Fastening management method, system, and program thereof

A worker management system using big data to match skills with plant needs optimizes personnel allocation, improving safety and efficiency in plant maintenance by ensuring workers are correctly assigned to tasks.

JP7587593B2Active Publication Date: 2024-11-20VALQUA LTD

Patent Information

Application Number
JP2022547526
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-09-08
Filing Date
2021-09-01
Publication Date
2024-11-20
Estimated Expiration
2041-09-01

AI Technical Summary

Technical Problem

Existing systems struggle with efficiently allocating workers with appropriate skills to plant equipment maintenance tasks, leading to potential judgment errors and inefficiencies in scheduling and worker allocation, requiring extensive training and experience.

Method used

A management system that collects worker qualification and skill information as big data, matches worker skills with plant requirements, and generates personalized instruction information for optimal personnel allocation and task management.

Benefits of technology

Improves safety and efficiency by ensuring workers with the right skills are assigned to the right tasks, reducing errors and workload on managers, and enhancing the reliability of plant maintenance operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007587593000001
    Figure 0007587593000001
  • Figure 0007587593000002
    Figure 0007587593000002
  • Figure 0007587593000003
    Figure 0007587593000003
Patent Text Reader

Abstract

The present invention comprises: a step for obtaining identification information of a worker (10) and reading out, from a worker database (14), skill information that is registered in association with the identification information; a step for obtaining skill condition information and position information of a flange fastening part in a plant; a step for comparing the skill information of the worker with the skill condition information and assigning the worker to the flange fastening part; a step for generating instruction information which includes work setting information and the position information of the flange fastening part; and a step for notifying the worker of the instruction information. Thus it is possible to use collected skill information of workers to dispatch personnel to the most suitable locations in the plant, and achieve safety in the plant via assembly and maintenance work.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The technology disclosed herein relates to a management technology for assembly and maintenance, including fastening work of flanges used in plant facilities and the like. [Background technology]

[0002] In facilities such as plants, flange joints are used to connect pipes and to connect pumps to pipes. Gaskets are placed between the flange joints, and the flanges are fastened with bolts and nuts placed at multiple points between the flanges.

[0003] In facilities that use flanges, maintenance management, including management of the fastening condition of bolts and nuts, the sealing condition of gaskets, and other corrosion management of pipes and their connections, is important to ensure the safety of the facilities. This maintenance work cannot be performed adequately unless the worker is thoroughly familiar with fastening techniques, such as the torque required for tightening bolts and nuts, as well as the necessary check points for each facility.

[0004] As a technology for informing workers of the necessary knowledge and work contents for fastening processes and the like, and for monitoring the work status, there is known a technology that judges the fastening work of bolts using a torque wrench and outputs a warning signal based on values ​​measured by a wearable sensor worn by the worker (for example, Patent Document 1).In addition, in plant maintenance work management, there is known a technology that automatically creates schedules and reports by inputting necessary information (for example, Patent Document 2). [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2018-202570 A [Patent Document 2] Japanese Patent Application Publication No. 8-129414 Summary of the Invention [Problem to be solved by the invention]

[0006] Meanwhile, in the assembly and maintenance management of plant equipment, in order to find workers with the necessary knowledge, skills, and experience, planning the allocation of workers to work locations and formulating schedules requires veteran managers with advanced experience and a grasp of the overall plant condition. In formulating schedules and planning the allocation of workers, it is necessary to match the skills of the many workers assigned to the plant with the skills required for assembly and maintenance work, and combining this information requires a great deal of effort and time. There is a problem in that it takes a lot of experience and a long period of training to train managers with such advanced judgment skills.

[0007] In addition, there is also the issue that even experienced managers cannot completely eliminate errors in judgment when it comes to staff allocation and schedule management in plant management. For this reason, the introduction of non-personal management techniques is being promoted.

[0008] Therefore, the inventors of the technology disclosed herein have discovered that by collecting workers' qualification information, skill training information, work experience information, etc. in advance and converting them into big data, and then using this information to match the skills required for the plant where the work will be performed, it is possible to develop efficient personnel deployment plans.

[0009] The configurations disclosed in Patent Documents 1 and 2 cannot solve such problems.

[0010] Therefore, in consideration of the above problems and findings, an object of the technology disclosed herein is to utilize collected skill information of workers to allocate personnel to optimal locations in a plant and ensure the safety of the plant during assembly and maintenance work.

[0011] Another object of the technique of the present disclosure is to grasp the work status of assigned workers and to improve the work capabilities of workers at work locations that are not in line with the work process, thereby achieving process management and work efficiency. [Means for solving the problem]

[0012] In order to achieve the above object, one aspect of the fastening management method of the present disclosure includes: This is done by the management server, and when a worker arrives at work, starts work at the plant, or completes a work process, or when an additional work process occurs for the worker, Obtain worker identification information The process of , Based on the identification information, reading out the skill information registered in association with the identification information from the worker database; The above acquiring position information and skill condition information of a flange fastening portion of a plant; before The skill information is compared with the skill condition information, and The above A step of allocating workers, position information of the flange fastening portion, and , indicates either the work content, the tools used for the work, or the numerical conditions of the work, or two or more of them The method includes the steps of generating instruction information including work setting information, and notifying the worker of the instruction information.

[0013] In the above fastening management method, the management server includes a step of presenting a work management selection screen to the worker after assigning the worker to the flange fastening portion, and a step of generating a work setting screen including the work setting information based on a selection input for the identification information displayed on the work management selection screen, and presenting the work setting screen to the worker. The above fastening management method includes a step of collecting work information of the flange fastening section, a step of comparing the work information with process information set for the flange fastening section to determine the progress status, and a step of adjusting the work capacity for the flange fastening section based on the determination result and generating new instruction information.

