period through the following Steps 11 to 15 (Step S102).

[0042] Step 11: The change detection unit 103 divides the performance value estimated in step S101 into a plurality of periods. Any unit can be set as the unit of the period, and examples of the unit include a year, a season, a month, a week, or a day. Alternatively, for example, if operation data is stored in the storage unit 105, the performance value may be divided into a plurality of periods with the equipment inspection date as a boundary by referring to the operation data.

[0043] Step 12: Next, the change detection unit 103 performs correction to remove external factors that affect the performance value in each period divided in Step 11 above. For example, similar to the method disclosed in Patent Document 1 above, the change detection unit 103 may correct the performance value using the slope of the regression equation between the external factors and the performance value. Note that the execution of the process of Step 12 is optional and does not necessarily have to be performed. Hereinafter, the performance value after the above correction is also referred to as the "corrected performance value."

[0044] Step 13: Next, the change detection unit 103 calculates statistics of the corrected performance values ​​(or performance values ​​if the processing of Step 12 above has not been executed) for each period divided in Step 11 above. Any statistics may be calculated as the statistics, and examples of the statistics include the average, standard deviation, maximum, minimum, etc. of the corrected performance values ​​(or performance values) for the period. Alternatively, for example, the average, standard deviation, maximum, minimum, etc. of the corrected performance values ​​(or performance values) for different periods (for example, period P m and period P m+1 It may be a correlation coefficient of the corrected performance value (or the performance value) between

[0045] Step 14: Next, the change detection unit 103 assigns a label to each of these periods, representing the performance during that period, using the statistics calculated for each period. At this time, the change detection unit 103 may perform labeling using an algorithm such as statistical detection or threshold judgment. As a result, a label is assigned to each period, representing, for example, whether the performance during that period is high or low. However, the label being binary is just an example, and labels may be assigned to classify each period into any number of classes. By assigning a label to each period, the same label is also assigned to the measurement data and corrected performance value (or performance value) during that period.

[0046] Note that labeling may be performed manually in Step 14. In this case, the statistical amount for each period and the corrected performance value (or performance value) for each period calculated in Step 13 above are presented to the user, and the user performs labeling.

[0047] Hereinafter, for simplicity, there will be no distinction between the corrected performance value and the performance value without correction, and they will simply be referred to as "performance value".

[0048] Step 15: Then, the change detection unit 103 detects the periods before and after the change in performance (for example, the performance degradation) as a performance change period, using the labels assigned to each period in the above Step 14.

[0049] An example of the performance change period detected in the above Steps 11 to 15 is shown in FIG. 4. In the example shown in FIG. 4, a period in years is set in the above Step 11. In the example shown in FIG. 4, the period P m The statistic of S m , period P m+1 The statistic of S m+1 So, these statistics S m and S m+1 By period P m For the label "High", the period P m+1The label "low" is assigned to the period P m and period P m+1 Since the performance changes during the period P m and P m+1 is detected as a period of performance change.

[0050] If a performance change period is not detected in step S102, the process in the following step S103 is not executed.

[0051] Finally, the factor analysis unit 104 extracts factors of the performance change during the performance change period detected in the above step S102 through the following steps 21 to 23 (step S103).

[0052] Step 21: First, the factor analysis unit 104 arbitrarily sets a factor to be analyzed. For example, the factor analysis unit 104 sets an arbitrary sensor ID as the factor to be analyzed. The factor analysis unit 104 sets an arbitrary number of sensor IDs as factors. At this time, it is possible to arbitrarily determine which sensor ID to set as the factor to be analyzed, and for example, a sensor ID designated by a user or the like may be set as the factor to be analyzed.

[0053] Step 22: Next, the factor analysis unit 104 constructs a classification binary tree for classifying the performance values ​​of the measurement data, with each factor as a branch node and the label value as a leaf node, using the performance values ​​labeled with the performance change period detected in the above step S102 and the factors set in the above step 21. That is, the factor analysis unit 104 constructs a classification binary tree for classifying the performance values ​​of the measurement data into the correct label value (i.e., the label value assigned to the performance value in the above step S102), with each factor as a branch node (including the root node) and the label value as a leaf node, when the measurement data is input to the root node.

