Method for dismantling and assembling a wind turbine

The wind turbine construction method using a frame with multiple mounts and elevating means allows for the dismantling and assembly of large turbines on a small area, addressing space constraints and environmental issues associated with large cranes.

JP7586877B2Active Publication Date: 2024-11-19TAIHEI DENGYO KAISHA
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2022169172
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-10-21
Publication Date
2024-11-19
Estimated Expiration
2042-10-21

AI Technical Summary

Technical Problem

Construction space for dismantling wind turbines is limited in mountainous areas, and the use of large cranes requires vast spaces and significant tree clearance, making the process time-consuming and costly.

Method used

A wind turbine construction method using a frame with a first and second mount surrounding the tower, pedestal lifting means, and elevating means to raise and lower tower members, allowing for dismantling and assembling the turbine on a smaller area without the need for large cranes.

Benefits of technology

Enables the dismantling and assembly of large wind turbines on a small piece of land safely and efficiently, reducing the need for extensive space and minimizing environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007586877000001
    Figure 0007586877000001
  • Figure 0007586877000002
    Figure 0007586877000002
  • Figure 0007586877000003
    Figure 0007586877000003
Patent Text Reader

Abstract

To provide a construction method or the like of a windmill using a windmill construction trestle which can construct a huge windmill on a narrow and small site.SOLUTION: By using a windmill construction trestle which has: a first trestle constructed in a position surrounding a tower of a windmill; a second trestle constructed at the outside of the first trestle; trestle lift means for lifting the first trestle; first lift means for lifting the other tower member in a suspended state located above the tower member at the lowest step out of a plurality of tower members constituting the tower; and second lift means for lifting the tower member located at the lowest step in a suspended state, the tower member located at the lowest step and a tower member located at a step higher than the lowest step by one step are divided. In a state in which the first trestle rises up with respect to the second trestle, a load of a member of a windmill located above the tower member at the lowest step is supported, and in that state, the tower member located at the lowest step is carried out while being supported.SELECTED DRAWING: Figure 20
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction method for dismantling or assembling a wind turbine used for wind power generation or the like. [Background technology]

[0002] Patent Document 1 discloses a construction method for a wind turbine used for wind power generation. In the construction method of Patent Document 1, as shown in Figure 1 etc. of Patent Document 1, a self-elevating work platform is constructed next to the tower of the wind turbine, a self-propelled crane is placed on top of it, and the wind turbine is constructed using the self-propelled crane. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-152120 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in mountainous areas where wind turbines are installed, the construction space for dismantling the wind turbines is limited, and it may be difficult to install a self-elevating work platform. Even if a super-large non-self-propelled crane is used instead of a self-propelled crane, a large work space is required considering the space required for assembling, dismantling, and installing the crane, and the space required for dismantling after the wind turbine tower is lowered. Furthermore, many trees must be cut down to prepare access roads and ground preparations for large cranes and large trailers to pass through, which can be very time-consuming and costly.

[0005] In view of the above circumstances, the present invention has an object to provide a wind turbine construction method using a wind turbine construction stand that enables the construction of a huge wind turbine on a small piece of land. [Means for solving the problem]

[0006] The present invention has been made to achieve the above object and has the following features.

[0007] The invention described in claim 1 is a method for dismantling a wind turbine using a wind turbine construction rack comprising: a first rack constructed at a position surrounding a tower of a wind turbine; a second rack constructed outside the first rack at a position surrounding the tower; a rack lifting means provided on the second rack for lifting and lowering the first rack; a first lifting means provided on the first rack for lifting and lowering the other tower members above the tower member at the lowest level among a plurality of tower members constituting the tower while suspending them; and a second lifting means provided on the first rack for lifting and lowering the tower member at the lowest level while suspending them, the first rack having a mounting portion at its top on which a nacelle installed on an upper part of the tower member at the highest level can be placed, the method including a division step of dividing the tower member at the lowest level and the tower member one level above the lowest level; and a step of lifting and lowering the tower member at the lowest level by the first lifting means while the first rack is raised relative to the second rack. a supporting step of supporting a load of wind turbine components; a carrying-out step of supporting the lowest tower component by the second lifting means while supporting the load by the supporting step, and carrying the lowest tower component out of the wind turbine construction frame; a wind turbine component lowering step of lowering the other tower components by the first lifting means after the carrying-out step; a separation step of separating the highest tower component from the nacelle when the nacelle is placed on the placement section by the wind turbine component lowering step; The method includes a platform lowering step in which the platform lifting means lowers the first platform in a raised state while the nacelle is placed on the placement section; a first platform dismantling step in which, after the platform lowering step, the lower part of the first platform is dismantled while leaving the upper part of the first platform, while the nacelle is placed on the placement section; and an upper part of the platform lowering step in which, after the first platform dismantling step, the platform lifting means further lowers the upper part of the first platform, while the nacelle is placed on the placement section.

[0008] The invention described in claim 2 is the method for dismantling a wind turbine described in claim 1, further comprising a removal step of removing members of the second frame that interfere when the upper part of the first frame is lowered, prior to the upper frame lowering step.

[0009] The invention described in claim 3 includes a first frame constructed in a position surrounding a wind turbine tower, a second frame constructed outside the first frame in a position surrounding the tower, a frame lifting means provided on the second frame for lifting and lowering the first frame, a first lifting means provided on the first frame for lifting and lowering some of the tower members among a plurality of tower members constituting the tower in a suspended state, and a lifting means provided on the first frame for lifting and lowering the other tower members arranged below the some of the tower members in a suspended state. a second lifting means for lifting and lowering the first frame with respect to the upper part of the first frame, the first frame having a mounting portion on the top of which a nacelle installed on the upper part of the uppermost tower member can be placed, the method for assembling the wind turbine using a wind turbine construction frame including a frame upper part construction step for constructing an upper part of the first frame having the mounting portion, a frame upper part raising step for raising the upper part of the first frame with the frame lifting means while the nacelle is placed on the mounting portion, and the first lifting means for lifting the uppermost tower member to a position where it can be joined with the nacelle and joining the uppermost tower member to the nacelle after the first lifting means for lifting the first tower member to a position where it can be joined with the nacelle and joining the uppermost tower member to the nacelle after the first lifting means for lifting the first tower member to a position where it can be joined with the nacelle and joining the uppermost tower member to the nacelle; a lifting step for lifting the part of the tower members by the first lifting means while the first rack is raised up relative to the second rack; a placement step for placing the other tower members in a suspended state by the second lifting means below the part of the tower members lifted by the first lifting means; a placement step for lowering the part of the tower members by the first lifting means and placing them on the other tower members placed in the placement step; and a tower member joining step for joining the part of the tower members to the other tower members after the placement step. Effect of the Invention

[0010] According to the invention of claim 1, a first frame and a second frame are constructed in a double structure surrounding the tower of the wind turbine, the first frame rises from the second frame, and while the first lifting means provided on the first frame supports the wind turbine components above the tower components at the lowest stage of the wind turbine, the second lifting means provided on the first frame removes the tower components at the lowest stage, so that a large area for installing cranes etc. is not required and a huge wind turbine can be dismantled even on a small area of ​​land. Also, the lifting means for the frame lowers the nacelle together with the upper part of the first frame to near the ground, so that the dismantling of the nacelle can be carried out more safely than when it is carried out at a high place.