[0014] The above-mentioned fastening management method includes a step of notifying a manager of the result of the determination of the progress state.

[0015] In order to achieve the above object, one aspect of the fastening management system of the present disclosure is to When a worker arrives at work, starts work or completes a work process at the plant, or when an additional work process occurs for the worker, an identification information acquisition means for acquiring identification information of a worker; and a worker database for registering the identification information of the worker and skill information of the worker in association with each other; The aboveA plant database in which position information and skill condition information of a flange fastening portion of a plant are stored, and the skill condition information is read out from the plant database, Based on the identification information The skill information is read out from the worker database, and the skill information is compared with the skill condition information to perform the above-mentioned operation on the flange fastening portion. The above Assigning a worker, position information of the flange fastening portion and , indicates either the work content, the tools used for the work, or the numerical conditions of the work, or two or more of them The system includes a control means for generating instruction information including work setting information, and a communication means for outputting the instruction information to a terminal device of the worker.

[0016] In the above-mentioned fastening management system, after the control means assigns the worker to the flange fastening section, it presents a work management selection screen to the worker, and based on the selection input for the identification information displayed on the work management selection screen, generates a work setting screen including the work setting information and presents it to the worker. In the above-mentioned fastening management system, the control means judges the progress status by comparing the work information collected from the flange fastening unit with the process information set in the flange fastening unit, and based on this judgment result, adjusts the work capacity for the flange fastening unit and generates new instruction information.

[0017] In order to achieve the above object, one aspect of the engagement management program of the present disclosure is a program realized by a computer, When a worker arrives at work, starts work at the plant, or completes a work process, or when an additional work process occurs for the worker, A function of reading the identification information of the worker from the identification information acquisition means, accessing the worker database, Based on the identification information, A function of reading skill information registered in association with the identification information, and accessing a plant database; The above A function of acquiring position information and skill condition information of a flange fastening part of a plant, and a function of comparing the skill information of a worker with the skill condition information to determine the position information and skill condition information of a worker with respect to the flange fastening part. The above Assigning a worker, position information of the flange fastening portion and , indicates either the work content, the tools used for the work, or the numerical conditions of the work, or two or more of them A function for generating instruction information including work setting information and a function for notifying the worker of the instruction information are realized by a computer.

[0018] In the above fastening management program, after assigning a worker to the flange fastening portion, the computer realizes the function of presenting a work management selection screen to the worker, generating a work setting screen including the work setting information based on a selection input for the identification information displayed on the work management selection screen, and presenting the work setting screen to the worker. In the above fastening management program, the computer realizes the functions of reading work information of the flange fastening section, comparing the work information with process information set for the flange fastening section to determine the progress status, and adjusting the work capacity for the flange fastening section and generating new instruction information based on the determination result. Effect of the Invention

[0019] According to the technology of the present disclosure, any of the following effects can be obtained.

[0020] (1) It is possible to assign workers with appropriate work skills to each work location in the plant, thereby reducing the workload of personnel assignment processing.

[0021] (2) Since workers with the necessary skills can be assigned to each work location, the safety of assembly, maintenance, and inspection work can be improved.

[0022] (3) The working status at each work location in the plant can be visualized, improving the reliability of plant assembly and maintenance management.

[0023] (4) By providing workers assigned to each work location with the instructions necessary for each work location, misunderstandings about the work content and work errors can be reduced.

[0024] Other objects, features, and advantages of the technology of the present disclosure will become more apparent with reference to the accompanying drawings and each embodiment. [Brief description of the drawings]

[0025] [Figure 1] 5 is a flowchart showing an example of a flange fastening management process according to the first embodiment. [Diagram 2] FIG. 1 is a diagram illustrating an example of the configuration of a fastening management system. [Diagram 3] FIG. 4 is a diagram illustrating an example of a worker database. [Figure 4]FIG. 2 is a diagram illustrating an example of a plant database. [Diagram 5] FIG. 4 is a diagram illustrating an example of a work status database. [Figure 6] 10 is a flowchart showing an example of a flange fastening management process according to the second embodiment. [Figure 7] FIG. 1 is a diagram illustrating an example of the configuration of a fastening management system. [Figure 8] FIG. 2 is a diagram illustrating an example of a hardware configuration of a fastening management system. [Figure 9] FIG. 4 is a diagram illustrating an example of a process information database. [Figure 10] FIG. 10A is a diagram showing an example of a selection screen for worker management, and FIG. 10B is a diagram showing an example of a selection screen for a worker in which identification information has been input. [Figure 11] FIG. 13 is a diagram showing an example of an operation confirmation screen for selected identification information. [Figure 12] FIG. 1A is a diagram showing setting information for an arranged work location, and FIG. 1B shows an example of a screen for transferring the setting information to a worker's terminal. [Figure 13] 1 shows an example of a work location in a plant. [Figure 14] 13 shows an example of tag information attached to an assigned work location. [Figure 15] FIG. 13 is a diagram illustrating an example of a configuration for setting instruction information in a tool. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0026] [First embodiment] Fig. 1 shows an example of a flange fastening management process according to the first embodiment. The process shown in Fig. 1 is an example of a fastening management method and a fastening management program of the present disclosure, and the technology of the present disclosure is not limited to such a configuration.

[0027] 1, this flange fastening management process includes, for example, a step (S101) of acquiring identification information 20 of a worker 10, a step (S102) of reading out registered skill information from a worker database (DB) 14, a step (S103) of acquiring position information and skill condition information of the flange fastening part of the plant, a matching process step (S104) of the flange fastening part and the worker 10, a generation process (S105) of instruction information, and a process step (S106) of notifying the worker 10 of the instruction information. This flange fastening management process is executed by a fastening management system 2 shown in FIG. 2, for example.