[0054] Step 23: Then, the factor analysis unit 104 extracts the factors of the performance change using the classification binary tree constructed in the above Step 22. Here, the factor analysis unit 104 calculates the variable importance VI(x) by the following formula (2) with the branch nodes as explanatory variables and the leaf nodes as objective variables, and extracts the factor corresponding to the explanatory variable with the highest variable importance VI(x) (or equal to or greater than a predetermined threshold) as the factor of the performance change. Note that the variable importance VI(x) may be presented to the user, and the factor of the performance change may be extracted based on the user's selection.

[0055]

number

[0056] As described above, the factor analysis device 10 according to this embodiment detects a performance change period by dividing measurement data into a plurality of periods and labeling these periods according to performance. Then, the factor analysis device 10 according to this embodiment constructs a classification binary tree from the labeled performance change periods and analyzes it to extract the cause of the performance change (e.g., a sensor ID). Therefore, the factor analysis device 10 according to this embodiment can identify, for example, a sensor that is a cause of a performance change among a plurality of sensors measuring a certain efficiency improvement target.

[0057] [Second embodiment] A second embodiment of the present invention will be described below. In the second embodiment, a case will be described in which measurement data is used to set a period for analyzing the causes of performance changes, a regression binary tree is constructed as a decision tree for extracting the causes of performance changes in that period, and the causes of performance changes are extracted by analyzing this regression binary tree.

[0058] In the second embodiment, differences from the first embodiment will be mainly described, and descriptions of components similar to those in the first embodiment will be omitted.

[0059] <Overall composition> First, the overall configuration of the factor analysis device 10 according to the present embodiment will be described with reference to Fig. 5. Fig. 5 is a diagram showing an example of the overall configuration of the factor analysis device 10 according to the second embodiment.

[0060] 5, the factor analysis device 10 according to this embodiment differs from the first embodiment in that it does not include a change detection unit 103. In addition, the factor analysis device 10 according to this embodiment includes an analysis period setting unit 106.

[0061] The analysis period setting unit 106 sets a period for analyzing factors of performance changes (hereinafter, also referred to as "analysis period"). That is, in the second embodiment, a performance change period is not detected by labeling each period, but only an analysis period for analyzing factors of performance changes is set.

[0062] Moreover, the factor analysis unit 104 according to this embodiment extracts factors of performance changes from the measurement data during the analysis period set by the analysis period setting unit 106. At this time, the factor analysis unit 104 constructs a regression binary tree from the measurement data during the analysis period, and extracts factors of performance changes by analyzing this regression binary tree.

[0063] <Flow of cause analysis process> Next, the flow of a factor analysis process for extracting factors of performance changes by the factor analysis device 10 according to this embodiment will be described with reference to Fig. 6. Fig. 6 is a flowchart showing an example of the flow of the factor analysis process according to the second embodiment. It is assumed that the measurement data collected by the collection unit 101 is stored in the storage unit 105 for each efficiency improvement target. In the following, a case where a factor of a performance change of a certain efficiency improvement target is extracted will be described.

[0064] First, similarly to step S101 in FIG. 3, the performance estimation unit 102 estimates a performance value of the efficiency improvement target by using the measurement data stored in the storage unit 105 (step S201).

[0065] Next, the analysis period setting unit 106 sets an analysis period for the performance value estimated in the above step S201 (step S202). At this time, the performance value in the analysis period may be corrected in the same manner as in Step 12 above.

[0066] In this embodiment, the performance value is estimated in step S201, and then the analysis period is set in step S202, but the order may be reversed. That is, for example, the analysis period may be set for the measurement data, and then the performance value may be estimated from each measurement data in the analysis period. In addition, hereinafter, for simplicity, the corrected performance value when correction is performed and the performance value when no correction is performed are not distinguished, and are simply referred to as "performance value".

[0067] Finally, the factor analysis unit 104 extracts factors of the performance change in the analysis period set in the above step S202 through the following steps 31 to 33 (step S203).

[0068] Step 31: First, the factor analysis unit 104 arbitrarily sets a factor (for example, a sensor ID) to be analyzed, in the same manner as in Step 21 above.

[0069] Step 32: Next, the factor analysis unit 104 uses the performance values ​​for the analysis period set in step S202 above and the factors set in step 31 above to construct a regression binary tree representing the relationship between the measurement data and the performance values, with each factor as a branch node and the performance values ​​as leaf nodes.