[0011] According to the invention of claim 3, a first frame and a second frame are constructed in a double structure in a position surrounding the tower of the wind turbine, the first frame rises from the second frame, and the other tower members are arranged in a suspended state by the second lifting means provided on the first frame below a part of the tower members lifted by the first lifting means provided on the first frame, and some of the tower members are placed on the other tower members and joined, so that a large site for installing a crane etc. is not required and a huge wind turbine can be assembled even on a small site. Also, since the nacelle assembled near the ground is lifted together with the upper part of the first frame by the lifting means for the frame, the assembly of the nacelle can be performed safely compared to the case where it is performed at a high place. [Brief description of the drawings]

[0012] [Figure 1] 1A is a front view of a blade 130C of the wind turbine 100 suspended by a chain block 11, and FIG. [Diagram 2] 10(A) is a plan view of the hoisting jig 1, (B) is a front view of the same, (C) is a left side view of the same, and (D) is a plan view of the hoisting jig 1 attached to the lower part of the flange 131 of the blade 130C. [Diagram 3]1 is a front view showing a state in which a blade 130C is suspended by a chain block 11 using a hoisting jig 1. FIG. [Figure 4] 1A is a front view of a blade 130C of the wind turbine 100 being lowered by a climber 21, and FIG. [Diagram 5] 1 is a front view showing a state in which a blade 130C is suspended by a climber 21 using a hoisting jig 1. FIG. [Figure 6] 1A is a front view of a blade 130C of the wind turbine 100 being suspended by a crane, and FIG. [Figure 7] FIG. 2 is a front view of the tower 110 and the wind turbine construction stand 300. [Figure 8] FIG. 2 is a side view of the tower 110 and the wind turbine construction stand 300. [Figure 9] FIG. 2 is a plan view of the tower 110 and the wind turbine construction stand 300. [Figure 10] 1A is a plan view of the jack base 306, and FIG. 1B is a side view of the jack base 306. [Figure 11] 13(A) to 13(D) are plan views and side views of a tower member 111 when a steel material penetrates the tower member 111, and 13(E) is a side view showing a joint of the tower member 111. [Figure 12] (A) is a side view of the wind turbine construction stand 300 when transporting the tower member 111C, (B) is a side view of the wind turbine construction stand 300 when transporting the tower member 111B, and (C) is a side view of the wind turbine construction stand 300 when transporting the tower member 111A. [Figure 13] 1A is a side view of the wind turbine construction stand 300 when the inner stand 301 has been lowered, and FIG. 1B is a side view of the wind turbine construction stand 300 when the nacelle 120 is being dismantled. [Figure 14] 4 is a flowchart showing an example of the flow of a method for dismantling the wind turbine 100. [Figure 15] 4 is a flowchart showing an example of the flow of a method for assembling the wind turbine 100. [Figure 16]FIG. 13 is a perspective view of the wind turbine construction stand 300 when the inner stand 301 is lowered in the modified example. [Figure 17] 1A is a front view of the wind turbine construction stand 300 when the inner frame 301 is lowered in the modified example, and FIG. 1B is a side view of the wind turbine construction stand 300 when the inner frame 301 is lowered in the modified example. [Figure 18] FIG. 13 is a perspective view of the wind turbine construction stand 300 before an upper part 301A of the inner stand 301 is lowered in the modified example. [Figure 19] 1A is a front view of the wind turbine construction stand 300 in the modified example before the upper part 301A of the inner stand 301 is lowered, and FIG. 1B is a side view of the wind turbine construction stand 300 in the modified example before the upper part 301A of the inner stand 301 is lowered. [Figure 20] FIG. 13 is a perspective view of the wind turbine construction stand 300 when an upper part 301A of the inner stand 301 is lowered in the modified example. [Figure 21] 1A is a front view of the wind turbine construction stand 300 when the upper part 301A of the inner stand 301 has been lowered in the modified example, and FIG. 1B is a side view of the wind turbine construction stand 300 when the upper part 301A of the inner stand 301 has been lowered in the modified example. [Figure 22] 13A is a front view of the modified example when upper portion 301A of inner cradle 301 is disassembled, and FIG. 13B is a side view of the modified example when upper portion 301A of inner cradle 301 is disassembled. [Figure 23] 13A is a front view of the modified example when the nacelle removal vehicle 405 is being brought in, and FIG. 13B is a side view of the modified example when the nacelle removal vehicle 405 is being brought in. FIG. [Figure 24] 13A is a front view of the modified example when the nacelle 120 is loaded onto the nacelle transport vehicle 405, and FIG. 13B is a side view of the modified example when the nacelle transport vehicle is loaded. [Diagram 25] 13A is a front view of the modified example when the nacelle 120 is removed by the nacelle removal vehicle 405, and FIG. 13B is a side view of the modified example when the nacelle 120 is removed by the nacelle removal vehicle 405. FIG. [Figure 26] 13 is a flowchart showing an example of the flow of a method for dismantling the wind turbine 100 in a modified example. [Figure 27] 10 is a flowchart showing an example of the flow of a method of assembling the wind turbine 100 in a modified example. [Figure 28] 1A is a front view of the wind turbine construction frame 300 showing another reinforcing method for the outer frame 302 in the modified example, and FIG. 1B is a side view of the wind turbine construction frame 300 showing another reinforcing method for the outer frame 302 in the modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, an embodiment of the present invention (specifically, a method for dismantling the wind turbine 100 and a method for assembling the wind turbine 100) will be described with reference to the drawings.

[0014] [1. Configuration of Wind Turbine 100] 1(A) and (B), the wind turbine 100 includes a tower 110, a nacelle 120, three blades 130A, 130B, and 130C (hereinafter, the three blades may be collectively referred to as blades 130), and a hub 140. The tower 110 is, for example, a tower-like structure of about 100 m.

[0015] Tower 110 is composed of three tower members 111A, 111B, and 111C that are divided in the height direction (hereinafter, the three tower members may be collectively referred to as tower members 111). Tower member 111A is the topmost tower member, tower member 111B is the second tier (middle tier) tower member from the top, and tower member 111C is the third tier (bottom tier) tower member from the top.

[0016] The nacelle 120 houses bearings, a power generating device, etc. The power generating device includes a gearbox that increases the rotation speed of the blades 130, a generator (induction generator, synchronous generator, etc.), and a monitoring device that monitors the operating status of the wind turbine 100. The nacelle 120 is attached to the top of the uppermost tower member 111A. A hub 140 is provided on the front side of the nacelle 120, and three blades 130 are attached to the hub 140.

[0017] Next, with reference to FIG. 2, a description will be given of the hoisting jig 1 used when removing the blade 130C from the hub 140 and suspending it down.

[0018] [2. Configuration of Lifting Jig 1] 2(A) to 2(C), the hoisting jig 1 includes a ring-shaped hoisting jig body 2, a hoisting plate 3, and a hoisting piece 4. The hoisting jig body 2 is made up of two semi-ring-shaped body members 2A and 2B. The hoisting jig body 2 abuts against a flange 131 of a blade 130C from below.

[0019] A suspension plate 3 is provided on each of the main body members 2A and 2B, and an insertion hole 3A is formed in the suspension plate 3. A suspension wire 13 of a chain block 11, which will be described later, is attached to the insertion hole 3A.

[0020] Further, two hanging pieces 4 are provided on each of the main body members 2A and 2B, and insertion holes 4A are formed in the hanging pieces 4. Suspension wires 23 of the climbers 21, which will be described later, are attached to the insertion holes 4A.

[0021] As shown in FIG. 2(D), when the hoisting jig 1 holds the blade 130 inside the ring-shaped hoisting jig body 2, the outer periphery of the hoisting jig body 2 is smaller than the outer periphery of the flange 131 of the blade 130.

[0022] [3. How to dismantle the Windmill 100] A method for dismantling the wind turbine 100 according to this embodiment will be described with reference to Figs. 1 to 14.

[0023] [3.1. Demolition process 1] As shown in FIG. 1, first, the hub 140 and the blade 130 are rotated so that the tip of the blade 130C to be suspended faces downward (vertically downward).

[0024] [3.2.Dismantling process 2] Next, as shown in FIG. 3, the chain block 11 is attached to the blades 130A and 130B other than the blade 130C that is the target to be lowered, and the chain block 11 is connected to the blade 130C that is the target to be lowered.

[0025] In dismantling process 2, a chain block 11 is attached to a hoisting jig 1 that supports from below a flange 131 of a blade 130C to be suspended, thereby indirectly connecting the chain block 11 and the blade 130C to be suspended.

[0026] Specifically, in order to attach the two chain blocks 11 to the blades 130A and 130B, respectively, the chain block attachment wires 12 provided on the chain block 11 are tied to the blades 130A and 130B, respectively. In addition, the jig receiver 14 is attached to the blade 130C so as to contact the lower surface (the lower surface when the tip of the blade 130C faces downward) of the flange 131 for attaching the blade 130C to the hub 140. Next, the body members 2A and 2B, which have been separated in advance, are sandwiched between the base of the blade 130C, and the upper surface of the hanging jig body 2 is attached by bolting so as to contact the lower surface of the jig receiver 14.

[0027] The hoisting jig 1 is then fixed by passing the hoisting wire 13 of the chain block 11 through an insertion hole 3A formed in the hoisting plate 3 of the hoisting jig 1. Next, the hoisting jig 1 is hoisted by the chain block 11, so that the jig receiver 14 and the hoisting jig 1 come into contact with each other. This indirectly connects the chain block 11 and the blade 130C, and the chain block 11 supports the load of the blade 130C.

[0028] The work from dismantling process 2 to dismantling process 5 is carried out by workers aboard a gondola 201 that rises and falls on a gondola wire 202 installed along the tower 110.