[0028] Step of acquiring identification information 20 of workers 10 (S101): The fastening management system 2 collects identification information 20 of the workers 10 working in the plant, for example, by the management server 4 having at least a worker allocation processing function. This identification information 20 is an example of information for individually identifying the workers 10 and authenticating those who have permission to enter and work in the plant.

[0029] The management server 4 uses, for example, biometric information of the worker 10, such as the face, retinal print, and fingerprint, as well as information registered on an ID card owned by the worker, as the identification information 20. The management server 4 collects the identification information 20, for example, when the worker 10 arrives at work, when work begins at the plant, when a work process is completed, when an additional work process occurs, and the like, and also collects the identification information 20 when determining whether the worker 10 is appropriately placed after being placed or during work.

[0030] Reading process (S102) of registered skill information from worker database (DB) 14: The management server 4 accesses DB (database) 6 provided in the fastening management system 2, and reads out the stored worker database 14. Then, the management server 4 reads out data associated with the collected identification information 20 of the worker 10.

[0031] Step of acquiring location information and skill condition information of the flange fastening parts of the plant (S103): The management server 4 accesses the plant database 16 stored in DB6, and reads out the location information of the flange fastening parts and the skill condition information required for the fastening, maintenance and inspection work from the equipment information that constitutes the plant.

[0032] Matching process process between flange fastening parts and workers 10 (S104): The management server 4 compares the information on the workers 10 read from the worker database 14 with the skill requirement information read from the plant database 16, and performs a matching process to assign the workers 10 to each work location in the plant.

[0033] The management server 4 matches the flange fastening location with the worker 10 by using at least the skill information among the information of the worker 10 registered in the worker database 14. Then, the management server 4 generates a work status database 18 in which the results of the matching process are registered, and stores the work status database 18 in DB6.

[0034] This matching process may be performed, for example, to set the location of a worker 10 who has not yet been assigned, or may be performed to appropriately determine the location of a worker 10 who is already engaged in assembly, maintenance, or management work.

[0035] Instruction information generation process (S105): The management server 4 generates instruction information including at least placement information for the work location for each worker 10 that has been matched. Furthermore, the instruction information may include, for example, information such as the type and name of the equipment installed at the work location, as well as setting information such as tool information used in the flange fastening work and tightening torque values.

[0036] Processing step of notifying instruction information to workers (S106): The management server 4 notifies each worker 10 of the generated instruction information, so that the worker can grasp the work location and obtain setting information necessary for the work. The instruction information may be displayed, for example, on the management server 4 or a shared terminal device (not shown) of the worker 10, or may be sent to the terminal device 12 possessed by each worker 10.

[0037] <Consolidation Management System 2> Fig. 2 shows the configuration of the fastening management system. The configuration shown in Fig. 2 is an example, and the technology of the present disclosure is not limited to such a configuration.

[0038] As shown in FIG. 2, the fastening management system 2 includes a management server 4, a DB 6 in which various databases are stored, a network 8, and terminal devices 12 for workers 10-1, 10-2, . . . 10-N.

[0039] The management server 4 is configured with a computer and executes management processes such as allocation processing of the workers 10 and monitoring processing of the work status. The management server 4 is equipped with an identification information acquisition means (not shown) that acquires the identification information 20 of the workers 10 at a set timing, for example. The identification information acquisition means may be, for example, an authentication device that performs authentication using biometric information of multiple workers 10-1, 10-2, ..., 10-N engaged in the assembly, maintenance, and management of the plant, a reader device that reads IC cards, or an input terminal into which IDs and passwords assigned to each of the workers 10-1, 10-2, ..., 10-N are input.

[0040] <Information processing on Management Server 4> The information processing performed by the management server 4 is, for example, A) Extraction and recording of worker information b) Extraction and recording of plant information C) Determining the allocation process and allocation status of workers 10 to work locations in the plant d) Collecting and determining the status and progress of plant operations E) Reassignment of workers 10 according to the work situation F) Generation of instruction information for the worker 10 G) Notification of instruction information to the terminal device 12 of the worker 10 H) Reporting and notification of work results for plant assembly, maintenance and management etc.

[0041] The DB 6 is an example of a storage means, and includes a storage unit built into the computer that constitutes the management server 4, as well as an external storage device connected to the management server 4, and the like.

[0042] The network 8 is an example of a means for performing data communication between the management server 4 and the terminal devices 12 of the multiple workers 10-1, 10-2, ..., 10-N, for example, by wire or wirelessly. This network 8 may utilize, for example, a public line, or a private line that is limited to be accessible only within the plant.

[0043] The terminal device 12 is an information processing device capable of performing data communication at least with the management server 4 and receiving and displaying instruction information, and includes, for example, a mobile phone, a mobile PC (Personal Computer), or other dedicated terminal devices used for fastening work.

[0044] <About Worker Database (DB) 14> FIG. 3 shows an example of the worker database.

[0045] The worker database 14 is an information source for workers 10 involved in, for example, the assembly, maintenance, and management of a plant, and registers information such as the identification and capabilities of the workers 10, their qualifications, and experience.

[0046] 3, the worker database 14 includes worker files 22-1, 22-2, ..., 22-N for each worker 10. Each worker file 22 includes a worker name section 24, an ID number section 26, an address information section 28, a date section 30, an instruction information section 32, a work history section 34, and a skill information section 36.

[0047] The worker name section 24 stores the name of the worker 10 .