[0070] Step 33: Then, the factor analysis unit 104 extracts factors of the performance change using the regression binary tree constructed in the above Step 32. Note that, similarly to the above Step 23, the factor analysis unit 104 calculates the variable importance VI(x) by the above formula (2) using the branch nodes as explanatory variables and the leaf nodes as objective variables, and extracts the factor corresponding to the explanatory variable with the highest variable importance VI(x) (or equal to or greater than a predetermined threshold) as the factor of the performance change.

[0071] As described above, the factor analysis device 10 according to this embodiment sets an analysis period for measurement data, constructs a regression binary tree from this analysis period, and analyzes it to extract factors of performance changes (e.g., sensor IDs). Therefore, in the factor analysis device 10 according to this embodiment, as in the first embodiment, it is possible to identify, for example, a sensor that is a factor of performance changes among a plurality of sensors that measure a certain efficiency improvement target.

[0072] [Third embodiment] A third embodiment of the present invention will be described below. In the third embodiment, a classification binary tree is constructed as a decision tree for detecting samples of performance changes during an analysis period using measurement data and extracting the factors of the performance changes during the analysis period, and the factors of the performance changes are extracted by analyzing the classification binary tree.

[0073] In the third embodiment, differences from the first embodiment will be mainly described, and descriptions of components similar to those in the first embodiment will be omitted.

[0074] <Overall composition> First, the overall configuration of the factor analysis device 10 according to the present embodiment will be described with reference to Fig. 7. Fig. 7 is a diagram showing an example of the overall configuration of the factor analysis device 10 according to the third embodiment.

[0075] 7, the factor analysis device 10 according to this embodiment differs from the first embodiment in that it does not include a change detection unit 103. In addition, the factor analysis device 10 according to this embodiment includes a change sample detection unit 107.

[0076] The change sample detection unit 107 sets an analysis period and detects samples whose performance values ​​have changed (hereinafter, also referred to as "performance change samples"). That is, in the third embodiment, a performance change period is not detected by labeling each period, but a sample whose performance has changed is detected by labeling each sample. Note that a sample refers to measurement data stored in the memory unit 105.

[0077] Moreover, the factor analysis unit 104 according to this embodiment extracts factors of performance changes from samples (measurement data) during an analysis period set by the change sample detection unit 107. At this time, the factor analysis unit 104, like the first embodiment, constructs a classification binary tree from the measurement data during the analysis period, and analyzes this classification binary tree to extract factors of performance changes.

[0078] <Flow of cause analysis process> Next, the flow of factor analysis processing for extracting factors of performance changes by the factor analysis device 10 according to this embodiment will be described with reference to Fig. 8. Fig. 8 is a flowchart showing an example of the flow of factor analysis processing according to the third embodiment. It is assumed that the measurement data collected by the collection unit 101 is stored in the storage unit 105 for each efficiency improvement target. In addition, hereinafter, a case where a factor of a performance change of a certain efficiency improvement target is extracted will be described.

[0079] First, similarly to step S101 in FIG. 3, the performance estimation unit 102 estimates a performance value of the efficiency improvement target by using the measurement data stored in the storage unit 105 (step S301).

[0080] Next, the change sample detection unit 107 detects a performance change sample through the following Steps 41 to 45 (Step S302).

[0081] Step 41: The change sample detection unit 107 sets an analysis period for the performance value estimated in the above step S301.

[0082] Step 42: Next, the change sample detection unit 107 performs correction to remove external factors that affect the performance value during the analysis period set in Step 41, similar to Step 12 above. Note that the execution of the processing in Step 42 is optional and does not necessarily have to be performed. Hereinafter, for simplicity, the performance value when corrected and the performance value when not corrected will not be distinguished, and will simply be referred to as the "performance value."

[0083] Step 43: Next, the change sample detection unit 107 divides the performance values ​​from the measurement data into a plurality of clusters or types during the analysis period set in the above Step 41. When dividing into a plurality of clusters, for example, a clustering method such as the k-means method or the Gaussian Mixture Model may be used to divide each sample into a plurality of clusters based on the characteristics of the performance values. On the other hand, when dividing into a plurality of types, for example, an anomaly detection method such as Isolation Forest or Random Cut Forest may be used to divide each sample into a plurality of normal and abnormal types based on the degree of anomaly in the performance values.

[0084] Step 44: Next, the change sample detection unit 107 assigns a label representing the performance to the clusters or types divided in the above step Step 43. As a result, a label is assigned to the samples (measurement data) belonging to each cluster or type. Note that, for example, two labels representing either normal or abnormal may be assigned as the labels. However, the number of labels being two is just an example, and any number of labels may be assigned.