[0029] [3.3. Demolition process 3] Next, in a state in which the chain block 11 and the blade 130C to be suspended are connected, the blade 130C to be suspended is removed from the hub 140. At this time, the chain block 11 receives the load of the blade 130C, thereby preventing the blade 130C from falling.

[0030] [3.4.Dismantling process 4] Next, with the chain block 11 and the blade 130C to be suspended connected, a chill climber 21 is installed inside the hub 140 or the nacelle 120, and the chill climber 21 is connected to the blade 130C to be suspended.

[0031] In dismantling process 4, the climber 21 is attached to the hoisting jig 1, thereby indirectly connecting the climber 21 to the blade 130C to be suspended.

[0032] Specifically, as shown in Figure 5, in order to attach each of the four climbers 21 (Figure 5 is a view from the horizontal direction, so two climbers 21 are shown) to a fixed portion (not shown) inside the hub 140 or the nacelle 120, the climber attachment wires 22 provided on the climbers 21 are fixed to the respective fixed portions.

[0033] The hoisting wire 23 of the tilt climber 21 is then passed through and fixed to the insertion hole 4A formed in the hoisting piece 4 of the hoisting jig 1. This indirectly connects the tilt climber 21 and the blade 130C, and the chain block 11 and the tilt climber 21 support the load of the blade 130C.

[0034] [3.5. Demolition process 5] Next, the connection between the chain block 11 and the blade 130C to be suspended is released. Specifically, as shown in Fig. 5, the suspension wire 13 of the chain block 11 inserted through the insertion hole 3A of the suspension plate 3 of the suspension jig 1 is removed. As a result, the load of the blade 130C is supported by the climber 21 alone.

[0035] [3.6. Demolition process 6] Next, as shown in FIG. 4, the blade 130C to be lowered is lowered to the ground by the chill climber 21.

[0036] In addition, in the dismantling process 6, instead of suspending the blade 130C to the ground by the chill climber 21, as shown in Figs. 6(A) and 6(B), the blade 130C may be transferred from the chill climber 21 to the crane 30 midway down and then suspended to the ground by the crane 30. At this time, the hoisting wire 31 attached to the hook at the tip of the boom 30A of the crane 30 is passed through the free insertion hole 3A of the suspension plate 3 and fixed. Then, when the boom 30A of the crane 30 is able to support the load, the hoisting wire 23 of the chill climber 21 is removed from the insertion hole 4A of the suspension piece 4 and the load is switched from the chill climber 21 to the crane 30.

[0037] Dismantling steps 1 to 6 are performed for each blade 130 to remove all of the blades 130. However, since the chain block 11 cannot be attached to the removed blades 130 in dismantling step 2, the chain block 11 is attached by attaching a jig such as an eye bolt to the flange hole where the removed blade 130 was attached.

[0038] [3.7. Demolition process 7] Next, a wind turbine construction stand 300 as shown in Figures 7 to 9 is constructed, for example, using only the main boom of the crane 30. The wind turbine construction stand 300 includes an inner stand 301 constructed in a position surrounding the tower 110 of the wind turbine 100, and an outer stand 302 constructed outside the inner stand 301 in a position surrounding the tower 110. Furthermore, four inner stand jacks 303 are provided on the outer stand 302, and the inner stand jacks 303 raise and lower the inner stand 301. As a result, the inner stand 301 rises relative to the outer stand 302, and the wind turbine construction stand 300 can be made taller.

[0039] The outer rack 302 is constructed on a rack girder 305 arranged on a rack mat 304. By providing the rack mat 304, the weight of the wind turbine construction rack 300 and the load of the components of the wind turbine 100 are widely distributed over the ground, making it possible to carry out construction even in places with weak bearing capacity. In addition, by providing the rack girder 305, the risk of the wind turbine construction rack 300 falling over is reduced.

[0040] A jack base 306 having eight jacks is fixed to the inner frame 301. As shown in Figs. 10(A) and (B), the jack base 306 includes a lower frame 307, a middle support member 308, and an upper support member 309. The lower frame 307 has a square shape in plan view and is the same size as the inner frame 301, and four corners 307A are fixed to the pillars of the inner frame 301. Four middle supports 308 are fixed to the lower frame 307 so as to span two sides of the lower frame 307. Four upper supports 309 are fixed to the middle supports 308. Lower jacks 311 are fixed to the four middle supports 308, respectively. Similarly, upper jacks 310 are fixed to the four upper supports 309, respectively. As a result, four upper jacks 310 and four lower jacks 311 are fixed to the jack base 306 in positions that do not overlap when viewed in a plane.

[0041] The wind turbine construction frame 300 is designed to be at a height where it can be assembled and disassembled using only the main boom of the crane 30 (no jib required) when the inner frame 301 is lowered to the lowest position. This reduces the time and cost required for assembling and dismantling the jib, and also shortens the time it takes for the crane to move between areas. In addition, by using lightweight temporary steel materials, the wind turbine construction frame 300 does not require the use of a large trailer for transporting it in and out, or a large crane for assembly and dismantling it.

[0042] [3.8. Demolition process 8] Next, the inner frame 301 of the wind turbine construction frame 300 constructed in the dismantling process 7 is raised horizontally (lifted up) by four inner frame jacks 303, and in this state, the inner frame 301 and the outer frame 302 are connected with steel materials (not shown). This improves the stability of the wind turbine construction frame 300 and prevents it from falling over due to strong winds, etc. By providing a work scaffold on the inner frame 301, work can be carried out safely at high altitudes.

[0043] [3.9. Demolition process 9] Next, suspension points are provided to tower member 111B and tower member 111C. Specifically, as shown in Figures 11(A) to (E), two steel members 312 each equipped with a suspension device 313 are inserted through the lower part of tower member 111B and the upper part of tower member 111C (i.e., near the joint between tower member 111B and tower member 111C) so as to intersect at right angles above and below. This provides four suspension points to each of tower member 111B and tower member 111C.

[0044] [3.10.Dismantling process 10] Next, tower member 111C (an example of the "lowest tower member") and tower member 111B (an example of the "tower member one step above the lowest") are separated (an example of a "separation process"). Note that dismantling process 10 may be performed after at least one of the following has been completed: the connection of tower member 111B to the four upper jacks 310 (see the following dismantling process 11), and the connection of tower member 111C to the four lower jacks 311 (see the following dismantling process 12). This allows the work to be performed stably, since at least one of tower member 111B and tower member 111C can be separated while supported by the jacks.

[0045] [3.11.Dismantling process 11] Next, the anchors on the hoisting wires 314 of the four upper jacks 310 are respectively connected to four hoisting devices (suspension points) 313 provided on the tower member 111B, and the load is lifted up (an example of a "supporting process"). As a result, the load of the wind turbine 100 components above the tower member 111B (tower member 111B, tower member 111A, nacelle 120, hub 140) is supported horizontally by the four upper jacks 310. Also, by lifting at four points with the four upper jacks 310, the load is less susceptible to the effects of wind, and load sway and rotation can be suppressed more than when lifting at one point with, for example, one crane.

[0046] [3.12.Dismantling process 12] Next, the anchors provided on the hoisting wires 314 of the four lower jacks 311 are connected to the hoisting devices (suspension points) 313 provided on the tower member 111C, respectively, and the tower member 111C is lifted up horizontally from the ground. Also, as with the upper jacks 310, lifting at four points with the four lower jacks 311 makes the load less susceptible to the effects of wind, and can suppress load sway and rotation more than when lifting at one point with one crane, for example.

[0047] [3.13.Dismantling process 13] Next, a dolly 315 is inserted between the tower member 111C that has been lifted in the dismantling step 12 and the ground, and then the tower member 111C is lowered horizontally by the four lower jacks 311 and placed on the dolly 315.

[0048] [3.14.Dismantling process 14] Next, as shown in FIG. 12(A), the tower member 111C is lowered by the four lower jacks 311 while the dolly 315 is pulled sideways by a winch (not shown), thereby laying the tower member 111C sideways.

[0049] [3.15. Demolition process 15] Next, the tower member 111C is hoisted by the four lower jacks 311 and the crane 30, and is loaded onto a trailer (not shown) while being removed from the wind turbine construction stand 300. Note that dismantling steps 14 and 15 are an example of a "transporting step".

[0050] [3.16.Dismantling process 16] Next, the suspension wires 314 of the four lower jacks 311 are disconnected from the tower member 111C.