[0048] The ID number section 26 stores ID (identification) information registered in the company to which the worker 10 belongs, or ID information registered when permission to enter or work in a plant is granted.

[0049] The address information section 28 includes, for example, email address information held by the worker 10, and is an example of information for receiving instruction information sent from the management server 4 to the terminal device 12 via email or directly via data communication.

[0050] The date section 30 stores information such as the date and time when the worker 10 engaged in the work, and the date and time when instruction information was notified to the management server 4, work report data was transmitted, and the like.

[0051] The instruction information section 32 stores work information including, for example, the work location and work content notified to each worker 10 from the management server 4, and setting information required for the work.

[0052] The work history section 34 stores, for example, the work content assigned to the worker 10 at the work location where the worker 10 is located, the progress of the work, and work report information input by the worker 10.

[0053] The skill information section 36 stores skill data of the worker 10. This skill data includes, for example, qualification information such as welding construction management, hazardous materials handling, fire protection equipment technician, and boiler engineer, as well as certified qualification information for having completed practical training using a flange and gasket fastening model, tool handling practical training, and other information on the fastening and other work that the worker 10 has experienced. In addition, this skill data may include information such as the number of years since obtaining a qualification or practical experience, the number of times a course has been attended, and the number of times a worker has worked.

[0054] <About Plant Database (DB) 16> FIG. 4 shows an example of a plant database.

[0055] This plant database 16 stores information such as the location of work in the plant and the details of fastening work. The plant database 16 includes, for example, a location information section 38, a work history section 40, a work target section 42, a repair period section 44, and a skill requirement information section 46.

[0056] The position information section 38 stores information that identifies the equipment and piping facilities installed in the plant, and is specified by categorizing each work location or work content, such as flange fastening work, inspection work of facilities and equipment, etc. In fastening management, for example, the position information stored in the position information section 38 is used as a task unit to assign a work location to each worker 10.

[0057] The work history section 40 stores history information that can identify the time when the assembly, maintenance, management, etc., of the equipment and facilities of the plant was performed.

[0058] The work target section 42 stores information on parts and tools used in flange fastening work, piping and equipment inspection work, etc. This work target includes, for example, model numbers of flanges and gaskets, diameters of piping, the number and nominal diameters of bolts and nuts, types of tools to be used, and other setting information such as torque values ​​to be set for tools when fastening bolts and nuts.

[0059] The maintenance period section 44 stores information such as the maintenance interval of the plant.

[0060] The skill condition information section 46 stores information on the work skills that the worker 10 must have acquired, related to the assembly, maintenance, and inspection of piping and equipment. The work skills, which are the skill conditions, include, for example, qualification information required for plant work, as well as conditions such as experience acquired in a training facility with a similar structure to this plant or flange.

[0061] The management server 4 compares the information in the skill requirement information section 46 with the skill information acquired by the worker 10, and selects the worker 10 who will be in charge of this work location.

[0062] <About Work Status Database (DB) 18> The work status database 18 is a workspace for performing personnel allocation processing of the workers 10 to work locations in the plant, and is also an example of work report information in which work status, results, etc. are stored. This work status database 18 includes work status files 50-1, 50-2, ... 50-N for each work day, as shown in Fig. 5. The work status files 50-1, 50-2, ... 50-N include, for example, a date section 52, a position information section 54, a skill condition information section 56, a worker ID section 58, a skill information section 60, a workload section 62, and a work capacity section 64.

[0063] The date section 52 stores date information on when fastening management is performed, and may also store time information on when the management data was updated.

[0064] Information indicating the work location of the plant that is the target of fastening management is stored in the location information section 54. This location information may be information read from the location information section 38 of the plant database 16, for example, or the data may be linked.

[0065] The skill requirements information section 56 stores skill information required for the assembly, maintenance, and inspection of plant equipment, piping, etc., and may store information read from the skill requirements information section 46 of the plant database 16, or the data may be linked.

[0066] The worker ID section 58 stores the name and ID information of the worker 10 who is assigned to the work position in the plant. This worker ID may be stored by reading out data from the worker name section 24 and the ID number section 26 of the worker database 14, for example, or may be linked to these information sections.

[0067] The skill information section 60 stores skill information possessed by the assigned worker 10. This skill information section 60 may store information read from the skill information section 36 of the worker database 14, for example.

[0068] The work load section 62 stores the work content to be performed by the worker 10 at each work location. This work content may, for example, be some or all of the information stored in the work target section 42 of the plant database 16, or may store load information calculated from this information. The load information may be, for example, information such as the number of times a bolt is tightened or the tightening torque value, as well as calculated information such as a predicted work time.

[0069] The work capacity section 64 stores information indicating the work status at each work location. For example, the work capacity may be a value calculated by comparing a work target value calculated using the information stored in the workload section 62 with an actual work result. This allows the management server 4 to determine the distribution state of work capacity relative to the workload for each work location, and use this information for processing such as reassignment of workers 10 and addition of personnel.

[0070] The management server 4 uses the information stored in the database 6 to assign and place workers 10 with appropriate skills to work locations in the plant. The management server 4 selects the workers 10 in charge by picking out workers 10 who have skill information corresponding to the skills required for the work stored in the skill condition information section 46 of the plant database 16, for example, and also determines whether the workers 10 already assigned are appropriate.

[0071] When selecting a worker 10, for example, if multiple workers 10 are nominated as candidates, conditions may be set such as the acquisition results and number of training sessions in practical training related to the plant equipment, as well as the recent date of the most recent training.

[0072] <Advantages of the First Embodiment> According to the first embodiment, one of the following effects can be obtained.