[0085] Step 45: Then, the change sample detection unit 107 uses the labels assigned to each sample in Step 44 above to detect samples whose performance has changed (for example, samples whose label value has changed from a value indicating normal to a value indicating abnormality) as performance change samples.

[0086] Finally, the factor analysis unit 104 extracts factors of the performance change in the analysis period set in the above Step 41 (Step S303), similarly to Step S103 in Fig. 3. That is, the factor analysis unit 104 arbitrarily sets factors to be analyzed, constructs a classification binary tree using the performance values ​​labeled in the analysis period and the factors, and extracts factors of the performance change using this classification binary tree.

[0087] As described above, the factor analysis device 10 according to this embodiment sets an analysis period for measurement data, constructs a classification binary tree from this analysis period, and analyzes it to extract factors of performance changes (e.g., sensor IDs). Therefore, in the factor analysis device 10 according to this embodiment, as in the first embodiment, it is possible to identify, for example, a sensor that is a factor of performance changes among a plurality of sensors that measure a certain efficiency improvement target.

[0088] The present invention is not limited to the above-described embodiments specifically disclosed, and various modifications, changes, combinations, etc. are possible without departing from the scope of the claims. [Explanation of symbols]

[0089] 10. Factor Analysis Device 101 Collection Department 102 Performance estimation section 103 Change detection unit 104 Factor Analysis Department 105 Storage section 106 Analysis Period Setting Section 107 Change sample detector

Claims

1. A collection means for collecting measurement data obtained by measuring an object using a plurality of sensors; a performance estimation means for estimating a performance value of the target using the measurement data collected by the collection means; a change detection means for setting an analysis period of the performance value estimated by the performance estimation means, and detecting measurement data used to estimate the performance value when the performance value changes during the analysis period; an analysis means for analyzing a cause of a performance change from the measurement data during the analysis period set by the change detection means; having The analysis means includes: constructing a classification binary tree using the measurement data during the analysis period, with the factors as branch nodes and labels representing performance as leaf nodes; the branching nodes are used as explanatory variables and the leaf nodes are used as objective variables, and a factor represented by a branching node corresponding to an explanatory variable having the highest variable importance with respect to the objective variable or an explanatory variable whose variable importance is equal to or greater than a predetermined threshold is extracted as a factor of the performance change.

2. The change detection means During the analysis period, the performance values ​​are divided into a plurality of clusters from the measurement data using a predetermined clustering method; 2. The factor analysis apparatus according to claim 1, wherein the label is assigned to each piece of measurement data belonging to each cluster, so that when the performance value changes, the measurement data used to estimate the performance value is detected.

3. The change detection means During the analysis period, the performance values ​​are divided into a plurality of normal or abnormal types from the measurement data using a predetermined anomaly detection method; 2. The factor analysis device according to claim 1, wherein the label is assigned to each of the measurement data divided into different types, so that when the performance value changes, the measurement data used for estimating the performance value is detected.

4. A collection step of collecting measurement data obtained by measuring an object using a plurality of sensors; a performance estimation step of estimating a performance value of the target using the measurement data collected in the collection step; a change detection step of setting an analysis period for the performance value estimated in the performance estimation step, and detecting measurement data used to estimate the performance value when the performance value changes during the analysis period; an analysis step of analyzing a cause of a performance change from the measurement data during the analysis period set in the change detection step; The computer executes The analysis procedure includes: constructing a classification binary tree using the measurement data during the analysis period, with the factors as branch nodes and labels representing performance as leaf nodes; the branching nodes are used as explanatory variables and the leaf nodes are used as objective variables, and a factor represented by a branching node corresponding to an explanatory variable having the highest variable importance with respect to the objective variable or an explanatory variable whose variable importance is equal to or greater than a predetermined threshold is extracted as a factor of the performance change.

Citation Information

Patent Citations

  • Threeephase group gas insulating switching device breaker

    JP1981018322A

  • Parts assembly structure for optical head

    JP1989072339A

  • Power plant performance diagnostic device

    JP1992258740A

  • Facility performance diagnostic apparatus and facility performance diagnostic method

    JP2016157223A

  • Performance failure analysis device, method, program, and performance failure analysis device analysis result display method

    WO2007052327A1