[0051] [3.17.Dismantling process 17] Next, the four upper jacks 310 are used to lower the components of the wind turbine 100 above the tower member 111B (the tower member 111B, the tower member 111A, the nacelle 120, and the hub 140) to the ground (an example of a "wind turbine member lowering process"). As a result, the tower member 111B becomes the lowest tower member.

[0052] [3.18. Demolition process 18] Next, as shown in FIG. 12(B), dismantling steps 9 to 17 are repeated for tower member 111B and tower member 111A in the same manner as for tower member 111C, and they are carried out from wind turbine construction frame 300. In dismantling step 9, the tower member is resuspended between upper jack 310 and lower jack 311. Specifically, a steel material is passed through the upper part of tower member 111 at the lowest level (located at the lowest level; same below) and the lower part of tower member 111 one level above to provide suspension points, and lower jack 311 and upper jack 310 are connected with suspension wire 314. However, for tower member 111A at the top level, if it can be carried out from wind turbine construction frame 300 without changing suspension from upper jack 310 to lower jack 311, it may be carried out with its lower part suspended by upper jack 310.

[0053] [3.19. Demolition process 19] In dismantling process 17 for tower member 111B or tower member 111A, nacelle 120 descends to a nacelle mounting section (one example of a "mounting section") previously provided on the upper part of inner frame 301, and stops descending when nacelle 120 is placed on the nacelle mounting section. Then, after nacelle 120 is fixed to inner frame 301, nacelle 120 is separated from tower member 111A (one example of a "separation process").

[0054] [3.20.Dismantling process 20] Next, after the nacelle 120 and the tower member 111A are separated in a dismantling process 19, as shown in FIG. 12(C), dismantling processes 13 to 16 are carried out on the tower member 111A.

[0055] [3.21. Demolition process 21] Then, when removal of all the tower components 111 has been completed, next, as shown in FIG. 13(A), the inner frame 301 on which the nacelle 120 is placed and fixed is lowered by the inner frame jack 303 (an example of the "frame lowering process").

[0056] [3.22. Demolition process 22] 13(B), the nacelle 120 is dismantled using the crane 30 while it is placed on the inner frame 301. By placing the nacelle 120, which is the heaviest component of the wind turbine 100, on the inner frame 301 and lowering the inner frame 301, the lifting height required for dismantling is reduced and a smaller crane can be used for dismantling.

[0057] [3.23.Demolition process 23] Next, the wind turbine construction stand 300 is dismantled using the crane 30.

[0058] In this manner, in the method for dismantling the wind turbine 100 of this embodiment, the tower 110 is dismantled by repeatedly dividing and carrying out the tower member 111 located in the lowest tier in a manner similar to that of a Daruma-otoshi game. Note that, although the present embodiment has been described with respect to a case in which the tower 110 is composed of three tiers of tower members 111, this dismantling method can also be applied to a tower 110 composed of four or more tiers of tower members 111.

[0059] Here, an example of the flow of a method for dismantling the wind turbine 100 will be described with reference to the flowchart of FIG.

[0060] First, the blade 130 is removed from the hub 140 (step S1). Step S1 corresponds to the above-mentioned disassembly steps 1 to 6.

[0061] Next, the wind turbine installation stand 300 is constructed (step S2). Step S2 corresponds to the dismantling step 7 described above.

[0062] Next, the inner rack 301 is raised (step S3). Step S3 corresponds to the dismantling step 8 described above.

[0063] Next, the tower member 111 at the bottom level is separated from the tower member 111 one level above it (step S4). Step S4 corresponds to the dismantling step 10 described above.

[0064] Next, the members of the wind turbine 100 above the lowest tower member 111 are supported by the upper jack 310 (step S5). Note that before step S5 (preferably before step S4), suspension points are provided on the lowest tower member 111 and the tower member 111 one step above (corresponding to dismantling step 9 described above), the lowest tower member 111 is connected to the lower jack 311, and the tower member 111 one step above is connected to the upper jack 310. Step S5 corresponds to dismantling step 11 described above.

[0065] Next, the tower member 111 at the lowest stage is carried out from the wind turbine installation stand 300 using the lower jack 311 (step S6). Step S6 corresponds to the dismantling steps 12 to 15 described above.

[0066] Next, the members of the wind turbine 100 supported by the upper jacks 310 are lowered (step S7). Step S7 corresponds to the dismantling step 17 described above.

[0067] If the nacelle 120 is placed on the nacelle placement portion on the upper part of the inner frame 301 during step S7 (step S8: YES), the nacelle 120 is fixed to the inner frame 301 (step S9), the nacelle 120 is separated from the tower member 111A (step S10), and the tower member 111 supported by the upper jack 310 is lowered again (step S11). Steps S9 and S10 correspond to the dismantling process 19 described above, and step S11 corresponds to the dismantling process 17 described above.

[0068] On the other hand, if the nacelle 120 is not placed on the nacelle placement portion on the upper part of the inner frame 301 (step S8: NO), the process proceeds to step S12.

[0069] Next, if the remaining tower members 111 that have not been removed are not only the top tower member 111A (step S12: NO), proceed to step S4. On the other hand, if the remaining tower members 111 that have not been removed are only the top tower member 111A (step S12: YES), then the top tower member 111A is removed from the wind turbine installation frame 300 (step S13). Step S13 corresponds to dismantling steps 9 to 16 that are repeated in the above-mentioned dismantling step 18.

[0070] Next, the inner frame 301 is lowered together with the nacelle 120 (step S14). Step S14 corresponds to the dismantling step 21 described above.

[0071] Next, the nacelle 120 is dismantled on the inner frame 301 using the crane 30 (step S15). Step S15 corresponds to the dismantling step 22 described above.

[0072] Next, the wind turbine installation frame 300 is dismantled using the crane 30 (step S16). Step S16 corresponds to the dismantling step 23 described above.

[0073] As described above, the method for dismantling the wind turbine 100 according to the present embodiment includes the following steps: The wind turbine 100 includes an inner frame 301 (an example of a "first frame") constructed in a position surrounding the tower 110 of the wind turbine 100, an outer frame 302 (an example of a "second frame") constructed in a position surrounding the tower 110 and outside the inner frame 301, an inner frame jack 303 (an example of a "frame lifting means") provided on the outer frame 302 and used to raise and lower the inner frame 301, an upper jack 310 (an example of a "first lifting means") provided on the inner frame 301 and used to lift and lower the other tower members 111 above the lowest tower member 111 among the multiple tower members 111 constituting the tower 110 while suspending them (a "second lifting means"). The method for dismantling a wind turbine 100 using a wind turbine construction frame 300 equipped with a tower member 111 at the lowest tier and a tower member 111 one tier above the lowest tier (an example of a "dividing step"), a dismantling step 11 (an example of a "supporting step"), a state in which the inner frame 301 is raised up relative to the outer frame 302, supports the load of the wind turbine 100 members above the tower member 111 at the lowest tier by the upper jacks 310, and a dismantling step 14 and a dismantling step 15 (an example of a "transporting step"), a state in which the upper jacks 310 support the tower member 111 at the lowest tier and transport it from the wind turbine construction frame 300 while supporting it by the lower jacks 311.

[0074] Therefore, according to the method for dismantling wind turbine 100 of this embodiment, inner frame 301 and outer frame 302 are constructed in a double structure in a position surrounding tower 110 of wind turbine 100, and inner frame 301 rises up from outer frame 302, and while upper jacks 310 provided on inner frame 301 support the components of wind turbine 100 above tower component 111 at the lowest level of wind turbine 100, lower jacks 311 provided on inner frame 301 remove tower component 111 at the lowest level, so that a large area of ​​land for installing cranes, etc. is not required and a huge wind turbine can be dismantled even on a small amount of land.

[0075] Moreover, the method for dismantling the wind turbine 100 of this embodiment further includes, after the dismantling steps 14 and 15, a dismantling step 17 (one example of a "wind turbine member lowering step") in which the other tower members 111 above the carried-out tower member 111 are lowered by the upper jack 310. This allows the tower member one step above the previously carried-out tower member 111 to become the lowest tower member 111 to be carried out next.

[0076] Furthermore, in the method for dismantling the wind turbine 100 of this embodiment, dismantling step 10 (an example of a "dividing step"), dismantling step 11 (an example of a "supporting step"), dismantling step 14 and dismantling step 15 (an example of a "transporting step"), and dismantling step 17 (an example of a "wind turbine component lowering step") are repeated to transport all tower components 111 that make up the tower 110. This makes it possible to dismantle and transport all tower components 111 even in a small area without using a large crane or the like.