[0073] (1) By comparing the skill requirement information stored in the plant database 16 with the skill information registered in the worker database 14 and selecting workers 10 equipped with the necessary work skills and assigning them to the work site, the reliability of plant assembly work, maintenance work, and management work can be improved.

[0074] (2) By selecting workers 10 with the skills required for the work and assigning them to the work site, the safety of the plant can be improved.

[0075] (3) By collecting information on the workers 10 working in the plant and using this information to automatically assign personnel, the work site manager can be relieved of the trouble of allocating work responsibilities.

[0076] (4) By using the work status database 18, the personnel allocation and conditions, or the progress of the work of the workers 10, etc. can be easily grasped. This makes it possible to visualize the work status at each work location in the plant, thereby improving the reliability of the assembly and maintenance management of the plant.

[0077] (5) By matching the skill information of the workers 10 with the skill information required for the work location, appropriate allocation of workers 10 can be performed regardless of the manager's experience level.

[0078] (6) The experience information and qualification information of the workers 10 are stored in a database, and the information is combined to perform the allocation process of the workers 10. The management server 4 displays the results of the allocation process, thereby visualizing the allocation process and improving the reliability of plant management.

[0079] Second Embodiment Fig. 6 shows an example of a flange fastening management process according to the second embodiment. The process shown in Fig. 6 is an example, and the technology of the present disclosure is not limited to this process. In this flange fastening management process, S indicates some of the processes, and the numbers attached to S indicate an example of the order.

[0080] This flange fastening management process includes, for example, a worker information registration process f1 and a fastening management process f2, as shown in FIG.

[0081] The worker information registration process f1 includes, for example, a step of registering the identification information 20 of the worker 10 in the worker DB (S201), a step of registering the skill information of the worker 10 in association with the identification information 20 (S202), and a step of completing the registration of the worker information (S203).

[0082] The fastening management process f2 also includes, for example, an authentication process for the worker 10 (S204), a process for reading out skill information from the identification information 20 of the worker 10 (S205), a process for acquiring plant information and skill condition information from the plant DB (S206), a process for comparing the skill information with the skill condition information (S207), a process for assigning the worker 10 to a flange fastening section of the plant (S208), a process for acquiring progress information for each flange fastening section (S209), a process for determining the progress status (S210), and a process for adjusting the placement of the worker 10 (S211).

[0083] Step of registering identification information 20 of worker 10 in worker DB 14 (S201): The fastening management system 70, for example, by the management server 4, collects identification information 20 of the worker 10 working in the plant and registers it in the worker database 14.

[0084] Step of registering the skill information of the worker 10 by linking it to the identification information 20 (S202): The management server 4 registers the skill information obtained from each worker 10 or collected from other databases, etc., in the worker file 22 of the registered worker 10.

[0085] Worker information registration completion step (S203): The management server 4 registers the skill information and other information in the worker file 22 in association with the identification information 20 of the worker 10, and completes the worker information registration process f1.

[0086] Authentication process for worker 10 (S204): As part of the conclusion management process f2, the management server 4 collects and authenticates identification information 20 from the worker 10 in the process confirmation process for the timing of coming to work at the plant, the timing of determining the work location, and other work status.

[0087] Reading out skill information from the identification information 20 of the worker 10 (S205): The management server 4 reads out the skill information registered in the worker database 14 based on the identification information 20.

[0088] Step of acquiring plant information and skill condition information from the plant DB (S206): The management server 4 acquires the location information of the work location of the plant and the skill condition information required for the work location from the plant database 16. In the case of the work process judgment process, it is sufficient to read out the skill information corresponding to the work location where the worker 10 is located.

[0089] Comparing skill information with skill requirement information (S207): The management server 4 compares the skill information of the worker 10 with the skill requirement information of the work area, and classifies the worker 10 and the work area that match.

[0090] Step of assigning the worker 10 to the flange fastening portion of the plant (S208): The management server 4 assigns the worker 10 to the work location matching the skill information based on the comparison result of S207.

[0091] Acquiring process of progress information for each flange fastening part (S209): After the start of the plant assembly, maintenance, and inspection work, the management server 4 acquires the work progress information for each flange fastening part at a set timing or random timing. The work progress information includes, for example, work report data created by the worker 10 or his / her manager, and work information stored in the tools or the terminal device 12.

[0092] Progress status determination step (S210): The management server 4 reads out, for example, preset process information and compares it with work progress information. This work progress information may utilize, for example, workload information registered in the work status database 18.

[0093] Worker 10 allocation adjustment process (S211): If the progress is as expected (YES in S210), the management server 4 determines that the allocation of workers 10 is sufficient. This determination result may be registered in the work status database 18, for example.

[0094] Furthermore, if the progress is not as expected (NO in S210) and the work status is behind schedule relative to the process information, the management server 4 determines that the work capacity of the worker 10 is insufficient and instructs the replacement or increase in the number of workers of the worker 10.

[0095] If the work status is faster than the process information, the worker 10 may be maintained, or instruction information may be generated to present a new work location after the work is completed.

[0096] <Consolidation Management System 70> Fig. 7 shows the configuration of the fastening management system according to the second embodiment. The configuration shown in Fig. 7 is an example, and the technology of the present disclosure is not limited to such a configuration. In Fig. 7, the same parts as those in Fig. 2 are given the same reference numerals.

[0097] 7, in addition to the qualification information acquired by the worker 10, this fastening management system 70 stores certification information such as skill experience information 72 acquired at a flange fastening skill training device and skill certification information 74 indicating the acquisition of knowledge related to flange fastening and other plant maintenance and inspection work in the worker database 14. The worker database 14 also stores information on entry and exit to the plant, work permits, and ID tag 76 information including the authentication information of the worker 10.

[0098] The code information 78 of this ID tag 76 is provided with a two-dimensional code such as a QR code (registered trademark), and is linked to authentication information for the worker 10 and management authority information including access to the management server 4, etc.

[0099] Facial authentication information 80 is sent to the management server 4 as the identification information 20 of the worker 10 by an authentication device (not shown), and the authentication result and authentication information are also notified to the management server 4 by an ID card 82 attached to the worker 10.

[0100] The management server 4 assigns personnel to work locations in the plant based on the authentication information and skill information of the workers 10.

[0101] <About the hardware of the fastening management system 70> FIG. 8 shows an example of the hardware configuration of the fastening management system.

[0102] The control unit 84 is configured by a computer having a communication function. The control unit 84 includes, for example, a processor 86, a storage unit 88, a communication unit 90, and an input / output unit (I / O) 92.

[0103] The processor 86 executes an OS (Operating System) in the memory unit 88 and performs information processing to realize various programs such as a fastening management program including authentication processing of the worker 10, registration in the worker database 14, comparison processing between the skill information of the worker 10 and the skill condition information of the work area, and judgment processing of the work progress status.

[0104] The storage unit 88 is an example of a recording medium, and includes storage elements such as a ROM (Read-Only Memory) and a RAM (Random-Access Memory). The storage unit 88 stores an OS, various programs such as a program for executing the above-mentioned worker 10 placement process and instruction information generation, a worker database 14, a plant database 16, a work status database 18, and a process information database 94.

[0105] The communication unit 90 is a functional unit for transmitting and receiving information to and from an external database and the terminal device 12 provided to the worker 10 via wireless communication.

[0106] Under the control of the processor 86, the I / O 92 displays instruction information on the information presentation unit 102 and also inputs information from the operation input unit 104. In addition, the I / O 92 is connected to an identification information input unit 96, an external DB 98, a fastening tool 100, a terminal device 12, and the like that constitute the fastening management system 70, by wire or wirelessly.

[0107] The identification information input unit 96 is an example of a means for taking in the identification information 20 of the worker 10 and performing authentication processing, and is composed of, for example, an imaging device for taking a face image, an authentication device, and the like.

[0108] The external database 98 includes, for example, a database of a management computer of a flange fastening training device or an organization that conducts fastening training, and stores information on the qualifications and skills acquired by the worker 10.

[0109] The fastening tool 100 is a tool used by the worker 10 at a work site, and setting information such as a tightening torque value to be notified to the worker 10 is input from the control unit 84. The fastening tool 100 includes tools such as a torque wrench and a nut runner into which various work data can be input and set.

[0110] The information presentation unit 102 is an example of a means for displaying the overall operating status of the fastening management system 70 and information on the work location to be notified to the worker 10, and is configured, for example, with an information presentation device such as an LCD (Liquid Crystal Display).

[0111] The operation input unit 104 is an example of a means for inputting setting conditions for the management server 4 and authentication information such as the ID number of the worker 10, and includes an operation means such as a keyboard or a touch panel.

[0112] <About Process Information Database (DB) 94> FIG. 9 shows an example of the process information database.

[0113] This process information database 94 is an example of management data including, for example, plant assembly, maintenance, and management work processes and work statuses, and is an information source used for determining the work capacity for each work location.

[0114] The process information database 94 includes, for example, a flange fastening section 106, a worker section 108, a work time section 110, a work amount section 112, a set time section 114, and a work status section 116, as shown in FIG.

[0115] The flange fastening section 106 stores information on the position of the flange to be fastened, as well as information on the work target such as the flange, gasket, bolts, and nuts.

[0116] The worker section 108 stores identification information 20 of the worker 10 positioned at the flange fastening section.

[0117] The work time section 110 stores time information on flange fastening, maintenance, and inspection work. This work time section 110 includes, for example, a start time section 1101 and an elapsed time section 1102. For example, when determining the progress of work, the management server 4 uses the information stored in the work time section 110 to compare a preset work set time with the elapsed time.

[0118] The workload section 112 stores information such as the work content performed by the worker 10 at the flange fastening section. This workload section 112 may store information stored in the workload section 62 of the work status database 18, for example, or may link data.

[0119] For example, scheduled work time information for a flange fastening portion is stored in the set time section 114. This scheduled work time information is an example of comparative information for determining the progress of a process, and may be set based on time information required for past assembly, maintenance, and inspection, for example.

[0120] The work status section 116 stores the progress status determined by the management server 4.

[0121] <About the contract management processing screen> 10, 11 and 12 show examples of the connection management processing screen.

[0122] The information presentation unit 102 of the management server 4 displays a selection screen 120 for worker management, as shown in, for example, A of Fig. 10. This selection screen 120 includes, for example, an "ID automatic search" operation unit 122 for transitioning to a search process for the worker 10, and a "person in charge determination" operation unit 124 for transitioning to an allocation process for the worker 10.

[0123] The worker 10, for example, accesses the management server 4, and selects and operates the "ID automatic search" operation section 122 or the "person in charge determination" operation section 124 from the selection screen 120.

[0124] For example, when the "ID automatic search" operation section 122 is selected, the management server 4 transitions to an ID card selection screen 130 as shown in Fig. 10B. This ID card selection screen 130 includes list information 132 of workers 10 selected by, for example, reading their ID cards or by biometric authentication information. The worker 10 can select his or her own ID card information from the list information 132, for example.

[0125] When a specific ID card information is selected from the information included in the list information 132, the management server 4 generates a confirmation screen 140 as shown in FIG.

[0126] This confirmation screen 140 includes, for example, a selection operation section 142 for confirming the start of bolting setting, together with some or all of the selected ID card information. The worker 10 selects and inputs either "Yes" or "No" in the selection operation section 142.