[0077] Furthermore, the dismantling method for wind turbine 100 of this embodiment further includes a dismantling process 19 (an example of a "separating process") in which inner frame 301 has a mounting portion at its top on which nacelle 120 installed on top of tower member 111A (an example of a "topmost tower member") can be placed, and in which tower member 111A and nacelle 120 are separated when nacelle 120 is placed on the mounting portion in dismantling process 17. This allows nacelle 120 to be separated from tower member 111A while nacelle 120 is in a stable state.

[0078] Furthermore, the method for dismantling the wind turbine 100 of this embodiment further includes a dismantling step 21 (an example of a "frame lowering step") in which the inner frame jacks 303 are lowered while the nacelle 120 is placed on the mounting section, so that the nacelle 120, which is one of the components of the wind turbine 100, can be stably moved downward and dismantled.

[0079] In dismantling process 11, it is sufficient that upper jack 310 is able to support the load of the components of wind turbine 100 above the lowest tower member 111, and upper jack 310 may support tower member 111A by setting a suspension point on tower member 111A as well as tower member 111B and lifting it up.

[0080] [4. How to assemble the windmill 100] Next, a method for assembling the wind turbine 100 using the wind turbine construction frame 300 will be described. Basically, the wind turbine 100 can be assembled by performing the above-mentioned method for dismantling the wind turbine 100 in reverse order. The method for assembling the wind turbine 100 will be described below.

[0081] [4.1. Assembly process 1] First, similarly to dismantling step 7 of the method for dismantling the wind turbine 100, the wind turbine construction stand 300 is constructed.

[0082] [4.2. Assembly process 2] Next, as shown in FIG. 13(B), the nacelle 120 is assembled on the inner frame 301 using the crane 30. When the nacelle 120 is completed, the nacelle 120 is fixed to the inner frame 301.

[0083] [4.3. Assembly process 3] Next, as shown in FIG. 13(A), the inner frame 301 on which the nacelle 120 is placed is raised horizontally by the inner frame jacks 303 (an example of a "frame raising step").

[0084] [4.4. Assembly process 4] Next, the tower member 111A is brought in by a trailer (not shown), and the four lower jacks 311 are connected to the upper part of the tower member 111A. Note that the tower member 111A is provided with a suspension point in advance (however, unlike the dismantling method, it is preferable to provide a suspension tool on the outer wall surface of the tower member 111, rather than providing a suspension point by penetrating a steel material, in consideration of strength and appearance). Next, the lower part of the tower member 111A is transferred from the trailer to the dolly 315.

[0085] [4.5. Assembly process 5] Next, as shown in FIG. 12(C), while the upper part of the tower member 111A is lifted by four lower jacks 311, the lower part of the tower member 111A is slid by the dolly 115, and the tower member 111A is slid inside the inner frame 301 and positioned in an upright position.

[0086] [4.6.Process 6] Next, with the upper part of tower member 111A suspended by lower jack 311, the suspension wire 314 of upper jack 310 is attached to a suspension point previously installed at the lower part of tower member 111A (however, unlike the dismantling method, in consideration of strength and appearance, it is preferable to install a suspension device on the outer wall surface of tower member 111 rather than installing a suspension point by penetrating steel material), thereby transferring the suspension from lower jack 311 to upper jack 310.

[0087] [4.7. Assembly process 7] Next, tower member 111A (an example of "a portion of tower members" or "the uppermost tower member") is lifted horizontally by four upper jacks 310 (an example of "the lifting process"), and the lifting is stopped when the upper part touches the nacelle 120.

[0088] [4.8. Assembly process 8] Next, the upper part of the tower member 111A is joined to the nacelle 120. Note that the assembly process 7 and the assembly process 8 are examples of a "nacelle joining process".

[0089] [4.9. Assembly process 9] Next, as shown in FIG. 12(B), assembly steps 4 and 5 are performed on tower member 111B, and tower member 111B is disposed below tower member 111A (an example of an "arrangement step").

[0090] [4.10. Assembly process 10] Next, tower member 111A and nacelle 120 (an example of "some of the tower members") are lowered horizontally using upper jack 310 and placed on top of tower member 111B (an example of "other tower members") that was placed in assembly process 9 (an example of a "mounting process").

[0091] [4.11. Assembly process 11] Next, the upper part of tower member 111B and the lower part of tower member 111A are joined together (an example of a "tower member joining process").

[0092] [4.12. Assembly process 12] Next, assembly process 6 is carried out on the tower member 111B.

[0093] [4.13. Assembly process 13] Next, tower member 111B and the tower member 111A above it (an example of "a portion of the tower members") are lifted horizontally by four upper jacks 310 (an example of a "lifting process"), and the lifting is stopped when space is created below in which tower member 111C can be placed.

[0094] [4.14. Assembly process 14] Next, as shown in FIG. 12(A), assembly steps 4 and 5 are performed on tower member 111C, and tower member 111B is disposed below tower member 111B (an example of an "arrangement step").

[0095] [4.15. Assembly process 15] Next, tower member 111A, tower member 111B and nacelle 120 (an example of "some of the tower members") are lowered horizontally by upper jack 310 and placed on top of tower member 111C (an example of "other tower members") that was arranged in assembly process 14 (an example of a "mounting process").

[0096] [4.16. Assembly process 16] Next, the upper part of tower member 111C and the lower part of tower member 111B are joined (an example of a "tower member joining process"). After tower member 111A, tower member 111B, and tower member 111C are joined to complete tower 110, tower 110 is lifted (jacked up) by upper jack 310 and suspended (jacked down) above the foundation to be fixed to the foundation.

[0097] [4.17. Assembly process 17] Next, the inner frame 301 is lowered, and then the wind turbine construction frame 300 is dismantled.

[0098] [4.18. Assembly process 18] Next, the three blades 130 are attached to the hub 140 using the crane 30 .

[0099] In this way, in the method of assembling the wind turbine 100 of this embodiment, the tower 110 is assembled by adding tower members 111 to the lowest position in a reverse manner to the Daruma-otoshi game. In this embodiment, the case where the tower 110 is composed of three stages of tower members 111 has been described, but this assembly method can also be applied to a tower 110 composed of four or more stages of tower members 111.

[0100] Here, an example of the flow of a method for assembling the wind turbine 100 will be described with reference to the flowchart of FIG.

[0101] First, the wind turbine construction frame 300, in which the inner frame 301 and the outer frame 302 are arranged, is constructed using the crane 30 so as to surround the position where the tower 110 is to be installed (step S51). Step S51 corresponds to the assembly step 1 of the assembly method described above.

[0102] Next, the nacelle 120 is fixed to the mounting portion of the inner frame 301 using the crane 30 (step S52), and the nacelle 120 is assembled on the mounting portion (step S53). Steps S52 and S53 correspond to the assembly process 2 of the assembly method described above.

[0103] Next, the inner frame 301 is raised together with the nacelle 120 (step S54). Step S54 corresponds to assembly step 3 of the assembly method described above.

[0104] Next, the top tower member 111A is carried into the wind turbine construction stand 300 and arranged in an upright state (step S55). At this time, the top tower member 111A is carried in and stood up while the upper part of the tower member 111A is suspended by the lower jack 311. Step S55 corresponds to the above-mentioned assembly process 4 and assembly process 5.

[0105] Next, the top tower member 111A is transferred from the lower jacks 311 to the upper jacks 310, and then the top tower member 111A is lifted up by the upper jacks 310 (step S56). Step S56 corresponds to assembly steps 6 and 7 of the assembly method described above.

[0106] When the uppermost tower member 111A and the nacelle 120 are raised to a height where they come into contact with each other, the uppermost tower member 111A and the nacelle 120 are joined together (step S57). Step S57 corresponds to assembly step 8 of the assembly method described above.

[0107] Next, the next tower member 111 is placed below the tower member 111 suspended (supported) by the upper jack 310 (step S58). The next tower member 111 refers to tower member 111B when the uppermost tower member 111A is suspended by the upper jack 310, and refers to tower member 111C when the middle tower member 111B is suspended by the upper jack 310. Step S58 corresponds to assembly step 9 of the assembly method described above.

[0108] Next, the tower member 111 suspended (supported) by the upper jack 310 is lowered and placed on the tower member 111 placed in step S58 (step S59). Step S59 corresponds to assembly step 10 of the assembly method described above.

[0109] Next, the tower member 111 arranged in step S58 and the tower member 111 placed in step S59 are joined together (step S60). Step S60 corresponds to assembly step 11 of the assembly method described above.

[0110] Next, if all tower members 111 have not been carried in (step S61: NO), the lower tower member 111 joined in step S60 is lifted by the upper jack 310 (step S62), and the process proceeds to step S58. Step S62 corresponds to assembly step 12 (assembly step 6) and assembly step 13 of the assembly method described above.

[0111] On the other hand, if all tower components 111 have been delivered (step S61: YES), the tower 110 is lifted (jacked up) by the upper jack 310, and then suspended (jacked down) over the foundation and fixed to the foundation (step S63). Step S63 corresponds to assembly step 16 of the assembly method described above. Next, the inner frame 301 is lowered (step S64), and the wind turbine construction frame 300 is dismantled using the crane 30 (step S65). Steps S64 and S65 correspond to assembly step 17 of the assembly method described above.

[0112] Next, the blades 130 are attached to the hub 140 (step S66). Step S66 corresponds to the assembly step 18 of the assembly method described above.

[0113] The method of assembling the wind turbine 100 of the present embodiment described above is a method of assembling the wind turbine 100 using a wind turbine construction frame 300 including an inner frame 301 (an example of a "first frame") constructed at a position surrounding the tower 110 of the wind turbine 100, an outer frame 302 (an example of a "second frame") constructed at a position surrounding the tower 110 and outside the inner frame 301, an inner frame jack 303 (an example of a "frame lifting means") provided on the outer frame 302 for lifting and lowering the inner frame 301, an upper jack 310 (an example of a "first lifting means") provided on the inner frame 301 for lifting and lowering some of the tower members 111 out of the multiple tower members 111 constituting the tower 110 in a suspended state, and a lower jack 311 (an example of a "second lifting means") provided on the inner frame 301 for lifting and lowering the other tower members 111 arranged below the some of the tower members in a suspended state. The assembly method includes assembly process 7 and assembly process 13 (an example of a "lifting process") in which some of the tower members 111 are lifted by the upper jacks 310 while the inner frame 301 is raised relative to the outer frame 302, assembly process 9 and assembly process 14 (an example of an "arrangement process") in which the other tower members 111 are placed in a suspended state by the lower jacks 311 below the some of the tower members lifted by the upper jacks 310, assembly process 10 and assembly process 15 (an example of a "placement process") in which some of the tower members 111 are lowered by the upper jacks 310 and placed on the other tower members 111 placed in assembly process 9 and assembly process 14, and assembly process 11 and assembly process 16 (an example of a "tower member joining process") in which some of the tower members 111 are joined to the other tower members 111 after assembly process 10 and assembly process 15.

[0114] Therefore, according to the method of assembling the wind turbine 100 of this embodiment, the inner frame 301 and the outer frame 302 are constructed in a double structure in a position surrounding the tower 110 of the wind turbine 100, the inner frame 301 rises up from the outer frame 302, and some of the tower components 111 are lifted by upper jacks 310 provided on the inner frame 301, and the other tower components 111 are placed in a suspended state by lower jacks 311 provided on the inner frame 301 below the other tower components 111, and some of the tower components 111 are placed on top of the other tower components 111 and joined, so that a large amount of land for installing cranes, etc. is not required and a huge wind turbine can be assembled even on a small amount of land.

[0115] In addition, in the method of assembling the wind turbine 100 of this embodiment, assembly process 7, assembly process 13 (an example of a "hoisting process"), assembly process 9, assembly process 14 (an example of an "arrangement process"), assembly process 10, assembly process 15 (an example of a "mounting process"), assembly process 11, and assembly process 16 (an example of a "tower component joining process") are repeated to assemble the tower 110. This makes it possible to assemble the tower 110 even on a small piece of land without using a large crane or the like.

[0116] Furthermore, the method of assembling the wind turbine 100 of this embodiment further includes an assembly step 3 (an example of a "mount raising step") in which the inner mount 301 has a mounting portion at its top on which the nacelle 120 installed on the top of the tower member 111A (an example of a "topmost tower member") can be placed, and the inner mount jack 303 raises the inner mount 301 with the nacelle 120 placed on the mounting portion, and an assembly step 7 and an assembly step 8 (an example of a "nacelle joining step") in which, after the assembly step 3, the upper jack 310 lifts the tower member 111A to a position where the tower member 111A can be joined to the nacelle 120, and joins the tower member 111A to the nacelle 120. This allows the nacelle 120, which is one of the components of the wind turbine 100, to be stably moved upward and joined to the tower member 111A.

[0117] As explained above, according to the dismantling and assembly method of the wind turbine 100 using the wind turbine construction frame 300 of this embodiment, the work area can be narrowed and the scope of application of construction can be expanded compared to the conventional construction method using an extra-large crane. Also, since construction can be done using only the boom of a small crane, there is no need to assemble a crane jib, and no space is required for assembling and dismantling the crane jib itself.

[0118] Furthermore, the wind turbine construction frame 300 can be designed according to the size of the wind turbine 100 and the conditions of the area. Even if the wind turbine 100 is large, the size of the crane remains almost the same, so fluctuations in construction costs can be suppressed.

[0119] Furthermore, while the wind turbine 100 is being dismantled on the wind turbine construction stand 300, the crane 30 can be engaged in work in another location, making it possible to carry out construction in two areas simultaneously, shortening the construction period and ultimately increasing the number of units that can be constructed per unit period, resulting in cost advantages.

[0120] Furthermore, in the conventional construction method using only a crane, work must be carried out inside the narrow space inside the wind turbine, but by erecting a work scaffold on the inner frame 301, the work area can be made larger, improving safety and workability.

[0121] [5. Modifications] Next, a modified example of the above embodiment will be described with reference to Figs. 16 to 27. In the above embodiment, when dismantling the wind turbine 100, as shown in Fig. 13(B), the inner frame 301, which is raised relative to the outer frame 302, is lowered together with the nacelle 120 (including the hub 140; the same applies in the following description of the modified example), and then the nacelle 120 is dismantled on the inner frame 301 using the crane 30. Also, when assembling the wind turbine 100, as shown in Fig. 13(B), the nacelle 120 is assembled on the inner frame 301 using the crane 30. In contrast, in this modified example, when dismantling, the lower part of the inner frame 301 is dismantled with the nacelle 120 placed thereon, and then the remaining upper part of the inner frame 301 is lowered together with the nacelle 120 to near the ground by the inner frame jack 303. During assembly, the nacelle 120 is assembled near the ground, and the nacelle 120 is raised together with the upper part of the inner frame 301 by the inner frame jack 303. In other words, by lowering and raising the nacelle 120 together with the upper part of the inner frame 301 between near the ground and near the upper part of the outer frame 302, work can be performed safely compared to dismantling and assembling the nacelle 120 near the upper part of the outer frame 302 (see FIG. 13(B)), i.e., at a high altitude. The modified example will be described in detail below. Note that the description of the modified example will focus on the differences from the above embodiment, and some descriptions of parts that overlap with the above embodiment will be omitted.

[0122] [5.1. Method of dismantling the wind turbine 100 in the modified example] As shown in Fig. 26, steps S21 to S34 in the modified example are similar to steps S1 to S14 (see Fig. 14) in the above embodiment, and therefore the description will be omitted. Note that Figs. 16, 17(A) and 17(B) correspond to the state in Fig. 13(B).

[0123] After step S34 in Fig. 26 (corresponding to step S14 in Fig. 14) is completed, the outer frame 302 is reinforced and divided (step S35). Specifically, as shown in Figs. 16 to 18, in order to reinforce the outer frame 302, outriggers 402 are provided at the bottom of the outer frame 302, and the number of supports of the outer frame 302 is increased. Note that by attaching the outriggers 402 when constructing the outer frame 302, the stability at the time of dismantling the wind turbine 100 can be improved. After the reinforcement of the outer frame 302 is completed, the beams 401 and braces (the upper brace on the front side, and the upper, middle and lower braces on the rear side) on the front and rear sides of the outer frame 302 are removed (an example of a "removal step"), so that both side surfaces of the outer frame 302 remain. As a result, there are no beams 401 or braces on the front and rear sides of the outer frame 302, and when the nacelle 120 is lowered together with the upper portion 301A of the inner frame 301, the nacelle 120 does not interfere with the beams 401 or braces.

[0124] Next, the inner frame jacks 303 are resuspended from the inner frame 301 (step S36). Specifically, as shown in Fig. 16, the hooks 403 of the four inner frame jacks 303 are attached to the lower end of the inner frame 301 in order to raise the inner frame 301, and after these are once removed and rolled up, the inner frame jacks 303 are resuspended by attaching them to the upper portion 301A of the inner frame 301 as shown in Fig. 18. This prevents the upper portion 301A from falling even if the lower portion of the inner frame 301 (the portion below the upper portion 301A) is dismantled in step S37.