[0127] Next, the management server 4 transitions to bolting setting processing through input from the selection operation unit 142, and generates a tightening work setting screen 150. This tightening work setting screen 150 includes, for example, as shown in A of Fig. 12, a setting information unit 152 for the flange fastening portion in charge of the worker 10, and an instruction information generation operation unit 154 for transferring this setting information to the terminal device 12, other devices, tools, etc.

[0128] The setting information section 152 includes information such as the target axial force or torque value for tightening, the name of the flange, the type, size and number of bolts, and the type of gasket.

[0129] The instruction information generating operation section 154 includes a selection section for selecting whether to import or export the setting information included in the setting information section 152 .

[0130] When an operation is performed on the instruction information generation operation unit 154, the management server 4 displays an instruction information generation process decision screen 156 as shown in FIG. 12B, and prompts the user to select whether or not to transfer the setting information to the terminal device 12.

[0131] <About the work area of ​​the plant> FIG. 13 shows an example of work locations set in a plant.

[0132] This plant facility 160 is composed of a plurality of pipes and equipment, for example, as shown in Fig. 13. The fastening management process of the present disclosure includes the allocation process of workers 10 with specialized skills and knowledge to flange fastening parts that connect these pipes together, and to work sites such as the assembly, maintenance, and inspection of equipment.

[0133] In this plant facility 160, work locations are divided, for example, by flange fastening parts or equipment located within one or a certain distance range, and work location identification information 162A, 162B, ... 162G is set for each work location.

[0134] 14, for example, in this work area, pipes each having a flange joint at the tip are connected to each other in a flange fastening section 170, and the flange joint is fastened with a bolt and a nut. Also, in this flange fastening section 170, a tag 172 is attached, for example, to a part of the pipe or the surface of the flange joint.

[0135] On this tag 172, access information such as a two-dimensional code that can be read by the terminal device 12 of the worker 10, for example, is printed.

[0136] By reading the access information of tag 172, for example, with terminal device 12, worker 10 can obtain information such as work location identification information 162C, the model number of the flange joint, the number of bolts and nuts to be fastened, and the diameter of the pipes, either directly or through a management server 4.

[0137] <About fastening work> FIG. 15 shows an example of a configuration for setting instruction information in a tool.

[0138] When the management server 4 completes the process of arranging the worker 10, it notifies the terminal device 12 of the work location and instruction information including setting information required for the work. This setting information includes information such as the axial force and tightening torque value required for fastening the bolts and nuts.

[0139] When the worker 10 receives instruction information at the terminal device 12, the worker 10 inputs setting information required for the fastening work to the controller 174, for example, as shown in FIG.

[0140] This controller 174 is a device for controlling a fastening tool 176 used in the fastening work, and inputs control instructions such as a tightening torque value T1 to the fastening tool 176 via a cable 178. The controller 174 is provided with a display screen 180 that displays, for example, setting information, operation contents, and the state of the fastening tool 176, and an operation input unit 182 for inputting setting operations, numerical information, and the like.

[0141] The fastening tool 176 performs the fastening process of the flange fastener 170 based on the setting information inputted through the controller 174 .

[0142] In this flange fastening portion 170, for example, a gasket 186 is sandwiched between flanges 184A and 184B which are connecting means, and bolts 188 (188A, 188B, 188C) and nuts 190 (190A, 190B, 190C) are arranged at a plurality of fastening points set on the periphery.

[0143] For example, eight fastening points are set on the periphery of flanges 184A, 184B. That is, eight bolts 188 and nuts 190 are fastened to flanges 184A, 184B at equal intervals, for example, at an angle of θ=45°. Gasket 186 is placed in contact with the opposing surfaces of flanges 184A, 184B and does not overlap with flow paths such as piping.

[0144] The instruction information also includes, for example, information on the tightening sequence and the number of tightenings and the increase in the tightening torque value for the bolts 188 and nuts 190 arranged on the periphery of the flanges 184A, 184B to gradually tighten the bolts.

[0145] In addition, in the fastening management process, the position of the fastening tool 176 relative to the flange fastening portion 170, the tightening sequence, etc. may be monitored by, for example, the controller 174, the terminal device 12, or other work status monitoring means not shown, and notified to the management server 4.

[0146] <Advantages of the second embodiment> According to this configuration, the following effects can be obtained.

[0147] (1) The same effects as in the first embodiment can be obtained.

[0148] (2) By utilizing the process information database 94 to determine the progress of work, the work efficiency and work capacity of the worker 10 can be managed, and the efficiency of plant assembly, maintenance, and inspection work can be improved.

[0149] (3) By adjusting the placement of the workers 10 according to the progress of each work area, the workload is prevented from being concentrated in certain work areas, which contributes to reducing the workload of the workers 10 and preventing work errors caused by a large amount of labor.

[0150] (4) By judging the work ability, the skills of the assigned worker 10 can be evaluated and fed back, thereby improving the efficiency of the practical training.