[0125] Next, the lower part of the inner frame 301 is dismantled (step S37, an example of a "first frame dismantling process"). As a result, as shown in Fig. 18, the lower part of the inner frame 301 is removed, and the upper part 301A of the inner frame 301 is suspended together with the nacelle 120 by the inner frame jack 303.

[0126] Next, as shown in FIGS. 20, 21(A) and 21(B), the upper portion 301A of the inner frame 301 is lowered together with the nacelle 120 to the ground by the inner frame jack 303 (step S38) (an example of the "upper frame lowering process").

[0127] Next, as shown in FIG. 22, the hook 403 of the inner frame jack 303 is attached to the beam (nacelle carrying beam 404) of the upper part 301A of the inner frame 301 on which the nacelle 120 is placed, and the upper part 301A of the inner frame 301 is dismantled and removed, leaving behind the nacelle carrying beam 404 (an example of a "placement portion") (step S39).

[0128] Next, the nacelle 120 is carried out (step S40). Specifically, as shown in Fig. 23, the nacelle carrying vehicle 405 is carried in below the nacelle carrying beam 404, and then, as shown in Fig. 24, the nacelle 120 is lowered together with the nacelle carrying beam 404 by the inner frame jack 303 and loaded onto the nacelle carrying vehicle 405, and then, as shown in Fig. 25, the nacelle 120 is carried out together with the nacelle carrying beam 404 by the nacelle carrying vehicle 405. The nacelle 120 is transported by the nacelle carrying vehicle 405 to a nacelle dismantling site and dismantled.

[0129] Next, the outer frame 302 is dismantled and removed (step S41).

[0130] As described above, the method of dismantling the wind turbine 100 in the modified example includes the inner frame 301 (an example of a "first frame") constructed in a position surrounding the tower 110 of the wind turbine 100, the outer frame 302 (an example of a "second frame") constructed in a position surrounding the tower 110 and outside the inner frame 301, the inner frame jack 303 (an example of a "frame lifting means") provided on the outer frame 302 for lifting and lowering the inner frame 301, and the other tower members 111 provided on the inner frame 301 and above the lowest tower member 111 among the multiple tower members 111 constituting the tower 110. The method for dismantling a wind turbine 100 uses a wind turbine construction stand 300, which is provided with upper jacks 310 (an example of a "first lifting means") for lifting and lowering the tower member 111 in a suspended state, and lower jacks 311 (an example of a "second lifting means") that are provided on the inner stand 301 and lift and lower the tower member 111 in the lowest stage while it is suspended, and the inner stand 301 has a mounting portion at its top on which a nacelle 120 installed on the top of the tower member 111A (an example of a "topmost tower member") can be placed, the method including a dismantling step 10 (a "division step") of separating the tower member 111 in the lowest stage from the tower member 111 one stage above the bottom stage. dismantling process 11 (an example of a "support process") in which the load of the wind turbine 100 components above the lowest tower component 111 is supported by the upper jacks 310 while the inner frame 301 is raised above the outer frame 302; dismantling process 14 and dismantling process 15 (an example of a "carrying out process") in which the lowest tower component 111 is supported by the lower jacks 311 while the load is supported by the upper jacks 310 and is removed from the wind turbine construction frame 300; and dismantling process 14 and dismantling process 15 in which the other components above the tower component 111 carried out by the upper jacks 310 are removed after the dismantling process. dismantling process 17 (an example of a "wind turbine component lowering process") in which tower component 111A is lowered; dismantling process 19 (an example of a "separating process") in which, when nacelle 120 has been placed on the mounting section by dismantling process 17, tower component 111A and nacelle 120 are separated; dismantling process 21 (an example of a "frame lowering process") in which, with nacelle 120 placed on the mounting section, inner frame 301 in a raised state with inner frame jack 303 is lowered; and, after process 21, a process of dismantling the lower part of inner frame 301 while leaving upper part 301A of inner frame 301, with nacelle 120 placed on the mounting section (step S37).and after the process of dismantling the lower part of the inner frame 301, the inner frame jack 303 further lowers the upper part 301A of the inner frame 301 with the nacelle 120 placed on the placement section (step S38, an example of an "upper frame lowering process").

[0131] Therefore, according to the method of dismantling the wind turbine 100 in the modified example, the nacelle 120 is lowered to near the ground together with the upper part 301A of the inner frame 301 by the inner frame jack 303, so that the dismantling of the nacelle 120 can be carried out more safely than if it were to be carried out at a high altitude.

[0132] Furthermore, the method of dismantling the wind turbine 100 in the modified example includes a step (step S38, an example of a "removal step") of removing beams 401 and diagonal braces (an example of a "member") of the outer frame 302 that interfere when lowering upper portion 301A of the inner frame 301, before the step (step S38) of lowering upper portion 301A of the inner frame 301. This makes it possible to prevent the beams 401 and diagonal braces of the outer frame 302 from coming into contact with the nacelle 120 when lowering upper portion 301A of the inner frame 301 by the inner frame jack 303.

[0133] [5.2. Assembly method of the wind turbine 100 in the modified example] Next, a method for assembling the wind turbine 100 in the modified example will be described with reference to Figure 27 etc. Basically, the method for dismantling the wind turbine 100 in the modified example described above is performed in reverse order. Note that, as shown in Figure 27, steps S77 to S88 in the modified example are similar to steps S55 to S66 (see Figure 15) in the above embodiment, and therefore a description thereof will be omitted.

[0134] First, the outer frame 302 is constructed at the installation position of the wind turbine 100 (step S71). At this time, the beams 401 on the front and rear sides are not provided so as to prevent interference when the upper part 301A of the inner frame 301 and the nacelle 120 are raised. In other words, the outer frame 302 is constructed in a state where it is divided into left and right halves. In addition, a frame mat 304 and a frame girder 305 are provided under the outer frame 302.

[0135] Next, the upper part 301A of the inner frame 301 is constructed inside the outer frame 302 (an example of an "upper frame construction step"), and the nacelle 120 is placed and fixed thereon (step S72). The nacelle 120 may be constructed on the upper part 301A of the inner frame 301 constructed previously. Alternatively, the nacelle 120 constructed in advance may be carried inside the outer frame 302 using a nacelle transport vehicle 405 and a nacelle transport beam 404 (an example of a "mounting unit"), and then the nacelle transport beam 404 and the nacelle 120 may be lifted by the inner frame jack 303, and the nacelle transport beam 404 may be used as a part of the upper part 301A to construct the upper part 301A.

[0136] Next, the upper portion 301A of the inner frame 301 is raised together with the nacelle 120 by the inner frame jack 303 (step S73). Note that the hooks 403 of the four inner frame jacks 303 are attached to the upper portion 301A of the inner frame 301 in advance.

[0137] Next, the lower part of the inner frame 301 (the part below the upper part 301A) is constructed (step S74). At this time, the lower part of the inner frame 301 is grounded on the frame girder 305 so that the load of the inner frame 301 and the nacelle 120 is supported by the ground.

[0138] Next, the inner frame jacks 303 of the inner frame 301 are changed over (step S75). Specifically, since the hooks 403 of the four inner frame jacks 303 are attached to the upper portion 301A of the inner frame 301, these are once detached and lowered, and then, as shown in FIG. 16, they are attached to the lower end portion of the inner frame 301, thereby changing over the suspension.

[0139] Next, the divided outer frame 302 is integrated, and then the inner frame 301 is raised together with the nacelle 120 by the inner frame jack 303 until the inner frame 301 is raised above the outer frame 302 (step S76). The outer frame 302 is integrated by attaching the beams 401 on the front and rear sides. Then, the process proceeds to step S77.

[0140] As described above, the method of assembling the wind turbine 100 in the modified example includes the inner frame 301 (an example of a "first frame") constructed at a position surrounding the tower 110 of the wind turbine 100, the outer frame 302 (an example of a "second frame") constructed at a position surrounding the tower 110 and outside the inner frame 301, the inner frame jack 303 (an example of a "frame lifting means") provided on the outer frame 302 for lifting and lowering the inner frame 301, and the tacho (a type of a jack) provided on the inner frame 301 for lifting and lowering the inner frame 301. The tower member 111A (an example of the "topmost tower member") is attached to the inner frame 301 and is provided with an upper jack 310 (an example of a "first lifting means") for lifting and lowering some of the tower members 111 among the multiple tower members 111 constituting the tower 110 in a suspended state, and a lower jack 311 (an example of a "second lifting means") for lifting and lowering the other tower members 111 arranged below the tower members in a suspended state. The inner frame 301 is provided with a lifting means for lifting and lowering the other tower members 111 arranged below the tower members in a suspended state. The method for assembling the wind turbine 100 using the wind turbine construction frame 300 having a mounting portion on which the nacelle 120 installed on the upper portion can be placed includes a step of constructing the upper portion 301A of the inner frame 301 having the mounting portion (step S72, an example of a "frame upper portion construction step"); a step of raising the upper portion 301A of the inner frame 301 with the inner frame jack 303 while the nacelle 120 is placed on the mounting portion (step S73, an example of a "frame upper portion raising step"); After the step of raising the upper part 301A of the frame 301, there is a step of constructing the lower part of the inner frame 301 relative to the upper part 301A of the inner frame 301 (step S74, an example of a "lower frame construction step"); and after the step of constructing the lower part of the inner frame 301, there is a step of, with the nacelle 120 placed on the mounting section, using the inner frame jack 303 to raise the inner frame 301 until the inner frame 301 is raised above the outer frame 302 (step S76).assembly process 7 and assembly process 8 (an example of a "nacelle joining process") in which, after the process of raising the inner frame 301, the tower member 111A is lifted by the upper jack 310 to a position where it can be joined to the nacelle 120, and the tower member 111A and the nacelle 120 are joined; assembly process 7 and assembly process 13 (an example of a "lifting process") in which, with the inner frame 301 raised above the outer frame 302, some of the tower members 111 are lifted by the upper jack 310; The process includes assembly process 9 and assembly process 14 (an example of a "placement process"), in which other tower members 111 are placed below while suspended by lower jacks 311, assembly process 10 and assembly process 15 (an example of a "placement process"), in which some of the tower members 111 are lowered by upper jacks 310 and placed on top of the other tower members 111 placed in assembly process 9 and assembly process 14, and assembly process 11 and assembly process 16 (an example of a "tower member joining process"), in which some of the tower members 111 are joined to the other tower members 111 after assembly process 10 and assembly process 15.

[0141] Therefore, according to the method of assembling the wind turbine 100 in the modified example, the nacelle 120 assembled near the ground is raised together with the upper part 301A of the inner frame 301 by the inner frame jack 303, so that the assembly of the nacelle 120 can be carried out more safely than if it were to be carried out at a high altitude.

[0142] In the modified example, as shown in Figs. 16-18, in order to reinforce the outer frame 302, outriggers 402 are provided at the bottom of the outer frame 302, or the number of pillars of the outer frame 302 is increased. Alternatively, as shown in Fig. 28, reinforcing frames 410 may be constructed on the left and right of the outer side of the outer frame 302. Each of the left and right reinforcing frames 410 includes two reinforcing pillars 412 (one on the front side and one on the rear side), a reinforcing beam 411 connecting the reinforcing pillars 412 to the outer frame 302, a brace 413, a reinforcing beam 414 connecting the reinforcing pillars 412 on the front side and the reinforcing pillars 412 on the rear side, and an outrigger 402 fixed to the reinforcing pillars 412. The reinforcing beam 411 is provided horizontally between the pillars of the outer frame 302 and the reinforcing pillars 412. The bottom of the reinforcing pillars 412 is fixed to the foundation. By constructing a reinforcing frame 410, the strength of the outer frame 302 can be increased. [Explanation of symbols]

[0143] 1 Lifting jig 2. Lifting jig body 2A, 2B Main body parts 3 hanging board 3A Insertion hole 4 Hanging piece 4A Insertion hole 11 Chain block 12 Chain block mounting wire 13 Suspension wire 14 Jig holder 21 Chill Climber 22 Chill Climber mounting wire 23 Suspension Wire 30 Crane 30A Boom 31 Suspension Wire 100 windmills 110 Tower 111 (111A, 111B, 111C) Tower member 120 Nacelle 130 (130A, 130B, 130C) Blade 131 Flange 140 Hub 201 Gondola 202 Gondola Wire 300 Wind turbine construction stand 301 Inner stand 302 Outside mount 303 Inner stand jack 304 Mat for Mounting 305 Mounting Girder 306 Jack Base 307 Lower Frame 308 Middle support material 309 Upper support material 310 Upper Jack 311 Lower jack 312 Steel material 313 Hanging equipment 314 Suspension Wire 315 Trolley 401 Beam 402 Outrigger 403 Hook 404 Nacelle removal beam 405 Nacelle removal vehicle 410 Reinforced stand 411 Reinforced beam 412 Reinforcement pillar 413 Bracing

Claims

1. A first frame constructed in a position surrounding the wind turbine tower; A second rack constructed at a position surrounding the tower and outside the first rack; a platform lifting means provided on the second platform for lifting and lowering the first platform; a first lifting means provided on the first frame for lifting and lowering the tower members above the lowest tower member among the plurality of tower members constituting the tower in a suspended state; a second lifting means provided on the first frame for lifting and lowering the tower member at the lowest stage while the tower member is suspended; The first frame has a mounting portion at its top on which a nacelle installed at the top of the uppermost tower member can be mounted, a dividing step of dividing the tower member at the lowest level and the tower member one level above the lowest level; a supporting step of supporting a load of the wind turbine components above the lowest tower component by the first lifting means in a state in which the first frame is elevated relative to the second frame; a carrying-out process of carrying out the tower member at the lowest stage from the wind turbine construction frame while supporting the tower member at the lowest stage by the second lifting means in a state in which the load is supported by the supporting process; a wind turbine member lowering step of lowering the other tower members by the first lifting means after the carrying-out step; a separation process of separating the uppermost tower member from the nacelle when the nacelle is placed on the placement section by the wind turbine member lowering process; a platform lowering step of lowering the first platform in a raised state by the platform lifting means while the nacelle is placed on the platform; a first frame dismantling step of dismantling a lower part of the first frame while leaving an upper part of the first frame, with the nacelle placed on the placement section after the frame lowering step; a frame upper part lowering step in which, after the first frame dismantling step, the frame lifting means further lowers an upper part of the first frame with the nacelle placed on the placement section; A method for dismantling a wind turbine, comprising:

2. A method for dismantling a wind turbine according to claim 1, The method for dismantling a wind turbine, further comprising, before the step of lowering the upper part of the frame, a removal step of removing members of the second frame that interfere when the upper part of the first frame is lowered.

3. A first frame constructed in a position surrounding the wind turbine tower; A second rack constructed at a position surrounding the tower and outside the first rack; a platform lifting means provided on the second platform for lifting and lowering the first platform; a first lifting means provided on the first frame and configured to lift and lower a part of the tower members among a plurality of tower members constituting the tower in a suspended state; A second lifting means is provided on the first frame and lifts and lowers the other tower members that are arranged below the part of the tower members in a suspended state; The first frame has a mounting portion at its top on which a nacelle installed at the top of the uppermost tower member can be mounted, a frame upper part construction process for constructing an upper part of the first frame having the mounting portion; a frame upper portion raising step in which the frame lifting means raises an upper portion of the first frame in a state in which the nacelle is placed on the placement section; a frame lower part construction step of constructing a lower part of the first frame relative to an upper part of the first frame after the frame upper part lifting step; a frame lifting step in which, after the frame lower part construction step, the frame lifting means lifts the first frame in a state in which the nacelle is placed on the placement part; a nacelle joining step of lifting the uppermost tower member by the first lifting means to a position where the uppermost tower member can be joined to the nacelle after the frame lifting step, and joining the uppermost tower member to the nacelle; a lifting process of lifting the part of the tower members by the first lifting means in a state in which the first frame is elevated relative to the second frame; a placement step of placing the other tower members in a suspended state by the second lifting means below the part of the tower members lifted by the first lifting means; a placing step of lowering the part of the tower members by the first lifting means and placing the part of the tower members on the other tower members arranged in the placing step; a tower member joining step of joining the part of the tower members to the other tower members after the placing step.

Citation Information

Patent Citations

  • Method of construction of connection type columnar body

    JP1995197696A

  • Tower structure assembling method and tower structure assembling apparatus

    JP2005042313A

  • Construction method for towering structure

    JP2014020016A

  • Construction method of onshore wind power generation set

    JP2019152120A

  • Tower member building-up method and lifting-up tool used for tower member building-up method

    JP2021143599A