[0151] As described above, the most preferred embodiment of the technology of the present disclosure has been described. The technology of the present disclosure is not limited to the above description. Various modifications and changes are possible for those skilled in the art based on the gist of the invention described in the claims or disclosed in the description of the embodiment. It goes without saying that such modifications and changes are included in the scope of the technology of the present disclosure. [Explanation of symbols]

[0152] 2, 70 Fastening Management System 4 Management Server 6 DB 8 Network 10 10-1, 10-2, ... 10-N Worker 12 Terminal Equipment 14 Worker database (DB) 16 Plant Database (DB) 18 Work Status Database (DB) 20 Identification Information 22-1, 22-2, 22-N Worker file 24 Worker Name 26 ID number section 28 Address information section 30 Date section 32 Instruction information section 34, 40 Work History Section 36, 60 Skills Information Department 38, 54 Location information section 42 Working area 44 Repair Period Department 46 Skill Condition Information Department 50-1, 50-2, 50-N Work status file 52 Date section 56 Skill Condition Information Department 58 Worker ID section 62 Workload Section 64 Work Capacity Department 72 Skills and experience information 74 Skills Certification Information 76 ID Tags 78 Code Information 80 Face Recognition Information 82 ID Card 84 Control Unit 86 processors 88 Memory section 90 Communications Department 92 I / O 94 Process Information Database (DB) 96 Identification information input section 98 External DB 100, 176 Fastening tools 102 Information presentation section 104 Operation input section 106 Flange fastening part 108 Workers' Department 110 Working Time Section 1101 Start time section 1102 Elapsed time section 112 Work amount department 114 Setting time section 116 Work Status Section 120 Selection Screen 122 "Automatic ID search" operation section 124 "Person in charge" operation section 130 ID card selection screen 132 List Information 140 Confirmation Screen 142 Selection operation section 150 Fastening work setting screen 152 Setting information section 154 Instruction information generation operation section 156 Instruction information generation process decision screen 160 Plant Facilities 162A~162G Work location identification information 170 Flange fastening part 172 Tags 174 Controller 178 Cable 180 display screen 182 Operation input section 184A, 184B flanges 186 Gasket 188A, 188B, 188C Bolts 190A, 190B, 190C Nuts

Claims

1. Performed by a management server, acquiring identification information of a worker when the worker arrives at work, starts work or completes a work process in the plant, or when an additional work process is generated for the worker; reading out skill information registered in association with the identification information from a worker database based on the identification information; acquiring position information and skill requirement information of a flange fastening portion of the plant; comparing the skill information with the skill condition information and allocating the worker to the flange fastening portion; generating instruction information including position information of the flange fastening portion and work setting information indicating any one or more of a work content, a tool to be used for the work, and a numerical condition of the work; notifying the operator of the instruction information; A fastening management method comprising:

2. the management server presents a work management selection screen to the worker after assigning the worker to the flange fastening portion; generating a work setting screen including the work setting information based on a selection input for the identification information displayed on the work management selection screen, and presenting the work setting screen to the worker; The fastening management method according to claim 1, further comprising:

3. Collecting work information on the flange fastening portion; a step of comparing the work information with process information set in the flange fastening portion to determine a progress state; a step of adjusting the work capacity for the flange fastening portion based on the result of the judgment and generating new instruction information; The fastening management method according to claim 1 or 2, further comprising:

4. 4. The method for managing completion according to claim 3, further comprising a step of notifying an administrator of the result of the determination of the progress state.

5. An identification information acquisition means for acquiring identification information of a worker when the worker arrives at work, starts work or completes a work process in a plant, or when an additional work process occurs for the worker; a worker database in which the identification information of the worker and skill information of the worker are registered in association with each other; a plant database in which position information and skill condition information of flange fastening parts of the plant are stored; a control means for reading out the skill condition information from the plant database, reading out the skill information from the worker database based on the identification information, comparing the skill information with the skill condition information, assigning the worker to the flange fastening portion, and generating instruction information including position information of the flange fastening portion and work setting information indicating one or more of the work content, the tools used in the work, and the numerical conditions of the work; a communication means for outputting the instruction information to a terminal device of the worker; A fastening management system comprising:

6. The fastening management system described in Claim 5, characterized in that after assigning a worker to the flange fastening portion, the control means presents a work management selection screen to the worker, and generates a work setting screen including the work setting information based on a selection input for the identification information displayed on the work management selection screen, and presents it to the worker.

7. The fastening management system described in claim 5 or claim 6, characterized in that the control means judges the progress status by comparing the work information collected from the flange fastening unit with the process information set in the flange fastening unit, and based on the judgment result, adjusts the work capacity for the flange fastening unit and generates new instruction information.

8. A program implemented by a computer, A function of reading the identification information of the worker from the identification information acquisition means when the worker arrives at work, starts work or completes a work process in the plant, or when an additional work process occurs for the worker; a function of accessing a worker database and reading skill information registered in association with the identification information based on the identification information; A function of accessing a plant database and acquiring position information and skill condition information of a flange fastening portion of the plant; a function of comparing the skill information of a worker with the skill condition information, allocating the worker to the flange fastening portion, and generating instruction information including position information of the flange fastening portion and work setting information indicating any one or more of the work content, the tools used in the work, and the numerical conditions of the work; a function of notifying the operator of the instruction information; A fastening management program characterized by realizing the above by a computer.

9. A function of presenting a work management selection screen to the worker after the worker is assigned to the flange fastening portion, generating a work setting screen including the work setting information based on a selection input for the identification information displayed on the work management selection screen, and presenting the work setting screen to the worker; 9. The fastening management program according to claim 8, wherein the program is implemented by the computer.

10. a function of reading work information of the flange fastening unit, and comparing the work information with process information set in the flange fastening unit to determine a progress state; a function of adjusting the work capacity for the flange fastening portion based on the result of the judgment and generating new instruction information; 10. The fastening management program according to claim 8, wherein the program is implemented by a computer.

Citation Information

Patent Citations

  • Management device for plant maintenance work

    JP1996129414A

  • Production control system

    JP1999300585A

  • Operation management system

    JP2001128202A

  • Device and program for determining flange fastening skill

    JP2015217497A

  • Fastening operation management device

    JP2018202570A

Cited By

  • Management methods and management systems

    JP2026172245A

  • Management method and management system

    JP7821353B1